JP2002322662A - Hydraulic back hoe - Google Patents

Hydraulic back hoe

Info

Publication number
JP2002322662A
JP2002322662A JP2001125357A JP2001125357A JP2002322662A JP 2002322662 A JP2002322662 A JP 2002322662A JP 2001125357 A JP2001125357 A JP 2001125357A JP 2001125357 A JP2001125357 A JP 2001125357A JP 2002322662 A JP2002322662 A JP 2002322662A
Authority
JP
Japan
Prior art keywords
arm
hydraulic cylinder
bracket
pin hole
drive hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001125357A
Other languages
Japanese (ja)
Inventor
Masaki Tamaru
正毅 田丸
Kenzo Kimoto
健蔵 木元
Masaki Naruse
真己 成瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP2001125357A priority Critical patent/JP2002322662A/en
Publication of JP2002322662A publication Critical patent/JP2002322662A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To reduce the weight of an arm of a working machine device of a hydraulic back hoe. SOLUTION: A bucket 16 is swingably fitted to the front end part of the arm 10, which is swingably fitted to the front end part of a boom 5 by an arm fitting pin 11, by a bucket fitting pin 17. An integrated-constitution bracket 20 having an arm driving hydraulic cylinder connecting pin hole 13 and a working tool driving hydraulic cylinder connecting pin hole 15 is welded to the rear end of the arm 10. The arm driving hydraulic cylinder connecting pin hole 13 and the boom 5 are connected by an arm cylinder 7, while the working tool driving hydraulic cylinder connecting pin hole 15 and the bucket 16 are connected by a bucket cylinder 8. The arm driving hydraulic cylinder connecting pin hole 13 and the working tool driving hydraulic cylinder connecting pin hole 15 are positioned on the rear end side and the front end side of a perpendicular Y-Y lowering from the center of the arm fitting pin hole 11 to a linear line X-X connecting the center of the bucket fitting pin 17 to the center of the arm driving hydraulic cylinder connecting pin hole 13 respectively.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、油圧ショベルに関
する。
TECHNICAL FIELD The present invention relates to a hydraulic shovel.

【0002】[0002]

【従来の技術】図6は油圧ショベル1の側面図である。
図6において、走行体2に旋回自在に搭載された上部旋
回体3には作業機装置4が取り付けられている。すなわ
ち、上部旋回体3にはブーム5が、その後端部を揺動自
在に取り付けられ、ブーム5の前端部には断面が箱形状
のアーム10がアーム取付ピン11によって揺動自在に
取り付けられている。アーム10の前端部にはバケット
16がバケット取付ピン17により揺動自在に取り付け
られている。ブーム5と上部旋回体3とはブームシリン
ダ6により連結されている。アーム10の後端部に溶着
されたアーム駆動油圧シリンダ連結ブラケット12には
アーム駆動油圧シリンダ連結ピン孔13が設けられ、ア
ーム駆動油圧シリンダ連結ピン孔13とブーム4とはア
ームシリンダ連結ピン13aを介してアームシリンダ7
により連結されている。アーム10のアーム駆動油圧シ
リンダ連結ブラケット12より前端側には作業具駆動油
圧シリンダ連結ピン孔15を有する作業具駆動油圧シリ
ンダ連結ブラケット14が溶着されている。作業具駆動
油圧シリンダ連結ピン孔15と、アーム10の前端側に
取り付けられ、バケット16に連結するリンク18と
は、作業具駆動シリンダ連結ピン15aを介してバケッ
トシリンダ8により連結されている。
2. Description of the Related Art FIG. 6 is a side view of a hydraulic excavator 1.
In FIG. 6, a work implement device 4 is attached to an upper revolving unit 3 that is rotatably mounted on a traveling unit 2. That is, a boom 5 is attached to the upper swing body 3 at its rear end so as to be swingable, and an arm 10 having a box-shaped cross section is attached to the front end of the boom 5 by an arm attachment pin 11 so as to be swingable. I have. A bucket 16 is swingably attached to the front end of the arm 10 by a bucket attachment pin 17. The boom 5 and the upper swing body 3 are connected by a boom cylinder 6. An arm drive hydraulic cylinder connection pin hole 13 is provided in the arm drive hydraulic cylinder connection bracket 12 welded to the rear end of the arm 10, and the arm drive hydraulic cylinder connection pin hole 13 and the boom 4 connect the arm cylinder connection pin 13a. Via arm cylinder 7
Are connected by A work tool drive hydraulic cylinder connection bracket 14 having a work tool drive hydraulic cylinder connection pin hole 15 is welded to the front end side of the arm drive hydraulic cylinder connection bracket 12 of the arm 10. The work implement drive hydraulic cylinder connection pin hole 15 and a link 18 attached to the front end of the arm 10 and connected to the bucket 16 are connected by a bucket cylinder 8 via a work implement drive cylinder connection pin 15a.

【0003】次に作動について説明する。ブームシリン
ダ6を伸縮するとブーム5は揺動する。アームシリンダ
7を伸縮するとアーム10はアーム取付ピン11を中心
として揺動する。バケットシリンダ8を伸縮するとバケ
ット16はリンク18を介し、バケット取付ピン17を
中心として揺動する。作業する場合には、作業者はブー
ムシリンダ6、アームシリンダ7及びバケットシリンダ
8を伸縮させて岩石、土砂等を掘削、運搬する。
Next, the operation will be described. When the boom cylinder 6 expands and contracts, the boom 5 swings. When the arm cylinder 7 expands and contracts, the arm 10 swings around the arm mounting pin 11. When the bucket cylinder 8 expands and contracts, the bucket 16 swings about the bucket mounting pin 17 via the link 18. When working, the operator excavates and transports rocks, earth and sand, etc. by expanding and contracting the boom cylinder 6, the arm cylinder 7, and the bucket cylinder 8.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記構
成においては、アーム駆動油圧シリンダ連結ブラケット
12と作業具駆動油圧シリンダ連結ブラケット14とは
それぞれ独立してアーム10に溶着されている。そのた
め、アームシリンダ7及びバケットシリンダ8の反力は
それぞれ独立してアーム10に伝えられる。したがっ
て、アーム10のアーム駆動油圧シリンダ連結ブラケッ
ト12及び作業具駆動油圧シリンダ連結ブラケット14
の溶着部を、それぞれその反力に耐えられるように強化
する必要がある。そのため、板厚の増大、あるいは補強
リブの装着等が必要になり、重量増加や構造の複雑化を
招く。
However, in the above configuration, the arm driving hydraulic cylinder connecting bracket 12 and the work implement driving hydraulic cylinder connecting bracket 14 are welded to the arm 10 independently of each other. Therefore, the reaction forces of the arm cylinder 7 and the bucket cylinder 8 are independently transmitted to the arm 10. Therefore, the arm drive hydraulic cylinder connection bracket 12 of the arm 10 and the work implement drive hydraulic cylinder connection bracket 14
It is necessary to reinforce the welded portions of each of them so that they can withstand the reaction force. Therefore, it is necessary to increase the thickness of the plate or to attach a reinforcing rib, which leads to an increase in weight and a complicated structure.

【0005】本発明は、上記の問題点に着目してなされ
たものであり、アームの軽量化が可能であると共に、製
作の容易な作業機アームを有する油圧ショベルを提供す
ることを目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and has as its object to provide a hydraulic shovel having a working machine arm that can reduce the weight of the arm and is easily manufactured. .

【0006】[0006]

【課題を解決するための手段、作用及び効果】上記の目
的を達成するために、第1発明は、走行体に搭載された
上部旋回体に、起伏可能に取付けたブームと、ブームの
先端側に屈折可能に連結したアームとからなる作業機構
を有する油圧ショベルにおいて、前記アームに設ける、
アーム駆動油圧シリンダ連結ピン孔を有するブラケット
と、作業具駆動油圧シリンダ連結ピン孔を有するブラケ
ットとを、一体化構成のブラケットにした構成としてい
る。
Means for Solving the Problems, Functions and Effects In order to achieve the above object, a first aspect of the present invention is directed to a boom mounted on an upper revolving structure mounted on a traveling body so as to be able to raise and lower, and a front end side of the boom. In a hydraulic shovel having a working mechanism including an arm refractably connected to the arm, provided on the arm,
The bracket having the arm driving hydraulic cylinder connecting pin hole and the bracket having the working tool driving hydraulic cylinder connecting pin hole are configured as an integrated bracket.

【0007】第1発明によると、アームに設ける、アー
ム駆動油圧シリンダ連結ピン孔を有するブラケットと、
作業具駆動油圧シリンダ連結ピン孔を有するブラケット
とを、一体化構成のブラケットにしたため、アームシリ
ンダとバケットシリンダの反力はアームを介さずに相互
に影響しあい、作業姿勢によっては互いに力を相殺する
場合がある。又、アームとブラケットとの溶接長が長く
なり、上記と合わせて溶着部の発生応力が緩和される。
そのため、アーム等の部材の板厚を薄くすることがで
き、重量軽減が可能になる。さらに、アーム駆動油圧シ
リンダ連結ピン孔と作業具駆動油圧シリンダ連結ピン孔
との相対位置はブラケット上で予め設定されているた
め、製造時の位置決めが簡単になり、工数を低減でき
る。
According to the first invention, a bracket provided on the arm and having an arm driving hydraulic cylinder connecting pin hole,
Since the bracket having the work tool drive hydraulic cylinder connecting pin hole is formed as an integrated bracket, the reaction forces of the arm cylinder and the bucket cylinder affect each other without passing through the arm, and cancel each other depending on the working posture. There are cases. In addition, the welding length between the arm and the bracket is increased, and the stress generated at the welded portion is reduced in combination with the above.
Therefore, the plate thickness of the members such as the arms can be reduced, and the weight can be reduced. Further, since the relative positions of the arm drive hydraulic cylinder connecting pin hole and the work implement driving hydraulic cylinder connecting pin hole are set in advance on the bracket, the positioning at the time of manufacturing is simplified, and the number of steps can be reduced.

【0008】第2発明は、第1発明において、一体化構
成の前記ブラケツトを、左右一対の側板と左右一対の側
板に被せた接続板とからなる縦長ボツクス状ブラケツト
に構成し、該縦長ボツクス左右側板の前端と後端位置
に、それぞれ、前記アーム駆動油圧シリンダ連結ピン孔
と、前記作業具駆動油圧シリンダ連結ピン孔を設けると
共に、ボツクス開口を前記アーム側に伏せて取付けた一
体化構成のブラケツトとした構成としている。
According to a second aspect of the present invention, in the first aspect, the bracket having an integrated structure is formed into a vertically elongated box-shaped bracket including a pair of left and right side plates and a connection plate covering the pair of left and right side plates. An integrated bracket in which the arm driving hydraulic cylinder connecting pin hole and the working tool driving hydraulic cylinder connecting pin hole are provided at the front end and the rear end position of the side plate, respectively, and the box opening is mounted face down on the arm side. The configuration is as follows.

【0009】第2発明によると、アーム駆動油圧シリン
ダ連結ピン孔と作業具駆動油圧シリンダ連結ピン孔とは
ブラケット上で予め相対位置を設定されているため、ア
ームに対する位置決め作業は容易になり、製造時の工数
を低減できる。
According to the second aspect of the present invention, since the relative positions of the arm driving hydraulic cylinder connecting pin holes and the working tool driving hydraulic cylinder connecting pin holes are set in advance on the bracket, the positioning operation with respect to the arm is facilitated, and manufacturing is facilitated. Man-hours can be reduced.

【0010】第3発明は、第1発明において、一体化構
成の前記ブラケツトを、前記アームに個別に取付けたア
ーム駆動油圧シリンダ連結ブラケットと作業具駆動油圧
シリンダ連結ブラケットと、前記両ブラケツト間に渡し
込みした縦長ボツクス状ブリツジブラケツトにより構成
し、該ブリツジブラケツトのボツクス開口を前記アーム
側に伏せて、前記両ブラケツトと前記アーム間にわたつ
て縦長ボツクス状ブリツジブラケツトを一体固定して取
付けた一体化構成のブラケツトとした構成としている。
According to a third aspect of the present invention, in the first aspect, the integrated bracket is passed between the arm driving hydraulic cylinder connecting bracket and the work implement driving hydraulic cylinder connecting bracket individually attached to the arm, and between the two brackets. A vertical box-shaped bridge bracket is provided, and the box opening of the bridge bracket is turned down to the arm side, and the vertical box-shaped bridge bracket is integrally fixed and attached between the two brackets and the arm. It is configured as an integrated bracket.

【0011】第3発明によると、アーム駆動油圧シリン
ダ連結ブラケットと作業具駆動油圧シリンダ連結ブラケ
ットとは一体化され、溶接線が長いため、溶着部に発生
する応力は低減される。したがって、アーム等の部材の
板厚を薄くして軽量化を図ることができる。
According to the third invention, the arm driving hydraulic cylinder connecting bracket and the work implement driving hydraulic cylinder connecting bracket are integrated and the welding line is long, so that the stress generated at the welded portion is reduced. Therefore, it is possible to reduce the weight of the members such as the arms by reducing the plate thickness.

【0012】第4発明は、第1〜第3発明において、前
記アームの前端部のバケット取付ピンの中心と、アーム
駆動油圧シリンダ連結ピン孔の中心とを結ぶ直線に、前
記アーム取付ピンの中心から垂線を下ろしたときに、前
記アーム駆動油圧シリンダ連結ピン孔は前記垂線に対し
て後端側に位置し、前記作業具駆動油圧シリンダ連結ピ
ン孔は前記垂線に対して前端側に位置する構成としてい
る。
According to a fourth aspect of the present invention, in the first to third aspects, the center of the arm mounting pin is formed in a straight line connecting the center of the bucket mounting pin at the front end of the arm and the center of the arm drive hydraulic cylinder connecting pin hole. When the perpendicular is lowered from the vertical axis, the arm drive hydraulic cylinder connecting pin hole is located on the rear end side with respect to the vertical line, and the work implement driving hydraulic cylinder connecting pin hole is located on the front end side with respect to the vertical line. And

【0013】第4発明によると、アーム駆動油圧シリン
ダ連結ピン孔の位置と作業具駆動油圧シリンダ連結ピン
孔の位置とを、アーム取付ピンに対して前後にまたぐ位
置にしたため、アーム駆動油圧シリンダ連結ピン孔と作
業具駆動油圧シリンダ連結ピン孔との間隔は十分に大き
くなる。したがってブラケットとアームとの溶接長は十
分に長くなり、溶着部に発生する応力を低減することが
でき、アーム等の部材の板厚を薄くすることが可能であ
る。
According to the fourth aspect of the present invention, the position of the arm drive hydraulic cylinder connecting pin hole and the position of the work tool drive hydraulic cylinder connecting pin hole are positioned so as to extend back and forth with respect to the arm mounting pin. The distance between the pin hole and the work tool drive hydraulic cylinder connecting pin hole becomes sufficiently large. Therefore, the welding length between the bracket and the arm is sufficiently long, the stress generated at the welded portion can be reduced, and the plate thickness of members such as the arm can be reduced.

【0014】[0014]

【発明の実施の形態】以下に本発明に係る油圧ショベル
の作業機アームの実施形態について、図面を参照して詳
述する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a working machine arm of a hydraulic shovel according to the present invention will be described below in detail with reference to the drawings.

【0015】図1は第1実施形態の、アーム10を用い
た作業機装置4の側面図であり、図2は図1のA矢視図
である。油圧ショベルは従来のものと同一であるので、
図1では油圧ショベル本体は省略し、作業機装置4部分
を示している。図6に示した従来のものと同一部材には
同一符号を付して説明は省略し、異なる部分についての
み説明する。図1、図2において、アーム10の後端部
には、前後端部にアーム駆動油圧シリンダ連結ピン孔1
3と作業具駆動油圧シリンダ連結ピン孔15とを有する
一体化構成のブラケット20が溶着されている。いま、
アーム10のアーム駆動油圧シリンダ連結ピン孔13の
中心と、バケット取付ピン17の中心とを結ぶ直線X−
Xに、アーム取付ピン11から垂線Y−Yを下ろしたと
きに、アーム駆動油圧シリンダ連結ピン孔13は垂線Y
−Yより後端側に位置し、作業具駆動油圧シリンダ連結
ピン孔15は垂線Y−Yより前端側に位置している。し
たがって、ブラケット20の左右両側面とアーム10と
の溶接線23,23の長さは十分に長い。
FIG. 1 is a side view of a working machine device 4 using an arm 10 according to a first embodiment, and FIG. 2 is a view taken in the direction of arrow A in FIG. Since the excavator is the same as the conventional one,
In FIG. 1, the hydraulic excavator body is omitted, and the work machine device 4 is shown. The same members as those of the related art shown in FIG. 6 are denoted by the same reference numerals, description thereof will be omitted, and only different portions will be described. 1 and 2, the arm 10 has an arm driving hydraulic cylinder connecting pin hole 1 at the front and rear ends at the rear end.
A bracket 20 having an integrated configuration having a work pin 3 and a working tool drive hydraulic cylinder connecting pin hole 15 is welded. Now
A straight line X- connecting the center of the arm drive hydraulic cylinder connecting pin hole 13 of the arm 10 and the center of the bucket mounting pin 17
When the perpendicular YY is lowered from the arm mounting pin 11 to X, the arm driving hydraulic cylinder connecting pin hole 13 is
The work implement drive hydraulic cylinder connecting pin hole 15 is located on the front end side of the vertical line Y-Y. Therefore, the length of the welding lines 23 between the left and right side surfaces of the bracket 20 and the arm 10 is sufficiently long.

【0016】ブラケット20は左右一対の側板21,2
1と、左右の側板21,21を接続する接続板22とか
らなっている。図3は図1のB−B矢視図である。図3
に示すように、接続板22は側板21,21の上端部に
溶着され、ボックス形状を構成している。つまり、一体
化構成の前記ブラケツト20を、左右一対の側板と左右
一対の側板に被せた接続板とからなる縦長ボツクス状ブ
ラケツトに構成し、該縦長ボツクス左右側板の前端と後
端位置に、それぞれ、前記アーム駆動油圧シリンダ連結
ピン孔13と、前記作業具駆動油圧シリンダ連結ピン孔
15を設けると共に、ボツクス開口を前記アーム10)
側に伏せて取付けた一体化構成のブラケツト20として
いる。
The bracket 20 includes a pair of left and right side plates 21 and
1 and a connection plate 22 for connecting the left and right side plates 21 and 21. FIG. 3 is a view taken in the direction of arrows BB in FIG. FIG.
As shown in (1), the connection plate 22 is welded to the upper ends of the side plates 21 and 21 to form a box shape. That is, the bracket 20 having an integrated configuration is configured as a vertically elongated box-shaped bracket including a pair of left and right side plates and a connection plate overlaid on the pair of left and right side plates, and is provided at the front end and the rear end position of the vertical box left and right side plates, respectively. The arm driving hydraulic cylinder connecting pin hole 13 and the working tool driving hydraulic cylinder connecting pin hole 15 are provided, and a box opening is formed in the arm 10).
The integrated bracket 20 is mounted on the side face down.

【0017】本発明の油圧ショベルの作業機アームは上
述のような構成としたため、アーム駆動油圧シリンダ連
結ピン孔13に連結するアームシリンダ7、及び作業具
駆動油圧シリンダ連結ピン孔15に連結するバケットシ
リンダ8の反力は、アーム10を介さずに、ブラケット
20を介して直接影響しあい、作業姿勢によっては力は
相殺される場合がある。又、ブラケット20とアーム1
0との溶接線23が長いため、上記の効果と合わせて溶
着部に発生する応力は低減する。したがって、アーム1
0等の部材の板厚を薄くすることができ、重量軽減を図
ることができる。さらに、アーム駆動油圧シリンダ連結
ピン孔13と作業具駆動油圧シリンダ連結ピン孔15と
はブラケット20上で予め相対位置を設定されているた
め、アーム10に対する位置決め作業は容易になり、製
造時の工数を低減できる。
Since the working machine arm of the hydraulic shovel of the present invention has the above-described structure, the arm cylinder 7 connected to the arm driving hydraulic cylinder connecting pin hole 13 and the bucket connected to the work tool driving hydraulic cylinder connecting pin hole 15 are provided. The reaction force of the cylinder 8 directly influences via the bracket 20 without passing through the arm 10, and the force may be offset depending on the working posture. Also, the bracket 20 and the arm 1
Since the welding line 23 with 0 is long, the stress generated in the welded portion is reduced in addition to the above effects. Therefore, arm 1
The thickness of the member such as 0 can be reduced, and the weight can be reduced. Further, since the relative positions of the arm driving hydraulic cylinder connecting pin hole 13 and the work implement driving hydraulic cylinder connecting pin hole 15 are set in advance on the bracket 20, the positioning operation with respect to the arm 10 becomes easy, and the man-hours during manufacturing are reduced. Can be reduced.

【0018】図4は第2実施形態の、アーム10の後部
の側面図であり、図5は図4のC−C矢視図である。第
1実施形態のものと同一部材には同一符号を付して説明
は省略し、異なる部分についてのみ説明する。図4、図
5において、アーム10の後端部にはアーム駆動油圧シ
リンダ連結ピン孔13を有するアーム駆動油圧シリンダ
連結ブラケット12が溶着され、その前端側には作業具
駆動油圧シリンダ連結ピン孔15を有する作業具駆動油
圧シリンダ連結ブラケット14が溶着されている。
FIG. 4 is a side view of the rear part of the arm 10 according to the second embodiment, and FIG. 5 is a view taken along the line CC of FIG. The same members as those of the first embodiment are denoted by the same reference numerals, and description thereof will be omitted. Only different parts will be described. 4 and 5, an arm drive hydraulic cylinder connection bracket 12 having an arm drive hydraulic cylinder connection pin hole 13 is welded to the rear end of the arm 10, and a work implement drive hydraulic cylinder connection pin hole 15 is provided at the front end thereof. The working tool drive hydraulic cylinder connecting bracket 14 having the above structure is welded.

【0019】アーム駆動油圧シリンダ連結ブラケット1
2と作業具駆動油圧シリンダ連結ブラケット14とは接
続部材24により接続、一体化され、ブラケット20a
を構成している。接続部材24は左右一対の側板21
a,21aと、接続板22aとからなり、左右の側板2
1a,21aはアーム駆動油圧シリンダ連結ブラケット
12、作業具駆動油圧シリンダ連結ブラケット14及び
アーム10に溶着されて溶接線23を形成している。接
続板22aは左右の側板21a,21aの上端部を接続
している。つまり、一体化構成の前記ブラケツト20a
を、前記アーム10に個別に取付けたアーム駆動油圧シ
リンダ連結ブラケット12と作業具駆動油圧シリンダ連
結ブラケット14と、前記両ブラケツト間に渡し込みし
た縦長ボツクス状ブリツジブラケツトにより構成し、該
ブリツジブラケツトのボツクス開口を前記アーム10側
に伏せて、前記両ブラケツトと前記アーム10間にわた
つて縦長ボツクス状ブリツジブラケツトを一体固定して
取付けた一体化構成のブラケツト20aとしている。本
第2実施形態においては、アーム駆動油圧シリンダ連結
ブラケット12と作業具駆動油圧シリンダ連結ブラケッ
ト14とは一体化され、第1実施形態のものと同様に溶
接線23が長いため、溶着部に発生する応力は低減され
る。したがって、アーム10等の部材の板厚を薄くして
軽量化を図ることができる。
Arm drive hydraulic cylinder connecting bracket 1
2 and the working tool drive hydraulic cylinder connecting bracket 14 are connected and integrated by a connecting member 24, and the bracket 20a
Is composed. The connecting member 24 is a pair of left and right side plates 21.
a, 21a and a connecting plate 22a, and the left and right side plates 2
Reference numerals 1a and 21a are welded to the arm driving hydraulic cylinder connecting bracket 12, the work implement driving hydraulic cylinder connecting bracket 14, and the arm 10 to form a welding line 23. The connection plate 22a connects the upper ends of the left and right side plates 21a, 21a. That is, the integrated bracket 20a
Is constituted by an arm driving hydraulic cylinder connecting bracket 12 and a work implement driving hydraulic cylinder connecting bracket 14 which are individually attached to the arm 10, and a vertically long box-shaped bridge bracket passed between the two brackets. The box opening is turned down to the arm 10 side, and a vertically long box-shaped bridge bracket is integrally fixed and attached between both the brackets and the arm 10 to form an integrated bracket 20a. In the second embodiment, the arm drive hydraulic cylinder connection bracket 12 and the work implement drive hydraulic cylinder connection bracket 14 are integrated, and the welding line 23 is long as in the first embodiment. Stress is reduced. Therefore, the thickness of the members such as the arm 10 can be reduced to reduce the weight.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1実施形態の、アームを用いた作業
機装置の側面図である。
FIG. 1 is a side view of a working machine device using an arm according to a first embodiment of the present invention.

【図2】図1のA矢視図である。FIG. 2 is a view taken in the direction of arrow A in FIG. 1;

【図3】図1のB−B矢視図である。FIG. 3 is a view taken in the direction of arrows BB in FIG. 1;

【図4】本発明の第2実施形態の、アームの後部側面図
である。
FIG. 4 is a rear side view of an arm according to a second embodiment of the present invention.

【図5】図4のC−C矢視図である。FIG. 5 is a view taken in the direction of the arrows CC in FIG. 4;

【図6】従来のアームを用いた油圧ショベルの側面図で
ある。
FIG. 6 is a side view of a conventional hydraulic excavator using an arm.

【符号の説明】[Explanation of symbols]

4…作業機装置、5…ブーム、6…ブームシリンダ、7
…アームシリンダ、8…バケットシリンダ、10…アー
ム、11…アーム取付ピン、12…アーム駆動油圧シリ
ンダ連結ブラケット、13…アーム駆動油圧シリンダ連
結ピン孔、14…作業具駆動油圧シリンダ連結ブラケッ
ト、15…作業具駆動油圧シリンダ連結ピン孔、16…
バケット、17…バケット取付ピン、18…リンク、2
0,20a…ブラケット、21,21a…側板、22,
22a…接続版、23…溶接線、24…接続部材。
4 ... Work equipment, 5 ... Boom, 6 ... Boom cylinder, 7
... Arm cylinder, 8 ... Bucket cylinder, 10 ... Arm, 11 ... Arm mounting pin, 12 ... Arm drive hydraulic cylinder connection bracket, 13 ... Arm drive hydraulic cylinder connection pin hole, 14 ... Work implement drive hydraulic cylinder connection bracket, 15 ... Work tool drive hydraulic cylinder connecting pin holes, 16 ...
Bucket, 17 ... Bucket mounting pin, 18 ... Link, 2
0, 20a: bracket, 21, 21a: side plate, 22,
22a: connecting plate, 23: welding line, 24: connecting member.

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 走行体に搭載された上部旋回体に、起伏
可能に取付けたブーム(4)と、ブーム(4)の先端側に屈折
可能に連結したアーム(10)とからなる作業機構を有する
油圧ショベルにおいて、前記アーム(10)に設けるアーム
駆動油圧シリンダ連結ピン孔(13)を有するブラケット
と、作業具駆動油圧シリンダ連結ピン孔(15)を有するブ
ラケットとを、一体化構成のブラケット(20,20a) にし
たことを特徴とする油圧ショベル。
A working mechanism comprising a boom (4) attached to an upper revolving structure mounted on a traveling body so as to be able to raise and lower, and an arm (10) connected to a tip end of the boom (4) so as to be able to bend. A hydraulic excavator having an arm (10) provided with an arm drive hydraulic cylinder connection pin hole (13) and a bracket having a work implement drive hydraulic cylinder connection pin hole (15), an integrated bracket ( A hydraulic excavator according to any one of 20, 20a).
【請求項2】 請求項1記載の油圧ショベルにおいて、
一体化構成の前記ブラケツト(20)を、左右一対の側板と
左右一対の側板に被せた接続板とからなる縦長ボツクス
状ブラケツトに構成し、該縦長ボツクス左右側板の前端
と後端位置に、それぞれ、前記アーム駆動油圧シリンダ
連結ピン孔(13)と、前記作業具駆動油圧シリンダ連結ピ
ン孔(15)を設けると共に、ボツクス開口を前記アーム(1
0)側に伏せて取付けた一体化構成のブラケツト(20)とし
たことを特徴とする油圧ショベル。
2. The hydraulic excavator according to claim 1,
The bracket (20) having an integrated structure is configured as a vertically elongated box-shaped bracket including a pair of left and right side plates and a connection plate overlaid on the pair of left and right side plates. The arm drive hydraulic cylinder connection pin hole (13) and the work tool drive hydraulic cylinder connection pin hole (15) are provided, and a box opening is formed in the arm (1).
0) A hydraulic excavator having an integrated bracket (20) mounted face down on a side.
【請求項3】 請求項1記載の油圧ショベルにおいて、
一体化構成の前記ブラケツト(20a) を、前記アーム(10)
に個別に取付けたアーム駆動油圧シリンダ連結ブラケッ
ト(12)と作業具駆動油圧シリンダ連結ブラケット(14)
と、前記両ブラケツト間に渡し込みした縦長ボツクス状
ブリツジブラケツトにより構成し、該ブリツジブラケツ
トのボツクス開口を前記アーム(10)側に伏せて、前記両
ブラケツトと前記アーム(10)間にわたつて縦長ボツクス
状ブリツジブラケツトを一体固定して取付けた一体化構
成のブラケツト(20a) としたことを特徴とする油圧ショ
ベル。
3. The excavator according to claim 1,
The bracket (20a) having an integrated structure is connected to the arm (10).
Arm drive hydraulic cylinder connection bracket (12) and work implement drive hydraulic cylinder connection bracket (14)
And a vertically elongated box-shaped bridge bracket passed between the two brackets. A hydraulic shovel comprising an integrated bracket (20a) in which a vertically long box-shaped bridge bracket is integrally fixed and mounted.
【請求項4】 請求項1〜3に記載の油圧ショベルにお
いて、前記アーム(10)の前端部のバケット取付ピン(17)
の中心と、アーム駆動油圧シリンダ連結ピン孔(13)の中
心とを結ぶ直線に、前記アーム取付ピン(11)の中心から
垂線を下ろしたときに、前記アーム駆動油圧シリンダ連
結ピン孔(13)は前記垂線に対して後端側に位置し、前記
作業具駆動油圧シリンダ連結ピン孔(15)は前記垂線に対
して前端側に位置することを特徴とする油圧ショベル。
4. The hydraulic excavator according to claim 1, wherein a bucket mounting pin (17) at a front end of said arm (10) is provided.
When the perpendicular is lowered from the center of the arm mounting pin (11) to a straight line connecting the center of the arm drive hydraulic cylinder connecting pin hole (13), the arm drive hydraulic cylinder connecting pin hole (13) Is a rear end side with respect to the perpendicular, and the work tool drive hydraulic cylinder connecting pin hole (15) is located on a front end side with respect to the perpendicular.
JP2001125357A 2001-04-24 2001-04-24 Hydraulic back hoe Pending JP2002322662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001125357A JP2002322662A (en) 2001-04-24 2001-04-24 Hydraulic back hoe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001125357A JP2002322662A (en) 2001-04-24 2001-04-24 Hydraulic back hoe

Publications (1)

Publication Number Publication Date
JP2002322662A true JP2002322662A (en) 2002-11-08

Family

ID=18974593

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001125357A Pending JP2002322662A (en) 2001-04-24 2001-04-24 Hydraulic back hoe

Country Status (1)

Country Link
JP (1) JP2002322662A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006045976A (en) * 2004-08-06 2006-02-16 Kobelco Contstruction Machinery Ltd Construction machine
CN103964191A (en) * 2014-05-20 2014-08-06 苏州新协力特种工业模板有限公司 Auxiliary device for conveying device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006045976A (en) * 2004-08-06 2006-02-16 Kobelco Contstruction Machinery Ltd Construction machine
JP4556538B2 (en) * 2004-08-06 2010-10-06 コベルコ建機株式会社 Construction machinery
CN103964191A (en) * 2014-05-20 2014-08-06 苏州新协力特种工业模板有限公司 Auxiliary device for conveying device

Similar Documents

Publication Publication Date Title
EP1124017B1 (en) Hydraulically driven working machine
KR100586087B1 (en) Arm with simplified attachment removable unit for construction equipment
JP2002322662A (en) Hydraulic back hoe
EP2290163A1 (en) Construction machine
JP3730551B2 (en) Offset boom type construction machine
JPWO2005003468A1 (en) Construction machinery and its protrusions
WO2019244617A1 (en) Rotary working vehicle
JP2003129521A (en) Revolving frame of construction machinery
JP3530375B2 (en) Front loader
JP2001049695A (en) Revolving frame of construction machine
JP2003034945A (en) Offset boom tape construction machinery
JP4329245B2 (en) Box-shaped cross-section structure and work attachment applied to work attachments for construction machinery
JP2002339403A (en) Turning frame of construction machine
JPH0960030A (en) Gutter-digging attachment
JP2006045976A (en) Construction machine
JPH11336112A (en) Construction machine
JP6102965B2 (en) Boom foot part of work machine
JP2002327459A (en) Revolving frame structure for backhoe
JP4086172B2 (en) Boom offset hydraulic excavator
JPS6233789Y2 (en)
JP2563568Y2 (en) Hydraulic excavator for gutter excavation
JP3804486B2 (en) Offset boom type construction machine
JP2002327454A (en) Working machine structure for hydraulic backhoe
JP2565537Y2 (en) Hydraulic excavator boom offset structure
JP2554928Y2 (en) Gutter excavator boom structure