JP2007270502A - Upper part construction method and upper part construction structure in approach part of underpass tunnel - Google Patents

Upper part construction method and upper part construction structure in approach part of underpass tunnel Download PDF

Info

Publication number
JP2007270502A
JP2007270502A JP2006097007A JP2006097007A JP2007270502A JP 2007270502 A JP2007270502 A JP 2007270502A JP 2006097007 A JP2006097007 A JP 2006097007A JP 2006097007 A JP2006097007 A JP 2006097007A JP 2007270502 A JP2007270502 A JP 2007270502A
Authority
JP
Japan
Prior art keywords
segment
approach
finished surface
constructed
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2006097007A
Other languages
Japanese (ja)
Other versions
JP4808533B2 (en
Inventor
Tadahiko Tsuji
忠彦 辻
Kimihiro Yoshida
公宏 吉田
Masayoshi Izawa
昌佳 井澤
Hiroshi Koga
洋志 古賀
Hirohide Hashimoto
博英 橋本
Kazuhiro Kobayashi
一博 小林
Akihiro Minezaki
晃洋 峯▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Ishikawajima Kenzai Kogyo Co Ltd
Ishikawajima Construction Materials Co Ltd
Original Assignee
Obayashi Corp
Ishikawajima Kenzai Kogyo Co Ltd
Ishikawajima Construction Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Ishikawajima Kenzai Kogyo Co Ltd, Ishikawajima Construction Materials Co Ltd filed Critical Obayashi Corp
Priority to JP2006097007A priority Critical patent/JP4808533B2/en
Publication of JP2007270502A publication Critical patent/JP2007270502A/en
Application granted granted Critical
Publication of JP4808533B2 publication Critical patent/JP4808533B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To construct a finish surface inexpensively without using different-shaped segments. <P>SOLUTION: This upper part construction structure 1 in the approach part 2A constructed by a shield tunneling method is constituted by placing concrete 4 up to height of the finish surface R from an upper end face 20a of the segment 20 when the upper end face 20a of the segment 20 in the approach part 2A is at a position being lower than the finish surface R forming an installation face of partitioning facility 3. A common segment piece 21 formed to have fixed height is arranged in an upper part of the segment 20. <P>COPYRIGHT: (C)2008,JPO&INPIT

Description

本発明は、シールド工法等によって構築されるアンダーパストンネルのアプローチ部における上部構築工法および上部構築構造に関する。   The present invention relates to an upper construction method and an upper construction structure in an approach portion of an underpass tunnel constructed by a shield construction method or the like.

従来、立体交差などにおけるアンダーパストンネルは、トンネル部の両側に立坑を構築し、両立坑間を推進工法やシールド工法などによって施工され、アプローチ部が開削工法によって施工されている。そして、立坑の掘削や開削を行なう箇所には予め杭の打設などの土留め作業が必要であり、振動、騒音が発生するといった周辺環境に対する問題があるうえ、これらの掘削作業を行う際に重機の配置や開削及び立坑に必要な路上の施工占有面積が広範囲となるため、都市部などでは施工箇所における交通障害が生じるという問題があった。また、立坑があるため工期が長くなっていた。
このような問題を解消するため、地上からシールド掘削機を発進させてアンダーパストンネルの全線を連続施工する方法が、例えば特許文献1に開示されている。
特許文献1は、断面正方形状のシールド掘削機を複数組み合わせて矩形断面のアンダーパストンネルを掘削しながら、シールド掘削機の後端で断面矩形のセグメントを組み立てるものである。アプローチ部など土被りの小さな区間では、複数のシールド掘削機のうち上方に配置されているシールド掘削機をトンネル進行方向に突出させて先行掘削することで安全に掘進できる。これにより、大掛かりな立坑工事や開削工事が不要となることから、上述したような周辺環境の問題を解消できると共に、工期短縮を図ることを可能としたものである。
特開2005−248546号公報
Conventionally, underpass tunnels at three-dimensional intersections and the like have been constructed with vertical shafts on both sides of the tunnel portion, constructed between the compatible wells by a propulsion method, a shield method, and the like, and the approach portion is constructed by an open-cut method. In addition, earth retaining work such as pile driving is required in advance for excavation and excavation of shafts, and there are problems with the surrounding environment such as vibration and noise, and when performing these excavation work Since the construction occupation area on the road required for the placement and excavation of heavy machinery and shafts is wide, there is a problem that traffic obstacles occur at construction sites in urban areas. In addition, the construction period was long due to the vertical shaft.
In order to solve such a problem, for example, Patent Document 1 discloses a method of starting a shield excavator from the ground and continuously constructing all lines of the underpass tunnel.
Patent Document 1 assembles a segment having a rectangular section at the rear end of a shield excavator while excavating an underpass tunnel having a rectangular section by combining a plurality of shield excavators having a square section. In a section with a small earth covering such as an approach portion, a shield excavator disposed above among a plurality of shield excavators can be safely excavated by projecting in advance in the tunnel traveling direction. This eliminates the need for large shaft work and excavation work, thereby eliminating the above-mentioned problems in the surrounding environment and shortening the work period.
JP 2005-248546 A

しかしながら、従来技術によると、以下のような問題があった。
構築されたアプローチ部の地上部分には、アプローチ部をなすトンネルとその周囲との境界に例えば高欄や防音設備などの仕切り設備を設置する場合がある。その際、仕切り設備の基礎をなす設置面(仕上り面)を、地上面に対して略平行となるように形成する必要があった。そして、地上面に対するアプローチ部のセグメントの高さ寸法は、トンネルの深度が深くなるにしたがって大きくなることから、一般的にはセグメントリング毎に高さ寸法の異なるコンクリート製の異形セグメントをアプローチ部の上部に配置させて上述した地上面と略平行な仕上り面を形成する構築方法となっている。このようなセグメントリング毎に高さの異なる異形セグメントを製造するためには、異形セグメント毎に型枠を設けたり型枠を改造したりすることになり手間と時間がかかるうえ、製造コストが大きくなるといった問題があった。
However, according to the prior art, there are the following problems.
In the ground portion of the constructed approach section, partition equipment such as a railing or soundproofing equipment may be installed at the boundary between the tunnel forming the approach section and its surroundings. At that time, it was necessary to form the installation surface (finished surface) that forms the basis of the partition facility so as to be substantially parallel to the ground surface. Since the height of the segment of the approach section relative to the ground surface increases as the tunnel depth increases, in general, deformed concrete segments with different height dimensions for each segment ring are used. It is a construction method in which a finished surface that is arranged in the upper part and is substantially parallel to the above-described ground surface is formed. In order to manufacture such deformed segments with different heights for each segment ring, it is necessary to provide a formwork for each deformed segment or to modify the formwork. There was a problem of becoming.

本発明は、上述する問題点に鑑みてなされたもので、異形セグメントを使用することなく、低コストで仕上り面を構築できるアンダーパストンネルのアプローチ部における上部構築工法および構築構造を提供することを目的とする。   The present invention has been made in view of the above-described problems, and provides an upper construction method and a construction structure in an approach portion of an underpass tunnel that can construct a finished surface at a low cost without using a deformed segment. Objective.

上記目的を達成するため、本発明に係るアンダーパストンネルのアプローチ部における上部構築工法は、セグメントが構築されたアプローチ部の上部を所定高さの仕上り面になるように構築するアンダーパストンネルのアプローチ部における上部構築工法であって、セグメントの上端面が仕上り面より低い位置にあるときに、セグメントの上端面から仕上り面の高さまでコンクリートを打設するようにしたことを特徴としている。
また、本発明に係るアンダーパストンネルのアプローチ部における上部構築構造では、セグメントが構築されてなるアプローチ部の上部を所定高さの仕上り面になるように構築されたアンダーパストンネルのアプローチ部における上部構築構造であって、セグメントの上端面から仕上り面の高さまでコンクリートを打設させて構成されていることを特徴としている。
本発明によれば、アプローチ部のセグメントの上端面にコンクリートを打設することで、アプローチ部の上部を所定の高さの仕上り面に形成することができる。これにより、従来のように高さ寸法の異なる異形セグメントをセグメントリング毎に設置することがなくなる。そして、セグメントの上端面が仕上り面より下方に配置されていれば、コンクリートの打設範囲内で段差などがあってもよいことから、セグメントの上端面の設置位置を高い精度とする必要がなく、施工を簡略化させることができる。
In order to achieve the above object, the upper construction method in the approach part of the underpass tunnel according to the present invention is an approach of the underpass tunnel in which the upper part of the approach part where the segment is constructed is constructed so as to be a finished surface of a predetermined height. In the upper construction method in the section, when the upper end surface of the segment is lower than the finished surface, the concrete is cast from the upper end surface of the segment to the height of the finished surface.
In the upper construction structure in the approach portion of the underpass tunnel according to the present invention, the upper portion in the approach portion of the underpass tunnel constructed so that the upper portion of the approach portion in which the segment is constructed becomes a finished surface having a predetermined height. The construction structure is characterized in that concrete is cast from the upper end surface of the segment to the height of the finished surface.
According to the present invention, by placing concrete on the upper end surface of the segment of the approach portion, the upper portion of the approach portion can be formed on a finished surface having a predetermined height. This eliminates the need for installing different shaped segments having different heights for each segment ring as in the prior art. If the upper end surface of the segment is arranged below the finished surface, there may be a step in the concrete placement range, so there is no need to make the installation position of the upper end surface of the segment highly accurate. Construction can be simplified.

また、本発明に係るアンダーパストンネルのアプローチ部における上部構築工法では、セグメントの上端面に、一定の高さ寸法に形成された共通セグメントピースを載せてセグメントと仕上り面までの高さを調整することが好ましい。
本発明によれば、共通セグメントピースをセグメントの上端面に載せることでアプローチ部の上部の高さを仕上り面に近づけるように調整させることができる。
Moreover, in the upper construction method in the approach part of the underpass tunnel according to the present invention, the height between the segment and the finished surface is adjusted by placing a common segment piece formed at a certain height on the upper end surface of the segment. It is preferable.
According to the present invention, the height of the upper portion of the approach portion can be adjusted to be close to the finished surface by placing the common segment piece on the upper end surface of the segment.

また、本発明に係るアンダーパストンネルのアプローチ部における上部構築工法では、セグメントが構築されたアプローチ部の上部を所定高さの仕上り面になるように構築するアンダーパストンネルのアプローチ部における上部構築工法であって、セグメントの上端面が仕上り面より高い位置にあるときに、仕上り面より上方に突出したセグメントの突出部を取り除くようにしたことを特徴としている。
本発明によれば、アンダーパストンネル全線において同じセグメントを設置できるため、セグメントの高さを調整するための異形セグメントを製造する必要がない。このため、異形セグメントを製作するための型枠が不要になり製造コストを低減できる。
Further, in the upper construction method in the approach part of the underpass tunnel according to the present invention, the upper construction method in the approach part of the underpass tunnel is constructed so that the upper part of the approach part where the segment is constructed becomes a finished surface having a predetermined height. However, when the upper end surface of the segment is at a position higher than the finished surface, the protruding portion of the segment that protrudes upward from the finished surface is removed.
According to the present invention, since the same segment can be installed in the entire underpass tunnel line, it is not necessary to manufacture a deformed segment for adjusting the height of the segment. For this reason, the formwork for manufacturing a deformed segment becomes unnecessary and manufacturing cost can be reduced.

また、本発明に係るアンダーパストンネルのアプローチ部における上部構築構造では、セグメントが構築されてなるアプローチ部の上部を所定高さの仕上り面になるように構築されたアンダーパストンネルのアプローチ部における上部構築構造であって、セグメントの上端面に高さ寸法が異なる異形の鋼製セグメントを載置させ、鋼製セグメントの内側の空間にコンクリートを打設させて構成されていることを特徴としている。
本発明によれば、アプローチ部のセグメントの上端面にセグメントリング毎に高さ寸法が異なる異形の鋼製セグメントが載置され、この鋼製セグメントの上端面が仕上り面となるように調整することができる。従来のようなコンクリート製の異形セグメントが不要であるため、仕上り面Rを構築するためのコンクリート用型枠が不要になるため、製造コストを低減することができる。
In the upper construction structure in the approach portion of the underpass tunnel according to the present invention, the upper portion in the approach portion of the underpass tunnel constructed so that the upper portion of the approach portion in which the segment is constructed becomes a finished surface having a predetermined height. A construction structure is characterized in that a deformed steel segment having a different height dimension is placed on the upper end surface of the segment, and concrete is placed in a space inside the steel segment.
According to the present invention, an irregular steel segment having a different height dimension is placed on the upper end surface of the segment of the approach portion for each segment ring, and the upper end surface of the steel segment is adjusted to be a finished surface. Can do. Since a conventional deformed segment made of concrete is unnecessary, a concrete formwork for constructing the finished surface R is not necessary, and the manufacturing cost can be reduced.

本発明のアンダーパストンネルにおけるアプローチ部の上部構築工法および上部構築構造によれば、従来のように高さ寸法の異なる種々の異形セグメントをセグメントリング毎に設置することなく、アプローチ部の上部を所定の仕上り面の高さとなるように構築することができる。異形セグメントが不要であることから、異形セグメントの製造時における型枠の製作や改造などにかかる製造コストを低減することができる。   According to the upper construction method and the upper construction structure of the approach part in the underpass tunnel of the present invention, the upper part of the approach part is predetermined without installing various deformed segments having different height dimensions for each segment ring as in the prior art. It can be constructed to have a height of the finished surface. Since the deformed segment is unnecessary, it is possible to reduce the manufacturing cost related to the production or modification of the mold at the time of manufacturing the deformed segment.

以下、本発明の第一の実施の形態によるアンダーパストンネルにおけるアプローチ部の上部構築工法および上部構築構造について、図1乃至図3に基づいて説明する。
図1は本発明の第一の実施の形態によるアプローチ部の上部構築構造を示す側面図、図2はアンダーパストンネルを示す全体側面図、図3は図1に示すアプローチ部におけるセグメントのA−A線断面図である。
Hereinafter, the upper construction method and the upper construction structure of the approach portion in the underpass tunnel according to the first embodiment of the present invention will be described with reference to FIGS. 1 to 3.
1 is a side view showing an upper construction structure of an approach portion according to the first embodiment of the present invention, FIG. 2 is an overall side view showing an underpass tunnel, and FIG. 3 is a segment A- in the approach portion shown in FIG. It is A sectional view.

図1に示すように、本第一の実施の形態によるアプローチ部2Aの上部構築構造1は、シールド工法によって地山内に延設された矩形状のセグメントにより構築されたシールドトンネルからなる立体交差などのアンダーパストンネル2のアプローチ部2Aに適用され、例えば防音壁や高欄などの仕切り設備3を設置するための設置面として地上面Gに略平行な面(仕上り面Rとする)を形成させて構築されている。なお、本第一の実施の形態では、仕上り面Rは地上面Gより上方に位置している。   As shown in FIG. 1, the upper construction structure 1 of the approach portion 2A according to the first embodiment is a three-dimensional intersection composed of shield tunnels constructed by rectangular segments extending in a natural ground by a shield method. This is applied to the approach portion 2A of the underpass tunnel 2 of, for example, a surface substantially parallel to the ground surface G (finished surface R) is formed as an installation surface for installing the partition equipment 3 such as a soundproof wall or a railing. Has been built. In the first embodiment, the finished surface R is located above the ground surface G.

先ず、本上部構築構造1が適用されるアンダーパストンネル2及びアプローチ部2Aについて説明する。
図2に示すように、アンダーパストンネル2は、側面視で略U字形に構築され、地中内に延設されているトンネル部2Bと、地上面Gからトンネル部2Bまでを連絡してなり上方が開放されたアプローチ部2Aとからなる。つまり、地上から地中に向けて徐々に深度を増していく傾斜路が形成され、所定の深さで略水平方向となり、さらに所定の位置で地上に向けた上り勾配の傾斜路が形成されている。
First, the underpass tunnel 2 and the approach portion 2A to which the upper construction structure 1 is applied will be described.
As shown in FIG. 2, the underpass tunnel 2 is constructed in a substantially U shape in a side view, and is connected to a tunnel portion 2B extending in the ground from the ground surface G to the tunnel portion 2B. The approach portion 2A is open at the top. In other words, a slope that gradually increases in depth from the ground toward the ground is formed, becomes a substantially horizontal direction at a predetermined depth, and further, an upward slope is formed at a predetermined position toward the ground. Yes.

図2に示すように、本アンダーパストンネル2の施工に採用されるシールド工法は、周知の種々の工法を採用できるが、本第一の実施の形態では、断面の有効利用といった利点から矩形断面シールド機(図示省略)が使用され、この矩形シールド掘削機の後方でコンクリート製のセグメントが組み立てられている。
なお、本矩形シールド掘削機は、例えばカッタを複数に分割させることで各々の掘削断面を小さくして掘削できる。そして、下部カッタより上部カッタを先行させることで、土被りの小さなアプローチ部2Aでも地山を安定させて掘削できる。
As shown in FIG. 2, the shield method employed in the construction of the underpass tunnel 2 can employ various well-known methods, but in the first embodiment, the rectangular cross section is advantageous from the advantage of effective use of the cross section. A shield machine (not shown) is used, and a concrete segment is assembled behind this rectangular shield excavator.
In addition, this rectangular shield excavator can excavate by making each excavation cross section small, for example by dividing | segmenting a cutter into plurality. Then, by leading the upper cutter before the lower cutter, the approach portion 2A with a small earth covering can stably excavate the natural ground.

図1に示すように、アプローチ部2Aにトンネル軸方向に連続して構築されるセグメント20(必要に応じて「セグメントリング20」と記述する)は、個々のセグメントピースを周方向に接続して構成され、上端を開放した断面視で略U型状をなしている。すなわち、セグメントリング20は、側部20b、20bと底部20cとからなる。そして、セグメントリング20の上端面20aが例えば地上面Gに略面一となるように構築されている。そのため、トンネルの深度が増加するにしたがって、セグメントリング20の側部20b(図3参照)の高さ寸法が大きくなる。   As shown in FIG. 1, a segment 20 (described as “segment ring 20” if necessary) constructed continuously in the tunnel axis direction on the approach portion 2A is formed by connecting individual segment pieces in the circumferential direction. It is comprised and has comprised the substantially U shape by the cross sectional view which open | released the upper end. That is, the segment ring 20 includes side portions 20b and 20b and a bottom portion 20c. And the upper end surface 20a of the segment ring 20 is constructed so as to be substantially flush with the ground surface G, for example. Therefore, the height dimension of the side part 20b (refer FIG. 3) of the segment ring 20 becomes large as the depth of a tunnel increases.

また、セグメント20には、その両側部20b、20bの上部に一定の高さ寸法に形成された共通セグメントピース21が配置されている。図1に示すように、この共通セグメントピース21の上端面21aには、側面視でアプローチ部2Aにおけるトンネル軸方向の傾斜角度と略同角度の傾斜面が形成されている。アプローチ部2Aのセグメント20は、その側部20bの一部及び底部20cがトンネル部2Bで使用されるセグメントピースを使用しているが、上述した共通セグメントピース21をセグメント20に載せて配置させることでアプローチ部2Aの上部の高さを仕上り面Rに近づけるように調整させている。
共通セグメントピース21はアプローチ部2Aの全範囲にわたって設置される必要はなく、例えば、図1に示すようにアプローチ部2Aにおけるトンネル深度の浅い部分(セグメント20の高さ寸法の小さい側)は、共通セグメントピース21を配置すると仕上り面Rより上方に突出することになることから共通セグメントピース21を設置しないようにする。
なお、アプローチ部2Aには、共通セグメントピース21の上端面21aとセグメント20の上端面20aとがあるが、とくに特定しない場合を除いて、共通セグメントピースの上端面21aについても「セグメント20の上端面20a」として以下記述する。
Moreover, the common segment piece 21 formed in the fixed height dimension by the upper part of the both sides 20b and 20b is arrange | positioned at the segment 20. As shown in FIG. As shown in FIG. 1, the upper end surface 21a of the common segment piece 21 is formed with an inclined surface having substantially the same angle as the inclined angle in the tunnel axis direction of the approach portion 2A in a side view. The segment 20 of the approach portion 2A uses a segment piece in which a part of the side portion 20b and the bottom portion 20c thereof are used in the tunnel portion 2B, but the common segment piece 21 described above is placed on the segment 20 and arranged. Thus, the height of the upper portion of the approach portion 2A is adjusted so as to approach the finished surface R.
The common segment piece 21 does not need to be installed over the entire range of the approach portion 2A. For example, as shown in FIG. 1, the shallow portion of the tunnel portion in the approach portion 2A (the side where the height dimension of the segment 20 is small) is common. When the segment piece 21 is disposed, the common segment piece 21 is not installed because the segment piece 21 protrudes upward from the finished surface R.
The approach portion 2A has an upper end surface 21a of the common segment piece 21 and an upper end surface 20a of the segment 20, but the upper end surface 21a of the common segment piece is also “ This will be described below as “end face 20a”.

図1に示すように、このように構成されるセグメント20及び共通セグメントピース21がアプローチ部2Aに設置された状態において、アプローチ部2Aの上部にはトンネル軸方向に段差が形成されている。このときの段差は、仕上り面Rより下方位置に配置されている。
そして、図3に示すように、セグメント20の上端面20aから仕上り面Rの高さまでコンクリート4が打設される。このときの打設方法は、セグメント20の上端面20aに型枠5を設置し、その型枠5の内側にコンクリート4を充填する。なお、必要に応じて鉄筋やアンカ−筋(図示省略)を型枠5内に配置することが好ましい。
このように、セグメント20の上端面20aが仕上り面Rより下方に配置されていれば、コンクリート4の打設範囲内で段差などがあってもよいことから、セグメント20の上端面20aの設置位置を高い精度で施工する必要がなく、施工を簡略化させることができる。
このようにして、アプローチ部2Aの上部構築構造1が構築され、形成された仕上り面Rには仕切り設備3を設置することができる。
As shown in FIG. 1, in a state where the segment 20 and the common segment piece 21 configured as described above are installed in the approach portion 2A, a step is formed in the tunnel axis direction on the approach portion 2A. The step at this time is arranged at a position below the finished surface R.
Then, as shown in FIG. 3, the concrete 4 is placed from the upper end surface 20 a of the segment 20 to the height of the finished surface R. The placing method at this time is to install the mold 5 on the upper end surface 20 a of the segment 20 and fill the concrete 5 inside the mold 5. In addition, it is preferable to arrange | position a reinforcing bar and an anchor reinforcement (illustration omitted) in the mold 5 as needed.
In this way, if the upper end surface 20a of the segment 20 is disposed below the finished surface R, there may be a step or the like within the placement range of the concrete 4, so the installation position of the upper end surface 20a of the segment 20 Can be constructed with high accuracy, and the construction can be simplified.
Thus, the upper construction structure 1 of the approach part 2A is constructed, and the partition facility 3 can be installed on the finished surface R formed.

上述したように第一の実施の形態によるアンダーパストンネルにおけるアプローチ部の上部構築工法および上部構築構造では、従来のように高さ寸法の異なる異形セグメントをセグメントリング毎に設置することなく、アプローチ部2Aの上部を所定の仕上り面Rの高さとなるように構築することができる。異形セグメントが不要であることから、異形セグメントの製造時における型枠の製作や改造などにかかる製造コストを低減することができる。   As described above, in the upper part construction method and the upper construction structure of the approach part in the underpass tunnel according to the first embodiment, the approach part is not provided for each segment ring without different shaped segments having different height dimensions as in the prior art. The upper part of 2A can be constructed so as to have a predetermined finished surface R height. Since the deformed segment is unnecessary, it is possible to reduce the manufacturing cost related to the production or modification of the mold at the time of manufacturing the deformed segment.

次に、本発明の第二及び第三の実施の形態の形態について、図4、図5に基づいて説明するが、上述の第一の実施の形態と同一又は同様な部材、部分には同一の符号を用いて説明を省略し、第一の実施の形態と異なる構成について説明する。
図4は第二の実施の形態によるアプローチ部の上部構築構造を示す側面図である。
図4に示すように、本第二の実施の形態では、アプローチ部2Aにおいて、トンネル部2Bと同様に断面矩形のセグメント22が設置されている、そして、所定の仕上り面Rより上方に突出している部分(突出部22aとする)を、例えばコンクリートカッタ、ワイヤーソーなどの切断手段(図示省略)によって取り除いて仕上り面Rとなるように形成するものである。
本第二の実施の形態の場合、アンダーパストンネル2全線においてトンネル部2Bと同じセグメントを設置できるため、従来のような異形セグメントを製造する必要がない。したがって、異形セグメントを製造するための型枠が不要となるためコストを低減させることができる。
Next, embodiments of the second and third embodiments of the present invention will be described with reference to FIGS. 4 and 5, but the same or similar members and parts as those of the first embodiment described above are the same. Description is abbreviate | omitted using the code | symbol of, and a different structure from 1st embodiment is demonstrated.
FIG. 4 is a side view showing the upper construction structure of the approach portion according to the second embodiment.
As shown in FIG. 4, in the second embodiment, in the approach portion 2A, a segment 22 having a rectangular section is installed in the same manner as the tunnel portion 2B, and protrudes upward from a predetermined finished surface R. The part (referred to as the projecting part 22a) is removed by a cutting means (not shown) such as a concrete cutter or a wire saw to form a finished surface R.
In the case of the second embodiment, since the same segment as the tunnel portion 2B can be installed in the entire underpass tunnel 2 line, it is not necessary to manufacture a deformed segment as in the prior art. Accordingly, a mold for manufacturing the deformed segment is not necessary, and the cost can be reduced.

次に、図5は第三の実施の形態によるアプローチ部の上部構築構造を示す正面断面図である。
図5に示すように、第三の実施の形態は、アプローチ部2Aのセグメント20の上端面20aに、セグメントリング20毎に高さ寸法が異なる異形の鋼製セグメント6が載置され、この鋼製セグメント6の上端面6aが仕上り面Rとなるように調整されている。鋼製セグメント6は、その上端面6aが下端面6bに対して所定角度で傾斜した形状をなしている。そして、鋼製セグメント6は、設置されたときの内周側が開口された外殻体をなし、外殻体によって囲われた内部には空間6cが形成されている。そして、本上部構築構造1は、鋼製セグメント6がセグメント20の上端面20aに設置され、この鋼製セグメント6の空間6cにコンクリート7が打設されて構成されている。
本第三の実施の形態では、鋼製セグメント6をセグメントリング毎に異なる大きさで製造しておき、現場に設置した後に複数の鋼製セグメント6に対して一度にコンクリート打設を行なうことができる。そして、仕上り面Rを構築するためのコンクリート用型枠が不要になるため、製造コストを低減することができる。
Next, FIG. 5 is a front sectional view showing the upper construction structure of the approach portion according to the third embodiment.
As shown in FIG. 5, in the third embodiment, a deformed steel segment 6 having a different height dimension for each segment ring 20 is placed on the upper end surface 20 a of the segment 20 of the approach portion 2 </ b> A. The upper end surface 6a of the manufactured segment 6 is adjusted to be a finished surface R. The steel segment 6 has a shape in which the upper end surface 6a is inclined at a predetermined angle with respect to the lower end surface 6b. And the steel segment 6 comprises the outer shell body by which the inner peripheral side opened when installed, and the space 6c is formed in the inside enclosed by the outer shell body. The upper construction structure 1 is configured such that the steel segment 6 is installed on the upper end surface 20 a of the segment 20, and the concrete 7 is placed in the space 6 c of the steel segment 6.
In the third embodiment, the steel segments 6 are manufactured in different sizes for each segment ring, and concrete placement is performed on the plurality of steel segments 6 at a time after installation on the site. it can. And since the concrete formwork for constructing the finishing surface R becomes unnecessary, manufacturing cost can be reduced.

以上、本発明によるアンダーパストンネルのアプローチ部における上部構築工法および上部構築構造の第一乃至第三の実施の形態について説明したが、本発明は上記の第一乃至第三の実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、第一乃至第三の実施の形態ではアプローチ部2Aのセグメント20の上端面20aの位置が、第一の実施の形態では仕上り面Rより下方であり、第二の実施の形態では仕上り面Rより上方となっているが、下方又は上方のどちらか一方に限定されることはなく、1箇所のアプローチ部2Aにおいて前述した上下の位置が混在した状態であってもよい。すなわち、仕上り面Rより下方となる部分では必要に応じて共通セグメントピース21をセグメント20の上端面20aに配置し、その上端面21aから仕上り面Rまでコンクリート4を打設する。また、セグメント20が仕上り面より上方に突出した突出部22aがある部分は、この突出部22aを切断手段によって取り除くようにすればよい。
また、第一の実施の形態では、共通セグメントピース21を設けているが、必ずしもこれを設置することに限定されない。アプローチ部2Aのセグメント20の高さ寸法と仕上り面の位置に応じて設置することが好ましい。そして、共通セグメントピース21の高さ寸法は、施工条件に適する高さ寸法に設定することができる。
The first to third embodiments of the upper construction method and the upper construction structure in the approach portion of the underpass tunnel according to the present invention have been described above, but the present invention is limited to the first to third embodiments. However, the present invention can be changed as appropriate without departing from the spirit of the invention.
For example, in the first to third embodiments, the position of the upper end surface 20a of the segment 20 of the approach portion 2A is lower than the finished surface R in the first embodiment, and the finished surface in the second embodiment. Although it is above R, it is not limited to either one below or above, and the above-described upper and lower positions may be mixed in one approach portion 2A. That is, in the portion below the finished surface R, the common segment piece 21 is disposed on the upper end surface 20a of the segment 20 as necessary, and the concrete 4 is placed from the upper end surface 21a to the finished surface R. Moreover, what is necessary is just to remove this protrusion part 22a with a cutting | disconnection means in the part with the protrusion part 22a which the segment 20 protruded upwards from the finishing surface.
Moreover, in 1st Embodiment, although the common segment piece 21 is provided, it is not necessarily limited to installing this. It is preferable to install according to the height dimension of the segment 20 of the approach portion 2A and the position of the finished surface. And the height dimension of the common segment piece 21 can be set to the height dimension suitable for construction conditions.

本発明の第一の実施の形態によるアプローチ部の上部構築構造を示す側面図である。It is a side view which shows the upper structure of the approach part by 1st embodiment of this invention. アンダーパストンネルを示す全体側面図である。It is a whole side view showing an underpass tunnel. 図1に示すアプローチ部におけるセグメントのA−A線断面図である。It is the sectional view on the AA line of the segment in the approach part shown in FIG. 第二の実施の形態によるアプローチ部の上部構築構造を示す側面図である。It is a side view which shows the upper construction structure of the approach part by 2nd embodiment. 第三の実施の形態によるアプローチ部の上部構築構造を示す断面図である。It is sectional drawing which shows the upper structure of the approach part by 3rd embodiment.

符号の説明Explanation of symbols

1 上部構築構造
2 アンダーパストンネル
2A アプローチ部
3 仕切り設備
4、7 コンクリート
6 鋼製セグメント
20 セグメント
20a 上端面
21 共通セグメントピース
R 仕上り面
G 地上面

DESCRIPTION OF SYMBOLS 1 Superstructure 2 Underpass tunnel 2A Approach part 3 Partitioning equipment 4, 7 Concrete 6 Steel segment 20 Segment 20a Upper end surface 21 Common segment piece R Finish surface G Ground surface

Claims (5)

セグメントが構築されたアプローチ部の上部を所定高さの仕上り面になるように構築するアンダーパストンネルのアプローチ部における上部構築工法であって、
前記セグメントの上端面が前記仕上り面より低い位置にあるときに、前記セグメントの前記上端面から前記仕上り面の高さまでコンクリートを打設するようにしたことを特徴とするアンダーパストンネルのアプローチ部における上部構築工法。
The upper construction method in the approach part of the underpass tunnel that constructs the upper part of the approach part where the segment is constructed so as to be a finished surface of a predetermined height,
In the approach portion of the underpass tunnel, the concrete is placed from the upper end surface of the segment to the height of the finished surface when the upper end surface of the segment is at a position lower than the finished surface. Upper construction method.
前記セグメントの前記上端面に、一定の高さ寸法に形成された共通セグメントピースを載せて前記セグメントと前記仕上り面までの高さを調整するようにしたことを特徴とする請求項1に記載のアンダーパストンネルのアプローチ部における上部構築工法。   The common segment piece formed in a fixed height dimension is placed on the upper end surface of the segment to adjust the height between the segment and the finished surface. Upper construction method in approach part of underpass tunnel. セグメントが構築されたアプローチ部の上部を所定高さの仕上り面になるように構築するアンダーパストンネルのアプローチ部における上部構築工法であって、
前記セグメントの上端面が前記仕上り面より高い位置にあるときに、前記仕上り面より上方に突出した前記セグメントの突出部を取り除くようにしたことを特徴とするアンダーパストンネルのアプローチ部における上部構築工法。
The upper construction method in the approach part of the underpass tunnel that constructs the upper part of the approach part where the segment is constructed so as to be a finished surface of a predetermined height,
The upper construction method in the approach part of the underpass tunnel, characterized in that when the upper end surface of the segment is at a position higher than the finished surface, the protruding part of the segment protruding upward from the finished surface is removed. .
セグメントが構築されてなるアプローチ部の上部を所定高さの仕上り面になるように構築されたアンダーパストンネルのアプローチ部における上部構築構造であって、
前記セグメントの上端面から前記仕上り面の高さまでコンクリートを打設させて構成されていることを特徴とするアンダーパストンネルのアプローチ部における上部構築構造。
The upper construction structure in the approach part of the underpass tunnel constructed so that the upper part of the approach part in which the segment is constructed becomes a finished surface of a predetermined height,
An upper construction structure in an approach portion of an underpass tunnel, wherein concrete is cast from an upper end surface of the segment to a height of the finished surface.
セグメントが構築されてなるアプローチ部の上部を所定高さの仕上り面になるように構築されたアンダーパストンネルのアプローチ部における上部構築構造であって、
前記セグメントの上端面に高さ寸法が異なる異形の鋼製セグメントを載置させ、該鋼製セグメントの内側の空間にコンクリートを打設させて構成されていることを特徴とするアンダーパストンネルのアプローチ部における上部構築構造。
The upper construction structure in the approach part of the underpass tunnel constructed so that the upper part of the approach part in which the segment is constructed becomes a finished surface of a predetermined height,
An underpass tunnel approach characterized in that it is constructed by placing a deformed steel segment having a different height dimension on the upper end surface of the segment and placing concrete in the space inside the steel segment. Superstructure in the department.
JP2006097007A 2006-03-31 2006-03-31 Superstructure and superstructure in the approach part of underpass tunnel Expired - Fee Related JP4808533B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006097007A JP4808533B2 (en) 2006-03-31 2006-03-31 Superstructure and superstructure in the approach part of underpass tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006097007A JP4808533B2 (en) 2006-03-31 2006-03-31 Superstructure and superstructure in the approach part of underpass tunnel

Publications (2)

Publication Number Publication Date
JP2007270502A true JP2007270502A (en) 2007-10-18
JP4808533B2 JP4808533B2 (en) 2011-11-02

Family

ID=38673588

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006097007A Expired - Fee Related JP4808533B2 (en) 2006-03-31 2006-03-31 Superstructure and superstructure in the approach part of underpass tunnel

Country Status (1)

Country Link
JP (1) JP4808533B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005105695A (en) * 2003-09-30 2005-04-21 Taisei Corp Tunnel construction method
JP2005248546A (en) * 2004-03-04 2005-09-15 Ohbayashi Corp Construction method of underpass structure
JP2006016892A (en) * 2004-07-02 2006-01-19 Ohbayashi Corp Method for preventing lift of lining body

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005105695A (en) * 2003-09-30 2005-04-21 Taisei Corp Tunnel construction method
JP2005248546A (en) * 2004-03-04 2005-09-15 Ohbayashi Corp Construction method of underpass structure
JP2006016892A (en) * 2004-07-02 2006-01-19 Ohbayashi Corp Method for preventing lift of lining body

Also Published As

Publication number Publication date
JP4808533B2 (en) 2011-11-02

Similar Documents

Publication Publication Date Title
JP2008013926A (en) Existing building foundation reinforcing method
KR102068129B1 (en) Demolition method of basement of building using underground structure as support
JP4309219B2 (en) Tunnel construction method
JP6543176B2 (en) Building method
JP4556786B2 (en) Shielding machine propulsion method
JP4808533B2 (en) Superstructure and superstructure in the approach part of underpass tunnel
JP4226954B2 (en) Underpinning method and viaduct
KR100322845B1 (en) tubular roof tunnel construction method
KR102382034B1 (en) Construction method of continuous cut off wall
JP4303512B2 (en) Construction method of large section tunnel
JP2007126936A (en) Semisubterranean road and its construction method
JP2000291398A (en) Underground structure and construction method therefor
JP4303511B2 (en) Construction method of large section tunnel
JP6043090B2 (en) Construction method of underground structure
KR101025399B1 (en) Underground Structure and Method for Constructing thereof
JP6543177B2 (en) Building method
JP4397797B2 (en) Construction method of underground structure
JP5167578B2 (en) Construction method for underground structures
JP6592331B2 (en) Survey method of circumferential shield machine
JP4349570B2 (en) Construction method of division box and underground level crossing
JP4937626B2 (en) Manufacturing method of irregular segment
JP6019689B2 (en) Tunnel widening method
JP2006348472A (en) Width expanding construction method for existing underground tunnel
JP4060836B2 (en) Open shield method
JP2006090048A (en) Wall body member of underground hollow structure and construction method of underground hollow structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090330

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20101126

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110809

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110817

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140826

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees