CN102995653B - Side-type high-precision rapid locator for foundation bolts - Google Patents

Side-type high-precision rapid locator for foundation bolts Download PDF

Info

Publication number
CN102995653B
CN102995653B CN201210501634.6A CN201210501634A CN102995653B CN 102995653 B CN102995653 B CN 102995653B CN 201210501634 A CN201210501634 A CN 201210501634A CN 102995653 B CN102995653 B CN 102995653B
Authority
CN
China
Prior art keywords
bolt
concrete foundation
outrigger
hole
dais
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210501634.6A
Other languages
Chinese (zh)
Other versions
CN102995653A (en
Inventor
刘成
韩兵
胡笳
林雪梅
王荣萍
吴红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU INDUSTRY EQUIPMENT INSTALLATION Co Ltd
Original Assignee
CHENGDU INDUSTRY EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU INDUSTRY EQUIPMENT INSTALLATION Co Ltd filed Critical CHENGDU INDUSTRY EQUIPMENT INSTALLATION Co Ltd
Priority to CN201210501634.6A priority Critical patent/CN102995653B/en
Publication of CN102995653A publication Critical patent/CN102995653A/en
Application granted granted Critical
Publication of CN102995653B publication Critical patent/CN102995653B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a side-type high-precision rapid locator for foundation bolts, belonging to the field of industrial installation equipment. The side-type high-precision rapid locator comprises a bottom height distribution seat and an outrigger, wherein the bottom height distribution seat can be detachably fixed together with a concrete foundation platform, and the horizontal height of the height distribution seat can be adjusted at multiple points; one end of the outrigger is fixed together with the height distribution seat, and the other end of the outrigger horizontally extends out of the side of the outrigger and fixedly provided with a horizontal locating template; and the locating template is provided with concrete pouring through holes and a plurality of foundation bolt holes. The side-type high-precision rapid locator can be used for economically, simply, reliably and greatly increasing the mounting speed and quality of the foundation bolts.

Description

Side formula stone bolt high accuracy quick positioner
Technical field
The invention belongs to industrial erection equipment field.
Background technology
In prior art, installing in steel work house, steel column is arranged in concrete foundation and (by stone bolt, steel column is fixed in concrete foundation) by stone bolt, therefore need be in concrete foundation pre-embedded anchoring bolts.
Stone bolt has two kinds to bury method:
One stays a hollow place in concrete foundation, in advance that stone bolt is first-class on steel column, and then entirety is placed in concrete foundation hole, then back-grouting.Such practice, unless pillar is very short, otherwise is difficult to operation.
The second way is the direct buried foot bolt of concrete foundation, then pacifies steel column: i.e. first pre-embedded anchoring bolts in the time making concrete foundation, then fluid concrete forms concrete foundation, and steel column is finally installed again.But the problem existing is, often stone bolt is difficult for burying standard, if bury standard, needs to do for a long time, and efficiency is low, and even if so, the vibrations of the stone bolt burying during also easily by concrete casting are given and destroyed.If do not carried out, have to knock out ready-made concrete foundation and heavily come, waste time and energy, but also there is no other ways.
Summary of the invention
The object of the invention is to: a kind of side formula stone bolt high accuracy quick positioner is proposed, can be economical, simply, significantly improve reliably installation rate and the installation quality of stone bolt.
The object of the invention realizes by following technical proposals:
A kind of side formula stone bolt high accuracy quick positioner, comprise that bottom can be detachably fixing and can multiple spot regulate the dais of joining of level height with concrete foundation cushion cap, one end with described in join dais and fix, the other end is from described outrigger of joining dais side level and stretch out and be fixed with horizontal location template, and described locating template is provided with pouring concrete through hole and some anchor (bolt) holes.
In such scheme, because concrete foundation is to be cast on concrete foundation cushion cap, steel column is arranged in concrete foundation by stone bolt.Thus, on locating template, suspend by anchor (bolt) hole the stone bolt that wish is installed in midair, again by being fixed on the position that concrete foundation cushion cap calculates and regulating level height by multiple spot joining dais, mix up its level height and levelness, each stone bolt on the locating template that ensures thus to support by outrigger is positioned at required horizontal level accurately, level height and levelness, realize thus the accuracy of embedding anchor bolts, ensure installation quality.It just looks like a crane, in advance just on the side of concrete foundation by the unsettled pre-embedded bolt assigned address that is hung in.Meanwhile, due to the restriction of locating template to stone bolt on it, so, civil engineering is when to stone bolt fluid concrete, and vibrations just cannot make stone bolt movement and deformation, have further ensured installation quality.After concrete initial set, take down this device, this device can be reused again, not only economy but also accurately quick.
As optimal way, described join dais comprise can with the detachable fixing base plate of concrete foundation cushion cap, be removably fixed in the Gao Zhu that joins above described base plate, and described in being removably fixed in, join the some adjusting bolts above high post, described outrigger and described adjusting bolt are fixed by adjusting nut and can be regulated respectively level height.
In such scheme, each part is detachable, convenient to disassembly; When use, first according to precalculated vertical and horizontal reference line, base plate is fixed on to the position that concrete foundation cushion cap calculates and mixes up levelness, meanwhile, join high post and adjusting bolt is carried out elevation control and further adjusted levelness by different size dismountable.So no matter concrete foundation be many height can by joining of different size high post and adjusting bolt carry out elevation control.
As optimal way, described base plate bottom surface be provided with for the fixing bolt hole of concrete foundation cushion cap.
In such scheme, by base plate bottom surface, bolt hole being set, realize with the detachable of concrete foundation cushion cap and fixing.
As optimal way, described pouring concrete through hole is located in the middle of locating template, and each anchor (bolt) hole is around arranged around it.
In such scheme, both facilitate pouring concrete construction, avoided again the impact on stone bolt as far as possible.
Beneficial effect of the present invention: can be economical, simply, significantly improve reliably installation rate and the installation quality of stone bolt.
Brief description of the drawings
Fig. 1 is the facade structures schematic diagram of the embodiment of the present invention;
Fig. 2 is the floor map that the embodiment of the present invention is used state;
Fig. 3 is the elevational schematic view that the embodiment of the present invention is used state;
Wherein 1 is concrete foundation cushion cap, and 2 is locating template, and 3 is outrigger, and 4 is base plate, and 5 for joining Gao Zhu, 6 is adjusting bolt, and 7 is adjusting nut, and 8 is batter brace, and 9 is nut, 10 is pouring concrete through hole, and 11 is anchor (bolt) hole, and 12 is stone bolt, and 13 is concrete foundation.
Detailed description of the invention
Following non-limiting examples is used for illustrating the present invention.
As shown in Figure 1, 2, 3, a kind of side formula stone bolt high accuracy quick positioner, comprise that bottom can be detachable fixing and can multiple spot regulate the dais of joining of level height with concrete foundation cushion cap 1, one end with join dais and fix, the other end stretches out and is fixed with the outrigger 3 of horizontal location template 2 from its side level.As preferably, as shown in this embodiment, join dais and comprise bolt hole, the bolt and nut 9 and the detachable fixing base plate 4 of concrete foundation cushion cap 1 by bottom surface, be removably fixed in the high post 5 of joining above base plate 4 by bolt and nut 9, and be removably fixed in and join high post 54 adjusting bolts 6 above by bolt and nut 9, outrigger 3 also can regulate respectively level height with adjusting bolt 6 by adjusting nut 7 is fixing.Join high post 5 and be provided with batter brace 8, locating template 2 is provided with 10 and 8 anchor (bolt) holes 11 of pouring concrete through hole, and pouring concrete through hole 10 is located in the middle of locating template 2, and 8 anchor (bolt) holes 11 are around arranged around it.Stone bolt 12 penetrates anchor (bolt) hole 11 and is suspended on locating template 2, and fluid concrete forms concrete foundation 13 more afterwards.
Using method: because concrete foundation 13 is to be cast on concrete foundation cushion cap 1, steel column is arranged in concrete foundation 13 by stone bolt 12.Thus, on locating template 2, suspend by anchor (bolt) hole 11 stone bolt 12 that wish is installed in midair, again according to precalculated vertical and horizontal reference line, base plate 4 is fixed on to the position that concrete foundation cushion cap 1 calculates and mixes up levelness, simultaneously, by different size dismountable join high post 5 and adjusting bolt 6 carry out elevation control and further adjust levelness (so no matter concrete foundation be many height can by joining of different size high post 5 and adjusting bolt 6 carry out elevation control), each stone bolt 12 on the locating template 2 that ensures thus to support by outrigger 3 is positioned at required horizontal level accurately, level height and levelness, realize thus the pre-buried accuracy of stone bolt 12, ensure installation quality.It just looks like a crane, in advance just on the side of concrete foundation 13 by unsettled pre-embedded bolt 12 assigned address that is hung in.Meanwhile, due to the restriction of locating template 2 to stone bolt on it 12, so, civil engineering is when to stone bolt 12 fluid concrete, and vibrations just cannot make stone bolt 12 movement and deformations, have further ensured installation quality.After concrete initial set, take down this device, this device can be reused again, not only economy but also accurately quick.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., within all should being included in protection scope of the present invention.

Claims (4)

1. a side formula stone bolt high accuracy quick positioner, it is characterized in that: comprise that bottom can be detachably fixing and can multiple spot regulate the dais of joining of level height with concrete foundation cushion cap, one end with described in join dais and fix, the other end is from described outrigger of joining dais side level and stretch out and be fixed with horizontal location template, and described locating template is provided with pouring concrete through hole and some anchor (bolt) holes.
2. side formula stone bolt high accuracy quick positioner as claimed in claim 1, it is characterized in that: described in join dais comprise can with the detachable fixing base plate of concrete foundation cushion cap, be removably fixed in the Gao Zhu that joins above described base plate, and described in being removably fixed in, join the some adjusting bolts above high post, described outrigger and described adjusting bolt are fixed by adjusting nut and can be regulated respectively level height.
3. side formula stone bolt high accuracy quick positioner as claimed in claim 2, is characterized in that: described base plate bottom surface be provided with for the fixing bolt hole of concrete foundation cushion cap.
4. the side formula stone bolt high accuracy quick positioner as described in claim 1,2 or 3, is characterized in that: described pouring concrete through hole is located in the middle of locating template, and each anchor (bolt) hole is around arranged around it.
CN201210501634.6A 2012-11-30 2012-11-30 Side-type high-precision rapid locator for foundation bolts Expired - Fee Related CN102995653B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210501634.6A CN102995653B (en) 2012-11-30 2012-11-30 Side-type high-precision rapid locator for foundation bolts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210501634.6A CN102995653B (en) 2012-11-30 2012-11-30 Side-type high-precision rapid locator for foundation bolts

Publications (2)

Publication Number Publication Date
CN102995653A CN102995653A (en) 2013-03-27
CN102995653B true CN102995653B (en) 2014-08-06

Family

ID=47924709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210501634.6A Expired - Fee Related CN102995653B (en) 2012-11-30 2012-11-30 Side-type high-precision rapid locator for foundation bolts

Country Status (1)

Country Link
CN (1) CN102995653B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569385B (en) * 2015-12-28 2017-08-29 成都市工业设备安装公司 Building industrialization PC component production line mounting and testing techniques
CN105735340B (en) * 2016-03-22 2018-12-28 中国十九冶集团有限公司 Road lamp concrete foundation positioning device
CN109025327A (en) * 2018-08-16 2018-12-18 武汉海王机电工程技术有限公司 A kind of auxiliary locator of foundation bolt
CN112112189A (en) * 2019-06-21 2020-12-22 航天长征化学工程股份有限公司 Foundation bolt fixing mechanism

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN201170420Y (en) * 2008-03-18 2008-12-24 河南省第二建筑工程有限责任公司 Concrete inserted bolt/bolt sleeve positioning device
CN101266011B (en) * 2008-04-22 2010-10-06 中冶天工建设有限公司 Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor
US7677522B2 (en) * 2008-05-07 2010-03-16 Bakos Stephen M Support bracket for a column
CN101338566B (en) * 2008-08-29 2010-09-22 河北省第四建筑工程公司 Integral built-in process for groups of anchor bolts
JP5594987B2 (en) * 2009-06-24 2014-09-24 三菱重工業株式会社 Method for manufacturing concrete mount, concrete mount, and connecting material
CN201448561U (en) * 2009-08-24 2010-05-05 中建钢构江苏有限公司 Bench type simple fixing structure of foundation bolts
CN201865121U (en) * 2010-10-30 2011-06-15 甘肃海外工程总公司 Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts
CN201865119U (en) * 2010-12-04 2011-06-15 中铁建电气化局集团北方工程有限公司 Foundation bolt fixing support
CN202370264U (en) * 2011-12-23 2012-08-08 河北大元建业集团股份有限公司 Fixing device for rapidly installing foundation bolt
CN202532110U (en) * 2012-04-16 2012-11-14 中国十九冶集团有限公司 Fixing device for foundation bolt of elevated platform

Also Published As

Publication number Publication date
CN102995653A (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN104389313B (en) The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof
CN102561712B (en) Accurate positioning frame for large steel column and equipment foundation fixing bolt and construction method thereof
CN103088840B (en) Axis type foundation bolt high-precision fast locator and locating method thereof
CN103397701B (en) Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN102995653B (en) Side-type high-precision rapid locator for foundation bolts
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN103334379B (en) A kind of construction method for anti-collision guard rail for highways overhanging portion
CN102493471B (en) Suspending installation construction process method of structural foot margin anchor bolt
CN203247603U (en) High-order rag bolt positioner
CN103485360A (en) Steel platform tower crane foundation and construction method thereof
CN203729319U (en) Locating steel frame of pre-buried annularly-distributed ground bolt group
CN102518300B (en) Embedded conical bearing joint type steel structure support and construction method thereof
CN106193094B (en) A kind of embedding anchor bolts construction mould and foundation bolt adjust construction method
CN105804110A (en) Construction method of foundation bolts of railway contact net and mounting bracket
CN103061249A (en) Quick positioning construction device and construction method for steel-pipe column of bridge
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN102296600A (en) Method for positioning middle pile of spread built subway station
CN112095485A (en) Bridge stay cable anchor cylinder pre-embedded positioning device and using method thereof
CN209145296U (en) A kind of installation lifting device for material distributing machine
CN217810530U (en) Oblique steel column base positioner
CN203531002U (en) Steel platform tower crane foundation
CN103174300B (en) Viscous damper installation construction method
CN105442855A (en) High-precision burying method for large-size pre-buried board
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN205591587U (en) Steel structure box type board room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Cheng

Inventor after: Han Bing

Inventor after: Hu Jia

Inventor after: Lin Xuemei

Inventor after: Wang Rongping

Inventor after: Wu Hong

Inventor before: Liu Cheng

Inventor before: Han Bin

Inventor before: Lin Xuemei

Inventor before: Wang Rongping

Inventor before: Wu Hong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU CHENG HAN BIN LIN XUEMEI WANG RONGPING WU HONG TO: LIU CHENG HAN BING HU JIA LIN XUEMEI WANG RONGPING WU HONG

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140806

Termination date: 20201130