JP2004326788A - 異なったジョブ優先度のシステムおよび方法のための予測可能でプリエンプティブのプラニングおよびスケジューリング - Google Patents

異なったジョブ優先度のシステムおよび方法のための予測可能でプリエンプティブのプラニングおよびスケジューリング Download PDF

Info

Publication number
JP2004326788A
JP2004326788A JP2004125576A JP2004125576A JP2004326788A JP 2004326788 A JP2004326788 A JP 2004326788A JP 2004125576 A JP2004125576 A JP 2004125576A JP 2004125576 A JP2004125576 A JP 2004125576A JP 2004326788 A JP2004326788 A JP 2004326788A
Authority
JP
Japan
Prior art keywords
job
work
function
units
functions
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004125576A
Other languages
English (en)
Other versions
JP4571819B2 (ja
Inventor
Markus P J Fromherz
ピー ジェイ フロムハーツ マルカス
G Boburo Daniel
ジー ボブロウ ダニエル
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xerox Corp
Original Assignee
Xerox Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xerox Corp filed Critical Xerox Corp
Publication of JP2004326788A publication Critical patent/JP2004326788A/ja
Application granted granted Critical
Publication of JP4571819B2 publication Critical patent/JP4571819B2/ja
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

【課題】 システムの機能のいくらかをより高い優先度のジョブに再割当てすることをも可能とする。
【解決手段】 作業ユニットを処理するための複数の選択的機能を伴う、複数のモジュールを有する再構成可能な生産システムにおける、コンフィギュレーション特有の、ジョブの再優先度付けのためのコンピュータ制御されたシステムであって、システム・コントローラ、一つ以上の作業ユニットを持つジョブの生産における、選択されたモジュール機能のプラニング利用のための、少なくとも一つのプラニング・ファンクションであって、モジュール機能が、モジュール機能の相対コストを含む、プラニングファンクション、および、一つ以上の作業ユニットを持つジョブの生産における選択されたモジュール機能の利用をスケジューリングするための、少なくとも一つのスケジューリング・ファンクション、を備えるシステム。
【選択図】 図1

Description

本発明は全体として、自動化された製造システムの制御および管理に関連し、より詳細には、異なった優先度を持つジョブの中でのリソースの再優先度付け(reprioritization)および再割当てへの、モデルベースのプラニングおよびスケジューリングの適用に関連する。
生産システムのための、現在のシステム制御ソフトウェアは、実行されているジョブが、他のジョブが実行され得る前に、完全に完了していることを要求する。これは、ジョブがしばしば長い大量生産システム、特に新しいジョブが、現在生産されているジョブに較べてより高い優先度を持つような場合の大量生産システムにとって、不満足なことである。そして、長い低優先度のジョブの終了を待つ替わりに、それらの新しいジョブを並行して生産すること、または、低優先度のジョブの替わりにそれらの新しいジョブを生産することが望まれる。従来の、イン・ライン(in-line)・システムのために、または、再構成可能なシステムのために提案されたシステムのために、実行されたスケジューリングおよびシステム制御は、新しいジョブが、実行されているジョブと衝突(conflict)しない場合に限り、新しいジョブの追加を可能とするだけである。例えば、印刷システムにおいて、もしシステムが、十分なキャパシティーを持ち、必要なリソースが利用可能ならば、ジョブ・キューの先頭において、新しいジョブが挿入され得、これによって、残りの未終了のジョブを遅らせる。しかし、現在のジョブは、全ての仕上げ器(finishers)を予約してしまっているかもしれず、この場合には、新しいジョブは、少なくとも現在のジョブの一つが完了するまで、スケジューリングされ得ず、実行され得ない。そのような場合には、もし高優先度のジョブがジョブ・キューに入るならば、長くて低優先度のジョブを、中断または更に中止することが望ましいであろう。再構成可能な生産システム、特に並行機能(parallel capabilities)を持つシステムは、操作者が、システムの機能のいくらかを、より高い優先度のジョブに再割当てすることをも可能とすべきである。これによって、生産性および顧客の満足度を増加させることになろう。
この目的を達成するために、システム制御ソフトウェアが、プラナ(planner)およびスケジューラ(scheduler)からの助力によって、システムの種々のモジュールおよび、しばしば、広い機能(extensive capabilities)を利用して、処理中のジョブを再ルーティング(reroute)し、作業を新しいより高い優先度のジョブに移し、或いは、ジョブの一部分をインテリジェントにパージして、それを後に再スタートすることを可能とすることが有用となろう。
簡潔に述べると、そして、本発明の一つの特徴に従って、コンピュータ制御されたシステムは、膨大な選択肢の機能を伴ったいくつかのモジュールを持つ、自動化された製造システムに対する、ジョブの、構成に特有の再優先度付けを提供する。コンピュータ制御されたシステムは、一つ上の作業ユニット(work unit)を有する、ジョブの生産における、選択されたモジュール機能(capabilities)の利用のプラニングおよびスケジューリングのための、少なくとも一つのシステム・コントローラを含む。モジュール機能には、モジュール機能の相対的コスト(relative cost)が含まれる。
本発明の他の特徴によって、作業ユニットを処理するための複数の選択的(alternative)機能を伴う、複数のモジュールを有する再構成可能な生産システムにおける、構成に特有の(configuration-specific)ジョブの再優先度付けための方法が開示される。本方法は、生産のためにプラニングされるべき、少なくとも一つの作業ユニット、および、少なくとも一つの優先度、を有するジョブから、少なくとも一つの作業ユニットを選択することを含む。作業ユニットを実行するために必要な機能(capabilities)、および、作業ユニットを実行するための、それら(必要な機能)の利用可能性、が決定される。本工程は、全ての作業ユニットがプラニングされ終えるまで反復される。ジョブのそれらの作業ユニット(これらに対して十分なモジュール機能が利用不可能なもの)は、考慮の対象から一時的に除去される。
ここに開示されるものは、モデル・ベースのプラニングおよびスケジューリングを適用して、システム・コントローラ内で、異なった優先度の、到着したジョブの中でのリソースの再優先度付け、および、再割当てを行う方法およびシステムであり、コントローラが全ての利用可能なシステム機能の連続する使用を提供し、各機能が実行された後の必要に応じて、システム状態および更新されたモジュール・モデルをレポートする、方法およびシステムである。これを実現するために、本方法は、新しいジョブを、挿入し、プラニングし、スケジューリングする一方、同時に、未終了のジョブ要素を、それらの制約(例えば、共有されたリソース)を考慮しつつ、正確に完了させる。未終了のジョブが中断され得ないような(後に再スタートできないような)場合には、未終了のジョブを中止するか、或いは、挿入されたジョブを遅らせるか、が更に判断される。制約ベースのフォーマットでのシステム状態とすれば、本方法は、システムの機能およびオリジナルのジョブ制約(constraints)を用いて、新しい(一つあるいはそれ以上の)挿入されたジョブとともに、未終了のジョブ要素および現在のジョブの残りを生産(produce)するために、新しいプランおよびスケジュールを生成することを試みる。スケジューリングのための現存するアプローチとは対照的に、ここに記載される本システムは、現在のシステム状態からのプラニングおよびスケジューリング、新しいジョブの挿入、および、必要に応じての作業の中止および再試行(redoing)、によって可能とされる。
本システムおよび方法は、製造、印刷、または組立、のような、マルチ・ステップ生産工程(multi-step production process)のために用いられる制御ソフトウェアに適用され、柔軟なルーティング、最適な生産性、および、最適な負荷バランシング、を提供するための、パス(paths)に亘った複雑なオペレーションの取扱いを提供する。以下の説明において、本発明の完全な理解を提供するために、膨大な特定の詳細が記載される。しかし当業者にとって、そのような特定の詳細無しに、本発明が実施できることは明白であろう。他の場合には、本発明が不必要に不明瞭化されることを避けるために、特定の実施の詳細は詳しく示されていない。
図面の説明に進む。ここでの目的は、本システムおよび方法の実施例の説明目的であり、それを限定するためではない。図1は、本システムの実施例に適合する、異なったジョブ優先度に対する、プラニングおよびスケジューリングのためのコントローラを示す。システム100において、システム・コントローラ110は、何らかの既知のタイプのジョブ入力リソースから生産されるべき作業(work)ユニットの記述(descriptions)を受け取る。これらの記述は、所望の出力製品(products)、または、達成されるべき他のゴールの記述に対応する。それらは、製品の属性(または特性)、これらの属性に対する値または範囲または一般的制約、および、可能性あるものとして、生産のタイミング(例えば締め切り)についての制約、を指定し得るが、一般的に、如何にして製品が生産されるかが指定されることは無い。作業ユニットの記述は一般的に、複数のジョブにグループ化され、インクリメンタルに受け取られる。プラニングおよびスケジューリングを含むシステム制御、および実行は、インクリメンタリに発生するので、これらのオペレーションは全て、同時に発生する。それ故、プランを生成し、次にそれを修正無しに実行することは、常に可能ではなく、または望ましくないかもしれない。システム・コントローラ110は、システム内の各モジュール120から、パス130に沿って、機能モデルおよびパフォーマンス・ログ情報をも受信する。機能モデルは、いかにして、モジュールが異同し、作業ユニットを移動させるかの記述であり、作業ユニットの属性およびタイミングについての情報通常を伴う。モデルは、生産システムが起動されたときに一回だけ、システム・コントローラに送られ得る。或いは、モデルは、定期的に、または、変化が起こったときに更新され得る。モジュール内でのそのような変化は(そして、それによるモデルでの変化は)、例えば、モジュールの再構成、タイミング値の変化、および、リソースの利用不可能性(及び、いくらかの機能)、であり得る。機能モデルには、例えば、タイミング制約(例えば、機能の実行の期間、リソースが占有される期間、または、リソースの予約)、特性(feature)の制約(例えば、処理されている作業ユニットのサイズについての制限、パーツ(parts)のオリエンテーション(orientation)の変更や、2つのパーツを一緒に付加すること、のような作業ユニットの変換)、およびコマンド(例えば、時間および、可能なものとしての(possibly)他の情報を伴う、機能に対応するオペレーションの名称またはID(identification))、が含まれる。タイミングおよび特性(feature)の制約は、いつ、そして、如何にして、機能が作業ユニットに適用され得るか、を記述する。コマンドは、対応するオペレーションを起動するためにモジュールに送られるコマンドである。
モジュール120は、例えば、フィーダー・モジュール、マーク・エンジン・モジュール、仕上げ器(finisher)モジュール、または、輸送モジュール、のような印刷エンジンの機器モジュールのような、多くの異なったタイプの生産システムを包含し(encompass)得る。或いは、モジュール120は、バイオテクノロジーのスクリーニング・システムの分析モジュール(これは、準備モジュール、加熱モジュール、混合モジュール、分析モジュール、または、輸送ロボット、を備え得る)を含み得る。製造ラインモジュールは、機械工作(machining)モジュール、組立(assembling)モジュール、試験モジュール、輸送ロボット、または梱包モジュール、を含み得る。梱包ラインは、ボトル充填モジュール、または、ラベリング・モジュールを含み得る。所望の作業ユニットのためのスケジュールをサーチする時に、システム・コントローラ110は、全てのあり得るシステム機能を考慮する。
一つあるいはそれ以上のジョブの、所望の作業ユニットの、いくつかを、或いは全てを、プラニングおよびスケジューリングすることは、選択された、および、スケジューリングされた、機能の組を結果としてもたらす。これらが利用可能となるので、システム・コントローラ110は、スケジューリングされた機能に対応する命令コマンドを、パス140に亘るモジュール120に送る。モジュールの各々は次に、指定されたジョブを完了させるための、そのタスク・シーケンスを実行する。処理されている作業ユニットのパスを示す、パス150に見られるように、作業(work)は、次のモジュールに連続して移動する前に、特定のモジュール120内で、反復して繰り返し得るか、または、第3のモジュールに渡す前に、複数のモジュールの中を反復して繰り返し得る。ここでの目的のために、3つのモジュール120だけが示されるが、ジョブ要求の複雑さにより、システムは膨大なモジュールを含むことが理解出来るであろう。モジュールは、再構成可能なシステム内に、種々の構成を持ち得る。更に、何時の時点においても、モジュールおよびシステムの状態について作業がスケジューリングされるに際しての、オペレータ・フィードバックのための機能も存在する。
システム制御ソフトウェアは、ジョブ優先度を識別し、機能を選択し、これらの機能のタイミング変数(timing variables)を決定し、スケジューリングされた機能を実行することによって、ジョブをプラニングし、スケジューリングする。図2は、システム・コントローラによる、モニタリング、レポーティングのファンクション、および、予測的(predictive)およびプリエンプティブなプラニングへのアプローチ、および、異なったジョブ優先度付けのためのスケジューリング、を説明する。この図面において、本方法のステップは、受信され、工程内の各後続のステップに提供された、データに関して説明される。この工程内のステップ220、230および240の各々は、次々と(一つの後に次の一つが)、または、同時に実行され得る。いずれの場合でも、各ステップは、データ225、235を消費する(consumes)か、または、スケジュールと、前のステップまたはシステム内の他のアクションによって提供された実行の間の不一致(discrepancies)を消費し、後続のステップまたは他のシステム・オペレーションのために、データ235、245、そして究極的に270、を生成する。このデータの消費および生産は一般的にインクリメンタリに為される。つまり、ステップは、一つのデータ・アイテムを、次から次に処理するが、実時間ソフトウェアの当業者にとって明白なように、バッチによっても為され得る 。最初は、作業ユニット225の記述は、或いは、実行されるべきジョブが、コントローラに提供される。そのような作業ユニットおよびジョブ記述は一般的に、インクリメンタリ(incrementally)に提供される。マルチプルの(multiple)ジョブのための作業ユニットの記述は、シリーズに(series)、または、パラレルに(parallel)提出され得る。新しいジョブは、前のジョブが完了する前に、或いは、完全に提出される前にさえ、提出され(submitted)得る。
コントローラは、現在のシステムの状態および、スケジュールと実行260(例えば、どのオペレーションがモジュールによって現在実行されているか、そして、それが、以前にプラニングし、スケジューリングしたかもしれない、何らかの機能)の間の不一致(discrepancies)についての情報とともに、利用可能なシステム・モジュールのモデルをも持つ。提出された作業ユニット記述の組から、どれが次に、プラニングされ、スケジューリングされるべきかが決定される。この選択は一般的に、作業ユニットとジョブが提出されたのと同じオーダー(order)で為されるが、例えば、以前に未知であった新しいジョブの優先度を考慮して、以前のジョブが完全にスケジューリングされる前に、新しいジョブのプラニングを開始することもまた可能である。選択された作業ユニット225は次に、ステップ220に渡され、各モジュールのための機能モデルを考慮して、選択された作業ユニットのための機能をプラニングし、スケジューリングする。このステップは、前のステップで選択された各作業ユニットおよび診断ユニットについて反復され、スケジューリングされた機能235の組が生成される。230において、故障が識別され、260からのスケジュールおよび実行の不一致(discrepancy)データに基づいて、復旧モデルが識別される。具体的に、何らかの(重要な)、スケジュールと実行との間の不一致は、潜在的な故障を示す。(故障は、介入(intervention)を必要とする現在の故障か、未だ回避し得る差し迫った故障かのいずれかで有り得る。)
従って、ソフトウェアは、レポートされた実行が、依然として、ジョブおよびモデルによって与えられた制約を満足させるか否かを識別しなければならない。例えば、もし作業ユニットが、モジュールに、予定されたより長く滞在する(stays)ならば、それは、他のスケジューリングされた作業ユニットとオーバーラップ(即ち衝突(collide))するであろうか?もし、作業ユニットが遅延されるならば、それは、依然として、他の作業ユニットとの関係で順位の(precedence)制約を満足させるであろうか?もし作業ユニット変換(例えば、オリエンテーション(orientation)での変化)が、実行されていなかったなら、それはクリティカルか?この理由付けは、モジュール・レポートに基づいて、スケジュールを修正し、次にそれを、制約との関係でチェックすることによって為され得る。もし制約が、相変わらず満足されるならば、更なるアクションは不必要である。(これは、モジュールが、ローカルな問題を解決することについての自律性(autonomy)を持ち、それによって更にロバストネスを改善することをも可能とする。)
モジュール・レポートによって、スケジュールを更新すること、または、更新を試みることによって、実行の差異(execution differences)のために、生産が不整合になってきているか否かを検知するために、正しいスケジュールを生成するためのスケジューラのファシリティ(例えば、制約解決器(constraint solver))が使用され得る。例えば、もし、作業ユニットについてのオペレーションが遅延しているならば、同じジョブの作業ユニットは、不適切に生成され得る(そして、順位制約(precedence constraints)は違反されることになる)、または、作業ユニットは、衝突(collide)し得る(そして、それによってリソース制約に違反することになる)。そのような実行差(execution differences)を比較し、そのスケジュールに統合(integrating)することによって、スケジューラは、即座に、そのような不整合(inconsistencies)を検知出来る。
もし、制約がもはや満足されないならば、詳細なシステム状態は、システムが故障から復旧出来るか否か、および、どのように復旧できるか、を決定するための基盤を提供する。例えば、故障(failure)の一般的な結果は、ジョブのその部分が、それらの順位制約(precedence constraints)に違反する(即ち、いくつかの作業ユニットの遅延によって、所望のものとは異なったオーダー(order)となること)、または、(それらを生成するためにスケジューリングされたモジュールが、オフラインとなってしまったために)全く生産されないということである。システム制御ソフトウェアが、恐らく、これらのジョブを再プラニング、または再ルーティングすることによって復旧出来るという意味で、その状態は、それらの部分(parts)を識別するために役立つ。ダイナミックなシステム・スケジュールに取りこむために、プラニングおよびスケジューリング・ステップ220に、システム故障識別および故障復旧モードが提供される。
スケジューリングされた機能235は次に、ステップ240に提供される。このステップにおいて、コントローラは、スケジューリングされた機能に対応するコマンド245を、個々のモジュールに送る。このステップは、各スケジューリングされた機能に対して反復される。モジュールはインクリメンタリに、それらのモデルで定義されたのと同じレベルの詳細度で、機能の実行をレポートする。例えば、輸送モジュール(transport module)は、入力時間、出力時間、入力作業ユニット(および、その属性)、出力作業ユニット(および、その属性)、および、それらの間のいくつかの制約(例えば、時間変数の間の時間制約、作業ユニット変数の間の属性変換、等)、を伴って「移動」機能を定義し得る。そして、もしシステム制御ソフトウェアが、その機能を選択し、スケジュールする(時間と属性変数のための値を決定する)ならば、コマンドが、モジュールに送られて、所定の時間に、この機能を実行し、モデル変数(時間、属性、リソース)のために、モジュールは、実際の値(または、予測された値への差異)を、折り返しレポートする。これらのモジュール・レポート255は、250でロギングされ、詳細化された、そのスケジュールの実行のログを構築するために統合される。ログは、明示的に、或いは黙示的に、システムのビヘイビヤのヒストリを含み得る。例えば、タイミング値に対する単一の値の替わりに、ログは、発生の頻度および見込みを含む、値の分散(distribution)を維持し得る。この情報は次に、システム状態260を更新し、システム・レポート270を生成するために利用される。
図3に進む。ここで、フローチャートは、異なったジョブ優先度の存在下での、予測可能(predictive)で、プリエンプティブな、プラニングを実現するために利用された例示のオペレーションを示す。この模範的実施例において、プラナ/スケジューラは、新しいジョブをも含み、それらと関連する種々の優先度を考慮する。種々の優先度は、例えば、ジョブの優先度のみでなく、ジョブの再製、及び/又は、遅延のコストをも考慮するコスト・モデルで表現され得る。高優先度のジョブを挿入することは単に、低優先度のジョブを、遅延すること、または、中止すること、を意味しない。システムの現在の状態および機能に依存して、恐らく、現在のジョブに対するいくらかの僅かな再プラニングを伴って、単純に、現在のジョブと並行して新しいジョブが生産され得る。他の場合には、現在のジョブは、殆ど(そのまま)遂行されて、より高い優先度のジョブが、短期間だけ遅延させられ得ることが、現在のジョブを再生成することに較べて、より、コスト的に有利であり得る。もし、より高い優先度のジョブを遅延するコストが、他のジョブを中止して再生成するコストより高いだけならば、そのオプションが採用されるべきである。スケジューラは、ジョブよりも木目細かに(at a finger granularity)さえ、つまり、個々の作業ユニットで、それらの決定を為し得る。制約ベースのスケジューラを用いると、何を遅延させるか、棚上げする(shelve)(例えば、バッファ・トレイに)か、または、パージさせるて再生成させるか、の判断は、システムの機能、システムの状態、システムについてのジョブの要求、および、ユーザの所望の目的ファンクション(objective function)(例えば、最も高い優先度のジョブの完了時間を最小化する)、についての詳細の情報に起因して為され得る。このアプローチは更に、ユーザが、決断に対する人間の介入を利用すること(例えば、アクションの経過(course of action)にコミットする(commit)前に、スケジューラの情報に基づいて、オペレータに、いくつかのオプションを提示することによって)を可能とする。
310においてコントローラは、新しい、処理中の(in-process)、または、完了したジョブを考慮して、プラニングされるべき作業ユニットを選択する。コントローラは次に、320において、作業ユニットを生産、修復、またはパージし、そして再生産するために必要な機能を判断する。作業ユニットのためのスケジュールを修復するための機能には、作業ユニットの再ルーティング、または、前に決定された(previously determined)ルートの作業ユニットの遅延が含まれる。復旧の機能、パージングおよび再生成の機能は、全て、割り当てられたコストである。スケジュールのトータルのコストは、全ての選択された機能のコストの合計である。従って、殆ど完了したジョブを終了することは、それをパージングして再生成するよりかなり少ないコストしか掛からないはずである一方、より高い優先度のジョブを、短期間だけ遅延することのインクリメンタルなコストは、小さいはずである。より高い優先度のジョブを遅延するコストが、他のジョブを中止して再生成するコストより高い場合に、明白に、その逆は真であり、よって、より低い優先度のジョブを中止することが選択されることとなろう。現在のプランを維持し、単に、新しいジョブを追加することは、もしそれがオプションであるならば、それが可能なときは何時でも、最も低いコスト(遅延無しで、実行するための余計なオペレーション無し)をもたらすはずである。
新しいジョブが受け取られるにつれて、プラナは絶えず、スケジューリングに関する、以前の判断に再訪問(revisit)して質問する。例えば、非常に高い優先度のジョブが提出された(submitted)場合にのみ、現在のジョブはパージされ得る。もし全てのジョブが同じ優先度を持つ、または、優先度が少ししか違わない、または、全ての可能なシナリオを考慮すること無しに決定が為され得る (即ち、現在のジョブが殆ど完了している) ならば、新しいジョブが到着した時に、現在のジョブをパージして再生成するオプションは、考慮する必要さえ無い。従って、320は代替的に、プラナが明白に、全ての可能な機能を詳細に比較することを避けることを援助する、(直近に述べたことのような)ジョブについての一定のヒューリスティックを知悉する判断要素を含み得る。
コントローラは次に、330において、どんな機能が利用可能かを判断する。もしジョブを完了するために十分な機能が利用不可能ならば、同じジョブの後続の作業ユニットが、340において、慮の対象から一時的に除去され、コントローラは310に戻って、プラニングされるべき作業ユニットを選択する。もし、十分な機能が利用可能ならば、選択変数(selection variables)によって修正されたタイミング制約が、350において通知(posted)される。コントローラは、360において、選択変数および共通モジュール(common modules)についての制約をも通知する。実時間制約およびオーダ制約(order constraints)は、370において通知され、全ての選択された機能に対するコスト値は、380で通知される。コントローラは次に、310に戻り、プラニングされるべき他の作業ユニットを選択する。
ここに提示される、異なったジョブ優先度に対する、プラニングおよびスケジューリングのための擬似コードの一つの例は、全体の(分離(disjunctive))問題を、制約記憶(constraint store)に提示し(posts)、同時にプラニングしてスケジューリングするために、ブーレアン変数(Boolean variables)を使用して、機能の中から選択する。当業者が理解するであろうように、例えば、サーチ手順が、必要に応じて代替的機能の選択および通知(posting)に亘って後戻り(backtracking)しつつ、異なった代替的機能が次から次へと(one after another)通知(posted)され得る、というような他のアプローチが利用され得る。そのような代替的アプローチは、本出願の明細書および特許請求の範囲の視野によって完全に考慮される。

initialize schedule S and constraint store C;
repeat forever do
given the current schedule S, determine set Up of in-process work units u and set Uf of
all other (future, including new) work units in S;
for all work units u in Up do
determine set Su,c of "create" capabilities S such that u = output work unit of s
and exit port of s is in Pu
and s does not use off-line resources;
determine the exit port pu of the module currently containing u;
determine set Su,p of "purge" capabilities s such that the entry port of s = pu
and exit port of s is a purge module
and s does not use off-line resources;
determine set Su,r of "repair" capabilities s such that u = output work unit of s
and exit port of s is in Pu
and s does not use off-line resources;
let Su = union of Su,c, Su,p, and Su,r;
add Su to S;
post to C: timing constraints of si in Su,c, with selection variables bi added;
post to C: timing constraints of si,p in Su,p, with selection variables bi,p, added ;
post to C: timing constraints of si,r, in Su,r, with selection variables bi, added;
post to C : bc = sum (si in Su,c) bi;
post to C : bp = sum (si in Su,p) bi,p;
post to C : br = sum (si in Su,r) bi,r,
post to C : b = bp;
post to C : 1 = bp + br,
post to C : real-time constraints for si in Su ;
for all si in Su,c and Su,r, post to C: exit port of si = exit port of job of u; end for
post to C : to = sum (si in Su,c and Su,r) bi times output time of si;
post to C : order constraint for to,
end if
end for
for all work units u in Uf do
(determine capabilities and post constraints as in regular scheduling;)
end for
for all schedules i in Su,r for work units in Up of jobs j do
post objective ci that combines the priority pj of job j and the quality
(e.g., end time) ei of schedule i (e.g., ci = bi pj ei with schedule selection variable bi);
end for
for all schedule pairs i in Su,p and Su,c, for work units in Up of jobs j do
post objective ci that combines the priority pj of job j and the quality
(e.g., end time) ei of schedule i (e.g., ci = bi pj ei with schedule selection variable bi);
end for
for all schedules i for work units in Uf of jobs j do
post objective ci that combines the priority pj of job j and the quality
(e.g., end time) ei of schedule i (e.g., ci = bi pj ei with schedule selection variable bi);
end for
for all jobs j and all possibly capabilities si,j in Su,c and Su,r scheduled above do
ri,j = resource for exit port of si,j;
if all work units in j are being scheduled then
post to C: reserve ri,j for the duration of job j;
else
post to C: reserve ri,j for open-ended future for job j;
end if
end for
solve for the undetermined time variables and selection variables in C,
preferring schedules (and capabilities) i that optimize objectives ci,
send commands to modules based on selected capabilities (bi = 1) in S and
determined time variables in C;
clean up completed parts of S and C;
end repeat
上記目的(objectives)は、個々の作業ユニットからの目的(例えば、全ての個々の作業ユニットに対する、優先度およびスケジュール長の合計)、および、それまでにプラニングされ、スケジューリングされた全体のジョブのための目的(例えば、ジョブ内の、先週の作業ユニットに対する優先度およびスケジュール長)を含む、異なったやり方によって計算され得ることが理解されるべきである。
図4を参照する。ここで、フローチャートは、コントローラのスケジューリング・ファンクションを示す。最初は、ステップ410において、コントローラは、スケジューリングされるべきそれらの機能(これらは、プラニング・ステップによって提供された機能の全てまたはサブセットであり得る)を選択する。コントローラは次に、ステップ420において、同じジョブ内のプラニングされた機能に対する出口リソースをリザーブする。同じジョブの全ての作業ユニットは、同じ最終出口ポートに配送されるように制約されるので、その同じ最終出口ポート(例えば、印刷エンジンの仕上げ器(finisher)のスタックに対応するもの)に接続されたリソースは、ジョブが終了するまでは、他のジョブによって使用され得ない。ステップ430において、コントローラは次に、プラニングされた機能の、タイミングおよび選択変数を解決する。これは、いくつかの制約解決または制約された最適化技術(これらは、当業者に既知である)を用いて実現され得る。
本発明は、特定の実施例を参照して説明され、記述されてきた一方、更なる修正および改善が当業者に想起されるであろう。例えば、このアプローチの種々の単純化と事前編集(pre-compilations)が可能であり得る。例えば単に、ジョブ中の、完了した、および、未完了の作業ユニットの数に基づいて、ヒューリスティックの近似が、現在のジョブを中止するか、終了させるか否かを決定し得る。更に、ここで用いられる「コード」、またはここで用いられる「プログラム」は、コンピュータまたはタスクを遂行するために実行可能な装置によって使用され得る、何らかの、複数のバイナリの値、または、何らかの実行可能な、解釈された(interpreted)または、コンパイルされた、コードである。このコードまたはプログラムは、幾つかの既知のコンピュータ言語の何らかの一つで書き込まれ得る。ここで用いられる「コンピュータ」は、データを記憶し、処理し、ルーティングし、操作し、または、これらに類似するオペレーションを実行する、何らかの装置を意味し得る。
本発明(subject invention)の一つの実施例による、ジョブ優先度に対する、予測可能でプリエンプティブなプラニングおよびスケジューリングのためのシステムを説明する。 本発明の一つの実施例による、異なったジョブ優先度のための、予測可能なプラニングおよびスケジューリングを実現するための、オペレーションのフローを詳述するフロー図を提供する。 本発明の一つの実施例による、異なったジョブ優先度のための、予測可能(predictive)で、プリエンプティブなプラニングを実現するための、オペレーションのオーダリング(ordering)を詳説するフロー・チャートを提供する。 本発明の一つの実施例による、異なったジョブ優先度のための、予測可能でプリエンプティブなプラニングが存在する状態でのスケジューリングを実現するための、オペレーションのオーダリングを詳説するフロー・チャートを提供する。

Claims (6)

  1. 作業ユニットを処理するための複数の選択的機能(alternative capabilities)を伴う、複数のモジュールを有する再構成可能な生産システムにおける、コンフィギュレーション特有の(configuration-specific)、ジョブの再優先度付け(reprioritization)のためのコンピュータ制御されたシステムであって、
    システム・コントローラ、
    一つ以上の作業ユニット(work unit)を持つジョブの生産における、選択されたモジュール機能の利用をプラニングするための、少なくとも一つのプラニング・ファンクション(planning function)であって、当該モジュール機能が、当該モジュール機能の相対コストを含む、プラニングファンクション、および、
    一つ以上の作業ユニットを持つ前記ジョブの生産における前記選択されたモジュール機能の利用をスケジューリングするための、少なくとも一つのスケジューリング・ファンクション、
    を備えるシステム。
  2. 請求項1に記載の、再構成可能な生産システムにおける、コンフィギュレーション特有の、ジョブの再優先度付けのためのシステムであって、
    選択されたモジュール機能の利用をプラニングするための前記ファンクションが、
    計画される(planned)べき一つ以上の作業ユニットを選択するための手段、および、
    計画されるべき前記一つ以上の作業ユニットと対応付けられた機能を決定するための手段、
    を備えるシステム。
  3. 請求項1に記載の、再構成可能な生産システムにおける、コンフィギュレーション特有の、ジョブの再優先度付けのためのシステムであって、前記プラニング・ファンクションが、
    再構成可能な生産システムで利用可能なモジュール機能を決定するための少なくとも一つのファンクション、
    選択変数(selection variables)によって修正されたタイミング制約(constraints)を通知する(posting)ための、少なくとも一つのファンクション、
    選択変数および共通モジュールについての制約を通知するための、少なくとも一つのファンクション、
    リアル・タイムの制約およびオーダ制約(order constraints)を通知するための、少なくとも一つのファンクション、
    全ての選択された機能に対するコスト値(cost value)を通知するための、少なくとも一つのファンクション、および、
    同じジョブの後続の作業ユニットを、考慮の対象(consideration)から一時的に除去するための、少なくとも一つのファンクション、
    を更に備えるシステム。
  4. 作業ユニットを処理するための複数の選択的機能(alternative capabilities)を伴う複数のモジュールを有する、再構成可能な生産システムにおける、コンフィギュレーション特有の、ジョブの再優先度付けのための方法であって、
    少なくとも一つのジョブの生産において計画されるべき一つ以上の作業ユニットを選択するステップであって、当該ジョブが、一つ以上の作業ユニットおよび一つ以上の優先度(priority)を含むステップ、
    前記作業ユニットを実行するために必要な機能を決定(determining)するステップ、
    前記作業ユニットを実行するために、十分なモジュール機能が利用可能か否かを判断するステップ、
    計画されるべき一つ以上の作業ユニットを選択すること、前記作業ユニットを実行するために必要な機能を決定すること、および、前記作業ユニットを実行するために十分なモジュール機能が利用可能か否かを判断すること、を、全ての作業ユニットが計画され尽くされるまで反復するステップ、および、
    或るジョブに対して、当該ジョブを実行するための十分なモジュール機能が利用不可能な、当該ジョブの、いかなる作業ユニットをも考慮の対象から一時的に除去するステップ、
    を含む方法。
  5. 請求項4に記載の、複数のモジュールを有する、再構成可能なコンピュータ制御された生産システムにおける、コンフィギュレーション特有の、ジョブの再優先度付けのための方法であって、
    スケジューリングされるべき機能(capabilities)を選択し、
    同じジョブを伴う計画された機能のための出口リソース(exit resources)を予約(reserving)し、そして、
    計画された機能のタイミングおよび選択変数(selection variables)を解決する(solving)、
    ステップを更に含む方法。
  6. 請求項4に記載の、複数のモジュールを有する、再構成可能なコンピュータ制御された生産システムにおける、コンフィギュレーション特有の、ジョブの再優先度付けのための方法であって、
    選択変数によって修正されたタイミング制約を通知し(posting)、
    選択変数および共通モジュールについての制約を通知し、
    実時間の制約およびオーダ制約(order constraints)を通知し、そして、
    全ての選択された機能に対するコスト値を通知する、
    ステップを更に含む方法。
JP2004125576A 2003-04-28 2004-04-21 異なったジョブ優先度のシステムおよび方法のための予測可能でプリエンプティブのプラニングおよびスケジューリング Expired - Fee Related JP4571819B2 (ja)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US10/424,661 US6895292B2 (en) 2003-04-28 2003-04-28 Predictive and preemptive planning and scheduling for different job priorities system and method

Publications (2)

Publication Number Publication Date
JP2004326788A true JP2004326788A (ja) 2004-11-18
JP4571819B2 JP4571819B2 (ja) 2010-10-27

Family

ID=32990352

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004125576A Expired - Fee Related JP4571819B2 (ja) 2003-04-28 2004-04-21 異なったジョブ優先度のシステムおよび方法のための予測可能でプリエンプティブのプラニングおよびスケジューリング

Country Status (3)

Country Link
US (1) US6895292B2 (ja)
EP (1) EP1473652A3 (ja)
JP (1) JP4571819B2 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013175060A (ja) * 2012-02-24 2013-09-05 Ricoh Co Ltd 情報処理装置、ファイル処理方法、プログラム
KR20140109970A (ko) * 2011-12-30 2014-09-16 비오메리으 생물학적 분석들을 위한 전기기계 시스템용 작업 스케줄러

Families Citing this family (149)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7226049B2 (en) 2003-06-06 2007-06-05 Xerox Corporation Universal flexible plural printer to plural finisher sheet integration system
JP4485763B2 (ja) * 2003-07-10 2010-06-23 株式会社日立製作所 運用管理方法及び装置
US20050203655A1 (en) * 2004-03-11 2005-09-15 Taiwan Semiconductor Manufacturing Co. Scheduling system and method for avoiding low equipment utilization
US7512455B2 (en) * 2004-03-29 2009-03-31 Palo Alto Research Center Incorporated Method for self-synchronization of modular production systems
US7185888B2 (en) * 2004-03-29 2007-03-06 Palo Alto Research Center Incorporated Rotational jam clearance apparatus
US7396012B2 (en) * 2004-06-30 2008-07-08 Xerox Corporation Flexible paper path using multidirectional path modules
US7188929B2 (en) * 2004-08-13 2007-03-13 Xerox Corporation Parallel printing architecture with containerized image marking engines
US7308218B2 (en) * 2005-06-14 2007-12-11 Xerox Corporation Warm-up of multiple integrated marking engines
US9250967B2 (en) * 2004-08-23 2016-02-02 Palo Alto Research Center Incorporated Model-based planning with multi-capacity resources
US20070002085A1 (en) * 2005-06-30 2007-01-04 Xerox Corporation High availability printing systems
US7123873B2 (en) * 2004-08-23 2006-10-17 Xerox Corporation Printing system with inverter disposed for media velocity buffering and registration
US7024152B2 (en) * 2004-08-23 2006-04-04 Xerox Corporation Printing system with horizontal highway and single pass duplex
US7245838B2 (en) * 2005-06-20 2007-07-17 Xerox Corporation Printing platform
US7493055B2 (en) * 2006-03-17 2009-02-17 Xerox Corporation Fault isolation of visible defects with manual module shutdown options
US7136616B2 (en) * 2004-08-23 2006-11-14 Xerox Corporation Parallel printing architecture using image marking engine modules
US7742185B2 (en) 2004-08-23 2010-06-22 Xerox Corporation Print sequence scheduling for reliability
US7224913B2 (en) * 2005-05-05 2007-05-29 Xerox Corporation Printing system and scheduling method
US8407077B2 (en) * 2006-02-28 2013-03-26 Palo Alto Research Center Incorporated System and method for manufacturing system design and shop scheduling using network flow modeling
US7649645B2 (en) 2005-06-21 2010-01-19 Xerox Corporation Method of ordering job queue of marking systems
US7787138B2 (en) 2005-05-25 2010-08-31 Xerox Corporation Scheduling system
US7619769B2 (en) * 2005-05-25 2009-11-17 Xerox Corporation Printing system
US7302199B2 (en) * 2005-05-25 2007-11-27 Xerox Corporation Document processing system and methods for reducing stress therein
US7542059B2 (en) * 2006-03-17 2009-06-02 Xerox Corporation Page scheduling for printing architectures
US7751072B2 (en) * 2004-09-29 2010-07-06 Xerox Corporation Automated modification of a marking engine in a printing system
JP4460411B2 (ja) * 2004-10-01 2010-05-12 本田技研工業株式会社 ロボット制御装置
US7162172B2 (en) * 2004-11-30 2007-01-09 Xerox Corporation Semi-automatic image quality adjustment for multiple marking engine systems
US7245856B2 (en) * 2004-11-30 2007-07-17 Xerox Corporation Systems and methods for reducing image registration errors
US7791751B2 (en) * 2004-11-30 2010-09-07 Palo Alto Research Corporation Printing systems
US7305194B2 (en) * 2004-11-30 2007-12-04 Xerox Corporation Xerographic device streak failure recovery
US7283762B2 (en) 2004-11-30 2007-10-16 Xerox Corporation Glossing system for use in a printing architecture
US20060114497A1 (en) * 2004-11-30 2006-06-01 Xerox Corporation Printing system
US7412180B2 (en) * 2004-11-30 2008-08-12 Xerox Corporation Glossing system for use in a printing system
JP4450205B2 (ja) * 2004-12-24 2010-04-14 ブラザー工業株式会社 インクジェット記録装置
US20060173723A1 (en) * 2005-01-28 2006-08-03 Raytheon Company Scheduler
US7540484B2 (en) * 2005-02-02 2009-06-02 Xerox Corporation System of opposing alternate higher speed sheet feeding from the same sheet stack
US7226158B2 (en) * 2005-02-04 2007-06-05 Xerox Corporation Printing systems
US8819103B2 (en) * 2005-04-08 2014-08-26 Palo Alto Research Center, Incorporated Communication in a distributed system
US7873962B2 (en) * 2005-04-08 2011-01-18 Xerox Corporation Distributed control systems and methods that selectively activate respective coordinators for respective tasks
US8081329B2 (en) 2005-06-24 2011-12-20 Xerox Corporation Mixed output print control method and system
US7791741B2 (en) * 2005-04-08 2010-09-07 Palo Alto Research Center Incorporated On-the-fly state synchronization in a distributed system
US8014024B2 (en) 2005-03-02 2011-09-06 Xerox Corporation Gray balance for a printing system of multiple marking engines
US7258340B2 (en) * 2005-03-25 2007-08-21 Xerox Corporation Sheet registration within a media inverter
US7697151B2 (en) * 2005-03-25 2010-04-13 Xerox Corporation Image quality control method and apparatus for multiple marking engine systems
US7416185B2 (en) * 2005-03-25 2008-08-26 Xerox Corporation Inverter with return/bypass paper path
US7206536B2 (en) * 2005-03-29 2007-04-17 Xerox Corporation Printing system with custom marking module and method of printing
US7272334B2 (en) * 2005-03-31 2007-09-18 Xerox Corporation Image on paper registration alignment
US7444108B2 (en) * 2005-03-31 2008-10-28 Xerox Corporation Parallel printing architecture with parallel horizontal printing modules
US7245844B2 (en) * 2005-03-31 2007-07-17 Xerox Corporation Printing system
US7706007B2 (en) * 2005-04-08 2010-04-27 Palo Alto Research Center Incorporated Synchronization in a distributed system
US7566053B2 (en) * 2005-04-19 2009-07-28 Xerox Corporation Media transport system
US7593130B2 (en) * 2005-04-20 2009-09-22 Xerox Corporation Printing systems
US20060244980A1 (en) * 2005-04-27 2006-11-02 Xerox Corporation Image quality adjustment method and system
US20060268287A1 (en) * 2005-05-25 2006-11-30 Xerox Corporation Automated promotion of monochrome jobs for HLC production printers
US7486416B2 (en) * 2005-06-02 2009-02-03 Xerox Corporation Inter-separation decorrelator
US8004729B2 (en) * 2005-06-07 2011-08-23 Xerox Corporation Low cost adjustment method for printing systems
US7451697B2 (en) * 2005-06-24 2008-11-18 Xerox Corporation Printing system
US7387297B2 (en) * 2005-06-24 2008-06-17 Xerox Corporation Printing system sheet feeder using rear and front nudger rolls
US7310493B2 (en) * 2005-06-24 2007-12-18 Xerox Corporation Multi-unit glossing subsystem for a printing device
US7433627B2 (en) * 2005-06-28 2008-10-07 Xerox Corporation Addressable irradiation of images
US8259369B2 (en) 2005-06-30 2012-09-04 Xerox Corporation Color characterization or calibration targets with noise-dependent patch size or number
US8203768B2 (en) * 2005-06-30 2012-06-19 Xerox Corporaiton Method and system for processing scanned patches for use in imaging device calibration
US7647018B2 (en) * 2005-07-26 2010-01-12 Xerox Corporation Printing system
US7496412B2 (en) 2005-07-29 2009-02-24 Xerox Corporation Control method using dynamic latitude allocation and setpoint modification, system using the control method, and computer readable recording media containing the control method
US8719825B2 (en) * 2005-08-17 2014-05-06 Sap Ag Prompting for execution or delay of scheduled job
US7466940B2 (en) * 2005-08-22 2008-12-16 Xerox Corporation Modular marking architecture for wide media printing platform
US7474861B2 (en) * 2005-08-30 2009-01-06 Xerox Corporation Consumable selection in a printing system
US7356376B1 (en) 2005-09-08 2008-04-08 At&T Corp Work when ready load balancing using critical dates
US7911652B2 (en) * 2005-09-08 2011-03-22 Xerox Corporation Methods and systems for determining banding compensation parameters in printing systems
US7495799B2 (en) * 2005-09-23 2009-02-24 Xerox Corporation Maximum gamut strategy for the printing systems
US7430380B2 (en) * 2005-09-23 2008-09-30 Xerox Corporation Printing system
US7444088B2 (en) * 2005-10-11 2008-10-28 Xerox Corporation Printing system with balanced consumable usage
US7811017B2 (en) * 2005-10-12 2010-10-12 Xerox Corporation Media path crossover for printing system
US7719716B2 (en) * 2005-11-04 2010-05-18 Xerox Corporation Scanner characterization for printer calibration
US8711435B2 (en) * 2005-11-04 2014-04-29 Xerox Corporation Method for correcting integrating cavity effect for calibration and/or characterization targets
US7660460B2 (en) * 2005-11-15 2010-02-09 Xerox Corporation Gamut selection in multi-engine systems
US7280771B2 (en) * 2005-11-23 2007-10-09 Xerox Corporation Media pass through mode for multi-engine system
US7519314B2 (en) * 2005-11-28 2009-04-14 Xerox Corporation Multiple IOT photoreceptor belt seam synchronization
US7922288B2 (en) * 2005-11-30 2011-04-12 Xerox Corporation Printing system
US7575232B2 (en) * 2005-11-30 2009-08-18 Xerox Corporation Media path crossover clearance for printing system
US7636543B2 (en) * 2005-11-30 2009-12-22 Xerox Corporation Radial merge module for printing system
US7706737B2 (en) 2005-11-30 2010-04-27 Xerox Corporation Mixed output printing system
US7912416B2 (en) 2005-12-20 2011-03-22 Xerox Corporation Printing system architecture with center cross-over and interposer by-pass path
US7826090B2 (en) * 2005-12-21 2010-11-02 Xerox Corporation Method and apparatus for multiple printer calibration using compromise aim
US7756428B2 (en) * 2005-12-21 2010-07-13 Xerox Corp. Media path diagnostics with hyper module elements
US8102564B2 (en) * 2005-12-22 2012-01-24 Xerox Corporation Method and system for color correction using both spatial correction and printer calibration techniques
US7746524B2 (en) * 2005-12-23 2010-06-29 Xerox Corporation Bi-directional inverter printing apparatus and method
US7624981B2 (en) * 2005-12-23 2009-12-01 Palo Alto Research Center Incorporated Universal variable pitch interface interconnecting fixed pitch sheet processing machines
US7963518B2 (en) * 2006-01-13 2011-06-21 Xerox Corporation Printing system inverter apparatus and method
US8477333B2 (en) * 2006-01-27 2013-07-02 Xerox Corporation Printing system and bottleneck obviation through print job sequencing
US7630669B2 (en) * 2006-02-08 2009-12-08 Xerox Corporation Multi-development system print engine
US7672006B2 (en) * 2006-02-22 2010-03-02 Xerox Corporation Multi-marking engine printing platform
US8194262B2 (en) * 2006-02-27 2012-06-05 Xerox Corporation System for masking print defects
US7965397B2 (en) * 2006-04-06 2011-06-21 Xerox Corporation Systems and methods to measure banding print defects
US8330965B2 (en) 2006-04-13 2012-12-11 Xerox Corporation Marking engine selection
US7681883B2 (en) * 2006-05-04 2010-03-23 Xerox Corporation Diverter assembly, printing system and method
US7382993B2 (en) * 2006-05-12 2008-06-03 Xerox Corporation Process controls methods and apparatuses for improved image consistency
US7800777B2 (en) * 2006-05-12 2010-09-21 Xerox Corporation Automatic image quality control of marking processes
US7679631B2 (en) 2006-05-12 2010-03-16 Xerox Corporation Toner supply arrangement
US8010216B2 (en) * 2006-05-18 2011-08-30 Roise Geoffrey J System and method for cutting-stock optimization across schedules and batches
US7865125B2 (en) * 2006-06-23 2011-01-04 Xerox Corporation Continuous feed printing system
US7856191B2 (en) * 2006-07-06 2010-12-21 Xerox Corporation Power regulator of multiple integrated marking engines
US7924443B2 (en) * 2006-07-13 2011-04-12 Xerox Corporation Parallel printing system
US8607102B2 (en) * 2006-09-15 2013-12-10 Palo Alto Research Center Incorporated Fault management for a printing system
US7766327B2 (en) * 2006-09-27 2010-08-03 Xerox Corporation Sheet buffering system
US7857309B2 (en) * 2006-10-31 2010-12-28 Xerox Corporation Shaft driving apparatus
US7819401B2 (en) * 2006-11-09 2010-10-26 Xerox Corporation Print media rotary transport apparatus and method
US8159713B2 (en) * 2006-12-11 2012-04-17 Xerox Corporation Data binding in multiple marking engine printing systems
US7969624B2 (en) 2006-12-11 2011-06-28 Xerox Corporation Method and system for identifying optimal media for calibration and control
US7945346B2 (en) * 2006-12-14 2011-05-17 Palo Alto Research Center Incorporated Module identification method and system for path connectivity in modular systems
US8145335B2 (en) 2006-12-19 2012-03-27 Palo Alto Research Center Incorporated Exception handling
US8100523B2 (en) 2006-12-19 2012-01-24 Xerox Corporation Bidirectional media sheet transport apparatus
US7559549B2 (en) 2006-12-21 2009-07-14 Xerox Corporation Media feeder feed rate
US8693021B2 (en) 2007-01-23 2014-04-08 Xerox Corporation Preemptive redirection in printing systems
US7934825B2 (en) * 2007-02-20 2011-05-03 Xerox Corporation Efficient cross-stream printing system
US7676191B2 (en) 2007-03-05 2010-03-09 Xerox Corporation Method of duplex printing on sheet media
US7894107B2 (en) 2007-04-27 2011-02-22 Xerox Corporation Optical scanner with non-redundant overwriting
US8253958B2 (en) * 2007-04-30 2012-08-28 Xerox Corporation Scheduling system
US8169657B2 (en) 2007-05-09 2012-05-01 Xerox Corporation Registration method using sensed image marks and digital realignment
US7925366B2 (en) * 2007-05-29 2011-04-12 Xerox Corporation System and method for real-time system control using precomputed plans
US7689311B2 (en) 2007-05-29 2010-03-30 Palo Alto Research Center Incorporated Model-based planning using query-based component executable instructions
US7590464B2 (en) 2007-05-29 2009-09-15 Palo Alto Research Center Incorporated System and method for on-line planning utilizing multiple planning queues
US10621525B2 (en) * 2007-06-29 2020-04-14 Palo Alto Research Center Incorporated Method for solving model-based planning with goal utility dependencies
US8203750B2 (en) 2007-08-01 2012-06-19 Xerox Corporation Color job reprint set-up for a printing system
US7697166B2 (en) 2007-08-03 2010-04-13 Xerox Corporation Color job output matching for a printing system
US7590501B2 (en) 2007-08-28 2009-09-15 Xerox Corporation Scanner calibration robust to lamp warm-up
US8458712B2 (en) * 2008-04-30 2013-06-04 International Business Machines Corporation System and method for multi-level preemption scheduling in high performance processing
US20090299511A1 (en) * 2008-05-30 2009-12-03 International Business Machines Corporation Method of releasing units in a production facility
US8219437B2 (en) * 2008-07-10 2012-07-10 Palo Alto Research Center Incorporated Methods and systems for constructing production plans
US8145334B2 (en) * 2008-07-10 2012-03-27 Palo Alto Research Center Incorporated Methods and systems for active diagnosis through logic-based planning
US8165705B2 (en) * 2008-07-10 2012-04-24 Palo Alto Research Center Incorporated Methods and systems for continuously estimating persistent and intermittent failure probabilities for production resources
US8266092B2 (en) * 2008-07-10 2012-09-11 Palo Alto Research Center Incorporated Methods and systems for target value path identification
US8169626B2 (en) 2008-08-29 2012-05-01 Xerox Corporation Using buffers to support uncertainties in marking engine execution
US8359110B2 (en) * 2009-03-23 2013-01-22 Kuhn Lukas D Methods and systems for fault diagnosis in observation rich systems
US7976012B2 (en) 2009-04-28 2011-07-12 Xerox Corporation Paper feeder for modular printers
US8464268B2 (en) * 2009-09-14 2013-06-11 Palo Alto Research Center Incorporated Dynamic scheduling of jobs/batches using earliest completion time algorithm in cellular manufacturing with batch-splitting of jobs above certain size
JP5222328B2 (ja) * 2010-08-04 2013-06-26 日立Geニュークリア・エナジー株式会社 作業計画作成方法および装置
US8769542B2 (en) 2010-10-26 2014-07-01 Palo Alto Research Center Incorporated System for adaptive lot sizing in cellular manufacturing for balancing workloads across multiple cells using split-then-merge operations and earliest completion route algorithm
US8521606B2 (en) * 2010-12-16 2013-08-27 Xerox Corporation System and method of determining price optimization for distributed demand
US20120185286A1 (en) * 2011-01-17 2012-07-19 Palo Alto Research Center Incorporated Online continual automated planning framework based on timelines
US10732913B2 (en) 2011-06-09 2020-08-04 Xerox Corporation System and method for multi-site cellular manufacturing with transportation delays
CN103092085B (zh) * 2011-10-28 2015-03-11 上海宝信软件股份有限公司 多工位竞争投料的控制方法
CN103092086B (zh) * 2011-10-28 2014-12-31 上海宝信软件股份有限公司 多工位竞争投料的控制方法及控制系统
JP5929949B2 (ja) * 2014-03-13 2016-06-08 トヨタ自動車株式会社 作業計画作成システム
DE102015003573B4 (de) * 2015-03-19 2017-07-13 Audi Ag Verfahren zur Durchführung eines Produktionsprozesses mittels einer Bearbeitungsstation, sowie Anordnung zur Durchführung des Verfahrens
DE102016217378A1 (de) 2016-09-13 2018-03-15 Kba-Kammann Gmbh Bearbeitungsmaschine mit mehreren Bearbeitungsstationen zum Bearbeiten von Körpern
DE102016217377A1 (de) 2016-09-13 2018-03-15 Kba-Kammann Gmbh Bearbeitungsmaschine mit mehreren Bearbeitungsstationen zum Bearbeiten von Körpern
CN110633914A (zh) * 2019-09-20 2019-12-31 中国银行股份有限公司 批量作业调度处理方法及装置
US11609545B2 (en) 2020-07-14 2023-03-21 Intrinsic Innovation Llc Method and system for preemptive planning
US11941448B2 (en) 2020-09-03 2024-03-26 Hewlett Packard Enterprise Development Lp Allocating computing resources to data transfer jobs based on a completed amount and an estimated priority of system failure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0528119A (ja) * 1991-07-18 1993-02-05 Nippon Telegr & Teleph Corp <Ntt> 動作ネツトワ−クシステム
JPH11237960A (ja) * 1998-02-20 1999-08-31 Fuji Xerox Co Ltd 画像出力制御装置およびその処理実行制御方法
JP2000020599A (ja) * 1998-07-06 2000-01-21 Yokogawa Electric Corp エージェント生産システム
JP2000033538A (ja) * 1998-07-16 2000-02-02 Yokogawa Electric Corp 生産システム及び生産システムにおける加工装置の選択方法
JP2000033539A (ja) * 1998-07-16 2000-02-02 Yokogawa Electric Corp 生産システム
JP2000052200A (ja) * 1998-08-06 2000-02-22 Yokogawa Electric Corp 生産システム
US6400999B1 (en) * 1998-07-06 2002-06-04 Yokogawa Electric Corporation Production system and manufacturing equipment selecting method on production system
WO2002097562A2 (en) * 2001-05-31 2002-12-05 Quicksilver Technology, Inc. Method and system for scheduling in an adaptable computing engine
JP2003029988A (ja) * 2001-07-13 2003-01-31 Nec Corp タスクスケジューリングシステムおよび方法、プログラム

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5095342A (en) 1990-09-28 1992-03-10 Xerox Corporation Methods for sheet scheduling in an imaging system having an endless duplex paper path loop
US5159395A (en) 1991-08-29 1992-10-27 Xerox Corporation Method of scheduling copy sheets in a dual mode duplex printing system
US5559710A (en) * 1993-02-05 1996-09-24 Siemens Corporate Research, Inc. Apparatus for control and evaluation of pending jobs in a factory
US5557367A (en) 1995-03-27 1996-09-17 Xerox Corporation Method and apparatus for optimizing scheduling in imaging devices
US5696893A (en) * 1995-06-07 1997-12-09 Xerox Corporation System for generically describing and scheduling operation of modular printing machine
US5604600A (en) * 1995-12-06 1997-02-18 Xerox Corporation Production trees for generic representation of document requirements for particular output terminals
US5890134A (en) * 1996-02-16 1999-03-30 Mcdonnell Douglas Corporation Scheduling optimizer
US5826104A (en) * 1996-04-15 1998-10-20 Mci Communications Corporation Batch program status via tape data set information for dynamically determining the real time status of a batch program running in a main frame computer system
US6115646A (en) * 1997-12-18 2000-09-05 Nortel Networks Limited Dynamic and generic process automation system
US6321133B1 (en) * 1998-12-04 2001-11-20 Impresse Corporation Method and apparatus for order promising
US6105520A (en) * 1999-02-26 2000-08-22 L&P Property Management Company Quilt making automatic scheduling system and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0528119A (ja) * 1991-07-18 1993-02-05 Nippon Telegr & Teleph Corp <Ntt> 動作ネツトワ−クシステム
JPH11237960A (ja) * 1998-02-20 1999-08-31 Fuji Xerox Co Ltd 画像出力制御装置およびその処理実行制御方法
JP2000020599A (ja) * 1998-07-06 2000-01-21 Yokogawa Electric Corp エージェント生産システム
US6400999B1 (en) * 1998-07-06 2002-06-04 Yokogawa Electric Corporation Production system and manufacturing equipment selecting method on production system
JP2000033538A (ja) * 1998-07-16 2000-02-02 Yokogawa Electric Corp 生産システム及び生産システムにおける加工装置の選択方法
JP2000033539A (ja) * 1998-07-16 2000-02-02 Yokogawa Electric Corp 生産システム
JP2000052200A (ja) * 1998-08-06 2000-02-22 Yokogawa Electric Corp 生産システム
WO2002097562A2 (en) * 2001-05-31 2002-12-05 Quicksilver Technology, Inc. Method and system for scheduling in an adaptable computing engine
JP2003029988A (ja) * 2001-07-13 2003-01-31 Nec Corp タスクスケジューリングシステムおよび方法、プログラム

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140109970A (ko) * 2011-12-30 2014-09-16 비오메리으 생물학적 분석들을 위한 전기기계 시스템용 작업 스케줄러
KR101669919B1 (ko) 2011-12-30 2016-11-09 비오메리으 생물학적 분석들을 위한 전기기계 시스템용 작업 스케줄러
JP2013175060A (ja) * 2012-02-24 2013-09-05 Ricoh Co Ltd 情報処理装置、ファイル処理方法、プログラム

Also Published As

Publication number Publication date
JP4571819B2 (ja) 2010-10-27
US6895292B2 (en) 2005-05-17
US20040225394A1 (en) 2004-11-11
EP1473652A3 (en) 2005-02-02
EP1473652A2 (en) 2004-11-03

Similar Documents

Publication Publication Date Title
JP4571819B2 (ja) 異なったジョブ優先度のシステムおよび方法のための予測可能でプリエンプティブのプラニングおよびスケジューリング
US7139629B2 (en) Planning and scheduling for failure recovery system and method
US6856845B2 (en) Monitoring and reporting incremental job status system and method
JP4777608B2 (ja) オフラインリソース周辺の再構成可能なシステムのプラニング及びスケジューリングシステム及び方法
Aytug et al. Executing production schedules in the face of uncertainties: A review and some future directions
CA2447067C (en) Planning and scheduling reconfigurable systems with regular and diagnostic jobs
US8606386B2 (en) Multi-agent system for distributed manufacturing scheduling with Genetic Algorithms and Tabu Search
Korytkowski et al. An evolutionary simulation-based optimization approach for dispatching scheduling
US6876894B1 (en) Forecast test-out of probed fabrication by using dispatching simulation method
Hamzadayi et al. Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server
JP2004152293A (ja) 代替能力を有する再構成可能なシステムのプランニング及びスケジューリングシステム及び方法
EP2000899A2 (en) System and method for real-time system control using precomputed plans
EP2447826B1 (en) System and methods of balancing workload accross multiple cells in cellular manufacturing
ElMekkawy et al. Real-time scheduling with deadlock avoidance in flexible manufacturing systems
Ecker et al. Scheduling tasks on a flexible manufacturing machine to minimize tool change delays
US7451132B2 (en) System and method for production planning utilizing on-line state-space planning
Herrmann Rescheduling Strategies, Policies, and Methods: Using the rescheduling framework to improve production scheduling
Russell et al. Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems
Vinod et al. Development and analysis of scheduling decision rules for a dynamic flexible job shop production system: a simulation study
Xiao-Feng et al. A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly
ElMaraghy et al. Deadlock-free rescheduling in flexible manufacturing systems
US20140058787A1 (en) Plan Choosing in Digital Commercial Print Workflows
Paschko et al. Material flow control in Remanufacturing Systems with random failures and variable processing times
Shr et al. A heuristic scheduling approach to the dedicated machine constraint
Barenji et al. Efficient Resource Allocation in Mass Customization based on Service Oriented Architecture

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070419

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091023

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091102

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100301

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20100601

A602 Written permission of extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A602

Effective date: 20100604

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100628

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100720

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100813

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees