JP2003321806A - Timbering beam - Google Patents
Timbering beamInfo
- Publication number
- JP2003321806A JP2003321806A JP2002129553A JP2002129553A JP2003321806A JP 2003321806 A JP2003321806 A JP 2003321806A JP 2002129553 A JP2002129553 A JP 2002129553A JP 2002129553 A JP2002129553 A JP 2002129553A JP 2003321806 A JP2003321806 A JP 2003321806A
- Authority
- JP
- Japan
- Prior art keywords
- timbering
- frames
- side beam
- webs
- chord member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、支点間に架け渡
し、その上面に橋梁のコンクリート床版等を構築するた
めの型枠支保工を載置する支保梁に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support beam which is bridged between fulcrums and on which a formwork support for constructing a concrete floor slab of a bridge is placed.
【0002】[0002]
【従来の技術】高架橋等でコンクリート床版を構築する
際に用いる支保梁は、中間トラス及び端部トラスを所要
スパンに応じて適宜連結して一連の側面梁枠を組み立
て、このような単位側面梁枠を支柱等の支点間に一定の
ピッチで並列配置し、これらの間に水平つなぎ材、水平
ブレース材及び斜めつなぎ材等の横つなぎ材を取って一
体化していた。2. Description of the Related Art A supporting beam used when constructing a concrete floor slab such as a viaduct is constructed by assembling a series of side beam frames by appropriately connecting an intermediate truss and an end truss according to a required span. The beam frames are arranged in parallel at a fixed pitch between fulcrums such as stanchions, and horizontal tie members such as horizontal tie members, horizontal brace members, and diagonal tie members are integrated between them.
【0003】従来の支保梁では、単位側面梁枠を地上で
組み立てた後、1本ずつクレーン等で吊り上げて支点間
にセットし、その後横つなぎ材を取り付けていたので、
組立作業が煩雑であったのに加え、高所作業が不安定な
状態で行われるので安全面でも問題があった。そこで支
保梁組立の安全性を考慮して2枚の側面梁枠と横つなぎ
材を地上において断面ボックス型に組み立てる施工法も
実施されていた。In the conventional supporting beam, after the unit side beam frames are assembled on the ground, they are individually lifted by a crane or the like and set between fulcrums, and then a horizontal connecting member is attached.
In addition to the complicated assembling work, there was also a problem in terms of safety because the work at high places was performed in an unstable state. Therefore, in consideration of the safety of supporting beam assembly, a construction method of assembling two side beam frames and a horizontal tie member in a box-shaped cross section on the ground was also implemented.
【0004】[0004]
【発明が解決しようとする課題】しかし、地上で断面ボ
ックス型に組み立てた支保梁であっても、その上面に構
築する型枠支保工の作業足場としては、各単位側面梁枠
の上面を利用していたので歩行面積が非常に狭く危険で
あった。又水平つなぎ材間に足場板を架け渡すこともあ
ったが、足場板と側面梁枠との間にはどうしても空隙が
存在してしまうため、作業足場の安全確保が十分ではな
かった。However, even if the supporting beam is assembled on the ground in a box-shaped cross section, the upper surface of each unit side beam frame is used as the work scaffold for the formwork supporting work to be built on the upper surface of the supporting beam. The walking area was very small and dangerous. In addition, a scaffolding board may be bridged between the horizontal tie members, but since a space is inevitably present between the scaffolding board and the side beam frame, it is not sufficient to ensure the safety of the working scaffold.
【0005】又従来の支保梁では、足場板を敷設しても
平面的に空隙が大半を占めるため飛来落下防止用の安全
ネットを全域に亘り架設することが必要であった。しか
もネットは、支保梁の下方に架設することになるため、
その取付作業が高所での危険を伴う作業になりがちであ
った。Further, in the conventional supporting beam, even if a scaffolding plate is laid, since most of the voids occupy a plane, it is necessary to lay a safety net for preventing flying and falling over the entire area. Moreover, since the net will be installed below the supporting beam,
The installation work tends to be dangerous work at a high place.
【0006】この発明は、上記のような従来の支保梁が
有する問題点を解消すべくなされたものであり、支点間
のセットが容易で、設置後に横つなぎ材を取る必要がな
く、型枠支保工用の作業足場も安全性が確保された支保
梁を提供することを目的としている。又、飛来落下防止
用の安全ネットの取付範囲が狭くとも安全を確保でき、
しかもその取付作業が安全に実施できる支保梁を提供す
ることを目的としている。The present invention has been made to solve the problems of the conventional supporting beams as described above, and it is easy to set the fulcrums, and it is not necessary to take a horizontal connecting material after the installation, and the formwork is used. The work scaffolding for supporting work is also intended to provide supporting beams with safety ensured. In addition, safety can be secured even if the mounting range of the safety net for flying drop prevention is narrow,
Moreover, it is an object of the present invention to provide a supporting beam that can be mounted safely.
【0007】[0007]
【課題を解決するための手段】上記課題を解決するた
め、この発明の支保梁は、平行に配置するトラス構造の
側面梁枠2枚と、両側面梁枠間にあって両者を連結する
横つなぎ材を有する支保梁において、前記横つなぎ材
は、側面梁枠の上弦材又は下弦材のウエブに固着する床
板を有することを特徴とするものである。側面梁枠は支
承部を設ける端部トラスと中間トラスを一体に形成し、
これらに水平つなぎ材を固着すると共に、上弦材等のウ
エブに板材からなる床板を固着する。床板は作業足場を
構成し当接するウエブがつま先板となるので滑り止めと
なる。In order to solve the above-mentioned problems, a supporting beam of the present invention comprises two side beam frames having a truss structure arranged in parallel with each other, and a horizontal connecting member between both side beam frames for connecting the two side beam frames. In the supporting beam having the above-mentioned, the horizontal connecting member has a floor plate fixed to the web of the upper chord member or the lower chord member of the side beam frame. The side beam frame is integrally formed with the end truss and the intermediate truss that provide the support,
A horizontal tie member is fixed to these, and a floor plate made of a plate member is fixed to a web such as an upper chord member. The floor plate constitutes a working scaffold, and the abutting web serves as a toe plate, which prevents slipping.
【0008】請求項2記載の支保梁の上弦材は、下側フ
ランジにネット吊下金具を装着することを特徴とするも
のである。ネット吊下金具は、例えばフランジに適宜間
隔で穿設する孔に取り付ける複数のアイボルトであっ
て、これらにネット係止具の環体を掛止してネットを吊
り下げる。ネットは側面梁枠間の空隙を保護する。The upper chord member of the supporting beam according to claim 2 is characterized in that a net hanging metal fitting is attached to the lower flange. The net suspension fitting is, for example, a plurality of eye bolts attached to holes formed in the flange at appropriate intervals, and the ring of the net locking device is hooked to these to suspend the net. The net protects the space between the side beam frames.
【0009】[0009]
【発明の実施の形態】次にこの発明の実施の形態を添付
図面に基づき詳細に説明する。図1は支保梁の正面図、
図2は同平面図である。支保梁1は、平行に配置する側
面梁枠2,2と、両者を連結する水平つなぎ材3と、側
面梁枠2の上弦材4のウエブ4a中央に固着する床板5
を有する。側面梁枠2は、上弦材4と下弦材6を基本構
成部材とし、この両材間に斜材7と垂直材8とを配して
トラス構造としている。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. Figure 1 is a front view of the supporting beam,
FIG. 2 is a plan view of the same. The support beam 1 includes side beam frames 2 and 2 arranged in parallel, a horizontal connecting member 3 connecting the side beam frames 2 and 2, and a floor plate 5 fixed to the center of the web 4a of the upper chord member 4 of the side beam frame 2.
Have. The side beam frame 2 has an upper chord member 4 and a lower chord member 6 as basic constituent members, and a diagonal member 7 and a vertical member 8 are arranged between these members to form a truss structure.
【0010】水平つなぎ材3は側面梁枠2の格点同士を
連結する部材で、側面梁枠2の端部には支承部9を設け
る。支承部9は図示しない補助部材を接続することで上
弦材4の長さを延長することができる。又、支保梁1の
安定した吊り込み作業が出来るように床板5の上面に突
出する水平つなぎ材3の適宜箇所には予め吊点10を設
けておく。The horizontal connecting member 3 is a member for connecting the points of the side beam frame 2 to each other, and a supporting portion 9 is provided at the end of the side beam frame 2. The support portion 9 can extend the length of the upper chord member 4 by connecting an auxiliary member (not shown). In addition, a hanging point 10 is provided in advance at an appropriate position of the horizontal tie member 3 protruding above the floor plate 5 so that the supporting beam 1 can be stably hung.
【0011】支保梁2は、断面ボックス型に構成され、
単独で水平力に対して十分な強度を発揮するものであ
り、現場に搬入された支保梁2をクレーンで吊り上げて
支持物へセットするだけで上空での補強作業が不要であ
り、架設工数が低減できるため全体工期の短縮も可能と
なる。The support beam 2 has a box-shaped cross section,
Since it alone exerts sufficient strength against horizontal force, it is not necessary to reinforce it in the sky by simply lifting the supporting beam 2 that has been brought into the field with a crane and setting it on a support, and the erection man-hour is reduced. Since it can be reduced, the entire construction period can be shortened.
【0012】次に支保梁における安全ネットの架設状態
を図3乃至図5に基き説明する。図3は架設時の支保梁
断面図、図4は上弦材の安全ネット取付部の拡大断面
図、図5は同拡大側面図である。上弦材4の下側フラン
ジ4bには適宜間隔で孔4cを穿設し、これにボルト1
1を挿通してその下端にアイナット12を螺着する。ネ
ット13はCリンク14によって吊り下げる。Next, the erected state of the safety net on the supporting beam will be described with reference to FIGS. 3 to 5. FIG. 3 is a sectional view of a supporting beam at the time of installation, FIG. 4 is an enlarged sectional view of a safety net mounting portion of the upper chord member, and FIG. 5 is an enlarged side view of the same. Holes 4c are formed in the lower flange 4b of the upper chord member 4 at appropriate intervals, and the bolts 1 are
1 and the eye nut 12 is screwed to the lower end. The net 13 is suspended by a C-link 14.
【0013】橋梁のコンクリート床版等を構築するため
に用いる支保梁2は、橋脚等に設ける支点間に複数本並
列して架け渡し、その上面にH型鋼等からなる大引材を
敷設してステージングを形成した上、これに型枠支保工
を組み上げる。ステージングが完成するまでは支保梁2
上が作業足場となるため支保梁2の架設と同時にネット
13の取り付けを行う。A plurality of supporting beams 2 used for constructing a concrete floor slab of a bridge are arranged in parallel between fulcrums provided on a bridge pier or the like, and a large drawing material made of H-shaped steel or the like is laid on the upper surface thereof. After forming staging, formwork support is assembled to this. Support beams 2 until staging is completed
Since the work scaffold is on the top, the nets 13 are attached at the same time as the support beams 2 are installed.
【0014】支保梁2は上面が安全な作業足場となって
閉鎖された構成であるため、側面梁枠2間の空隙をネッ
ト13で保護すれば、飛来落下物はほぼ完全に防止でき
る。又ネット13は床板5上から容易に取り付けること
ができる。Since the support beam 2 has a structure in which the upper surface is closed as a safe work scaffold and is closed, if the space between the side beam frames 2 is protected by a net 13, flying fall objects can be almost completely prevented. Further, the net 13 can be easily attached from above the floor plate 5.
【0015】[0015]
【発明の効果】以上説明したように、この発明の支保梁
は、側面梁枠の上弦材又は下弦材のウエブに床板を固着
するので、完全に閉鎖された作業足場を形成することが
できる。又請求項2記載の支保梁の上弦材は、下側フラ
ンジにネット吊下金具を装着するので、飛来落下防止用
ネットを安全かつ容易に取り付けることができる。As described above, according to the supporting beam of the present invention, since the floor board is fixed to the web of the upper chord member or the lower chord member of the side beam frame, the working scaffold which is completely closed can be formed. Further, in the upper chord member of the supporting beam according to the second aspect, the net hanging metal fitting is attached to the lower flange, so that the flying fall prevention net can be attached safely and easily.
【図1】支保梁の正面図である。FIG. 1 is a front view of a support beam.
【図2】支保梁の平面図である。FIG. 2 is a plan view of a support beam.
【図3】架設時の支保梁断面図である。FIG. 3 is a sectional view of a supporting beam at the time of installation.
【図4】上弦材の安全ネット取付部の拡大断面図であ
る。FIG. 4 is an enlarged sectional view of a safety net attachment portion of the upper chord member.
【図5】上弦材の安全ネット取付部の拡大側面図であ
る。FIG. 5 is an enlarged side view of a safety net attachment portion of the upper chord member.
1 支保梁 2 側面梁枠 3 水平つなぎ材 4 上弦材 5 床版 6 下弦材 1 Support beam 2 Side beam frame 3 horizontal ties 4 upper chord material 5 floor slabs 6 lower chord material
フロントページの続き (72)発明者 大竹 満 東京都北区滝野川6丁目3番1号 川田建 設株式会社内 Fターム(参考) 2D059 AA06 AA14 BB37 CC05 DD12 GG29 Continued front page (72) Inventor Mitsuru Otake 6-3-1, Takinogawa, Kita-ku, Tokyo Ken Kawada Inside the corporation F-term (reference) 2D059 AA06 AA14 BB37 CC05 DD12 GG29
Claims (2)
枚と、両側面梁枠間にあって両者を連結する横つなぎ材
を有する支保梁において、前記横つなぎ材は、側面梁枠
の上弦材又は下弦材のウエブに固着する床板を有するこ
とを特徴とする支保梁。1. A side beam frame 2 of truss structure arranged in parallel.
In a supporting beam having a sheet and a horizontal connecting member between both side beam frames for connecting the two, the horizontal connecting member has a floor plate fixed to a web of an upper chord member or a lower chord member of a side beam frame. Support beams.
下金具を装着することを特徴とする請求項1記載の支保
梁。2. The support beam according to claim 1, wherein the upper chord member has a net hanging metal fitting attached to a lower flange thereof.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002129553A JP2003321806A (en) | 2002-05-01 | 2002-05-01 | Timbering beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002129553A JP2003321806A (en) | 2002-05-01 | 2002-05-01 | Timbering beam |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2003321806A true JP2003321806A (en) | 2003-11-14 |
Family
ID=29542925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002129553A Pending JP2003321806A (en) | 2002-05-01 | 2002-05-01 | Timbering beam |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2003321806A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824212A (en) * | 2018-07-31 | 2018-11-16 | 中铁六局集团石家庄铁路建设有限公司 | A kind of means of defence that continuous beam suspended bracket cantilever method is constructed to existing traffic |
CN112030750A (en) * | 2020-07-17 | 2020-12-04 | 中交一公局集团有限公司 | Construction process for tie beam in water |
-
2002
- 2002-05-01 JP JP2002129553A patent/JP2003321806A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824212A (en) * | 2018-07-31 | 2018-11-16 | 中铁六局集团石家庄铁路建设有限公司 | A kind of means of defence that continuous beam suspended bracket cantilever method is constructed to existing traffic |
CN112030750A (en) * | 2020-07-17 | 2020-12-04 | 中交一公局集团有限公司 | Construction process for tie beam in water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5097313B2 (en) | Suspended scaffold and its installation method | |
KR100779059B1 (en) | Check equipment for bridge of a deferred type and construction method thereof | |
JP5020163B2 (en) | Support for overhanging slab | |
JP5020162B2 (en) | Support for overhanging slab | |
JP4279189B2 (en) | Temporary strut and its construction method | |
JP6831714B2 (en) | Tower crane foundation and tower crane | |
JP3179138U (en) | Scaffolding support for leg head construction | |
JPH02503099A (en) | Cable supported bridge and construction method | |
JP2007050967A (en) | Crane base isolation supporting beam structure | |
JP2003321806A (en) | Timbering beam | |
JPH09195228A (en) | Build-up trestle for bridge pier reinforcing work and its using method | |
KR100808291B1 (en) | A safety device for pierces | |
JP6520533B2 (en) | Overhead crane support device and load receiving member | |
JP5409955B1 (en) | Steel bridge structure | |
KR200358247Y1 (en) | Downward construction structure using bracket support type | |
JP2004270377A (en) | Column-beam preassembled reinforcement body, and preassembled reinforcement method using the same | |
KR200145486Y1 (en) | Hanger for safety ropes of steel structure | |
CN217232352U (en) | Large-span assembled combined arch heavy roof structure | |
KR100260674B1 (en) | A net of safety styled for cable stayed bridge | |
KR200276904Y1 (en) | Safety construction of pier for bridge's inspection | |
KR102612270B1 (en) | Prevention apparatus for turnover of girder for remote construction | |
CN215829259U (en) | Cantilever beam type support for high formwork operation | |
JPH09296601A (en) | Suspended scaffolding and construction method thereof | |
JPH07217230A (en) | Hanging stair and erecting method thereof | |
Zallen | Problems with industry standard for erecting open web steel joists |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20060112 |
|
A131 | Notification of reasons for refusal |
Effective date: 20060124 Free format text: JAPANESE INTERMEDIATE CODE: A131 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20060606 |