JP2017514247A5 - - Google Patents

Download PDF

Info

Publication number
JP2017514247A5
JP2017514247A5 JP2017502918A JP2017502918A JP2017514247A5 JP 2017514247 A5 JP2017514247 A5 JP 2017514247A5 JP 2017502918 A JP2017502918 A JP 2017502918A JP 2017502918 A JP2017502918 A JP 2017502918A JP 2017514247 A5 JP2017514247 A5 JP 2017514247A5
Authority
JP
Japan
Prior art keywords
project
projects
resource
dependent
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017502918A
Other languages
English (en)
Other versions
JP2017514247A (ja
JP6564015B2 (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/US2015/022448 external-priority patent/WO2015148641A1/en
Publication of JP2017514247A publication Critical patent/JP2017514247A/ja
Publication of JP2017514247A5 publication Critical patent/JP2017514247A5/ja
Application granted granted Critical
Publication of JP6564015B2 publication Critical patent/JP6564015B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Claims (16)

  1. プロセッサによって、複数のプロジェクトにアクセスすることと、
    前記プロセッサによって、前記複数のプロジェクトのうち少なくともプロジェクトのサブセットを完了する時間の長さを示す計画対象期間にアクセスすることと、
    前記プロセッサによって、複数の資源であって、前記複数の資源の各資源が前記複数のプロジェクトの少なくとも1つのプロジェクトを完了するために前記資源によって実行可能である1つまたは複数の機能を特定する前記複数の資源にアクセスすることと、
    前記プロセッサによって、前記複数の資源の各資源について、各資源を前記複数のプロジェクトにわたって利用することが可能である最大利用可能容量を示す予算支出にアクセスすることと、
    前記プロセッサによって、前記複数のプロジェクトの各プロジェクトについて、前記プロジェクトを完了することに関連する費用の制約にアクセスすることと、
    前記プロセッサによって、前記複数のプロジェクトの各プロジェクトについて、前記プロジェクトを完了することで得られる利益の量を示す利益値にアクセスすることと、
    前記プロセッサによって、前記複数のプロジェクトの他のプロジェクトの完了の要件として前記複数のプロジェクトの中のどのプロジェクトを完了させなければならないかを示すプロジェクト依存値の集合にアクセスすることと、
    前記プロセッサによって、前記プロジェクト依存値の集合に基づいて、完了される前記複数のプロジェクトの中のプロジェクトの順序を示す複数の依存経路を決定することであって、少なくとも1つの依存経路内のプロジェクトは、前記少なくとも1つの依存経路内の先行するすべてのプロジェクトが完了するまで開始されることができないことと、
    前記プロセッサによって、各依存経路の順位付けを決定することであって、前記順位付けは、各依存経路のプロジェクトの合計値に基づくことと、
    前記プロセッサによって、前記計画対象期間内の前記複数の依存経路の中からの依存経路の効率的な選択を、各依存経路の依存経路順位付けと前記意依存経路の各プロジェクトの前記費用の制約との間の比較に基づいて決定し、
    前記プロセッサによって、前記複数の資源の効率的な利用を決定して、各資源についての前記予算支出によって制約される、前記依存経路の効率的な選択を完了することとを含む、方法。
  2. 前記少なくとも1つの依存経路を決定することは、
    前記複数のプロジェクトを複数のクラスタに分割することと、
    前記クラスタ内の各プロジェクトについて、前記クラスタ内の前記プロジェクトに関連した前記プロジェクト依存値によって結びつけられる前記複数のプロジェクトの中の一連のプロジェクトを示す、各クラスタについてのクラスタ依存経路を計算することと、
    前記クラスタ依存経路の併合操作を実行して前記少なくとも1つの依存経路を生成することと、
    前記併合操作中に前記少なくとも1つの依存経路と関連しない少なくとも1つの前記クラスタ依存経路の少なくともサブセットをプルーニングすることとを含む、請求項1記載の方法。
  3. 前記併合操作は、少なくとも2つのクラスタ依存経路をともに接続することを含み、接続される前記少なくとも2つのクラスタ依存経路の選択は、前記少なくとも2つのクラスタ依存経路の中で共通している少なくとも1つのプロジェクトに基づく、請求項1から2のいずれかに記載の方法。
  4. 前記少なくとも1つの依存経路を決定することは、
    前記プロジェクト依存値の集合に基づいて第1の依存経路を決定することと、前記プロジェクト依存値の集合に基づいて第2の依存経路を決定することと、前記第1および第2の経路依存性の予測収益間の比較に基づいて前記第2の依存経路に対して前記第1の依存経路を順位付けすることと、前記計画対象期間によって制約される予定表に沿って、前記プロジェクトを、前記予定表に沿って前記第2の依存経路に前記プロジェクトを割り当てる前に前記第1の依存経路に割り当てることとを含む、請求項1から3のいずれかに記載の方法。
  5. 前記完了される複数のプロジェクトの中からの前記プロジェクトの効率的な選択を決定することは、前記計画対象期間によって制約される予定表上のプロジェクトについて効率的な配置を決定することを含み、前記効率的な配置は、前記プロジェクト完了にかかる時間長と、前記プロジェクト完了に必要な資源量と、前記プロジェクトにかかる最大財務費用を規定するプロジェクト予算とに基づく、請求項1から4のいずれかに記載の方法。
  6. 前記プロジェクトについて前記効率的な配置を決定することは、前記資源を前記プロジェクト内のロールとマッチングすることと、前記ロールとマッチングされる前記資源の選択を優先することと、前記資源とマッチングされる前記ロールの選択を優先することとを含む、請求項1から5のいずれかに記載の方法。
  7. 前記資源の選択を優先することは、非優先資源よりも早く優先資源を選択することと、
    非スティッキーな資源よりも早くスティッキーな資源を割り当て、前記スティッキーな資源は検討されている前記ロールより前の時間間隔に割り当てられた資源を示すことと、
    フレキシブルな資源よりも早く非フレキシブルな資源を割り当てることと、
    前記ロールのベストフィット記述に合うロールに資源を割り当てることと、
    利用可能期間が短い資源に対して利用可能期間が長い資源を優遇することとを含む、請求項1から6のいずれかに記載の方法。
  8. 前記ロールの選択を優先することは、
    より希少でないロールよりも前に希少のロールをマッチングすることと、
    ロールのコンター(contours)として、より長い非ゼロの需要の連鎖(sequence)を有するロールを、より短いコンターをもつロールよりも前にマッチングすることと、
    より短い時間拘束であるロールよりも前により長い時間拘束であるロールをマッチングすることとを含む、請求項1から7のいずれかに記載の方法。
  9. 前記完了される複数のプロジェクトの中からの前記プロジェクトの効率的な選択を決定することは、前記複数のプロジェクトの中のプロジェクトが、前記プロジェクトの効率的な選択の中から除外される理由を決定することを含む、請求項1から8のいずれかに記載の方法。
  10. 前記プロジェクトが除外される理由を決定することは、
    予算不足により前記プロジェクトが除外されるかどうかを決定することと、
    資源不足により前記プロジェクトが除外されるかどうかを決定することと、
    予定表の不足により前記プロジェクトが除外されるかどうかを決定することと、
    依存経路不足により前記プロジェクトが除外されるかどうかを決定することとを含む、請求項1から9のいずれかに記載の方法。
  11. 前記完了される複数のプロジェクトの中からの前記プロジェクトの効率的な選択を決定することは、プロジェクトの制約の集合を修正して前記プロジェクトの効率的な選択の中に現在含まれていない前記複数のプロジェクトの中の少なくとももう1つのプロジェクトを、前記効率的な選択の中に含むことができるかどうかを決定することを含む、請求項1から10のいずれかに記載の方法。
  12. 前記プロジェクトの制約の集合を修正することは、
    前記プロジェクトの効率的な選択の完了に関してロール数を修正することが、結果として、前記プロジェクトの効率的な選択の中に含まれる1つまたは複数のプロジェクトになるかどうかを決定すること、
    前記プロジェクトの効率的な選択に関連する少なくとも1つの予算を増加することが、結果として、前記プロジェクトの効率的な選択の中に含まれる1つまたは複数のプロジェクトになるかどうかを決定すること、または、
    前記プロジェクトの効率的な選択の中のプロジェクト内のロールの容量を増加することが、結果として、前記プロジェクトの効率的な選択の中に含まれる1つまたは複数のプロジェクトになるかどうかを決定することを含む、請求項1から11のいずれかに記載の方法。
  13. 前記計画対象期間内の前記完了される複数のプロジェクトの中からの前記プロジェクトの効率的な選択を決定することは、前記プロジェクトの効率的な選択内の各プロジェクトの前記利益値と前記プロジェクトの効率的な選択内の各プロジェクトの前記費用の制約との間の比較を最大化することにさらに基づく、請求項1から12のいずれかに記載の方法。
  14. 前記方法は、前記プロセッサによって、依存経路の前記効率的な選択の前記プロジェクトと、依存経路の前記効率的な選択のそれぞれの前記プロジェクトに割り当てられた資源を含むスケジュールを生産することを更に備える、請求項1から13のいずれかに記載の方法。
  15. 複数のプロジェクトと、
    前記複数のプロジェクトの少なくともプロジェクトのサブセットを完了する時間の長さを示す計画対象期間と、
    複数の資源であって、前記複数の資源の各資源が前記複数のプロジェクトの少なくとも1つのプロジェクトを完了するために前記資源によって実行可能である1つまたは複数の機能を特定する前記複数の資源と、
    前記複数の資源の各資源について、各資源を前記複数のプロジェクトにわたって利用することが可能である最大利用可能容量を示す予算支出と、
    前記複数のプロジェクトの各プロジェクトについて、前記プロジェクトを完了することに関連した財務費用を示す費用の制約と、
    前記複数のプロジェクトの各プロジェクトについて、前記プロジェクトを完了することで得られる利益の量を示す利益値と、
    前記複数のプロジェクトのうちの他のプロジェクトの完了の要件として前記複数のプロジェクトの中のどのプロジェクトを完了させなければならないかを示すプロジェクト依存値の集合とを含む、データを記憶するように構成されたメモリと、
    かつ、前記メモリに結合されるプロセッサと、および、
    記憶されたプログラム指示を備える非一時的なコンピュータ読み取り可能な媒体とを含み、前記プログラム指示は、前記プロセッサによって実行される場合に請求項1から14のいずれかに記載の前記方法を前記プロセッサに対して実行させる、システム。
  16. プロセッサによって解釈される場合に、請求項1から14のいずれかに記載の前記方法をマシンに対して実行させる指示を含む、非一時的なコンピュータ読み取り可能な媒体。
JP2017502918A 2014-03-25 2015-03-25 時間、資源および予算の制約下での構造化経営組織内のプロジェクトの選択および資源の割り当てを最適化する方法およびシステム Expired - Fee Related JP6564015B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201461967714P 2014-03-25 2014-03-25
US61/967,714 2014-03-25
PCT/US2015/022448 WO2015148641A1 (en) 2014-03-25 2015-03-25 A framework to optimize the selection of projects and the allocation of resources within a structured business organization under time, resource and budget constraints

Publications (3)

Publication Number Publication Date
JP2017514247A JP2017514247A (ja) 2017-06-01
JP2017514247A5 true JP2017514247A5 (ja) 2018-04-19
JP6564015B2 JP6564015B2 (ja) 2019-08-21

Family

ID=54190907

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017502918A Expired - Fee Related JP6564015B2 (ja) 2014-03-25 2015-03-25 時間、資源および予算の制約下での構造化経営組織内のプロジェクトの選択および資源の割り当てを最適化する方法およびシステム

Country Status (6)

Country Link
US (1) US20150278736A1 (ja)
EP (1) EP3123417A4 (ja)
JP (1) JP6564015B2 (ja)
KR (1) KR102376755B1 (ja)
AU (1) AU2015236099A1 (ja)
WO (1) WO2015148641A1 (ja)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170220974A1 (en) * 2016-01-29 2017-08-03 Sap Se Resource optimization for production efficiency
US10489204B2 (en) * 2017-01-31 2019-11-26 Samsung Electronics Co., Ltd. Flexible in-order and out-of-order resource allocation
US10789208B2 (en) * 2017-08-02 2020-09-29 Sap Se Dependency mapping in a database environment
KR102298999B1 (ko) * 2018-03-02 2021-09-07 (주) 빌트온 웹브라우저에 입력된 이벤트에 대응하는 빅데이터분석결과와 경영정보를 통합하여 제공하는 토탈경영정보제공장치
US10810524B1 (en) * 2018-05-21 2020-10-20 Amazon Technologies, Inc. Dynamic resource prediction simulation
CN112136111B (zh) * 2019-04-24 2024-04-16 创新先进技术有限公司 分布式资源分配
JP7027450B2 (ja) * 2019-04-24 2022-03-01 アドバンスド ニュー テクノロジーズ カンパニー リミテッド 分散された資源配分
SG11201910158YA (en) * 2019-04-24 2020-11-27 Advanced New Technologies Co Ltd Distributed resource allocation
DE102020203716A1 (de) * 2020-03-23 2021-09-23 Zf Friedrichshafen Ag Computerimplementiertes Verfahren für eine Produktionsplanung und/oder -steuerung eines Produktionssystems und Produktionsplanung und/oder-steuerungssystem
KR102349118B1 (ko) * 2021-09-07 2022-01-11 주식회사 디케이브라더스 프로젝트 중개 플랫폼 서비스 제공 방법 및 장치
US20230410011A1 (en) * 2022-06-09 2023-12-21 Abductive Services LLC Systems, Devices, and/or Methods for Managing Projects
CN117648179A (zh) * 2023-11-23 2024-03-05 北京菱云科技有限公司 一种资源分配方法、装置、电子设备和存储介质
KR102669893B1 (ko) 2024-02-19 2024-05-28 주식회사 똑똑한개발자 스마트 업무일지를 활용한 it프로젝트별 손익 금액 자동 계산 시스템

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630070A (en) * 1993-08-16 1997-05-13 International Business Machines Corporation Optimization of manufacturing resource planning
US5408663A (en) * 1993-11-05 1995-04-18 Adrem Technologies, Inc. Resource allocation methods
US7496886B2 (en) * 2004-09-30 2009-02-24 Microsoft Corporation Method and system for providing cross project commitments
CN101283317A (zh) * 2005-02-11 2008-10-08 伏特资讯科学公司 计划/范围管理中的项目工作项目变更和商业信息协作系统及方法
US8281313B1 (en) * 2005-09-29 2012-10-02 Hewlett-Packard Development Company, L.P. Scheduling computer processing jobs that have stages and precedence constraints among the stages
US20080255910A1 (en) * 2007-04-16 2008-10-16 Sugato Bagchi Method and System for Adaptive Project Risk Management
US20090119144A1 (en) * 2007-11-02 2009-05-07 International Business Machines Corporation Method, system and program product for optimal project selection and tradeoffs
US20090234699A1 (en) * 2008-03-15 2009-09-17 Microsoft Corporation User Interface For Scheduling Resource Assignments
JP2010211364A (ja) * 2009-03-09 2010-09-24 Hitachi Ltd プロジェクトのシミュレーション方法及びシミュレーションシステム
US7991632B1 (en) * 2011-01-28 2011-08-02 Fmr Llc Method and system for allocation of resources in a project portfolio
JP5749561B2 (ja) * 2011-05-10 2015-07-15 株式会社竹中工務店 スケジューリング装置及びプログラム
US20140032256A1 (en) * 2012-07-27 2014-01-30 International Business Machines Corporation Multi-project portfolio optimization

Similar Documents

Publication Publication Date Title
JP2017514247A5 (ja)
EP3438821B1 (en) Task-resource scheduling method and device
JP6799947B2 (ja) スライディングタイムウィンドウを用いてタスクをスケジュール設定するためのシステムおよび方法
US20140019987A1 (en) Scheduling map and reduce tasks for jobs execution according to performance goals
EP2631798B1 (en) Long-term resource provisioning with cascading allocations
CN111108480B (zh) 一种用于分布式资源需求及分配的系统和方法
US8943353B2 (en) Assigning nodes to jobs based on reliability factors
US20130290972A1 (en) Workload manager for mapreduce environments
CN110389816B (zh) 用于资源调度的方法、装置以及计算机可读介质
US20120066683A1 (en) Balanced thread creation and task allocation
CN104765640B (zh) 一种智能服务调度方法
US9374314B2 (en) QoS aware balancing in data centers
US10846144B2 (en) Multistep automated scaling for cluster containers
JP2011258119A5 (ja)
CN104239154B (zh) 一种Hadoop集群中的作业调度方法和作业调度器
CN103729246A (zh) 一种任务调度方法和装置
CN111813523A (zh) 时长预估模型生成方法、系统资源调度方法、装置、电子设备和存储介质
JP2015194923A (ja) 並列計算機システム,ジョブ管理装置の制御プログラム,及び並列計算機システムの制御方法
US20150277980A1 (en) Using predictive optimization to facilitate distributed computation in a multi-tenant system
US20140137122A1 (en) Modified backfill scheduler and a method employing frequency control to reduce peak cluster power requirements
CN114265679A (zh) 数据处理方法、装置和服务器
CN110196773B (zh) 统一调度计算资源的多时间尺度安全校核系统及方法
US20160139959A1 (en) Information processing system, method and medium
US8201023B2 (en) Test optimization
JP6753521B2 (ja) 計算資源管理装置、計算資源管理方法、及びプログラム