JP2004514077A - Processing method for gaps and cracks in the airfield runway surface - Google Patents

Processing method for gaps and cracks in the airfield runway surface Download PDF

Info

Publication number
JP2004514077A
JP2004514077A JP2002543107A JP2002543107A JP2004514077A JP 2004514077 A JP2004514077 A JP 2004514077A JP 2002543107 A JP2002543107 A JP 2002543107A JP 2002543107 A JP2002543107 A JP 2002543107A JP 2004514077 A JP2004514077 A JP 2004514077A
Authority
JP
Japan
Prior art keywords
asphalt
gap
crack
runway
pores
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002543107A
Other languages
Japanese (ja)
Inventor
ルー・チャー ルン
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lu Eric Chia Chun
Original Assignee
Lu Eric Chia Chun
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lu Eric Chia Chun filed Critical Lu Eric Chia Chun
Publication of JP2004514077A publication Critical patent/JP2004514077A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/005Methods or materials for repairing pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/10Packing of plastic or elastic materials, e.g. wood, resin
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6801Fillings therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors
    • E04F15/14Construction of joints, e.g. dividing strips

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mining & Mineral Resources (AREA)
  • Road Paving Structures (AREA)
  • Road Signs Or Road Markings (AREA)
  • Road Repair (AREA)
  • Coating Apparatus (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

A process of finishing slits in the surface layer of a runway involves a first step in which a slit (11) is heated such that the surface of the slit (11) is dry, and that the capillary holes of the slit (11) are opened up. The surface of the slit (11) is then provided with a coating (50) of an asphalt synthetic agent. The coating (50) is subsequently heated to cause the molecules of the asphalt synthetic agent to diffuse into the capillary holes of the slit (11), thereby preventing water from finding its way into the gradation layer (A) of the runway. The slit (11) is provided with a soft interface (60) capable of preventing the water from finiding its way into the slits of the surface layer of the runway. The soft interface (60) is securely attached to the slits.

Description

【0001】
【発明の属する技術分野】
本発明は、飛行場の滑走路表層中の間隙や亀裂の処理施工法に係り、特に新たに飛行場の滑走路を建造しようとする際、或いは既に使用中の滑走路に対し、その表層中の亀裂個所に防水処理を施す工法に関わる。
【0002】
【従来の技術】
公知の技術として、長さ3000m×幅60m×厚さ30cmの飛行場の滑走路を、飛行場(飛行機の離着陸をする個所や駐機場を含む)に建設しようとする場合、その手順は以下の如くである。
【0003】
A.図1に示すように、地盤A上にコンクリート(PC)或いは鉄筋コンクリート(RC)などの材質とした表層10を設ける。
B.図2に示すように、飛行場の滑走路に沿って6m間隔を開ける形で、数本の長さが等しい表層ユニット10Aを舗装する。
C.図3に示すように、該表層ユニット10Aのコンクリート(PC)或いは鉄筋コンクリート(RC)が乾燥して硬化したら、数本の表層ユニット10Bを舗装して、飛行場の滑走路表層10を完成する。
D.図4に示すように、該表層ユニット10A及び表層ユニットBの接する個所の表層10には、深さ3cm×幅1cmの縦向き伸縮間隙11を開設する。
E.図5に示すように、更に該滑走路表層10上には一定間隔で、数百本に分けて、飛行場の滑走路の長さと等しく且つ垂直な人工の亀裂12を設けておき、滑走路表層10中に不規則な亀裂が発生しないようにする。
F.図6に示すように、該人工の亀裂12上には更に深さ3cm×幅1cmの横向き伸縮間隙13を開設し、該滑走路表層10上は切り込みが設けられて、複数のブロック14状となる(図7参照)。こうすることで施工後に温度の変化によって膨張したり収縮するのを防止し、滑走路表層10に凹凸ができたり破損を来たすことが防止されている。
G.図8,9に示すように、該縦向き伸縮間隙11及び横向き伸縮間隙13内にはそれぞれPE棒15が設けられており、且つPU(ポリユリア)などの充填剤16が該PE棒15上に被覆されている。こうして該表層10上の全ての縦向き伸縮間隙11及び横向き伸縮間隙13は全て充填されて封じられ、防止処理が完了する。
【0004】
上述の手順のB.及びC.において、表層ユニット10A及び表層ユニット10Bは、二度に分けて施工が行われていることより、両者が隣接している個所は自然に二次施工間隙17(図3,4,8参照)が形成されており、且つ該手順中のE.では人工の亀裂12が完成すると同時に、該人工の亀裂12底部が地盤Aに向かって自然の亀裂18を生じる(図5,6,9参照)ことになり、該充填剤16では該縦向き伸縮間隙11と横向き伸縮間隙13の壁面を接着させるのみであり、天候や温度の変化によって起こる膨張や収縮で、該充填剤16は該縦向き伸縮間隙11及び横向き伸縮間隙13の内の一つ或いは両者が剥離を起してしまう。
これは充填剤16が軟性の材質であり、表層ユニット10Aと10BがPC或いはRCの剛性材質である、つまり両者の材質が有する特性の差異が大きいことが原因であり、膨張係数が自ずと異なることから、ある一定の使用時間が経過することで両者が剥離するのである。該縦向き伸縮間隙11と横向き伸縮間隙13はそれぞれ充填剤16との間に進水するすき間11´,13´(図10,11参照)が形成され、水分Wが該すき間11´から二次施工間隙17内に進入し、更には地盤A(図8,10参照)にまで進入する、若しくは該すき間13´から人工の亀裂12及び亀裂18を伝って、該地盤A内(図9,11参照)に流入し、該地盤A中の微細な土壌や石材などの骨材が流失し、空洞A1(図12参照)が形成されてしまう。
よって、該縦向き伸縮間隙11付近に位置する表層10の構造の強度が弱まり、飛行機の着陸やその他の重機などの設備が駐機するときなどには、タイヤからかかる圧力で該滑走路表面10が圧迫されて陥没したり割れ片19(図13の破線参照)が発生したりする。該割れ片19は清掃車や或いは人間の手によって清掃されるが、清掃されなかった場合は、該割れ片19が飛行機の前輪によって跳ね上がり、発動機に吸い込まれるといったことが充分に考えられ、メンテナンスに高額な費用がかかるだけでなく、人命にかかる事故に繋がる危険性もある。
【0005】
こういった公知における充填剤16は、該縦向き及び横向き伸縮間隙11,13の毛細孔中に完全に浸入していないことで、膨張や収縮時に剥離が起こりやすく、防水の機能を喪失させる原因の一つとなっている。よって時間が経過すると、該縦向き及び横向き伸縮間隙11,13は地盤Aに水分Wが進入し、腐食させる主要なルートと変わってしまうことから、該充填剤16をある一定の時間が経過するごとに新たなものを充填する、という方法が取られており、こうすることで該地盤Aの腐食を防止している。
また、該手順中のF.において、該ブロック14上の該縦向き及び横向き伸縮間隙11,13が隣り合う個所(図14参照)においては、該地盤Aが骨材を流失するのが最も速い個所であることから、必然的に該縦向き及び横向き伸縮間隙11,13の隣り合う個所のブロック14上は最も表層に亀裂14´が入りやすい個所となり、割れ片19が最も早く形成されやすいばかりでなく、滑走路表層10の使用寿命を縮めてしまう。これを防止すべく既に行われている補修施工法を以下に記す。
【0006】
a1.図14に示すように、該表面亀裂14´の両側のブロック14上には予め細いすき間141を設ける。
a2.図15に示すように、二本の該細いすき間141間の表層10を削り、幅30cm×深さ10cmの浅溝142を形成する。
a3.図16に示すように、エポキシ樹脂石英砂,セメントコンクリート,早硬化セメントなどの材料を濡らして攪拌してなる充填材料20を、該浅溝142内に塗布して平らにし、該表面亀裂14´の修復作業とする。
【0007】
しかし上述のような工法によると、該手順a3.の浅溝142で充填される充填材料20はエポキシ樹脂石英砂,セメントコンクリート,早硬化セメントなどの混合物であり、該浅溝142の両側及び底部の表層10の材質はコンクリート(PC)あるいは鉄筋コンクリート(RC)であることから、その材質の差異により膨張係数の差異も大きく、当然二種の異なる材質が一定の時間を経た後、その膨張と収縮の差異から接合個所が密でなくなり、該充填材料20と該浅溝10の両側と底部との間に二次施工間隙21(図17参照)が形成されてしまう。よって水分Wが該二時施工間隙21より該浅溝142底部表面の亀裂14´に進入し、更に該表面の亀裂14´より該地盤A中に流入してしまう。更に図18に示すように、該充填材料20が該浅溝142の四周壁面の膨張によって押された後に剥離を起し、該浅溝142底部にすき間23が形成されてしまい、こうなると該充填材料20は上方に盛り上がって該滑走路表層10上に突起した形となり、高速で走行する飛行機やその他の重機などのタイヤがパンクをする原因となる。
上述のように、該滑走路表層10中のブロック14上の表面亀裂14´が多くなった場合の対処法においては、該表層10を全面的に新しくする方法を取ることになる。その方法を以下に示す。
【0008】
b1.図19に示すように、該飛行場の滑走路表層10を下方に約10cm厚で削る。
b2.更に該削られた後の表層10´上にアスファルトを吹き付け、貼着層101を形成する。
b3.該貼着層101上に先に約5cm厚のアスファルトコンクリート(AC)30を敷設し、該アスファルトコンクリート(AC)30上にポリプロピレンやポリエステル繊維網材質などによる強化材料であるPRF(Pavement Reinforcing Fabrics)40を設ける。
b4.最後に厚さ約5cmのアスファルトコンクリート(AC)30を該強化材料40上に敷設し、新たな滑走路表層30´が完成する(図20参照)。
【0009】
【発明が解決しようとする課題】
上述のような方法による欠点として、該表層30´底部の旧ブロック14中にも二次施工間隙17、若しくは自然の亀裂18などが存在するが、これらに対し、防水処理となる亀裂口を封じる作業を行っていないため、飛行機の離着陸による重力や天候の変化などによる膨張や収縮により、該二次施工間隙17や自然の亀裂18は該新たな表層30´に向かって亀裂を生むことが言える。
該新たな表層30´も、使用時間がある一定の時間を超えれば、これらの結果による間隙31(図20参照)を生じ、水分Wが該間隙31より直接地盤A内に進入し、空洞や断裂による陥没が徐々に形成されていってしまう。最後には該間隙31の幅が更に拡大して割れ片19が生じ、結果として該表層30´の使用寿命を短くしてしまう。
そこで滑走路表面の亀裂や間隙から水分が地盤に浸透するのを防止し、割れ片の発生を防いで飛行機の離着陸や走行における安全の確保をするべく、飛行場の滑走路表層中の間隙や亀裂における処理施工法を提供する。
【0010】
【課題を解決するための手段】
先ず施工準備の整った亀裂表面に加熱をして急速脱水乾燥並びに毛細孔を拡張させ、適量のアスファルト合成剤を該亀裂表面上に塗布し、更に該アスファルト合成剤上に加熱することで亀裂した表面の毛細孔内に完全に溶解して浸入するようにし、該亀裂口を充填することで完全に封じ、また該亀裂口上には温度の変化によって膨張及び収縮しても剥離しないよう軟質の面を設け、該軟質の面で地盤に水分が入り込まないよう完全にシャットアウトする。
【0011】
【発明実施の形態】
先ず、本発明にて使用するアスファルト合成剤とは、ストレートアスファルト(Straight Asphalt)とブローンアスファルト(Blown Asphalt)とを、施工地区の常温などの条件により、適切な比率によって調合したものであり、高温時に母材と小母材の毛細孔内へに対する可溶性及び浸透性、並びに母材の表層の間隙内を封じる密着性を発揮するものであり、また更に間隙の密閉及び表層の貼着を強化するべく防水テープを貼着することにより接合性を提供する。常温時では弾性を具有することより、表層が安定して表層に建材が舗装されるべく排水性と抗腐性が提供される。
【0012】
本発明における施工法を以下に記す。
(1)先ず施工しようとする間隙表面より加熱し、該間隙した表面を急速脱水して乾燥させ、毛細孔を拡張させる。
(2)次に適量のアスファルト合成剤50を該化熱後の間隙表面に塗布する。
(3)更に該塗布した該アスファルト合成剤50上より加熱し、完全に該間隙表粘の毛細孔中にて溶解、浸透させ、該間隙口を隙間のないように完全に充填することで完成とする。
また該手順(1)施工開始前には、切り込み、削り、研磨、清掃、などの作業を行っておくことが望ましい。
【0013】
飛行場の滑走路表層10中の縦向き伸縮間隙11,横向き伸縮間隙13,ブロック14の表面層亀裂14´及び滑走路表層10の再舗装における施工手順を以下に記す。
図22から図24に示すように、本発明により滑走路表層10中の縦向き伸縮間隙11を処理しようとする場合における手順は、
(1c)該縦向き伸縮間隙11表面上より加熱し、該間隙11の表面を急速脱水して乾燥させ、毛細孔を拡張させる。
(2c)適量のアスファルト合成剤50を該加熱後の縦向き伸縮間隙11表面上に塗布する。
(3c)更に該手順(2c)で舗装した該アスファルト合成剤50上より加熱し、該縦向き伸縮間隙11の間隙壁111,間隙底部112,間隙最上部隅肉113の毛細孔内、二次施工間隙17中にて溶解及び浸透させ、該2次施工間隙17の間隙口を充填によって完全に封じ、貼着面51を形成させる(図22参照)。
(4c)該貼着面51上に防水テープ60を貼設する(図23参照)。
(5c)高温のアスファルト混合剤50´を該縦向き伸縮間隙11中に注入し、該間隙口最上部にまで至らしめ、こうすることで全体が接合されて一体となる(図24参照)。
該アスファルト合成剤50´と貼着面51とは同一の材質であり、且つ該貼着面着面51は完全に該縦向き伸縮間隙11の間隙壁111及び間隙底部112及び隅肉113の毛細孔内に浸透しているため、温度が上がるに従って膨張する、或いは温度が上がって収縮が起こった場合でも、該アスファルト合成剤50´が該貼着面51から剥がれることがなく、また該縦向き伸縮間隙11及び二次施工間隙17は皆アスファルト合成剤50及び50´と、防水テープ60とによって完全に封じられていることより、該縦向き伸縮間隙11の間隙壁111や間隙底部112並びに隅肉113間に浸水するような隙間が生じず、つまり水分が該地盤A中に入ることのできない状態となり、該地盤A内の微細な骨材が流失して空洞A1を形成することがないようになる。更には該貼着面51は該隅肉113を被覆していることから、該縦向き伸縮間隙11を飛行機などの重機が走行しても、圧しかかる重力によって割れ片19が生ずることもなく、飛行機の発動機が割れ片によって被る事故が防止される。
【0014】
図25に示すように、本発明により滑走路表層10中の横向き伸縮間隙13を処理する手順を以下に記す。
(1d)横向き伸縮間隙13表面上より加熱し、該間隙13の表面を急速脱水して乾燥させ、毛細孔を拡張させる。
(2d)適量のアスファルト合成剤50を該加熱後の横向き伸縮間隙13表面上に塗布する。
(3d)更に該(2d)の手順にて塗布されたアスファルト合成剤50上より加熱し、該横向き伸縮間隙13の間隙壁131,間隙底部132及び隅肉133の毛細孔内と人工の亀裂12中にて完全に溶解させて浸透させ、該人工の亀裂12の亀裂口を充填により封じ、貼着面51を形成する。
(4d)該貼着面51上に防水テープ60を貼設する。
(5d)高温のアスファルト合成剤50´を該横向き伸縮間隙13中に注入して該間隙口最上部にまで至らしめ、こうすることで全体が接合されて一体となる。
該横向き伸縮間隙13処理と、該縦向き伸縮間隙11処理の手順は同じであり、効果の上でも同様に、該横向き伸縮間隙13の間隙壁131,間隙底部132,隅肉133間には隙間が完全に存在せず、水分が侵入しないことから該地盤A中に水分が入り込むことが不可能となり、該地盤A内の微細な骨材に空洞A1が生ずるのが防止される。また上述同様、飛行機などの重機が走行することにより割れ片19が生ずるのが同時に防止されていることより、飛行機の発動機が該割れ片19を吸入して事故などの被害を被ることが防止される。
【0015】
図15,16及び図26,32に示すように、本発明によって滑走路表層10中の亀裂14´を処理する際の手順を記す。
(1e)該滑走路表層10の亀裂14´の両側面のブロック14上にそれぞれ細いすき間141(図14参照)を切り出し、該両間隙141間の滑走路表層10を削ることにより、適当な幅と深さの浅溝142(図15参照)を設け、該浅溝142中の屑を除去する。
(2e)該浅溝142上より加熱することで、溝壁141´と溝底部142´を脱水乾燥させ、毛細孔を拡張させる(図26参照)。
(3e)適量のアスファルト合成剤50を加熱後の該浅溝142上の溝壁141´と溝底部142´表面上に塗布する。
(4e)更に該手順(3e)で舗装した後のアスファルト合成剤50上を加熱し、該浅溝142の溝壁141´と溝底部142´の毛細孔内と表面亀裂14´中にて溶解及び浸透させ(図27参照)、該表面亀裂14´の亀裂口を封じ、第一貼着面52を形成する。
(5e)該第一貼着面52上に防水テープ60を貼設する(図28参照)。
(6e)該アスファルト合成剤50を加熱し、該防水テープ60上に塗布し、該防水テープ60上に第二貼着面53を形成させる(図29参照)。
(7e)体積が該浅溝142とほぼ等しい小母材70を設け、該小母材70の四周表面を加熱して表面の毛細孔を拡張させ、更にアスファルト合成剤50を該小母材70の表層毛細孔中にて溶解及び浸透させる(図30参照)。
(8e)該小母材70上のアスファルト合成剤50、及び該浅溝142の第二貼着面53を加熱し、該小母材70を該浅溝142上の第二貼着面53上に塞入し、該小母材70を該浅溝142上の第二貼着面53と緊密に結合させる(図32参照)。
該小母材70上のアスファルト合成剤50及び該第二貼着面53上のアスファルト合成剤50は、同材質であることから溶解して一体となり、該小母材70が該浅溝142に塞入されて結合した後は、施工後の気温などの変化により膨張或いは収縮を起さない。つまり公知の技術で問題となっていた第二次施工間隙21や充填材料20の剥離などの現象が防止され(図18参照)、高速で走行する車両や飛行機のタイヤがパンクすることが防止される。
【0016】
図19及び図32〜図35に示すように、本発明によって滑走路表層10を再度舗装しようとする際の施工手順を以下に記す。
(1f)適当な厚さの滑走路表層10を削る(図19参照)。
(2f)適量のアスファルト合成剤50を該削った後の滑走路表層10´上に塗布する(図32参照)。
(3f)塗布した該アスファルト合成剤50を加熱し、完全に該滑走路表層10´上の全ての亀裂(二次施工間隙17や亀裂18なども含む)にて溶解及び浸透させ、全ての亀裂口を封じ、貼着面54を形成する(図32参照)。
(4f)該貼着面54上に適当な厚さのアスファルト混合剤(AC)30を舗装することで、新しい滑走路表層10´とする(図34参照)。
該(3f)の手順中の全ての縦向き伸縮間隙11,人工の亀裂12,横向き伸縮間隙13,二次施工間隙17及び亀裂18などの貼着面54上には、更に防水テープ60を貼設することで(図35参照)、飛行機の離着陸や走行時などの荷重に対する反作用、もしくは天候による膨張や収縮により発生する上向き(垂直方向)の力が、該貼着面43及び防水テープ60の二重の阻隔で横向き(水平方向)の力に変換され、こうして新しく舗装されたアスファルト混合剤(AC)30が表層10´中で反射による亀裂を生まず、該貼着面54及び防水テープ60が更に防水効果を強化しており、水分Wが該地盤Aに進入するのを完全に防止しており、よって滑走路表層10´に亀裂や陥没、剥離、盛り上がり、或いは割れ片が発生することがない。
【0017】
また本発明は、飛行場の滑走路表層としての目的以外にも、新しく架設される、或いは既に使用中の橋梁の表層や路面に応用した場合も、上述同様の施工法により、同様の効果、即ち施工が簡単かつスピーディーであり、二次施工による亀裂や進水の防止、並びに剥離や陥没、盛り上がり、割れ片の発生を防止などの効果が得られる。
【0018】
【発明の効果】
本発明によると、飛行機の離着陸、或いはその他の重機の走行、駐機、そして天候の変化などの過酷な条件を克服し、特殊な材質や施工法によって滑走路表層の間隙を効果的に処理することで、表層が剥離を起したり、表面に凹凸を形成するのを防止して飛行機の安全を確保し、同時に割れ片の発生や地盤への水分の浸透が防止されていることで滑走路が疲労を起しにくく、寿命の比較的長いものとすることに成功した。
【図面の簡単な説明】
【図1】
公知の滑走路における断面図である。
【図2】
飛行場内に舗装されている滑走路中の表層ユニット断面を示す図(1)である。
【図3】
飛行場内に舗装されている滑走路中の表層ユニット断面を示す図(2)である。
【図4】
滑走路表層に立て向き伸縮間隙を切り込んだ様子を示す断面図である。
【図5】
滑走路表層に人工の亀裂を切り込んだ様子を示す断面図である。
【図6】
滑走路表層に横向き伸縮間隙を切り込んだ様子を示す断面図である。
【図7】
滑走路表層数個のブロックを切り込んだ様子を示す俯瞰図である。
【図8】
飛行場に新たに滑走路を舗装しようとする際、縦向き伸縮間隙上に防水処理を行った様子を示す断面図である。
【図9】
図8中のB−Bにおける断面図である。
【図10】
縦向き伸縮間隙と充填材料とが剥離を起し、進水するすき間が形成されている様子を示す拡大図である。
【図11】
横向き伸縮間隙と充填材料とが剥離を起し、進水するすき間が形成されている様子を示す拡大図である。
【図12】
滑走路表層中の縦向き伸縮間隙が、重量を受けて断裂した様子を示す断面図である。
【図13】
ブロック上表面に亀裂が生じた様子を説明する俯瞰図である。
【図14】
図12中の表面亀裂両側に、細いすき間を切り込んだ様子を示す図である。
【図15】
図14中のC−Cにおける断面図である。
【図16】
図15中の浅溝内に充填材料を充填した様子を示す断面図である。
【図17】
図16中の充填材料と浅溝間に二次施工間隙が形成されている様子を示す拡大図である。
【図18】
図17中の充填材料が突起した様子を示す断面図である。
【図19】
適当な厚さの滑走路表層を削って除去した様子を示す断面図である。
【図20】
適当な厚さの滑走路表層を削った上に、貼着層を噴きつけ、強化材料を貼着させた様子を示す断面図である。
【図21】
舗装後の新たな飛行場滑走路の表層上に、反射による亀裂が生じた様子を示す断面図である。
【図22】
縦向き伸縮面上に貼着面を形成させた様子を示す断面図である。
【図23】
図22中の貼着面上に防水テープを貼設した様子を示す断面図である。
【図24】
図23中の縦向き伸縮間隙内にアスファルト合成剤を充填させて封じた様子を示す断面図である。
【図25】
横向き伸縮間隙内にアスファルト合成剤を充填させて封じた様子を示す断面図である。
【図26】
ブロックの表面亀裂上に浅溝を切り込んだ様子を示す断面図である。
【図27】
図26中の浅溝上に第一貼着面を形成した様子を示す断面図である。
【図28】
図27中の第一貼着面上に防水テープを貼設した様子を示す断面図である。
【図29】
図28中の防水テープ上に第二貼着面を形成した様子を示す断面図である。
【図30】
小母材の四周にアスファルト合成剤を溶解させて浸透させた様子を示す断面図である。
【図31】
図30の小母材を図29中の浅溝内に塞入した様子を示す断面図である。
【図32】
削った後の滑走路表層上にアスファルト合成剤を敷設した様子を示す断面図である。
【図33】
図32中のアスファルト合成剤が滑走路表層上の全ての亀裂口を封じ、且つ貼着面をした様子を示す断面図である。
【図34】
図33中の貼着面上にアスファルトコンクリートを一層敷設し、新たな滑走路表層とした様子を示す断面図である。
【図35】
図33中の全ての亀裂上方の貼着面上に防水テープを貼設した後、アスファルトコンクリートを一層敷設した様子を示す断面図である。
【符号の説明】
10,10´,30´ 飛行場の滑走路の表層
101 貼着層
10A,10B 表層ユニット
11 縦向き伸縮間隙
11´,13´ 進水するすき間
111,131 間隙壁
112,132 間隙底部
113,133 間隙最上部隅肉
12 人工の亀裂
13 横向き伸縮間隙
14 ブロック
141 細いすき間
142 浅溝
14´ 表面亀裂
141´ 溝壁
142´ 溝底部
15 PE棒
16 間隙充填材
17,21 二次施工間隙
18 自然の亀裂
19 割れ片
20 充填材料
22 すき間
30 アスファルトコンクリート
31 反射間隙
40 強化材料
50,50´ アスファルト合成剤
51,54 貼着面
52 第一貼着面
53 第二貼着面
60 防水テープ
70 小母材
A 地盤
A1 空洞
W 水分
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method of treating and processing gaps and cracks in the surface of an airfield runway, and particularly when a new airfield runway is to be constructed or a runway already in use is cracked in the surface. Involved in the method of waterproofing at individual locations.
[0002]
[Prior art]
As a well-known technique, when a runway of an airfield having a length of 3000 m, a width of 60 m and a thickness of 30 cm is to be constructed at an airfield (including a place for taking off and landing of an airplane and a tarmac), the procedure is as follows. is there.
[0003]
A. As shown in FIG. 1, a surface layer 10 made of a material such as concrete (PC) or reinforced concrete (RC) is provided on the ground A.
B. As shown in FIG. 2, several surface units 10A having the same length are paved at intervals of 6 m along the runway of the airfield.
C. As shown in FIG. 3, when the concrete (PC) or reinforced concrete (RC) of the surface unit 10A is dried and hardened, several surface units 10B are paved to complete the runway surface layer 10 of the airport.
D. As shown in FIG. 4, a vertical elastic gap 11 having a depth of 3 cm and a width of 1 cm is formed in the surface layer 10 where the surface unit 10A and the surface unit B are in contact.
E. FIG. As shown in FIG. 5, an artificial crack 12 having a length equal to the length of the runway of the airfield and having a vertical length is provided on the runway surface layer 10 at regular intervals and divided into several hundreds. No irregular cracks are formed in 10.
F. As shown in FIG. 6, on the artificial crack 12, a horizontal stretching gap 13 having a depth of 3 cm and a width of 1 cm is further opened, and a cut is provided on the runway surface layer 10, and a plurality of blocks 14 are formed. (See FIG. 7). This prevents expansion and contraction due to a change in temperature after construction, and prevents the runway surface layer 10 from being uneven or damaged.
G. FIG. As shown in FIGS. 8 and 9, a PE rod 15 is provided in each of the vertical elastic gap 11 and the horizontal elastic gap 13, and a filler 16 such as PU (polyurea) is placed on the PE rod 15. Coated. In this way, all the vertical expansion gaps 11 and the horizontal expansion gaps 13 on the surface layer 10 are all filled and sealed, and the prevention process is completed.
[0004]
B. of the above procedure. And C.I. In the surface layer unit 10A and the surface layer unit 10B, since the construction is performed twice, the place where both are adjacent naturally has the secondary construction gap 17 (see FIGS. 3, 4, and 8). Has been formed and E. coli during the procedure. At the same time as the artificial crack 12 is completed, the bottom of the artificial crack 12 forms a natural crack 18 toward the ground A (see FIGS. 5, 6, and 9). The filler 16 only bonds the gap 11 to the wall surface of the horizontal expansion gap 13 and expands or contracts due to a change in weather or temperature, and the filler 16 becomes one of the vertical expansion gap 11 and the horizontal expansion gap 13 or Both cause peeling.
This is because the filler 16 is a soft material, and the surface units 10A and 10B are PC or RC rigid materials, that is, the difference between the properties of the two materials is large, and the expansion coefficients naturally differ. Therefore, the two peel off after a certain use time elapses. The vertical expansion gap 11 and the horizontal expansion gap 13 are respectively formed with gaps 11 ′ and 13 ′ (see FIGS. 10 and 11) for injecting water between the filler 16, and water W is secondary from the gap 11 ′. It enters into the construction gap 17 and further into the ground A (see FIGS. 8 and 10), or from the gap 13 ′ through the artificial cracks 12 and the cracks 18, and into the ground A (FIGS. 9 and 11). ), Aggregates such as fine soil and stone in the ground A are washed away, and a cavity A1 (see FIG. 12) is formed.
Therefore, the strength of the structure of the surface layer 10 located in the vicinity of the vertically extending and contracting gap 11 is weakened, and when landing of an airplane or other heavy equipment or the like is parked, the pressure applied from the tires causes the runway surface 10 to be damaged. Is pressed and collapsed, or cracks 19 (see broken lines in FIG. 13) are generated. The splinters 19 are cleaned by a cleaning car or a human hand. If the splinters 19 are not cleaned, it is sufficiently considered that the splinters 19 will jump up by the front wheels of the airplane and be sucked into the engine, so that the maintenance is performed. Not only is it expensive, but it can also lead to fatal accidents.
[0005]
These known fillers 16 do not completely penetrate into the pores of the vertically and horizontally stretchable gaps 11 and 13, so that they tend to peel off during expansion and contraction, and cause loss of the waterproof function. It has become one of. Therefore, when the time elapses, the vertical and horizontal expansion gaps 11 and 13 change into a main route for the water W to enter the ground A and corrode, so that a certain time elapses in the filler 16. A method of filling each time with a new one is adopted, thereby preventing the ground A from being corroded.
In addition, F.D. In the place where the vertical and horizontal expansion gaps 11 and 13 on the block 14 are adjacent to each other (see FIG. 14), the ground A is inevitably the fastest place for the aggregate to flow away. On the blocks 14 adjacent to the vertical and horizontal expansion gaps 11 and 13, cracks 14 ′ are most likely to be formed in the surface layer. It shortens the service life. The following is a list of repairing methods that have already been implemented to prevent this.
[0006]
a1. As shown in FIG. 14, narrow gaps 141 are previously provided on the blocks 14 on both sides of the surface crack 14 '.
a2. As shown in FIG. 15, the surface layer 10 between the two narrow gaps 141 is shaved to form a shallow groove 142 having a width of 30 cm and a depth of 10 cm.
a3. As shown in FIG. 16, a filling material 20 obtained by wetting and stirring a material such as an epoxy resin quartz sand, a cement concrete, and a fast-setting cement is applied in the shallow groove 142 to be flattened, and the surface crack 14 'is formed. Repair work.
[0007]
However, according to the method described above, the procedure a3. The filling material 20 filled in the shallow groove 142 is a mixture of epoxy resin quartz sand, cement concrete, fast-setting cement, and the like. The material of the surface layer 10 on both sides and the bottom of the shallow groove 142 is concrete (PC) or reinforced concrete ( RC), the difference in the expansion coefficient is large due to the difference in the material. Naturally, after a certain period of time, the two different materials are not dense due to the difference in their expansion and contraction, and the joint is not dense. A secondary working gap 21 (see FIG. 17) is formed between the bottom 20 and both sides of the shallow groove 10 and the bottom. Therefore, the moisture W enters the crack 14 ′ on the bottom surface of the shallow groove 142 from the two-time gap 21, and further flows into the ground A through the crack 14 ′ on the surface. Further, as shown in FIG. 18, the filling material 20 is pressed by the expansion of the four circumferential wall surfaces of the shallow groove 142 and then peels off, and a gap 23 is formed at the bottom of the shallow groove 142. The material 20 bulges upward and protrudes on the runway surface layer 10, causing punctures in tires such as airplanes and other heavy equipment running at high speed.
As described above, in the case where the number of surface cracks 14 'on the blocks 14 in the runway surface layer 10 increases, a method of entirely renewing the surface layer 10 will be adopted. The method is described below.
[0008]
b1. As shown in FIG. 19, the runway surface layer 10 of the airfield is shaved downward with a thickness of about 10 cm.
b2. Further, asphalt is sprayed on the surface layer 10 ′ after the shaving to form an adhesive layer 101.
b3. An asphalt concrete (AC) 30 having a thickness of about 5 cm is first laid on the adhesive layer 101, and PRF (Pavement Reinforcing Fabrics), which is a reinforcing material such as a polypropylene or polyester fiber net material, is laid on the asphalt concrete (AC) 30. 40 are provided.
b4. Finally, an asphalt concrete (AC) 30 having a thickness of about 5 cm is laid on the reinforcing material 40 to complete a new runway surface layer 30 '(see FIG. 20).
[0009]
[Problems to be solved by the invention]
As a disadvantage of the above-described method, a secondary working gap 17 or a natural crack 18 is also present in the old block 14 at the bottom of the surface layer 30 ′. Since the work is not performed, it can be said that the secondary construction gap 17 and the natural crack 18 generate a crack toward the new surface layer 30 ′ due to expansion and contraction due to gravity and weather change due to takeoff and landing of the airplane. .
If the usage time exceeds a certain period of time, the new surface layer 30 ′ also generates a gap 31 (see FIG. 20) due to these results, and the moisture W directly enters the ground A from the gap 31, causing a cavity or the like. The depression due to the rupture is gradually formed. Finally, the width of the gap 31 is further increased to generate a crack 19, and as a result, the service life of the surface layer 30 'is shortened.
Therefore, in order to prevent moisture from penetrating into the ground from cracks and gaps on the runway surface, prevent the generation of cracks, and secure the safety of airplane takeoff and landing and traveling, gaps and cracks in the runway surface of the airfield To provide processing and construction methods.
[0010]
[Means for Solving the Problems]
First, the crack surface prepared for construction was heated to rapidly dehydrate and dry and expand the pores, an appropriate amount of asphalt synthesizing agent was applied on the crack surface, and further cracking was caused by heating on the asphalt synthesizing agent. A soft surface that completely dissolves and penetrates into the pores on the surface, fills the cracks and completely seals them, and does not peel off on the cracks even if it expands and contracts due to a change in temperature. And completely shut out to prevent moisture from entering the ground on the soft surface.
[0011]
DETAILED DESCRIPTION OF THE INVENTION
First, the asphalt synthesizing agent used in the present invention is a mixture of straight asphalt and blown asphalt (Blown Asphalt) at an appropriate ratio depending on conditions such as room temperature in a construction area. Occasionally, it exhibits the solubility and permeability of the parent material and the small parent material into the pores, and the adhesiveness that seals the gap between the surface layers of the parent material, and further enhances the sealing of the gap and the adhesion of the surface layer. Adhesiveness is provided by attaching a waterproof tape as much as possible. At room temperature, having elasticity provides drainage and antiseptic properties so that the surface layer can be stably paved with the building material.
[0012]
The construction method in the present invention is described below.
(1) First, the surface of the gap to be constructed is heated, and the surface of the gap is rapidly dehydrated and dried to expand the pores.
(2) Next, an appropriate amount of asphalt synthesizing agent 50 is applied to the gap surface after the heat treatment.
(3) Further heating is performed from above the applied asphalt synthetic agent 50 to completely dissolve and penetrate into the pores of the gap surface, and completely fill the gap opening without any gap. And
Prior to the start of the procedure (1), it is desirable to perform operations such as cutting, shaving, polishing, and cleaning.
[0013]
The construction procedure in the vertical stretch gap 11, the horizontal stretch gap 13, the surface layer crack 14 'of the block 14, and the resurfacing of the runway surface layer 10 in the runway surface layer 10 of the airfield will be described below.
As shown in FIG. 22 to FIG. 24, the procedure in the case of processing the vertical stretch gap 11 in the runway surface layer 10 according to the present invention is as follows.
(1c) The surface of the vertical stretching gap 11 is heated from above, and the surface of the gap 11 is rapidly dehydrated and dried to expand the pores.
(2c) Apply an appropriate amount of asphalt synthesizing agent 50 on the surface of the vertically stretched gap 11 after the heating.
(3c) Further heating from above the asphalt synthetic agent 50 paved in the step (2c), the inside of the pores of the gap wall 111, the gap bottom 112, and the gap top 113 of the vertical stretching gap 11, It is dissolved and penetrated in the working gap 17, and the gap opening of the secondary working gap 17 is completely sealed by filling to form the sticking surface 51 (see FIG. 22).
(4c) A waterproof tape 60 is attached on the attaching surface 51 (see FIG. 23).
(5c) A high-temperature asphalt mixture 50 'is injected into the vertically extending and contracting gap 11 and reaches the uppermost portion of the gap opening, whereby the whole is joined and integrated (see FIG. 24).
The asphalt synthesizing agent 50 ′ and the attaching surface 51 are made of the same material, and the attaching surface attaching surface 51 is completely formed of the gap wall 111, the gap bottom portion 112, and the fillet 113 of the vertical elastic gap 11. Because it penetrates into the pores, it expands as the temperature rises, or even when the temperature rises and shrinks, the asphalt synthetic agent 50 'does not peel off from the sticking surface 51, and Since the elastic gap 11 and the secondary working gap 17 are all completely sealed by the asphalt synthetic agents 50 and 50 ′ and the waterproof tape 60, the gap wall 111, the gap bottom 112, and the corner of the vertical elastic gap 11 are formed. There is no gap between the meats 113 so as to be submerged, that is, water cannot enter the ground A, and fine aggregates in the ground A flow away to form the cavity A1. It becomes strange. Furthermore, since the sticking surface 51 covers the fillet 113, even when a heavy machine such as an airplane runs through the vertically extending and contracting gap 11, the crack 19 is not generated by the pressing gravity, Accidents caused by cracks on the engine of the airplane are prevented.
[0014]
As shown in FIG. 25, a procedure for processing the lateral expansion gap 13 in the runway surface layer 10 according to the present invention will be described below.
(1d) The surface of the horizontal expansion gap 13 is heated from above, and the surface of the gap 13 is rapidly dehydrated and dried to expand the pores.
(2d) Apply an appropriate amount of asphalt synthesizing agent 50 on the surface of the horizontal stretching gap 13 after the heating.
(3d) Further heating from above the asphalt synthetic agent 50 applied in the procedure of (2d), the inside of the pores 131 of the horizontal expansion gap 13, the gap bottom 132 and the fillet 133 and the artificial crack 12 The artificial cracks 12 are completely dissolved and penetrated therein, and the cracks of the artificial cracks 12 are sealed by filling to form a sticking surface 51.
(4d) A waterproof tape 60 is attached on the attachment surface 51.
(5d) A high-temperature asphalt synthetic agent 50 ′ is injected into the laterally stretchable gap 13 to reach the uppermost portion of the gap, whereby the whole is joined and integrated.
The procedure of the horizontal expansion / contraction gap 13 is the same as that of the vertical expansion / contraction gap 11, and similarly, the gap between the gap wall 131, the gap bottom 132, and the fillet 133 of the horizontal expansion / contraction gap 13 is also effective. Is completely absent and water does not penetrate, so that it is impossible for water to enter the ground A, thereby preventing the formation of a cavity A1 in fine aggregate in the ground A. Also, as described above, the generation of cracks 19 due to the traveling of heavy equipment such as an airplane is also prevented, thereby preventing the engine of the airplane from inhaling the cracks 19 and suffering damage such as an accident. Is done.
[0015]
As shown in FIGS. 15 and 16 and FIGS. 26 and 32, a procedure for processing a crack 14 'in the runway surface layer 10 according to the present invention will be described.
(1e) Cut out narrow gaps 141 (see FIG. 14) on the blocks 14 on both sides of the cracks 14 ′ of the runway surface layer 10, and cut the runway surface layer 10 between the gaps 141 to obtain an appropriate width. And a shallow groove 142 (see FIG. 15) having a depth equal to that of the first groove 142, and dust in the shallow groove 142 is removed.
(2e) By heating from above the shallow groove 142, the groove wall 141 'and the groove bottom 142' are dehydrated and dried to expand the pores (see FIG. 26).
(3e) An appropriate amount of asphalt synthetic agent 50 is applied to the surface of the groove wall 141 'on the shallow groove 142 and the surface of the groove bottom 142' after heating.
(4e) Further, the asphalt synthetic agent 50 after paving in the step (3e) is heated to dissolve in the pores 141 ′ of the shallow groove 142 and the pores of the groove bottom 142 ′ and in the surface crack 14 ′. (See FIG. 27) to seal the cracks of the surface cracks 14 ′ to form the first attachment surface 52.
(5e) A waterproof tape 60 is attached on the first attaching surface 52 (see FIG. 28).
(6e) The asphalt synthetic agent 50 is heated and applied on the waterproof tape 60 to form a second attaching surface 53 on the waterproof tape 60 (see FIG. 29).
(7e) A small base material 70 having a volume substantially equal to that of the shallow groove 142 is provided, and the four circumferential surfaces of the small base material 70 are heated to expand the pores on the surface. (See FIG. 30).
(8e) The asphalt synthetic agent 50 on the small base material 70 and the second attachment surface 53 of the shallow groove 142 are heated, and the small base material 70 is placed on the second attachment surface 53 on the shallow groove 142. And the small base material 70 is tightly coupled with the second attaching surface 53 on the shallow groove 142 (see FIG. 32).
Since the asphalt synthetic agent 50 on the small base material 70 and the asphalt synthetic agent 50 on the second attaching surface 53 are of the same material, they are melted and integrated, and the small base material 70 is After being occupied and joined, it does not expand or contract due to a change in temperature or the like after construction. That is, phenomena such as separation of the secondary working gap 21 and the filling material 20 which are problems with the known technology are prevented (see FIG. 18), and tires of a vehicle or an airplane running at high speed are prevented from being punctured. You.
[0016]
As shown in FIG. 19 and FIGS. 32 to 35, a construction procedure for re-paving the runway surface layer 10 according to the present invention will be described below.
(1f) The runway surface layer 10 having an appropriate thickness is shaved (see FIG. 19).
(2f) An appropriate amount of asphalt synthetic agent 50 is applied on the runway surface layer 10 'after the shaving (see FIG. 32).
(3f) The applied asphalt synthetic agent 50 is heated and completely dissolved and penetrated in all cracks (including the secondary construction gap 17 and the cracks 18) on the runway surface layer 10 ', and all the cracks The mouth is sealed to form an attachment surface 54 (see FIG. 32).
(4f) A new runway surface layer 10 'is formed by paving an asphalt mixture (AC) 30 having an appropriate thickness on the attachment surface 54 (see FIG. 34).
A waterproof tape 60 is further applied on the adhering surfaces 54 such as the vertical expansion gap 11, the artificial crack 12, the horizontal expansion gap 13, the secondary construction gap 17, and the crack 18 during the procedure of (3f). (See FIG. 35), an upward (vertical) force generated by the reaction to the load during take-off and landing or running of the airplane, or the expansion or contraction due to the weather causes the sticking surface 43 and the waterproof tape 60 to It is converted into a lateral (horizontal) force by the double barrier, so that the newly paved asphalt mixture (AC) 30 does not crack by reflection in the surface layer 10 ′, the adhesive surface 54 and the waterproof tape 60. Further enhances the waterproofing effect and completely prevents the water W from entering the ground A, thereby causing cracks, sinking, peeling, swelling, or cracks on the runway surface layer 10 '. There is no .
[0017]
In addition to the purpose of the present invention as a runway surface layer of an airfield, even when applied to a newly erected or already used bridge surface layer or road surface, the same effect as described above, The construction is simple and speedy, and effects such as prevention of cracks and launching due to secondary construction, and prevention of peeling, depression, swelling, and generation of cracks are obtained.
[0018]
【The invention's effect】
According to the present invention, it is possible to overcome severe conditions such as takeoff and landing of an airplane or other heavy equipment traveling, parking, and weather change, and to effectively treat a gap of a runway surface layer by a special material and construction method. As a result, the surface layer is prevented from peeling off and unevenness is formed on the surface, ensuring the safety of the aircraft, and at the same time preventing the generation of cracks and the penetration of moisture into the ground, the runway Have less fatigue and have a relatively long life.
[Brief description of the drawings]
FIG.
It is sectional drawing in a known runway.
FIG. 2
It is a figure (1) which shows the surface unit cross section in the runway paved in the airport.
FIG. 3
It is a figure (2) which shows the surface unit cross section in the runway paved in the airport.
FIG. 4
It is sectional drawing which shows a mode that the vertical expansion gap was cut in the runway surface layer.
FIG. 5
It is sectional drawing which shows a mode that the artificial crack was cut in the runway surface layer.
FIG. 6
It is sectional drawing which shows a mode that the horizontal expansion gap was cut in the runway surface layer.
FIG. 7
It is an overhead view which shows the mode which cut in several blocks of the runway surface layer.
FIG. 8
It is sectional drawing which shows a mode that waterproof processing was performed on the vertical expansion-contraction gap at the time of paving a runway newly at an airport.
FIG. 9
It is sectional drawing in BB in FIG.
FIG. 10
FIG. 4 is an enlarged view showing a state in which a vertically extending elastic gap and a filling material are separated from each other, and a gap for launching water is formed.
FIG. 11
FIG. 4 is an enlarged view showing a state in which a horizontal expansion gap and a filler material are separated from each other, and a gap for launching water is formed.
FIG.
It is sectional drawing which shows the mode that the vertical expansion-contraction gap in the runway surface layer was torn under the weight.
FIG. 13
FIG. 4 is an overhead view illustrating a state in which a crack has occurred on the upper surface of the block.
FIG. 14
It is a figure which shows a mode that the narrow gap was cut in both sides of the surface crack in FIG.
FIG.
It is sectional drawing in CC in FIG.
FIG.
FIG. 16 is a cross-sectional view illustrating a state where a filling material is filled in the shallow groove in FIG. 15.
FIG.
FIG. 17 is an enlarged view showing a state in which a secondary working gap is formed between a filling material and a shallow groove in FIG. 16.
FIG.
FIG. 18 is a cross-sectional view showing a state in which the filling material in FIG. 17 protrudes.
FIG.
It is sectional drawing which shows a mode that the runway surface layer of suitable thickness was shaved and removed.
FIG.
FIG. 3 is a cross-sectional view showing a state in which a runway surface layer having an appropriate thickness is shaved, an adhesive layer is sprayed, and a reinforcing material is applied.
FIG. 21
It is sectional drawing which shows a mode that the crack by reflection occurred on the surface layer of the new airfield runway after paving.
FIG.
It is sectional drawing which shows a mode that the sticking surface was formed on the vertical expansion-contraction surface.
FIG. 23
FIG. 23 is a cross-sectional view showing a state in which a waterproof tape is stuck on the sticking surface in FIG. 22.
FIG. 24
FIG. 24 is a cross-sectional view showing a state in which the vertically extending elastic gap in FIG. 23 is filled with an asphalt synthetic agent and sealed.
FIG. 25
It is sectional drawing which shows a mode that the asphalt synthetic agent was filled and sealed in the horizontal expansion gap.
FIG. 26
It is sectional drawing which shows the mode that the shallow groove was cut in on the surface crack of the block.
FIG. 27
FIG. 27 is a cross-sectional view showing a state where a first attaching surface is formed on a shallow groove in FIG. 26.
FIG. 28
It is sectional drawing which shows a mode that the waterproof tape was stuck on the 1st sticking surface in FIG.
FIG. 29
FIG. 29 is a cross-sectional view illustrating a state where a second attaching surface is formed on the waterproof tape in FIG. 28.
FIG. 30
It is sectional drawing which shows a mode that the asphalt synthetic agent was melt | dissolved and infiltrated into four circumferences of the small base material.
FIG. 31
FIG. 31 is a cross-sectional view showing a state where the small base material of FIG. 30 is inserted into a shallow groove in FIG. 29.
FIG. 32
It is sectional drawing which shows a mode that the asphalt synthetic agent was laid on the runway surface layer after shaving.
FIG. 33
FIG. 33 is a cross-sectional view showing a state in which the asphalt synthetic agent in FIG. 32 has sealed all cracks on the runway surface layer and has a sticking surface.
FIG. 34
FIG. 34 is a cross-sectional view showing a state in which one layer of asphalt concrete is laid on the sticking surface in FIG. 33 to form a new runway surface layer.
FIG. 35
FIG. 34 is a cross-sectional view showing a state in which a layer of asphalt concrete is laid after a waterproof tape is stuck on the stuck surfaces above all cracks in FIG. 33.
[Explanation of symbols]
10, 10 ', 30' Airfield runway surface layer 101 Adhesive layers 10A, 10B Surface layer unit 11 Vertically stretchable gaps 11 ', 13' Launch gaps 111, 131 Gap walls 112, 132 Gap bottoms 113, 133 Gap Top fillet 12 Artificial crack 13 Lateral stretching gap 14 Block 141 Thin gap 142 Shallow groove 14 ′ Surface crack 141 ′ Groove wall 142 ′ Groove bottom 15 PE rod 16 Gap filler 17, 21 Secondary construction gap 18 Natural crack 19 Fragment 20 Filling material 22 Gap 30 Asphalt concrete 31 Reflection gap 40 Reinforcement material 50, 50 'Asphalt synthetic agent 51, 54 Sticking surface 52 First sticking surface 53 Second sticking surface 60 Waterproof tape 70 Small base material A Ground A1 Cavity W Moisture

Claims (11)

飛行場の滑走路表層中の間隙や亀裂における処理施工法において、
手順1.施工しようとする亀裂表面に加熱処理を加え、該亀裂表面を急速脱水して毛細孔を拡張させ、
手順2.適量のアスファルト合成剤を該加熱後の亀裂表面上に塗布し、
手順3.更に該塗布されたアスファルト合成剤を加熱して、該亀裂表面の毛細孔内にて該アスファルト合成剤が完全に溶解及び浸透し、該亀裂口を完全に封じる、
上述の各手順を含むことを特徴とする飛行場の滑走路表層中の間隙や亀裂における処理施工法。
In the processing method for gaps and cracks in the runway surface of the airport,
Procedure 1. Heat treatment is applied to the crack surface to be constructed, the crack surface is rapidly dehydrated to expand the pores,
Procedure 2. Apply an appropriate amount of asphalt synthesizing agent on the crack surface after heating,
Procedure 3. Further heating the applied asphalt synthesizing agent, the asphalt synthesizing agent completely dissolves and penetrates into the pores of the crack surface, completely closing the crack opening,
A method for treating and processing gaps and cracks in a runway surface of an airfield, comprising the steps described above.
該手順1実行前には予め適宜に、切り込み、削り、研磨、清掃などの手順を行っておくことを特徴とする請求項1記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。2. The method according to claim 1, wherein a procedure such as cutting, shaving, polishing, and cleaning is appropriately performed before executing the procedure 1. 該飛行場の滑走路表層の縦向き伸縮間隙を処理する際には、
1c.縦向き伸縮間隙の表面上より加熱し、該縦向き伸縮間隙の表面を急速脱水して毛細孔を拡張させ、
2c.適量のアスファルト合成剤を該加熱後の縦向き伸縮間隙表面上に塗布し、
3c.更に該手順2c.で塗布したアスファルト合成剤上より加熱することで、該アスファルト合成剤を該縦向き伸縮間隙の壁面及び底部及び上部の隅肉個所の毛細孔と二次施工間隙にて溶解及び浸入させ、該二時施工間隙の間隙口を封じ、また貼着面を形成し、
4c.該貼着面上に防水テープを貼設し、
5c.高温に熱したアスファルト合成剤を該間隙口に至るまで該縦向き伸縮間隙中に注入し、相互に貼着させて結合させる、
上述の各手順を含むことを特徴とする請求項1記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
When processing the vertical stretch gap of the runway surface of the airfield,
1c. Heating from the surface of the vertical stretching gap, rapidly dehydrating the surface of the vertical stretching gap to expand the pores,
2c. Apply an appropriate amount of asphalt synthetic agent on the surface of the vertically stretched gap after heating,
3c. Further, the procedure 2c. By heating from above the asphalt synthetic agent applied in step 2, the asphalt synthetic agent dissolves and penetrates into the wall of the vertical expansion and contraction gap and the pores at the bottom and top fillet in the secondary construction gap, Seals the opening of the time work gap, forms a sticking surface,
4c. Paste a waterproof tape on the sticking surface,
5c. Injecting the asphalt synthetic agent heated to a high temperature into the vertically extending and contracting gap up to the opening of the gap, sticking and bonding each other,
The method for treating and processing a gap or a crack in a surface of a runway of an airfield according to claim 1, comprising each of the above procedures.
飛行場の滑走路表層中の横向き伸縮間隙を処理する際には、
1d.横向き伸縮間隙の表面上より加熱し、該縦向き伸縮間隙の表面を急速脱水して毛細孔を拡張させ、
2d.適量のアスファルト合成剤を該加熱後の横向き伸縮間隙表面上に塗布し、
3d.更に該手順2d.で塗布したアスファルト合成剤上より加熱することで、該アスファルト合成剤を該横向き伸縮間隙の壁面及び底部及び上部の隅肉個所の毛細孔と人工の亀裂にて溶解及び浸入させ、人工の亀裂の間隙口を封じ、また貼着面を形成し、
4d. 該貼着面上に防水テープを貼設し、
5d.高温に熱したアスファルト合成剤を該間隙口に至るまで該横向き伸縮間隙中に注入し、相互に貼着させて結合させる、
上述の各手順を含むことを特徴とする請求項1記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
When processing the lateral expansion gap in the airfield runway surface,
1d. Heating from the surface of the horizontal stretching gap, rapidly dehydrating the surface of the vertical stretching gap to expand the pores,
2d. Applying an appropriate amount of asphalt synthetic agent on the surface of the horizontal stretch gap after heating,
3d. Further, the procedure 2d. By heating from above the asphalt synthesizing agent applied in the above, the asphalt synthesizing agent is dissolved and penetrated by the artificial cracks and the pores of the wall of the horizontal stretching gap and the bottom and the fillet portion of the upper fillet, and the artificial cracks Seals the opening of the gap and forms a sticking surface,
4d. Paste a waterproof tape on the sticking surface,
5d. Injecting the asphalt synthetic agent heated to a high temperature into the horizontally extending and contracting gap up to the opening of the gap, sticking and bonding each other,
The method for treating and processing a gap or a crack in a surface of a runway of an airfield according to claim 1, comprising each of the above procedures.
飛行場の滑走路表層中の表面亀裂を処理する際の手順は、
1e.該飛行場滑走路表面の亀裂の両側面のブロック上に、それぞれ細いすき間を設け、該二本の細いすき間の間の表層を削り、適当な幅及び深さの浅溝を形成し、該浅溝中の屑を取り除き、
2e.該浅溝上より加熱することで、溝壁と溝底部を脱水乾燥して毛細孔を拡張させ、
3e.適量のアスファルト合成剤を該加熱後の浅溝の溝壁と溝底表面上に塗布し、
4e.更に該手順3eで塗布されたアスファルト合成剤上より加熱し、該浅溝の溝壁と溝底部の毛細孔と表面の亀裂中にて該アスファルト合成剤を溶解及び浸入させて該表面亀裂の亀裂口を塞ぎ、また第一貼着面を形成し、
5e.該貼着面上に防止テープを貼設し、
6e.アスファルト合成剤を加熱して該防水テープ上に塗布し、該防水テープ上に第二貼着面を形成し、
7e.該浅溝と体積が等しい小母材を準備しておき、該小母材の四周表面を加熱することで毛細孔を拡張させ、該アスファルト合成剤を該小母材の表層毛細孔中に溶解させて浸入させ、
8e.該小母材上のアスファルト合成剤及び該浅溝の第二貼着面を加熱した後、該小母材を該浅溝の第二貼着面上に塞入し、該小母材を該浅溝上の第二貼着面上に密に結合させる、
上述の各手順を含むことを特徴とする請求項1記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
The procedure for treating surface cracks in the airfield runway surface is:
1e. A narrow gap is provided on each of the blocks on both sides of the crack on the airfield runway surface, a surface layer between the two narrow gaps is cut, and a shallow groove having an appropriate width and depth is formed. Remove the debris inside,
2e. By heating from above the shallow groove, the groove wall and groove bottom are dehydrated and dried to expand the pores,
3e. Apply an appropriate amount of asphalt synthetic agent on the groove wall and groove bottom surface of the heated shallow groove,
4e. Further, the asphalt synthesizing agent is heated from above the asphalt synthesizing agent applied in the step 3e, and the asphalt synthesizing agent is dissolved and penetrated into the pores of the shallow groove wall, the pores at the bottom of the groove, and the surface cracks to crack the surface crack. Closes the mouth and forms the first sticking surface,
5e. Pasting a prevention tape on the sticking surface,
6e. Heating the asphalt synthetic agent and applying it on the waterproof tape, forming a second adhesive surface on the waterproof tape,
7e. A small base material having the same volume as the shallow groove is prepared, and the pores are expanded by heating the four peripheral surfaces of the small base material, and the asphalt synthetic agent is dissolved in the surface pores of the small base material. Let it penetrate,
8e. After heating the asphalt synthetic agent on the small base material and the second attachment surface of the shallow groove, the small base material is inserted into the second attachment surface of the shallow groove, and the small base material is Tightly bonded on the second sticking surface on the shallow groove,
The method for treating and processing a gap or a crack in a surface of a runway of an airfield according to claim 1, comprising each of the above procedures.
飛行場滑走路表面の亀裂を処理する際における施工手順は、
1e.該飛行場滑走路表面の亀裂の両側面のブロック上に、それぞれ細いすき間を設け、該二本の細いすき間間の表層を削り、適当な幅且つ深さの浅溝を形成し、該浅溝中の屑を取り除き、
2e.該浅溝上より加熱することで、溝壁と溝底部を脱水乾燥して毛細孔を拡張させ、
3e.適量のアスファルト合成剤を該加熱後の浅溝の溝壁と溝底表面上に塗布し、
4e.更に該手順3eで塗布されたアスファルト合成剤上より加熱し、該浅溝の溝壁と溝底部の毛細孔と表面の亀裂中にて該アスファルト合成剤を溶解及び浸入させ、該表面亀裂の亀裂口を塞ぎ、また第一貼着面を形成し、
5e.該貼着面上に防止テープを貼設し、
6e.アスファルト合成剤を加熱して該防水テープ上に塗布し、該防水テープ上に第二貼着面を形成し、
7e.該浅溝と体積が等しい小母材を準備しておき、該小母材の四周表面を加熱することで毛細孔を拡張させ、該アスファルト合成剤を該小母材の表層毛細孔中に溶解させて浸入させ、
8e.該小母材上のアスファルト合成剤及び該浅溝の第二貼着面を加熱した後、該小母材を該浅溝の第二貼着面上に塞入し、該小母材を該浅溝上の第二貼着面上に密に結合させる、
上述の各手順を含むことを特徴とする請求項2記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
The construction procedure for treating cracks on the airfield runway surface is as follows:
1e. A narrow gap is provided on each of the blocks on both sides of the crack on the airfield runway surface, a surface layer between the two narrow gaps is cut, and a shallow groove having an appropriate width and depth is formed. Remove the waste
2e. By heating from above the shallow groove, the groove wall and groove bottom are dehydrated and dried to expand the pores,
3e. Apply an appropriate amount of asphalt synthetic agent on the groove wall and groove bottom surface of the heated shallow groove,
4e. Further, the asphalt synthesizing agent is heated from above the asphalt synthesizing agent applied in the step 3e, and the asphalt synthesizing agent is dissolved and penetrated into the pores of the shallow groove wall, the pores at the bottom of the groove and the surface cracks, and the cracks of the surface crack Closes the mouth and forms the first sticking surface,
5e. Pasting a prevention tape on the sticking surface,
6e. Heating the asphalt synthetic agent and applying it on the waterproof tape, forming a second adhesive surface on the waterproof tape,
7e. A small base material having the same volume as the shallow groove is prepared, and the pores are expanded by heating the four peripheral surfaces of the small base material, and the asphalt synthetic agent is dissolved in the surface pores of the small base material. Let it penetrate,
8e. After heating the asphalt synthetic agent on the small base material and the second attachment surface of the shallow groove, the small base material is inserted into the second attachment surface of the shallow groove, and the small base material is Tightly bonded on the second sticking surface on the shallow groove,
3. The method according to claim 2, further comprising the steps of: performing a process on a gap or a crack in a runway surface of an airfield.
飛行場の滑走路表層を新たに舗装する際における施工手順には、
1f.適当な厚さで飛行場の滑走路表層を削り、
2f.適量のアスファルト合成剤を該削った後の滑走路表層上に塗布し、
3f.該塗布されたアスファルト合成剤上より加熱し、該アスファルト合成剤を完全に該表層上にて溶解、並びに該表層上全ての亀裂表面の毛細孔内に浸透させ、全ての亀裂口を封じ、更に貼着面を形成し、
4f.適当な厚さのアスファルト合成剤(AC)を該貼着面上に塗布して舗装とする、
上述の各手順を含むことを特徴とする請求項1記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
Construction procedures when paving the airfield runway surface newly include:
1f. Shaving the runway surface of the airfield with an appropriate thickness,
2f. Apply an appropriate amount of asphalt synthetic agent on the runway surface after shaving,
3f. The applied asphalt synthesizing agent is heated from above, completely dissolving the asphalt synthesizing agent on the surface layer, and penetrating into pores on all crack surfaces on the surface layer, sealing all crack openings, Form the sticking surface,
4f. An asphalt synthetic agent (AC) having an appropriate thickness is applied on the application surface to form a pavement,
The method for treating and processing a gap or a crack in a surface of a runway of an airfield according to claim 1, comprising each of the above procedures.
飛行場の滑走路表層を新たに舗装する際における施工手順は、
1f.適当な厚さで飛行場の滑走路表層を削り、
2f.適量のアスファルト合成剤を該削った後の滑走路表層上に塗布し、
3f.該塗布されたアスファルト合成剤上より加熱し、該アスファルト合成剤を完全に該表層上にて溶解、並びに該表層上全ての亀裂表面の毛細孔内に浸透させ、全ての亀裂口を封じ、更に貼着面を形成し、
4f.適当な厚さのアスファルト合成剤(AC)を該貼着面上に塗布して舗装とする、
上述の各手順を含むことを特徴とする請求項2記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
The construction procedure when paving the airfield runway surface newly,
1f. Shaving the runway surface of the airfield with an appropriate thickness,
2f. Apply an appropriate amount of asphalt synthetic agent on the runway surface after shaving,
3f. The applied asphalt synthesizing agent is heated from above, completely dissolving the asphalt synthesizing agent on the surface layer, and penetrating into pores on all crack surfaces on the surface layer, sealing all crack openings, Form the sticking surface,
4f. An asphalt synthetic agent (AC) having an appropriate thickness is applied on the application surface to form a pavement,
3. The method according to claim 2, further comprising the steps of: performing a process on a gap or a crack in a runway surface of an airfield.
該手順3f.中の全ての縦向き及び横向き伸縮間隙、並びに人工の亀裂、二次施工間隙、自然の亀裂などの貼着面上には更に防水テープが貼設されることを特徴とする請求項7記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。The procedure 3f. 8. The waterproof tape according to claim 7, wherein a waterproof tape is further applied on all the vertical and horizontal expansion gaps therein, as well as on the attachment surfaces of artificial cracks, secondary construction gaps, natural cracks, and the like. Processing method for gaps and cracks in the airfield runway surface. 該手順3f.中の全ての縦向き及び横向き伸縮間隙、並びに人工の亀裂、二次施工間隙、自然の亀裂などの貼着面上には更に防水テープが貼設されることを特徴とする請求項8記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。The procedure 3f. 9. The waterproof tape according to claim 8, wherein all the vertical and horizontal expansion gaps therein, as well as artificial cracks, secondary construction gaps, natural cracks, etc., are pasted on a sticking surface. Processing method for gaps and cracks in the airfield runway surface. 該アスファルト合成剤は、ストレートアスファルト(Straight Asphalt)とブローンアスファルト(Blown Asphalt)とが適度な比率で調整されているものであることより、
高温時には可溶性(バーニングポイント250℃),浸透性(母材の毛細孔内に浸透),並びに溶接性(防水テープと貼着することによる亀裂封じと建材との結合性の強化)、常温時の弾性(表層に舗装された建材の安定した結合)、並びに防水性と耐食性を具有することを特徴とする請求項1から請求項10記載の飛行場の滑走路表層中の間隙や亀裂における処理施工法。
The asphalt synthesizing agent is one in which straight asphalt and blown asphalt are adjusted at an appropriate ratio.
Soluble at high temperature (burning point 250 ° C), permeability (penetration into pores of base material), and weldability (enhancement of crack sealing and bonding with building material by sticking with waterproof tape), at room temperature 11. The method for treating and treating gaps and cracks in a runway surface of an airfield according to claim 1, wherein the method has elasticity (stable bonding of building materials paved on a surface layer) and waterproofness and corrosion resistance. .
JP2002543107A 2000-11-14 2000-11-14 Processing method for gaps and cracks in the airfield runway surface Pending JP2004514077A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2000/030137 WO2002040806A2 (en) 2000-11-14 2000-11-14 Processes of finishing slits of surface layer of airplane runway

Publications (1)

Publication Number Publication Date
JP2004514077A true JP2004514077A (en) 2004-05-13

Family

ID=21741950

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002543107A Pending JP2004514077A (en) 2000-11-14 2000-11-14 Processing method for gaps and cracks in the airfield runway surface

Country Status (11)

Country Link
EP (1) EP1337711B8 (en)
JP (1) JP2004514077A (en)
CN (1) CN1479826A (en)
AT (1) ATE374865T1 (en)
AU (1) AU2001217544A1 (en)
BR (1) BR0017373A (en)
CA (1) CA2428367C (en)
DE (1) DE60036648D1 (en)
IL (1) IL155877A0 (en)
MX (1) MXPA03004260A (en)
WO (1) WO2002040806A2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101178520B1 (en) 2010-02-04 2012-08-30 (주)지케이 A reparing method of road
JP2020183695A (en) * 2019-04-26 2020-11-12 ジオ・サーチ株式会社 Road surface reinforcement method

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1598504A3 (en) * 2004-05-21 2006-05-10 Gerd Pleyers Method for protecting and for restoring construction elements subject to cracks like reinforced concrete elements
EP1953308A1 (en) * 2007-01-31 2008-08-06 Sika Technology AG Method for installing a floor covering on a floor
US8562247B2 (en) 2009-01-02 2013-10-22 Heatwurx, Inc. Asphalt repair system and method
US8556536B2 (en) 2009-01-02 2013-10-15 Heatwurx, Inc. Asphalt repair system and method
US8801325B1 (en) 2013-02-26 2014-08-12 Heatwurx, Inc. System and method for controlling an asphalt repair apparatus
US9416499B2 (en) 2009-12-31 2016-08-16 Heatwurx, Inc. System and method for sensing and managing pothole location and pothole characteristics
CN102505606B (en) * 2011-10-31 2014-09-17 湖南云中沥青有限责任公司 Processing method for cracks when asphalt layer is additionally paved on cement road surface
CN102828607B (en) * 2012-09-25 2014-07-09 湖南交泰建材有限公司 Grinding and polishing technology of concrete terrace
CN102966049B (en) * 2012-11-28 2014-11-12 华南理工大学 Method for treating vertical crack of reinforced concrete bridge abutment
CN103114517B (en) * 2013-02-07 2015-04-15 东南大学 Handheld dual-component encapsulation material injector
USD700633S1 (en) 2013-07-26 2014-03-04 Heatwurx, Inc. Asphalt repair device
CN105625150B (en) * 2015-12-29 2017-09-15 东南大学 A kind of method that asphalt pavement pit repairs border reinforcement
CN107604801B (en) * 2017-10-13 2019-09-06 苏州东振路桥工程有限公司 A kind of the reparation structure and its gap casting glue restorative procedure of impaired bituminous pavement
CN108166348A (en) * 2017-12-27 2018-06-15 孔金河 A kind of asphalt pavement crack method for repairing and mending and repairing construction
CN110904763A (en) * 2019-11-25 2020-03-24 四川路通建设工程有限公司 Asphalt road reinforcing treatment method
CN112267344B (en) * 2020-10-16 2022-05-06 长沙理工大学 Crack-inducing member and crack-inducing structure
CN113089412A (en) * 2021-04-13 2021-07-09 张国星 Method for reinforcing waterproof expansion joint of highway
CN113417192B (en) * 2021-05-11 2022-09-02 湖南优冠体育材料有限公司 Plastic track warped edge repairing method
CN114059790B (en) * 2021-09-27 2022-12-06 云南豪玖建材有限公司 Waterproof coating repairing method based on homologous coating

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4109033A (en) * 1975-06-06 1978-08-22 Blankenhorn Paul R Process for impregnating concrete with polymers
CA1139973A (en) * 1977-07-22 1983-01-25 Richard L. Cottingham Method of sealing bridge deck joints
US4547399A (en) * 1983-03-28 1985-10-15 W. R. Meadows, Inc. Sealing composition and method of making the same
US5405213A (en) * 1988-04-13 1995-04-11 Thermal Power Corporation Method of repairing cracks in asphaltic roads
US5236276A (en) * 1991-08-19 1993-08-17 Chang Chung Hsiung Construction method of compound asphalt net with flame treatment
US5827008A (en) * 1995-06-23 1998-10-27 Smith; Gerald R. Pavement sealing product and method
US5630677A (en) * 1995-07-25 1997-05-20 Barroso; Luther C. Method for repair of cracked pavement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101178520B1 (en) 2010-02-04 2012-08-30 (주)지케이 A reparing method of road
JP2020183695A (en) * 2019-04-26 2020-11-12 ジオ・サーチ株式会社 Road surface reinforcement method

Also Published As

Publication number Publication date
EP1337711B1 (en) 2007-10-03
EP1337711A4 (en) 2005-04-13
MXPA03004260A (en) 2003-09-22
CA2428367C (en) 2007-07-31
IL155877A0 (en) 2003-12-23
EP1337711A2 (en) 2003-08-27
ATE374865T1 (en) 2007-10-15
EP1337711B8 (en) 2008-01-23
BR0017373A (en) 2003-12-09
WO2002040806A2 (en) 2002-05-23
CA2428367A1 (en) 2002-05-23
CN1479826A (en) 2004-03-03
AU2001217544A1 (en) 2002-05-27
DE60036648D1 (en) 2007-11-15
WO2002040806A3 (en) 2002-11-07

Similar Documents

Publication Publication Date Title
JP2004514077A (en) Processing method for gaps and cracks in the airfield runway surface
CN108166348A (en) A kind of asphalt pavement crack method for repairing and mending and repairing construction
KR101036277B1 (en) Expansion joint waterproof material of structure including road and bridge, and constructing method of expansion joint part using this
CN108412222A (en) A kind of construction leakage internal maintenance waterproof layer structure and construction technology
KR101522505B1 (en) Overall repairing method for concrete and asphalt road after repairing cracks by using the overall pavement products
US7396185B2 (en) Method for repairing a crack in a recreational court or surface
KR101739777B1 (en) Waterproof agent for surface of bridges and process for waterproofing surface of bridges using that
WO2011143928A1 (en) Construction method for repairing cracks
US4240995A (en) Methods for preparing natural and artificial structures
CN110396926A (en) A kind of concrete bridge deck pavement structure and construction method
KR20100042094A (en) Method of repair work on the asphalt road and construction method of bridge deck joints or structure junctions using sealant
KR101392477B1 (en) Repacking of asphalt concrete pavement method
KR20050010984A (en) Method of reinforcing and waterproofing a paved surface
JP6592297B2 (en) Slab track repair structure, adhesive sheet used for slab track repair structure, and slab track repair method
CN1115445C (en) Construction method for preventing airport surface from forming crack and crushed stone
CN207727375U (en) A kind of Highway Asphalt Pavement Cracks repairing structure
KR100806849B1 (en) Repair method for pavement on bridge
US6491472B1 (en) Construction method for protecting the airplane runway surface from being cracked to spit out crush stones
CN106894319A (en) Cement-concrete road-surface groove-carving method
KR101176572B1 (en) Thin-layer overlaying method for reinforcing paving concrete of road
CN208250853U (en) A kind of road gap filling repairing structure
TW567269B (en) Construction method of crack treatment for airport runway surface
KR101590846B1 (en) Maintenance Method for Drainage
KR100926779B1 (en) Polymer Modified Bitumen Waterproofing Sheet
CN211312061U (en) Road surface expansion joint structure and instrument of repairing road surface expansion joint

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050913

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060228