JP2010515421A - 架空送電線路のための導体を選択する方法 - Google Patents
架空送電線路のための導体を選択する方法 Download PDFInfo
- Publication number
- JP2010515421A JP2010515421A JP2009544157A JP2009544157A JP2010515421A JP 2010515421 A JP2010515421 A JP 2010515421A JP 2009544157 A JP2009544157 A JP 2009544157A JP 2009544157 A JP2009544157 A JP 2009544157A JP 2010515421 A JP2010515421 A JP 2010515421A
- Authority
- JP
- Japan
- Prior art keywords
- transmission line
- conductor
- overhead
- power transmission
- line tension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
- H02G1/04—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/04—Arrangements or devices for relieving mechanical tension
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
好適なアルミニウムは、例えば、ペンシルバニア州ピッツバーグ(Pittsburgh)のアルコア(Alcoa)から、「スーパーピュアアルミニウム(SUPRE PURE ALUMINUM);99.99%Al」という商品名で入手可能である。アルミニウム合金(例えば、Al−2重量%のCu(0.03重量%不純物))は、ニューヨーク州ニューヨーク(New York)のベルモントメタルズ社(Belmont Metals)から得ることができる。
Claims (23)
- 架空送電線路のための導体を選択する方法であって、
少なくとも2つの鉄塔によって支えられる架空送電線路耐張セクションの少なくとも1つの所望のパラメーターを特定する工程と、
少なくとも1つの選択ルールと少なくとも1つの特定された所望の前記パラメーターとに基づいて前記架空送電線路耐張セクションの導体構造を選択する工程であって、前記導体構造が、第1の導体の少なくとも1つのパラメーターと異なる少なくとも1つのパラメーターを有する少なくとも1つの第2の導体と連なる少なくとも1つの第1の導体を含む工程と、を含む方法。 - 前記架空送電線路耐張セクションの少なくとも1つの所望のパラメーターを特定する工程が、導体選択システムのユーザーインターフェースを介して、架空送電線路に関する入力データを受け取る工程を含み、
導体構造を選択する工程が、前記導体選択システムによって自動的に実行される、請求項1に記載の方法。 - 前記架空送電線路耐張セクションの少なくとも1つの所望のパラメーターを特定する前記工程と、前記架空送電線路耐張セクションの導体構造を選択する前記工程が、人によって手動で実行される、請求項1に記載の方法。
- 前記架空送電線路耐張セクションが架設される地理的領域を表す地理的プロファイル情報を受け取る工程を更に含み、
前記送電線路耐張セクションの導体構造を選択する工程が、前記地理的プロファイル情報と、少なくとも1つの特定された所望の前記パラメーターと、少なくとも1つの前記選択ルールとに基づき、前記架空送電線路耐張セクションの導体構造を選択する工程を含む、請求項1に記載の方法。 - 前記地理的プロファイル情報と、少なくとも1つの特定された所望の前記パラメーターとに従って、前記架空送電線路耐張セクションをモデル化する工程を更に含み、
前記架空送電線路耐張セクションの導体構造を選択する工程が、少なくとも部分的に、架空送電線路モデルに基づいている、請求項4に記載の方法。 - 前記第1及び第2の導体が、重量、熱膨張度、直径、補強材、導体材、電気抵抗、引張強度、弾性、又はコストの少なくとも1つの点で異なる、請求項1に記載の方法。
- 少なくとも2つの前記鉄塔が、2つの引留鉄塔間にある前記架空送電線路耐張セクションを支える少なくとも1つの直線鉄塔を含む、請求項1に記載の方法。
- 前記架空送電線路耐張セクションの少なくとも1つの所望のパラメーターが、架空送電線路耐張セクションのクリアランス、架空送電線路耐張セクションの弛度、架空送電線路の電気的特性、架空送電線路耐張セクションの重量、及び架空送電線路耐張セクションの張力のうちの少なくとも1つを含む、請求項1に記載の方法。
- 前記導体構造を選択する工程が、導体構造のコスト、導体構造の電気的特性、又は導体構造によって少なくとも1つの鉄塔に作用する力の少なくとも1つに基づき、前記架空送電線路耐張セクションの導体構造を選択する工程を更に含む、請求項1に記載の方法。
- 鉄塔の高さ、又は鉄塔の位置の少なくとも1つを特定する、鉄塔に関する入力データを受け取る工程を更に含む、請求項1に記載の方法。
- 選択した導体構造の少なくとも1つの前記第1の導体と、少なくとも1つの前記第2の導体とを、架空送電線路耐張セクションとして、架設場所に架設する工程を更に含む、請求項1に記載の方法。
- 架空送電線路のための導体を選択するコンピュータ実行システムであって、
少なくとも2つの鉄塔によって支えられる架空送電線路耐張セクションの少なくとも1つの所望のパラメーターを特定し、少なくとも1つの特定された所望の前記パラメーターと少なくとも1つの選択ルールとに基づいて前記架空送電線路耐張セクションの導体構造を選択するプロセッサを含み、
前記導体構造が、少なくとも第1の導体と、前記第1の導体の少なくとも1つのパラメーターと異なる少なくとも1つのパラメーターを有する第2の導体とを含む、システム。 - 少なくとも1つの所望の前記パラメーターと、地理的プロファイル情報と、少なくとも1つの前記選択ルールとを格納するメモリを更に含み、
前記プロセッサが、少なくとも部分的に、少なくとも1つの前記選択ルールに基づき、導体構造を選択する、請求項12に記載のシステム。 - 前記プロセッサが、前記地理的プロファイル情報と、少なくとも1つの所望の前記パラメーターと、少なくとも1つの前記選択ルールとに従って、架空送電線路耐張セクションをモデル化し、少なくとも部分的に架空送電線路モデルに基づいて前記架空送電線路耐張セクションの導体構造を選択する、請求項13に記載のシステム。
- ユーザーインターフェースが、前記架空送電線路耐張セクションの少なくとも1つの所望のパラメーターをプロセッサで特定できるようにする架空送電線路に関する入力データを受け取り、
前記プロセッサが、少なくとも1つの所望の前記パラメーターに基づき、導体構造を自動的に選択する、請求項12に記載のシステム。 - ユーザーインターフェースが、架空送電線路耐張セクションが架設される地理的領域を表す地理的プロファイル情報を受け取り、
前記プロセッサが、前記地理的プロファイル情報と、少なくとも1つの特定された所望の前記パラメーターと、少なくとも1つの前記選択ルールとに基づき、前記架空送電線路耐張セクションの導体構造を選択する、請求項12に記載のシステム。 - 前記プロセッサが、前記地理的プロファイル情報と、少なくとも1つの特定された所望の前記パラメーターとに従って前記架空送電線路耐張セクションをモデル化し、
前記プロセッサが、少なくとも部分的に、架空送電線路モデルに基づいて前記架空送電線路耐張セクションの導体構造を選択する、請求項16に記載のシステム。 - 前記第1及び第2の導体が、重量、熱膨張度、直径、補強材、導体材、電気抵抗、引張強度、弾性、又はコストのうちの少なくとも1つで異なる、請求項12に記載のシステム。
- 前記架空送電線路耐張セクションの少なくとも1つの所望のパラメーターが、架空送電線路耐張セクションのクリアランス、架空送電線路耐張セクションの弛度、架空送電線路の電気的特性、架空送電線路耐張セクションの重量、及び架空送電線路耐張セクションの張力のうちの少なくとも1つを含む、請求項12に記載のシステム。
- 前記プロセッサが、導体構造のコスト、導体構造の電気的特性、又は導体構造によって少なくとも1つの鉄塔に作用する力のうちの少なくとも1つに基づき、前記架空送電線路耐張セクションの導体構造を更に選択する、請求項12に記載のシステム。
- 少なくとも2つの前記鉄塔が、2つの引留鉄塔間にある前記架空送電線路耐張セクションを支える少なくとも1つの直線鉄塔を含む、請求項12に記載のシステム。
- ユーザーインターフェースが、少なくとも2つの前記鉄塔に関して、鉄塔の高さ、又は鉄塔の位置の少なくとも1つを特定する、鉄塔に関する入力デーを受け取る、請求項12に記載のシステム。
- プロセッサに、少なくとも2つの鉄塔によって支えられる架空送電線路耐張セクションの少なくとも1つの所望のパラメーターを特定させる命令、及び
プロセッサに、少なくとも1つの特定された所望の前記パラメーターと少なくとも1つの選択ルールとに基づいて前記架空送電線路耐張セクションの導体構造を選択させる命令であって、前記導体構造が、少なくとも1つの第1の導体と、前記第1の導体の少なくとも1つのパラメーターと異なる少なくとも1つのパラメーターを有する少なくとも1つの第2の導体と、を含む命令、
を含むコンピュータ読み取り可能な媒体。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/617,480 US7921005B2 (en) | 2006-12-28 | 2006-12-28 | Method for selecting conductors of an overhead power transmission line |
PCT/US2007/087227 WO2008082884A1 (en) | 2006-12-28 | 2007-12-12 | Method for selecting conductors of an overhead power transmission line |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2010515421A true JP2010515421A (ja) | 2010-05-06 |
JP2010515421A5 JP2010515421A5 (ja) | 2011-02-03 |
Family
ID=39585182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009544157A Pending JP2010515421A (ja) | 2006-12-28 | 2007-12-12 | 架空送電線路のための導体を選択する方法 |
Country Status (9)
Country | Link |
---|---|
US (1) | US7921005B2 (ja) |
EP (1) | EP2104972A4 (ja) |
JP (1) | JP2010515421A (ja) |
KR (1) | KR101474037B1 (ja) |
CN (1) | CN101548445B (ja) |
BR (1) | BRPI0721172A2 (ja) |
CA (1) | CA2674574A1 (ja) |
RU (1) | RU2402850C1 (ja) |
WO (1) | WO2008082884A1 (ja) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2742694T3 (es) * | 2010-04-08 | 2020-02-17 | Omicron Electronics Gmbh | Procedimiento para la supervisión de una línea de transmisión de energía, supresión de interferencias mediante la transmisión repetida de datos |
US8374821B2 (en) * | 2010-12-22 | 2013-02-12 | Utility Risk Management Corporation, Llc | Thermal powerline rating and clearance analysis using thermal imaging technology |
EP2477288A1 (en) * | 2011-01-12 | 2012-07-18 | BAE Systems PLC | Assisting with installation of cabling in a build/equipping project |
US8275570B2 (en) * | 2011-03-02 | 2012-09-25 | Utility Risk Management Corporation, Llc | Thermal powerline rating and clearance analysis using local thermal sensor |
CN107563099B (zh) * | 2017-09-30 | 2020-11-27 | 河南财经政法大学 | 一种顾及排位知识的架空输电线路杆塔排位方法 |
RU2711333C1 (ru) * | 2019-01-22 | 2020-01-16 | Общество С Ограниченной Ответственностью "Мзва" (Ооо "Мзва") | Натяжной прессуемый зажим (варианты) |
WO2020213765A1 (ko) * | 2019-04-18 | 2020-10-22 | 주식회사 지오멕스소프트 | 기압계와 온도계를 사용한 실시간 송전선 수직변위 계측 시스템 |
CN112001088B (zh) * | 2020-08-28 | 2023-01-10 | 国网四川省电力公司电力科学研究院 | 基于悬链线的输电线路三维实景模型穿地校核方法 |
CN112100830A (zh) * | 2020-08-31 | 2020-12-18 | 季龙三 | 一种输电线路铁塔张力计算方法 |
CN112541630A (zh) * | 2020-12-10 | 2021-03-23 | 国网辽宁省电力有限公司丹东供电公司 | 一种基于天气变化的输电导线垂度预测方法 |
US11658755B2 (en) | 2021-03-05 | 2023-05-23 | Perspecta Labs Inc. | Interference mitigation in multi-antenna system |
CN113032878B (zh) * | 2021-03-24 | 2023-06-02 | 贵州电网有限责任公司 | 一种可修复铁塔防冰减灾设计方法 |
US20230124132A1 (en) * | 2021-08-03 | 2023-04-20 | NXP Enhanced Conductor Sciences, LLC | Enhanced high-voltage power line cable conductors for electric power transmission |
CN114417487B (zh) * | 2022-03-29 | 2022-07-01 | 陕西万迪信息科技有限公司 | 一种配电网杆塔结构优化方法及装置 |
CN114669617B (zh) * | 2022-05-27 | 2022-08-26 | 江苏中天科技股份有限公司 | 一种特耐热铝合金耐张管材 |
CN115600048B (zh) * | 2022-12-12 | 2023-03-24 | 安徽送变电工程有限公司 | 一种具有相邻导线间距补偿的弧垂观测方法、装置及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57106313A (en) * | 1980-12-18 | 1982-07-02 | Furukawa Electric Co Ltd | Method of installing aerial transmission line |
JP2006066259A (ja) * | 2004-08-27 | 2006-03-09 | Chugoku Electric Power Co Inc:The | 22kV配電線施設システム |
JP2006129581A (ja) * | 2004-10-27 | 2006-05-18 | Chugoku Electric Power Co Inc:The | 高圧配電線選定システム |
Family Cites Families (49)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2790843A (en) * | 1952-05-27 | 1957-04-30 | Gordon James | Suspended wire vibration damping means |
US2831048A (en) * | 1953-03-27 | 1958-04-15 | Holla E Weaver | System for eliminating galloping in aerial conductors |
GB1069084A (en) * | 1962-11-12 | 1967-05-17 | John Edward Gill | Improvements relating to overhead cable systems |
US3145259A (en) * | 1963-01-07 | 1964-08-18 | Leonard | Three phase electrical power distribution system |
US3709706A (en) * | 1969-05-16 | 1973-01-09 | Minnesota Mining & Mfg | Refractory fibers and other articles of zirconia and silica mixtures |
US3676578A (en) * | 1970-10-14 | 1972-07-11 | Gkn Somerset Wire Ltd | Electric conductor cables for use in overhead power transmissions |
US3795524A (en) * | 1971-03-01 | 1974-03-05 | Minnesota Mining & Mfg | Aluminum borate and aluminum borosilicate articles |
US4047965A (en) * | 1976-05-04 | 1977-09-13 | Minnesota Mining And Manufacturing Company | Non-frangible alumina-silica fibers |
CA1151256A (en) * | 1980-01-24 | 1983-08-02 | Slater Steel Industries Limited | Subspan oscillation and aeolian vibration absorber for single and bundle conductors |
US4362352A (en) * | 1980-05-08 | 1982-12-07 | Aluminum Company Of America | Splicing device |
GB8502336D0 (en) * | 1985-01-30 | 1985-02-27 | Bicc Plc | Overhead electric traction system |
US4686325A (en) * | 1986-05-16 | 1987-08-11 | Ronald Marsico | Catenary sag adjustment using added weights |
US5185299A (en) * | 1987-06-05 | 1993-02-09 | Minnesota Mining And Manufacturing Company | Microcrystalline alumina-based ceramic articles |
US4954462A (en) * | 1987-06-05 | 1990-09-04 | Minnesota Mining And Manufacturing Company | Microcrystalline alumina-based ceramic articles |
US5789701A (en) * | 1988-12-01 | 1998-08-04 | British Telecommunictions Public Limited Company | Drop cable |
US5171942A (en) * | 1991-02-28 | 1992-12-15 | Southwire Company | Oval shaped overhead conductor and method for making same |
US5243137A (en) * | 1992-06-25 | 1993-09-07 | Southwire Company | Overhead transmission conductor |
US5428549A (en) * | 1993-05-28 | 1995-06-27 | Abb Power T&D Company | Transmission line fault location system |
US5689417A (en) * | 1994-03-11 | 1997-11-18 | Southwire Company | Medium-voltage cable expert system |
US5501906A (en) * | 1994-08-22 | 1996-03-26 | Minnesota Mining And Manufacturing Company | Ceramic fiber tow reinforced metal matrix composite |
US5933355A (en) * | 1995-05-04 | 1999-08-03 | Deb; Anjan Kumar | Object oriented expert power line ampacity system |
US6245425B1 (en) * | 1995-06-21 | 2001-06-12 | 3M Innovative Properties Company | Fiber reinforced aluminum matrix composite wire |
US6304838B1 (en) * | 1997-01-31 | 2001-10-16 | Linesoft Corporation | Methods of increasing power handling capability of a power line |
US6127625A (en) * | 1997-04-18 | 2000-10-03 | Professional Communications, S.A. | Transmission conduit and method of installation of same |
TW505634B (en) * | 1998-01-19 | 2002-10-11 | Dainippon Ink & Amp Chemicals | Quinolinone glucoside, the process for preparing thereof and antiallergic |
US6191354B1 (en) * | 1998-04-16 | 2001-02-20 | Professional Communications, S. A. | Transmission conduit and method of installation |
US6205867B1 (en) * | 1998-10-07 | 2001-03-27 | American Electric Power, Inc. | Power line sag monitor |
US6559385B1 (en) * | 2000-07-14 | 2003-05-06 | 3M Innovative Properties Company | Stranded cable and method of making |
US6723451B1 (en) * | 2000-07-14 | 2004-04-20 | 3M Innovative Properties Company | Aluminum matrix composite wires, cables, and method |
US6344270B1 (en) * | 2000-07-14 | 2002-02-05 | 3M Innovative Properties Company | Metal matrix composite wires, cables, and method |
US6485796B1 (en) * | 2000-07-14 | 2002-11-26 | 3M Innovative Properties Company | Method of making metal matrix composites |
US6329056B1 (en) * | 2000-07-14 | 2001-12-11 | 3M Innovative Properties Company | Metal matrix composite wires, cables, and method |
JP4409084B2 (ja) | 2000-12-22 | 2010-02-03 | 株式会社巴技研 | 電線の張力調整装置 |
DE60119555T2 (de) * | 2001-12-21 | 2007-03-08 | Abb Schweiz Ag | Ermittlung der Betriebsgrenzwerte in einem Energieverteilungsnetz |
EP1389819A1 (en) * | 2002-08-14 | 2004-02-18 | ABB Technology AG | Automatic creation of a design for a high or medium voltage power transmission network |
CN2682706Y (zh) * | 2004-01-18 | 2005-03-02 | 桂林市天地光纤通信有限公司 | 架空线路用预绞式耐张线夹 |
US20050181228A1 (en) * | 2004-02-13 | 2005-08-18 | 3M Innovative Properties Company | Metal-cladded metal matrix composite wire |
US7131308B2 (en) * | 2004-02-13 | 2006-11-07 | 3M Innovative Properties Company | Method for making metal cladded metal matrix composite wire |
US7057103B1 (en) * | 2004-05-07 | 2006-06-06 | Alan B Peabody | Transmission tower devices for reducing longitudinal shock loads |
US7093416B2 (en) * | 2004-06-17 | 2006-08-22 | 3M Innovative Properties Company | Cable and method of making the same |
US20050279526A1 (en) * | 2004-06-17 | 2005-12-22 | Johnson Douglas E | Cable and method of making the same |
US20050279527A1 (en) * | 2004-06-17 | 2005-12-22 | Johnson Douglas E | Cable and method of making the same |
US7933599B2 (en) * | 2005-03-29 | 2011-04-26 | Qualcomm Incorporated | Techniques for facilitating communication handoffs |
CN2814745Y (zh) * | 2005-05-19 | 2006-09-06 | 陈龙章 | 耐张线夹 |
JP2006333651A (ja) | 2005-05-27 | 2006-12-07 | Chugoku Electric Power Co Inc:The | 耐張装置および耐張装置用ヨーク |
WO2007008872A2 (en) * | 2005-07-11 | 2007-01-18 | Gift Technologies, Lp | Method for controlling sagging of a power transmission cable |
US7627402B2 (en) * | 2005-10-21 | 2009-12-01 | Current Technologies, Llc | Device and method for designing power line communication system networks |
US7516051B2 (en) * | 2006-05-19 | 2009-04-07 | 3M Innovative Properties Company | Overhead power transmission line conductor selection |
US7494271B2 (en) * | 2007-02-05 | 2009-02-24 | Abb Research Ltd. | Power-line sag calculation by way of power-system state estimation |
-
2006
- 2006-12-28 US US11/617,480 patent/US7921005B2/en not_active Expired - Fee Related
-
2007
- 2007-12-12 JP JP2009544157A patent/JP2010515421A/ja active Pending
- 2007-12-12 RU RU2009123414/09A patent/RU2402850C1/ru active
- 2007-12-12 BR BRPI0721172-4A patent/BRPI0721172A2/pt not_active Application Discontinuation
- 2007-12-12 CN CN2007800452628A patent/CN101548445B/zh not_active Expired - Fee Related
- 2007-12-12 KR KR1020097015716A patent/KR101474037B1/ko not_active IP Right Cessation
- 2007-12-12 EP EP07865573.5A patent/EP2104972A4/en not_active Withdrawn
- 2007-12-12 WO PCT/US2007/087227 patent/WO2008082884A1/en active Application Filing
- 2007-12-12 CA CA002674574A patent/CA2674574A1/en not_active Abandoned
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS57106313A (en) * | 1980-12-18 | 1982-07-02 | Furukawa Electric Co Ltd | Method of installing aerial transmission line |
JP2006066259A (ja) * | 2004-08-27 | 2006-03-09 | Chugoku Electric Power Co Inc:The | 22kV配電線施設システム |
JP2006129581A (ja) * | 2004-10-27 | 2006-05-18 | Chugoku Electric Power Co Inc:The | 高圧配電線選定システム |
Also Published As
Publication number | Publication date |
---|---|
US7921005B2 (en) | 2011-04-05 |
CA2674574A1 (en) | 2008-07-10 |
EP2104972A4 (en) | 2015-01-21 |
KR101474037B1 (ko) | 2014-12-17 |
US20080162106A1 (en) | 2008-07-03 |
EP2104972A1 (en) | 2009-09-30 |
CN101548445B (zh) | 2012-06-13 |
WO2008082884A1 (en) | 2008-07-10 |
CN101548445A (zh) | 2009-09-30 |
BRPI0721172A2 (pt) | 2014-03-18 |
KR20090096642A (ko) | 2009-09-11 |
RU2402850C1 (ru) | 2010-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2010515421A (ja) | 架空送電線路のための導体を選択する方法 | |
RU2405234C1 (ru) | Воздушная линия электропередач | |
RU2399135C1 (ru) | Воздушная линия электропередачи | |
WO2007136961A1 (en) | Overhead power transmission line conductor selection | |
JP2010515421A5 (ja) | ||
EP2118909B1 (en) | Electrical conductor and core for an electrical conductor | |
Chen et al. | Experimental research on bending performance of structural cable | |
JP2001291429A (ja) | 架空送電線及び光ファイバ複合架空地線 | |
CN110147522A (zh) | 一种绞合型碳纤维复合芯导线拐点温度、应力计算方法 | |
Baniotopoulos et al. | Mathematical modeling of delamination and nonmonotone friction problems by hemivariational inequalities | |
WO2020245892A1 (ja) | 設備状態解析装置、設備状態解析方法、及びプログラム | |
Ibrahim | Performance evaluation of fiber-reinforced polymer poles for transmission lines | |
Liu et al. | Study on mechanical characteristics of conductors with three-dimensional finite-element models | |
CN114638044A (zh) | 一种基于双目标的索支承桥梁索力分类布设实用方法 | |
Zignani et al. | Numerical Simulation of $\hbox {Nb} _ {3}\hbox {Sn} $ Strands Performances With Bending Strain and Comparison With Experimental Measurements | |
CN111737863B (zh) | 基于能量法的多跨架空输电线覆冰找形计算方法 | |
Boopathy et al. | Numerical Analysis of High Temperature Low Sag Conductor | |
CN111737862B (zh) | 基于静力平衡的多跨架空输电线覆冰找形计算方法 | |
Kiitam et al. | Strength Analysis of Medium Voltage Overhead Line Crossarms for Updating Conductor | |
KR102655966B1 (ko) | 적어도 하나의 건축물에 대한 위험등급랭크정보를 제공하기 위한 방법 및 이를 이용한 서버 | |
Nascimento et al. | The state of the art for increased overhead line ampacity utilizing new technologies and statistical criteria | |
CN118070583A (zh) | 基于外部环境特征的铝包钢绞线临界融冰电流估算方法 | |
CN114417643A (zh) | 一种配电网中电杆材料选择方法及装置 | |
Stephen | Objective determination of optimal power line designs | |
Zhai | Performance Evaluation of K-DEMO Cable-in-conduit Conductors Using the Florida Electro-Mechanical Cable Model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101202 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20101202 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120629 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120807 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20130108 |