JP2015109728A - センサ内蔵開閉器の配置計画支援装置および配置計画支援方法 - Google Patents
センサ内蔵開閉器の配置計画支援装置および配置計画支援方法 Download PDFInfo
- Publication number
- JP2015109728A JP2015109728A JP2013250550A JP2013250550A JP2015109728A JP 2015109728 A JP2015109728 A JP 2015109728A JP 2013250550 A JP2013250550 A JP 2013250550A JP 2013250550 A JP2013250550 A JP 2013250550A JP 2015109728 A JP2015109728 A JP 2015109728A
- Authority
- JP
- Japan
- Prior art keywords
- power system
- center point
- load center
- arrangement
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 61
- 238000009826 distribution Methods 0.000 claims abstract description 47
- 238000009434 installation Methods 0.000 claims description 132
- 238000005259 measurement Methods 0.000 claims description 62
- 238000004364 calculation method Methods 0.000 claims description 43
- 230000005540 biological transmission Effects 0.000 claims description 5
- 238000012937 correction Methods 0.000 description 11
- 238000012545 processing Methods 0.000 description 10
- 238000012986 modification Methods 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 238000013500 data storage Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
【解決手段】配置計画支援装置は、電力系統内の設備および計測装置の配置を示す電力系統データと、電力系統への送出電力および電力系統内の負荷を示す電力状態データとを記憶する記憶部と、電力系統データと電力状態データとに基づいて、配置を判定する演算を行う演算部と、を備える。演算は、電力系統内の負荷中心点として、複数の負荷中心点条件にそれぞれ従う複数の負荷中心点位置を、電力系統データと電力状態データとを用いて決定し、電力系統内の電圧分布として、複数の負荷中心点位置にそれぞれ基づく複数の電圧分布を、電力系統データと電力状態データとを用いて算出し、複数の電圧分布の間の電圧の変動の大きさを示す変動量を推定し、変動量が予め定められた変動条件を満たすか否かを判定する。
【選択図】図1
Description
Claims (14)
- 電力系統内の設備およびセンサ内蔵開閉器を含む計測装置の配置を示す電力系統データと、前記電力系統への送出電力および前記電力系統内の負荷を示す電力状態データとを記憶する記憶部と、
前記電力系統データと前記電力状態データとに基づいて、前記配置を判定する演算を行う演算部と、
を備え、
前記演算は、
前記電力系統内の負荷中心点として、複数の負荷中心点条件にそれぞれ従う複数の負荷中心点位置を、前記電力系統データと前記電力状態データとを用いて決定し、
前記電力系統内の電圧分布として、前記複数の負荷中心点位置にそれぞれ基づく複数の電圧分布を、前記電力系統データと前記電力状態データとを用いて算出し、
前記複数の電圧分布の間の電圧の変動の大きさを示す変動量を推定し、
前記変動量が予め定められた変動条件を満たすか否かを判定する、
センサ内蔵開閉器の配置計画支援装置。 - 前記変動量が前記変動条件を満たさないと判定された場合、前記演算部は、前記配置を変更し、前記変更された配置に基づいて前記演算を行う、
請求項1に記載の配置計画支援装置。 - 前記演算部は、前記変動量が前記変動条件を満たすと判定されるまで、前記変更と前記演算とを繰り返す、
請求項2に記載の配置計画支援装置。 - 前記演算部は、前記計測装置の設置台数を増加させることにより、前記変更を行う、
請求項3に記載の配置計画支援装置。 - 前記演算部は、前記増加による複数の計測装置のそれぞれの設置位置に基づく所定のパラメータが均等になるように、前記複数の計測装置のそれぞれの設置位置を決定することにより、前記変更を行う、
請求項4に記載の配置計画支援装置。 - 特定の計測装置に対する前記パラメータは、前記特定の計測装置の下流側に隣接する計測装置までの区間の距離と、前記区間のインピーダンスと、前記区間の電圧降下量と、前記区間における需要家負荷容量との少なくとも何れかに基づく値である、
請求項5に記載の配置計画支援装置。 - 前記演算部は、潮流計算または状態推定により前記複数の電圧分布のそれぞれを算出する、
請求項6に記載の配置計画支援装置。 - 前記演算部は、前記変動量が前記変動条件を満たすと判定された場合の計測装置の配置を、ユーザからの入力に基づいて修正し、前記修正された配置に基づいて前記演算を行い、前記修正された配置に基づく変動量が前記変動条件を満たすか否かを判定する、
請求項7に記載の配置計画支援装置。 - 前記修正された配置に基づく変動量が前記変動条件を満たさないと判定された場合、前記演算部は、前記修正された配置を再修正し、前記再修正された配置に基づいて前記演算を行う、
請求項8に記載の配置計画支援装置。 - 前記負荷データは、前記区間内の第1負荷中心点位置を示し、
前記演算部は、前記電力系統データに示されている前記区間内の複数の位置の中で電圧降下が最も小さい位置を第2負荷中心点位置として決定し、前記複数の位置の中で電圧降下が最も大きい位置を第3負荷中心点位置として決定し、前記第1負荷中心点と前記第2負荷中心点と前記第3負荷中心点とにそれぞれ基づいて、前記第1電圧分布と前記第2電圧分布と前記第3電圧分布とを算出し、前記第1電圧分布に対する前記第2電圧分布および前記第3電圧分布の偏差の大きさの最大値を、前記変動量として推定する、
請求項9に記載の配置計画支援装置。 - 前記演算部は、前記電力系統データに示されている前記区間内の複数の位置の中で電圧降下が最も小さい位置を第2負荷中心点位置として決定し、前記複数の位置の中で電圧降下が最も大きい位置を第3負荷中心点位置として決定し、前記第2負荷中心点と前記第3負荷中心点とにそれぞれ基づいて、前記第2電圧分布と前記第3電圧分布とを算出し、前記第2電圧分布および前記第3電圧分布の差の大きさの最大値を、前記変動量として推定する、
請求項9に記載の配置計画支援装置。 - 前記記憶部は、前記変動量の閾値である変動量閾値を記憶し、
前記演算部は、前記変動量が前記変動量閾値以下である場合、前記変動量が変動条件を満たすと判定する、
請求項1乃至11の何れか一項に記載の配置計画支援装置。 - 前記電力系統データは、前記区間内の複数の位置を示し、
前記記憶部は、前記複数の位置にそれぞれ対応する複数の変動量閾値を記憶し、
前記演算部は、前記変動量として、前記複数の位置における前記複数の変動量をそれぞれ算出し、前記複数の変動量のすべてがそれぞれ対応する前記複数の変動量閾値以下である場合、前記変動量が変動条件を満たすと判定する、
請求項1乃至11の何れか一項に記載の配置計画支援装置。 - 電力系統内の設備およびセンサ内蔵開閉器を含む計測装置の配置を示す電力系統データと、前記電力系統への送出電力および前記電力系統内の負荷を示す電力状態データとを記憶し、
前記電力系統データと前記電力状態データとに基づいて、前記配置を判定する演算を行う、
ことを備え、
前記演算は、
前記電力系統内の負荷中心点として、複数の負荷中心点条件にそれぞれ従う複数の負荷中心点位置を、前記電力系統データと前記電力状態データとを用いて決定し、
前記電力系統内の電圧分布として、前記複数の負荷中心点位置にそれぞれ基づく複数の電圧分布を、前記電力系統データと前記電力状態データとを用いて算出し、
前記複数の電圧分布の間の電圧の変動の大きさを示す変動量を推定し、
前記変動量が予め定められた変動条件を満たすか否かを判定する、
センサ内蔵開閉器の配置計画支援方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013250550A JP6173193B2 (ja) | 2013-12-03 | 2013-12-03 | センサ内蔵開閉器の配置計画支援装置および配置計画支援方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013250550A JP6173193B2 (ja) | 2013-12-03 | 2013-12-03 | センサ内蔵開閉器の配置計画支援装置および配置計画支援方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2015109728A true JP2015109728A (ja) | 2015-06-11 |
JP6173193B2 JP6173193B2 (ja) | 2017-08-02 |
Family
ID=53439707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013250550A Active JP6173193B2 (ja) | 2013-12-03 | 2013-12-03 | センサ内蔵開閉器の配置計画支援装置および配置計画支援方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6173193B2 (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10847974B2 (en) | 2016-05-24 | 2020-11-24 | Mitsubishi Electric Corporation | Device and method for estimating a voltage distribution along a power distribution line in a high-voltage system |
KR20210023128A (ko) * | 2019-08-22 | 2021-03-04 | 한국전력공사 | 배전계통의 전압 및 구간 부하 추정 시스템 및 방법 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000069668A (ja) * | 1998-08-19 | 2000-03-03 | Matsushita Electric Ind Co Ltd | 高圧自動電圧調整器設定パラメータ解析装置 |
JP2006217742A (ja) * | 2005-02-04 | 2006-08-17 | Fuji Electric Systems Co Ltd | 配電系統の電圧分布計算装置、区間負荷計算装置およびその方法 |
JP2007082346A (ja) * | 2005-09-15 | 2007-03-29 | Central Res Inst Of Electric Power Ind | 配電系統の負荷分布推定方法、装置及びプログラム、並びに電圧推定方法、装置及びプログラム |
JP2008072791A (ja) * | 2006-09-12 | 2008-03-27 | Toshiba Corp | 計測器設置位置の決定装置、決定方法及び決定用プログラム |
WO2012114582A1 (ja) * | 2011-02-24 | 2012-08-30 | 三菱電機株式会社 | 電圧制御装置 |
JP2012191779A (ja) * | 2011-03-11 | 2012-10-04 | Meidensha Corp | 配電系統の電圧制御装置 |
US20130035885A1 (en) * | 2011-08-04 | 2013-02-07 | Massachusetts Institute Of Technology | Topology identification in distribution network with limited measurements |
JP2013074639A (ja) * | 2011-09-26 | 2013-04-22 | Hitachi Ltd | 電力系統状態推定装置およびそれを用いた電力系統システム |
-
2013
- 2013-12-03 JP JP2013250550A patent/JP6173193B2/ja active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000069668A (ja) * | 1998-08-19 | 2000-03-03 | Matsushita Electric Ind Co Ltd | 高圧自動電圧調整器設定パラメータ解析装置 |
JP2006217742A (ja) * | 2005-02-04 | 2006-08-17 | Fuji Electric Systems Co Ltd | 配電系統の電圧分布計算装置、区間負荷計算装置およびその方法 |
JP2007082346A (ja) * | 2005-09-15 | 2007-03-29 | Central Res Inst Of Electric Power Ind | 配電系統の負荷分布推定方法、装置及びプログラム、並びに電圧推定方法、装置及びプログラム |
JP2008072791A (ja) * | 2006-09-12 | 2008-03-27 | Toshiba Corp | 計測器設置位置の決定装置、決定方法及び決定用プログラム |
WO2012114582A1 (ja) * | 2011-02-24 | 2012-08-30 | 三菱電機株式会社 | 電圧制御装置 |
JP2012191779A (ja) * | 2011-03-11 | 2012-10-04 | Meidensha Corp | 配電系統の電圧制御装置 |
US20130035885A1 (en) * | 2011-08-04 | 2013-02-07 | Massachusetts Institute Of Technology | Topology identification in distribution network with limited measurements |
JP2013074639A (ja) * | 2011-09-26 | 2013-04-22 | Hitachi Ltd | 電力系統状態推定装置およびそれを用いた電力系統システム |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10847974B2 (en) | 2016-05-24 | 2020-11-24 | Mitsubishi Electric Corporation | Device and method for estimating a voltage distribution along a power distribution line in a high-voltage system |
KR20210023128A (ko) * | 2019-08-22 | 2021-03-04 | 한국전력공사 | 배전계통의 전압 및 구간 부하 추정 시스템 및 방법 |
KR102628055B1 (ko) | 2019-08-22 | 2024-01-25 | 한국전력공사 | 배전계통의 전압 및 구간 부하 추정 시스템 및 방법 |
Also Published As
Publication number | Publication date |
---|---|
JP6173193B2 (ja) | 2017-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6164030B2 (ja) | 相判定プログラム、相判定方法および相判定装置 | |
US10908198B2 (en) | Determining meter phase using interval voltage measurements | |
JP5311894B2 (ja) | 配電系統の電圧管理方法、変圧器のタップ選定方法 | |
US20150052088A1 (en) | Voltage-Based Clustering to Infer Connectivity Information in Smart Grids | |
US20070185665A1 (en) | Method for determining power flow in an electrical distribution system | |
JP2007288877A (ja) | 複数の分散型電源が連系された配電系統の電力品質維持支援方法及び電力品質維持支援システム | |
US20140148966A1 (en) | Decentralized Volt/VAR Control for Advanced Distribution Automation Systems | |
JP2007020314A (ja) | 電力需給予測システム | |
US20150168465A1 (en) | Method and apparatus for electric power system distribution state estimations | |
US20200050990A1 (en) | Method for asset management of substation | |
JP2015109729A (ja) | 配電系統の状態推定装置、状態推定方法、および状態推定プログラム | |
JPWO2016084282A1 (ja) | 電力調整装置、電力流通システム、電力調整方法及びプログラム | |
JP6173193B2 (ja) | センサ内蔵開閉器の配置計画支援装置および配置計画支援方法 | |
JP6702232B2 (ja) | 保守計画作成装置および方法 | |
JP5457949B2 (ja) | 潮流計算機能を備えた無効電力補償装置、およびそのシステムと方法 | |
Nijhuis et al. | Valuation of measurement data for low voltage network expansion planning | |
JP7484550B2 (ja) | トランス接続相判定プログラム、装置、及び方法 | |
JPWO2019150586A1 (ja) | 集中電圧制御装置および集中電圧制御システム | |
JP2015139322A (ja) | 電力ネットワークシステム | |
US9009019B2 (en) | Electrical optimization and component selection in an electrical grid | |
JP6390795B2 (ja) | 配電系統監視システムおよび配電系統監視システムの制御方法 | |
JP2013243842A (ja) | 配電用変圧器タップ制御システムおよび配電用変圧器タップ制御方法 | |
JP7140569B2 (ja) | 太陽光発電出力推定装置及び出力推定方法 | |
US11061056B2 (en) | Voltage rating validator for advanced metering | |
JP6454961B2 (ja) | 設備選択支援プログラム、設備選択支援方法および設備選択支援装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160809 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170501 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170509 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170616 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170627 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170704 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6173193 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |