CN106894319A CN201710152929.XA CN201710152929A CN106894319A CN 106894319 A CN106894319 A CN 106894319A CN 201710152929 A CN201710152929 A CN 201710152929A CN 106894319 A CN106894319 A CN 106894319A
Authority
CN
China
Prior art keywords
cement
cutting
layer
concrete layer
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710152929.XA
Other languages
Chinese (zh)
Other versions
CN106894319B (en
Inventor
张爱民
卢明智
肖俊毅
陈琪
国彬
朱付杰
崔洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Highway Engineering Co Ltd
Original Assignee
CCCC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Highway Engineering Co Ltd filed Critical CCCC Third Highway Engineering Co Ltd
Priority to CN201710152929.XA priority Critical patent/CN106894319B/en
Publication of CN106894319A publication Critical patent/CN106894319A/en
Application granted granted Critical
Publication of CN106894319B publication Critical patent/CN106894319B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/02Devices for making, treating or filling grooves or like channels in not-yet-hardened paving, e.g. for joints or markings; Removable forms therefor; Devices for introducing inserts or removable insert-supports in not-yet-hardened paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/02Devices for making, treating or filling grooves or like channels in not-yet-hardened paving, e.g. for joints or markings; Removable forms therefor; Devices for introducing inserts or removable insert-supports in not-yet-hardened paving
    • E01C23/021Removable, e.g. reusable, forms for grooves or like channels ; Installing same prior to placing the paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/02Devices for making, treating or filling grooves or like channels in not-yet-hardened paving, e.g. for joints or markings; Removable forms therefor; Devices for introducing inserts or removable insert-supports in not-yet-hardened paving
    • E01C23/025Making or working grooves or like channels in laid paving, e.g. smoothing groove edges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a kind of cement-concrete road-surface groove-carving method, comprise the following steps:Laying sub-surface;Ground floor cement concrete layer is laid on sub-surface, cutting net and even power rolling cutting net are sequentially laid afterwards;After ground floor cement concrete layer is pre-hardening, one layer of PVC adhesive of even application on the upper surface of cutting net, and PVC adhesives are not sprayed at strip lamellar body;Second layer cement concrete layer is laid on ground floor cement concrete layer so that the radian of second layer concrete layer is adapted with the height of the strip lamellar body of the online end face of cutting;After after the initial set of second layer cement concrete layer, the online strip lamellar body of removal cutting forms road surface cutting and carries out polishing finishing, is rinsed with water afterwards, makes the road surface cutting of shaping accurately clear.The inventive method, construction is simple, road surface cutting good forming effect;Lift and fix the cutting net of bar shaped lamellar body and can also improve the cracking resistance of cement retardative soil surface, extend the service life on road surface.

Description

Cement-concrete road-surface groove-carving method
Technical field
The present invention relates to pavement construction technical field, more particularly to a kind of cement-concrete road-surface groove-carving method.
Background technology
At present, in construction of cement concrete road surface, in order to reach technical bid of the related specifications about surface friction coefficient Alignment request is, it is necessary to the cutting of the surface formation pitted skin or formation certain specification in cement concrete pavement, can thus reach road The coefficient of friction technical standard in face, the pitted skin on road surface or cutting are entered using two methods in construction of cement concrete road surface at present Row construction, one kind is that after cement concrete pavement has been flattened, intensity uses hairbrush or steel brush in concrete road before not formed The surface in face forms pitted skin or cutting, and also a kind of way is after the intensity of cement concrete pavement is formed, using special Cutting machinery forms cutting referred to as " hard cutting " on the surface on road surface, when being constructed using former approach, using hairbrush in cement The pitted skin that concrete surface is formed, coefficient of friction does not often reach code requirement, is unfavorable for the safety of driving, does not reach road surface yet Acceptance criteria, such as using steel brush formed cutting when, work progress brush teeth is easy to the rubble or the grains of sand in concrete to tick, Make to be damaged in the local position short time for producing more serious pit and pitted skin, road surface to form pit and pitted skin after being open to traffic, Must be repaired.When carrying out " hard cutting " construction using second method, because the sawblade-replacing of gaining machine is frequent, work is caused Journey cost is increased substantially, and engineering cost increasing degree is larger, uneconomical.
The content of the invention
It is an object of the invention to solve at least the above, and provide the advantage that at least will be described later.
It is a still further object of the present invention to provide a kind of cement-concrete road-surface groove-carving method, it can be in cement concrete Bar shaped lamellar body is embedded into during road surfacing, after the completion of road surfacing, bar shaped lamellar body is removed and is directly formed after repairing Road surface cutting, construction is simple, easy to use;Lift and fix the cutting net of bar shaped lamellar body and can also improve cement retardative soil surface Cracking resistance, extend road surface service life.
In order to realize these purposes of the invention and further advantage, there is provided a kind of cement-concrete road-surface groove-carving side Method, comprises the following steps:
Step one, laying sub-surface;
Step 2, the laying ground floor cement concrete layer on the sub-surface, afterwards on the part road for needing cutting Cutting net is sequentially laid in section, the raised insertion ground floor cement concrete layer of the multiple set on the lower surface of the cutting net In;
Step 3, even power roll the cutting net so that the part of cement of ground floor cement concrete layer is from the cutting It is prominent in the hole of net, height of the projecting height less than the strip lamellar body on the upper surface of the cutting net;
Step 4, after ground floor cement concrete layer initial set after, one layer of the even application on the upper surface of the cutting net PVC adhesives are not sprayed at PVC adhesives, and the strip lamellar body;
After step 5, spraying PVC adhesives 5-15min, second layer cement is laid on ground floor cement concrete layer mixed Solidifying soil layer so that the radian of second layer concrete layer is adapted with the height of the strip lamellar body of the online end face of the cutting;
Step 6, after after the initial set of second layer cement concrete layer, the removal online strip lamellar body of cutting forms road surface and carves Groove;
Step 7, with concrete sander to carrying out polishing finishing at the road surface cutting in step 6, afterwards with water rinse, Make the road surface cutting of shaping accurately clear;
Wherein, cutting net includes web body, and it is the network structure being stamped and formed out by the lamellar body of PVC materials, and described It is 2-5cm that multiple raised, raised length is set on the lower surface of network structure;The cutting net also includes that multiple strips are described Groove is put, it is integrally formed on the upper surface of the web body;Strip lamellar body, its it is dismountable it is embedded be arranged on it is described many In individual strip storage tank, and the width of the strip lamellar body is adapted with the depth of any bar strip storage tank.
Preferably, the thickness of the ground floor cement concrete layer is no more than 22cm;And mixed in laying ground floor cement During solidifying soil layer, it is continuously vibrated, is flattened, construction operation of wiping one's face, such as need to interrupt, construction joint, the position of construction joint should be set Putting should be in the seaming position of design code;
The thickness of the second layer cement concrete layer is 2-5cm.
Preferably, the hole of the cutting net is the polygonal hole of rule, and the area of hole is 5-15cm2
Preferably, in the step 2, according to the arrangement of road surface cutting need to use what multiple head and the tail can be mutually linked Cutting net is laid on the first cement concrete layer successively, the online multiple bar shapeds of the cutting that plurality of head and the tail can be mutually linked Storage tank head and the tail are mutually linked, and the one end for the strip lamellar body being embedded is sequentially embedded bar shaped storage tank adjacent thereto respectively It is interior.
Preferably, the cross section of the strip storage tank is rectangle or isosceles trapezoidal structure, and isosceles trapezoid Upper bottom edge length is less than bottom edge lengths.
Preferably, a width of 5~7mm of notch of the strip storage tank, a width of 2~5mm of bottom land, groove depth be 4~ 8mm;Spacing between adjacent two strip storage tanks is 20-40mm.
Preferably, also include:Strip bulge, it is separately positioned on two side walls of strip lamellar body;And
Strip storage tank, it is shaped on the side wall of strip storage tank, and is mutually twisted with the strip bulge.
Preferably, it is further comprising the steps of:Step 8, the road surface to the formation of the second cement concrete layer are incised and periphery Sprinkling JR-01 concrete cements ground metope curing agent.
Preferably, it is further comprising the steps of:Step 9, ground floor concrete layer initial set after remove in clean construction joint The debris such as silt particle, joint seal construction is carried out afterwards, joint seal agent is PVC cement or bitumastic.
Preferably, it is just reserved to the construction joint of ground floor cement concrete layer when second layer cement concrete layer is constructed to apply Work is stitched, and removes the debris such as silt particle in clean construction joint after the initial set of second layer concrete layer, and carry out using the joint seal agent Joint seal is constructed.
The present invention at least includes following beneficial effect:
Cutting net is directly laid in step 2, on the ground floor cement concrete layer for just having laid so that cutting net Directly the ground floor cement retardative soil layer with moistening is in close contact, and the excessively multiple raised insertions of cutting Netcom are fixed to the first water In cement concrete layer, it is to avoid cutting net is shifted;Cutting wet end is partially pressed into the first cement layer by even power in step 3 afterwards; Now, in order to easy construction is laborsaving, the width of the latitude and longitude of the crisscross network of cutting net is less than 2mm, strip The width of the bottom of storage tank is less than 4mm, and the web body of cutting net can use PVC materials or wire quality, not only side Just laid bar shaped lamellar body, and improve the cracking resistance of cement retardative soil surface;Treat the initial set of the first cement concrete layer Afterwards, cutting net is securely fixed by the cement in the hole of multiple raised and embedded cutting nets, and also improves the first cement The roughness of the upper surface of concrete layer;In the first cement retardative soil layer and the surface spraying PVC adhesives of cutting net so that the Two cement concrete layers can be preferably with the first cement retardative soil layer and cutting net surface be adhesively fixed, it is to avoid layering;Paving If after complete second cement concrete layer, part road surfacing, the equating of cutting net will be equipped with, with bar shaped lamellar body not by the second water The upper surface of cement concrete layer is covered as criterion, facilitates the later stage to remove bar shaped lamellar body;Further, since the embedded setting of bar shaped lamellar body In multiple strip storage tanks, when removal bar shaped lamellar body, also will not sticky its periphery coagulating cement soil particle, protection Road surface is complete, and construction effect is good, it is only necessary to substantially prominent multiple strip storage tanks with second cement concrete layer Opening edge along carrying out grinding process;And machine cuts before being construction due to cutting net, pour shaping, thereon many Individual bar shaped storage tank with the combined and spliced pattern into various shapes, can enrich the shape of road surface cutting, extend its range of application;
In sum, the inventive method can be embedded into bar shaped lamellar body during paving cement concrete pavement, on road After the completion of the laying of face, bar shaped lamellar body is removed and road surface cutting is directly formed after repairing, construction is simple, easy to use;Lift solid Surely living the cutting net of bar shaped lamellar body can also improve the cracking resistance of cement retardative soil surface, extend the service life on road surface.
Further advantage of the invention, target and feature embody part by following explanation, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is the process chart of the inventive method;
Fig. 2 is the top view of the cutting net described in one embodiment of the present of invention;
Fig. 3 is the profile at A in Fig. 2 of the invention;
Fig. 4 is the top view of the cutting net described in an alternative embodiment of the invention.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that it is used herein such as " have ", "comprising" and " including " term do not allot one or many The presence or addition of individual other elements or its combination.
As shown in Figure 1, 2, 3, the present invention provides a kind of cement-concrete road-surface groove-carving method, comprises the following steps:
Step one, laying sub-surface;
Step 2, the laying ground floor cement concrete layer on the sub-surface, afterwards on the part road for needing cutting Cutting net is sequentially laid in section, the raised insertion ground floor cement concrete layer of the multiple set on the lower surface of the cutting net In;
Step 3, even power roll the cutting net so that the part of cement of ground floor cement concrete layer is from the cutting It is prominent in the hole of net, height of the projecting height less than the strip lamellar body on the upper surface of the cutting net;
Step 4, after ground floor cement concrete layer initial set after, one layer of the even application on the upper surface of the cutting net PVC adhesives are not sprayed at PVC adhesives, and the strip lamellar body;
After step 5, spraying PVC adhesives 5-15min, second layer cement is laid on ground floor cement concrete layer mixed Solidifying soil layer so that the radian of second layer concrete layer is adapted with the height of the strip lamellar body of the online end face of the cutting;
Step 6, after after the initial set of second layer cement concrete layer, the removal online strip lamellar body of cutting forms road surface and carves Groove;
Step 7, with concrete sander to carrying out polishing finishing at the road surface cutting in step 6, afterwards with water rinse, Make the road surface cutting of shaping accurately clear;
Wherein, cutting net includes web body 10, and it is the network structure being stamped and formed out by the lamellar body of PVC materials, and institute State and set on the lower surface of network structure multiple raised 101, raised length is 2-5cm;The cutting net also includes multiple long Bar shaped storage tank 102, it is integrally formed on the upper surface of the web body;Strip lamellar body 103, it is dismountable embedded Be arranged in the multiple strip storage tank, and width and any bar strip storage tank of the strip lamellar body depth phase Adapt to.
In such scheme, the directly laying cutting in step 2, on the ground floor cement concrete layer for just having laid Net so that cutting net is directly in close contact with the ground floor cement retardative soil layer of moistening, and cutting Netcom is excessively multiple raised slotting Enter and be fixed in the first cement concrete layer, it is to avoid cutting net is shifted;Afterwards by even power in step 3 by cutting wet end partial pressure In entering the first cement layer;Now, in order to easy construction is laborsaving, the latitude and longitude 104 of the crisscross network of cutting net Width is less than 2mm, and the width of the bottom of strip storage tank is less than 4mm, the web body of cutting net can using PVC materials or Person's wire quality, has not only easily laid bar shaped lamellar body, and improve the cracking resistance of cement retardative soil surface;Treat first After cement concrete layer initial set, cutting net is securely fixed by the cement in the hole of multiple raised and embedded cutting nets, and Also improve the roughness of the upper surface of the first cement concrete layer;In the first cement retardative soil layer and the surface spraying of cutting net PVC adhesives so that the surface that the second cement concrete layer can be preferably with the first cement retardative soil layer and cutting net bonds It is fixed, it is to avoid layering;After having laid the second cement concrete layer, part road surfacing, the equating of cutting net will be equipped with, with bar Shape lamellar body is not covered as criterion by the upper surface of the second cement concrete layer, facilitates the later stage to remove bar shaped lamellar body;Further, since bar Shape lamellar body is embedded to be arranged in multiple strip storage tanks, when removal bar shaped lamellar body, also will not sticky its periphery water Cement concrete particle, protection road surface is complete, and construction effect is good, it is only necessary to substantially protruding and second cement concrete layer The opening edge edge of multiple strip storage tanks carries out grinding process;And machine cuts before being construction due to cutting net, Shaping is poured, multiple bar shaped storage tanks thereon can be with the combined and spliced pattern into various shapes, such as being parallel to each other in Fig. 2 Cutting, or such as square cutting in Fig. 4, enrich the shape of road surface cutting, extend its range of application.
In sum, the inventive method can be embedded into bar shaped lamellar body during paving cement concrete pavement, on road After the completion of the laying of face, bar shaped lamellar body is removed and road surface cutting is directly formed after repairing, construction is simple, easy to use;Lift solid Surely living the cutting net of bar shaped lamellar body can also improve the cracking resistance of cement retardative soil surface, extend the service life on road surface.
In a preferred scheme, the thickness of the ground floor cement concrete layer is no more than 22cm;And in laying first During layer cement concrete layer, it continuously vibrated, is flattened, construction operation of wiping one's face, such as needing to interrupt, construction joint should be set, being applied The position of work seam should be in the seaming position of design code;
The thickness of the second layer cement concrete layer is 2-5cm.
In this programme, when the first concrete layer is laid, construction joint, and one layer of first complete cement are set in good time Concrete layer can not be interrupted in construction, consistent with the pre-hardening degree for ensureing the first cement concrete layer, it is ensured that pavement strength is consistent.
In a preferred scheme, the hole of the cutting net is the polygonal hole of rule, and the area of hole is 5- 15cm2
In a preferred scheme, need to use multiple head and the tail can phase in the step 2, according to the arrangement of road surface cutting Mutually the cutting net of linking is laid on the first cement concrete layer successively, and the cutting that plurality of head and the tail can be mutually linked is online Multiple bar shaped storage tank head and the tail are mutually linked, and the one end for the strip lamellar body being embedded is sequentially embedded bar adjacent thereto respectively In shape storage tank.
In a preferred scheme, the cross section of the strip storage tank is rectangle or isosceles trapezoidal structure, and is waited The trapezoidal upper bottom edge length of waist is less than bottom edge lengths.
In a preferred scheme, a width of 5~7mm of notch of the strip storage tank, a width of 2~5mm of bottom land, groove depth It is 4~8mm;Spacing between adjacent two strip storage tanks is 20-40mm.
In a preferred scheme, also include:Strip bulge, it is separately positioned on two side walls of strip lamellar body;With And
Strip storage tank, it is shaped on the side wall of strip storage tank, and is mutually twisted with the strip bulge.
In this programme, strip bulge and strip storage tank are mutually twisted, to cause that strip-shaped blade body is removably fixed In strip storage tank, in addition, convenient in order to remove strip lamellar body, the height of general strip bulge is difficult more than 2mm, one Under fixed external force traction, you can depart from strip storage tank, road surface cutting is formed.
It is further comprising the steps of in a preferred scheme:Step 8, the road surface formed to the second cement concrete layer are scarce Carve and periphery sprinkling JR-01 concrete cements ground metope curing agent.The construction of JR-01 concrete cements ground metope curing agent Simplicity, need to only spray and brush the effect that the preferable wear-resisting, hardening in concrete road surface and blast are capable of achieving on road surface.
It is further comprising the steps of in a preferred scheme:Step 9, remove after the initial set of ground floor concrete layer it is clean The debris such as the silt particle in construction joint, carry out joint seal construction afterwards, and joint seal agent is PVC cement or bitumastic.Joint seal work Make to be carried out after the initial set of ground floor cement concrete, when joint seal is expansion joint (E.J.), a thin layer adhesive bitument primer, packing should be applied in slotted wall Material will be filled, and summer should flush with the first cement concrete surface, and winter is preferably slightly less than the first cement concrete layer, be commonly used Joint seal agent have two major classes, i.e.,:Heating construction formula crack sealer normal temperature construction formula crack sealer mainly has polyurethane joint seal glue, polysulfide fat The normal temperature such as joint seal glue and neoprene class, emulsified asphalt rubber-like construction formula crack sealer.
In a preferred scheme, just to the construction of ground floor cement concrete layer when second layer cement concrete layer is constructed The reserved construction joint of seam, removes the debris such as silt particle in clean construction joint, and use the envelope after the initial set of second layer concrete layer Seam agent carries out joint seal construction.
Although embodiment of the present invention is disclosed as above, it is not restricted to listed in specification and implementation method With, it can be applied to various suitable the field of the invention completely, for those skilled in the art, can be easily Other modification is realized, therefore under the universal limited without departing substantially from specification and equivalency range, the present invention is not limited to Specific details and shown here as the legend with description.

Claims (10)

1. a kind of cement-concrete road-surface groove-carving method, it is characterised in that comprise the following steps:
Step one, laying sub-surface;
Step 2, the laying ground floor cement concrete layer on the sub-surface, afterwards on the part way for needing cutting Cutting net is sequentially laid, in the raised insertion ground floor cement concrete layer of the multiple set on the lower surface of the cutting net;
Step 3, even power roll the cutting net so that the part of cement of ground floor cement concrete layer is from the cutting net It is prominent in hole, height of the projecting height less than the strip lamellar body on the upper surface of the cutting net;
Step 4, after ground floor cement concrete layer initial set after, one layer of PVC glue of even application on the upper surface of the cutting net Glutinous agent, and PVC adhesives are not sprayed at the strip lamellar body;
After step 5, spraying PVC adhesives 5-15min, second layer cement concrete is laid on ground floor cement concrete layer Layer so that the radian of second layer concrete layer is adapted with the height of the strip lamellar body of the online end face of the cutting;
Step 6, after after the initial set of second layer cement concrete layer, the removal online strip lamellar body of cutting forms road surface cutting;
Step 7, with concrete sander to carrying out polishing finishing at the road surface cutting in step 6, afterwards with water rinse, make into The road surface cutting of type is accurately clear;
Wherein, cutting net includes web body, and it is the network structure being stamped and formed out by the lamellar body of PVC materials, and described netted It is 2-5cm that multiple raised, raised length is set on the lower surface of structure;The cutting net also includes that multiple strips are housed Groove, it is integrally formed on the upper surface of the web body;Strip lamellar body, its it is dismountable it is embedded be arranged on it is the multiple In strip storage tank, and the width of the strip lamellar body is adapted with the depth of any bar strip storage tank.
2. cement-concrete road-surface groove-carving method as claimed in claim 1, it is characterised in that the ground floor cement concrete The thickness of layer is no more than 22cm;And when ground floor cement concrete layer is laid, it is continuously vibrated, flatten, wiped one's face Construction operation, such as needs to interrupt, and should set construction joint, and the position of construction joint should be in the seaming position of design code;
The thickness of the second layer cement concrete layer is 2-5cm.
3. cement-concrete road-surface groove-carving method as claimed in claim 1, it is characterised in that the hole of the cutting net is rule Polygonal hole then, and the area of hole is 5-15cm2
4. cement-concrete road-surface groove-carving method as claimed in claim 1, it is characterised in that in the step 2, according to road The cutting net that the arrangement of face cutting needs to use multiple head and the tail and can be mutually linked is laid on the first cement concrete layer successively, its The online multiple bar shaped storage tanks head and the tail of middle multiple cuttings that can be mutually linked from beginning to end are mutually linked, and the strip-shaped blade being embedded One end of body is sequentially embedded in bar shaped storage tank adjacent thereto respectively.
5. cement-concrete road-surface groove-carving method as claimed in claim 4, it is characterised in that the horizontal stroke of the strip storage tank Tangent plane is rectangle or isosceles trapezoidal structure, and the upper bottom edge length of isosceles trapezoid is less than bottom edge lengths.
6. cement-concrete road-surface groove-carving method as claimed in claim 4, it is characterised in that the groove of the strip storage tank A width of 5~the 7mm of mouth, a width of 2~5mm of bottom land, groove depth is 4~8mm;Spacing between adjacent two strip storage tanks is 20- 40mm。
7. cement-concrete road-surface groove-carving method as claimed in claim 1, it is characterised in that also include:
Strip bulge, it is separately positioned on two side walls of strip lamellar body;And
Strip storage tank, it is shaped on the side wall of strip storage tank, and is mutually twisted with the strip bulge.
8. cement-concrete road-surface groove-carving method as claimed in claim 1, it is characterised in that further comprising the steps of:
Step 8, the road surface to the formation of the second cement concrete layer are incised and periphery sprinkling JR-01 concrete cements ground metope Curing agent.
9. cement-concrete road-surface groove-carving method as claimed in claim 2, it is characterised in that further comprising the steps of:
Step 9, after the initial set of ground floor concrete layer the debris such as silt particle in clean construction joint are removed, joint seal is carried out afterwards and is applied Work, joint seal agent is PVC cement or bitumastic.
10. cement-concrete road-surface groove-carving method as claimed in claim 9, it is characterised in that second layer cement concrete layer Construction joint during construction just to ground floor cement concrete layer reserves construction joint, is removed after the initial set of second layer concrete layer clean The debris such as the silt particle in construction joint, and joint seal construction is carried out using the joint seal agent.
CN201710152929.XA 2017-03-15 2017-03-15 Grooving method for cement concrete pavement Active CN106894319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710152929.XA CN106894319B (en) 2017-03-15 2017-03-15 Grooving method for cement concrete pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710152929.XA CN106894319B (en) 2017-03-15 2017-03-15 Grooving method for cement concrete pavement

Publications (2)

Publication Number Publication Date
CN106894319A true CN106894319A (en) 2017-06-27
CN106894319B CN106894319B (en) 2019-12-24

Family

ID=59192296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710152929.XA Active CN106894319B (en) 2017-03-15 2017-03-15 Grooving method for cement concrete pavement

Country Status (1)

Country Link
CN (1) CN106894319B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111218876A (en) * 2018-11-27 2020-06-02 长春市市政工程设计研究院 Cement concrete pavement wet assembling process with three-dimensional embedding and extruding joint
CN112227154A (en) * 2020-10-19 2021-01-15 张新成 Cement concrete pavement grooving method and device for highway engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2166153Y (en) * 1993-08-09 1994-05-25 尚军 Woodworking grating
CN2365253Y (en) * 1998-12-29 2000-02-23 浙江锦达土工合成材料有限公司 Warp-knitted earth work grille
CN1599827A (en) * 2001-12-04 2005-03-23 综合铺筑概念公司 Method of forming an inlaid pattern in an asphalt surface
KR100958146B1 (en) * 2009-12-17 2010-05-18 장남필 Constructing apparatus of non-slip layer
CN106192699A (en) * 2016-08-29 2016-12-07 武汉建工集团股份有限公司 A kind of homophase out-phase road surface cutting method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2166153Y (en) * 1993-08-09 1994-05-25 尚军 Woodworking grating
CN2365253Y (en) * 1998-12-29 2000-02-23 浙江锦达土工合成材料有限公司 Warp-knitted earth work grille
CN1599827A (en) * 2001-12-04 2005-03-23 综合铺筑概念公司 Method of forming an inlaid pattern in an asphalt surface
KR100958146B1 (en) * 2009-12-17 2010-05-18 장남필 Constructing apparatus of non-slip layer
CN106192699A (en) * 2016-08-29 2016-12-07 武汉建工集团股份有限公司 A kind of homophase out-phase road surface cutting method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111218876A (en) * 2018-11-27 2020-06-02 长春市市政工程设计研究院 Cement concrete pavement wet assembling process with three-dimensional embedding and extruding joint
CN112227154A (en) * 2020-10-19 2021-01-15 张新成 Cement concrete pavement grooving method and device for highway engineering

Also Published As

Publication number Publication date
CN106894319B (en) 2019-12-24

Similar Documents

Publication Publication Date Title
CN105926406B (en) A kind of joining method and structure on old road new in reorganization and expansion pavement construction
US9580915B2 (en) Decorative concrete and method of installing the same
DE60316782T2 (en) Safety improvements for runways and taxiways of airports
US8079775B2 (en) Non-slick surface-seeded aggregate concrete and method of forming
CN108797292A (en) A kind of cement concrete cracks breakage raggle formula patching
CN103758008B (en) Asphalt pavement crack molding asphalt rubber is squeegeeed method
JP2004514077A (en) Processing method for gaps and cracks in the airfield runway surface
CN109441059A (en) A kind of plastic floor laying structure and its construction method
CN106894319A (en) Cement-concrete road-surface groove-carving method
CN208136691U (en) A kind of Cost of New Type Asphalt Pavement cementation of fissures reparation structure
CN108385932A (en) The laying method of macroplate stone material
KR100604212B1 (en) The construction method of elastic paving material having a water permeability
KR101341594B1 (en) Cutting blade structure of the road cutter for cutting groove of the asphalt and the method for reparing cracks of the asphalt using it
CN204662193U (en) Oblique prestressing force cement concrete-bituminous concrete composite pavement
CN1115445C (en) Construction method for preventing airport surface from forming crack and crushed stone
CN110820466A (en) Quick repairing method for cement concrete pavement
CN214992802U (en) Asphalt pavement pit repairing structure
CN104775347B (en) Hot asphalt spraying repair construction method with characteristic of concurrent repair and unblocking of municipal road
CN208701522U (en) A kind of enhancing bridge lateral association structure
RU2148122C1 (en) Method for repair of asphaltic concrete road pavements
CN105350423B (en) A kind of construction method in diamond dust ramp
JPH10325104A (en) Elastic pavement bed and its manufacture
CN112523028A (en) Waterproof edge sealing construction method for joint of pit and groove of asphalt pavement
CN212021238U (en) Circular perforating equipment of multilayer heavy-duty type ramp
CN214328441U (en) Persistent crack pouring structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant