JP2010043468A - Anchor bolt setting apparatus and construction method of foundation - Google Patents

Anchor bolt setting apparatus and construction method of foundation Download PDF

Info

Publication number
JP2010043468A
JP2010043468A JP2008208160A JP2008208160A JP2010043468A JP 2010043468 A JP2010043468 A JP 2010043468A JP 2008208160 A JP2008208160 A JP 2008208160A JP 2008208160 A JP2008208160 A JP 2008208160A JP 2010043468 A JP2010043468 A JP 2010043468A
Authority
JP
Japan
Prior art keywords
anchor bolt
positioning tool
foundation
height
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008208160A
Other languages
Japanese (ja)
Other versions
JP4491030B2 (en
Inventor
Yukiyasu Nakajima
幸康 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2008208160A priority Critical patent/JP4491030B2/en
Publication of JP2010043468A publication Critical patent/JP2010043468A/en
Application granted granted Critical
Publication of JP4491030B2 publication Critical patent/JP4491030B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide an anchor bolt setting apparatus capable of performing anchor bolt positioning and fixing work accurately in a short time even when there is nothing that can serve as a reference such as a form in the construction of a foundation, and suitably usable for the construction of the foundation of a small, lightweight structure or building. <P>SOLUTION: The anchor bolt setting apparatus (A) includes a plurality of leg members (14); a horizontal member (11) adjustable in height and levelness while extending between the leg members (14); a plurality of supports (1) having movable members (15) mounted in a movable and fixable manner along the horizontal member (11); and a positioning implement (2) removably mountable extending between the respective movable members (15) of the plurality of support (1) and adjustable in height and levelness in the mounted state. The positioning implement (2) has mounting holes (155, 27) provided according to the mounting part of the building to be constructed, to allow anchor bolts to be mounted and removed in a vertical state. <P>COPYRIGHT: (C)2010,JPO&INPIT

Description

本発明は、アンカーボルトセット装置及び基礎の施工方法に関するものである。更に詳しくは、基礎の施工において、アンカーボルトを立てる位置の近傍に型枠のような基準となり得るものがない場合でも、位置決め及び固定作業を短時間で正確に行うことができ、特に小型軽量な構造物または建築物の基礎の施工に好適に使用することができるものに関する。   The present invention relates to an anchor bolt setting device and a foundation construction method. More specifically, in the construction of the foundation, positioning and fixing operations can be performed accurately in a short time even when there is no reference such as a formwork in the vicinity of the position where the anchor bolt is erected. The present invention relates to a structure that can be suitably used for construction of a structure or a foundation of a building.

構造物または建築物の基礎の施工においては、構造物または建築物を固定するためのアンカーボルトが所要の位置に立てられる。アンカーボルトを立てる一般的な工法は、配筋の上部の所要箇所に、横筋を渡す等して位置決めをし、アンカーボルトを横筋に番線等で括り付けるというものであった。   In the construction of a structure or a building foundation, an anchor bolt for fixing the structure or the building is set at a required position. A general method for raising the anchor bolt is to position the anchor bolt by passing a horizontal stripe to a required portion of the upper part of the bar arrangement and tie the anchor bolt to the horizontal stripe with a wire or the like.

この方法では、位置決め及び固定作業の作業効率が極めて悪く、相当の時間を要する。また、アンカーボルトが一方向において複数箇所にある場合に通りが歪みやすい等、正確性にも劣る。さらには、番線による固定では強度が十分ではなく、位置決め後においても、コンクリート打設時のコンクリートの圧力でアンカーボルトが傾いたり位置がずれたりしやすい。   In this method, the working efficiency of positioning and fixing work is extremely poor, and a considerable time is required. In addition, when the anchor bolt is in a plurality of locations in one direction, the accuracy is inferior, for example, the street is easily distorted. Furthermore, the strength with the wire is not sufficient, and even after positioning, the anchor bolt is easily tilted or displaced due to the pressure of the concrete at the time of placing the concrete.

そこで、アンカーボルトを配筋に固定するのではなく、型枠等に取り付け及び取り外しが可能な固定具を介在させてアンカーボルトを所要の位置に宙に浮かせた状態で配し、その後でコンクリートを打つ施工方法及び装置も提案されている。このような施工方法及び装置としては、例えば特許文献1に記載のものがある。   Therefore, instead of fixing the anchor bolt to the reinforcing bar, place the anchor bolt in a state where it is suspended in the required position with a fixture that can be attached to and removed from the formwork, etc. A hitting construction method and apparatus have also been proposed. As such a construction method and apparatus, there exists a thing of patent document 1, for example.

特許文献1記載の「基礎の構築用アンカーボルト支持装置」は、型枠の間に架設するテンプレートの下側に離間して平行状に補助プレートを設け、各プレートに上端ねじ部を挿通して狭持用ナットで上下から固着したアンカーボルトで構成したものであり、隣接した柱の設置位置毎に各アンカーボルトを強固な支持力によって鉛直に支持し、隣接した柱の設置位置の間隔を簡単な構造で安価な間隔設定板によって容易且つ精度良く位置決めでき、鉄骨柱との間に形成するグラウト層のレベル調節を容易且つ精度良く設定できるというものである。   The “anchor bolt support device for foundation construction” described in Patent Document 1 is provided with an auxiliary plate in parallel and spaced apart from the lower side of a template installed between molds, and an upper end thread portion is inserted into each plate. It is composed of anchor bolts fixed from above and below with clamping nuts. Each anchor bolt is supported vertically by a strong support force at each adjacent column installation position, and the interval between adjacent column installation positions is simple. It can be positioned easily and accurately by an inexpensive interval setting plate with a simple structure, and level adjustment of the grout layer formed between the steel column and the steel column can be easily and accurately set.

特開2007−211514JP2007-2111514

しかしながら、前記従来の「基礎の構築用アンカーボルト支持装置」には次のような課題があった。
すなわち、アンカーボルトを立てる位置は、あらかじめ位置が決められて基準となる型枠の間にテンプレートを架設して設定される。ところが、基礎の施工においてアンカーボルトを立てる位置の近傍に型枠のような基準となり得るものがない場合、例えばカーポート、バス停留所等の小型軽量な構造物または建築物を施工する場合のベタ基礎のような簡易な基礎の施工において、アンカーボルトの位置決めを行うことができるようにはなっておらず、このような施工においては全く使用できない。
However, the above-mentioned “anchor bolt support device for foundation construction” has the following problems.
That is, the position where the anchor bolt is raised is set by laying a template between the reference molds whose positions are determined in advance. However, when there is nothing that can serve as a standard such as a formwork in the vicinity of the position where the anchor bolt is raised in the construction of the foundation, for example, a solid foundation for constructing a small lightweight structure or building such as a carport or a bus stop. In such a simple foundation construction, the anchor bolt cannot be positioned and cannot be used at all in such construction.

(本発明の目的)
本発明の目的は、基礎の施工において、アンカーボルトを立てる位置の近傍に型枠のような基準となり得るものがない場合でも、アンカーボルトの位置決め及び固定作業を短時間で正確に行うことができ、特にカーポート、ガレージ、倉庫、バス停留所等の小型軽量な構造物または建築物の基礎の施工に好適に使用することができる、アンカーボルトセット装置及び基礎の施工方法を提供することである。
(Object of the present invention)
The object of the present invention is to accurately perform positioning and fixing of the anchor bolt in a short time even when there is nothing that can be a reference such as a formwork in the vicinity of the position where the anchor bolt is raised in the construction of the foundation. In particular, it is to provide an anchor bolt setting device and a foundation construction method that can be suitably used for construction of a small and light structure or building foundation such as a carport, a garage, a warehouse, or a bus stop.

上記課題を解決するために本発明が講じた手段は次のとおりである。
本発明は、
アンカーボルトの位置を決める位置決め具と、
位置決め具を支える、二以上の支持具と、
を備えており、
位置決め具は、
上物の取付部分に対応する位置にありアンカーボルトが着脱自在であるアンカーボルト取付部を有し、
支持具は、位置決め具の高さの調節手段と、水平度の調節手段を有する、
アンカーボルトセット装置である。
Means taken by the present invention to solve the above problems are as follows.
The present invention
A positioning tool that determines the position of the anchor bolt;
Two or more supports that support the positioning tool;
With
The positioning tool
It has an anchor bolt mounting part that is located at a position corresponding to the mounting part of the upper object, and the anchor bolt is detachable,
The support tool includes a height adjusting means for the positioning tool and a leveling adjusting means.
An anchor bolt setting device.

本発明は、
基礎の施工においてアンカーボルトを立てる装置であって、
アンカーボルトの位置を決める位置決め具と、
位置決め具を支える、二以上の支持具と、
を備えており、
位置決め具は、施工される構造物または建築物の取付部に合わせて設けられアンカーボルトを鉛直方向に向けた状態で取り付け及び取り外しができるアンカーボルト取付部を有し、
支持具は、
高さ調節手段を有する脚部材と、
脚部材間に渡してある横架部材と、
横架部材の長さ方向に沿って移動自在かつ高さの調節ができるように取り付けられ位置決め具の取り付け及び取り外しができる可動部材を有し、
横架部材は、脚部材の高さ調節手段によって高さ及び水平度の調節ができる、
アンカーボルトセット装置である。
The present invention
A device that raises anchor bolts in foundation construction,
A positioning tool that determines the position of the anchor bolt;
Two or more supports that support the positioning tool;
With
The positioning tool has an anchor bolt mounting portion that is provided in accordance with a mounting portion of a structure or building to be constructed and can be attached and detached in a state where the anchor bolt is oriented in the vertical direction.
The support is
A leg member having height adjusting means;
A horizontal member passed between the leg members;
It has a movable member that can be moved along the length direction of the horizontal member and that can be adjusted in height, and that can attach and remove the positioning tool.
The horizontal member can be adjusted in height and level by the height adjusting means of the leg member.
An anchor bolt setting device.

本発明は、
位置決め具に、位置決め具を縦横方向へ延長するために他の位置決め具を接合する接合手段を備えることもできる。
The present invention
The positioning tool may be provided with joining means for joining another positioning tool in order to extend the positioning tool in the vertical and horizontal directions.

本発明は、
アンカーボルトを立てる位置を基準として地面に基礎を施工するための基礎穴の中に位置決め具を配し所要の高さで水平に設定する工程、
位置決め具のアンカーボルト取付部に所要数のアンカーボルトを取り付ける工程、
基礎穴の中にコンクリートを打ってアンカーボルトの下部を埋没させ、コンクリート表面を所要の高さに均す工程、
コンクリートが固化したところで、下部が埋設されているアンカーボルトを残して位置決め具と支持具を撤去する工程、
を含む、基礎の施工方法である。
The present invention
A process of arranging a positioning tool in the foundation hole for constructing the foundation on the ground with the position where the anchor bolt is raised as a reference, and setting it horizontally at the required height,
Attaching the required number of anchor bolts to the anchor bolt mounting portion of the positioning tool;
The process of leveling the concrete surface to the required height by placing concrete in the foundation hole and burying the lower part of the anchor bolt,
When the concrete is solidified, the step of removing the positioning tool and the support tool while leaving the anchor bolt embedded in the lower part,
It is the construction method of the foundation including

本発明は、
地面に基礎を施工するための基礎穴の中に配筋をする工程、
アンカーボルトを立てる位置を基準として配筋の上部または上方に位置決め具を配する工程、
支持具を使用して位置決め具を所要の高さで水平に設定し固定する工程、
位置決め具のアンカーボルト取付部に所要数のアンカーボルトを取り付ける工程、
基礎穴の中にコンクリートを打ってアンカーボルトの下部を埋没させ、コンクリート表面を所要の高さに均す工程、
コンクリートが固化したところで、下部が埋設されているアンカーボルトを残して位置決め具と支持具を撤去する工程、
を含む、基礎の施工方法である。
The present invention
The process of arranging bars in the foundation hole for constructing the foundation on the ground,
Placing a positioning tool above or above the bar arrangement relative to the position where the anchor bolt is raised;
The process of setting and fixing the positioning tool horizontally at the required height using the support tool,
Attaching the required number of anchor bolts to the anchor bolt mounting portion of the positioning tool;
The process of leveling the concrete surface to the required height by placing concrete in the foundation hole and burying the lower part of the anchor bolt,
When the concrete is solidified, the step of removing the positioning tool and the support tool while leaving the anchor bolt embedded in the lower part,
It is the construction method of the foundation including

(作用)
本発明に係るアンカーボルトセット装置の作用を説明する。なお、ここでは、説明で使用する各構成要件に、後述する実施の形態において各部に付与した符号を対応させて付与するが、この符号は、特許請求の範囲の各請求項に記載した符号と同様に、あくまで内容の理解を容易にするためであって、各構成要件の意味を上記各部に限定するものではない。
(Function)
The operation of the anchor bolt setting device according to the present invention will be described. Here, the constituent elements used in the description are assigned in correspondence with the reference numerals given to the respective parts in the embodiments described later. These reference numerals are the same as the reference numerals described in the claims of the claims. Similarly, it is only for the purpose of facilitating understanding of the contents, and the meaning of each component is not limited to the above-described parts.

アンカーボルトセット装置(S)は、作業前には二台の支持具(1)と位置決め具(2)に分けておく。
地面に基礎を施工するための所要の形状及び深さの基礎穴(4)を形成する。
基礎穴(4)の中に配筋(5)を形成する。
アンカーボルト(3)を立てる位置を基準として配筋の上部に位置決め具(2)を載置する。
The anchor bolt setting device (S) is divided into two support tools (1) and a positioning tool (2) before work.
Form a foundation hole (4) with the required shape and depth for constructing the foundation on the ground.
Form reinforcement (5) in the base hole (4).
The positioning tool (2) is placed on the upper part of the bar arrangement with reference to the position where the anchor bolt (3) is raised.

支持具(1)の横架部材(11)が位置決め具(2)のアンカーボルト取付部(155,27)の上を大体において通るようにし、二台の支持具(1)を基礎穴(4)を跨ぐようにして地面に据える。
位置決め具(2)に合わせるように各支持具(1)の位置の微調節及び可動部材(15)の位置の調節を行い、各可動部材(15)を位置決め具(2)の高さまで下降させ、可動部材(15)に位置決め具(2)を固定する。
The horizontal member (11) of the support (1) passes roughly over the anchor bolt mounting portion (155, 27) of the positioning tool (2), and the two support tools (1) are inserted into the base hole (4 ) And put it on the ground.
Finely adjust the position of each support tool (1) and adjust the position of the movable member (15) to match the positioning tool (2), and lower each movable member (15) to the height of the positioning tool (2). Then, the positioning tool (2) is fixed to the movable member (15).

位置決め具(2)を固定した後、横架部材(11)の高さを、位置決め具(2)の長さ方向の水平をとるように、かつ位置決め具(2)の下面が配筋の上端よりやや高くなる位置を目安に調節する。同時に、横架部材(11)が水平となるよう調節し、位置決め具(2)の幅方向の水平をとるようにする。   After fixing the positioning tool (2), set the horizontal member (11) so that it is horizontal in the length direction of the positioning tool (2), and the lower surface of the positioning tool (2) is the upper end of the bar arrangement. Adjust the position so that it is slightly higher. At the same time, the horizontal member (11) is adjusted so as to be horizontal so that the positioning tool (2) is horizontal in the width direction.

基礎穴(4)の中に配筋(5)に詰めるようにしてコンクリート(6)を打って各アンカーボルト(3)の下部を埋没させる。そして、位置決め具(2)の下面に高さを合わせるようにコンクリート(6)表面を水平に均す。コンクリート(6)が固化したところで、下部がコンクリート(6)に埋設されている各アンカーボルト(3)を残して、位置決め具(2)と各支持具(1)を撤去する。後は、コンクリート(6)の養生を待ち、基礎の施工が完了する。   Concrete (6) is struck in the foundation hole (4) so that the reinforcing bar (5) is packed, and the lower part of each anchor bolt (3) is buried. Then, the surface of the concrete (6) is leveled so that the height matches the lower surface of the positioning tool (2). When the concrete (6) is solidified, the positioning tool (2) and each support tool (1) are removed, leaving the anchor bolts (3) whose lower part is embedded in the concrete (6). After that, waiting for the concrete (6) to be cured, the foundation work is completed.

本発明は、支持具を使用して位置決め具の位置を決めて固定することにより、アンカーボルトを立てることができる。これにより、基礎の施工において、アンカーボルトを立てる位置の近傍に型枠のような基準となり得るものがない場合(あるいは、型枠等があっても使用できない位置にある場合)でも、アンカーボルトの位置決め及び固定作業を短時間で正確に行うことができ、特にカーポート、ガレージ、倉庫、バス停留所等の小型軽量な構造物または建築物の基礎の施工に好適に使用することができる。   In the present invention, the anchor bolt can be raised by fixing the position of the positioning tool by using the support tool. As a result, even if there is nothing that can serve as a reference in the vicinity of the position where the anchor bolt is raised in the construction of the foundation (or if it is in a position where it cannot be used even if there is a formwork, etc.), Positioning and fixing work can be performed accurately in a short time, and it can be suitably used particularly for the construction of small and light structures such as carports, garages, warehouses, and bus stops, or building foundations.

本発明を図面に示した実施の形態に基づき詳細に説明する。
図1は本発明に係るアンカーボルトセット装置の一実施の形態を示す分解斜視説明図、
図2はアンカーボルトセット装置を使用した基礎の施工方法を示す断面説明図、
図3は図2におけるA−A部分断面説明図、
図4図2におけるB−B部分断面説明図である。
The present invention will be described in detail based on the embodiments shown in the drawings.
FIG. 1 is an exploded perspective view showing an embodiment of an anchor bolt setting device according to the present invention,
FIG. 2 is a cross-sectional explanatory view showing a foundation construction method using an anchor bolt setting device,
3 is an AA partial cross-sectional explanatory view in FIG.
4 is a partial sectional view BB in FIG.

アンカーボルトセット装置Sは、二台の支持具1と、一台の位置決め具2で構成されている。1セットとなる支持具1と位置決め具2のそれぞれの台数は、これに限定されるものではなく、例えば図1に示しているように位置決め具2に他の位置決め具2aをボルト・ナットで長さ方向に連結する等、施工される基礎の大きさや形状に合わせて適宜設定できる。   The anchor bolt setting device S is composed of two support tools 1 and one positioning tool 2. The number of support tools 1 and positioning tools 2 in one set is not limited to this. For example, as shown in FIG. 1, another positioning tool 2a is extended with bolts and nuts to the positioning tool 2. It can be set as appropriate according to the size and shape of the foundation to be constructed, such as connecting in the vertical direction.

支持具1は、所要長さの横架部材11を備えている。横架部材11は、角管で形成されており、その両端寄りには所要長さの案内管12、13が案内管12、13に固定された角管状のホルダー19を介して取り付けられている。案内管12、13は円管状であり、横架部材11に対しては直角に、かつ案内管12、13同士は平行になるようにしてある。案内管12、13は、横架部材11にホルダー19を嵌め入れて移動自在に取り付けられており、螺子(符号省略)の締め付けによって横架部材11の任意の位置に固定できる。   The support 1 includes a horizontal member 11 having a required length. The horizontal member 11 is formed of a square tube, and guide tubes 12 and 13 having a required length are attached to both ends of the horizontal member 11 via a square tubular holder 19 fixed to the guide tubes 12 and 13. . The guide tubes 12 and 13 have a circular tube shape so that they are perpendicular to the horizontal member 11 and the guide tubes 12 and 13 are parallel to each other. The guide tubes 12 and 13 are movably attached by fitting a holder 19 to the horizontal member 11, and can be fixed to any position of the horizontal member 11 by tightening screws (not shown).

案内管12、13には、それぞれ脚部材14が装着されている。脚部材14は、所要長さの螺子棒140を有し、その一端には四角形状の台板141が螺子棒140と直角に固定されている。本実施の形態では、台板141は単に平板状であるが、例えば釘穴等、載置部に固定するための手段を設けることもできる。   A leg member 14 is attached to each of the guide tubes 12 and 13. The leg member 14 has a screw rod 140 of a required length, and a square base plate 141 is fixed to the screw rod 140 at a right angle at one end thereof. In the present embodiment, the base plate 141 is simply a flat plate, but it is also possible to provide means for fixing to the mounting portion such as a nail hole.

螺子棒140には、高さ調節体142が螺合されている。高さ調節体142は、内面に螺子が切ってある管体と二本のハンドル(いずれも符号省略)で構成されている。高さ調節体142は、回転させることによって螺子棒140に沿って軸線方向の両方向(使用時においては上下方向)に移動させることができる。   A height adjuster 142 is screwed onto the screw rod 140. The height adjuster 142 is composed of a tube body having a thread on the inner surface and two handles (both are not shown). The height adjuster 142 can be moved in both axial directions (up and down in use) along the screw rod 140 by rotating.

螺子棒140は、前記案内管12、13の内径よりやや径小に形成されている。横架部材11は、案内管12、13を各脚部材14の螺子棒140にスライド自在に被せ入れてあり、案内管12、13が高さ調節体142の管体の上に載るようにして、各脚部材14間に架設される。これにより、前記のように各高さ調節体142を上下動させると、横架部材11の高さ及び水平度を調節することができる。   The screw rod 140 is formed to be slightly smaller in diameter than the inner diameters of the guide tubes 12 and 13. The horizontal member 11 is configured such that the guide tubes 12 and 13 are slidably placed on the screw rods 140 of the leg members 14, and the guide tubes 12 and 13 are placed on the tube of the height adjusting body 142. These are installed between the leg members 14. Thereby, if each height adjustment body 142 is moved up and down as mentioned above, the height and levelness of the horizontal member 11 can be adjusted.

横架部材11には、可動部材15が、横架部材11の長さ方向に移動調節自在に装着されている。可動部材15は、互いに平行な縦部材150、151と、それらを下端部で連結する横部材152を備えている。縦部材150、151と横部材152は、角管で形成されている。縦部材150、151の下端の側面には、ブラケット153、154が同じ方向へ突出して固定されている(図1参照)。   A movable member 15 is attached to the horizontal member 11 so as to be movable and adjustable in the length direction of the horizontal member 11. The movable member 15 includes longitudinal members 150 and 151 that are parallel to each other and a transverse member 152 that connects them at the lower end. The vertical members 150 and 151 and the horizontal member 152 are formed of square tubes. Brackets 153 and 154 protrude and be fixed in the same direction on the side surfaces at the lower ends of the vertical members 150 and 151 (see FIG. 1).

ブラケット153、154は、それぞれ水平部とその内側に設けられている三角形の補強部(いずれも符号省略)で構成されている。水平部には、アンカーボルト3を挿通し取り付けることができる取付孔155が設けられている。なお、縦部材150、151と横部材152及びブラケット153、154の下面は、互いに面一になるように設けられている。   Each of the brackets 153 and 154 includes a horizontal portion and a triangular reinforcing portion (both of which are omitted). The horizontal portion is provided with an attachment hole 155 into which the anchor bolt 3 can be inserted and attached. Note that the vertical members 150 and 151, the horizontal member 152, and the lower surfaces of the brackets 153 and 154 are provided to be flush with each other.

縦部材150、151には、ホルダー156が固定されている。ホルダー156は、四角形の基板156aと、基板156aの上部に取り付けられた縦押さえ板156cと、基板156aの一方の側部に取り付けられた横押さえ板156bで構成されている。各押さえ板156b、156cは直角に折り曲げた五面でいわばΩ様に形成したものであり、基板156aに螺子着することによって、縦押さえ板156cで前記縦部材150、151を、横押さえ板156bで横架部材11を挿通することができる四角形の穴を形成することができる。   A holder 156 is fixed to the vertical members 150 and 151. The holder 156 includes a rectangular substrate 156a, a vertical pressing plate 156c attached to the top of the substrate 156a, and a horizontal pressing plate 156b attached to one side of the substrate 156a. Each presser plate 156b, 156c is formed in a so-called Ω-like shape with five surfaces bent at right angles, and is screwed onto the substrate 156a, whereby the vertical presser plate 156c connects the vertical members 150, 151 to the horizontal presser plate 156b. Thus, a rectangular hole through which the horizontal member 11 can be inserted can be formed.

なお、可動部材15は、ホルダー156の縦押さえ板156cで縦部材150、151を適当な位置で保持し、横押さえ板156bで横架部材11を適当な位置で保持して、螺子を締め付けることにより、高さが調整できると共に横架部材11の所要位置に固定することができる。   The movable member 15 holds the vertical members 150 and 151 at appropriate positions by the vertical pressing plate 156c of the holder 156, and holds the horizontal member 11 at an appropriate position by the horizontal pressing plate 156b and tightens the screw. Thus, the height can be adjusted and the horizontal member 11 can be fixed at a required position.

前記位置決め具2は、所要間隔をおいて設置された二台の支持具1の各可動部材15に両端側を固定して吊設される。位置決め具2は、各支持具1の横架部材11及び可動部材15の高さを調節することにより、高さ及び水平度の調節を行うことができる。位置決め具2は、外形が細長い四角形状の枠体であり、主に角管を組んで形成されている。位置決め具2を構成する二本の平行な長材20、20の長さ方向の一端側には、長さ方向に所要の間隔をおいて二箇所に長材20、20を連結する短材21、22が固定されている。   The positioning tool 2 is suspended from the movable members 15 of the two support tools 1 installed at a required interval with both ends fixed. The positioning tool 2 can adjust the height and the horizontality by adjusting the height of the horizontal member 11 and the movable member 15 of each support tool 1. The positioning tool 2 is a rectangular frame having an elongated outer shape, and is mainly formed by assembling square tubes. On one end side in the length direction of the two parallel long members 20, 20 constituting the positioning tool 2, a short member 21 that connects the long members 20, 20 at two positions with a predetermined interval in the length direction. , 22 are fixed.

長材20、20の長さ方向の他端側にも同様に二箇所に短材23、24が固定されている。なお、長さ方向両端側の短材21、24は山形鋼で形成され、各短材21、24の縦部には、他の位置決め具2aを接合するためのボルト・ナット(図示省略)を装着するボルト孔210、240がそれぞれ二箇所に設けられている。短材21、24とボルト孔210、240は接合手段を構成する。また、各長材20にも同様にボルト孔を設けて、位置決め具2を幅方向に接合する接合手段を構成するようにしてもよい。また、内側の短材22、23間の二箇所にも短材25、26が固定されている。   Similarly, the short members 23 and 24 are fixed at two places on the other end side in the length direction of the long members 20 and 20. In addition, the short members 21 and 24 at both ends in the length direction are formed of angle steel, and bolts and nuts (not shown) for joining the other positioning tools 2a are formed on the vertical portions of the respective short members 21 and 24. Bolt holes 210 and 240 to be mounted are provided at two locations, respectively. The short members 21 and 24 and the bolt holes 210 and 240 constitute a joining means. Also, each long member 20 may be similarly provided with a bolt hole to constitute a joining means for joining the positioning tool 2 in the width direction. Further, the short members 25 and 26 are also fixed at two positions between the inner short members 22 and 23.

長材20、20において、短材21、22及び短材23、24が固定されている箇所には、上下方向に貫通した取付孔27が設けられている。すなわち、取付孔27は、位置決め具2の長さ方向の一端側に四箇所、他端側に四箇所、合計八箇所に設けられている。各取付孔27には、アンカーボルト3を挿通し鉛直方向に取り付けることができる。   In the long members 20 and 20, mounting holes 27 penetrating in the vertical direction are provided at locations where the short members 21 and 22 and the short members 23 and 24 are fixed. That is, the attachment holes 27 are provided at a total of eight locations, four on one end side in the length direction of the positioning tool 2 and four on the other end side. The anchor bolt 3 can be inserted into each attachment hole 27 and attached in the vertical direction.

なお、内側の短材22、23に対応する箇所の各取付孔27は、基礎上に施工される構造物または建築物の取付箇所に合うように配されている。この各取付孔27の数、位置等は、構造物または建築物に合わせて適宜決められる。各取付孔27は、アンカーボルト3を介して前記各可動部材15のブラケット153、154に固定するための孔ともなる。位置決め具2を各支持具1の可動部材15に取り付ける方法、構造については、後述する。   In addition, each attachment hole 27 of the location corresponding to the inner short materials 22 and 23 is distribute | arranged so that it may fit the attachment location of the structure or building constructed on a foundation. The number, position, and the like of each mounting hole 27 are appropriately determined according to the structure or the building. Each mounting hole 27 also serves as a hole for fixing to the brackets 153 and 154 of each movable member 15 via the anchor bolt 3. A method and structure for attaching the positioning tool 2 to the movable member 15 of each support tool 1 will be described later.

アンカーボルト3は、各図面に示すように、本実施の形態では所要長さの螺子棒31の下端部に二つのナット32、33を螺合し、上部側に同じく二つのナット34、35を螺合したものを採用している。下側のナット32、33は、コンクリートに埋没することにより抜けないようにするためのストッパーとしての機能を有する。上側のナット34、35は、取付孔27の上下側の孔縁部または取付孔155の上側の孔縁部と取付孔27の下側の孔縁部を挟んで固定する機能を有する。
なお、アンカーボルトの構造は、これに限定されるものではなく、固化したコンクリートから抜けないものであれば、他の構造のアンカーボルトを採用してもよい。
As shown in each drawing, the anchor bolt 3 has two nuts 32 and 33 screwed to the lower end portion of the screw rod 31 having a required length in the present embodiment, and the two nuts 34 and 35 are similarly attached to the upper side. The screw is used. The lower nuts 32 and 33 have a function as a stopper for preventing the nuts 32 and 33 from being pulled out by being buried in concrete. The upper nuts 34, 35 have a function of fixing the upper and lower hole edges of the attachment hole 27 or the upper edge of the attachment hole 155 and the lower hole edge of the attachment hole 27.
The structure of the anchor bolt is not limited to this, and an anchor bolt having another structure may be adopted as long as it does not come out from the solidified concrete.

(作用)
図1ないし図4を参照して本実施の形態に係るアンカーボルトセット装置Sの作用及び基礎の施工方法を説明する。
なお、ここでは、小型軽量な構造物である片持ち式のバス停留所の施工における基礎を施工する場合を例にとり説明する。この施工では、ベタ基礎の一辺側に偏って、所要間隔をおいて二箇所にそれぞれ四本ずつ合計八本のアンカーボルトを立てる。
(Function)
With reference to FIG. 1 thru | or FIG. 4, the effect | action of the anchor bolt setting apparatus S which concerns on this Embodiment, and the construction method of a foundation are demonstrated.
Here, a case where a foundation is constructed in the construction of a cantilevered bus stop which is a small and light structure will be described as an example. In this construction, a total of eight anchor bolts are erected in each of two locations with a required interval, with a bias toward one side of the solid foundation.

(1)アンカーボルトセット装置Sは、作業前には二台の支持具1と位置決め具2に分けておく。
(2)地面に基礎を施工するための四角形で所要の深さの基礎穴4を形成する。基礎穴4の穴底にはグリ石(図示省略)を敷き、転圧して固める。
(3)基礎穴4のグリ石の上に配筋5を形成する。この配筋5は、その場で鉄筋を組んでつくってもよいし、あらかじめ工場で製作したものを搬入してもよい。なお、配筋5を施工しない、より簡易な施工の場合も、後述するようにアンカーボルト3を宙に浮かせた状態で位置決めができるので、アンカーボルトを立てる際の取付部となる捨てコンクリートの施工は必ずしも必要ではない。
(1) The anchor bolt setting device S is divided into two support tools 1 and a positioning tool 2 before work.
(2) A base hole 4 having a required depth is formed in a quadrangle for constructing the foundation on the ground. A grit stone (not shown) is laid on the bottom of the base hole 4 and is hardened by rolling.
(3) The reinforcing bar 5 is formed on the grindstone of the base hole 4. The reinforcing bar 5 may be made by assembling reinforcing bars on the spot, or may be made in advance at the factory. In addition, even in the simpler construction that does not install the reinforcement bar 5, since the anchor bolt 3 can be positioned in the air as described later, the construction of the abandoned concrete that serves as the attachment portion when the anchor bolt is erected Is not necessarily required.

(4)アンカーボルト3を立てる位置を基準として配筋5の上部に位置決め具2を載置して配する。すなわち、位置決め具2の両端側のそれぞれ四箇所ずつの各取付孔27を、設計において決められている構造物(上物)の取付箇所に合わせるようにして載置する。
(5)前記短材22、23に対応する箇所の各取付孔27の上方を支持具1の横架部材11が大体において通るようにし、二台の支持具1を基礎穴4を跨ぐようにして地面GLに据える。
(4) The positioning tool 2 is placed on the upper part of the bar arrangement 5 with the position where the anchor bolt 3 is erected as a reference. That is, the mounting holes 27 at the four positions on both ends of the positioning tool 2 are placed so as to match the mounting positions of the structure (upper object) determined in the design.
(5) The horizontal member 11 of the support tool 1 generally passes above the mounting holes 27 at locations corresponding to the short members 22 and 23 so that the two support tools 1 straddle the base hole 4. And place it on the ground GL.

(6)位置決め具2に合わせるように支持具1の位置の微調節及び可動部材15の位置の調節を行い、ホルダー156の縦押さえ板156cを緩めて各可動部材15を位置決め具2の高さまで下降させ、縦押さえ板156cを締めて可動部材15を固定する。そして、短材22、23に対応する箇所の各取付孔27と可動部材15のブラケット153、154の取付孔155を合わせるようにし、アンカーボルト3によってブラケット153、154に位置決め具2を固定する。 (6) Fine adjustment of the position of the support tool 1 and adjustment of the position of the movable member 15 so as to match the positioning tool 2, loosen the vertical pressing plate 156 c of the holder 156, and move each movable member 15 to the height of the positioning tool 2. The movable member 15 is fixed by tightening the vertical pressing plate 156c. Then, the mounting holes 27 at locations corresponding to the short members 22 and 23 are aligned with the mounting holes 155 of the brackets 153 and 154 of the movable member 15, and the positioning tool 2 is fixed to the brackets 153 and 154 by the anchor bolt 3.

この固定は、アンカーボルト3の螺子棒31を各取付孔27、155に通し、上側のナット34、35で、取付孔155の上側の孔縁部と取付孔27の下側の孔縁部を挟んで締め付けることにより行う。また、他のアンカーボルト3は、位置決め具2の短材21、24に対応する箇所の取付孔27に螺子棒31を通し、上側のナット34、35で取付孔27の上下側の孔縁部を挟んで締め付けることにより固定する。これにより、各アンカーボルト3は、地面GLより低い高さで宙に浮かせた状態で位置が決まる。   In this fixing, the screw rod 31 of the anchor bolt 3 is passed through the mounting holes 27 and 155, and the upper edge of the mounting hole 155 and the lower edge of the mounting hole 27 are connected by the upper nuts 34 and 35. It is done by pinching and tightening. In addition, the other anchor bolt 3 passes the screw rod 31 through the mounting hole 27 corresponding to the short members 21 and 24 of the positioning tool 2, and the upper and lower hole edges of the mounting hole 27 by the upper nuts 34 and 35. Fix by tightening with a pin. Thereby, the position of each anchor bolt 3 is determined in a state where it is suspended in the air at a height lower than the ground GL.

なお、このとき、各アンカーボルト3の螺子棒31の上端と長材20の下面との距離が、あらかじめ決められている距離に揃うようにする。つまり、後述するように長材20の下面が施工後の基礎コンクリート面の高さとなるので、螺子棒31の上端と長材20の下面との距離が、螺子棒31の基礎のコンクリート面からの突出長さになる。   At this time, the distance between the upper end of the screw rod 31 of each anchor bolt 3 and the lower surface of the long member 20 is set to a predetermined distance. That is, as will be described later, since the lower surface of the long member 20 becomes the height of the foundation concrete surface after construction, the distance between the upper end of the screw rod 31 and the lower surface of the long member 20 is from the concrete surface of the foundation of the screw rod 31. It becomes the protruding length.

(7)位置決め具2を固定した後、両支持具1の各脚部材14の高さ調節体142により横架部材11の高さを、位置決め具2の長さ方向の水平をとるように、かつ位置決め具2の長材20の下面が配筋5の上端より例えば50mm程度高くなる位置を目安に調節する。同時に、各高さ調節体142により横架部材11が水平となるよう調節し、位置決め具2の幅方向の水平をとるようにする。 (7) After fixing the positioning tool 2, the height of the horizontal member 11 is adjusted by the height adjusting body 142 of each leg member 14 of both the support tools 1 so as to be horizontal in the length direction of the positioning tool 2. And the position where the lower surface of the long member 20 of the positioning tool 2 is higher than the upper end of the reinforcing bar 5 by about 50 mm, for example, is adjusted. At the same time, the horizontal adjustment member 142 is adjusted so that the horizontal member 11 is horizontal, and the horizontal direction of the positioning tool 2 is adjusted.

(8)基礎穴4の中に配筋5に詰めるようにしてコンクリートを打って各アンカーボルト3の下部を埋没させる。そして、位置決め具2の長材20の下面に高さを合わせるようにコンクリート6表面を水平に均す。
(9)コンクリート6が固化したところで、各アンカーボルト3の上側のナット34、35を緩めて螺子棒31から外し、下部が埋設されている各アンカーボルト3を残して、位置決め具2と各支持具1を撤去する。これにより、各アンカーボルト3は、構造物(上物)に合わせてあらかじめ決められた位置に正確に立てることができ、作業において墨を打つ必要がなく、熟練した技術を特に持たない一般の作業者でも正確に施工することができる。また、位置決め具2と各支持具1は繰り返し使用することができる。
(10)後は、コンクリート6の養生を待ち、基礎の施工が完了する。本施工ではコンクリート6の表面高さが地面GLより低い位置にあり、アスファルト等で地面GLと面一になるように仕上げられる。
(8) Concrete is struck so as to fill the reinforcing bar 5 in the foundation hole 4, and the lower part of each anchor bolt 3 is buried. Then, the surface of the concrete 6 is leveled so that the height matches the lower surface of the long member 20 of the positioning tool 2.
(9) When the concrete 6 is solidified, the nuts 34 and 35 on the upper side of the anchor bolts 3 are loosened and removed from the screw rods 31, leaving the anchor bolts 3 in which the lower part is embedded, and the positioning tool 2 and each support. Remove tool 1. As a result, each anchor bolt 3 can be accurately set in a predetermined position according to the structure (superior), does not need to be blacked in the work, and does not have a skilled technique in particular. Even a person can perform construction accurately. Moreover, the positioning tool 2 and each support tool 1 can be used repeatedly.
(10) After that, the foundation construction is completed after waiting for the concrete 6 to be cured. In this construction, the surface height of the concrete 6 is at a position lower than the ground GL and is finished so as to be flush with the ground GL with asphalt or the like.

なお、本明細書で使用している用語と表現は、あくまでも説明上のものであって、なんら限定的なものではなく、本明細書に記述された特徴およびその一部と等価の用語や表現を除外する意図はない。また、本発明の技術思想の範囲内で、種々の変形態様が可能であるということは言うまでもない。   Note that the terms and expressions used in this specification are merely explanatory and are not limiting at all, and terms and expressions equivalent to the features described in this specification and parts thereof. There is no intention to exclude. It goes without saying that various modifications are possible within the scope of the technical idea of the present invention.

本発明に係るアンカーボルトセット装置の一実施の形態を示す分解斜視説明図。The exploded perspective explanatory view showing one embodiment of the anchor bolt set device concerning the present invention. アンカーボルトセット装置を使用した基礎の施工方法を示す断面説明図。Cross-sectional explanatory drawing which shows the construction method of the foundation which uses an anchor bolt set apparatus. 図2におけるA−A部分断面説明図。FIG. 3 is a partial cross-sectional explanatory diagram along AA in FIG. 図2におけるB−B部分断面説明図。BB partial cross-sectional explanatory drawing in FIG.

符号の説明Explanation of symbols

S アンカーボルトセット装置
1 支持具
11 横架部材
12、13 案内管
19 ホルダー
14 脚部材
140 螺子棒
141 台板
142 高さ調節体
15 可動部材
150、151 縦部材
152 横部材
153、154 ブラケット
155 取付孔
156 ホルダー
156a 基板
156b 横押さえ板
156c 縦押さえ板
2、2a 位置決め具
20 長材
21、22、23、24 短材
210、240 ボルト孔
25、26 短材
27 取付孔
3 アンカーボルト
31 螺子棒
32、33 ナット
34、35 ナット
4 基礎穴
5 配筋
6 コンクリート
S anchor bolt setting device 1 support 11 horizontal member 12, 13 guide tube 19 holder 14 leg member 140 screw rod 141 base plate 142 height adjusting body 15 movable member 150, 151 vertical member 152 horizontal member 153, 154 bracket 155 mounting Hole 156 Holder 156a Substrate 156b Horizontal holding plate 156c Vertical holding plate 2, 2a Positioning tool 20 Long material 21, 22, 23, 24 Short material 210, 240 Bolt hole 25, 26 Short material 27 Mounting hole 3 Anchor bolt 31 Screw rod 32 , 33 Nut 34, 35 Nut 4 Foundation hole 5 Reinforcement 6 Concrete

Claims (5)

アンカーボルトの位置を決める位置決め具(2)と、
位置決め具(2)を支える、二以上の支持具(1)と、
を備えており、
位置決め具(2)は、
上物の取付部分に対応する位置にありアンカーボルトが着脱自在であるアンカーボルト取付部(155,27)を有し、
支持具(1)は、位置決め具(2)の高さの調節手段(14,15)と、水平度の調節手段(14,15)を有する、
アンカーボルトセット装置。
A positioning tool (2) for determining the position of the anchor bolt;
Two or more supports (1) that support the positioning tool (2);
With
The positioning tool (2)
There is an anchor bolt mounting part (155, 27) at a position corresponding to the mounting part of the upper article and the anchor bolt is detachable,
The support (1) has a height adjusting means (14, 15) of the positioning tool (2) and a leveling adjusting means (14, 15).
Anchor bolt set device.
基礎の施工においてアンカーボルトを立てる装置であって、
アンカーボルトの位置を決める位置決め具(2)と、
位置決め具(2)を支える、二以上の支持具(1)と、
を備えており、
位置決め具(2)は、施工される構造物または建築物の取付部に合わせて設けられアンカーボルトを鉛直方向に向けた状態で取り付け及び取り外しができるアンカーボルト取付部(155,27)を有し、
支持具(1)は、
高さ調節手段を有する脚部材(14)と、
脚部材(14)間に渡してある横架部材(11)と、
横架部材(11)の長さ方向に沿って移動自在かつ高さの調節ができるように取り付けられ位置決め具(2)の取り付け及び取り外しができる可動部材(15)を有し、
横架部材(11)は、脚部材(14)の高さ調節手段によって高さ及び水平度の調節ができる、
アンカーボルトセット装置。
A device that raises anchor bolts in foundation construction,
A positioning tool (2) for determining the position of the anchor bolt;
Two or more supports (1) that support the positioning tool (2);
With
The positioning tool (2) has an anchor bolt mounting portion (155, 27) that is provided in accordance with the mounting portion of the structure or building to be constructed and can be mounted and removed with the anchor bolt oriented in the vertical direction. ,
The support (1)
A leg member (14) having height adjusting means;
A horizontal member (11) passed between the leg members (14);
It has a movable member (15) that can be moved and adjusted in height along the length of the horizontal member (11) and that can be attached and removed from the positioning tool (2).
The horizontal member (11) can be adjusted in height and level by the height adjusting means of the leg member (14).
Anchor bolt set device.
位置決め具(2)に、位置決め具(2)を縦横方向へ延長するために他の位置決め具(2a)を接合する接合手段を備えている、
請求項1または2のいずれかに記載のアンカーボルトセット装置。
The positioning tool (2) includes a joining means for joining another positioning tool (2a) to extend the positioning tool (2) in the vertical and horizontal directions.
The anchor bolt setting device according to claim 1.
アンカーボルト(3)を立てる位置を基準として地面に基礎を施工するための基礎穴(4)の中に位置決め具(2)を配し、所要の高さで水平に設定する工程、
位置決め具(2)のアンカーボルト取付部(155,27)に所要数のアンカーボルト(3)を取り付ける工程、
基礎穴(4)の中にコンクリート(6)を打ってアンカーボルト(3)の下部を埋没させ、コンクリート(6)表面を所要の高さに均す工程、
コンクリート(6)が固化したところで、下部が埋設されているアンカーボルト(3)を残して位置決め具(2)と支持具(1)を撤去する工程、
を含む、
基礎の施工方法。
Positioning the positioning tool (2) in the foundation hole (4) for constructing the foundation on the ground based on the position where the anchor bolt (3) is raised, and setting it horizontally at the required height,
Attaching the required number of anchor bolts (3) to the anchor bolt mounting portions (155, 27) of the positioning tool (2);
Placing concrete (6) in the foundation hole (4) and burying the lower part of the anchor bolt (3), leveling the surface of the concrete (6) to the required height,
When the concrete (6) is solidified, the step of removing the positioning tool (2) and the support tool (1) leaving the anchor bolt (3) embedded in the lower part,
including,
Foundation construction method.
地面に基礎を施工するための基礎穴(4)の中に配筋(5)をする工程、
アンカーボルト(3)を立てる位置を基準として配筋(5)の上部または上方に位置決め具(2)を配する工程、
支持具(1)を使用して位置決め具(2)を所要の高さで水平に設定し固定する工程、
位置決め具(2)のアンカーボルト取付部(155,27)に所要数のアンカーボルト(3)を取り付ける工程、
基礎穴(4)の中にコンクリート(6)を打ってアンカーボルト(3)の下部を埋没させ、コンクリート(6)表面を所要の高さに均す工程、
コンクリート(6)が固化したところで、下部が埋設されているアンカーボルト(3)を残して位置決め具(2)と支持具(1)を撤去する工程、
を含む、
基礎の施工方法。
The process of placing reinforcements (5) in the foundation holes (4) for constructing foundations on the ground,
Placing the positioning tool (2) above or above the reinforcing bar (5) with reference to the position where the anchor bolt (3) is raised,
Setting and fixing the positioning tool (2) horizontally at the required height using the support tool (1);
Attaching the required number of anchor bolts (3) to the anchor bolt mounting portions (155, 27) of the positioning tool (2);
Placing concrete (6) in the foundation hole (4) and burying the lower part of the anchor bolt (3), leveling the surface of the concrete (6) to the required height,
When the concrete (6) is solidified, the step of removing the positioning tool (2) and the support tool (1) leaving the anchor bolt (3) embedded in the lower part,
including,
Foundation construction method.
JP2008208160A 2008-08-12 2008-08-12 Anchor bolt set device Active JP4491030B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008208160A JP4491030B2 (en) 2008-08-12 2008-08-12 Anchor bolt set device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008208160A JP4491030B2 (en) 2008-08-12 2008-08-12 Anchor bolt set device

Publications (2)

Publication Number Publication Date
JP2010043468A true JP2010043468A (en) 2010-02-25
JP4491030B2 JP4491030B2 (en) 2010-06-30

Family

ID=42015047

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008208160A Active JP4491030B2 (en) 2008-08-12 2008-08-12 Anchor bolt set device

Country Status (1)

Country Link
JP (1) JP4491030B2 (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518145A (en) * 2011-12-26 2012-06-27 中国十七冶集团有限公司 Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations
JP2013049973A (en) * 2011-08-31 2013-03-14 Toshiharu Horimoto Construction method of skeleton structure made of reinforced concrete
KR101329662B1 (en) * 2013-01-17 2013-11-14 주식회사 쏠라빌 A base concrete structure for installation of solar panel
JP2016000888A (en) * 2014-06-11 2016-01-07 メークス株式会社 Level adjustment tool for steel frame unit
CN106968268A (en) * 2017-05-23 2017-07-21 中国化学工程第三建设有限公司 A kind of installation method of foundation bolt
CN107816136A (en) * 2017-11-06 2018-03-20 浙江新邦远大绿色建筑产业有限公司 A kind of embedded parts positioning device
CN109914467A (en) * 2019-04-04 2019-06-21 南京中核能源工程有限公司 A kind of foundation bolt positioning device convenient for adjusting
CN110397096A (en) * 2019-08-08 2019-11-01 中建空列(北京)科技有限公司 Built-in fitting construction survey positions tool
CN112663654A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable location frock suitable for assembly type structure built-in fitting
CN112663655A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable location frock suitable for assembled building built-in fitting
CN112663656A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable positioning tool for assembled building embedded part
CN112663651A (en) * 2020-06-19 2021-04-16 杨春娥 Embedded positioning tool suitable for assembled building embedded part
CN112663652A (en) * 2020-06-19 2021-04-16 杨春娥 Embedded positioning tool suitable for assembled building embedded part
CN112663657A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable positioning tool for assembled building embedded part
CN113006288A (en) * 2021-03-03 2021-06-22 重庆科技学院 Integral positioning device for embedded counter-force ground anchor and construction method
CN113404008A (en) * 2021-07-19 2021-09-17 中国建筑第八工程局有限公司 Pneumatic shield gate embedded part and construction method thereof
CN114319886A (en) * 2021-11-18 2022-04-12 河南中智成城建筑科学研究院有限公司 Truss burst equipment bed-jig device
CN115012656A (en) * 2022-06-15 2022-09-06 中建八局科技建设有限公司 Combined fixture for cushion stone preformed hole and construction method thereof
CN115405117A (en) * 2022-09-15 2022-11-29 中建科工集团武汉有限公司 Steel column positioning device and installation method of inner steel column of cup-mouth foundation
CN115506397A (en) * 2022-09-23 2022-12-23 中国化学工程第六建设有限公司 Construction method for accurately positioning foundation bolt box
CN117005621A (en) * 2023-09-19 2023-11-07 中铁四局集团有限公司 Prefabricated wallboard reinforcing steel bar auxiliary positioning device and application method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57101148U (en) * 1980-12-05 1982-06-22
JPS6037498A (en) * 1983-08-06 1985-02-26 東芝プラント建設株式会社 Device for mounting packer plate
JPS6070141U (en) * 1983-10-21 1985-05-17 石川島播磨重工業株式会社 Anchor bolt installation jig
JPH0336326A (en) * 1989-06-30 1991-02-18 Koken Sekkei Kenkyusho:Kk Method of execution for foundation
JP2002105967A (en) * 2000-10-02 2002-04-10 Yuuki Oguri Setting method of anchor bolt corresponding to inclined ground and fixing device of anchor bolt
JP2006118272A (en) * 2004-10-22 2006-05-11 Kiyoshi Sekiya Anchor bolt positioning fitting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57101148U (en) * 1980-12-05 1982-06-22
JPS6037498A (en) * 1983-08-06 1985-02-26 東芝プラント建設株式会社 Device for mounting packer plate
JPS6070141U (en) * 1983-10-21 1985-05-17 石川島播磨重工業株式会社 Anchor bolt installation jig
JPH0336326A (en) * 1989-06-30 1991-02-18 Koken Sekkei Kenkyusho:Kk Method of execution for foundation
JP2002105967A (en) * 2000-10-02 2002-04-10 Yuuki Oguri Setting method of anchor bolt corresponding to inclined ground and fixing device of anchor bolt
JP2006118272A (en) * 2004-10-22 2006-05-11 Kiyoshi Sekiya Anchor bolt positioning fitting

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013049973A (en) * 2011-08-31 2013-03-14 Toshiharu Horimoto Construction method of skeleton structure made of reinforced concrete
CN102518145A (en) * 2011-12-26 2012-06-27 中国十七冶集团有限公司 Device for wholly positioning and strengthening groups of embedded bolts in ranks on device foundations
KR101329662B1 (en) * 2013-01-17 2013-11-14 주식회사 쏠라빌 A base concrete structure for installation of solar panel
JP2016000888A (en) * 2014-06-11 2016-01-07 メークス株式会社 Level adjustment tool for steel frame unit
CN106968268A (en) * 2017-05-23 2017-07-21 中国化学工程第三建设有限公司 A kind of installation method of foundation bolt
CN107816136A (en) * 2017-11-06 2018-03-20 浙江新邦远大绿色建筑产业有限公司 A kind of embedded parts positioning device
CN107816136B (en) * 2017-11-06 2024-01-23 长沙远大住宅工业集团股份有限公司 Built-in fitting positioner
CN109914467A (en) * 2019-04-04 2019-06-21 南京中核能源工程有限公司 A kind of foundation bolt positioning device convenient for adjusting
CN110397096A (en) * 2019-08-08 2019-11-01 中建空列(北京)科技有限公司 Built-in fitting construction survey positions tool
CN112663652A (en) * 2020-06-19 2021-04-16 杨春娥 Embedded positioning tool suitable for assembled building embedded part
CN112663656A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable positioning tool for assembled building embedded part
CN112663651A (en) * 2020-06-19 2021-04-16 杨春娥 Embedded positioning tool suitable for assembled building embedded part
CN112663655A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable location frock suitable for assembled building built-in fitting
CN112663657A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable positioning tool for assembled building embedded part
CN112663654A (en) * 2020-06-19 2021-04-16 杨春娥 Detachable location frock suitable for assembly type structure built-in fitting
CN113006288B (en) * 2021-03-03 2022-09-23 重庆科技学院 Integral positioning device for embedded counter-force ground anchor and construction method
CN113006288A (en) * 2021-03-03 2021-06-22 重庆科技学院 Integral positioning device for embedded counter-force ground anchor and construction method
CN113404008A (en) * 2021-07-19 2021-09-17 中国建筑第八工程局有限公司 Pneumatic shield gate embedded part and construction method thereof
CN114319886A (en) * 2021-11-18 2022-04-12 河南中智成城建筑科学研究院有限公司 Truss burst equipment bed-jig device
CN115012656A (en) * 2022-06-15 2022-09-06 中建八局科技建设有限公司 Combined fixture for cushion stone preformed hole and construction method thereof
CN115405117A (en) * 2022-09-15 2022-11-29 中建科工集团武汉有限公司 Steel column positioning device and installation method of inner steel column of cup-mouth foundation
CN115405117B (en) * 2022-09-15 2024-03-19 中建科工集团武汉有限公司 Steel column positioning device and method for installing steel column in cup rim foundation
CN115506397A (en) * 2022-09-23 2022-12-23 中国化学工程第六建设有限公司 Construction method for accurately positioning foundation bolt box
CN115506397B (en) * 2022-09-23 2023-06-27 中国化学工程第六建设有限公司 Accurate positioning construction method for foundation anchor bolt box
CN117005621A (en) * 2023-09-19 2023-11-07 中铁四局集团有限公司 Prefabricated wallboard reinforcing steel bar auxiliary positioning device and application method thereof
CN117005621B (en) * 2023-09-19 2024-02-06 中铁四局集团有限公司 Prefabricated wallboard reinforcing steel bar auxiliary positioning device and application method thereof

Also Published As

Publication number Publication date
JP4491030B2 (en) 2010-06-30

Similar Documents

Publication Publication Date Title
JP4491030B2 (en) Anchor bolt set device
US8235346B2 (en) Support bracket for a column
US8132774B1 (en) Concrete forming screed aids
CN104755681A (en) A panel support bracket
KR101304985B1 (en) Foundation bolt mount with height adjustment
JP5961778B1 (en) Anchor bolt installation base
JP4020406B2 (en) Formwork support mechanism and placement method
KR20120046919A (en) Boundary stone construction apparatus and the method of construct the boundary stone
US10480191B2 (en) Method and apparatus for setting concrete reinforcement
JP2005090116A (en) Method for erecting steel frame column and positioning frame body used for it
JP2004197504A (en) Method of defining crest, and auxiliary tool for defining crest and reinforcement bar
JP2008291438A (en) Anchor frame
KR200468906Y1 (en) Foundation bolt mount with height adjustment
JP2004285607A (en) Method and auxiliary implement for leveling of concrete, and spacer for reinforcement
JP2630623B2 (en) Anchor bolt installation method and anchor bolt support device used for it
JP4313431B1 (en) Forming support device for box extraction and installation method thereof
JP3740232B2 (en) Anchor bolt mounting bracket
JP3861085B2 (en) Support metal fittings, installation method of support metal fittings, height adjustment method of support metal fittings, and mortar leveling method.
JP2001159240A (en) Concrete direct finishing method and jig
JP6373218B2 (en) Height adjustment jig and method for forming rising portion of slab
KR200285372Y1 (en) Horizontal Adjustable Underpinning for Wall Foam Panel
CN219509179U (en) Beam bottom surface formwork appurtenance
JPH0138947B2 (en)
CN219240216U (en) Elevation control tool for paving roadbed surface layer in municipal road construction
JP5766828B2 (en) Method for installing solar cell module installation stand and solar cell module installation stand

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20091130

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20091130

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20091215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100105

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100330

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100402

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130409

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4491030

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130409

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140409

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250