JP2014512052A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2014512052A5 JP2014512052A5 JP2014504183A JP2014504183A JP2014512052A5 JP 2014512052 A5 JP2014512052 A5 JP 2014512052A5 JP 2014504183 A JP2014504183 A JP 2014504183A JP 2014504183 A JP2014504183 A JP 2014504183A JP 2014512052 A5 JP2014512052 A5 JP 2014512052A5
- Authority
- JP
- Japan
- Prior art keywords
- cluster
- energy
- power
- priority
- distributing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 claims 17
- 230000004931 aggregating effect Effects 0.000 claims 1
- 230000002776 aggregation Effects 0.000 claims 1
- 238000004220 aggregation Methods 0.000 claims 1
- 229960001716 benzalkonium Drugs 0.000 claims 1
- CYDRXTMLKJDRQH-UHFFFAOYSA-N benzododecinium Chemical compound CCCCCCCCCCCC[N+](C)(C)CC1=CC=CC=C1 CYDRXTMLKJDRQH-UHFFFAOYSA-N 0.000 claims 1
- 238000004590 computer program Methods 0.000 claims 1
- 238000012544 monitoring process Methods 0.000 claims 1
Images
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP11162735.2 | 2011-04-15 | ||
| EP11162735 | 2011-04-15 | ||
| PCT/EP2011/074040 WO2012139670A1 (en) | 2011-04-15 | 2011-12-23 | Method for distributing an energy flow over a predetermined period of time to a cluster of a plurality of devices taking into account constraints relating to the energy to be delivered to the devices, a computer program for performing such a method and a system therefor |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2014512052A JP2014512052A (ja) | 2014-05-19 |
| JP2014512052A5 true JP2014512052A5 (enExample) | 2015-02-05 |
| JP5810209B2 JP5810209B2 (ja) | 2015-11-11 |
Family
ID=44364011
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014504183A Expired - Fee Related JP5810209B2 (ja) | 2011-04-15 | 2011-12-23 | 複数の装置に配給すべきエネルギに関する制約を考慮して、予め定められた期間にわたって複数の装置のクラスタにエネルギ流を分配するための方法、そのような方法を行なうためのコンピュータプログラム、およびそのためのシステム |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US9703308B2 (enExample) |
| EP (2) | EP3093805A1 (enExample) |
| JP (1) | JP5810209B2 (enExample) |
| WO (1) | WO2012139670A1 (enExample) |
Families Citing this family (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103219751B (zh) * | 2013-05-08 | 2015-04-29 | 东南大学 | 一种集群风电场有功功率控制方法 |
| US9471080B2 (en) | 2013-10-21 | 2016-10-18 | Restore Nv | Portfolio managed, demand-side response system |
| US10673232B2 (en) | 2014-07-10 | 2020-06-02 | California Institute Of Technology | Dynamic frequency control in power networks |
| US10351124B2 (en) | 2014-10-02 | 2019-07-16 | Volvo Truck Corporation | Method performed by a control unit for controlling energy flows of a vehicle |
| WO2016172348A1 (en) | 2015-04-21 | 2016-10-27 | California Institute Of Technology | Distributed optimal power flow processes for unbalanced radial distribution networks |
| CN105069251B (zh) * | 2015-08-26 | 2018-05-08 | 华北电力大学(保定) | 一种基于情景模式仿真的电动汽车集群模型建模方法 |
| WO2017066790A1 (en) | 2015-10-16 | 2017-04-20 | California Intitute Of Technology | Adaptive charging algorithms for a network of electric vehicles |
| CN108604310B (zh) | 2015-12-31 | 2022-07-26 | 威拓股份有限公司 | 用于使用神经网络架构来控制分配系统的方法、控制器和系统 |
| US11171509B2 (en) | 2016-02-25 | 2021-11-09 | California Institute Of Technology | Adaptive charging network using adaptive charging stations for electric vehicles |
| CN107464028B (zh) * | 2017-09-13 | 2020-11-06 | 杭州骑迹科技有限公司 | 一种电池柜的位置部署方法和网络服务器 |
| JP6640821B2 (ja) | 2017-11-24 | 2020-02-05 | ファナック株式会社 | ロボットの構造 |
| EP3718073A4 (en) * | 2017-12-01 | 2021-08-25 | California Institute of Technology | OPTIMIZATION FRAMEWORK AND PROCESS FOR ADAPTIVE EV CHARGING |
| WO2020160427A1 (en) * | 2019-02-01 | 2020-08-06 | Duke Energy Corporation | Advanced power distribution platform |
| US11376981B2 (en) | 2019-02-08 | 2022-07-05 | California Institute Of Technology | Systems and methods for adaptive EV charging |
| CN116345472B (zh) * | 2023-03-09 | 2025-10-03 | 国网山东省电力公司临沂供电公司 | 一种智能化有载调压变压器分布式控制方法 |
Family Cites Families (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002200948A (ja) * | 2000-12-28 | 2002-07-16 | Denso Corp | 車両用配電装置 |
| US7051215B2 (en) * | 2003-06-13 | 2006-05-23 | Intel Corporation | Power management for clustered computing platforms |
| JP3980541B2 (ja) | 2003-09-22 | 2007-09-26 | 日本電信電話株式会社 | 分散型エネルギーコミュニティー制御システム、中央制御装置、分散制御装置と、それらの制御方法 |
| JP2005245180A (ja) | 2004-02-27 | 2005-09-08 | Fuji Electric Systems Co Ltd | エネルギ供給システム |
| US7702931B2 (en) * | 2006-06-27 | 2010-04-20 | Hewlett-Packard Development Company, L.P. | Adjusting power budgets of multiple servers |
| US20080046387A1 (en) | 2006-07-23 | 2008-02-21 | Rajeev Gopal | System and method for policy based control of local electrical energy generation and use |
| EP2143061A4 (en) * | 2007-03-23 | 2015-05-13 | Bpl Global Ltd | SYSTEM AND METHOD FOR ADAPTIVE ISLANDING FOR STORED / DISTRIBUTED ENERGY ARRANGEMENTS |
| US8131403B2 (en) * | 2007-08-28 | 2012-03-06 | Consert, Inc. | System and method for determining and utilizing customer energy profiles for load control for individual structures, devices, and aggregation of same |
| US20090132842A1 (en) * | 2007-11-15 | 2009-05-21 | International Business Machines Corporation | Managing Computer Power Consumption In A Computer Equipment Rack |
| US20090228324A1 (en) * | 2008-03-04 | 2009-09-10 | Ronald Ambrosio | Method and System for Efficient Energy Distribution in Electrical Grids Using Sensor and Actuator Networks |
| US8600571B2 (en) | 2008-06-19 | 2013-12-03 | Honeywell International Inc. | Energy optimization system |
| US8260471B2 (en) * | 2008-08-27 | 2012-09-04 | Herman Miller, Inc. | Energy distribution management system |
| JP5309815B2 (ja) * | 2008-09-09 | 2013-10-09 | 富士通株式会社 | 電力供給管理装置および電力供給管理方法 |
| JP4713623B2 (ja) | 2008-09-25 | 2011-06-29 | 株式会社日立製作所 | 充放電管理装置 |
| US8935112B2 (en) | 2009-02-17 | 2015-01-13 | Chargepoint, Inc. | System and method for managing electric vehicles |
| US8600556B2 (en) * | 2009-06-22 | 2013-12-03 | Johnson Controls Technology Company | Smart building manager |
| GB0913038D0 (en) | 2009-07-27 | 2009-09-02 | Rltec Ltd | Dynamic demand grid monitoring |
| US9477286B2 (en) * | 2010-11-05 | 2016-10-25 | International Business Machines Corporation | Energy allocation to groups of virtual machines |
| US9300141B2 (en) * | 2010-11-18 | 2016-03-29 | John J. Marhoefer | Virtual power plant system and method incorporating renewal energy, storage and scalable value-based optimization |
| EP2608123B1 (en) * | 2011-12-23 | 2016-11-30 | Vlaamse Instelling voor Technologisch Onderzoek (VITO) | System for distributing electrical energy over a cluster of electrical devices, method for distributing electrical energy over a cluster of electrical devices of such a system and controller for use in such a system |
| GB201218342D0 (en) * | 2012-10-12 | 2012-11-28 | Univ Leuven Kath | Method and system for distributing and/or controlling an energy flow taking into account constraints relating to the electricity network |
-
2011
- 2011-12-23 US US14/111,667 patent/US9703308B2/en not_active Expired - Fee Related
- 2011-12-23 JP JP2014504183A patent/JP5810209B2/ja not_active Expired - Fee Related
- 2011-12-23 WO PCT/EP2011/074040 patent/WO2012139670A1/en not_active Ceased
- 2011-12-23 EP EP16171989.3A patent/EP3093805A1/en not_active Withdrawn
- 2011-12-23 EP EP11811548.4A patent/EP2697749A1/en not_active Ceased
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2014512052A5 (enExample) | ||
| CN103164279B (zh) | 云计算资源分配方法和系统 | |
| JP2013527518A5 (enExample) | ||
| JP2012523620A5 (enExample) | ||
| EP2453357A3 (en) | Event-based orchestration in distributed order orchestration system | |
| CN108132839B (zh) | 一种资源调度方法及装置 | |
| IN2012DE01112A (enExample) | ||
| JP2013531839A5 (enExample) | ||
| WO2015041741A3 (en) | Systems and methods for utility usage monitoring and management | |
| WO2013033716A3 (en) | Dynamic tagging to create logical models and optimize caching in energy management systems | |
| GB2478070A (en) | Market dynamics | |
| WO2012017073A3 (en) | Method for aggregating task data objects and for providing an aggregated view | |
| WO2009134755A3 (en) | Adaptive knowledge platform | |
| CN106688215B8 (zh) | 针对内容效能优化的自动点击类型选择 | |
| EP2639701A3 (en) | Real time performance monitoring | |
| CN103067297A (zh) | 一种基于资源消耗预测的动态负载均衡方法及装置 | |
| WO2013055711A3 (en) | Business activity monitoring runtime | |
| CN103414577A (zh) | 用于Hadoop平台的计费系统及方法 | |
| IN2014CN02823A (enExample) | ||
| CN102593821A (zh) | 结合时间信息分析用户负荷的方法及系统 | |
| EP2709230A3 (en) | Power management control system and method | |
| JP2016048536A (ja) | クラスタコンピューティングシステム用のマスタデバイス、スレーブデバイスおよびそのコンピューティング方法 | |
| WO2013112940A3 (en) | Social family networking platform | |
| CN102147809A (zh) | 一种并行文件系统及其管理方法 | |
| JP2009500704A5 (enExample) |