wiring
route
information
temporary
information file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2008162643A
Other languages
Japanese (ja)
Other versions
JP4275722B2 (en
Inventor
Katsuyuki Ito
克幸 伊藤
Tetsuo Sasaki
哲雄 佐々木
Toshiaki Okada
俊明 岡田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2008162643A priority Critical patent/JP4275722B2/en
Publication of JP2008243230A publication Critical patent/JP2008243230A/en
Application granted granted Critical
Publication of JP4275722B2 publication Critical patent/JP4275722B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Design And Manufacture Of Integrated Circuits (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To present a rough wiring plan from a floor plan stage, to a wiring board requiring various wiring restrictions, and to complete wiring design satisfying the wiring restrictions in a short time, while evaluating a congestion degree or the like in wiring, in a wiring design support system. <P>SOLUTION: This wiring design support system receives wire logical connection information for wiring components, and signal information handled as a signal in one bundle, the signal group is handled as a unit for wiring to search a wiring route, the signal group is divided sequentially, and divided respective signal groups are arranged as adjacently as possible to search the optimum route. The arrangement of the components and the congestion degree of the wires are evaluated, when dividing the signal group, to search the route. <P>COPYRIGHT: (C)2009,JPO&INPIT

Description

本発明は、配線設計支援システム、および、配線設計支援方法に係り、特に、多種多様な配線制約を要求する配線板に対して、フロアプラン段階から大まかな配線の仕方を提示して、短期間で配線制約を満足する配線設計を完了するのに好適な配線設計支援システム、および、配線設計支援方法に関する。   The present invention relates to a wiring design support system and a wiring design support method, and in particular, presents a rough wiring method from a floor plan stage to a wiring board that requires various wiring constraints, and is a short period of time. The present invention relates to a wiring design support system and a wiring design support method suitable for completing a wiring design that satisfies the wiring constraints.

従来より、コンピュータシステムにより、電子回路の配線板の配線を自動化する試みがなされてきた。   Conventionally, attempts have been made to automate the wiring of wiring boards of electronic circuits by computer systems.

ここで、図12を用いて従来技術に係る配線設計支援の問題点を説明する。
図12は、隣接配線制約を持つ信号群を配置するときの一例を示す模式図である。
Here, the problem of the wiring design support according to the prior art will be described with reference to FIG.
FIG. 12 is a schematic diagram illustrating an example when a signal group having adjacent wiring constraints is arranged.

一般に電子回路の配線板における配線は、信号の特性や配線間における干渉が生じるため実際に配線するときには、様々な配線制約の基で配線設計がおこなわれることになる。   In general, wiring on a wiring board of an electronic circuit causes signal characteristics and interference between wirings. Therefore, when wiring is actually performed, wiring design is performed based on various wiring constraints.

例えば、隣接する信号インタフェース種によって異なる隣接間隔制約がある場合においては、配線経路の並び順によって配線密度が低下する場合も生じる。   For example, in the case where there are adjacent space restrictions depending on the adjacent signal interface types, the wiring density may be reduced depending on the arrangement order of the wiring paths.

今、図12に示されるように隣接平行配線間隔制約1203に記載したような隣接する信号群ごとにそれぞれ異なる隣接間隔が与えられているとする。これは、例えば、信号群がgroupAである信号群に属する配線と信号群がgroupBに属する配線とは、互いに4単位以上離さなければならないことを意味している。ここで、信号群とは、共通の特性を持つ配線を一つのグループとしてまとめたものである。   Now, as shown in FIG. 12, it is assumed that different adjacent intervals are provided for each adjacent signal group as described in the adjacent parallel wiring interval constraint 1203. This means, for example, that a wiring belonging to a signal group whose signal group is group A and a wiring belonging to a signal group belonging to group B must be separated from each other by 4 units or more. Here, the signal group is a group of wirings having common characteristics as one group.

このとき、信号群がgroupAである配線と信号群がgroupBである配線を、配線状況1201のように配線すると互いの隣接配線制約のために、配線の高密度化が阻害されることになる。   At this time, if a wiring whose signal group is group A and a wiring whose signal group is group B are wired as in the wiring state 1201, the density of the wiring is hindered due to mutual wiring restrictions.

そこで、配線状況1202に示すように、信号群がgroupAである信号1204の隣に同じ信号群groupAの信号1206を配線するといった同一の信号群を意図的に隣接させることによって、配線の高密度化が実現させることができる。   Therefore, as shown in the wiring state 1202, the same signal group, such as the signal 1206 of the same signal group groupA, is intentionally adjacent to the signal 1204 whose signal group is groupA, thereby increasing the density of the wiring. Can be realized.

さらに、半導体集積回路の高速化によって、複数の信号間で特性を合わせることが必要となってきており、配線長や配線経路を極力揃える事によって信号特性を合わせるということが必要となってきている。   Furthermore, it is necessary to match characteristics between multiple signals due to the speeding up of semiconductor integrated circuits, and it is necessary to match signal characteristics by aligning wiring lengths and wiring paths as much as possible. .

これらに対処する方法として、例えば、特許文献1には、仮想配線という概念を用い、これを分割していくことにより、概略配線から詳細配線を実施する手法が開示されている。仮想配線においては、「複数の要特性統一ネットが一つに束ねられてなる単一の仮想ネットとして取り扱われる」ことになる。   As a method for dealing with these problems, for example, Patent Document 1 discloses a method of performing detailed wiring from schematic wiring by using the concept of virtual wiring and dividing the concept. In the virtual wiring, “a plurality of characteristically unified nets are handled as a single virtual net bundled together”.

特開2002−124571号公報JP 2002-124571 A

上記従来技術では、仮想ネットにより、「特性を揃えるべき複数のネットの配線長、配線容量、配線経路、配線形状等の特性を実効的に揃える」ことができるとしている。   According to the above-described conventional technology, it is described that “virtual lengths, wiring capacities, wiring paths, wiring shapes, and other characteristics of a plurality of nets whose characteristics should be aligned can be effectively aligned” by the virtual net.

しかしながら、配線板の部品の配置のされ方によっては、配線長が長くなったり、配線のための面積が増加するのなどの問題点を生じる。   However, depending on how the parts of the wiring board are arranged, problems such as an increase in the wiring length and an increase in the area for wiring arise.

以下、図13を用いて配線板の部品が配線の障害物となる場合の配線の問題点について説明する。
図13は、配線板の部品が配線の障害物となる場合の配線パターンの形態について説明する模式図である。
Hereinafter, the problem of wiring when a component of the wiring board becomes an obstacle to wiring will be described with reference to FIG.
FIG. 13 is a schematic diagram for explaining the form of a wiring pattern when a component of the wiring board becomes an obstacle to wiring.

今、図13(a)に示す二つの部品1301および1302間の同じ特性で揃える必要がある接続関係1303の配線のための経路探索をおこなうことを考える。   Now, consider performing a route search for the wiring of the connection relationship 1303 that needs to be aligned with the same characteristics between the two components 1301 and 1302 shown in FIG.

このとき、接続関係1303によって、従来技術では、図10(b)に示す一つの仮想ネット1305として割り付け、経路探索処理をおこなうであろう。   At this time, according to the connection relation 1303, in the prior art, it is allocated as one virtual net 1305 shown in FIG.

しかしながら、部品1301および1302の間には部品1304が存在するため障害物となり、仮想ネット1305に対し経路探索処理をおこなうと、仮想ネット1305は、部品1304を迂回するような図13(c)に示す配線経路1306を作成してしまうことになる。   However, since the component 1304 exists between the components 1301 and 1302, it becomes an obstacle, and when the route search processing is performed for the virtual net 1305, the virtual net 1305 bypasses the component 1304 in FIG. 13C. The wiring route 1306 shown will be created.

これにより、配線長が増加し、配線のための面積が増加して、これにより配線板の面積も増加させなければならなく等の問題点が発生する。   As a result, the wiring length increases and the area for wiring increases, thereby causing problems such as the area of the wiring board also having to be increased.

したがって、配線設計支援システムは、図13(d)に示すように部品と部品との間を通り抜け、しかも、その前後では配線経路をひと束ねにして揃えている配線経路1307を作成できることが望ましい。   Therefore, it is desirable that the wiring design support system can create a wiring path 1307 that passes between parts as shown in FIG. 13 (d), and that the wiring paths are bundled together before and after that.

また、他の課題として、半導体回路の高速化や高密度化によって配線制約が多種多様になってきていることがある。それら配線制約に触れないような配線をおこなうためには、配線板の構造や詳細な配線の前におこなって、大まかな配線計画や部品の配置をおこなう工程である「フロアプラン」が特に、重要になってきており、配線の早い段階から配線制約や配線性を検討する必要がある。   In addition, as another problem, there are cases where wiring restrictions are becoming diverse due to the increase in speed and density of semiconductor circuits. In order to carry out wiring without touching these wiring restrictions, “floor plan”, which is a process of rough wiring planning and component placement, which is performed before the structure of the wiring board and detailed wiring, is particularly important. Therefore, it is necessary to examine wiring restrictions and wiring properties from an early stage of wiring.

しかしながら、従来の手法では、詳細配線設計と同等の情報を準備しなければならず、配線性を検討するための準備に期間と工数が必要であり、また、フロアプランを検討する作業についても、一つ一つの信号の配線情報を取り扱うため、検討および修正に大きな時間を要する。そこで、フロアプラン段階でも実用になるような簡易な情報で動作して、準備期間を大幅に削減し、信号群で取り扱って検討および修正の工数を削減するというシステムを提供する必要がある。   However, in the conventional method, it is necessary to prepare information equivalent to the detailed wiring design, and it takes time and man-hours to prepare for examining the wiring property, and for the work of examining the floor plan, Since the wiring information of each signal is handled, it takes a lot of time to review and correct. Therefore, it is necessary to provide a system that operates with simple information that is practical even at the floor plan stage, greatly reduces the preparation period, and handles the signal group to reduce the number of examination and correction processes.

本発明は、上記問題点を解決するためになされたもので、その目的は、多種多様な配線制約を要求する配線板に対して、フロアプラン段階から大まかな配線の仕方を提示して、配線の混雑度などを評価しながら、短期間で配線制約を満足する配線設計を完了することのできる配線設計支援システム、および、配線設計方法を提供することにある。   The present invention has been made to solve the above-mentioned problems, and its purpose is to present a rough wiring method from the floor plan stage to a wiring board requiring various wiring constraints, and to perform wiring. It is an object of the present invention to provide a wiring design support system and a wiring design method capable of completing a wiring design that satisfies the wiring constraints in a short period of time while evaluating the degree of congestion.

本発明では、バスなどのまとまった配線を一つの信号群として扱い、信号群内の信号が配線できるだけの配線領域を確保しながら経路探索処理をおこなう。そして、障害物などによって、信号群内の全ての信号の配線を割り当てる配線経路が見つからない場合は、信号群を分割して、再度経路探索処理をおこなう。   In the present invention, a group of wirings such as buses are handled as one signal group, and a route search process is performed while securing a wiring area that allows signals within the signal group to be wired. If a wiring route to which all signal wirings in the signal group are assigned cannot be found due to an obstacle or the like, the signal group is divided and the route search process is performed again.

このとき、分割された信号群は同一の配線形状となるように同一層の隣接領域あるいは別の層に同一形状の配線経路を割り当てる。   At this time, wiring paths having the same shape are assigned to adjacent regions of the same layer or different layers so that the divided signal groups have the same wiring shape.

信号群内のどれか一つの信号に対して、大まかな情報で配線経路指示を与えることにより、当該信号だけでなく、同一信号群内の全ての信号に同じ配線経路指示が与えられたものとして、指示された領域を優先して、経路探索をおこなう。   By giving a wiring path instruction with rough information to any one signal in the signal group, it is assumed that the same wiring path instruction is given not only to the signal but also to all signals in the same signal group. The route search is performed with priority given to the designated area.

また、本発明では、簡易な仮想的な情報で、大まかな配線経路を割り付けて混雑度を評価する。さらに、設計が進んでいくうちに徐々に情報の精度を上げていき、実際の情報により近い情報に順次置き換えていく。その際、情報の不一致から未接続となった区間のみを対象として、配線経路の補正をかけていくようにする。   In the present invention, a rough wiring route is allocated with simple virtual information, and the degree of congestion is evaluated. Furthermore, as the design progresses, the accuracy of information is gradually increased, and information that is closer to actual information is sequentially replaced. At this time, the wiring path is corrected only for the section that is not connected due to the information mismatch.

このような手段により、本発明の配線設計システムによれば、同一の特性に揃えることが要求されるような信号に対しても好適な配線経路を求めることができ、さらに配線板の高密度化についても有益な結果を得ることができる。また、配線板設計の早い段階から配線板の配線制約や配線性までをフロアプラン設計をおこなうことが可能である。   By such means, according to the wiring design system of the present invention, it is possible to obtain a suitable wiring path even for signals that are required to have the same characteristics, and further increase the density of the wiring board. You can also get useful results. In addition, it is possible to perform floor plan design from the early stage of wiring board design to wiring restrictions and wiring properties of the wiring board.

本発明によれば、多種多様な配線制約を要求する配線板に対して、フロアプラン段階から大まかな配線の仕方を提示して、配線の混雑度などを評価しながら、短期間で配線制約を満足する配線設計を完了することのできる配線設計支援システム、および、配線設計方法を提供することができる。   According to the present invention, for a wiring board that requires a wide variety of wiring constraints, a rough wiring method is presented from the floor plan stage, and the wiring constraints are evaluated in a short period of time while evaluating the degree of congestion of the wiring. A wiring design support system and a wiring design method capable of completing a satisfactory wiring design can be provided.

以下、本発明に係る各実施形態を、図1ないし図11を用いて説明する。   Embodiments according to the present invention will be described below with reference to FIGS.

〔配線設計支援システムの構成と動作〕
先ず、図1ないし図3を用いて本発明に係る配線設計支援システムの構成について説明する。
図1は、本発明に係る配線設計支援システムの構成図である。
図2は、経路指示ファイル104の格納情報の例を示す模式図である。
図3は、経路探索処理の詳細を示すフローチャートである。
[Configuration and operation of wiring design support system]
First, the configuration of the wiring design support system according to the present invention will be described with reference to FIGS. 1 to 3.
FIG. 1 is a configuration diagram of a wiring design support system according to the present invention.
FIG. 2 is a schematic diagram illustrating an example of information stored in the route instruction file 104.
FIG. 3 is a flowchart showing details of the route search processing.

配線設計支援システム101の入力処理部107に対して、図1に示されるように、ネット情報ファイル102、信号群情報ファイル103、経路指示情報ファイル104、配置指示情報ファイル105、配線制約情報ファイル106の入力ファイルが入力される。   As shown in FIG. 1, the net information file 102, the signal group information file 103, the route instruction information file 104, the placement instruction information file 105, and the wiring constraint information file 106 are input to the input processing unit 107 of the wiring design support system 101. The input file is input.

これらの入力ファイルは、配線処理部108に渡されて、配線板上の部品の変更や配線経路の設計がされる。   These input files are transferred to the wiring processing unit 108, where parts on the wiring board are changed and wiring paths are designed.

出力情報は、出力処理部115を介して出力ファイルとして、配線経路情報ファイル116、混雑度評価ファイル117、配置情報ファイル118を出力する。   As the output information, a wiring route information file 116, a congestion degree evaluation file 117, and an arrangement information file 118 are output as output files via the output processing unit 115.

ここで、ネット情報ファイル102は、配線板上の部品の論理的な結線情報のファイルである。信号群情報ファイル103は、配線のために信号群の指示情報を持ったファイルである。信号群とは、配線をバスなどのひとまとまりとして扱うための概念である。経路指示情報ファイル104は、配線経路の大まかな指示情報をあらわすファイルである。配線制約情報ファイル106は、配線する際の配線長や隣接信号間隔などの配線制約に関するファイルである。   Here, the net information file 102 is a file of logical connection information of components on the wiring board. The signal group information file 103 is a file having signal group instruction information for wiring. A signal group is a concept for handling wiring as a group such as a bus. The route instruction information file 104 is a file representing rough instruction information of the wiring route. The wiring constraint information file 106 is a file related to wiring constraints such as a wiring length and an adjacent signal interval when wiring.

また、配線経路情報ファイル116は、配線処理部108によって決定された配線経路情報を格納するファイルである。混雑度評価ファイル117は、決定した配線経路情報によって、その配線経路の混雑度の評価をおこなった結果を格納するファイルである。配置情報ファイル118は、部品配置の情報を持ったファイルである。   The wiring path information file 116 is a file for storing wiring path information determined by the wiring processing unit 108. The congestion degree evaluation file 117 is a file that stores the result of evaluating the degree of congestion of a wiring route based on the determined wiring route information. The arrangement information file 118 is a file having information on component arrangement.

経路指示ファイル104は、経路指示情報は、図2に示されるような構造が考えられる。経路指示情報とは、配線信号群に対して経路を通ることを望む箇所を指示するものであり、テーブル201のような信号群名または信号名、始点、終点、層名といった直線の情報から成り立っている。また、テーブル202のように信号群名または信号名、指定配線領域の二つの座標点、層番号といった情報から生成することもできる。   In the route instruction file 104, the route instruction information may have a structure as shown in FIG. The route instruction information is for instructing a part of the wiring signal group that wants to pass the route, and is composed of linear information such as a signal group name or a signal name such as the table 201, a start point, an end point, and a layer name. ing. Further, as shown in the table 202, it can be generated from information such as a signal group name or signal name, two coordinate points of a designated wiring region, and a layer number.

ここで、信号群名または信号名とは、本発明の配線設計支援システムで配線設計のために、それぞれ信号群および信号を取り扱う名称である。また、座標は、システムが配線しやすいよいように任意のものを用いることができる。また、多層にわたって配線をおこなうために、層名や層番号を有している。   Here, the signal group name or the signal name is a name for handling the signal group and the signal, respectively, for wiring design in the wiring design support system of the present invention. Also, any coordinates can be used so that the system can be easily wired. In addition, in order to perform wiring over multiple layers, it has layer names and layer numbers.

次に、本発明の配線設計支援システムの配線処理部108の処理の詳細について説明する。   Next, details of the processing of the wiring processing unit 108 of the wiring design support system of the present invention will be described.

配線処理108は、入力処理部107から得られた情報に基づいて経路未探索の信号群を一つ選択し(S01)、その後、選択した信号群の経路探索をおこなう(S02)。   The wiring process 108 selects one unsearched signal group based on the information obtained from the input processing unit 107 (S01), and then performs a route search for the selected signal group (S02).

そして、経路探索終了後、他の経路未探索の信号群があるか否かを判定し(S03)、未探索の信号群があれば、再度処理をおこなう(S03)。   Then, after the end of the route search, it is determined whether or not there is another route unsearched signal group (S03), and if there is an unsearched signal group, the process is performed again (S03).

経路未探索の信号群がなければ、探索終了後の配線混雑の評価や配線制約との比較を配線評価でおこなう(S04)。   If there is no route unsearched signal group, the evaluation of the wiring congestion after the end of the search and the comparison with the wiring restriction are performed by the wiring evaluation (S04).

配線評価後、混雑度が高いか制約違反があるか否かを判定し(S05)、判定の結果、混雑度が高いか制約違反があれば、部品配置や配線経路を変更し(S06)、再度処理をおこなう(S06)。   After the wiring evaluation, it is determined whether the congestion level is high or there is a constraint violation (S05). If the result of the determination is that the congestion level is high or there is a constraint violation, the component placement or wiring path is changed (S06). The process is performed again (S06).

そして、判定の結果、混雑度も高くなく、制約違反もなければ、信号の細分化がおこなえるか否かを判定し(S07)、判定の結果、まだ信号群の細分化ができて、細分化しきい値が細分化制限値より大きければ、細分化しきい値を下げる(S08)。そして、探索結果の経路を推奨経路とし、再度処理をおこなう(S09)。ここで、細分化制限値は、細分化をどこまでやるかを制御するために外部から与えるパラメータである。   As a result of the determination, if the degree of congestion is not high and there is no constraint violation, it is determined whether or not the signal can be subdivided (S07). As a result of the determination, the signal group can still be subdivided and subdivided. If the threshold value is larger than the subdivision limit value, the subdivision threshold value is lowered (S08). Then, the route of the search result is set as a recommended route, and the process is performed again (S09). Here, the segmentation limit value is a parameter given from the outside in order to control how far segmentation is performed.

信号群が細分化できないか、細分化しきい値が細分化制限値より小さければ、必要な情報を渡して出力処理部115に処理を移す。   If the signal group cannot be subdivided or if the subdivision threshold is smaller than the subdivision limit value, necessary information is transferred and the processing is transferred to the output processing unit 115.

次に、経路探索処理S02の詳細について図3を用いて説明する。   Next, details of the route search process S02 will be described with reference to FIG.

先ず、推奨経路を配線板上に配置する(S301)。推奨経路とは、配線経路が通過することを奨励する経路であり、経路指示情報104によって指定する。この推奨経路によって、配線板の部品配置状況などを考慮した望ましい配線になるように配線設計を進めることができる。この推奨経路の指示については、後に詳細に説明する。   First, a recommended route is arranged on the wiring board (S301). The recommended route is a route that encourages the wiring route to pass, and is specified by the route instruction information 104. With this recommended route, it is possible to proceed with the wiring design so as to obtain a desirable wiring in consideration of the component placement status of the wiring board. This recommended route instruction will be described in detail later.

次に、信号群内に属する信号を経路探索を行える単位に分割(グループ化)する(S302)。信号群は、配線をひとまとまりで扱うためのものであり、本発明の配線設計支援システムの配線の単位とする。そして、ここでの信号群分割は、信号群内の信号でより隣接したものが極力同一グループに入るようにする。この信号群分割の仕方は、本発明の特徴の一つをなすものであり、後に具体例により説明する。なお、差動信号などは、常に同一グループになるように指示することが可能である。差動信号は、二本の信号のレベルを常に相反な状態にしておくことによって、配線上の高速な信号伝搬における外部からのノイズを押さえるのに有効な信号であり、必ず、隣接するように配置する必要があるためである。   Next, the signals belonging to the signal group are divided (grouped) into units capable of route search (S302). The signal group is for handling the wiring as a whole, and is a unit of wiring in the wiring design support system of the present invention. In this signal group division, signals in the signal group that are more adjacent to each other are placed in the same group as much as possible. This method of signal group division constitutes one of the features of the present invention, and will be described later with a specific example. It is possible to instruct differential signals and the like to always be in the same group. The differential signal is an effective signal for suppressing noise from the outside in high-speed signal propagation on the wiring by always keeping the levels of the two signals in a reciprocal state. This is because it needs to be arranged.

その後、信号群内の信号数が細分化しきい値より大きいか否かを判定する(S303)。判定の結果、信号群内の信号数が細分化しきい値より大きければ、細分化しきい値以下になるようにグループ分割をおこなう(S304)。   Thereafter, it is determined whether or not the number of signals in the signal group is larger than the subdivision threshold (S303). As a result of the determination, if the number of signals in the signal group is larger than the subdivision threshold value, group division is performed so as to be less than the subdivision threshold value (S304).

その後、グループを一つ選択する(S305)。   Thereafter, one group is selected (S305).

次に、選択したグループの経路探索をおこなう(S306)。経路探索では、推奨経路を優先して採用する。経路探索をおこなった結果、配線経路が見つかり、かつ、配線経路に容量オーバが発生していなければ(S307)、信号群内のほかのグループが近接した経路を見つけるようにするために、見つかった探索経路を新たな推奨経路として配置する(S310)。なお、このS310の具体的なやり方については、次に説明する。   Next, the route search of the selected group is performed (S306). In route search, the recommended route is preferentially adopted. As a result of the route search, if a wiring route is found and if there is no capacity over in the wiring route (S307), a route is found so that other groups in the signal group find a close route. The searched route is arranged as a new recommended route (S310). The specific method of S310 will be described next.

配線経路がないか、配線経路があっても容量オーバであれば(S307)、グループを分割できるか否かを判定する(S308)。   If there is no wiring path or if the capacity is over even if there is a wiring path (S307), it is determined whether or not the group can be divided (S308).

グループ分割ができれば、グループ分割を実行し(S309)、S305から再度処理をおこなう。グループ分割できるときは、例えば、分割前では、信号数が多くて配置できなかったが、分割することにより、部品の間を通り抜けるようになった場合や、分割することにより、混雑度が緩和される場合などである。   If group division is possible, group division is executed (S309), and processing is performed again from S305. When group division is possible, for example, before the division, the number of signals was large and could not be arranged.However, when division occurs, it becomes possible to pass between parts, or division reduces the degree of congestion. This is the case.

グループ分割ができなければ、この場合も見つかった探索経路を新たな推奨経路として配置する(S310)。   If the group cannot be divided, the found search route is also arranged as a new recommended route in this case (S310).

配置の後に、未探索のグループがあるか否かの判定をおこない(S311)、未探索グループがあれば、S305から再度処理をおこない、未探索グループがなければ処理を終了する。   After the placement, it is determined whether or not there is an unsearched group (S311). If there is an unsearched group, the process is repeated from S305, and if there is no unsearched group, the process ends.

〔推奨経路と信号分割による経路探索および配線経路の確定の手法〕
次に、図4ないし図6を用いて本発明の配線設計支援方法の推奨経路と信号分割による経路探索および配線経路の確定の手法について説明する。
図4は、本発明の推奨経路を用いた経路探索について説明した図である。
図5は、本発明のグループ分割した信号群を隣接させる経路探索について説明した図である。
図6は、信号群から配線経路の確定する手順について説明した図である。
[Recommended route and method of route search by signal division and determination of wiring route]
Next, with reference to FIGS. 4 to 6, the recommended route and the route search method using signal division and the determination method of the wire route in the wiring design support method of the present invention will be described.
FIG. 4 is a diagram for explaining route search using the recommended route of the present invention.
FIG. 5 is a diagram illustrating a route search for making adjacent signal groups divided into groups according to the present invention.
FIG. 6 is a diagram illustrating a procedure for determining a wiring path from a signal group.

先ず、図3のフローチャートのS310で述べた推奨経路を指定して経路探索をおこなう手法について説明する。   First, a method for performing a route search by specifying a recommended route described in S310 of the flowchart of FIG. 3 will be described.

例として、配線板501上に部品502と503があり、部品502と503の間に信号群504があるものとする。   As an example, parts 502 and 503 are provided on the wiring board 501, and a signal group 504 is provided between the parts 502 and 503.

ここで、望ましい配線をおこなったり、配線の経路の変更を明示的に指定するために、経路指示情報ファイル506により信号群504に対して推奨経路505を与える。   Here, a recommended route 505 is given to the signal group 504 by the route instruction information file 506 in order to perform desired wiring or to explicitly specify a change in the route of the wiring.

このとき、推奨経路505は、図2で示したような経路指示情報から生成されるもので、信号群504の配線経路ができるだけ通って欲しい領域を指示するものである。推奨経路は、信号群内の全ネットが通過できるように、推奨経路507のように幅を拡大して登録する。そして、経路探索をおこなうときには、推奨経路507を極力通るような配線経路508を生成する。   At this time, the recommended route 505 is generated from the route instruction information as shown in FIG. 2, and indicates a region that the wiring route of the signal group 504 desires to pass as much as possible. The recommended route is registered with an expanded width like the recommended route 507 so that all nets in the signal group can pass. When a route search is performed, a wiring route 508 that passes through the recommended route 507 as much as possible is generated.

次に、図3のフローチャートのS309で述べた信号群分割(グループ化)されたときに、信号群同士を近接して配線する手順を、図5を用いて説明する。   Next, a procedure for wiring signal groups close to each other when signal group division (grouping) described in S309 of the flowchart of FIG. 3 is performed will be described with reference to FIG.

例として、部品601と602があり、部品601と602の間に信号群603があるものとする。部品601と602の中間には複数の部品604があるものとする。   As an example, it is assumed that there are parts 601 and 602 and a signal group 603 is provided between the parts 601 and 602. It is assumed that there are a plurality of parts 604 between the parts 601 and 602.

このとき、信号群603が、一まとまりのままで経路探索をおこなうと、部品604の間を通ることができず、部品604を回り込むような迂回が発生する。それは、配線設計上得策ではない。したがって、信号群603を部品604の間を通りぬけられる単位にグループ化し、経路探索をおこなう。   At this time, if the signal group 603 performs a route search in a group, the signal group 603 cannot pass between the parts 604, and a detour that goes around the parts 604 occurs. That is not a good idea in wiring design. Therefore, the signal group 603 is grouped into units that can pass between the parts 604, and a route search is performed.

このようにして、部品604の間を通るように経路を生成しグループの配線経路605を得る。次に、配線経路605を推奨経路とし(図3のS310)、推奨経路606のように幅を拡大して登録する。配線経路607は、その推奨経路の幅内を通るようにして生成する。   In this way, a path is generated so as to pass between the parts 604, and a group wiring path 605 is obtained. Next, the wiring route 605 is set as a recommended route (S310 in FIG. 3), and the width is enlarged and registered as in the recommended route 606. The wiring route 607 is generated so as to pass through the width of the recommended route.

経路の幅を拡大して登録したので、次の経路は、第一の配線経路605に近接して配線されることになり、部品604のすぐ近くの間を通る経路が得られる。   Since the route is registered with the width expanded, the next route is routed close to the first wiring route 605, and a route passing between the immediate vicinity of the component 604 is obtained.

以上の処理を繰り返し、配線経路608を生成する。   The above processing is repeated to generate the wiring path 608.

次に、図6を用いて信号群の経路から配線経路を確定させる手順について説明する。   Next, a procedure for determining the wiring route from the route of the signal group will be described with reference to FIG.

例として、配線板710上に部品703、704、705が搭載され、部品703と部品704の間に接続情報706が定義され、同一信号群を指示しているものとする。   As an example, it is assumed that components 703, 704, and 705 are mounted on the wiring board 710, connection information 706 is defined between the components 703 and 704, and the same signal group is indicated.

そして、配線設計支援システム400には、この配線板710のネット情報701と、経路指示情報702が入力される。   The wiring design support system 400 receives the net information 701 and the route instruction information 702 of the wiring board 710.

配線設計支援システム400では、信号群単位あるいはグループの経路探索をおこない、配線経路711、712を生成する。その後に、信号群単位あるいはグループの探索経路を基本としてより詳細な配線経路713、714、715、716を生成し、配線を信号群単位から信号単位へと細分化していくことによって、信号の経路を確定させる。   In the wiring design support system 400, the route search of the signal group unit or the group is performed, and the wiring routes 711 and 712 are generated. Thereafter, more detailed wiring paths 713, 714, 715, 716 are generated based on the signal group unit or group search path, and the signal paths are subdivided from the signal group unit to the signal unit. To confirm.

最後に、信号の配線経路決定後、混雑度評価ファイル717と配線経路情報ファイル718を出力する。   Finally, after determining the signal wiring route, a congestion degree evaluation file 717 and a wiring route information file 718 are output.

〔実施形態1〕
次に、本発明に係る第一の実施形態を、図7を用いて説明する。
図7は、本発明の第一の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。
Embodiment 1
Next, a first embodiment according to the present invention will be described with reference to FIG.
FIG. 7 is a schematic diagram for explaining the processing flow of the wiring design support system according to the first embodiment of the present invention.

本実施形態は、混雑度を評価し、部品の配置の変更、推奨経路の指示をおこなって、最適な配線設計をおこなうものである。   In this embodiment, the degree of congestion is evaluated, the arrangement of components is changed, and a recommended route is instructed to perform optimal wiring design.

第一の実施形態の配線板のネット情報401は、図7の右上に示されるように、配線板402上に部品403、404、406、407、409、410が搭載されている。   In the wiring board net information 401 of the first embodiment, components 403, 404, 406, 407, 409, and 410 are mounted on the wiring board 402 as shown in the upper right of FIG. 7.

そして、部品403と404の間に接続情報405があり、これが同一信号群指示がなされている。同様に、部品406と407の間に接続情報408があり、同一信号群を指示し、部品409と410の間に接続情報411があり、同一信号群を指示しているものとする。   And there is connection information 405 between the parts 403 and 404, and this is the same signal group instruction. Similarly, it is assumed that there is connection information 408 between the components 406 and 407, indicating the same signal group, and connection information 411 between the components 409 and 410, indicating the same signal group.

配線設計支援システム400には、これらの情報が入力されて、信号群内の信号全ての配線経路が割り当てられるだけの配線領域を確保しながら経路探索をおこない、配線経路412、413、414、415を生成する。そして、生成した配線結果を評価し、混雑度評価416を得る。混雑度評価は、配線経路に対して配線領域全体を等間隔の分割線で区切られた小領域に分割し、各小領域中の配線経路物量の割合によって得られる。ここで、配線の混雑度を評価した混雑度評価ファイル417と、決定した配線経路を格納する配線経路情報ファイル418とを出力することが可能である。   The wiring design support system 400 receives these pieces of information and performs a route search while securing a wiring area to which all the wiring routes of the signals in the signal group are allocated, and the wiring routes 412, 413, 414, 415. Is generated. Then, the generated wiring result is evaluated, and a congestion degree evaluation 416 is obtained. The congestion degree evaluation is obtained by dividing the entire wiring area with respect to the wiring path into small areas divided by equally-spaced dividing lines, and by the proportion of the amount of wiring path in each small area. Here, it is possible to output a congestion degree evaluation file 417 that evaluates the degree of congestion of the wiring and a wiring path information file 418 that stores the determined wiring path.

ここで、混雑度評価416によって、配線経路413、414、415が非常に近接しており、決定した配線経路の混雑度評価結果が部分的に混雑度が高いことがわかる。   Here, the congestion degree evaluation 416 indicates that the wiring routes 413, 414, and 415 are very close to each other, and the congestion degree evaluation result of the determined wiring route is partially high.

これを解決するために、部品配置の変更と配線経路の修正をおこなえばよい。したがって、部品配置の見直しをおこなって、部品409と410を矢印420、421の方向に移動する。   In order to solve this, it is only necessary to change the component arrangement and correct the wiring path. Accordingly, the component arrangement is reviewed and the components 409 and 410 are moved in the directions of arrows 420 and 421.

また、配線経路の修正をおこなうために、信号群405に対して推奨経路424を付加する。   In addition, a recommended route 424 is added to the signal group 405 in order to correct the wiring route.

この二つの対策により、配線板の中央部の混雑度が緩和されることが期待される。そして、このようにして、部品配置の変更と推奨経路を付加した配線経路情報419を用いて、再び、経路探索をおこなう。   These two measures are expected to reduce the degree of congestion at the center of the wiring board. In this way, the route search is performed again using the wiring route information 419 to which the component placement change and the recommended route are added.

その結果、新たな配線経路425、426、427が生成される。次に、このようにして生成された配線結果を評価し、混雑度評価428を得る。ここで、新たな混雑度評価ファイル429と新たな配線経路情報ファイル430とを生成することが可能である。このようにして、混雑度が大きすぎるところがなくなるまで処理を繰り返しおこなう。   As a result, new wiring paths 425, 426, and 427 are generated. Next, the wiring result generated in this way is evaluated to obtain a congestion degree evaluation 428. Here, a new congestion degree evaluation file 429 and a new wiring route information file 430 can be generated. In this way, the process is repeated until there is no place where the degree of congestion is too large.

〔実施形態2〕
次に、本発明に係る第二の実施形態を、図8を用いて説明する。
図8は、本発明の第二の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。
[Embodiment 2]
Next, a second embodiment according to the present invention will be described with reference to FIG.
FIG. 8 is a schematic diagram for explaining the processing flow of the wiring design support system according to the second embodiment of the present invention.

本実施形態は、配線長に関する制約や隣接する配線によって生じする制約を考慮して配線設計をおこなうものである。   In the present embodiment, wiring design is performed in consideration of restrictions on the wiring length and restrictions caused by adjacent wiring.

例として、配線板808上に部品802、803が搭載され、部品802と部品803の間には、信号805、806、807、808があり、信号805、806と、信号807、808が同一グループの信号群を表しているものとする。   As an example, components 802 and 803 are mounted on a wiring board 808, and signals 805, 806, 807, and 808 exist between the components 802 and 803, and signals 805 and 806 and signals 807 and 808 are in the same group. It is assumed that the signal group is represented.

また、配線制約が定められており、隣接する信号群の配線間隔を記述した隣接配線制約情報810と、信号群に配線長公差と配線長制約の情報を持った配線長制約情報811が、配線制約情報ファイル812に格納されている。これらの情報は、信号群名で記述されており、信号群名と信号の対応表として、信号群情報ファイル809を有するものとする。   In addition, wiring constraints are defined, adjacent wiring constraint information 810 describing the wiring interval of adjacent signal groups, and wiring length constraint information 811 having wiring length tolerance and wiring length constraint information in the signal groups are It is stored in the constraint information file 812. These pieces of information are described by signal group names, and have a signal group information file 809 as a correspondence table between signal group names and signals.

ここでは、信号805、806がgrpAに属し、信号807、808がgrpBに属してるものとする。また、例えば、grpAとgrpBの信号の配線とが、隣接するときには、1.27mm以上話さねばならないこと、grpAの配線の信号間の公差(許容し得る差)は、±3mmであること、grpAの配線長の制約は、50mm以下であることが理解できる。   Here, it is assumed that the signals 805 and 806 belong to grpA, and the signals 807 and 808 belong to grpB. Also, for example, when the grpA and grpB signal wirings are adjacent to each other, it must be spoken of 1.27 mm or more, and the tolerance (allowable difference) between the grpA wiring signals is ± 3 mm, grpA It can be understood that the limitation on the wiring length is 50 mm or less.

配線設計支援システムには、これらの配線板808の情報を定義したネット情報ファイル801と、信号群情報ファイル809と、配線制約情報ファイル812が入力される。   The wiring design support system receives a net information file 801 that defines information on these wiring boards 808, a signal group information file 809, and a wiring constraint information file 812.

そして、配線設計支援システム400では、隣接配線制約810を考慮し、信号群間の隣接配線間隔を遵守した配線経路813と814を生成する。その後、信号群単位の探索経路を基本として信号群単位から信号単位へと細分化し、信号群813内に属する信号の配線経路815と816、信号群814内に属する信号の配線経路817と818を隣接配線制約情報810と配線長制約情報811を満たすように生成する。   Then, the wiring design support system 400 generates the wiring routes 813 and 814 that respect the adjacent wiring interval between the signal groups in consideration of the adjacent wiring restriction 810. Thereafter, the signal group unit is subdivided into signal units based on the signal group unit search path, and the signal wiring paths 815 and 816 belonging to the signal group 813 and the signal wiring paths 817 and 818 belonging to the signal group 814 are divided. It generates so as to satisfy the adjacent wiring restriction information 810 and the wiring length restriction information 811.

その後、混雑度評価ファイル819と配線経路情報ファイル820を出力する。   Thereafter, the congestion degree evaluation file 819 and the wiring route information file 820 are output.

〔実施形態3〕
次に、本発明に係る第三の実施形態を、図9を用いて説明する。
図9は、本発明の第三の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。
[Embodiment 3]
Next, a third embodiment according to the present invention will be described with reference to FIG.
FIG. 9 is a schematic diagram for explaining a processing flow of the wiring design support system according to the third embodiment of the present invention.

本実施形態では、詳細な情報が決まるまでに時間がかかる論理や部品に対して仮の情報で補って、「仮の配線」を先ずおこなって、これを「実配線」に近づけていこうという考え方である。   In this embodiment, it is assumed that logic and components that take time until detailed information is determined are supplemented with provisional information, and “temporary wiring” is first performed and this is brought close to “real wiring”. It is.

すなわち、配線板の情報、部品間の接続、部品に対するピンアサイン、部品の配線板上の配置などを大まかな情報で与えておき、その時点での部品の配置と配線の最良解を配線設計支援システムで求める。その後、大まかな情報で与えられた配線板や部品間の接続の情報が設計完了し、詳細な情報になった時点で、情報を入替え、以前の配置と配線の解と設計完了した詳細情報を用いて、より詳細な部品の配置と配線にまでブレークダウンする。   In other words, information on wiring boards, connection between parts, pin assignments to parts, layout of parts on the wiring board, etc. are given as rough information, and wiring design support at the time of component placement and wiring best solution Ask in the system. After that, when the design of the connection information between the wiring boards and parts given in the rough information is completed and becomes detailed information, the information is replaced, and the previous layout and wiring solution and the detailed information of the design completed are replaced. Use to break down to more detailed component placement and wiring.

本実施形態では、配線設計支援システム400に、配線設計のための「仮情報」ファイル群を入力する。   In this embodiment, a “temporary information” file group for wiring design is input to the wiring design support system 400.

すなわち、仮配線板情報ファイル901は、配線板の大きさを大まかな大きさで定義するファイルである。予約領域ファイル902は、配線板上に未搭載の論理回路の部品などに使われる領域を予め指定するためのファイルである。   That is, the temporary wiring board information file 901 is a file that defines the size of the wiring board in a rough size. The reserved area file 902 is a file for specifying in advance an area used for a part of a logic circuit not mounted on the wiring board.

仮部品情報ファイル903は、実際に搭載する部品は定まっていないが、仮の部品として、その部分に接続するピン数やピン位置の情報を定めるためのファイルである。仮接続(ネット)情報ファイル904は、部品と部品との大まかな接続本数を有し、接続情報がピンに割り付けが完了していない段階での接続を示すファイルである。仮配置情報ファイル905は、部品の大まかな配置位置を決定するファイルである。   The temporary component information file 903 is a file for determining information on the number of pins connected to the portion and information on the pin positions as temporary components, although the components to be actually mounted are not determined. The temporary connection (net) information file 904 has a rough number of connections between components, and is a file indicating connections at a stage where the connection information has not been assigned to pins. The temporary arrangement information file 905 is a file for determining a rough arrangement position of parts.

そして、配線設計支援システム400は、入力された大まかな情報による配線設計における最良解を決定する。その結果としてその際の配線混雑度の評価結果として、混雑度評価ファイル915と配線経路情報ファイル916と配置情報ファイル917を出力する。   Then, the wiring design support system 400 determines the best solution in the wiring design based on the input rough information. As a result, a congestion degree evaluation file 915, a wiring route information file 916, and an arrangement information file 917 are output as the evaluation result of the wiring congestion degree at that time.

配線設計支援システム400に、上記の「仮情報」ファイル群が入力される。それによって、配線設計支援システム400において、仮配線板上に接続情報が大まかなピン位置のみを有する仮部品906と、実部品の情報をもった部品907と、予約領域908と、仮部品906と実部品907の間にある信号群909、910、911の情報を得る。   The “temporary information” file group is input to the wiring design support system 400. Accordingly, in the wiring design support system 400, the temporary part 906 having only a rough pin position on the temporary wiring board, the part 907 having information on the actual part, the reserved area 908, and the temporary part 906 Information on the signal groups 909, 910, and 911 between the actual components 907 is obtained.

ここで、部品に関する情報が確定していないものがある部品を「仮部品」、部品に関する情報が全て確定したものを「実部品」と言うことにする。   Here, a part for which information about the part has not been determined is referred to as a “provisional part”, and a part for which all the information about the part has been determined is referred to as an “real part”.

図9の左の配線状況では、部品906は、仮部品であり、部品の大きさ、ピンの数と位置が確定していないものとし、部品907は、実部品であるものとする。また、予約領域908が確保されているものとする。   In the left wiring state of FIG. 9, it is assumed that the component 906 is a temporary component, the size of the component, the number of pins, and the position are not fixed, and the component 907 is an actual component. Further, it is assumed that a reserved area 908 is secured.

このとき、仮部品である部品906に対しては、全てのピンが部品の中心にあるものとして処理し、配線経路探索処理をおこなう。このとき、配線経路探索処理では、予約領域908を極力通らないような配線経路912、913、914を生成する。また、仮部品である部品906と実部品である部品907間の配線では、仮部品906の端点は部品の中心とする。   At this time, the component 906, which is a temporary component, is processed assuming that all pins are at the center of the component, and a wiring route search process is performed. At this time, in the wiring route search process, wiring routes 912, 913, and 914 that do not pass through the reserved area 908 as much as possible are generated. In the wiring between the part 906 that is a temporary part and the part 907 that is an actual part, the end point of the temporary part 906 is the center of the part.

このようにして、仮情報を考慮しながら配線設計支援システム400内で、適切な部品の配置や配線経路を生成し、混雑度評価ファイル915と配線経路情報ファイル916と配置情報ファイル917を出力する。そして、設計が進み、実際の情報が作られたら、仮の情報ファイルから実配線板情報ファイル918、実部品情報ファイル919、実接続情報ファイル920、実配置情報ファイル922に順次入力情報ファイルを差し替えることによって配線設計の精度を向上させる。また、仮の情報ファイルで生成した配線経路情報ファイル916を反映させた経路指示情報ファイル921を入力する。さらに、配置情報ファイル917の情報を実配線板情報および実部品情報を考慮して反映させた実配置情報ファイル922を入力する。   In this way, appropriate component placement and wiring paths are generated in the wiring design support system 400 in consideration of temporary information, and the congestion degree evaluation file 915, wiring path information file 916, and placement information file 917 are output. . When the design progresses and actual information is created, the input information file is sequentially replaced from the temporary information file to the actual wiring board information file 918, the actual part information file 919, the actual connection information file 920, and the actual placement information file 922. This improves the accuracy of wiring design. Further, the route instruction information file 921 reflecting the wiring route information file 916 generated by the temporary information file is input. Further, an actual placement information file 922 reflecting the information of the placement information file 917 in consideration of actual wiring board information and actual component information is input.

実接続情報ファイル920は、実際の部品のピン位置まで配線した配線情報を表すファイルである。   The actual connection information file 920 is a file representing wiring information for wiring up to the pin position of the actual component.

実配置情報ファイル922は、実際の部品の配置を定めるものであり、これは、予約領域情報ファイル902と、仮配置情報ファイル905に対応している。   The actual arrangement information file 922 determines the actual arrangement of parts, and corresponds to the reserved area information file 902 and the temporary arrangement information file 905.

なお、経路指示情報ファイル921は、経路探索のときにふさわしい経路を指示するものであり、仮情報を用いて得られる配線情報を用いることにする。   Note that the route instruction information file 921 instructs a route suitable for route search, and uses wiring information obtained using temporary information.

実際の配線板では、部品923と、部品907、部品927〜部品929が配置されており、部品923と部品907との間に信号群924、925、926が配線され、部品927と928と929の間には信号群930と931が配線されるものとする。   In an actual wiring board, a component 923, a component 907, and a component 927 to a component 929 are arranged, and signal groups 924, 925, and 926 are wired between the component 923 and the component 907, and the components 927, 928, and 929 are arranged. Signal groups 930 and 931 are wired between the two.

このとき、予約領域908は、部品927〜部品929の配置領域に置き換わる。そして、先の手順で生成した配線経路912、913、914を推奨経路として、部品923と部品907との間の配線経路の探索をおこなう。また、推奨経路と実部品のピンの間が接続されていない部分では、ピン位置を定めるようにする。   At this time, the reserved area 908 is replaced with an arrangement area for the parts 927 to 929. Then, the wiring route between the component 923 and the component 907 is searched using the wiring routes 912, 913, and 914 generated in the previous procedure as recommended routes. In addition, the pin position is determined in a portion where the recommended path and the pin of the actual part are not connected.

そして、仮情報での結果を有効利用しながら配線設計をおこない、部品の実ピンの位置まで定めた配線経路933、934、935を生成する。   Then, the wiring design is performed while effectively using the result of the temporary information, and the wiring paths 933, 934, and 935 determined up to the position of the actual pin of the component are generated.

また、置き換わった部品927〜部品929に対しても、適切な配線経路探索をおこなって、配線経路936、937を生成する。   Also, appropriate wiring path search is performed for the replaced parts 927 to 929 to generate wiring paths 936 and 937.

配線設計が終わると、配線設計支援システムは、混雑度評価ファイル938と配線経路情報ファイル939と配置情報ファイル940を出力する。本実施形態では、このようにして、大まかな情報によって、詳細な配線設計に入る前のフロアプランの段階の設計の早い段階から配線設計の検討をおこなうことを可能とし、その結果を実配線板に受け渡すことで、初期の検討結果を有効なものとする。   When the wiring design is completed, the wiring design support system outputs a congestion degree evaluation file 938, a wiring route information file 939, and an arrangement information file 940. In this embodiment, in this way, it is possible to examine the wiring design from the early stage of the floor plan stage before entering into the detailed wiring design based on the rough information, and the result is the actual wiring board. The result of the initial examination is made valid by passing it to

〔実施形態4〕
次に、本発明に係る第四の実施形態を、図10を用いて説明する。
図10は、本発明の第四の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。
[Embodiment 4]
Next, a fourth embodiment according to the present invention will be described with reference to FIG.
FIG. 10 is a schematic diagram for explaining the processing flow of the wiring design support system according to the fourth embodiment of the present invention.

本実施形態は、電子回路基板の部品を配置するために不可欠なコンデンサや電源カットラインなどを考慮して、配線設計をおこなうことを可能とするものである。   In the present embodiment, it is possible to design a wiring in consideration of a capacitor, a power cut line, and the like which are indispensable for arranging electronic circuit board components.

配線板1009上には、部品1002、1003、1004があり、部品1002と部品1003の間には、接続情報1005、1006、1007、1008があり、接続情報1005、1006は、同一信号群を指示し、接続情報1007、1008は、他の信号群を指示しているものとする。   There are parts 1002, 1003, and 1004 on the wiring board 1009, and connection information 1005, 1006, 1007, and 1008 are provided between the parts 1002 and 1003. The connection information 1005 and 1006 indicate the same signal group. The connection information 1007 and 1008 indicate other signal groups.

また、部品の電圧種ごとの必要コンデンサ数の情報を持ったコンデンサ情報ファイル1010が定義されている。例えば、部品名1002の部品は、電圧種がVG1のコンデンサを6個要し、電圧種がVG2のコンデンサを2個要することを示している。   In addition, a capacitor information file 1010 having information on the required number of capacitors for each voltage type of parts is defined. For example, the component with the component name 1002 indicates that six capacitors having the voltage type VG1 are required and two capacitors having the voltage type VG2 are required.

また、信号と電圧種の対応表1012が定義されている。これは、例えば、信号名1005、1006の信号は、VG1の電圧が供給される領域に配置されなければならないことを意味している。   Further, a correspondence table 1012 of signals and voltage types is defined. This means that, for example, signals with signal names 1005 and 1006 must be arranged in a region to which the voltage of VG1 is supplied.

また、電源カットライン情報ファイル1011には、配線板の電源カットラインに関する大まかな情報が格納されている。電源カットラインは、配線板上に供給される電圧値の境界を表すラインである。   The power cut line information file 1011 stores rough information related to the power cut line of the wiring board. The power cut line is a line that represents the boundary of the voltage value supplied on the wiring board.

本実施形態の配線設計支援システム400には、この配線板1009を表すネット情報1001と、コンデンサ情報ファイル1010、電源カットライン情報ファイル1011、信号と電圧種の対応表1012が入力される。   The wiring design support system 400 of this embodiment receives the net information 1001 representing the wiring board 1009, the capacitor information file 1010, the power cut line information file 1011 and the signal / voltage type correspondence table 1012.

そして、配線設計支援システム400が大まかな電源カットライン1013に合わせ、コンデンサ情報ファイル1010を参照して、必要な個数分だけコンデンサを対象となる部品の周辺に配置をおこなう。その後に、コンデンサの配置に基づき、電源カットライン1014の補正をおこなう。次に、これらの配置を前提として、配線経路探索処理をおこなう。   Then, the wiring design support system 400 refers to the capacitor information file 1010 in accordance with the rough power supply cut line 1013 and arranges the required number of capacitors around the target component. Thereafter, the power cut line 1014 is corrected based on the capacitor arrangement. Next, on the premise of these arrangements, a wiring route search process is performed.

このとき、電源カットラインの上下の配線層を通る信号配線については電源カットラインを跨がないような配線経路を生成する。そして、得られた配線経路1015、1016、1017の配線の混雑度に応じて、カットラインの位置を部分的にずらすことによって、再度カットラインの補正をおこなう。その後、混雑度評価ファイル1018、配線経路情報ファイル1019、補正した電源カットライン情報ファイル1020を出力する。このように、コンデンサやカットラインなどの電源設計とそれらの影響を考慮に入れた配線設計を同時におこなうことができ、早い段階から短期間でフロアプランと電源設計の両方を完了させることができる。   At this time, for the signal wiring passing through the wiring layers above and below the power cut line, a wiring path that does not cross the power cut line is generated. Then, the cut line is corrected again by partially shifting the position of the cut line in accordance with the wiring congestion degree of the obtained wiring paths 1015, 1016, and 1017. Thereafter, a congestion degree evaluation file 1018, a wiring route information file 1019, and a corrected power cut line information file 1020 are output. In this way, it is possible to simultaneously perform power supply design such as capacitors and cut lines and wiring design taking into account their influence, and both floorplanning and power supply design can be completed from an early stage in a short period of time.

〔実施形態5〕
次に、本発明に係る第五の実施形態を、図11を用いて説明する。
図11は、本発明の第五の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。
[Embodiment 5]
Next, a fifth embodiment according to the present invention will be described with reference to FIG.
FIG. 11 is a schematic diagram for explaining the processing flow of the wiring design support system according to the fifth embodiment of the present invention.

本実施形態では、配線設計の一環として、部品のピンアサインの変更までおこなうものである。   In this embodiment, the part pin assignment is changed as part of the wiring design.

配線板1108には、部品1102、1103が搭載され、部品1112と1113の間には、接続情報1104、1105、1106、1107があり、接続情報1104、1105は、同一信号群を指示し、接続情報1106、1107は、他の信号群を指示しているものとする。   Components 1102 and 1103 are mounted on the wiring board 1108, and connection information 1104, 1105, 1106, and 1107 are provided between the components 1112 and 1113. The connection information 1104 and 1105 indicate the same signal group and are connected It is assumed that the information 1106 and 1107 indicate another signal group.

本実施形態では、この配線板1108を表すネット情報ファイル1101を入力して、経路探索をおこなう。そして、配線経路1109と1110を生成し、配線長を評価する。迂回長に関する評価を行った結果1111で、配線長とマンハッタン長(部品を水平、垂直線で結んだ最短経路)の差が極端に長いものがあるとき、または、それに準ずるピンアサインの評価をおこなって配線設計に支障があると判断した場合、ピンアサインの見直しをおこなう。   In the present embodiment, a route search is performed by inputting the net information file 1101 representing the wiring board 1108. Then, wiring paths 1109 and 1110 are generated and the wiring length is evaluated. As a result of evaluating the detour length, if there is an extremely long difference between the wiring length and the Manhattan length (the shortest path connecting the parts by horizontal and vertical lines), or the pin assignment according to it is evaluated. If it is determined that the wiring design is hindered, review the pin assignments.

この図の例では、grpBの迂回長が7で極端に長いことがわかる。   In the example of this figure, it can be seen that the detour length of grpB is 7, which is extremely long.

このようなときには、ピンアサイン1114を見直した部品1113を用いて再度経路探索をおこない、配線経路1115、1116を生成し、再び評価をおこなう。迂回長に関する評価結果1118において配線長とマンハッタン長の差が極端に長いものがなければ経路探索終了として、ピンアサイン変更情報1119と、混雑度評価ファイル1120と、配線経路情報ファイル1121を出力する。   In such a case, the route search is performed again using the component 1113 whose pin assignment 1114 has been reviewed, the wiring routes 1115 and 1116 are generated, and the evaluation is performed again. If there is no extremely long difference between the wiring length and the Manhattan length in the evaluation result 1118 concerning the detour length, the pin assignment change information 1119, the congestion degree evaluation file 1120, and the wiring route information file 1121 are output as the end of route search.

本発明に係る配線設計支援システムの構成図である。1 is a configuration diagram of a wiring design support system according to the present invention. 経路指示ファイル104の格納情報の例を示す模式図である。5 is a schematic diagram illustrating an example of stored information in a route instruction file 104. FIG. 経路探索処理の詳細を示すフローチャートである。It is a flowchart which shows the detail of a route search process. 本発明の推奨経路を用いた経路探索について説明した図である。It is a figure explaining the route search using the recommended route of the present invention. 本発明のグループ分割した信号群を隣接させる経路探索について説明した図である。It is the figure explaining the route search which makes the signal group which carried out the group division | segmentation of this invention adjoin. 信号群から配線経路の確定する手順について説明した図である。It is a figure explaining the procedure which determines a wiring path | route from a signal group. 本発明の第一の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。It is a schematic diagram explaining the flow of a process of the wiring design support system which concerns on 1st embodiment of this invention. 本発明の第二の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。It is a schematic diagram explaining the flow of a process of the wiring design support system which concerns on 2nd embodiment of this invention. 本発明の第三の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。It is a schematic diagram explaining the flow of a process of the wiring design support system which concerns on 3rd embodiment of this invention. 本発明の第四の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。It is a schematic diagram explaining the flow of a process of the wiring design support system which concerns on 4th embodiment of this invention. 本発明の第五の実施形態に係る配線設計支援システムの処理の流れを説明する模式図である。It is a schematic diagram explaining the flow of a process of the wiring design support system which concerns on 5th embodiment of this invention. 隣接配線制約を持つ信号群を配置するときの一例を示す模式図である。It is a schematic diagram which shows an example when arrange | positioning the signal group which has adjacent wiring restrictions. 配線板の部品が配線の障害物となる場合の配線パターンの形態について説明する模式図である。It is a schematic diagram explaining the form of a wiring pattern in case the components of a wiring board become an obstruction of wiring.

符号の説明Explanation of symbols

101…配線設計支援システム
102…ネット情報ファイル
103…信号群情報ファイル
104…経路指示情報ファイル
105…配置指示情報ファイル
106…配線制約情報ファイル
107…入力処理部
108…配線処理部
S01…経路未探索信号群選択
S02…経路探索
S03…経路探索判定
S04…配線経路評価
S05…再配置/配置要否判定
S06…部品配置/配線経路変更判定
S07…細分化判定
S08…細分化しきい値変更
S09…探索結果の経路を推奨経路化
115…出力処理部
116…配線経路情報ファイル
117…混雑度評価ファイル
118…配置情報ファイル
DESCRIPTION OF SYMBOLS 101 ... Wiring design support system 102 ... Net information file 103 ... Signal group information file 104 ... Route instruction information file 105 ... Placement instruction information file 106 ... Wiring restriction information file 107 ... Input processing unit 108 ... Wiring processing unit S01 ... Route unsearched Signal group selection S02 ... Route search S03 ... Route search determination S04 ... Wiring route evaluation S05 ... Relocation / placement necessity determination S06 ... Part placement / wiring route change determination S07 ... Subdivision determination S08 ... Subdivision threshold change S09 ... Search The route of the result is converted into a recommended route 115... Output processing unit 116... Wiring route information file 117.

Claims (3)

詳細な配線決定の前のフロアプランの段階から配線設計の支援をするための配線設計支援方法において、
配線板に部品の大きさ、ピンの位置が確定していない仮部品と、未搭載部品のために予約しておく予約領域とを指定し、
前記仮部品との接続は、全て部品の中心にあるものとし、前記予約領域を通らないように、経路探索をおこない配線経路情報を得て、
しかる後に、前記仮部品を、部品の大きさ、ピンの位置が確定した実部品に置き換え、前記予約領域に部品を配置して、順次、より詳細な配線経路を設計していくことを特徴とする配線設計支援方法。
In the wiring design support method for supporting the wiring design from the stage of the floor plan before the detailed wiring decision,
Specify a temporary part whose size and pin position are not fixed on the wiring board, and a reserved area reserved for an unmounted part.
All connections with the temporary parts are assumed to be in the center of the parts, and route search is performed so as not to pass through the reserved area, to obtain wiring route information,
Thereafter, the temporary part is replaced with an actual part whose part size and pin position are determined, the part is placed in the reserved area, and a more detailed wiring route is sequentially designed. Wiring design support method.
前記配線経路情報を得る際に、配線の混雑度を計算して出力することを特徴とする請求項1記載の配線設計支援方法。 The wiring design support method according to claim 1, wherein when obtaining the wiring route information, the degree of congestion of the wiring is calculated and output. 詳細な配線決定の前のフロアプランの段階から配線設計の支援をするための配線設計支援方法において、
配線設計のための仮情報として、
配線板の大きさを大まかな大きさで定義する仮配線板情報ファイルと、配線板上に未搭載部品に使われる領域を予め指定するため予約領域ファイルと、仮の部品として、その部分に接続するピン数やピン位置の情報を定める仮部品情報ファイルと、部品と部品との大まかな接続本数を有し、接続情報がピンに割り付けが完了していない段階での接続を示す仮接続情報ファイルと、部品の大まかな配置位置を決定する仮配置情報ファイルとを入力し、
これらの仮情報を基に経路探索をおこなって、
配線経路を指示するための経路指示情報ファイルを出力し、
前記仮配線板情報ファイルを、実際の配線板の大きさを示す実配線板情報ファイルに、前記仮部品情報ファイルを、実際に搭載する部品を指定する実部品情報ファイルに、前記仮接続情報ファイルを、実際の部品の配線を表す実接続ファイルに、前記仮配置情報を、実際の部品の配置を定める実配置情報ファイルに、順次、置き換えてゆき、
前記仮情報を基にして得られた配線経路を推奨経路として、経路探索をおこなって、順次、より詳細な配線経路を設計していくことを特徴とする配線設計支援方法。
In the wiring design support method for supporting the wiring design from the stage of the floor plan before the detailed wiring decision,
As temporary information for wiring design,
Temporary wiring board information file that defines the size of the wiring board in a rough size, reserved area file for pre-designating the area used for unmounted parts on the wiring board, and connection to that part as a temporary part Temporary part information file that defines information on the number of pins to be used and pin positions, and a temporary connection information file that has a rough number of connections between parts, and indicates connection at the stage when connection information is not assigned to pins And a temporary placement information file that determines the rough placement position of the part,
Perform route search based on these temporary information,
Output the route instruction information file to instruct the wiring route,
The temporary connection information file is converted into an actual wiring board information file indicating the actual size of the wiring board, the temporary component information file is converted into an actual component information file designating a component to be actually mounted, and the temporary connection information file is stored. Sequentially replace the temporary placement information with an actual connection information file that represents the wiring of actual parts, and an actual placement information file that defines the placement of actual parts.
A wiring design support method, wherein a route search is performed using a wiring route obtained based on the provisional information as a recommended route, and more detailed wiring routes are sequentially designed.
JP2008162643A 2008-06-23 2008-06-23 Wiring design method Expired - Fee Related JP4275722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008162643A JP4275722B2 (en) 2008-06-23 2008-06-23 Wiring design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008162643A JP4275722B2 (en) 2008-06-23 2008-06-23 Wiring design method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2003077172A Division JP2004287681A (en) 2003-03-20 2003-03-20 Wiring design support system and wiring design support method

Publications (2)

Publication Number Publication Date
JP2008243230A true JP2008243230A (en) 2008-10-09
JP4275722B2 JP4275722B2 (en) 2009-06-10

Family

ID=39914402

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008162643A Expired - Fee Related JP4275722B2 (en) 2008-06-23 2008-06-23 Wiring design method

Country Status (1)

Country Link
JP (1) JP4275722B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8898615B2 (en) 2013-01-11 2014-11-25 Fujitsu Limited Apparatus and method for layout design of substrate

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8898615B2 (en) 2013-01-11 2014-11-25 Fujitsu Limited Apparatus and method for layout design of substrate

Also Published As

Publication number Publication date
JP4275722B2 (en) 2009-06-10

Similar Documents

Publication Publication Date Title
JP2004287681A (en) Wiring design support system and wiring design support method
JPH08123836A (en) Conversational circuit design device
JP2006323643A (en) Floor plan design program, floor plan design device, and design method of semiconductor integrated circuit
US6245599B1 (en) Circuit wiring system circuit wiring method semi-conductor package and semi-conductor package substrate
JPS63225869A (en) Wiring path search system
US10204894B2 (en) Via placement within an integrated circuit
JP4275722B2 (en) Wiring design method
JP4311244B2 (en) Wiring route determination method and system
JP4400428B2 (en) Semiconductor integrated circuit design method, design apparatus and program
JP4303170B2 (en) Wiring design system for multilayer printed wiring boards
JP2989985B2 (en) Equipment for examining component placement on wiring boards
JP3641209B2 (en) Automatic placement and routing apparatus and automatic placement and routing method
JP5423316B2 (en) Layout design apparatus, layout design method, and program
JP5922802B2 (en) DESIGN METHOD, PROGRAM, MEMORY MEDIUM, AND DESIGN DEVICE
JP3141588B2 (en) On-grid automatic wiring method
JP2998763B2 (en) Wiring design equipment for electronic circuits
JP4311736B2 (en) Interactive floor planner apparatus and program
JP3111970B2 (en) Automatic wiring method of semiconductor integrated circuit
JP5035003B2 (en) Wiring layout apparatus, wiring layout method, and wiring layout program
JP4676995B2 (en) Design support program, recording medium storing the program, design support apparatus, and design support method
JP2620005B2 (en) Placement and wiring decision method
JPH10163326A (en) Automatic layout wiring method
JP2009277245A (en) Design method and design device for semiconductor integrated circuit, and program
JPH0887542A (en) Lsi wiring method
JP2006023809A (en) Cell placement method for semiconductor integrated circuit

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081111

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090113

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090210

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090304

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120313

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120313

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130313

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130313

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees