JP2008254834A - Main rope replacing method for hydraulic elevator and pulley tool for main rope replacement using the method - Google Patents

Main rope replacing method for hydraulic elevator and pulley tool for main rope replacement using the method Download PDF

Info

Publication number
JP2008254834A
JP2008254834A JP2007096284A JP2007096284A JP2008254834A JP 2008254834 A JP2008254834 A JP 2008254834A JP 2007096284 A JP2007096284 A JP 2007096284A JP 2007096284 A JP2007096284 A JP 2007096284A JP 2008254834 A JP2008254834 A JP 2008254834A
Authority
JP
Japan
Prior art keywords
main rope
pulley
car
replacement
hoistway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2007096284A
Other languages
Japanese (ja)
Other versions
JP4935465B2 (en
JP2008254834A5 (en
Inventor
Mitsunori Ikegami
光憲 池上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2007096284A priority Critical patent/JP4935465B2/en
Publication of JP2008254834A publication Critical patent/JP2008254834A/en
Publication of JP2008254834A5 publication Critical patent/JP2008254834A5/ja
Application granted granted Critical
Publication of JP4935465B2 publication Critical patent/JP4935465B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a main rope replacing method for a hydraulic elevator capable of safely performing main rope replacement work by a worker located above a car. <P>SOLUTION: The main rope replacing method for the hydraulic elevator having a pulley tool 5 for main rope replacement mounted to an upper beam of the car 4 includes a process of stopping the car 4 in the vicinity of an uppermost floor and hanging and fixing the car 4 in a hoistway top part; a process of installing a new main rope drum 1 on a landing 3 of the uppermost floor; a process of fixing the pulley tool 5 for main rope replacement to the upper beam of the car 4; a process of cutting an old main rope 10 at the car side main rope terminal portion and jointing an end part of a new main rope 2 to the cutting end part of the old main rope 10; and a process of hanging down the joint part of the old and new main ropes 10, 2 toward a rotating wheel 6 below the car 4 while delivering the new main rope 2 with the new main rope 2 put in a rope groove of a pulley of the pulley tool 5 for main rope replacement, and of winding up the old main rope 10 around a winding drum 8 installed in a hoistway pit. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

この発明は、油圧サイドプランジャー方式と呼ばれる油圧エレベータの主ロープ交換方法及びそれに用いる主ロープ交換用滑車治具に関するものである。   The present invention relates to a hydraulic rope main rope replacement method called a hydraulic side plunger system and a main rope replacement pulley jig used therefor.

従来、油圧サイドプランジャー方式と呼ばれる油圧エレベータの主ロープ交換作業は、かごを最上階付近に固定し、乗場に新主ロープを設置した状態で、既設のかご側主ロープ端末部分でワイヤーロープを切断し、新主ロープと旧主ロープをジョイントさせる。そして、この状態からはピット作業者が1本の新主ロープを全周に亘って巻き終わるまで、かご上作業者が手で新主ロープを保持しておかなければならず、大変な労力が必要であった。また、新旧主ロープのジョイント部分が、かご下に設けられたかご下回転車の外れ止め部分で、最もロープ外れが起こり易い。そのため、かご上の作業者が目視で確認しながら、手で主ロープをコントロールしなければならない。しかし、かご上の作業者が手で主ロープをコントロールするのは、極めて困難なことである。   Conventionally, the main rope replacement work for hydraulic elevators, called the hydraulic side plunger method, is to fix the car near the top floor and install the new main rope at the landing, and wire rope at the existing car side main rope end. Cut and join the new main rope and the old main rope. From this state, until the pit operator finishes winding the new main rope over the entire circumference, the operator on the car must hold the new main rope by hand, which is very labor intensive. It was necessary. Moreover, the joint part of the old and new main ropes is the slip-off preventing part of the car lower rotating car provided under the car, and the rope comes off most easily. Therefore, the operator on the car must control the main rope by hand while visually checking. However, it is extremely difficult for a worker on the car to control the main rope by hand.

また、従来技術として、安価な費用で、かつ効率良く主ロープ交換作業を行える油圧エレベータの主ロープ交換方法が知られている(例えば、特許文献1参照)。   Further, as a conventional technique, there is known a main rope exchanging method for a hydraulic elevator that can perform main rope exchanging work efficiently at low cost (for example, see Patent Document 1).

特開2000−128456号公報JP 2000-128456 A

従来の油圧サイドプランジャー方式と呼ばれる油圧エレベータの主ロープ交換作業では、1本の新主ロープを全周に亘って巻き終わるまで、かご上作業者が手で新主ロープを保持する必要があり、大変な労力がいるという課題があった。また、新旧主ロープのジョイント部分が、かご下に設けられたかご下回転車の外れ止め部分を通過する時、ロープ外れが起こらないように、かご上の作業者が目視確認しながら、手で主ロープをコントロールする必要があり、困難な作業になるという課題があった。また、万一新主ロープがかご下回転車から外れた時は、作業者がかご下に降りて、ロープ外れを直す必要があるため、安全性にも課題があった。   In the conventional hydraulic elevator main rope replacement work, called the hydraulic side plunger method, the operator on the car must hold the new main rope by hand until one new main rope has been wound all around. There was a problem that there was a lot of labor. In addition, when the joint part of the old and new main ropes passes through the locking part of the undercarriage rotating car provided under the car, the operator on the car must visually check the hand so that the rope does not come off. There was a problem that it was difficult to control the main rope. In addition, when the new main rope is detached from the car under the car, it is necessary for the worker to get down to the car and fix the rope.

この発明は、上述のような課題を解決するためになされたもので、かごの上梁に主ロープ交換用滑車治具を取り付け、新旧主ロープをジョイントした後は、主ロープ交換用滑車治具の滑車のロープ溝に新主ロープを入れて、ピット作業者に巻き取らせるようにし、安全性を向上させた油圧エレベータの主ロープ交換方法及びそれに用いる主ロープ交換用滑車治具を提供するものである。   The present invention has been made to solve the above-described problems. After the main rope replacement pulley jig is attached to the upper beam of the car and the old and new main ropes are joined, the main rope replacement pulley jig is provided. A new main rope is inserted into the rope groove of the pulley of the pulley so that it can be taken up by the pit operator, and a safety rope main rope replacement method and a main rope replacement pulley jig used therefor are improved. It is.

この発明に係る油圧エレベータの主ロープ交換方法においては、昇降路内に設置され、上部にプーリが設けられた油圧ジャッキと、油圧ジャッキの動作により昇降路内を昇降し、下部にかご下回転車が設けられたかごと、一端が昇降路の頂部に取り付けられ、中間部がかご下回転車及び油圧ジャッキの上部プーリに巻き掛けられて、他端が昇降路底部に取り付けられた主ロープと、かごの上梁に取り付けられる主ロープ交換用滑車治具とを備えたものであって、かごを最上階付近で停止させて、かごを昇降路頂部に吊り下げ固定する工程と、最上階乗場に新主ロープドラムを設置する工程と、かごの上梁に主ロープ交換用滑車治具を取り付け固定する工程と、かご側主ロープ端末部分で旧主ロープを切断し、新主ロープの端部と旧主ロープの切断端部をジョイントする工程と、新主ロープを主ロープ交換用滑車治具の滑車のロープ溝に入れた状態で、新主ロープを繰り出しながら新旧主ロープのジョイント部をかご下回転車に向かって垂下させるとともに、旧主ロープを昇降路ピットに設置した巻き取りドラムに巻き取っていく工程とを備えたものである。   In the main rope exchanging method of the hydraulic elevator according to the present invention, a hydraulic jack installed in the hoistway and provided with a pulley at the upper part, and the hoistway is moved up and down by the operation of the hydraulic jack, and the car is rotated under the car. A main rope with one end attached to the top of the hoistway, an intermediate part wrapped around the upper pulley of the lower car and the hydraulic jack, and the other end attached to the hoistway bottom, With a main rope replacement pulley jig attached to the upper beam of the car, stopping the car near the top floor, hanging and fixing the car to the top of the hoistway, and new to the top floor landing The process of installing the main rope drum, the process of attaching and fixing the main rope replacement pulley jig to the upper beam of the car, and cutting the old main rope at the car side main rope end, and the end of the new main rope and the old Main rope With the joint of the stump and the new main rope inserted into the rope groove of the pulley of the main rope replacement pulley jig, the new and old main rope joints face the rotating car under the car while feeding out the new main rope. And a process of winding the old main rope around a winding drum installed in the hoistway pit.

また、主ロープ交換用滑車治具は、新主ロープを支持案内する滑車と、この滑車を回転可能に軸支する滑車取付基台と、前記滑車及び滑車取付基台をかご上梁に取り付けるT型取付金具とから構成されている。   The main rope replacement pulley jig includes a pulley that supports and guides the new main rope, a pulley mounting base that rotatably supports the pulley, and a T that attaches the pulley and the pulley mounting base to the beam on the car. It consists of a mold mounting bracket.

また、主ロープ交換用滑車治具は、滑車の取付角度を任意に首振り調整できるものである。   Further, the main rope replacement pulley jig can arbitrarily swing the pulley mounting angle.

また、主ロープ交換用滑車治具は、T型取付金具のかご上梁への取付高さを任意に調整できるものである。   In addition, the main rope replacement pulley jig can arbitrarily adjust the mounting height of the T-shaped mounting bracket to the beam on the car.

また、この発明に係る油圧エレベータの主ロープ交換方法に用いる主ロープ交換用滑車治具おいては、昇降路内に設置され、上部にプーリが設けられた油圧ジャッキと、油圧ジャッキの動作により昇降路内を昇降し、下部にかご下回転車が設けられたかごと、一端が昇降路の頂部に取り付けられ、中間部がかご下回転車及び油圧ジャッキの上部プーリに巻き掛けられて、他端が昇降路底部に取り付けられた主ロープと、かごの上梁に取り付けられる主ロープ交換用滑車治具とを備え、主ロープ交換用滑車治具は、新主ロープを支持案内する滑車と、この滑車を回転可能に軸支する滑車取付基台と、滑車及び滑車取付基台をかご上梁に取り付けるT型取付金具とから構成されているものである。   Moreover, in the main rope exchanging pulley jig used in the main rope exchanging method of the hydraulic elevator according to the present invention, a hydraulic jack installed in the hoistway and provided with a pulley on the upper side, and the raising and lowering by the operation of the hydraulic jack. Ascending and descending in the road, whether a car lower rotating car is installed at the bottom, one end is attached to the top of the hoistway, the middle part is wrapped around the car lower rotating car and the upper pulley of the hydraulic jack, the other end is A main rope attached to the bottom of the hoistway and a main rope exchanging pulley jig attached to the upper beam of the car. The main rope exchanging pulley jig includes a pulley that supports and guides the new main rope, and the pulley. And a T mounting bracket for attaching the pulley and the pulley mounting base to the car upper beam.

また、滑車を木製とし、木製の滑車に穴を形成したものである。   The pulley is made of wood and a hole is formed in the wooden pulley.

この発明によれば、かごの上梁に主ロープ交換用滑車治具を取り付け、新旧主ロープをジョイントした後、主ロープ交換用滑車治具の滑車のロープ溝に新主ロープを入れて、ピット作業者に巻き取らせる時、かご上の作業員はロープジョイント部がかご下回転車を通過する時だけ、チェックしておけばよく、後は手を添えておくだけで主ロープの全周交換が行えるので、かご上作業員の負担を著しく軽減することができる。また、新主ロープがかご下回転車から外れることは殆ど無く、作業者がかご下に降りて、ロープ外れを直す必要がなくなり、安全性を著しく向上できる効果がある。   According to this invention, the main rope replacement pulley jig is attached to the upper beam of the car, the old and new main ropes are joined, the new main rope is put into the rope groove of the pulley of the main rope replacement pulley jig, and the pit When the operator winds up, the worker on the car needs to check only when the rope joint passes through the car under the car. Can significantly reduce the burden on workers on the car. In addition, the new main rope is rarely detached from the car rotating under the car, and there is no need for the operator to go down under the car and repairing the rope disengagement, so that the safety can be remarkably improved.

実施の形態1.
図1はこの発明の実施の形態1における油圧エレベータの主ロープ交換方法を説明するための概略構成図、図2はこの発明の実施の形態1における油圧エレベータの主ロープ交換方法に用いる主ロープ交換用滑車治具をかごの上梁に取り付けた状態を示す斜視図、図3は主ロープ交換用滑車治具をかごの上梁に取り付けるためのT型取付金具を示す正面図、図4は同じくT型取付金具の側面図、図5は同じくT型取付金具の平面図、図6は主ロープ交換用滑車を取り付けるための滑車取付基台を示す正面図、図7は同じく滑車取付基台の側面図、図8は同じく滑車取付基台の底面図、図9は主ロープ交換用滑車の溝を示す部分拡大図、図10はこの発明による主ロープ交換用滑車治具を乗用エレベータに適用してかごの上梁に取り付けた状態を示す説明図、図11はこの発明による主ロープ交換用滑車治具を荷物エレベータに適用してかごの上梁に取り付けた状態を示す説明図である。
Embodiment 1 FIG.
1 is a schematic configuration diagram for explaining a main rope exchanging method of a hydraulic elevator in Embodiment 1 of the present invention, and FIG. 2 is a main rope exchanging method used in the main rope exchanging method of the hydraulic elevator in Embodiment 1 of the present invention. FIG. 3 is a front view showing a T-shaped mounting bracket for attaching the main rope replacement pulley jig to the upper beam of the car, and FIG. FIG. 5 is a plan view of the T-shaped mounting bracket, FIG. 6 is a front view showing a pulley mounting base for mounting the main rope replacement pulley, and FIG. 7 is a similar view of the pulley mounting base. FIG. 8 is a bottom view of the pulley mounting base, FIG. 9 is a partially enlarged view showing the groove of the main rope replacement pulley, and FIG. 10 is an application of the main rope replacement pulley jig according to the present invention to a passenger elevator. Attached to the upper beam of the basket Explanatory view showing, Fig. 11 is an explanatory view showing a state attached to a beam on top of the car by applying the main rope replacement pulley fixture according to the invention luggage elevator.

図において、1は新主ロープ2が巻かれた新主ロープドラム、3は新主ロープドラム1が設置された最上階乗場、4は油圧エレベータのかご、5はかご上梁4aに設置されるこの発明による主ロープ交換用滑車治具、6はかご4の下部に設けられたかご下回転車、7は昇降路内に設置され、上部にプーリが設けられた油圧サイドプランジャー方式の油圧ジャッキ、8は昇降路ピット9に設置された旧主ロープ10を巻き取るための巻き取りドラム、11は昇降路頂部に設けられたかご側主ロープ端末、12は昇降路下部に設けられたジャッキ側主ロープ端末、13は昇降路頂部に設けられた玉掛けワイヤーで、かご上梁を引っ掛けて吊り下げるものである。主ロープは、一端が昇降路の頂部のかご側主ロープ端末11に取り付けられ、中間部がかご下回転車6及び油圧ジャッキ7の上部プーリに巻き掛けられて、他端が昇降路底部のジャッキ側主ロープ端末12に取り付けられる。   In the figure, 1 is a new main rope drum around which a new main rope 2 is wound, 3 is a top floor hall where the new main rope drum 1 is installed, 4 is a hydraulic elevator car, and 5 is installed on a car upper beam 4a. The main rope replacement pulley jig according to the present invention, 6 is a car lower rotating car provided at the lower part of the car 4, 7 is a hydraulic side plunger type hydraulic jack installed in the hoistway and provided with a pulley at the upper part. , 8 is a take-up drum for winding the old main rope 10 installed in the hoistway pit 9, 11 is a car main rope terminal provided at the top of the hoistway, and 12 is a jack side provided at the lower part of the hoistway. A main rope terminal 13 is a sling wire provided at the top of the hoistway, and is hung by hanging a beam on the car. One end of the main rope is attached to the car-side main rope terminal 11 at the top of the hoistway, the intermediate portion is wound around the upper pulley of the car lower rotating wheel 6 and the hydraulic jack 7, and the other end is a jack at the bottom of the hoistway. Attached to the side main rope terminal 12.

次に、この発明による主ロープ交換用滑車治具5の具体的構成について、図2〜図9により詳細に説明する。
主ロープ交換用滑車治具5は、最上階乗場3に設置された新主ロープドラム1から繰り出される新主ロープ2を支持案内する木製の滑車51と、この滑車51を軸ピン52を介して回転可能に軸支する滑車取付基台53と、滑車51及び滑車取付基台53をかご上梁4aに取り付けるためのT型取付金具54とから構成されている。上記木製の滑車51は、外周に設けられ、径の大きなワイヤーロープでも入るように斜めにカットされたロープ溝51aと、出来るだけ軽量化を図るために、4個の大きな穴51bが設けられている。また、上記滑車取付基台53は、断面L型アングルの上端部一側面に軸ピン52が挿通固定される貫通穴53aが設けられており、更に断面L型アングルの下端部は底面部53bにより塞がれており、その底面部53bに貫通穴53cが設けられている。また、上記T型取付金具54は、取付時に水平配置される中央脚部54aが断面L型アングルで構成され、この中央脚部54aと直交して左右に延び、取付時に垂直配置される左右両腕部54bが断面L型アングルで構成され、その両側端面部は側面部54cによりそれぞれ塞がれている。そして、左右両腕部54bの延長方向と直交する中央脚部54aの断面L型アングルの片側辺の中央付近には、長穴54dが設けられている。また、左右両腕部54bの両側端面の側面部54cには、それぞれ貫通穴54eが設けられている。この貫通穴54eのどちらか一方を、上記滑車取付基台53の底面部53bの貫通穴53cに合致させてボルト、ナット等からなる締結具55で締結固定する。なお、この時の締結具55による固定位置の角度は、360度変更調整ができるので、滑車51の取付角度(首振り角度)を任意に調整することができるので、昇降路機器類等との干渉を避けることができる。また、左右両腕部54bの中央脚部54aの取付側辺の左腕部中央付近(図3参照)には、長穴54fが設けられている。
Next, a specific configuration of the main rope replacement pulley jig 5 according to the present invention will be described in detail with reference to FIGS.
The main rope replacement pulley jig 5 includes a wooden pulley 51 that supports and guides the new main rope 2 fed from the new main rope drum 1 installed on the top floor landing 3, and the pulley 51 via the shaft pin 52. The pulley mounting base 53 is rotatably supported and a T-shaped mounting bracket 54 for mounting the pulley 51 and the pulley mounting base 53 to the car upper beam 4a. The wooden pulley 51 is provided with a rope groove 51a which is provided on the outer periphery and is obliquely cut so that even a wire rope having a large diameter can be inserted, and four large holes 51b in order to reduce the weight as much as possible. Yes. Further, the pulley mounting base 53 is provided with a through hole 53a through which the shaft pin 52 is inserted and fixed on one side surface of the upper end portion of the L-shaped angle, and the lower end portion of the L-shaped angle is formed by the bottom surface portion 53b. It is closed and a through hole 53c is provided in the bottom surface portion 53b. Further, the T-shaped mounting bracket 54 has a central leg portion 54a horizontally disposed at the time of mounting with an L-shaped cross section, and extends to the left and right perpendicular to the central leg portion 54a. The arm portion 54b has an L-shaped cross section, and both side end surface portions are respectively closed by side surface portions 54c. An elongated hole 54d is provided in the vicinity of the center of one side of the L-shaped cross section of the central leg 54a orthogonal to the extending direction of the left and right arms 54b. Further, through holes 54e are provided in the side surface portions 54c on both side end surfaces of the left and right arm portions 54b. Either one of the through holes 54e is matched with the through hole 53c of the bottom surface portion 53b of the pulley mounting base 53, and is fastened and fixed by a fastener 55 made of a bolt, a nut or the like. In addition, since the angle of the fixing position by the fastener 55 at this time can be changed and adjusted by 360 degrees, the attachment angle (swing angle) of the pulley 51 can be arbitrarily adjusted. Interference can be avoided. Further, an elongated hole 54f is provided in the vicinity of the center of the left arm part (see FIG. 3) on the attachment side of the central leg part 54a of the left and right arm parts 54b.

次に、この発明による油圧エレベータの主ロープ交換方法について説明する。
先ず、かご4を最上階付近で停止させ、玉掛けワイヤー13をかご4の上梁4aに引っ掛けて吊り下げ固定する。次に、かご4上で作業者が主ロープ交換用滑車治具5をかご上梁4aの所定位置に取り付ける作業を実施する。主ロープ交換用滑車治具5は、新主ロープ2を支持案内する木製の滑車51と、この滑車51を軸ピン52を介して回転可能に軸支する滑車取付基台53と、滑車51及び滑車取付基台53をかご上梁4aに取り付けるためのT型取付金具54とから構成されている。図2では、T型取付金具54の左右両腕部54bを垂直に、またT型取付金具54の中央脚部54aを水平になるように配置した状態である。T型取付金具54の上端部となる左右両端部54bの左腕部の側面部54c上には、木製の滑車51が取り付けられた滑車取付基台53が締結具55により締結固定されている。締結具55による固定位置の角度は、360度変更調整ができるので、滑車51の取付角度(首振り角度)を任意に調整することにより、昇降路機器類等との干渉を避ける。また、T型取付金具54の水平配置された中央脚部54aが上梁4aの水平辺の下面に接触するように、また、T型取付金具54の垂直配置された左右両腕部54bの左腕部が上梁4aの垂直辺の外側面に接触するように、T型取付金具54がかご上梁4aに取り付けられる。そして、それぞれの長穴54d、54fに対してレールクリップ56により頑丈かつ強固に固定される。この長穴54d、54fの存在により、かご上梁4aの大きさの変化に追従させることができる。これにより、主ロープ交換用滑車治具5のかご上梁4aの所定位置への取り付け作業が完了する。この時、主ロープ交換用滑車治具5の滑車51のロープ溝51aから垂下する主ロープの垂下直線上にかご下回転車6のロープ溝の位置が一致するようになっている。次に、最上階乗場4に新主ロープドラム1を設置した状態で、既設のかご側主ロープ端末部分で旧主ロープ10を切断し、新主ロープ2の端部と旧主ロープ10の切断端部をジョイント14させる。滑車51はロープ溝51aにより新旧主ロープのジョイント部分14が、かご下に設けられた回転車6の外れ止め部分を通過する時でも、簡単に外れないようになっており、回転も円滑に行われるものである。新旧主ロープをジョイントした後は、そっと主ロープ交換用滑車治具5の滑車51のロープ溝51aに新主ロープ2入れて、後はピット作業者が旧主ロープ巻き取りドラム8に巻き取らせる。この時、かご上の作業員はロープジョイント部14がかご下回転車6を通過する時だけ、チェックしておけば、後は手を添えておくだけで主ロープの全周交換が行えるので、かご上作業員の負担を著しく軽減することができる。また、最後のロープ端末まで出てくると、ロープ取り付けチャックを取り付け、かご側主ロープ端末11へ新主ロープ2を取り付けることにより、1本分が終了する。この作業を主ロープ本数分繰り返す。
Next, a method for exchanging the main rope of the hydraulic elevator according to the present invention will be described.
First, the car 4 is stopped near the uppermost floor, and the slinging wire 13 is hooked on the upper beam 4a of the car 4 and suspended and fixed. Next, an operator performs an operation of attaching the main rope replacement pulley jig 5 to a predetermined position of the car upper beam 4a on the car 4. The main rope replacement pulley jig 5 includes a wooden pulley 51 that supports and guides the new main rope 2, a pulley mounting base 53 that rotatably supports the pulley 51 via a shaft pin 52, a pulley 51, The pulley mounting base 53 includes a T-shaped mounting bracket 54 for mounting the pulley mounting base 53 to the car upper beam 4a. In FIG. 2, the left and right arms 54b of the T-shaped mounting bracket 54 are arranged vertically and the center leg 54a of the T-shaped mounting bracket 54 is placed horizontally. A pulley attachment base 53 to which a wooden pulley 51 is attached is fastened and fixed by a fastener 55 on the side surface portion 54 c of the left arm portion 54 b that is the upper end portion of the T-shaped mounting bracket 54. Since the angle of the fixed position by the fastener 55 can be changed and adjusted by 360 degrees, interference with hoistway devices and the like is avoided by arbitrarily adjusting the mounting angle (swing angle) of the pulley 51. Also, the left arm of the left and right arms 54b of the T-shaped mounting bracket 54 so that the horizontally disposed central leg portion 54a contacts the lower surface of the horizontal side of the upper beam 4a. The T-shaped mounting bracket 54 is attached to the car upper beam 4a so that the portion contacts the outer surface of the vertical side of the upper beam 4a. And it fixes firmly and firmly with respect to each long hole 54d and 54f with the rail clip 56. FIG. Due to the presence of the elongated holes 54d and 54f, it is possible to follow the change in the size of the car upper beam 4a. As a result, the operation of attaching the main rope replacement pulley jig 5 to the predetermined position of the car upper beam 4a is completed. At this time, the position of the rope groove of the car lower rotary wheel 6 coincides with the hanging straight line of the main rope hanging from the rope groove 51a of the pulley 51 of the pulley replacement pulley 5 for the main rope. Next, in a state where the new main rope drum 1 is installed at the top floor hall 4, the old main rope 10 is cut at the existing car side main rope terminal portion, and the end of the new main rope 2 and the old main rope 10 are cut. Let the end part be the joint 14. The pulley 51 is configured so that the rope groove 51a prevents the joint portion 14 of the old and new main ropes from coming off easily even when passing through the locking portion of the rotating wheel 6 provided under the car, and the rotation is performed smoothly. It is what is said. After the old and new main ropes are joined, the new main rope 2 is gently put into the rope groove 51a of the pulley 51 of the main rope replacement pulley jig 5, and then the pit operator takes up the old main rope take-up drum 8. . At this time, if the worker on the car checks only when the rope joint part 14 passes through the car lower rotating wheel 6, the entire rope can be replaced with a simple hand afterwards. The burden on workers on the car can be significantly reduced. Moreover, when it comes out to the last rope end, a rope attachment chuck | zipper is attached and the new main rope 2 is attached to the cage | basket side main rope terminal 11, and one part will be complete | finished. Repeat this process for the number of main ropes.

また、図10は図2と同様に主ロープ交換用滑車治具5を乗用エレベータのかごの上梁(上向きアングル)に取り付けた状態を示しているのに対し、図11は主ロープ交換用滑車治具5を荷物エレベータのかごの上梁(下向きアングル)に取り付けた状態を示している。荷物エレベータでは、T字型取付金具54の左右両腕部54bを構成する断面L型アングルを上下逆に取り付け、下向きアングルからなるかご上梁4a上に取り付けている。   FIG. 10 shows a state in which the main rope replacement pulley jig 5 is attached to the upper beam (upward angle) of the passenger elevator car as in FIG. 2, whereas FIG. 11 shows the main rope replacement pulley. A state in which the jig 5 is attached to the upper beam (downward angle) of the luggage elevator car is shown. In the luggage elevator, the L-shaped cross section constituting the left and right arms 54b of the T-shaped mounting bracket 54 is mounted upside down and mounted on the car upper beam 4a having a downward angle.

以上述べたように、この発明によれば、かごの上梁に主ロープ交換用滑車治具を取り付け、新旧主ロープをジョイントした後、主ロープ交換用滑車治具の滑車のロープ溝に新主ロープを入れて、ピット作業者に巻き取らせる時、かご上の作業員はロープジョイント部がかご下回転車を通過する時だけ、チェックしておけばよく、後は手を添えておくだけで主ロープの全周交換が行えるので、かご上作業員の負担を著しく軽減することができる。また、新主ロープがかご下回転車から外れることは殆ど無く、作業者がかご下に降りて、ロープ外れを直す必要がなくなり、安全性を著しく向上させることができる。   As described above, according to the present invention, after the main rope replacement pulley jig is attached to the upper beam of the car and the old and new main ropes are jointed, the new main main rope replacement pulley jig is inserted into the rope groove of the pulley. When putting the rope and letting the pit operator take up, the worker on the car needs to check only when the rope joint part passes the rotating car under the car, and after that, just add a hand. Since the entire circumference of the main rope can be changed, the burden on the car operator can be significantly reduced. In addition, the new main rope is rarely detached from the car-revolving car, so that it is not necessary for the operator to get down under the car to correct the rope disengagement, and safety can be significantly improved.

この発明の実施の形態1における油圧エレベータの主ロープ交換方法を説明するための概略構成図である。It is a schematic block diagram for demonstrating the main rope replacement | exchange method of the hydraulic elevator in Embodiment 1 of this invention. この発明の実施の形態1における油圧エレベータの主ロープ交換方法に用いる主ロープ交換用滑車治具をかごの上梁に取り付けた状態を示す斜視図である。It is a perspective view which shows the state which attached to the upper beam of the cage | basket | car for main rope replacement | exchange pulleys used for the main rope replacement | exchange method of the hydraulic elevator in Embodiment 1 of this invention. 主ロープ交換用滑車治具をかごの上梁に取り付けるためのT型取付金具を示す正面図である。It is a front view which shows the T type attachment bracket for attaching the pulley jig | tool for main rope replacement | exchange to the upper beam of a cage | basket | car. 主ロープ交換用滑車治具をかごの上梁に取り付けるためのT型取付金具を示す側面図である。It is a side view which shows the T-shaped attachment bracket for attaching the pulley jig | tool for main rope replacement | exchange to the upper beam of a cage | basket | car. 主ロープ交換用滑車治具をかごの上梁に取り付けるためのT型取付金具を示す平面図である。It is a top view which shows the T type attachment bracket for attaching the pulley jig | tool for main rope replacement | exchange to the upper beam of a cage | basket | car. 主ロープ交換用滑車を取り付けるための滑車取付基台を示す正面図である。It is a front view which shows the pulley attachment base for attaching the pulley for main rope replacement | exchange. 主ロープ交換用滑車を取り付けるための滑車取付基台を示す側面図である。It is a side view which shows the pulley attachment base for attaching the pulley for main rope replacement | exchange. 主ロープ交換用滑車を取り付けるための滑車取付基台を示す底面図である。It is a bottom view which shows the pulley attachment base for attaching the pulley for main rope replacement | exchange. 主ロープ交換用滑車の溝を示す部分拡大図である。It is the elements on larger scale which show the groove | channel of the pulley for main rope replacement | exchange. この発明による主ロープ交換用滑車治具を乗用エレベータに適用してかごの上梁に取り付けた状態を示す説明図である。It is explanatory drawing which shows the state which applied the pulley jig for main rope replacement | exchange by this invention to the passenger elevator, and was attached to the upper beam of the cage | basket | car. この発明による主ロープ交換用滑車治具を荷物エレベータに適用してかごの上梁に取り付けた状態を示す説明図である。It is explanatory drawing which shows the state which applied the pulley jig for main rope replacement | exchange by this invention to the luggage elevator, and was attached to the upper beam of the cage | basket | car.

符号の説明Explanation of symbols

1 新主ロープドラム
2 新主ロープ
3 最上階乗場
4 かご
4a かご上梁
5 主ロープ交換用滑車治具
6 かご下回転車
7 油圧ジャッキ
8 巻き取りドラム
9 昇降路ピット
10 旧主ロープ
11 かご側主ロープ端末
12 ジャッキ側主ロープ端末
13 玉掛けワイヤー
51 滑車
51a ロープ溝
51b 穴
52 軸ピン
53 滑車取付基台
53a 貫通穴
53b 底面部
53c 貫通穴
54 T字型取付金具
54a 中央脚部
54b 左右両腕部
54c 側面部
54d 長穴
54e 貫通穴
54f 長穴
55 締結具
56 レールクリップ
DESCRIPTION OF SYMBOLS 1 New main rope drum 2 New main rope 3 Top floor landing 4 Car 4a Car upper beam 5 Main rope replacement pulley jig 6 Car lower rotation car 7 Hydraulic jack 8 Winding drum 9 Hoistway pit 10 Old main rope 11 Car side Main rope terminal 12 Jack side main rope terminal 13 sling wire 51 pulley 51a rope groove 51b hole 52 shaft pin 53 pulley mounting base 53a through hole 53b bottom surface portion 53c through hole 54 T-shaped mounting bracket 54a central leg 54b left and right arms Part 54c side part 54d oblong hole 54e through hole 54f oblong hole 55 fastener 56 rail clip

Claims (7)

昇降路内に設置され、上部にプーリが設けられた油圧ジャッキと、前記油圧ジャッキの動作により昇降路内を昇降し、下部にかご下回転車が設けられたかごと、一端が昇降路の頂部に取り付けられ、中間部が前記かご下回転車及び油圧ジャッキの上部プーリに巻き掛けられて、他端が昇降路底部に取り付けられた主ロープと、前記かごの上梁に取り付けられる主ロープ交換用滑車治具とを備えた油圧エレベータの主ロープ交換方法であって、
前記かごを最上階付近で停止させて、かごを昇降路頂部に吊り下げ固定する工程と、
前記最上階乗場に新主ロープドラムを設置する工程と、
前記かごの上梁に前記主ロープ交換用滑車治具を取り付け固定する工程と、
かご側主ロープ端末部分で旧主ロープを切断し、新主ロープの端部と旧主ロープの切断端部をジョイントする工程と、
新主ロープを前記主ロープ交換用滑車治具の滑車のロープ溝に入れた状態で、新主ロープを繰り出しながら新旧主ロープのジョイント部を前記かご下回転車に向かって垂下させるとともに、旧主ロープを昇降路ピットに設置した巻き取りドラムに巻き取っていく工程と、
を備えたことを特徴とする油圧エレベータの主ロープ交換方法。
A hydraulic jack installed in the hoistway, with a pulley at the top, and the operation of the hydraulic jack raises and lowers the hoistway, and a lower car is installed at the bottom, one end at the top of the hoistway A main rope attached to the lower pulley of the car and the upper pulley of the hydraulic jack and having the other end attached to the bottom of the hoistway, and a main rope replacement pulley attached to the upper beam of the car A main rope replacement method for a hydraulic elevator equipped with a jig,
Stopping the car near the top floor and hanging and fixing the car to the top of the hoistway;
Installing a new main rope drum at the top floor hall;
Attaching and fixing the main rope replacement pulley jig to the upper beam of the car;
Cutting the old main rope at the car-side main rope end, and joining the end of the new main rope and the cut end of the old main rope;
While the new main rope is put in the rope groove of the pulley of the main rope replacement pulley jig, the new main rope is drawn out while the joint portion of the old and new main ropes is suspended toward the car below the car. Winding the rope around the winding drum installed in the hoistway pit,
A main rope replacement method for a hydraulic elevator, comprising:
主ロープ交換用滑車治具は、新主ロープを支持案内する滑車と、この滑車を回転可能に軸支する滑車取付基台と、前記滑車及び滑車取付基台をかご上梁に取り付けるT型取付金具とから構成されていることを特徴とする請求項1記載の油圧エレベータの主ロープ交換方法。   The main rope replacement pulley jig includes a pulley that supports and guides the new main rope, a pulley mounting base that rotatably supports the pulley, and a T-shaped mounting that attaches the pulley and the pulley mounting base to the beam on the car. The main rope replacement method for a hydraulic elevator according to claim 1, wherein the main rope is replaced with a metal fitting. 主ロープ交換用滑車治具は、滑車の取付角度を任意に首振り調整できるように構成したことを特徴とする請求項2記載の油圧エレベータの主ロープ交換方法。   3. The main rope exchanging method for a hydraulic elevator according to claim 2, wherein the main rope exchanging pulley jig is configured such that the angle at which the pulley is attached can be arbitrarily adjusted. 主ロープ交換用滑車治具は、T型取付金具のかご上梁への取付高さを任意に調整できるように構成したことを特徴とする請求項2又は請求項3記載の油圧エレベータの主ロープ交換方法。   4. The main rope of the hydraulic elevator according to claim 2 or 3, wherein the pulley jig for exchanging the main rope is configured so that the height of the T-type mounting bracket attached to the upper beam of the car can be arbitrarily adjusted. method of exchange. 昇降路内に設置され、上部にプーリが設けられた油圧ジャッキと、前記油圧ジャッキの動作により昇降路内を昇降し、下部にかご下回転車が設けられたかごと、一端が昇降路の頂部に取り付けられ、中間部が前記かご下回転車及び油圧ジャッキの上部プーリに巻き掛けられて、他端が昇降路底部に取り付けられた主ロープと、前記かごの上梁に取り付けられる主ロープ交換用滑車治具とを備え、
前記主ロープ交換用滑車治具は、新主ロープを支持案内する滑車と、この滑車を回転可能に軸支する滑車取付基台と、前記滑車及び滑車取付基台をかご上梁に取り付けるT型取付金具とから構成されていることを特徴とする油圧エレベータの主ロープ交換方法に用いる主ロープ交換用滑車治具。
A hydraulic jack installed in the hoistway, with a pulley at the top, and the operation of the hydraulic jack raises and lowers the hoistway, and a lower car is installed at the bottom, one end at the top of the hoistway A main rope attached to the lower pulley of the car and the upper pulley of the hydraulic jack and having the other end attached to the bottom of the hoistway, and a main rope replacement pulley attached to the upper beam of the car With a jig,
The main rope replacement pulley jig includes a pulley that supports and guides the new main rope, a pulley mounting base that rotatably supports the pulley, and a T-type that mounts the pulley and the pulley mounting base on a beam on the car. A pulley assembly for exchanging a main rope used in a method for exchanging a main rope of a hydraulic elevator, characterized in that it comprises a mounting bracket.
滑車を木製としたことを特徴とする請求項5記載の油圧エレベータの主ロープ交換方法に用いる主ロープ交換用滑車治具。   6. The pulley jig for exchanging a main rope used in the main rope exchanging method of the hydraulic elevator according to claim 5, wherein the pulley is made of wood. 木製の滑車に穴を形成したことを特徴とするた請求項6記載の油圧エレベータの主ロープ交換方法に用いる主ロープ交換用滑車治具。   A pulley jig for exchanging a main rope for use in a main rope exchanging method for a hydraulic elevator according to claim 6, wherein a hole is formed in the wooden pulley.
JP2007096284A 2007-04-02 2007-04-02 Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor Expired - Fee Related JP4935465B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007096284A JP4935465B2 (en) 2007-04-02 2007-04-02 Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007096284A JP4935465B2 (en) 2007-04-02 2007-04-02 Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor

Publications (3)

Publication Number Publication Date
JP2008254834A true JP2008254834A (en) 2008-10-23
JP2008254834A5 JP2008254834A5 (en) 2009-10-08
JP4935465B2 JP4935465B2 (en) 2012-05-23

Family

ID=39978804

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007096284A Expired - Fee Related JP4935465B2 (en) 2007-04-02 2007-04-02 Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor

Country Status (1)

Country Link
JP (1) JP4935465B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110487235A (en) * 2019-09-23 2019-11-22 合肥搬易通科技发展有限公司 It is a kind of secret formula, positioning height stay wire sensor mounting structure
CN110713092A (en) * 2019-07-01 2020-01-21 海瑞可(武汉)新材料有限公司 Hoisting method and hoisting mechanism for elevator synthetic fiber rope
JPWO2022009411A1 (en) * 2020-07-10 2022-01-13

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0361276A (en) * 1989-07-31 1991-03-18 Hitachi Elevator Eng & Service Co Ltd Main rope replacing auxiliary device
JPH0861467A (en) * 1994-08-12 1996-03-08 Norihiro Nakajima Plastic block and its manufacture
JPH10182037A (en) * 1996-12-25 1998-07-07 Hitachi Building Syst Co Ltd Hydraulic elevator
JP2000128456A (en) * 1998-10-27 2000-05-09 Hitachi Building Systems Co Ltd Replacing method for main rope of hydraulic elevator
JP2001139253A (en) * 1999-11-11 2001-05-22 Hitachi Building Systems Co Ltd Elevator
JP2003206083A (en) * 2002-01-11 2003-07-22 Hitachi Building Systems Co Ltd Main rope changing method and device for elevator
JP2004001915A (en) * 2002-05-30 2004-01-08 Otis Elevator Co Elevator device
JP2005082256A (en) * 2003-09-04 2005-03-31 Mitsubishi Electric Corp Rope delivery device of elevator for construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0361276A (en) * 1989-07-31 1991-03-18 Hitachi Elevator Eng & Service Co Ltd Main rope replacing auxiliary device
JPH0861467A (en) * 1994-08-12 1996-03-08 Norihiro Nakajima Plastic block and its manufacture
JPH10182037A (en) * 1996-12-25 1998-07-07 Hitachi Building Syst Co Ltd Hydraulic elevator
JP2000128456A (en) * 1998-10-27 2000-05-09 Hitachi Building Systems Co Ltd Replacing method for main rope of hydraulic elevator
JP2001139253A (en) * 1999-11-11 2001-05-22 Hitachi Building Systems Co Ltd Elevator
JP2003206083A (en) * 2002-01-11 2003-07-22 Hitachi Building Systems Co Ltd Main rope changing method and device for elevator
JP2004001915A (en) * 2002-05-30 2004-01-08 Otis Elevator Co Elevator device
JP2005082256A (en) * 2003-09-04 2005-03-31 Mitsubishi Electric Corp Rope delivery device of elevator for construction

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110713092A (en) * 2019-07-01 2020-01-21 海瑞可(武汉)新材料有限公司 Hoisting method and hoisting mechanism for elevator synthetic fiber rope
CN110487235A (en) * 2019-09-23 2019-11-22 合肥搬易通科技发展有限公司 It is a kind of secret formula, positioning height stay wire sensor mounting structure
JPWO2022009411A1 (en) * 2020-07-10 2022-01-13
WO2022009411A1 (en) * 2020-07-10 2022-01-13 三菱電機ビルテクノサービス株式会社 Elevator main rope replacement device and method for replacing main rope of elevator
JP7207613B2 (en) 2020-07-10 2023-01-18 三菱電機ビルソリューションズ株式会社 Elevator main rope replacement device and elevator main rope replacement method
CN115812065A (en) * 2020-07-10 2023-03-17 三菱电机楼宇解决方案株式会社 Device for replacing main rope of elevator and method for replacing main rope of elevator
CN115812065B (en) * 2020-07-10 2023-07-18 三菱电机楼宇解决方案株式会社 Device for replacing main rope of elevator and method for replacing main rope of elevator

Also Published As

Publication number Publication date
JP4935465B2 (en) 2012-05-23

Similar Documents

Publication Publication Date Title
JP2008045363A (en) Suspension device
JP4935465B2 (en) Hydraulic rope main rope replacement method and main rope replacement pulley jig used therefor
JP5791206B2 (en) Hoisting machine lifting jig unit and hoisting machine lifting method
JP6969686B2 (en) How to extend the lift of a construction elevator
JP6605411B2 (en) Lifting bracket and hoist
JP2008179469A (en) Guide rail arranging method in elevator device
JP4197325B2 (en) Work device and method for manufacturing mechanical parking equipment
JP2865540B2 (en) Elevator car elevator
JPH08245116A (en) Installation engineering of elevator
JP3034960B2 (en) Equipment installed in hoistway
JP6022007B1 (en) Brake attachment / detachment jig
JP2016055932A (en) Apparatus and method for centering of guide rail in elevator
JP2008254834A5 (en)
JP3994631B2 (en) Elevator main rope elongation adjustment method
JP2007210708A (en) Lifting device and lifting method for elevator hoist machine
JPH05330758A (en) Elevator guide rail installation assist device and guide rail installation method
JP7131663B1 (en) Elevator Compensation Rope Pulling Device and Elevator Compensation Rope Pulling Method
JP2008195487A (en) Hanging fixture of rope-stopping mechanism for elevator
JP2015030559A (en) Main rope fixing device for elevator, and repair method for elevator
JP3444816B2 (en) How to replace the main elevator cable
JP2012106859A (en) Main rope entanglement preventing jig of elevator
JP4312590B2 (en) Lower assembly method for elevator upper equipment
JPH07133085A (en) Replacement of main rope of elevator
JP4978218B2 (en) Elevator installation apparatus and installation method
JP6950458B2 (en) Elevator weight removal device and weight removal method

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090820

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090820

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111102

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20111115

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111208

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120124

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120206

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150302

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees