JP2010156158A - Box drawing form supporting apparatus and method of installing the same - Google Patents

Box drawing form supporting apparatus and method of installing the same Download PDF

Info

Publication number
JP2010156158A
JP2010156158A JP2008335409A JP2008335409A JP2010156158A JP 2010156158 A JP2010156158 A JP 2010156158A JP 2008335409 A JP2008335409 A JP 2008335409A JP 2008335409 A JP2008335409 A JP 2008335409A JP 2010156158 A JP2010156158 A JP 2010156158A
Authority
JP
Japan
Prior art keywords
box
bracket
suspension
formwork
suspension rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008335409A
Other languages
Japanese (ja)
Other versions
JP4313431B1 (en
Inventor
Chosuke Takamori
長助 高森
Takeo Tsukiori
武夫 月折
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAKACHO KENSETSU KK
Original Assignee
TAKACHO KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAKACHO KENSETSU KK filed Critical TAKACHO KENSETSU KK
Priority to JP2008335409A priority Critical patent/JP4313431B1/en
Application granted granted Critical
Publication of JP4313431B1 publication Critical patent/JP4313431B1/en
Publication of JP2010156158A publication Critical patent/JP2010156158A/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a box drawing form supporting apparatus and a method of installing the box drawing form supporting apparatus provided with hanging metal fittings for supporting box drawing forms adjustably in a horizontal direction (an X-Y direction) and in a height direction (a Z-direction), setting the box drawing forms as designed dimensions beforehand on the ground, and lifting the box drawing forms to fix them to a concrete form in installation positions. <P>SOLUTION: The box drawing form supporting apparatus is constituted to arrange a lower hanging metal fitting with a space below an upper hanging metal fitting supported to concrete forms on both sides, to dispose suspension rods arranged in the embedded positions of anchor bolts, vertically to penetrate the upper hanging metal fitting and lower hanging metal fitting, to support the suspension rods in a vertically adjustable manner at the upper hanging metal fitting, to arrange the box drawing forms downward from the lower face of the lower hanging metal fitting to surround the suspension rods, and to fix the box drawing forms to the suspension rods to hold the box drawing forms into the embedded positions of the anchor bolts. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、コンクリート打設工事においてアンカーボルトを埋設する縦穴を形成するために予め設置される箱抜用型枠を所定位置に支持するための箱抜用型枠支持装置及びその設置方法に関する。   The present invention relates to a box-forming form support device for supporting a box-forming form that is set in advance in order to form a vertical hole in which an anchor bolt is embedded in concrete placing work and a method for installing the same.

従来から、高速道路等の橋脚は鉄筋コンクリート製で形成されており、その上面にはアンカーボルトを立設するための縦穴を予めあけておくために、ボイド等と称されるワインディングパイプまたは硬質紙製の長尺チューブ等の箱抜用型枠を仮設してからコンクリート打設が行われている。
このコンクリート打設工事において、予め縦穴を形成するためにボイド等を仮設してからコンクリートを打設し、コンクリート固化後にボイド等を抜き取り、形成された縦穴にアンカーボルトを立てて隙間にはモルタルやアスファルト等を注入して固定させるという一連の工事のボイド等を抜き取るまでを箱抜き工事と称し、仮設されるボイド等を箱抜用型枠と称しているのである。
Conventionally, piers of highways and the like have been formed of reinforced concrete, and in order to make a vertical hole for standing anchor bolts in advance on the upper surface, a winding pipe called a void or the like made of hard paper Concrete placement is performed after temporarily forming a box-extracting formwork such as a long tube.
In this concrete placement work, in order to form a vertical hole in advance, a void or the like is temporarily set and then the concrete is placed. After the concrete is solidified, the void is removed, and an anchor bolt is set up in the formed vertical hole, and a mortar or Until a void or the like of a series of works of injecting and fixing asphalt or the like is extracted, it is called boxing work, and a temporary void or the like is called a boxing formwork.

この箱抜用型枠はその固定手段として適切な方法や用具がなく、大変苦労しているのが現状である。例えば、箱抜用型枠を溶接金物などを利用して型枠内の鉄筋に溶接しているが、橋脚上部の鉄筋上で箱抜用型枠を位置決めし、箱抜用型枠を溶接金物を介して溶接で固定する作業は大変なものであった。また、雨の日には溶接作業ができないこと、あるいは、溶接の火花が型枠材に飛び散り型枠を損傷するなど問題が多かった。
さらに、従来のものでは、コンクリート打設後に、養生期間を置き、箱抜用型枠を撤去、処分しなければならないという問題もあった。
This boxing formwork has no proper method and tools as its fixing means, and is currently very difficult. For example, the boxing formwork is welded to the reinforcing bar in the formwork using welding hardware, etc., but the boxing formwork is positioned on the reinforcing bar at the top of the pier, and the boxing formwork is welded to the welding hardware. The work of fixing by welding through the work was very difficult. In addition, there were many problems that welding work could not be performed on rainy days, or that welding sparks scattered on the formwork material and damaged the formwork.
Further, the conventional one has a problem that after placing concrete, a curing period is required, and the box-forming form must be removed and disposed.

最近、箱抜用型枠を型枠内の鉄筋に溶接で固定するのではなく、コンクリート型枠に固定する手法として、両側のコンクリート型枠の上端間に架橋して釘打ち等により固定した2枚の桟木に取付台部を取付け、この取付台部に固定された鉤形保持部材と締め部材との間に箱抜用型枠を固定するようにした発明が提案されている(たとえば、特許文献1参照。以下、「従来技術1」という。)。
また、箱抜用型枠を再利用可能にするため、棒状の軸材と、該軸材に取り付けられたベースと、該ベースの周囲に、前記軸材を包囲するように巻き付けられる、弾性を有する薄板とから形成されてなる箱抜用型枠が提案されている(たとえば、特許文献2参照。以下、「従来技術2」という。)。
Recently, instead of fixing the boxing formwork to the reinforcing bars in the formwork by welding, it was fixed to the concrete formwork by bridging between the upper ends of the concrete formwork on both sides and fixing it by nailing etc. 2 An invention has been proposed in which a mounting base portion is attached to a piece of pier and a box form is fixed between a hook-shaped holding member and a fastening member fixed to the mounting base portion (for example, a patent See Reference 1. Hereinafter, referred to as “Prior Art 1”).
Further, in order to make the boxing formwork reusable, the rod-shaped shaft member, the base attached to the shaft member, and the elasticity wound around the base so as to surround the shaft member. A box punching mold formed from a thin plate having been proposed has been proposed (see, for example, Patent Document 2, hereinafter referred to as “Prior Art 2”).

特開平7−247683号公報JP-A-7-247683 特開2003−129660号公報JP 2003-129660 A

従来技術1においては、溶接作業はなくなるものの、箱抜用型枠の水平方向(X−Y方向)の設置位置調節機能を有していないため、箱抜用型枠を所定の水平方向位置に調節しながらセットすることができないという問題があった。また、高さ方向(Z方向)の位置決めに関しては、作業者が箱抜用型枠を手で持って所定の高さ位置で締め部材を締め付けて固定しなければならないという問題もあった。
従来技術2においては、箱抜用型枠の再利用は可能になるものの、箱抜用型枠の水平方向(X−Y方向)および高さ方向(Z方向)の設置位置調節に関しては全く考慮されていないため、箱抜用型枠を所定の位置にセットすることができないという問題があった。
一方、高速道路等の橋脚の上面は水平にあるいは傾斜を有して形成されるが、いずれの場合においても、アンカーボルトの設置面は厳密に水平に形成する必要があるため、橋脚の上面とアンカーボルトの設置面との間には段差が形成されることから、この段差形成のための型枠を設置する必要もあった。
In the prior art 1, although the welding work is eliminated, the boxing mold is placed in a predetermined horizontal position because it does not have an installation position adjusting function in the horizontal direction (XY direction) of the boxing mold. There was a problem that it could not be set while adjusting. Further, regarding the positioning in the height direction (Z direction), there is also a problem that the operator must hold the boxing formwork by hand and fasten and fix the fastening member at a predetermined height position.
In the prior art 2, although the boxing formwork can be reused, the installation position adjustment of the boxing formwork in the horizontal direction (XY direction) and the height direction (Z direction) is completely considered. Since this is not done, there has been a problem that the boxing form cannot be set at a predetermined position.
On the other hand, the upper surface of a pier such as an expressway is formed horizontally or with an inclination. In any case, the installation surface of the anchor bolt must be formed strictly horizontally. Since a step is formed between the anchor bolt and the installation surface, it is necessary to install a mold for forming the step.

本発明は、コンクリート打設工事においてアンカーボルトを埋設する縦穴を形成するために予め設置される箱抜用型枠の設置において、箱抜用型枠を水平方向(X−Y方向)および高さ方向(Z方向)に調節可能に支持する吊り金具を備え、予め地上において箱抜用型枠を設計寸法とおりにセットしておき、これをクレーン等で吊り上げて設置位置のコンクリート型枠に固定し、設置位置においては、高さ方向(Z方向)の微調整をするだけで所定位置に箱抜用型枠を設置可能とした箱抜用型枠支持装置及びその設置方法を提供することを目的としている。
また、本発明は、箱抜用型枠の設置に併せて段差用型枠の設置も簡単に行えるようにすることを目的とする。
The present invention relates to a horizontal direction (X-Y direction) and a height of a boxing mold in the installation of a boxing mold that is set in advance to form a vertical hole in which an anchor bolt is embedded in concrete placing work. Suspension metal fittings that can be adjusted in the direction (Z direction) are provided, and the boxing formwork is set according to the design dimensions in advance on the ground, and this is lifted with a crane or the like and fixed to the concrete formwork at the installation position. An object of the present invention is to provide a boxing form support apparatus and a method for installing the boxing form which can be installed at a predetermined position only by fine adjustment in the height direction (Z direction) at the installation position. It is said.
Another object of the present invention is to make it easy to install a step form in conjunction with the boxing form.

上記目的を達成するため本発明の箱抜用型枠支持装置は、第1に、両側のコンクリート型枠に支持される上部吊金具の下方に間隔をおいて下部吊金具を配置し、アンカーボルトの埋設位置に配置される吊支ロッドを上部吊金具および下部吊金具を貫通するようにして鉛直方向に配設し、上部吊金具において吊支ロッドを上下方向調節自在に支持し、下部吊金具の下面から下方に向けて箱抜用型枠を吊支ロッドを囲むようにして配置し、箱抜用型枠を吊支ロッドに固定することによりアンカーボルトの埋設位置に保持することを特徴としている。
また、本発明の箱抜用型枠支持装置は、第2に、第1の特徴において、上部吊金具は、X方向に間隔を隔てて平行に配置された一対の梁状部材からなり、それぞれの梁状部材は、断面箱形の形鋼を吊支ロッドの直径より僅かに大きな間隙を有するように平行に配置されて一体に形成されていることを特徴としている。
In order to achieve the above object, according to the first embodiment of the present invention, there is provided a box unloading support device in which a lower hanging bracket is disposed below an upper hanging bracket supported by a concrete mold on both sides, and an anchor bolt is provided. The suspension rod arranged at the buried position is vertically disposed so as to penetrate the upper suspension bracket and the lower suspension bracket, and the suspension rod is supported by the upper suspension bracket so that the suspension rod can be adjusted in the vertical direction. The box-extracting formwork is arranged so as to surround the suspension rod from the lower surface of the frame, and the box-extracting formwork is fixed to the suspension rod to be held at the embedded position of the anchor bolt.
In addition, the boxing form support device of the present invention is, secondly, according to the first feature, the upper suspension metal fittings are composed of a pair of beam-like members arranged in parallel in the X direction at intervals, These beam-shaped members are characterized in that the cross-sectional box-shaped steel bars are arranged in parallel so as to have a gap slightly larger than the diameter of the suspension rod, and are integrally formed.

また、本発明の箱抜用型枠支持装置は、第3に、第2の特徴において、上部吊金具の一対の梁状部材に直交して吊支ロッドの配置される位置に一対のY方向位置決め用定規を配置し、かつ、上部吊金具の一対の梁状部材に沿うように一対のX方向位置決め用定規を配置し、Y方向位置決め用定規とX方向位置決め用定規との交差する4個所のうち、基準となる1個所を固定し、他の3個所をボルト・ナットで調整自在に固定してなることを特徴としている。
また、本発明の箱抜用型枠支持装置は、第4に、第3の特徴において、Y方向位置決め用定規およびX方向位置決め用定規は、それぞれ、断面箱形の形鋼を吊支ロッドの直径より僅かに大きな間隙を有するように平行に配置されて一体に形成されてなり、Y方向位置決め用定規およびX方向位置決め用定規には相対する位置決め用定規の間隙に沿ってスライド可能なガイド部材を設けることを特徴としている。
Further, according to the third feature of the present invention, in the second feature, the pair of Y-directions are located at positions where the suspension rods are arranged perpendicular to the pair of beam members of the upper suspension bracket. Positioning ruler and a pair of X-direction positioning rulers along the pair of beam-like members of the upper hanger. Four points where the Y-direction positioning ruler and the X-direction positioning ruler intersect Among them, one reference point is fixed and the other three points are fixed by bolts and nuts so as to be adjustable.
According to the fourth and third features of the present invention, the Y-direction positioning ruler and the X-direction positioning ruler each have a box-shaped section steel with a hanging rod. A guide member that is arranged in parallel so as to have a gap slightly larger than the diameter and is integrally formed, and is slidable along the gap of the positioning ruler opposite to the Y-direction positioning ruler and the X-direction positioning ruler. It is characterized by providing.

また、本発明の箱抜用型枠支持装置は、第5に、第1ないし4のいずれかの特徴において、下部吊金具は、矩形を形成するように四隅に配置されるコーナー金物とこれらのコーナー金物を連結する連結部材とから形成され、それぞれのコーナー金物は、断面箱形の形鋼を直角に交差させて結合した十字状をしており、その交点には吊支ロッドを貫通させるための貫通孔を形成し、隣接するコーナー金物に連結部材を入れ子式に嵌合させることによりコーナー金物の位置が調整可能に形成されていることを特徴としている。
また、本発明の箱抜用型枠支持装置は、第6に、第5の特徴において、下部吊金具の周囲に所定の間隔を隔てて段差用型枠を配置し、段差用型枠を下部吊金具のコーナー金物で支持するようにしたことを特徴としている。
また、本発明の箱抜用型枠支持装置は、第7に、第6の特徴において、下部吊金具のコーナー金物から外方に向けて段差用型枠固定金具を延設し、段差用型枠固定金具のコーナー金物における支持位置を調節することにより段差用型枠の配置を変更自在とすることを特徴としている。
Further, according to the fifth aspect of the present invention, in any one of the features of the first to fourth aspects, the lower hanging bracket includes corner hardwares arranged at four corners so as to form a rectangle, and these metal fittings. It is formed from connecting members that connect corner hardware, and each corner hardware has a cross shape in which cross-section box-shaped steel bars are crossed at right angles, and a suspension rod is passed through the intersection. Are formed so that the position of the corner hardware can be adjusted by fitting the connecting member into the adjacent corner hardware in a nested manner.
Further, according to the sixth aspect of the present invention, in the fifth feature, the step formwork is arranged around the lower suspension bracket at a predetermined interval, and the step formwork is arranged at the lower part. It is characterized by being supported by the corner hardware of the hanging bracket.
Further, according to the sixth aspect of the present invention, in the sixth feature of the present invention, in the sixth feature, the step mold fixing bracket is extended outward from the corner hardware of the lower hanging bracket, and the step mold is provided. It is characterized in that the arrangement of the step molds can be changed by adjusting the support position of the corner fixture of the frame fixing bracket.

また、本発明の箱抜用型枠支持装置は、第8に、第1ないし7のいずれかの特徴において、箱抜用型枠をテーパを有する鋼管により形成し、該鋼管の上端には吊支ロッド挿通用の孔を中心に設けた固定板を装着し、鋼管の下端には底板を設け、該底板の上面の中心部に吊支ロッドの下端が螺合する袋ナットを固着し、底板の下面に補強板を固着してなることを特徴としている。
また、本発明の箱抜用型枠支持装置は、第9に、第8の特徴において、箱抜用型枠を形成する鋼管の長さを、長さ調節用鋼管を積み重ねることにより調節自在とすることを特徴としている。
Eighthly, according to any one of the first to seventh features, the boxing form support device of the present invention is such that the boxing formwork is formed of a steel pipe having a taper, and is suspended from the upper end of the steel pipe. A fixing plate provided around the hole for inserting the support rod is attached, a bottom plate is provided at the lower end of the steel pipe, and a cap nut to which the lower end of the suspension support rod is screwed is fixed to the center of the upper surface of the bottom plate. It is characterized in that a reinforcing plate is fixed to the lower surface of the plate.
Ninthly, in the eighth feature of the present invention, the length of the steel pipe forming the boxing formwork can be adjusted by stacking the length adjusting steel pipes. It is characterized by doing.

本発明の箱抜用型枠支持装置の設置方法は、第1ないし第9の特徴に記載の箱抜用型枠の支持装置を、吊支ロッドのX−Y方向の位置が設計寸法とおりに位置するように上部吊金具および下部吊金具を調整しながら地上において仮組し、仮組された箱抜用型枠支持装置を吊上げ装置で吊上げてコンクリート型枠の決められた位置に装着し、その後、上部吊金具に対する吊支ロッドの上下方向の支持位置を調節することにより下部吊金具を介して箱抜用型枠を水平、且つ、所定の高さ位置に配置するようにしたことを特徴としている。   According to the method for installing the boxing formwork support device of the present invention, the boxing formwork support device according to any one of the first to ninth features is arranged such that the position of the suspension rod in the XY direction is in accordance with the design dimension. Temporarily assembled on the ground while adjusting the upper and lower suspension brackets so that they are positioned, and the temporarily assembled box extraction formwork support device is lifted by the lifting device and attached to the determined position of the concrete formwork, After that, by adjusting the vertical support position of the suspension rod with respect to the upper suspension bracket, the boxing formwork is arranged horizontally and at a predetermined height position via the lower suspension bracket. It is said.

本発明の箱抜用型枠支持装置およびその設置方法は、以下のような優れた効果を奏することができる。
(1)箱抜用型枠を溶接作業を行うことなく設置することができ、雨天における作業を可能にするとともに、溶接火花発生によるコンクリート型枠の損傷を防止できる。
(2)接地面の状況にかかわらず、箱抜用型枠のX−Y−Z方向の位置調節を正確に行うことができる。また、設置された箱抜用型枠はコンクリート打設時に傾斜したり、移動したりすることなく、堅固に固定される。
(3)アンカーボルト埋設位置である現場における作業を簡素化でき、作業の安全、効率化に大きく貢献できる。このため、施工時間の短縮を図ることができる。
(4)アンカーボルト埋設位置における段差形成用の段差用型枠の設置も簡単に行うことができる。
(5)アンカーボルト埋設位置に対応して箱抜用型枠および段差用型枠の設置位置を自在に調節できる。このため、同じ箱抜用型枠支持装置を広範な現場に対応して使用することができる。
(6)箱抜用型枠の再利用を可能としているため、必要とされる箱抜用型枠の個数が減少でき、さらに、解体後の廃材の処理がなくなることから、費用の低減を図ることができる。
The boxing form support apparatus and the installation method thereof according to the present invention can provide the following excellent effects.
(1) The boxing formwork can be installed without performing welding work, enabling work in rainy weather and preventing damage to the concrete formwork due to generation of welding sparks.
(2) Regardless of the condition of the ground contact surface, the position adjustment of the boxing form in the X, Y, and Z directions can be accurately performed. Further, the box-forming formwork that is installed is firmly fixed without being tilted or moved when the concrete is placed.
(3) The work at the site where the anchor bolt is buried can be simplified, and it can greatly contribute to the safety and efficiency of the work. For this reason, construction time can be shortened.
(4) It is possible to easily install a step mold for forming a step at a position where an anchor bolt is buried.
(5) It is possible to freely adjust the installation positions of the boxing form and the step form corresponding to the anchor bolt burying position. For this reason, the same boxing form support apparatus can be used corresponding to a wide field.
(6) Since the boxing formwork can be reused, the number of required boxing formwork can be reduced, and further, the disposal of waste material after dismantling is eliminated, thereby reducing costs. be able to.

本発明の箱抜用型枠支持装置およびその設置方法を実施するための最良の形態を図面を参照しながら詳細に説明するが、本発明はこれに限定されて解釈されるものではなく、本発明の範囲を逸脱しない限りにおいて、当業者の知識に基づいて、種々の変更、修正、改良を加えうるものである。   BEST MODE FOR CARRYING OUT THE INVENTION The best form for carrying out the boxing formwork support apparatus and its installation method of the present invention will be described in detail with reference to the drawings. However, the present invention is not construed as being limited thereto. Various changes, modifications, and improvements can be made based on the knowledge of those skilled in the art without departing from the scope of the invention.

図1は、高速道路等のコンクリートを打設した後の橋脚1を示したもので、(a)は平面図、(b)は正面図である。
説明の都合上、以下においては、部材の配置関係をX−Y−Zの直交座標系を用いて説明するが、平面位置関係については、図1(a)に示すように左右方向をX方向、上下方向をY方向とする。
この例の場合、橋脚1の上面2には、X方向に2個所、それぞれ4本のアンカーボルト3が埋設されている。コンクリートが打設される前の状態では、橋脚1の外形に沿ってコンクリート型枠が設置され、また、その内側には鉄筋が縦・横・高さ方向に配筋され、これら鉄筋の間にアンカーボルト埋設用の縦穴を形成すべく箱抜用型枠が設置されるものである。
FIG. 1 shows a pier 1 after placing concrete such as a highway, where (a) is a plan view and (b) is a front view.
For convenience of explanation, the arrangement relationship of members will be described below using an XYZ orthogonal coordinate system. As for the planar position relationship, the horizontal direction is the X direction as shown in FIG. The vertical direction is defined as the Y direction.
In the case of this example, four anchor bolts 3 are embedded in the upper surface 2 of the pier 1 in two locations in the X direction. Before the concrete is placed, a concrete formwork is installed along the outer shape of the pier 1, and reinforcing bars are arranged in the vertical, horizontal, and height directions on the inside. A box-extruding formwork is installed to form a vertical hole for anchor bolt embedding.

ところで、橋脚1の上面2は、水平、あるいは図1(b)および図2に示すように一方向に傾斜するように形成される場合がある。いずれの場合でも、図2に示すように、アンカーボルト3は水平面4を基準にして据え付けられるものであるから、縦穴5を形成する箱抜用型枠も水平面4を基準にして設置されなければならない。このため、アンカーボルト3の設置面には、橋脚1の上面2とは別に水平面4が形成され、橋脚上面2との間には、段差6が生じるのでこの段差6に型枠を設置する必要がある。
橋脚1の外形に沿って設置されるコンクリート型枠には、アンカーボルト3埋設用の縦穴の位置関係が表示されているので、縦穴を形成するための箱抜用型枠の設置は、コンクリート型枠に表示されたこの位置関係を基準にして行われる。
Incidentally, the upper surface 2 of the pier 1 may be formed to be horizontal or inclined in one direction as shown in FIGS. In any case, as shown in FIG. 2, the anchor bolt 3 is installed with reference to the horizontal plane 4, and therefore the boxing form forming the vertical hole 5 must be installed with reference to the horizontal plane 4. Don't be. For this reason, a horizontal surface 4 is formed on the installation surface of the anchor bolt 3 separately from the upper surface 2 of the pier 1, and a step 6 is formed between the upper surface 2 of the pier 1. There is.
Since the positional relationship of the vertical holes for embedding the anchor bolts 3 is displayed on the concrete form installed along the outer shape of the pier 1, the installation of the box form for forming the vertical hole is a concrete type. This is performed based on this positional relationship displayed in the frame.

図3は、本発明の箱抜用型枠支持装置を地上において仮組するための架台を示したもので、(a)は側面図、(b)は正面図である。
架台7は、直方体状に形成されているもので、4隅に配置されたレベル調整ジャッキ8の2台を結ぶ下部横梁9、それぞれの横梁9を連結するように横梁9上に該横梁9と直交して配置された縦梁10、それぞれの横梁9から上方に向けて立設された2本の柱11、11および柱11、11を上端において連結する上部横梁12から構成されている。
後記する箱抜用型枠支持装置の上部吊金具15が、上部横梁12、12上に載置されて箱抜用型枠支持装置の仮組が地上において行われる。
3A and 3B show a frame for temporarily assembling the boxing form support device of the present invention on the ground. FIG. 3A is a side view and FIG. 3B is a front view.
The gantry 7 is formed in a rectangular parallelepiped shape. The gantry 7 is a lower horizontal beam 9 connecting two level adjusting jacks 8 arranged at four corners, and the horizontal beam 9 is connected to the horizontal beam 9 so as to connect the respective horizontal beams 9. It is comprised from the vertical beam 10 arrange | positioned orthogonally, the two pillars 11 and 11 erected upward from each horizontal beam 9, and the upper horizontal beam 12 which connects the pillars 11 and 11 in an upper end.
The upper hanging bracket 15 of the boxing form support apparatus to be described later is placed on the upper cross beams 12 and 12, and the box forming form support apparatus is temporarily assembled on the ground.

図4は、図5のB−B矢視図であって、本発明の箱抜用型枠支持装置がコンクリート型枠に固定され、設置された状態を示す正面図である。
図5は、本発明の箱抜用型枠支持装置がコンクリート型枠に固定され、設置された状態を示す平面図である。本例においては、箱抜用型枠支持装置として、4本のアンカーボルトを埋設するように4つの箱抜用型枠を支持する装置について説明するが、これに限らず、箱抜用型枠の数量については適宜設定可能であることはいうまでもない。
図4および5において、両側のコンクリート型枠14、14は、図1(a)のY方向に間隔を有して両側に配設される型枠である。
この例では、箱抜用型枠支持装置は、両側のコンクリート型枠14、14に固定されるようにY方向に配置されるものであり、4本のアンカーボルト埋設用の縦穴が同時に形成できるように4個の箱抜用型枠を支持している。この場合、高さ方向の基準は、一番低い位置に形成されるアンカーボルト位置を基準として箱抜用型枠が位置決めされる。
FIG. 4 is a front view showing a state in which the boxing form support device of the present invention is fixed to the concrete formwork and installed, as seen from the direction of arrows BB in FIG. 5.
FIG. 5 is a plan view showing a state in which the boxing form support device of the present invention is fixed to a concrete formwork and installed. In this example, a description will be given of a device for supporting four box-forming molds so as to embed four anchor bolts as a box-forming mold support device. It goes without saying that the quantity can be set as appropriate.
4 and 5, the concrete molds 14 and 14 on both sides are molds disposed on both sides with a space in the Y direction in FIG. 1 (a).
In this example, the boxing formwork support device is arranged in the Y direction so as to be fixed to the concrete formwork 14 on both sides, and four vertical holes for embedding anchor bolts can be formed simultaneously. In this way, four boxing molds are supported. In this case, as a reference in the height direction, the box cutting form is positioned with reference to the anchor bolt position formed at the lowest position.

箱抜用型枠支持装置は、両側のコンクリート型枠14、14に支持される上部吊金具15の下方に間隔をおいて下部吊金具30を配置し、平面視でアンカーボルトの埋設位置に配置される吊支ロッド35を上部吊金具15および下部吊金具30を貫通するようにして鉛直方向に配設し、上部吊金具15において吊支ロッド35を上下方向調節自在に支持し、箱抜用型枠50を吊支ロッド35を囲むようにして下部吊金具30の下面から下方に向けて配置し、箱抜用型枠50を吊支ロッド35により固定することによりアンカーボルトの埋設位置に保持している。   The box-forming form support device has a lower suspension bracket 30 disposed below the upper suspension bracket 15 supported by the concrete molds 14 and 14 on both sides, and is disposed at an anchor bolt burying position in plan view. The suspended support rod 35 is vertically disposed so as to penetrate the upper suspension fitting 15 and the lower suspension fitting 30, and the suspension rod 35 is supported by the upper suspension fitting 15 so as to be adjustable in the vertical direction. The mold frame 50 is disposed so as to surround the suspension rod 35 and downward from the lower surface of the lower hanging bracket 30, and the box-extracting mold frame 50 is fixed by the suspension rod 35 to be held at the anchor bolt embedded position. Yes.

図5に示すように、上部吊金具15は、X方向に間隔を隔てて平行に配置された一対の梁状部材16、16からなり、それぞれの梁状部材16は、断面箱形の形鋼17、17を吊支ロッド35の直径より僅かに大きな間隙δを有して平行に配置して両端において溶接等の手段で一体に形成されている。梁状部材16表面の長手方向に寸法を表示する目盛りが付されている。また、上部吊金具15の長手方向の両側の上面には、吊りワイヤー取付金具18、18が設けられており、クレーン等の吊上げ装置で吊上げ移動可能となっている。   As shown in FIG. 5, the upper hanging bracket 15 is composed of a pair of beam-like members 16 and 16 arranged in parallel with a gap in the X direction, and each beam-like member 16 is a section steel having a box-shaped section. 17 and 17 are arranged in parallel with a gap δ slightly larger than the diameter of the suspension rod 35 and are integrally formed at both ends by means such as welding. The scale which displays a dimension is attached | subjected to the longitudinal direction of the beam-shaped member 16 surface. Moreover, suspension wire attachment brackets 18 and 18 are provided on the upper surfaces of both sides in the longitudinal direction of the upper suspension bracket 15 and can be lifted and moved by a lifting device such as a crane.

図4に示すように、上部吊金具15の長手方向の両側には、両側のコンクリート型枠14、14に固定するための固定金具、すなわち、コンクリート型枠14を挟持する挟持金具19、挟持金具19から立設され上部吊金具15を貫通して配設されるねじ棒20、上部吊金具15の上下からねじ棒20に螺合して挟着するワッシャー付きナット21、21が装着されている。このため、上部吊金具15は、コンクリート型枠14に対して上下方向に調節可能に固定される。   As shown in FIG. 4, on both sides in the longitudinal direction of the upper hanging bracket 15, fixing brackets for fixing to the concrete molds 14, 14 on both sides, that is, a clamping bracket 19 for clamping the concrete mold 14, a clamping bracket A screw rod 20 which is erected from 19 and is disposed through the upper hanging bracket 15 and nuts 21 and 21 with washers which are screwed into the screw rod 20 from above and below the upper hanging bracket 15 and attached thereto are mounted. . For this reason, the upper suspension fitting 15 is fixed to the concrete formwork 14 so as to be adjustable in the vertical direction.

上部吊金具15の一対の梁状部材16、16に直交して吊支ロッド35の配置される位置に一対のX方向位置決め用定規22、22を配置し、かつ、上部吊金具15の一対の梁状部材16、16の内側に沿うように一対のY方向位置決め用定規23、23を配置し、X方向位置決め用定規22とY方向位置決め用定規23との交差する4個所のうち、基準となる1個所、たとえば、図5に示す基準個所24−1においてX方向位置決め用定規22とY方向位置決め用定規23とを90°の角度をもって溶接にて固定し、他の3個所24−2〜24−4をボルト・ナット25で調整自在に固定する。X方向位置決め用定規22およびY方向位置決め用定規23の表面の長手方向にはは、寸法を表示する目盛が付されており、基準個所24−1のアンカーボルト埋設位置から他の3個所のアンカーボルト埋設位置を正確に割り出すことができるようになっている。
本例においては、X方向位置決め用定規22は上部吊金具15の一対の梁状部材16、16の上面に載置されるように配置され、Y方向位置決め用定規23はX方向位置決め用定規22の下面に接するように配置されている。
A pair of X-direction positioning rulers 22, 22 is disposed at a position where the suspension rod 35 is disposed orthogonally to the pair of beam members 16, 16 of the upper suspension bracket 15, and the pair of upper suspension bracket 15 A pair of Y-direction positioning rulers 23, 23 are arranged along the inside of the beam-shaped members 16, 16, and among the four points where the X-direction positioning ruler 22 and the Y-direction positioning ruler 23 intersect, For example, in the reference location 24-1 shown in FIG. 5, the X-direction positioning ruler 22 and the Y-direction positioning ruler 23 are fixed by welding at an angle of 90 °, and the other three locations 24-2 to 24-2. 24-4 is fixed with bolts and nuts 25 in an adjustable manner. In the longitudinal direction of the surfaces of the X-direction positioning ruler 22 and the Y-direction positioning ruler 23, a scale for displaying dimensions is attached, and the anchor bolt embedded position at the reference location 24-1 is fixed to the other three anchors. The bolt burying position can be accurately determined.
In this example, the X-direction positioning ruler 22 is disposed so as to be placed on the upper surfaces of the pair of beam-like members 16, 16 of the upper hanging bracket 15, and the Y-direction positioning ruler 23 is the X-direction positioning ruler 22. It arrange | positions so that the lower surface of may be touched.

X方向位置決め用定規22およびY方向位置決め用定規23は、それぞれ、断面箱形の形鋼26を吊支ロッド35の直径より僅かに大きな間隙δを有して平行に配置しその両端において溶接等の手段で一体に形成されている。
図6(a)(b)は、それぞれ、図5のC−C矢視図、D−D矢視図であり、X方向位置決め用定規22およびY方向位置決め用定規23には相対する位置決め用定規の間隙δに沿ってスライド可能なガイド部材27を設けて、相対移動がスムーズにできるようにされている。たとえば、図4に示すように、個所24−2においては、Y方向位置決め用定規23の上面からX方向位置決め用定規22の間隙δに嵌合するガイド部材27が突出して設けられている。また、図6(b)に示すように、個所24−3においては、X方向位置決め用定規22の下面からY方向位置決め用定規23の間隙δに嵌合するガイド部材27が突出して設けられている。さらに、ボルト・ナット25において、ボルト25−1はY方向位置決め用定規23の下方から上方に向けてX方向位置決め用定規22の上部に突出するようにセットされ、ワッシャ25−3を介してナット25−2を締付け固定するようになっている。図6に示すように、ボルト25−1にも間隙δに嵌合するガイド部材27が突出して設けられている。
Each of the X-direction positioning ruler 22 and the Y-direction positioning ruler 23 has a cross-sectional box-shaped steel 26 arranged in parallel with a gap δ slightly larger than the diameter of the suspension rod 35 and welded at both ends thereof. It is integrally formed by the means.
6 (a) and 6 (b) are a CC arrow view and a DD arrow view of FIG. 5, respectively, and are for positioning relative to the X direction positioning ruler 22 and the Y direction positioning ruler 23, respectively. A guide member 27 slidable along the ruler gap δ is provided so that the relative movement can be performed smoothly. For example, as shown in FIG. 4, a guide member 27 that fits into the gap δ of the X-direction positioning ruler 22 protrudes from the upper surface of the Y-direction positioning ruler 23 at the location 24-2. Further, as shown in FIG. 6B, a guide member 27 that fits into the gap δ of the Y-direction positioning ruler 23 protrudes from the lower surface of the X-direction positioning ruler 22 at the location 24-3. Yes. Further, in the bolt / nut 25, the bolt 25-1 is set so as to protrude from the lower side to the upper side of the Y-direction positioning ruler 23 so as to protrude above the X-direction positioning ruler 22, and through the washer 25-3, the nut 25-2 is fastened and fixed. As shown in FIG. 6, a guide member 27 that fits in the gap δ is also provided protruding from the bolt 25-1.

図7は、図4のE−E矢視図である。
下部吊金具30は、矩形を形成するように四隅に配置されるコーナー金物31とこれらのコーナー金物31を連結する連結部材32とから形成され、それぞれのコーナー金物31は、断面箱形の形鋼を直角に交差させて結合した十字状をしており、その交点には吊支ロッド35を貫通させるための貫通孔33を形成し、隣接するコーナー金物31、31に連結部材32を入れ子式に嵌合させることによりコーナー金物31の位置が調整可能に形成されている。
本例において、十字状をしたコーナー金物31は、図7に示すように、貫通孔33を基点として連結部材32を嵌合させる嵌合部31−1が長く、反対側の外方向に向かう外方部31−2は短く形成され、連結部材32を嵌合させる嵌合部31−1には固定ボルト34が設けられている。
FIG. 7 is an EE arrow view of FIG.
The lower hanging metal fitting 30 is formed of corner metal parts 31 arranged at four corners so as to form a rectangle and a connecting member 32 for connecting these corner metal parts 31, and each corner metal part 31 is a section steel having a box-shaped section. Are formed by crossing them at right angles, and a through hole 33 for penetrating the suspension rod 35 is formed at the intersection, and the connecting member 32 is nested in the adjacent corner hardware 31,31. By fitting, the position of the corner hardware 31 can be adjusted.
In this example, as shown in FIG. 7, the cross-shaped corner hardware 31 has a long fitting part 31-1 for fitting the connecting member 32 with the through-hole 33 as a base point, and the outer side facing the outer side on the opposite side. The direction part 31-2 is formed short, and the fixing bolt 34 is provided in the fitting part 31-1 into which the connecting member 32 is fitted.

下部吊金具30の周囲に所定の間隔を隔てて段差用型枠36を配置し、段差用型枠36を下部吊金具30のコーナー金物31で支持している。
段差用型枠36のコーナー部の内側には取付金具37が固定され、段差用型枠36の補強および下部吊金具30のコーナー金物31による支持の便宜を図っている。
A step mold 36 is arranged around the lower hanging bracket 30 at a predetermined interval, and the step mold 36 is supported by a corner metal 31 of the lower hanging bracket 30.
A mounting bracket 37 is fixed to the inside of the corner portion of the step mold 36 to facilitate the reinforcement of the step mold 36 and the support of the lower hanging bracket 30 by the corner hardware 31.

図8は、図7のF−F矢視図である。
段差用型枠36は、コーナー金物31からほぼ水平に外方へ延びるように設けられた段差用型枠固定棒38および段差用型枠補助固定棒40により固定されるようになっている。このため、コーナー金物31の外方部31−2上面の段差用型枠36の交差部に向かう位置には、コーナー金物31と段差用型枠36の取付金具37とをコーナー部において連結し、段差用型枠36を支持するところの段差用型枠固定棒38を固定する固定金具39が溶接されている。また、コーナー金物31の外方部31−2の側面には、段差用型枠補助固定棒40を収容するポケット41が形成されている。また、ポケット41には段差用型枠補助固定棒40を所定の位置で固定する固定ボルト42が設けられている。なお、段差用型枠補助固定棒40は、固定金具39の両側に位置して段差用型枠36の取付金具37に直交するように2個所設けられる。
FIG. 8 is a view taken along the line FF in FIG.
The step mold 36 is fixed by a step mold fixing rod 38 and a step mold auxiliary fixing rod 40 provided so as to extend outward from the corner hardware 31 substantially horizontally. For this reason, the corner metal 31 and the mounting bracket 37 of the step mold 36 are connected at the corner portion at a position toward the intersection of the step mold 36 on the upper surface of the outer portion 31-2 of the corner metal 31, A fixing bracket 39 for fixing the step mold fixing rod 38 that supports the step mold 36 is welded. Further, a pocket 41 for accommodating the step form auxiliary frame fixing fixture 40 is formed on the side surface of the outer portion 31-2 of the corner hardware 31. The pocket 41 is provided with a fixing bolt 42 for fixing the stepped form auxiliary fixing rod 40 at a predetermined position. In addition, the step form auxiliary mold fixing rods 40 are provided at two positions so as to be positioned on both sides of the fixing bracket 39 and to be orthogonal to the mounting bracket 37 of the step mold 36.

段差用型枠36の取付金具37は、図8に示すように、矩形断面をしており、段差用型枠36側から順にビス止め用木材43および金属製のカバー44が設けられ、内側にポケット45が形成されている。ポケット45には段差用型枠補助固定棒40の一端と螺合されるクランク状をしたスライド金具46が収容されている。
また、取付金具37の上面には、段差用型枠固定棒38の一端を収容し、スライド可能に支持する収容金物47が固定されており、段差用型枠固定棒38を所定位置で固定する固定ボルト48が設けられている。
段差用型枠36の位置を調節する場合、固定ボルト42および固定ボルト48を緩めるとともに、スライド金具46をポケット45内でスライドさせながら段差用型枠36を所定位置にセットし、固定ボルト42および固定ボルト48を締め付けて段差用型枠固定棒38および段差用型枠補助固定棒40を固定すればよい。
As shown in FIG. 8, the mounting bracket 37 of the step mold 36 has a rectangular cross section, and is provided with a screw-fixing wood 43 and a metal cover 44 in order from the step mold 36 side. A pocket 45 is formed. The pocket 45 accommodates a crank-shaped slide fitting 46 that is screwed into one end of the step-form form auxiliary fixing rod 40.
Further, a receiving metal piece 47 that accommodates one end of the step mold fixing rod 38 and is slidably supported is fixed on the upper surface of the mounting bracket 37, and the step mold fixing rod 38 is fixed at a predetermined position. A fixing bolt 48 is provided.
When adjusting the position of the step mold 36, the fixing bolt 42 and the fixing bolt 48 are loosened, and the step mold 36 is set at a predetermined position while the slide fitting 46 is slid in the pocket 45. The fixing bolt 48 may be tightened to fix the step mold fixing rod 38 and the step mold auxiliary fixing rod 40.

吊支ロッド35は、図4に特に示されているように、平面視で、アンカーボルトの埋設位置に配設されるものであって、上部吊金具15、Y方向位置決め用定規23および下部吊金具30を貫通するようにして鉛直方向に配され、下部吊金具30の下面から下方に向けて配置された箱抜用型枠50を吊下げ固定するものである。また、吊支ロッド35は、上部吊金具15において上下方向調節自在に支持されるようになっている。このため、吊支ロッド35は、鋼製で断面円形をしておりその表面には雄ねじが切られており、上部吊金具15と交差するX方向位置決め用定規22の上面側と上部吊金具15の下面側からワッシャー付きウイングナット49で締付けられ、所定の高さ位置に吊下げ支持される。    As shown particularly in FIG. 4, the suspension rod 35 is disposed at a position where the anchor bolt is embedded in a plan view, and includes an upper suspension bracket 15, a Y-direction positioning ruler 23, and a lower suspension. The box-extracting formwork 50 that is arranged in the vertical direction so as to penetrate the metal fitting 30 and that is arranged downward from the lower surface of the lower hanging metal fitting 30 is suspended and fixed. The suspension rod 35 is supported by the upper suspension bracket 15 so as to be adjustable in the vertical direction. For this reason, the suspension rod 35 is made of steel and has a circular cross section, and has a male thread cut on the surface thereof, and the upper surface side of the X-direction positioning ruler 22 intersecting the upper suspension bracket 15 and the upper suspension bracket 15. The wing nut 49 with a washer is tightened from the lower surface side of the, and is suspended and supported at a predetermined height position.

箱抜用型枠50は、上方から下方に向けて径が小さくなるテーパを有する円形断面の鋼管により形成されている。該箱抜用型枠50の上端には吊支ロッド35挿通用の孔51を中心に設けた固定板52を装着し、下端には底板53を設け、該底板53の上面の中心部に吊支ロッド35の下端が螺合する袋ナット54を固着し、底板53の下面に補強板55を固着している。さらに、底板53および補強板55の下面には、打設コンクリートとの剥離を良好にするため発泡プラスチック製の剥離板56を装着している。
箱抜用型枠50は、アンカーボルトを埋設する縦穴の深さに応じてその長さを調節できるように、長さ調節用鋼管50’を積み重ねることができるようになされている。
The boxing form 50 is formed of a steel pipe having a circular cross section having a taper that decreases in diameter from the upper side to the lower side. A fixing plate 52 provided around a hole 51 for inserting a suspension support rod 35 is attached to the upper end of the boxing mold 50, a bottom plate 53 is provided at the lower end, and suspended from the center of the upper surface of the bottom plate 53. A cap nut 54 to which the lower end of the support rod 35 is screwed is fixed, and a reinforcing plate 55 is fixed to the lower surface of the bottom plate 53. Further, on the lower surfaces of the bottom plate 53 and the reinforcing plate 55, a release plate 56 made of foamed plastic is attached in order to improve the release from the cast concrete.
The box forming mold 50 is configured such that the length adjusting steel pipes 50 'can be stacked so that the length thereof can be adjusted according to the depth of the vertical hole in which the anchor bolt is embedded.

箱抜用型枠50の袋ナット54に吊支ロッド35の下端を螺合させ、下部吊金具30の上面側において吊支ロッド35に螺合されたウイングナット57を締付けることにより箱抜用型枠50の上面と下部吊金具30の下面が密着し、箱抜用型枠50が吊支ロッド35に保持される。
このような保持機構により箱抜用型枠50が保持されているため、コンクリートが打設された場合でも、箱抜用型枠50の傾き、横移動、あるいは、縦移動を防止することができる。
The lower end of the suspension rod 35 is screwed into the cap nut 54 of the box extraction mold 50, and the wing nut 57 screwed to the suspension rod 35 is tightened on the upper surface side of the lower suspension bracket 30 to tighten the box extraction mold. The upper surface of the frame 50 and the lower surface of the lower hanging metal fitting 30 are in close contact with each other, and the box extraction form 50 is held by the suspension rod 35.
Since the boxing mold 50 is held by such a holding mechanism, even when concrete is cast, the boxing mold 50 can be prevented from being tilted, laterally moved, or vertically moved. .

上記のように構成された箱抜用型枠支持装置を設置するには、吊支ロッド35のX−Y方向の位置が設計寸法とおりに位置するように上部吊金具15および下部吊金具30を地上において仮組し、仮組された箱抜用型枠支持装置を吊上げ装置で吊上げてコンクリート型枠14の決められた位置に装着する。その後、上部吊金具15に対する吊支ロッド35の上下方向の支持位置を調節することにより下部吊金具30を介して箱抜用型枠50を水平、且つ、所定の高さ位置に配置する。   In order to install the box extraction formwork support device configured as described above, the upper suspension bracket 15 and the lower suspension bracket 30 are mounted so that the position of the suspension rod 35 in the XY direction is positioned as designed. Temporarily assembled on the ground, the temporarily assembled box-extracting formwork support device is lifted by a lifting device and mounted on a predetermined position of the concrete formwork 14. Thereafter, by adjusting the vertical support position of the suspension rod 35 with respect to the upper suspension bracket 15, the boxing mold 50 is disposed horizontally and at a predetermined height position via the lower suspension bracket 30.

図9は、箱抜用型枠50を打設コンクリートから抜取る作業を説明するための説明図である。
まず、箱抜用型枠支持装置のうち、吊支ロッド35および箱抜用型枠50を残してその他の部材を撤去する。その後、吊支ロッド35に挿通する挿通孔58を形成した断面箱形の形鋼等からなる横梁59を吊支ロッド35に挿通させ、ウイングナット57を横梁59の上から吊支ロッド35に螺合させ、打設コンクリートと横梁59との間に2台のジャッキ60、60を配設する。ジャッキ60にて横梁59を上方に持ち上げると、吊支ロッド35を介して箱抜用型枠50が上方に移動し、打設コンクリートから抜け出る。この際、箱抜用型枠50がテーパを有すること、および、箱抜用型枠50底部に剥離板56が設けられていることから、箱抜用型枠50は容易に打設コンクリートから抜き取ることができる。
抜き取られた箱抜用型枠50は、損傷がないため、何度でも再利用可能である。
FIG. 9 is an explanatory diagram for explaining an operation of extracting the box-extracting formwork 50 from the cast concrete.
First, other members are removed from the boxing form support device, leaving the suspension rod 35 and the boxing formwork 50. Thereafter, a cross beam 59 made of box-shaped section steel having an insertion hole 58 inserted through the suspension rod 35 is inserted into the suspension rod 35, and a wing nut 57 is screwed onto the suspension rod 35 from above the transverse beam 59. The two jacks 60, 60 are disposed between the cast concrete and the cross beam 59. When the horizontal beam 59 is lifted upward by the jack 60, the box-extracting formwork 50 moves upward through the suspension rod 35 and comes out of the cast concrete. At this time, since the boxing mold 50 has a taper and the peeling plate 56 is provided at the bottom of the boxing mold 50, the boxing mold 50 can be easily extracted from the cast concrete. be able to.
Since the box-drawing formwork 50 is not damaged, it can be reused any number of times.

アンカーボルトが埋設された高速道路等のコンクリート打設後の橋脚を示したもので、(a)は平面図、(b)は正面図である。The pier after concrete placement, such as a highway with an anchor bolt embedded, is shown, (a) is a plan view, and (b) is a front view. 図1のA−A断面図である。It is AA sectional drawing of FIG. 本発明の箱抜用型枠支持装置を地上において仮組するための架台を示したもので、(a)は側面図、(b)は正面図である。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 shows a gantry for temporarily assembling a boxing form support device of the present invention on the ground, wherein (a) is a side view and (b) is a front view. 図5のB−B矢視図であって、本発明の箱抜用型枠支持装置がコンクリート型枠に固定され、設置された状態を示す正面図である。It is a BB arrow line view of FIG. 5, Comprising: It is a front view which shows the state in which the box form support apparatus for box extraction of this invention was fixed to the concrete formwork. 本発明の箱抜用型枠支持装置がコンクリート型枠に固定され、設置された状態を示す平面図である。It is a top view which shows the state by which the form support apparatus for box extraction of this invention was fixed to the concrete formwork, and was installed. (a)(b)は、それぞれ、図5のC−C矢視図、D−D矢視図である。(A) and (b) are CC arrow views and DD arrow views of FIG. 5, respectively. 図4のE−E矢視図である。It is the EE arrow line view of FIG. 図7のF−F矢視図である。It is a FF arrow line view of FIG. 箱抜用型枠を打設コンクリートから抜取る作業を説明するための説明図である。It is explanatory drawing for demonstrating the operation | work which extracts the formwork for box extraction from placement concrete.

符号の説明Explanation of symbols

1 橋脚
2 上面
3 アンカーボルト
4 水平面
5 縦穴
6 段差
7 架台
8 レベル調整ジャッキ
9 下部横梁
10 縦梁
11 柱
12 上部横梁
14 コンクリート型枠
15 上部吊金具
16 梁状部材16
17 断面箱形の形鋼
18 吊りワイヤー取付金具
19 挟持金具
20 ねじ棒
21 ワッシャー付きナット
22 X方向位置決め用定規
23 Y方向位置決め用定規
24−1基準個所
25 ボルト・ナット
26 断面箱形の形鋼
27 ガイド部材
30 下部吊金具
31 コーナー金物
32 連結部材
33 貫通孔
34 固定ボルト
35 吊支ロッド
36 段差用型枠
37 取付金具
38 段差用型枠固定棒
39 固定金具
40 段差用型枠補助固定棒
41 ポケット
42 固定ボルト
43 ビス止め用木材
44 カバー
45 ポケット
46 スライド金具
47 収容金物
48 固定ボルト
49 ワッシャー付きウイングナット
50 箱抜用型枠
51 吊支ロッド挿通用の孔
52 固定板
53 底板
54 袋ナット
55 補強板
56 剥離板
57 ウイングナット
58 挿通孔
59 横梁
60 ジャッキ







DESCRIPTION OF SYMBOLS 1 Pier 2 Upper surface 3 Anchor bolt 4 Horizontal surface 5 Vertical hole 6 Step 7 Stand 8 Level adjustment jack 9 Lower horizontal beam 10 Vertical beam 11 Column 12 Upper horizontal beam 14 Concrete formwork 15 Upper suspension bracket 16 Beam-like member 16
17 Sectional box-shaped steel 18 Hanging wire mounting bracket 19 Clamping bracket 20 Screw rod 21 Nut with washer 22 X-direction positioning ruler 23 Y-direction positioning ruler 24-1 reference location
25 Bolts and nuts 26 Sectional box shaped steel 27 Guide member 30 Lower hanging bracket 31 Corner hardware 32 Connecting member 33 Through hole 34 Fixing bolt 35 Suspension rod 36 Step mold 37 Fixing bracket 38 Step mold fixing rod 39 Fixing bracket 40 Auxiliary fixing rod for forming step 41 Pocket 42 Fixing bolt 43 Screw fixing wood 44 Cover 45 Pocket 46 Slide fitting 47 Holding metal 48 Fixing bolt 49 Washer wing nut 50 Box removal mold 51 Suspension support rod insertion Hole 52 Fixed plate 53 Bottom plate 54 Cap nut 55 Reinforcement plate 56 Peeling plate 57 Wing nut 58 Insertion hole 59 Cross beam 60 Jack







Claims (10)

両側のコンクリート型枠に支持される上部吊金具の下方に間隔をおいて下部吊金具を配置し、アンカーボルトの埋設位置に配置される吊支ロッドを上部吊金具および下部吊金具を貫通するようにして鉛直方向に配設し、上部吊金具において吊支ロッドを上下方向調節自在に支持し、下部吊金具の下面から下方に向けて箱抜用型枠を吊支ロッドを囲むようにして配置し、箱抜用型枠を吊支ロッドに固定することによりアンカーボルトの埋設位置に保持することを特徴とする箱抜用型枠支持装置。   A lower suspension bracket is disposed below the upper suspension bracket supported by the concrete molds on both sides, and the suspension rod disposed at the anchor bolt embedded position passes through the upper suspension bracket and the lower suspension bracket. Arranged vertically, supporting the suspension rod in the upper hanging bracket so that it can be adjusted in the vertical direction, and placing the boxing form frame so as to surround the suspension rod downward from the lower surface of the lower hanging bracket, A box forming form supporting apparatus, wherein the box forming form holding apparatus is held at a position where an anchor bolt is buried by fixing the box forming form to a suspension support rod. 上部吊金具は、X方向に間隔を隔てて平行に配置された一対の梁状部材からなり、それぞれの梁状部材は、断面箱形の形鋼を吊支ロッドの直径より僅かに大きな間隙を有するように平行に配置されて一体に形成されていることを特徴とする請求項1記載の箱抜用型枠支持装置。   The upper hanging bracket is composed of a pair of beam-like members arranged parallel to each other in the X direction, and each beam-like member has a gap slightly larger than the diameter of the suspension rod. 2. The box-forming form support apparatus according to claim 1, wherein the box-forming form support apparatus is integrally formed so as to be arranged in parallel. 上部吊金具の一対の梁状部材に直交して吊支ロッドの配置される位置に一対のY方向位置決め用定規を配置し、かつ、上部吊金具の一対の梁状部材に沿うように一対のX方向位置決め用定規を配置し、Y方向位置決め用定規とX方向位置決め用定規との交差する4個所のうち、基準となる1個所を固定し、他の3個所をボルト・ナットで調整自在に固定してなることを特徴とする請求項2記載の箱抜用型枠支持装置。   A pair of Y-direction positioning rulers are arranged at positions where the suspension rods are arranged perpendicular to the pair of beam-like members of the upper hanging bracket, and a pair of the pair of beam-like members of the upper hanging bracket is arranged along the pair of beam-like members Place the X-direction positioning ruler, fix one of the four points where the Y-direction positioning ruler intersects the X-direction positioning ruler, and adjust the other three with bolts and nuts. 3. A box-supporting formwork supporting apparatus according to claim 2, which is fixed. Y方向位置決め用定規およびX方向位置決め用定規は、それぞれ、断面箱形の形鋼を吊支ロッドの直径より僅かに大きな間隙を有するように平行に配置されて一体に形成されてなり、Y方向位置決め用定規およびX方向位置決め用定規には相対する位置決め用定規の間隙に沿ってスライド可能なガイド部材を設けることを特徴とする請求項3記載の箱抜用型枠支持装置。   The Y-direction positioning ruler and the X-direction positioning ruler are each formed by integrally forming a box-shaped section steel in parallel with a gap slightly larger than the diameter of the suspension rod. 4. The box-forming form support device according to claim 3, wherein the positioning ruler and the X-direction positioning ruler are provided with a guide member that is slidable along a gap between the opposing positioning rulers. 下部吊金具は、矩形を形成するように四隅に配置されるコーナー金物とこれらのコーナー金物を連結する連結部材とから形成され、それぞれのコーナー金物は、断面箱形の形鋼を直角に交差させて結合した十字状をしており、その交点には吊支ロッドを貫通させるための貫通孔を形成し、隣接するコーナー金物に連結部材を入れ子式に嵌合させることによりコーナー金物の位置が調整可能に形成されていることを特徴とする請求項1ないし4のいずれか1項に記載の箱抜用型枠支持装置。   The lower hanging bracket is formed of corner hardware arranged at four corners so as to form a rectangle and a connecting member for connecting these corner hardware, and each corner hardware intersects a section box-shaped section at a right angle. A cross hole is formed at the intersection, and a through hole for penetrating the suspension rod is formed at the intersection, and the position of the corner hardware is adjusted by fitting the connecting member into the adjacent corner hardware. The form support device for box extraction according to any one of claims 1 to 4, wherein the device is formed so as to be capable of being formed. 下部吊金具の周囲に所定の間隔を隔てて段差用型枠を配置し、段差用型枠を下部吊金具のコーナー金物で支持するようにしたことを特徴とする請求項5記載の箱抜用型枠支持装置。   6. The method for removing a box according to claim 5, wherein a step mold is disposed around the lower hanging bracket at a predetermined interval, and the step mold is supported by a corner metal fitting of the lower hanging bracket. Formwork support device. 下部吊金具のコーナー金物から外方に向けて段差用型枠固定金具を延設し、段差用型枠固定金具のコーナー金物における支持位置を調節することにより段差用型枠の配置を変更自在とすることを特徴とする請求項6記載の箱抜用型枠支持装置。   Extending the step mold fixing bracket from the corner bracket of the lower hanging bracket outward, and adjusting the support position of the corner mold fixing bracket for the step bracket makes it possible to change the arrangement of the step mold The form-support apparatus for box extraction according to claim 6. 箱抜用型枠をテーパを有する鋼管により形成し、該鋼管の上端には吊支ロッド挿通用の孔を中心に設けた固定板を装着し、鋼管の下端には底板を設け、該底板の上面の中心部に吊支ロッドの下端が螺合する袋ナットを固着し、底板の下面に補強板を固着してなることを特徴とする請求項1ないし7のいずれか1項に記載の箱抜用型枠支持装置。   The box forming form is formed of a steel pipe having a taper, and a fixing plate provided around a hole for inserting a suspension rod is attached to the upper end of the steel pipe, and a bottom plate is provided at the lower end of the steel pipe. The box according to any one of claims 1 to 7, wherein a cap nut to which a lower end of a suspension rod is screwed is fixed to a center portion of an upper surface, and a reinforcing plate is fixed to a lower surface of the bottom plate. Die form support device. 箱抜用型枠を形成する鋼管の長さを、長さ調節用鋼管を積み重ねることにより調節自在とすることを特徴とする請求項8に記載の箱抜用型枠支持装置。   The box forming form support apparatus according to claim 8, wherein the length of the steel pipe forming the box forming form is adjustable by stacking the length adjusting steel pipes. 請求項1ないし9に記載の箱抜用型枠の支持装置を、吊支ロッドのX−Y方向の位置が設計寸法とおりに位置するように上部吊金具および下部吊金具を調整しながら地上において仮組し、仮組された箱抜用型枠支持装置を吊上げ装置で吊上げてコンクリート型枠の決められた位置に装着し、その後、上部吊金具に対する吊支ロッドの上下方向の支持位置を調節することにより下部吊金具を介して箱抜用型枠を水平、且つ、所定の高さ位置に配置するようにしたことを特徴とする箱抜用型枠支持装置の設置方法。

























10. The box-drawing form support apparatus according to claim 1 on the ground while adjusting the upper and lower suspension brackets so that the position of the suspension rod in the XY direction is positioned as designed. Temporarily assembled, and the temporarily assembled box-extracting formwork support device is lifted by the lifting device and attached to the fixed position of the concrete formwork, and then the vertical support position of the suspension rod relative to the upper suspension fitting is adjusted. By doing so, the boxing formwork is arranged horizontally and at a predetermined height position via the lower hanging metal fitting.

























JP2008335409A 2008-12-27 2008-12-27 Forming support device for box extraction and installation method thereof Expired - Fee Related JP4313431B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008335409A JP4313431B1 (en) 2008-12-27 2008-12-27 Forming support device for box extraction and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008335409A JP4313431B1 (en) 2008-12-27 2008-12-27 Forming support device for box extraction and installation method thereof

Publications (2)

Publication Number Publication Date
JP4313431B1 JP4313431B1 (en) 2009-08-12
JP2010156158A true JP2010156158A (en) 2010-07-15

Family

ID=41036717

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008335409A Expired - Fee Related JP4313431B1 (en) 2008-12-27 2008-12-27 Forming support device for box extraction and installation method thereof

Country Status (1)

Country Link
JP (1) JP4313431B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703072A (en) * 2016-12-21 2017-05-24 中建六局土木工程有限公司 Scaffolding equipment foundation embedded part construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631323B (en) * 2013-11-08 2016-06-01 五冶集团上海有限公司 Mould bases is hung in a kind of bridge-collision-avoidance wall construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703072A (en) * 2016-12-21 2017-05-24 中建六局土木工程有限公司 Scaffolding equipment foundation embedded part construction method

Also Published As

Publication number Publication date
JP4313431B1 (en) 2009-08-12

Similar Documents

Publication Publication Date Title
JP2010043468A (en) Anchor bolt setting apparatus and construction method of foundation
CN105525625A (en) Construction method and device of pre-embedded bolts of fixed steel column base
US20140215953A1 (en) Solar panel mounting stand installation method, pile and solar panel mounting stand
JP4313431B1 (en) Forming support device for box extraction and installation method thereof
JP5553947B1 (en) Installation method of solar panel support column by cast-in percussion method
JP2006291550A (en) Method and apparatus for installing column fixing member in steel pipe foundation pile
EP2414604B1 (en) Building construction method
JP4722201B2 (en) Anchor frame
JP2005272116A (en) Tower crane support device and its construction method
CN102995653B (en) Side-type high-precision rapid locator for foundation bolts
JP2006002415A (en) Anchor bolt installing method and anchor bolt installing device of steel pipe foundation pile
JP5749620B2 (en) Seismic isolation method for existing buildings
JP2019090266A (en) Installation method of main leg material and installation jig of main leg material
JP2008291438A (en) Anchor frame
KR101526200B1 (en) Cd pipe supporting apparatus and weight fixing method and wall installing method
JP5766828B2 (en) Method for installing solar cell module installation stand and solar cell module installation stand
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JP2012067441A (en) Installation method for anchor bolt
JP5305941B2 (en) Floor frame height adjustment nut embedding method and floor frame height adjustment nut holder
JP2007291736A (en) Block for support foundation
JP2015232236A (en) Form support tool and form support structure
JP2015055079A (en) Anchor frame, and method for constructing anchor structure using the anchor frame
JP6278937B2 (en) Round boxing fixing device
JP3740232B2 (en) Anchor bolt mounting bracket
JP6477289B2 (en) How to install the packer plate

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090512

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090514

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120522

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4313431

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120522

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150522

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees