JPH09195228A - Build-up trestle for bridge pier reinforcing work and its using method - Google Patents

Build-up trestle for bridge pier reinforcing work and its using method

Info

Publication number
JPH09195228A
JPH09195228A JP8005322A JP532296A JPH09195228A JP H09195228 A JPH09195228 A JP H09195228A JP 8005322 A JP8005322 A JP 8005322A JP 532296 A JP532296 A JP 532296A JP H09195228 A JPH09195228 A JP H09195228A
Authority
JP
Japan
Prior art keywords
pier
monorail
frame
prefabricated
bridge pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8005322A
Other languages
Japanese (ja)
Inventor
Shiro Yamada
志朗 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Kizai Forming Co Ltd
Original Assignee
Kawatetsu Kizai Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawatetsu Kizai Kogyo Co Ltd filed Critical Kawatetsu Kizai Kogyo Co Ltd
Priority to JP8005322A priority Critical patent/JPH09195228A/en
Publication of JPH09195228A publication Critical patent/JPH09195228A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/243Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building

Abstract

PROBLEM TO BE SOLVED: To realize a build-up trestle to which carrying-in and carrying-out function of materials is added to a conventional scaffold so that the carrying-in and mounting of a steel plate can be performed without disassembling the frame once assembled in the middle as it is. SOLUTION: A monorail suspending beam 5 (5a) is mounted on the top part of a curved surface frame formed of steel pipe-made gate frames 1, a cross brace, and a cloth frame with plate, which is constructed around a bridge pier P having a substantially circular section, in the normal direction to the bridge pier surface so as to be slightly protruded on the bridge pier side, a monorail 6 is mounted on the lower surface of the protruded part while holding a substantially equal distance to the bridge pier surface, and a geared trolley having a chain block suspended therefrom is mounted on the monorail 6 in such a manner as to be capable of being suspended and traveling.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、道路橋、鉄道橋等
の橋脚部分の耐震性を向上させるための補強工事におい
て、資材の搬入や作業足場として使用する組立式の架台
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pedestal for use as a scaffold for carrying in materials during reinforcement work for improving the earthquake resistance of piers such as road bridges and railway bridges.

【0002】[0002]

【従来の技術】平成7年1月の兵庫県南部大地震におい
て高速道路の橋梁部分や鉄道橋の被害が予想以上に大き
かったことから、RC構造物に対する耐震基準の見直し
が急務となり、例えば運輸省では鉄道施設耐震構造検討
委員会を設けて緊急補強対策をとりまとめ、既設のラー
メン構造の高架橋や橋台、開削式トンネルの中柱等につ
いて耐震補強工事を行うこととなった。
2. Description of the Related Art Since the damage to highway bridges and railroad bridges was greater than expected in the January 1995 Hyogoken Nanbu Earthquake, it was an urgent task to review the seismic standards for RC structures. In the province, a railway facility seismic structure study committee has been established to summarize emergency reinforcement measures, and seismic reinforcement work will be carried out on existing viaducts with a rigid frame structure, abutments, and middle pillars of open-cut tunnels.

【0003】破壊状況を検討すると、地震の際の衝撃に
よってコンクリート部分が圧潰、脱落してRC構造物の
圧縮側の抵抗力が急激に低下していることから、対策と
しては、衝撃を受けてもコンクリートが鉄筋の周囲に拘
束されたままの状態を維持できる構造とすることが望ま
しい。したがって、橋脚の場合であれば、コンクリート
を囲むように橋脚の外周表面に鋼板を貼り付けることに
より、これが内側のコンクリートを拘束するために耐震
性の向上が期待できる。
Examining the state of failure, the concrete part was crushed and dropped due to the impact during an earthquake, and the resistance on the compression side of the RC structure dropped sharply. It is desirable that the concrete has a structure that can maintain the state of being constrained around the reinforcing bars. Therefore, in the case of a pier, by sticking a steel plate to the outer peripheral surface of the pier so as to surround the concrete, this restrains the concrete on the inside, so that improvement in earthquake resistance can be expected.

【0004】この場合の工事手順の一例を示すと、RC
の橋脚の外周表面を目荒らししてから鋼板を吊り込んで
周囲にあてがい、鋼板相互間を溶接するとともにコンク
リートと鋼板の隙間に樹脂を注入して鋼板を橋脚の外周
表面に接着させ、最後に鋼板の表面を仕上げ塗装するの
である。このような橋脚表面部分に対する作業において
は、鋼管製の建枠、クロスブレース、板付き布枠等を組
み立てた鋼管枠組み足場(以下枠組みという)を橋脚の
周囲に設置するのが普通である。建枠の例として図7に
門型枠1を示す。
An example of the construction procedure in this case is RC
After roughening the outer peripheral surface of the bridge pier, suspend the steel plates and apply them to the surroundings, weld the steel plates to each other and inject resin into the gap between the concrete and the steel plates to bond the steel plates to the outer peripheral surface of the pier, and finally The surface of the steel sheet is finished and painted. In such work on the surface portion of the pier, it is usual to install a steel pipe framework scaffold (hereinafter referred to as a framework), which is an assembly of steel pipe building frames, cross braces, cloth frames with plates, etc., around the piers. As an example of a building frame, the gate formwork 1 is shown in FIG.

【0005】しかし、前記したような一連の作業におい
て、この枠組みがあると中間段階である鋼板の搬入の際
にはクレーンによる吊り込みの支障となるので、ここで
一旦枠組みを一部解体撤去し、鋼板をほぼ定位置まで搬
入してから再度組み立てる必要があり、枠組みの組み立
て、解体を2回行うため作業能率が悪いという問題点が
あった。
However, in the above-described series of operations, if this framework is provided, it will hinder the suspension by the crane when the steel sheet is loaded in the intermediate stage. However, since it is necessary to carry the steel plates to almost fixed positions and then reassemble them, the work efficiency is poor because the frame is assembled and disassembled twice.

【0006】[0006]

【発明が解決しようとする課題】本発明は、このような
問題点を解消し、一旦組み立てた枠組みはそのままにし
て鋼板の搬入、取り付けを行うことのできるよう、従来
の鋼管枠組み足場に資材の搬出入機能を付加した橋脚補
強工事用組立式架台を実現することを目的とする。
DISCLOSURE OF THE INVENTION The present invention solves the above problems and allows a conventional steel pipe frame scaffold to be provided with a material so that a steel plate can be carried in and attached while the assembled frame remains as it is. The purpose is to realize a prefabricated stand for pier reinforcement work with loading / unloading functions.

【0007】[0007]

【課題を解決するための手段】請求項1に記載の本発明
は、略円形断面の橋脚の周囲に設置される組立式架台で
あって、橋脚の周囲の地上に若干の距離を設けてから所
定の間隔で橋脚の略法線方向に配置されるベースジャッ
キの上部に、所定の段数まで門型枠を積み上げ、門型枠
間には板付き布枠をかけ渡し、門型枠側面にはクロスブ
レースを取り付けて構築した曲面壁用枠組みと、この枠
組みの頂部に頂部ジャッキを介して略水平に、また橋脚
表面に対して法線方向に、かつ橋脚側に若干突出させて
取り付けられるモノレール吊り梁と、このモノレール吊
り梁の前記突出部分下面に橋脚表面に対して略等距離を
保持して取り付けられるモノレールとからなり、このモ
ノレールに、チェーンブロックを吊り下げたギヤードト
ロリを懸垂走行自在に取り付けたことを特徴とする橋脚
補強工事用組立式架台である。
The present invention as set forth in claim 1 is an assembling type pedestal installed around a pier having a substantially circular cross section, after a slight distance is provided on the ground around the pier. The gate formwork is piled up to a specified number of steps on the upper part of the base jacks that are arranged at a predetermined interval in the approximately normal direction of the pier, and a cloth frame with a plate is spanned between the gate formwork, and on the side of the gate formwork. A curved wall frame constructed by attaching cross braces, and a monorail suspension that is mounted on the top of this frame approximately horizontally via the top jack and in the direction normal to the pier surface and slightly protruding to the pier side. The monorail is composed of a beam and a monorail attached to the lower surface of the protruding portion of the monorail suspension beam at a substantially equal distance from the pier surface. A bridge pier construction work for prefabricated platform, characterized in that attached to.

【0008】請求項2に記載の本発明は、橋脚Pの周囲
に設置される曲面壁用枠組みが、少なくとも1スパンに
ついてクロスブレース、板付き布枠のない開口部となっ
ており、この開口部位置ではモノレールが橋脚表面に対
し離反するように配置されている請求項1に記載の橋脚
補強工事用組立式架台である。請求項3に記載の本発明
は、枠組みの側面に、略台形状で、1辺の両端付近に枠
組みに係止するヒンジ機構を有し、その対辺両端付近に
吊りチェーンの端部を接続してなるはね上げデッキを設
けた請求項1または2に記載の橋脚補強工事用組立式架
台である。
According to the second aspect of the present invention, the curved wall frame installed around the pier P is an opening without cross braces and a cloth frame with a plate for at least one span. The assembled pedestal for pier reinforcement work according to claim 1, wherein the monorail is arranged so as to be separated from the surface of the pier at the position. The present invention according to claim 3 has, on the side surface of the frame, a hinge mechanism that is substantially trapezoidal and is locked to the frame near both ends of one side, and connects the ends of the hanging chain near both ends of the opposite side. It is an assembling stand for pier reinforcement work according to claim 1 or 2, which is provided with a splash deck.

【0009】請求項4に記載の本発明は、チェーンブロ
ックで補強用の鋼板を吊り上げ、ギヤードトロリをモノ
レールに沿って走行させて橋脚表面付近まで吊りこむこ
とを特徴とする請求項1ないし3のいずれかに記載の橋
脚補強工事用組立式架台の使用方法である。また、請求
項5に記載の本発明は、チェーンブロックで補強用の鋼
板を吊り上げ、ギヤードトロリをモノレールに沿って走
行させて橋脚表面付近まで吊りこむに際して、少なくと
も一部のはね上げデッキを一時収納し、その部分を通過
させて補強用の鋼板を吊りこむ請求項3に記載の橋脚補
強工事用組立式架台の使用方法である。
The present invention according to claim 4 is characterized in that a reinforcing steel plate is hung by a chain block, and a geared trolley is run along a monorail to hang it up to near the surface of a pier. It is a method of using the prefabricated mount for pier reinforcement work described in any of the above. Further, in the present invention according to claim 5, at the time of hoisting a steel plate for reinforcement by a chain block and running the geared trolley along the monorail to hang it near the surface of the pier, at least a part of the splash deck is temporarily stored. The method of using the prefabricated pier reinforced construction mount according to claim 3, wherein the reinforcing steel plate is hung through the portion.

【0010】[0010]

【発明の実施の形態】以下本発明の実施例を説明する
が、この実施例においては、略円形断面の橋脚Pの外周
面に対して鋼板を巻き付ける作業を行うため、先ず橋脚
Pを囲む略円形の鋼管枠組み足場を構築する必要があ
る。ところで本出願人は、かねてよりこのような曲面に
沿って設置する枠組み足場についても鋭意研究してお
り、その一環として、去る平成7年4月14日付けを以て
「曲面壁用枠組み足場」(特願平7-89256号、以下「先
行発明」という)を出願した。本発明においてはこの先
行発明の枠組みを使用することがきわめて効果的である
ので、実施例の説明に先立ってまずこれを概略説明す
る。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the present invention will be described below. In this embodiment, since the work of winding a steel plate around the outer peripheral surface of the pier P having a substantially circular cross section is performed, the pier P surrounding the pier P is first surrounded. It is necessary to construct a circular steel pipe framework scaffold. By the way, the Applicant has been studying frame scaffolds installed along such curved surfaces for a long time, and as part of that, since April 14, 1995, "frame scaffolds for curved wall" (special Japanese Patent Application No. 7-89256, hereinafter referred to as "prior invention"). Since it is extremely effective to use the framework of the prior invention in the present invention, it will be first outlined before the description of the embodiments.

【0011】図8はこの曲面壁用枠組み足場(枠組み)
の一実施例を示す斜視図で、1は門型枠、2aはその基部
に挿入されるベースジャッキ、3(3a、3b)は門型枠1
間に、これと直角方向に取り付けられるクロスブレー
ス、4(4a、4b)は門型枠1間にかけ渡される板付き布
枠、Sは枠組み、Wは壁体である。図8の例では、略円
形断面の壁体Wの外側に枠組みSを構築しているが、壁
体Wの法線方向に設置された門型枠1に対してクロスブ
レース3は曲面壁用に遠い側のもの3aと近い側のもの3b
とでは全長が異なっており、また板付き布枠4について
も、それぞれ平面形状が長辺はたがいに平行で、短辺は
長辺と直角方向から同じ角度だけ反対方向に壁に離れる
方向に開いて傾斜した2等辺台形の平面形状を有すると
ともに、曲面壁用に遠い側にかけ渡すもの4aと近い側に
かけ渡すもの4bとでは全長も異なる構成となっている。
FIG. 8 is a scaffold (framework) for this curved wall.
1 is a perspective view showing an embodiment, 1 is a portal form, 2a is a base jack to be inserted into the base thereof, 3 (3a, 3b) is the portal form 1
In the meantime, cross braces 4 (4a, 4b) attached at right angles to this are cloth frames with a plate spanned between the portal forms 1, S is a frame, and W is a wall. In the example of FIG. 8, the frame S is constructed on the outside of the wall W having a substantially circular cross section, but the cross brace 3 is for a curved wall with respect to the portal form 1 installed in the normal direction of the wall W. Far side 3a and near side 3b
And the overall length of the cloth frame 4 with a plate is different, and the plane shape of each of the long sides is parallel to each other, and the short side is opened in the direction away from the wall by the same angle from the direction perpendicular to the long side. In addition to having an isosceles trapezoidal plane shape that is inclined, the length 4a of the curved wall that is extended to the far side and the length 4b that is extended to the near side are different from each other.

【0012】以上のように構成することにより、構成部
品の点数を増加させることなく、また三角形状の開口部
を随所に発生させることもなく曲面壁に沿って枠組みを
構築し、作業を安全に行うことができる。つづいて、本
発明の橋脚補強工事用組立式架台の一実施例を図面によ
り説明する。図1はこの組立式架台を図2におけるXX
矢視により示した正断面図、図2は同じく平面図、図3
は図1の一部を拡大して示す部分正面図、図4は図2の
一部を拡大して示す部分平面図で、1は門型枠、2は門
型枠1の上下に配置されたジャッキ、3は門型枠を相互
に連結するクロスブレース、4は門型枠間にかけ渡され
る足場材である板付き布枠、5は門型枠1、クロスブレ
ース3、板付き布枠4等で構成される枠組みSの頂部に
取り付けられるモノレール吊り梁、6はこのモノレール
吊り梁5の下面に取り付けられるモノレール走行桁(以
下単にモノレールという)、7はこのモノレール6を懸
垂走行するギヤードトロリ、8はこのギヤードトロリ7
に吊り下げられたチェーンブロック、9は枠組みSの側
面に取り付けられるはね上げ可能なはね上げデッキ、10
はこのはね上げデッキ先端部を吊り上げ支持する吊りチ
ェーン、Pは橋脚である。
With the above construction, the framework is constructed along the curved wall without increasing the number of components and without forming triangular openings everywhere, and the work can be performed safely. It can be carried out. Next, an embodiment of the prefabricated gantry for pier reinforcement work of the present invention will be described with reference to the drawings. FIG. 1 shows this prefabricated mount as XX in FIG.
FIG. 2 is a plan view of the front view, and FIG.
1 is a partial front view showing an enlarged part of FIG. 1, FIG. 4 is a partial plan view showing an enlarged part of FIG. 2, 1 is a gate form, and 2 is arranged above and below the gate form 1. A jack, 3 is a cross brace that connects the gate forms to each other, 4 is a cloth frame with a plate that is a scaffolding that is laid between the gate forms, 5 is a gate form 1, a cross brace 3, a cloth frame with a plate 4 A monorail suspension beam attached to the top of the frame S composed of, for example, 6 is a monorail traveling girder (hereinafter simply referred to as a monorail) attached to the lower surface of the monorail suspension beam 5, and 7 is a geared trolley that suspends the monorail 6. 8 is this geared trolley 7
Chain block suspended on the side, 9 is a flip-up flip deck attached to the side of the frame S, 10
Is a suspension chain that suspends and supports the tip of this splash deck, and P is a pier.

【0013】まず橋脚Pの周囲の地上に、若干の距離を
設けてから所定の間隔で橋脚Pの法線方向にベースジャ
ッキ2aを配置し、その上部に門型枠1を適当段数、すな
わち橋梁補強工事の作業に必要な高さまで積み上げ、門
型枠間には板付き布枠4をかけ渡し、門型枠側面にはク
ロスブレース3を取り付けて枠組みを構築する。板付き
布枠4、クロスブレース3はいずれも図8に示した先行
発明の曲面壁用のものを使用する。
First, after a slight distance is provided on the ground around the pier P, the base jacks 2a are arranged at a predetermined interval in the normal direction of the pier P, and the gate formwork 1 is provided on the upper portion of the base jack 2a at an appropriate number of steps, that is, the bridge. It is piled up to the height necessary for the work of reinforcement work, the cloth frame 4 with a plate is passed between the gate formwork, and the cross brace 3 is attached to the side face of the gate formwork to construct the frame. As the cloth frame 4 with a plate and the cross brace 3, the one for the curved wall of the prior invention shown in FIG. 8 is used.

【0014】門型枠1は橋脚Pとの間に作業用の空間を
若干残して、すなわち適当な距離だけ離して、略法線方
向に向けて配置されているから、枠組み頂部の門型枠1
の真上位置に、頂部ジャッキ2bを介してモノレール吊り
梁5aを取り付ける。上下のベースジャッキ2a、頂部ジャ
ッキ2bにより施工面の不陸(凹凸)や枠組みのレベル不
良等を微調整して、板付き布枠4やモノレール吊り梁5a
をできるだけ水平とする。
Since the portal form 1 is arranged in a substantially normal direction with a small working space left between it and the pier P, that is, at an appropriate distance, the portal form 1 is located at the top of the framework. 1
The monorail suspension beam 5a is attached to a position directly above the top via the top jack 2b. The upper and lower base jacks 2a and the top jack 2b finely adjust the unevenness (unevenness) of the construction surface and the level defect of the framework, and the cloth frame 4 with a plate and the monorail suspension beam 5a
Be as horizontal as possible.

【0015】モノレール吊り梁5aは、枠組みSよりも内
側に突出させ、突出部分の下面に、橋脚表面に対して等
距離を保持するように、すなわち略円周状にモノレール
6を取り付ける。この際モノレール吊り梁5aの反突出側
端部付近を、図3で符号Fで示すように鋼線等で緊縛し
て、使用時の浮き上がりを防止することが望ましい。モ
ノレール6は市販のギヤードトロリ7を懸垂走行させる
走行桁であるから、所定寸法のH形鋼、I形鋼等を使用
する。ギヤードトロリ7は、付属している走行チェーン
を引いてやることにより任意の方向へ走行する。ギヤー
ドトロリ7にこれも市販のチェーンブロック8を吊り下
げれば、このチェーンブロック8を使用し、モノレール
6に沿って、すなわち橋脚Pの表面に沿って、鋼板を始
めとする資材を搬送することができる。
The monorail suspension beam 5a is projected inward of the frame S, and the monorail 6 is attached to the lower surface of the projecting portion so as to keep an equal distance from the pier surface, that is, in a substantially circumferential shape. At this time, it is desirable that the vicinity of the end of the monorail suspension beam 5a on the side opposite to the protruding side be tightly bound with a steel wire or the like as shown by reference numeral F in FIG. Since the monorail 6 is a running girder for suspending a commercially available geared trolley 7, H-shaped steel, I-shaped steel or the like having a predetermined size is used. The geared trolley 7 travels in an arbitrary direction by pulling an attached travel chain. If a commercially available chain block 8 is also suspended from the geared trolley 7, the chain block 8 can be used to convey materials such as steel plates along the monorail 6, that is, along the surface of the pier P. it can.

【0016】図2に示すように、枠組みSの少なくとも
1スパン(図2においては下部)についてはクロスブレ
ース3、板付き布枠4を取り付けず、材料の搬入口とす
ることが望ましい。モノレール6は橋脚Pの周囲をほぼ
1周しているが、前記した材料の搬入口部分では橋脚表
面に離反して、すなわち壁面に沿って走行せずに反転し
て外方へ向かうように配置する。したがってこの部分に
ついては枠組みの頂部に、両側の枠組みから支持するモ
ノレール吊り梁5b、5cを適宜取り付ける必要がある。
As shown in FIG. 2, it is preferable that the cross brace 3 and the cloth frame 4 with a plate are not attached to at least one span (lower portion in FIG. 2) of the frame S, and the material is used as a material inlet. The monorail 6 circulates around the bridge pier P almost once, but is arranged so that it is separated from the surface of the pier at the above-mentioned material inlet portion, that is, it is inverted and does not run along the wall surface and goes outward. To do. Therefore, for this part, it is necessary to appropriately attach monorail suspension beams 5b and 5c that support the frame from both sides to the top of the frame.

【0017】枠組みSの内側側面には、適宜図1に示す
ようにはね上げデッキ9を取り付け、これを作業用の足
場とする。はね上げデッキ9は、図5に示すように、台
形状のデッキプレートの1辺両端付近にヒンジ機構を設
けクランプ金具等で門型枠1に係止しその対辺両端付近
に吊りチェーン10の端部を接続して構成する。図6は図
5のYY矢視により示した断面図である。はね上げデッ
キ9の周囲には、適宜取り外し可能な手すりを設けるこ
とが望ましい。
As shown in FIG. 1, a flip-up deck 9 is appropriately attached to the inner side surface of the frame S to be used as a scaffold for work. As shown in FIG. 5, the flip-up deck 9 is provided with a hinge mechanism near one end of a trapezoidal deck plate and is locked to the gate formwork 1 by clamp metal fittings or the like, and ends of the hanging chain 10 near both ends of the opposite side. Connect and configure. FIG. 6 is a sectional view taken along the line YY of FIG. Around the flip-up deck 9, it is desirable to provide a handrail that can be removed appropriately.

【0018】組立式架台を以上のように構成することに
より、枠組みの適当な高さにかけ渡した板付き布枠4や
はね上げデッキ9を足場として橋脚Pの表面荒らしや鋼
板の溶接、塗装等の作業を行うとともに、枠組みはその
ままではね上げデッキ9のみを一時はね上げることによ
り、外部から鋼板を搬入し、チェーンブロック8によっ
て吊り上げてギヤードトロリ7を所望の位置まで走行さ
せ、鋼板を橋脚Pの所定の位置に取り付ける作業を行う
ことができる。
By constructing the assembling type pedestal as described above, by using the cloth frame 4 with a plate and the splashing deck 9 which are spread over an appropriate height of the frame as a scaffold, the surface of the pier P is roughened, steel plates are welded, painting, etc. While performing the work, the steel plate is carried in from the outside by temporarily flipping up only the lifting deck 9 with the framework as it is, and is lifted by the chain block 8 to move the geared trolley 7 to a desired position, and the steel plate is attached to the pier P. It is possible to carry out the work of mounting in a predetermined position.

【0019】[0019]

【発明の効果】本発明によれば、橋脚の周囲に作業用の
空間を若干残して枠組み足場を組み立て、その空間部分
にモノレール、ギヤードトロリ、チェーンブロックを取
り付けるようにしたから、鋼板搬入の際に枠組み足場を
解体、再組み立てする必要がなく、橋脚補強工事の効率
ならびに安全性が大幅に向上するという優れた効果を奏
する。
According to the present invention, a frame scaffold is assembled with a small working space left around the pier, and a monorail, geared trolley, and chain block are attached to the space, so that when carrying in steel plates. In addition, it is not necessary to disassemble and reassemble the frame scaffold, and it has an excellent effect that the efficiency and safety of the pier reinforcement work are significantly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例の組立式架台を図2のXX矢
視により示す正断面図である。
FIG. 1 is a front sectional view showing an assembly-type mount according to an embodiment of the present invention as seen from the direction of arrow XX in FIG.

【図2】本発明の一実施例を示す組立式架台の平面図で
ある。
FIG. 2 is a plan view of an assembly type pedestal showing an embodiment of the present invention.

【図3】図1の一部を拡大して示す部分正面図である。3 is a partial front view showing a part of FIG. 1 in an enlarged manner. FIG.

【図4】図2の一部を拡大して示す部分平面図である。FIG. 4 is a partial plan view showing a part of FIG. 2 in an enlarged manner.

【図5】本発明の一実施例におけるはね上げデッキ付近
を示す平面図である。
FIG. 5 is a plan view showing the vicinity of the splash deck in the embodiment of the present invention.

【図6】図5のYY断面を示すはね上げデッキの断面図
である。
6 is a cross-sectional view of the flip deck showing the YY cross section of FIG. 5;

【図7】本発明に使用する門型枠を示す正面図である。FIG. 7 is a front view showing a portal form used in the present invention.

【図8】本発明に使用する先行発明の曲面壁用枠組み足
場を示す斜視図である。
FIG. 8 is a perspective view showing a curved wall frame scaffold of the prior invention for use in the present invention.

【符号の説明】[Explanation of symbols]

1 門型枠 2 ジャッキ 2a ベースジャッキ 2b 頂部ジャッキ 3 クロスブレース 4 板付き布枠 5 モノレール吊り梁 6 モノレール 7 ギヤードトロリ 8 チェーンブロック 9 はね上げデッキ 10 吊りチェーン P 橋脚 S 枠組み 1 portal form 2 jack 2a base jack 2b top jack 3 cross brace 4 cloth frame with board 5 monorail suspension beam 6 monorail 7 geared trolley 8 chain block 9 splash deck 10 suspension chain P pier S frame

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 略円形断面の橋脚(P)の周囲に設置さ
れる組立式架台であって、橋脚(P)の周囲の地上に若
干の距離を設けてから所定の間隔で橋脚(P)の略法線
方向に配置されるベースジャッキ(2a)の上部に、所定
の段数まで門型枠(1)を積み上げ、門型枠(1)間に
は板付き布枠(4)をかけ渡し、門型枠(1)側面には
クロスブレース(3)を取り付けて構築した曲面壁用枠
組みと、この枠組みの頂部に頂部ジャッキ(2b)を介し
て略水平に、また橋脚表面に対して法線方向に、かつ橋
脚側に若干突出させて取り付けられるモノレール吊り梁
(5)と、このモノレール吊り梁(5)の前記突出部分
下面に橋脚(P)表面に対して略等距離を保持して取り
付けられるモノレール(6)とからなり、このモノレー
ル(6)に、チェーンブロック(8)を吊り下げたギヤ
ードトロリ(7)を懸垂走行自在に取り付けたことを特
徴とする橋脚補強工事用組立式架台。
1. A prefabricated pedestal installed around a pier (P) having a substantially circular cross section, the pier (P) being provided at a predetermined interval after a certain distance is provided on the ground around the pier (P). The gate formwork (1) is piled up to a predetermined number of stages on the upper part of the base jack (2a) which is arranged in the substantially normal direction, and the cloth frame with plate (4) is laid between the gate formwork (1). , A frame for curved walls constructed by installing cross braces (3) on the side of the gate formwork (1), and approximately horizontal to the top of this frame via the top jacks (2b) and to the pier surface. A monorail suspension beam (5) mounted in the direction of the line and slightly projecting to the pier side, and a lower surface of the projecting portion of the monorail suspension beam (5) at a substantially equal distance from the surface of the pier (P). It consists of a monorail (6) that can be attached, and a chain is attached to this monorail (6). Pier reinforcement work for prefabricated platform, wherein a geared trolley with hanging block (8) and (7) mounted freely suspended travel.
【請求項2】 橋脚(P)の周囲に設置される曲面壁用
枠組みが、少なくとも1スパンについてクロスブレース
(3)、板付き布枠(4)のない開口部となっており、
この開口部位置ではモノレール(6)が橋脚表面に対し
離反するように配置されている請求項1に記載の橋脚補
強工事用組立式架台。
2. The curved wall frame installed around the pier (P) is an opening without cross braces (3) and a plate-shaped cloth frame (4) for at least one span,
The prefabricated mount for pier reinforcement work according to claim 1, wherein the monorail (6) is arranged so as to be separated from the pier surface at the opening position.
【請求項3】 枠組みの側面に、略台形状で、1辺の両
端付近に枠組みに係止するヒンジ機構を有し、その対辺
両端付近に吊りチェーン(10)の端部を接続してなるは
ね上げデッキ(9)を設けた請求項1または2に記載の
橋脚補強工事用組立式架台。
3. The frame has a substantially trapezoidal side surface, and has a hinge mechanism near both ends of one side, which is locked to the frame, and ends of the hanging chain (10) are connected near both ends of the opposite side. The pedestal reinforcement work assembly type stand according to claim 1 or 2, further comprising a splash deck (9).
【請求項4】 チェーンブロックで補強用の鋼板を吊り
上げ、ギヤードトロリをモノレールに沿って走行させて
橋脚表面付近まで吊りこむことを特徴とする請求項1な
いし3のいずれかに記載の橋脚補強工事用組立式架台の
使用方法。
4. The pier reinforcement work according to claim 1, wherein a reinforcing steel plate is hung up by a chain block, and a geared trolley is run along a monorail to hang it up to near the pier surface. How to use the prefabricated mount.
【請求項5】 チェーンブロックで補強用の鋼板を吊り
上げ、ギヤードトロリをモノレールに沿って走行させて
橋脚表面付近まで吊りこむに際して、少なくとも一部の
はね上げデッキを一時収納し、その部分を通過させて補
強用の鋼板を吊りこむ請求項3に記載の橋脚補強工事用
組立式架台の使用方法。
5. When a steel plate for reinforcement is hoisted by a chain block and a geared trolley is run along a monorail to hang it near the surface of a pier, at least a part of the flip-up deck is temporarily stored and passed through that part. The method of using the prefabricated gantry for reinforcing pier according to claim 3, wherein a steel plate for reinforcement is suspended.
JP8005322A 1996-01-17 1996-01-17 Build-up trestle for bridge pier reinforcing work and its using method Pending JPH09195228A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8005322A JPH09195228A (en) 1996-01-17 1996-01-17 Build-up trestle for bridge pier reinforcing work and its using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8005322A JPH09195228A (en) 1996-01-17 1996-01-17 Build-up trestle for bridge pier reinforcing work and its using method

Publications (1)

Publication Number Publication Date
JPH09195228A true JPH09195228A (en) 1997-07-29

Family

ID=11608024

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8005322A Pending JPH09195228A (en) 1996-01-17 1996-01-17 Build-up trestle for bridge pier reinforcing work and its using method

Country Status (1)

Country Link
JP (1) JPH09195228A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242162A (en) * 2001-02-21 2002-08-28 Sato Kogyo Co Ltd United scaffold type mobile formwork equipment
CN102912739A (en) * 2012-10-16 2013-02-06 中铁十局集团有限公司 Supporting structure for temporary beam pivot below existing bridge cantilever plate
CN103132461A (en) * 2011-12-01 2013-06-05 上海市基础工程有限公司 Flexible bracket device for steel truss girder bridge cantilever construction
WO2015188612A1 (en) * 2014-06-09 2015-12-17 韩景伟 Chimney disassembling elevator
CN106758839A (en) * 2016-12-27 2017-05-31 中铁二局集团有限公司 A kind of strutting system and its installation method of the cast-in-place segmental construction of pier top
JP2018112027A (en) * 2017-01-13 2018-07-19 鹿島建設株式会社 Mobile working vehicle
JP6369791B1 (en) * 2017-09-29 2018-08-08 株式会社日立プラントコンストラクション Demolition method for torus indoor equipment
CN112342940A (en) * 2020-11-05 2021-02-09 贵州路桥集团有限公司 Steel-concrete composite beam bridge deck reinforcing device
CN111041994B (en) * 2019-12-24 2021-02-12 中交隧道工程局有限公司 Pier stud wraps up in mould device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242162A (en) * 2001-02-21 2002-08-28 Sato Kogyo Co Ltd United scaffold type mobile formwork equipment
JP4570063B2 (en) * 2001-02-21 2010-10-27 佐藤工業株式会社 Scaffold integrated moving formwork device
CN103132461A (en) * 2011-12-01 2013-06-05 上海市基础工程有限公司 Flexible bracket device for steel truss girder bridge cantilever construction
CN103132461B (en) * 2011-12-01 2015-11-25 上海市基础工程集团有限公司 For the flexible carrier device of steel truss beam bridge cantilever construction
CN102912739A (en) * 2012-10-16 2013-02-06 中铁十局集团有限公司 Supporting structure for temporary beam pivot below existing bridge cantilever plate
CN102912739B (en) * 2012-10-16 2015-08-26 中铁十局集团有限公司 The construction method of just beam fulcrum support structure under a kind of existing bridge outrigger base
WO2015188612A1 (en) * 2014-06-09 2015-12-17 韩景伟 Chimney disassembling elevator
CN106758839A (en) * 2016-12-27 2017-05-31 中铁二局集团有限公司 A kind of strutting system and its installation method of the cast-in-place segmental construction of pier top
JP2018112027A (en) * 2017-01-13 2018-07-19 鹿島建設株式会社 Mobile working vehicle
JP6369791B1 (en) * 2017-09-29 2018-08-08 株式会社日立プラントコンストラクション Demolition method for torus indoor equipment
JP2019066285A (en) * 2017-09-29 2019-04-25 株式会社日立プラントコンストラクション Method for dismantling of torus in-room apparatus
CN111041994B (en) * 2019-12-24 2021-02-12 中交隧道工程局有限公司 Pier stud wraps up in mould device
CN112342940A (en) * 2020-11-05 2021-02-09 贵州路桥集团有限公司 Steel-concrete composite beam bridge deck reinforcing device
CN112342940B (en) * 2020-11-05 2022-09-13 贵州路桥集团有限公司 Steel-concrete composite beam bridge deck reinforcing device

Similar Documents

Publication Publication Date Title
JP3885584B2 (en) Construction method of composite truss bridge
CN110886237B (en) Arch bridge construction method
JPH11181725A (en) Method for constructing horizontal beam of main tower made of concrete
CN109989348A (en) A kind of concrete construction cantilever form and its construction method
JPH09195228A (en) Build-up trestle for bridge pier reinforcing work and its using method
CN114197325A (en) Pier shaft construction safety protection platform
JPH09195227A (en) Built-up trestle for bridge pier reinforcing work and using method thereof
JPH0959932A (en) Construction method of column head of overhanging erection girder bridge
JPH02503099A (en) Cable supported bridge and construction method
CN110700112A (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam and construction method
JP4044893B2 (en) Suspended scaffolding
CN211173029U (en) A liftable platform structure for chimney reinforcement construction
JP3032052U (en) Construction equipment for pier reinforcement work
CN211420881U (en) Movable formwork for concrete construction of overhanging wing plate of steel-concrete composite beam
JP4051584B2 (en) Apparatus and method for supporting and supporting heavy loads for work at height
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN113235470A (en) Large-radian overflow surface complex-structure reinforced concrete bridge and demolition method
JPH09195519A (en) Prefabricated frame for pier reinforcing work, and its usage
CN113512944A (en) Rigid frame bridge side span construction method using bracket and hanging basket
JP2004232366A (en) Suspended scaffolding
JP6944900B2 (en) Construction method of linear structure
JP3671061B2 (en) Suspension staircase and its temporary method
JP7393814B2 (en) How to build a suspended scaffold
JP2004052455A (en) External scaffolding device and construction method therefor
JP2005264607A (en) Construction method for overhang slab of viaduct and precast concrete board for overhang slab