JP2002275830A - Scaffold device for subsidiary work and subsidiary work method of elevated bridge - Google Patents

Scaffold device for subsidiary work and subsidiary work method of elevated bridge

Info

Publication number
JP2002275830A
JP2002275830A JP2001070640A JP2001070640A JP2002275830A JP 2002275830 A JP2002275830 A JP 2002275830A JP 2001070640 A JP2001070640 A JP 2001070640A JP 2001070640 A JP2001070640 A JP 2001070640A JP 2002275830 A JP2002275830 A JP 2002275830A
Authority
JP
Japan
Prior art keywords
frame
scaffolding
support
scaffold
viaduct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001070640A
Other languages
Japanese (ja)
Other versions
JP4500462B2 (en
Inventor
Mitsuaki Shinagawa
光彰 品川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINAGAWA SANGYO KK
Original Assignee
SHINAGAWA SANGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINAGAWA SANGYO KK filed Critical SHINAGAWA SANGYO KK
Priority to JP2001070640A priority Critical patent/JP4500462B2/en
Publication of JP2002275830A publication Critical patent/JP2002275830A/en
Application granted granted Critical
Publication of JP4500462B2 publication Critical patent/JP4500462B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a subsidiary work of an elevated bridge having high safety while being inexpensive, eliminating a cause of traffic congestion, and improving workability. SOLUTION: This scaffold device comprises a support stand 20 used when appending and executing an ancillary execution object such as a sound insulating wall on the elevated bridge, and detachably fixed to a handrail, and a scaffold frame body 30 having a scaffold plate 31 movably connected in parallel to this support stand 20 via a connecting member.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、道路や鉄道等の高
架橋を対象として橋梁側部の保守点検を行ったり、遮音
壁や化粧板等の設置工事を行うに際し使用される高架橋
の付設工事用足場装置および付設工事方法に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffold for attaching a viaduct to be used for maintenance and inspection of a bridge side portion for a viaduct such as a road and a railway, and for installation work of a sound insulation wall and a decorative panel. The present invention relates to an apparatus and a construction method.

【0002】[0002]

【従来の技術】道路や鉄道等の高架橋は直列に敷設され
た複数の脚桁の上に橋梁が架設支持されてなり、橋梁の
上面に自動車や鉄道車両の走行面が形成されているのが
一般的である。ところで、かかる高架橋の側部には、四
囲の状況に応じて照明灯用の鉄柱や遮音壁さらには化粧
用外装板等の付帯施工物を設けなければならない場合が
ある。このような付帯施工物は、例えば高架橋の側部に
防護柵として上向きに突設された高欄に支持させた状態
で取り付けられる。
2. Description of the Related Art In a viaduct such as a road or a railway, a bridge is erected and supported on a plurality of spars laid in series, and a running surface of an automobile or a railway vehicle is formed on an upper surface of the bridge. General. By the way, on the side of the viaduct, there may be a case where it is necessary to provide incidental works such as an iron pole for a lighting lamp, a sound insulating wall, and a decorative outer panel depending on the surrounding conditions. Such an ancillary construction is attached to, for example, a side of a viaduct while being supported on a railing projecting upward as a protective fence.

【0003】従って、高架橋に付帯施工物を付設しよう
とすれば、高架橋の路面側からの施工だけでは無理であ
り、高欄の外側からも各種の作業を行う必要がある。そ
こで、高架橋の側部の施工位置に地上から足場を組み上
げることが考えられるが、通常、高架橋は地上10m以
上、高いところでは数10mにも達する場合があり、か
かる高所を対象に高架橋に沿って長距離に亘って足場を
設けることは実質的に不可能である。
[0003] Therefore, if it is intended to attach an additional work to the viaduct, it is impossible to perform the work only from the road surface side of the viaduct, and it is necessary to perform various operations from the outside of the railing. Therefore, it is conceivable to assemble a scaffold from the ground at the construction position on the side of the viaduct. Generally, the viaduct may be 10 m or more above the ground, and may reach several tens of meters at high places. It is virtually impossible to provide a scaffold over long distances.

【0004】そこで、従来は、適当な形状の吊り足場を
高欄に固定し、これを足場にして工事をしたり(第一の
従来法)、地上側にクレーン車等の高所作業車を配置し
てその作業アームの先端に設けられた作業足場を高欄の
付帯施工物の施工位置に移動させ、この作業足場から作
業を行うようになされている(第二の従来法)。また近
年、アームが高欄の外側に回り込むように構成された特
殊作業車(オーバーフェンス作業車と通称されている)
を採用し、このオーバーフェンス作業車を橋梁の路面側
に駐車させてアームを展開し、このアームの先端に設け
られた作業足場から作業することも行われ始めている
(第三の従来法)。
[0004] Therefore, conventionally, an appropriately shaped hanging scaffold is fixed on a railing and used as a scaffold for construction work (first conventional method), or a crane truck or other high work vehicle is arranged on the ground side. Then, a work scaffold provided at the tip of the work arm is moved to a construction position of a collateral work on a railing, and work is performed from the work scaffold (second conventional method). In recent years, a special work vehicle configured so that an arm goes around the outside of a railing (commonly called an over fence work vehicle)
It has also begun to park the over-fence work vehicle on the road surface of the bridge, deploy the arm, and work from a work scaffold provided at the end of the arm (third conventional method).

【0005】[0005]

【発明が解決しようとする課題】ところで、高欄に吊り
足場を固定する上記第一の従来法にあっては、設置場所
での工事が終わった後、吊り足場を高欄から一旦全面的
に撤去した後、つぎの作業場所に再構築しなければなら
ず、施工効率が著しく劣るという問題点も存在する。
By the way, in the above-mentioned first conventional method of fixing a suspended scaffold to a railing, after the construction at the installation site is completed, the suspended scaffold is once completely removed from the railing. Thereafter, the work must be rebuilt at the next work place, and there is a problem that the construction efficiency is extremely poor.

【0006】また、高所作業車を高架橋の脇の地上側に
駐車して作業する上記第二の従来法にあっては、地上側
が側道になっているような場合、その側道を工事期間中
通行止めにしなければならず、交通渋滞を招くという不
都合が発生する。また、工事位置に対応した地上側に必
ずしも高所作業車を駐車させ得る空間が存在するとは限
らず、汎用性が乏しいという欠点も存在する。
In the above-mentioned second conventional method, in which an aerial work vehicle is parked on the ground side beside the viaduct, when the ground side is a side road, the side road is constructed. It must be closed during the period, which causes inconvenience of traffic congestion. In addition, there is not always a space on the ground side corresponding to the construction position where the aerial work vehicle can be parked, and there is a disadvantage that versatility is poor.

【0007】さらに、オーバーフェンス作業車を使用す
る上記第三の従来法にあっては、高架橋側の路面にオー
バーフェンス作業車を止めて作業を行わなければなら
ず、そのための通行止めで交通渋滞の原因になるという
問題点を有している他、オーバーフェンス作業車は極め
て高価であり、たとえレンタルで対応してもそのレンタ
ル料は高価で作業コストが嵩むという不都合が生じる。
Further, in the third conventional method using an over-fence work vehicle, the work must be performed by stopping the over-fence work vehicle on the road surface on the viaduct side. In addition to the drawback, the overfence work vehicle is extremely expensive, and even if the vehicle is rented, the rental fee is expensive and the work cost increases.

【0008】本発明は、上記のような問題点を解消する
ためになされたものであり、地上に影響を与えずに高架
橋の付設工事を安全かつ効率よく行うことができる高架
橋の付設工事用足場装置および付設工事方法を提供する
ことを目的としている。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and has an advantage of being able to safely and efficiently carry out a viaduct installation work without affecting the ground. The purpose of the present invention is to provide a device and a method of installing works.

【0009】[0009]

【課題を解決するための手段】請求項1記載の発明は、
高架橋の側部に付帯施工物を付設施工するに際して用い
られる高架橋の付設工事用足場装置であって、上記高架
橋の側部に着脱可能に固定される支持架台と、この支持
架台に連結部材を介して高架橋の延びる方向に移動可能
に連結される足場用枠体とが備えられ、かつ、この足場
用枠体は、高架橋よりも外側の位置で上記支持架台に連
結されていることを特徴とするものである。
According to the first aspect of the present invention,
A scaffolding device for additional work of a viaduct used for attaching and constructing an incidental work piece on a side portion of the viaduct, and a support base detachably fixed to the side part of the viaduct, and a connecting member connected to the support base. And a scaffold frame movably connected in the direction in which the viaduct extends, and the scaffold frame is connected to the support base at a position outside the viaduct. Things.

【0010】請求項2記載の発明は、請求項1記載の発
明において、上記支持架台は、高架橋の側部に施工され
た高欄に着脱可能に固定されていることを特徴とするも
のである。
According to a second aspect of the present invention, in the first aspect of the present invention, the support gantry is detachably fixed to a railing provided on a side portion of the viaduct.

【0011】これらの発明によれば、高架橋の側部また
は高欄に支持架台を固定した状態で、連結部材を介して
足場用枠体を支持架台に支持させることにより、足場用
枠体は高架橋の外側位置で上記支持架台に連結された状
態になる。従って、作業者は、足場用枠体の足場板の上
に載ることにより、高架橋の外側位置に位置することが
可能になり、これによって高架橋の外側から付帯施工物
を施工することが可能になる。
According to these inventions, the scaffolding frame is supported by the supporting frame via the connecting member in a state where the supporting frame is fixed to the side portion or the railing of the viaduct. At the outer position, it is connected to the support base. Therefore, the worker can be located on the outside position of the viaduct by being placed on the scaffold plate of the scaffold frame, whereby it is possible to construct the incidental work from outside the viaduct. .

【0012】そして、足場用枠体は、連結部材を介して
支持架台に対し移動可能になっているため、位置設定さ
れた作業域での作業が完了した時点で、足場用枠体をつ
ぎの作業域まで移動させればよい。こうすることによっ
て、足場用枠体の作業可能範囲を拡大することが可能に
なり、一作業域での作業が完了する都度、足場を解体し
てつぎの作業域で再度構築するような従来の足場の不都
合が解消され、足場の構築コストの低減化が実現すると
ともに、作業効率が向上する。
Since the scaffolding frame is movable with respect to the support base via the connecting member, the scaffolding frame is moved to the next position when the work in the set work area is completed. It only has to be moved to the work area. By doing so, it becomes possible to expand the workable range of the scaffolding frame, and every time work in one work area is completed, the scaffold is dismantled and reconstructed in the next work area. The inconvenience of the scaffold is eliminated, the construction cost of the scaffold is reduced, and the working efficiency is improved.

【0013】請求項3記載の発明は、請求項2記載の発
明において、上記支持架台は、高欄の内側面からその上
端を跨いで外側面に到る形状の固定部を含むフレームを
備えていることを特徴とするものである。
According to a third aspect of the present invention, in the second aspect of the present invention, the support gantry includes a frame including a fixing portion having a shape extending from the inner side surface of the railing to the outer side surface across the upper end thereof. It is characterized by the following.

【0014】この発明によれば、上方に向けて突出した
高欄の形状を有効に利用して支持架台を簡単にかつ安定
して据え付けることができる。また、高欄に対して固定
部を被せるように吊り降ろすだけで支持架台が高欄に装
着されるため、支持架台の高欄に対する装着作業の作業
性が良好になり効率化される。
According to the present invention, the support gantry can be easily and stably installed by effectively utilizing the shape of the row projecting upward. Further, since the support base is mounted on the rail by simply hanging down the rail so as to cover the fixing portion, workability of mounting the support base on the rail is improved and efficiency is improved.

【0015】請求項4記載の発明は、請求項1乃至3の
いずれかに記載の発明において、上記足場用枠体は、そ
の上側および上記支持架台に対向した側が当該支持架台
に上記連結部材を介して連結されることにより吊り下げ
られていることを特徴とするものである。
According to a fourth aspect of the present invention, in the invention according to any one of the first to third aspects, the scaffold frame has an upper side and a side opposed to the support gantry connecting the connecting member to the support gantry. It is characterized by being suspended by being connected via a wire.

【0016】この発明によれば、足場用枠体を支持架台
に吊持させることにより、足場用枠体にフロアを設け、
このフロア上を支持台車に走行させるように構成したも
のに比較して足場用枠体の支持架台に対する連結構造が
簡単になり、設備コストの低減化に貢献する。
According to the present invention, a floor is provided on the scaffold frame by suspending the scaffold frame on the support frame.
Compared to the structure in which the supporting carriage is made to run on the floor, the connecting structure of the scaffold frame to the supporting frame is simplified, which contributes to a reduction in equipment cost.

【0017】請求項5記載の発明は、請求項1乃至4の
いずれかに記載の発明において、上記連結部材は、支持
架台および足場用枠体の一方側に高架橋の長手方向に向
けて延びるように設けられるレール部材と、同他方側に
上記レール部材に案内されてレール部材と相対移動可能
となるように設けられるローラ部材を含むことを特徴と
するものである。
According to a fifth aspect of the present invention, in the first aspect of the present invention, the connecting member extends on one side of the support base and the scaffold frame in the longitudinal direction of the viaduct. And a roller member provided on the other side so as to be guided by the rail member so as to be relatively movable with respect to the rail member.

【0018】この発明によれば、ローラー部材がレール
部材に案内されて軸心回りに回転することにより、足場
用枠体は、支持架台に対して円滑に移動する。従って、
単に摺接状態で足場用枠体が支持架台に連結されている
場合に比較し、小さな力で足場用枠体を動かすことが可
能になり、作業域変更のための足場用枠体の移動作業が
効率化する。
According to the present invention, the scaffold frame moves smoothly with respect to the support base by the roller member being guided by the rail member and rotating around the axis. Therefore,
The scaffolding frame can be moved with a smaller force than when the scaffolding frame is simply connected to the support base in the sliding state, and the scaffolding frame is moved to change the work area Is more efficient.

【0019】請求項6記載の発明は、請求項5記載の発
明において、上記レール部材は、足場用枠体に設けられ
ていることを特徴とするものである。
According to a sixth aspect of the present invention, in the fifth aspect of the invention, the rail member is provided on a scaffold frame.

【0020】この発明によれば、支持架台を高架橋の側
部に沿って連設するような場合にレール部材を節約する
ことが可能になる。すなわち、支持架台側にレール部材
を設けると、支持架台を連設した場合には、各支持架台
にレール部材を設けなければならなくなるが、レール部
材を足場用枠体に設けることにより、全ての支持架台に
対応させることが可能になって1本で済ませることがで
き、部品コストが低減するとともに、施工も容易にな
る。
According to the present invention, it is possible to save the rail members when the support base is continuously provided along the side of the viaduct. That is, when the rail members are provided on the support gantry side, when the support gantry is continuously provided, the rail members must be provided on each support gantry, but by providing the rail members on the scaffold frame, all the rail members are provided. It is possible to correspond to the support gantry, and it is possible to use only one, so that the cost of parts is reduced and the construction becomes easy.

【0021】請求項7記載の発明は、請求項6記載の発
明において、上記レール部材は、足場用枠体の上部に設
けられた上部レール部材と、この上部レール部材より下
部に設けられた下部レール部材とを備えている一方、上
記支持架台は、頂部または上側部に設けられた上記上部
レールを支持する上部ローラ部材と、下部に設けられた
上記下部レール部材を支持する下部ローラ部材とを備
え、上記下部ローラ部材は、上部レール部材と上部ロー
ラ部材との当接点を支点とした足場用枠体の支持架台の
方向に向かうモーメントを受けるように支持架台に取り
付けられていることを特徴とするものである。
According to a seventh aspect of the present invention, in the sixth aspect of the invention, the rail member includes an upper rail member provided on an upper portion of the scaffold frame and a lower portion provided below the upper rail member. On the other hand, the supporting frame includes an upper roller member that supports the upper rail provided on the top or upper portion, and a lower roller member that supports the lower rail member provided below. Wherein the lower roller member is attached to the support frame so as to receive a moment directed toward the support frame of the scaffold frame with the contact point between the upper rail member and the upper roller member as a fulcrum. Is what you do.

【0022】この発明によれば、上部レール部材が上部
ローラ部材に支持された状態で、足場用枠体には上部レ
ール部材と上部ローラ部材との当接点を支点にして支持
架台の方向に向かうモーメントが作用するが、このモー
メントは、下部レール部材を介して下部ローラ部材に受
けられるため、足場用枠体は、傾倒するような不都合が
防止されて直立姿勢が安定する。
According to the present invention, in the state where the upper rail member is supported by the upper roller member, the scaffold frame is directed toward the support base with the contact point between the upper rail member and the upper roller member as a fulcrum. Although a moment acts, the moment is received by the lower roller member via the lower rail member, so that the scaffold frame is prevented from inconvenience such as tilting, and the upright posture is stabilized.

【0023】請求項8記載の発明は、請求項1乃至7の
いずれかに記載の発明において、上記足場用枠体には、
当該足場用枠体の支持架台に対する相対移動を規制する
ストッパーが設けられていることを特徴とするものであ
る。
According to an eighth aspect of the present invention, in the invention according to any one of the first to seventh aspects, the scaffold frame includes:
A stopper is provided for restricting relative movement of the scaffold frame with respect to the support frame.

【0024】この発明によれば、高架橋の側部に対する
足場用枠体による作業域が設定された状態で、ストッパ
ーを操作して足場用枠体の移動を規制することにより、
足場用枠体が風圧等で勝手に移動するような不具合の生
じることがなくなり安全性が向上するとともに、作業性
も向上する。
According to the present invention, by controlling the movement of the scaffold frame by operating the stopper in a state where the working area of the scaffold frame for the side portion of the viaduct is set.
A trouble such as the scaffolding frame moving on its own due to wind pressure or the like does not occur, and safety is improved, and workability is also improved.

【0025】請求項9記載の発明は、請求項1乃至8の
いずれかに記載の発明において、上記足場用枠体には、
当該足場用枠体を取り囲むようにネットが張設されてい
ることを特徴とするものである。
According to a ninth aspect of the present invention, in the invention according to any one of the first to eighth aspects, the scaffold frame comprises:
A net is stretched so as to surround the scaffold frame.

【0026】この発明によれば、足場板の上での作業中
にボルトやナットなどの設備資材や、ハンマーやドライ
バー等の施工工具が誤って落下しても、足場用枠体に
は、当該足場用枠体を取り囲むようにネットが張設され
ているため、誤って落とした設備資材や施工工具はこの
ネットによって捕捉され、これによって作業域の直下に
設備資材等が落下することによる危険な事態が確実に回
避される。
According to the present invention, even if equipment materials such as bolts and nuts or construction tools such as a hammer and a screwdriver fall by mistake while working on the scaffold plate, the scaffold frame is not affected by the same. Since the net is stretched around the scaffolding frame, equipment materials and construction tools that have been accidentally dropped are caught by this net, and this can cause a risk of falling equipment materials etc. just below the work area. The situation is reliably avoided.

【0027】請求項10記載の発明は、複数の支持架台
を高架橋の側部に沿って直列に架設する支持架台架設工
程と、上記複数の支持架台のいずれかにその並び方向に
移動可能に足場用枠体を設置する足場用枠体設置工程
と、足場用枠体を用いて工事中あるいは工事の前後に足
場用枠体をつぎの支持架台へ移動させる移動工程と、こ
の移動工程の完了後に足場用枠体後方の支持架台を足場
用枠体前方に移し替える支持架台移設工程とを含むこと
を特徴とするものである。
According to a tenth aspect of the present invention, there is provided a supporting frame mounting step of mounting a plurality of supporting frames in series along a side portion of a viaduct, and a scaffold movably mounted on one of the plurality of supporting frames in a direction in which the supporting frames are arranged. A scaffolding frame installation process of installing a scaffolding frame, a moving process of moving the scaffolding frame to the next support frame during or before and after construction using the scaffolding frame, and after completion of this moving process. And a support gantry transfer step of transferring the support gantry behind the scaffold frame to the front of the scaffold frame.

【0028】この発明によれば、支持架台が並設されて
いる範囲内の工事については、足場用枠体を端から順次
各支持架台間で移動させながら高架橋の側部に対して所
定の工事を施工していくことができる。そして、上記範
囲内の工事が完了する頃合いを見計らい、足場用枠体後
方の支持架台を足場用枠体前方に移し替えることによ
り、足場用枠体をこの移し替えられた支持架台に移動さ
せて高架橋の側部のつぎのスパンの工事を施工すること
ができる。
According to the present invention, for the construction within the range where the support frames are juxtaposed, the scaffold frame is sequentially moved from the end to each of the support frames, and the predetermined work is performed on the side of the viaduct. Can be constructed. Then, in anticipation of the completion of construction within the above range, by moving the support frame behind the scaffold frame to the front of the scaffold frame, the scaffold frame is moved to the transferred support frame. The construction of the span next to the side of the viaduct can be performed.

【0029】[0029]

【発明の実施の形態】図1および図2は、本発明に係る
足場装置の第一実施形態を示す斜視図であり、図1は、
支持架台および足場用枠体が互いに分離された状態、図
2は、足場用枠体の装着された支持架台が高欄に取り付
けられた状態をそれぞれ示している。また、図3は図2
のA線矢視図、図4は図2のB線矢視図である。なお、
図4では、支持架台と足場用枠体との相対位置関係を明
確にするために両者を正対位置から若干ずらせている。
また、この実施形態では、高架橋の側部に上向きに突出
した高欄Kが形成されている。
1 and 2 are perspective views showing a first embodiment of a scaffolding device according to the present invention. FIG.
FIG. 2 shows a state in which the support gantry and the scaffold frame are separated from each other, and FIG. 2 shows a state in which the support gantry on which the scaffold frame is mounted is attached to the railing. FIG. 3 is FIG.
4 is a view as seen from the direction of the arrow A, and FIG. 4 is a view as viewed from the direction of the arrow B in FIG. In addition,
In FIG. 4, in order to clarify the relative positional relationship between the support base and the scaffold frame, the two are slightly displaced from the directly facing positions.
Further, in this embodiment, a row K projecting upward is formed on the side of the viaduct.

【0030】これらの図に示すように、足場装置10
は、高欄Kに着脱可能に固定される支持架台20と、こ
の支持架台20に高欄Kの延びる方向に向けて移動可能
に連結される足場用枠体30と、上記支持架台20を高
欄Kに固定する支持架台固定構造40と、足場用枠体3
0を移動可能に支持架台20に連結する連結構造50
と、足場用枠体30にネットを張設するネット張設構造
60とを備えた基本構造を有している。
As shown in these figures, the scaffold device 10
Is a support frame 20 detachably fixed to the rail K, a scaffold frame 30 movably connected to the support rack 20 in the direction in which the rail K extends, and the support frame 20 is attached to the rail K. Supporting frame fixing structure 40 for fixing, and scaffold frame 3
Connection structure 50 for movably connecting the support frame 20 to the support base 20
And a net extending structure 60 for extending the net to the scaffolding frame 30.

【0031】上記支持架台20は、高欄Kに装着される
三本歯の櫛形フレーム21の複数体(本実施形態におい
ては4体)が、各側面を互いに平行になるように対向さ
せた状態で、二本のアングル材27、すなわち上部アン
グル材27aおよび下部アングル材27bによって直列
に連結されることによって形成されている。
The support gantry 20 is a state in which a plurality of (three in this embodiment) three-tooth comb frames 21 mounted on the row K face each other so that their side surfaces are parallel to each other. , Two angle members 27, that is, an upper angle member 27a and a lower angle member 27b connected in series.

【0032】上記各櫛形フレーム21は、高欄Kの路面
K1側の壁面に対応した角パイプからなる路面側支柱2
2と、高欄Kの外面側の壁面に対応した角パイプからな
る外面側支柱23と、この外面側支柱23のさらに外方
位置にオーバーハング状で配設された角パイプからなる
オーバーハング支柱24とを備えている。路面側支柱2
2と外面側支柱23とは略同一の長さに寸法設定されて
いるのに対し、オーバーハング支柱24はこれらより若
干長めに寸法設定されている。
Each of the comb-shaped frames 21 is a road-side support 2 composed of a square pipe corresponding to the wall surface of the rail K on the road surface K1 side.
2, an outer support 23 made of a square pipe corresponding to the outer wall surface of the railing K, and an overhang support 24 made of a square pipe arranged in an overhang shape further outside the outer support 23. And Road surface support 2
2 and the outer support 23 are dimensioned to be approximately the same length, whereas the overhang support 24 is dimensioned slightly longer.

【0033】これら各支柱22,23,24の下端部の
高さレベルが揃えられた状態で、路面側支柱22および
外面側支柱23の頂部並びにオーバーハング支柱24の
頂部より若干下方位置が溶接によって角パイプからなる
上部梁材25に一体に結合されるとともに、同上下方向
の中間位置より若干上方部分が溶接によって角パイプか
らなる中間部梁材26に一体に結合されることによって
櫛形フレーム21が形成されている。
With the lower ends of the columns 22, 23, and 24 at the same height level, the tops of the road-side columns 22 and the outer-side columns 23 and the positions slightly below the tops of the overhang columns 24 are welded. The comb-shaped frame 21 is integrally connected to the upper beam 25 made of a square pipe, and a part slightly above the intermediate position in the vertical direction is integrally connected to the intermediate beam 26 made of the square pipe by welding. Is formed.

【0034】上記路面側支柱22は、高欄Kの路面K1
側の壁面の傾斜に沿うように若干斜めになるように角度
設定され、これによって路面側支柱22と外面側支柱2
3との間の間隔寸法は、下方に向かうに従って漸増する
ようになっている。そして、このような路面側支柱22
と、上記外面側支柱23と、上記中間部梁材26とによ
って本発明に係る逆U字状フレーム20aが形成されて
いる。この逆U字状フレーム20aが高欄Kに被せられ
ることにより、支持架台20が高欄Kに装着されるよう
になっている。
The above-mentioned road-side support 22 is provided on the road surface K1
The angle is set so as to be slightly oblique so as to follow the inclination of the side wall surface.
3 is gradually increased downward. And such road surface side support 22
, The outer side support 23 and the intermediate beam 26 form an inverted U-shaped frame 20a according to the present invention. By mounting the inverted U-shaped frame 20a on the row K, the support gantry 20 is mounted on the row K.

【0035】また、上記上部梁材25は、その上面であ
ってオーバーハング支柱24の近傍位置に立設された短
尺支柱28を有している。この短尺支柱28は、その上
端部がオーバーハング支柱24の上端部と同一高さレベ
ルになるように寸法設定されている。
Further, the upper beam member 25 has a short column 28 standing upright at a position near the overhang column 24 on the upper surface thereof. The short support 28 is dimensioned such that the upper end thereof is at the same height level as the upper end of the overhang support 24.

【0036】かかる櫛形フレーム21において、上部梁
材25と中間部梁材26とが結合されている部分にはそ
れぞれ補強板256が溶接止めで固定され、これによる
剛性の向上で櫛形フレーム21の原形保持が確保される
ようにしている。
In this comb-shaped frame 21, reinforcing plates 256 are fixed by welding to portions where the upper beam member 25 and the intermediate beam member 26 are joined, and the rigidity thereof is improved to improve the original shape of the comb-shaped frame 21. Retention is ensured.

【0037】かかる支持架台20の上部梁材25には、
その略中央部の上面に貫通孔29aの穿設された吊持用
ブラケット29が溶接止めで固定されている。このブラ
ケット29は、支持架台20をクレーン車等の作業機械
で吊持するときに使用されるものであり、そのとき作業
機械の吊持用のワイヤ先端に設けられたフックがこのブ
ラケット29の貫通孔29aに差し通される。
The upper beam 25 of the support frame 20 includes
A suspension bracket 29 having a through-hole 29a formed on the upper surface of the substantially central portion is fixed by welding. The bracket 29 is used when the support base 20 is suspended by a working machine such as a crane truck. At this time, a hook provided at a tip of a wire for suspension of the working machine is used to penetrate the bracket 29. It is inserted through the hole 29a.

【0038】上記支持架台固定構造40は、路面側支柱
22の上記中間部梁材26より下方位置の両側面に溶接
された一対のボルト支持ブラケット41と、各ボルト支
持ブラケット41に上下位置に貫通螺設されたボルト孔
にそれぞれ螺着される係止ボルト42と、上記外面側支
柱23から上記各係止ボルト42に対向するように突設
された、高欄Kの外面側に当接される上下各一対の当接
突起43とを備えて構成されている。
The support gantry fixing structure 40 includes a pair of bolt support brackets 41 welded to both sides of the road-side column 22 below the intermediate beam member 26, and penetrates the bolt support brackets 41 vertically. The locking bolts 42 screwed into the screwed bolt holes, respectively, and abut on the outer surface side of the railing K protruding from the outer surface side support 23 so as to face each of the locking bolts 42. A pair of upper and lower contact protrusions 43 are provided.

【0039】上記係止ボルト42は、その先端に高欄K
の内面側に当接される首振り自在の当接円盤42aが設
けられている。この当接円盤42aの当接面には、ゴム
や軟質合成樹脂からなる緩衝材44が積層されていると
ともに、上記当接突起43の当接面にも同様の緩衝材4
4が積層されている。
The locking bolt 42 has a rail K
Is provided with an abutting disk 42a which is abuttable on the inner surface side of the head. A buffer 44 made of rubber or soft synthetic resin is laminated on the contact surface of the contact disk 42a, and a similar buffer 4 is also provided on the contact surface of the contact protrusion 43.
4 are stacked.

【0040】従って、支持架台20の逆U字状フレーム
20aを高欄Kに跨がせた状態で、係止ボルト42を締
結することにより、高欄Kは、各緩衝材44を介して係
止ボルト42および当接突起43によって押圧挟持され
た状態になり、これによって支持架台20は高欄Kに安
定的に装着固定されるようになっている。
Therefore, by fastening the locking bolts 42 with the inverted U-shaped frame 20a of the support base 20 straddling the row K, the row K can be locked via the cushioning members 44. The support frame 20 is stably mounted and fixed to the high rail K by being pressed and held by the abutment 43 and the contact protrusion 43.

【0041】上記足場用枠体30は、作業者が載って作
業を行う足場板31を支持するためのものであり、各種
のフレームに囲まれて全体的に直方体状に形状設定さ
れ、かつ、長さ(高欄Kに平行な方向の長さ)寸法が上
記支持架台20の長さ寸法と略同一に設定されている。
The scaffolding frame 30 is for supporting a scaffolding plate 31 on which an operator stands and performs work, and is surrounded by various frames and has a rectangular parallelepiped shape as a whole. The length (the length in the direction parallel to the column K) is set to be substantially the same as the length of the support base 20.

【0042】かかる足場用枠体30は、足場板31を支
持するための平面視で矩形状を呈した角パイプ製の足場
板支持フレーム32と、この足場板支持フレーム32の
上記支持架台20から遠い方の二個所の角部、およびこ
れら角部間の適所、並びに各角部から若干支持架台20
の方向に寄った位置にそれぞれ立設された所定本数の角
パイプ製の垂直フレーム33と、これら垂直フレーム3
3の頂部に架設された高欄Kと平行に延びる角パイプ製
の二本の長尺水平フレーム34と、高欄と直交する方向
に延びるように垂直フレーム33の頂部に架設された角
パイプ製の所定本数の短尺水平フレーム35とを備えて
構成されている。
The scaffolding frame 30 includes a scaffolding plate support frame 32 made of a square pipe and having a rectangular shape in plan view for supporting the scaffolding plate 31, and a support frame 20 of the scaffolding plate support frame 32. Two distant corners, and a suitable place between these corners, and a slight support stand 20 from each corner
And a predetermined number of vertical frames 33 made of square pipes, each of which is erected at a position close to
3, two long horizontal frames 34 made of square pipes extending in parallel with the row K and a square pipe formed on the top of a vertical frame 33 extending in a direction perpendicular to the row. And a number of short horizontal frames 35.

【0043】上記垂直フレーム33は、足場用枠体30
が支持架台20に連結された状態でその下端部が高欄K
の下端部より若干下方レベルに位置するように長さ寸法
が設定されているとともに、足場板支持フレーム32
は、足場用枠体30が支持架台20に連結された状態で
垂直フレーム33が立設されていない側の長尺縁部が高
欄Kの下方に潜り込み得るように寸法設定されている。
The vertical frame 33 is provided on the scaffold frame 30.
Is connected to the support base 20, and the lower end thereof is
The length is set so as to be slightly lower than the lower end of the scaffold plate support frame 32.
The dimension is set such that the long edge portion on the side where the vertical frame 33 is not erected can sink under the row K in a state where the scaffold frame 30 is connected to the support frame 20.

【0044】従って、足場用枠体30が支持架台20に
連結された状態では、図2に示す斜視図を平面視で見た
場合、足場板31が高欄Kの下部に潜り込むことにより
足場板31と高欄Kとの間には隙間が存在せず、従っ
て、作業者が隙間を通して転落するような事故が確実に
防止されるようになっている。
Accordingly, when the scaffolding frame 30 is connected to the support frame 20, when the perspective view shown in FIG. There is no gap between the rail and the railing K, so that an accident in which the worker falls down through the gap is reliably prevented.

【0045】また、各垂直フレーム33の中間位置に
は、当該中間位置の間を結んで足場板31を囲むように
架設された平面視でコ字状を呈する中間水平フレーム3
6が設けられているとともに、これら中間水平フレーム
36と足場板支持フレーム32との間、中間水平フレー
ム36と長尺水平フレーム34との間および中間水平フ
レーム36と短尺水平フレーム35との間にX字状に筋
交い37が装着され、これによって足場用枠体30は構
造的に丈夫なものになっている。
An intermediate horizontal frame 3 having a U-shape in plan view is provided at an intermediate position of each vertical frame 33 so as to surround the scaffold plate 31 by connecting the intermediate positions.
6 between the intermediate horizontal frame 36 and the scaffold plate support frame 32, between the intermediate horizontal frame 36 and the long horizontal frame 34, and between the intermediate horizontal frame 36 and the short horizontal frame 35. The brace 37 is attached in an X shape, whereby the scaffold frame 30 is structurally strong.

【0046】また、上記短尺水平フレーム35は、その
長さ寸法が足場板支持フレーム32の幅寸法の略半分に
設定され、これによってその先端部は当該短尺水平フレ
ーム35の中間部を支持している垂直フレーム33から
支持架台20の方向に向けて突出した状態になってい
る。
The length of the short horizontal frame 35 is set to approximately half the width of the scaffolding plate support frame 32, so that the front end supports the middle portion of the short horizontal frame 35. From the vertical frame 33 in the direction of the support base 20.

【0047】足場用枠体30を支持架台20に連結する
連結構造50は、各短尺水平フレーム35の先端下面部
に溶接止めで固定されたI型鋼製の水平方向に延びる上
部レール部材51と、垂直フレーム33の略中間位置で
あって、支持架台20に対向した面に溶接止めで固定さ
れたC型鋼製の水平方向に延びる下部レール部材52
と、支持架台20の上部梁材25に上部レール部材51
に対応して設けられた当該上部レール部材51下面を支
持する垂直ローラ部材53と、上記上部梁材25にオー
バーハング支柱24の上部および短尺支柱28を介して
設けられた上記上部レール部材51を挟持する上部水平
ローラ部材54と、上記オーバーハング支柱24の下部
に上記垂直ローラ部材53に対応して設けられた下部水
平ローラ部材55とからなっている。垂直ローラ部材5
3と上部水平ローラ部材54とで本発明に係る上部ロー
ラ部材が形成されている。
The connecting structure 50 for connecting the scaffold frame 30 to the support base 20 includes an upper rail member 51 made of I-shaped steel and extending in the horizontal direction, which is fixed to the lower surface of the distal end of each short horizontal frame 35 by welding. , A lower rail member 52 extending in the horizontal direction, which is made of a C-shaped steel and is fixed to the surface facing the support frame 20 at a substantially intermediate position of the vertical frame 33 by welding.
And an upper rail member 51 on the upper beam member 25 of the support base 20.
And a vertical roller member 53 supporting the lower surface of the upper rail member 51 provided corresponding to the above, and the upper rail member 51 provided on the upper beam member 25 via the upper portion of the overhang support 24 and the short support 28. It comprises an upper horizontal roller member 54 to be clamped, and a lower horizontal roller member 55 provided below the overhanging support 24 so as to correspond to the vertical roller member 53. Vertical roller member 5
3 and the upper horizontal roller member 54 form an upper roller member according to the present invention.

【0048】上記上部レール部材51は、I型鋼の一対
の長尺平板を連結する連結板が垂直になるように短尺水
平フレーム35に固定されているとともに、上記下部レ
ール部材52は、C型鋼の長尺開口面が支持架台20の
方向に向くように垂直フレーム33に固定されている。
そして、これらの上部レール部材51および下部レール
部材52は、いずれも足場用枠体30の長さの略1.5
倍に寸法設定され、これによって足場用枠体30の両側
部から同一寸法だけ外部に突出した状態になっている。
The upper rail member 51 is fixed to the short horizontal frame 35 so that a connecting plate connecting a pair of long flat plates of I-shaped steel is vertical, and the lower rail member 52 is formed of C-shaped steel. It is fixed to the vertical frame 33 so that the long opening surface faces the direction of the support base 20.
Each of the upper rail member 51 and the lower rail member 52 has a length of approximately 1.5 times the length of the scaffold frame 30.
The dimensions are set to be twice as large, so that the scaffolding frame 30 projects outwardly from both sides by the same dimension.

【0049】図5は、垂直ローラ部材53および上部水
平ローラ部材54による上部レール部材51の支持を説
明するための図3の部分拡大図である。この図に示すよ
うに、垂直ローラ部材53は、正面視でU字形状を呈し
たローラ受部材53aと、このローラ受部材53aの側
板間に貫通架設されたローラ軸53bと、このローラ軸
53b回りに回転自在に軸支された垂直ローラ53cと
からなっている。そして、上記上部レール部材51の下
面が垂直ローラ53cの周面に支持されることにより、
足場用枠体30が垂直ローラ53cのローラ軸53b回
りの回転によって正逆移動可能に支持架台20に支持さ
れるようになっている。
FIG. 5 is a partially enlarged view of FIG. 3 for explaining the support of the upper rail member 51 by the vertical roller member 53 and the upper horizontal roller member 54. As shown in this figure, a vertical roller member 53 includes a roller receiving member 53a having a U shape in a front view, a roller shaft 53b penetrating between side plates of the roller receiving member 53a, and a roller shaft 53b. And a vertical roller 53c rotatably supported around. The lower surface of the upper rail member 51 is supported on the peripheral surface of the vertical roller 53c,
The scaffold frame 30 is supported by the support base 20 so as to be able to move forward and backward by the rotation of the vertical roller 53c around the roller shaft 53b.

【0050】また、上部水平ローラ部材54は、上部レ
ール部材51の垂直部分を挟持するように一対で設けら
れ、正面視でC字形状を呈したローラ受部材54aと、
このローラ受部材54aの上下板間に貫通架設されたロ
ーラ軸54bと、このローラ軸54b回りに回転自在に
軸支された上部水平ローラ54cとからなっている。か
かる一対の上部水平ローラ部材54の各上部水平ローラ
54cによって上部レール部材51の垂直部分が挟持さ
れていることにより、垂直ローラ53cに支持された上
部レール部材51の当該垂直ローラ53cからの脱落が
確実に防止されるようになっている。
The upper horizontal roller member 54 is provided as a pair so as to sandwich the vertical portion of the upper rail member 51, and has a C-shaped roller receiving member 54a in a front view.
It comprises a roller shaft 54b penetrating between the upper and lower plates of the roller receiving member 54a, and an upper horizontal roller 54c rotatably supported around the roller shaft 54b. Since the vertical portion of the upper rail member 51 is sandwiched between the upper horizontal rollers 54c of the pair of upper horizontal roller members 54, the upper rail member 51 supported by the vertical roller 53c is prevented from falling off from the vertical roller 53c. It is surely prevented.

【0051】図6は、下部水平ローラ部材(下部ローラ
部材)55による下部レール部材52の支持を説明する
ための図3の部分拡大図である。この図に示すように、
下部水平ローラ部材55は、正面視でC字形状を呈した
ローラ受部材55aと、このローラ受部材55aの上下
板間に貫通架設されたローラ軸55bと、このローラ軸
55b回りに回転自在に軸支された下部水平ローラ55
cとからなっている。そして、下部水平ローラ55cの
周面は、下部レール部材52の底板に当接するように下
部水平ローラ部材55の設置位置が設定されている。
FIG. 6 is a partially enlarged view of FIG. 3 for explaining the support of the lower rail member 52 by the lower horizontal roller member (lower roller member) 55. As shown in this figure,
The lower horizontal roller member 55 has a C-shaped roller receiving member 55a in front view, a roller shaft 55b penetrated between upper and lower plates of the roller receiving member 55a, and a rotatable shaft around the roller shaft 55b. Lower horizontal roller 55 supported by the shaft
c. The installation position of the lower horizontal roller member 55 is set so that the peripheral surface of the lower horizontal roller 55c contacts the bottom plate of the lower rail member 52.

【0052】かかる下部水平ローラ部材55の構成によ
れば、足場用枠体30が上部レール部材51および垂直
ローラ部材53を介して支持架台20に吊持された状態
で、垂直ローラ53cの頂部周面を支点とした時計方向
に向かうモーメントが下部レール部材52の底面を介し
て下部水平ローラ部材55下部水平ローラ55cに受け
られ、これによって足場用枠体30が垂直ローラ53c
の上記支点回りに回動するのを阻止することができ、足
場用枠体30の吊持姿勢が安定する。
According to the configuration of the lower horizontal roller member 55, the scaffold frame 30 is hung on the support base 20 via the upper rail member 51 and the vertical roller member 53, and the top periphery of the vertical roller 53c. A clockwise moment about the surface as a fulcrum is received by the lower horizontal roller member 55 and the lower horizontal roller 55c via the bottom surface of the lower rail member 52, whereby the scaffold frame 30 is moved to the vertical roller 53c.
Of the scaffold frame 30 can be prevented from rotating around the fulcrum.

【0053】上記ネット張設構造60は、足場用枠体3
0の外面側(支持架台20に対向した面の反対側の面)
に付設された、防護ネット63を張設するためのネット
張設用枠体61と、このネット張設用枠体61を支持す
る筋交いフレーム62とからなっている。
The net extending structure 60 is used for the scaffold frame 3.
0 outer surface (surface opposite to the surface facing the support base 20)
And a brace frame 62 for supporting the protection net 63 and a brace frame 62 for supporting the protection net 63.

【0054】上記ネット張設用枠体61は、一対の長尺
フレーム61aと、一対の短尺フレーム61bとが矩形
状になるように組み合わされて矩形状に形成されてい
る。短尺フレーム61bは、足場用枠体30の幅寸法の
略1.5倍に設定されているとともに、上記長尺フレー
ム61aは、長さ寸法が足場用枠体30の長さ寸法より
若干長めに設定されている。また、一対の長尺フレーム
61a間には、所定本数の中間フレーム61cが架設さ
れ、これによってネット張設用枠体61が構造的に頑丈
になっている。
The net stretching frame 61 is formed in a rectangular shape by combining a pair of long frames 61a and a pair of short frames 61b into a rectangular shape. The short frame 61b is set to be approximately 1.5 times the width of the scaffold frame 30, and the long frame 61a has a length slightly longer than the length of the scaffold frame 30. Is set. A predetermined number of intermediate frames 61c are provided between the pair of long frames 61a, so that the net extending frame 61 is structurally strong.

【0055】かかるネット張設用枠体61は、その短尺
フレーム61bが足場板支持フレーム32の角部に立設
された垂直フレーム33の上端部に、先上がりの傾斜が
形成されるようにボルト止めで固定されている。そし
て、筋交いフレーム62が垂直フレーム33の略中間位
置と、短尺フレーム61bの略中間位置との間に架設さ
れてボルト止めで固定され、これによってネット張設用
枠体61の足場用枠体30に対する装着状態を安定させ
るようにしている。
The net stretching frame 61 is provided with bolts such that a short frame 61b is formed at the upper end of a vertical frame 33 erected at the corner of the scaffolding plate support frame 32 so as to form a rising slope. It is fixed with a stop. Then, the brace frame 62 is erected between a substantially middle position of the vertical frame 33 and a substantially middle position of the short frame 61b, and is fixed by bolting, whereby the scaffolding frame 30 of the net stretching frame 61 is formed. To stabilize the mounting state.

【0056】そして、このようなネット張設用枠体61
の全面に防護ネット63が張設されている。このような
ネット張設構造60によれば、作業中に足場用枠体30
の上方を越えて落下しようとした落下物は、足場用枠体
30から斜め上方に延びるように設けられた防護ネット
63によって捕捉されるため、落下物が高架橋Brから
地面に向けて落ちるような不都合が確実に防止される。
Then, such a frame 61 for net stretching is provided.
A protection net 63 is stretched over the entire surface of the vehicle. According to such a net extending structure 60, the scaffolding frame 30
The fallen object that is going to fall over the upper part is caught by the protective net 63 provided to extend obliquely upward from the scaffolding frame 30, so that the fallen object falls from the viaduct Br toward the ground. Inconvenience is reliably prevented.

【0057】なお、本実施形態においては、防護ネット
63は、ネット張設用枠体61だけではなく、足場用枠
体30の上記高欄Kに対向した面以外の四面(両側面、
背面および上面)にも張設され、これによって足場板3
1上で作業中に例えば工具や工事部材を誤って落下させ
るような不都合も確実に防止される。
In this embodiment, the protective net 63 is formed not only by the net extending frame 61 but also by four surfaces of the scaffolding frame 30 other than the surface facing the high rail K (both sides,
Back and top surfaces), thereby providing a scaffold plate 3
The inconvenience of, for example, accidentally dropping a tool or a construction member during operation on the work 1 is also reliably prevented.

【0058】そして、本発明においては、支持架台20
に対する足場用枠体30の移動を規制するストッパー7
0が設けられ、このストッパー70のストップ操作で足
場用枠体30の移動を阻止し、これによって足場用枠体
30の設定位置を安定して維持し得るようになってい
る。
In the present invention, the support frame 20
7 for restricting movement of scaffolding frame 30 with respect to
The stop operation of the stopper 70 prevents the movement of the scaffold frame 30, whereby the set position of the scaffold frame 30 can be stably maintained.

【0059】かかるストッパー70は、図1および図3
に示すように、本実施形態においては、支持架台20の
各オーバーハング支柱24の高欄Kと反対側の面に突設
された第一突設板71と、この第一突設板71に僅かな
隙間を介して上下で対向するように垂直フレーム33か
ら突設された第二突設板72と、第一および第二突設板
71,72が互いに重なり合った状態で両者に貫通され
るストップピン73とを備えて構成されている。第一突
設板71にはストップピン73を挿通するための第一ピ
ン孔71aが穿設されているとともに、第二突設板72
にも同様の第二ピン孔72aが穿設されている。
The stopper 70 is shown in FIGS.
As shown in FIG. 2, in the present embodiment, a first protruding plate 71 protruding from a surface of each of the overhanging posts 24 of the support base 20 opposite to the row K, The second projecting plate 72 projecting from the vertical frame 33 so as to face the upper and lower sides with a small gap therebetween, and the first and second projecting plates 71, 72 are mutually penetrated in a state where they overlap each other. A pin 73 is provided. The first projecting plate 71 has a first pin hole 71a for inserting a stop pin 73, and the second projecting plate 72
Also, a similar second pin hole 72a is formed.

【0060】上記ストップピン73は、第一および第二
ピン孔71a,72aの内径寸法より僅かに小さい径寸
法を有するピン本体73aと、このピン本体73aの頂
部に形成された、第一および第二ピン孔71a,72a
の内径寸法より大きい径寸法を有する頭部73bとから
なっている。
The stop pin 73 has a pin body 73a having a diameter slightly smaller than the inside diameter of the first and second pin holes 71a, 72a, and first and second pin holes 73a formed on the top of the pin body 73a. Two pin holes 71a, 72a
And a head 73b having a diameter larger than the inner diameter of the head 73b.

【0061】従って、第一突設板71と第二突設板72
とが互いに重なり合った状態で、上部から第一ピン孔7
1aおよび第二ピン孔72aにピン本体73aを差し通
すことにより、図6に示すように、第一および第二突設
板71,72がストップピン73を介して互いに連結さ
れ、これによって足場用枠体30の支持架台20に対す
る相対移動が阻止されるようになっている。
Accordingly, the first projecting plate 71 and the second projecting plate 72
With the first pin hole 7
By inserting the pin body 73a into the 1a and the second pin holes 72a, as shown in FIG. 6, the first and second protruding plates 71, 72 are connected to each other via the stop pin 73, whereby the scaffold is used. The relative movement of the frame 30 with respect to the support base 20 is prevented.

【0062】以下、図7〜図10を基に必要に応じて図
1〜図6を参照しながら本実施形態の足場装置10の作
用について説明する。図7は、高欄Kに遮音壁80を施
工する場合を例に挙げて足場装置10の作用を説明する
ための説明図であり、図7の(イ)は、支持架台20が
高欄Kに向けて吊り降ろされつつある状態、図7の
(ロ)は、支持架台20が高欄Kに固定された状態、図
8の(イ)は、足場用枠体30が支持架台20に向けて
吊り降ろされつつある状態、図8の(ロ)は、足場用枠
体30が支持架台20に連結された状態、図9の(イ)
は、遮音壁支持支柱81間に遮音壁80が嵌め込まれつ
つある状態、図9の(ロ)は、2スパンの遮音壁80が
施工された状態、図10は、足場用枠体30が1スパン
分移動された状態をそれぞれ示している。
Hereinafter, the operation of the scaffolding device 10 of the present embodiment will be described with reference to FIGS. 1 to 6 as needed based on FIGS. FIG. 7 is an explanatory diagram for explaining the operation of the scaffolding device 10 by exemplifying a case where the sound insulation wall 80 is constructed on the high rail K. FIG. 7B is a state in which the support base 20 is fixed to the row K, and FIG. 8A is a state in which the scaffold frame 30 is suspended toward the support base 20. 8B is a state in which the scaffolding frame 30 is connected to the support base 20, and FIG.
9 shows a state in which the sound insulating wall 80 is being fitted between the sound insulating wall support columns 81, FIG. 9B shows a state in which the two-sound sound insulating wall 80 is constructed, and FIG. 10 shows a state in which the scaffold frame 30 moves by one span. Each state is shown.

【0063】なお、図7〜図9において、(イ)〜
(ロ)に付記されているは、高欄Kの外方から見た正
面図であり、同は、側面図である。また、図10は、
高欄Kの外方から見た正面図である。
Note that in FIGS. 7 to 9, (a) to (b)
(B) is a front view as viewed from the outside of the railing K, and is a side view. FIG.
It is the front view seen from the outside of the high row K.

【0064】因みに、以下に説明する遮音壁80を施工
する工事においては、足場装置10を高欄Kに取り付け
る前に、予め遮音壁支持支柱81が高欄Kに装着されて
いる。従って、図7〜図10に基く以下の説明は、遮音
壁支持支柱81間に遮音壁80を嵌め込んだ上で遮音壁
支持支柱81の底部と高欄Kの頂部との接合工事が行わ
れるに際し、本発明の足場装置10が使用される場合の
施工例である。
Incidentally, in the construction of the sound insulating wall 80 described below, the sound insulating wall support column 81 is mounted on the high row K before the scaffolding device 10 is mounted on the high row K. Therefore, the following description based on FIG. 7 to FIG. 10 is based on the assumption that the sound insulation wall 80 is fitted between the sound insulation wall support columns 81 and the bottom of the sound insulation wall support columns 81 is joined to the top of the railing K. It is an example of construction when the scaffolding device 10 is used.

【0065】また、図7〜図10において、図7は、支
持架台架設工程に対応し、図8は、足場用枠体設置工程
に対応し、図9は、移動工程に対応し、図10は、支持
枠体移設工程に対応したものにしている。
7 to 10, FIG. 7 corresponds to a supporting gantry erection step, FIG. 8 corresponds to a scaffold frame setting step, FIG. 9 corresponds to a moving step, and FIG. Corresponds to the support frame transfer process.

【0066】まず支持架台架設工程においては、図7の
(イ)に示すように、支持架台20が図略のクレーン車
等の作業機械のクレーンによって高欄Kに向けて吊り降
ろされる。このとき、高欄Kにはすでに遮音壁支持支柱
81が取り付けられているが、支持架台20の逆U字状
フレーム20a(図1〜図3)は、それを高架橋の路面
K1側から高欄Kに被せる場合には遮音壁支持支柱81
とは干渉しないため、櫛を通すように各逆U字状フレー
ム20aを遮音壁支持支柱81間に通すことができる。
First, in the support frame mounting step, as shown in FIG. 7A, the support frame 20 is hung down toward the rail K by a crane of a working machine such as a crane truck (not shown). At this time, the sound insulating wall support columns 81 are already attached to the railing K, but the inverted U-shaped frame 20a (FIGS. 1 to 3) of the support base 20 covers the railing K from the road surface K1 side of the viaduct. In the case, the sound insulating wall support column 81
Therefore, each inverted U-shaped frame 20a can be passed between the sound insulating wall support columns 81 so as to pass a comb.

【0067】ついで、クレーンの操作で支持架台20を
高欄K上に吊り降ろすことにより、図7の(ロ)に示す
ように、逆U字状フレーム20aが高欄Kを跨いだ状態
になる。この状態で係止ボルト42(図1、図3)を締
結することにより、高欄Kは、係止ボルト42の当接円
盤42aと外面側支柱23の当接突起43との間で押圧
挟持された状態になり、これによって支持架台20の高
欄Kに対する装着状態が安定する。
Then, the support frame 20 is suspended from the row K by operating the crane, so that the inverted U-shaped frame 20a straddles the row K as shown in FIG. By fastening the locking bolts 42 (FIGS. 1 and 3) in this state, the row K is pressed and clamped between the abutting disk 42a of the locking bolt 42 and the abutting projection 43 of the outer support 23. In this state, the mounting state of the support base 20 with respect to the row K is stabilized.

【0068】引き続き足場用枠体設置工程においては、
図8の(イ)に示すように、足場用枠体30をクレーン
によって支持架台20の側方位置に向けて吊り降ろす。
そして、この吊り降ろし操作においては、足場用枠体3
0の上部レール部材51の端面を一対の上部水平ローラ
54c(図3)間に対向させるとともに、下部レール部
材52の端面を下部水平ローラ55cに一旦対向させる
(なお、図8の(イ)においては、図示の都合上足場用
枠体30を支持架台20の直上位置に描いている)。
Subsequently, in the scaffold frame installation step,
As shown in FIG. 8A, the scaffold frame 30 is suspended by a crane toward the lateral position of the support base 20.
In this suspending operation, the scaffolding frame 3
No. 0, the end face of the upper rail member 51 is opposed between a pair of upper horizontal rollers 54c (FIG. 3), and the end face of the lower rail member 52 is once opposed to the lower horizontal roller 55c (see FIG. 8A). Illustrates the scaffolding frame 30 at a position directly above the support frame 20 for convenience of illustration.)

【0069】ついで、上記対向状態を維持しながらクレ
ーンの操作で足場用枠体30を支持架台20の方向に向
けて平行移動させることにより、上部レール部材51
は、その垂直板部分が一対の上部水平ローラ54c間に
嵌り込んで垂直ローラ53c(図3)に支持された状態
になるとともに、下部レール部材52は、そのC字形状
の開口部分が下部水平ローラ55cに外嵌された状態に
なる。
Then, the scaffold frame 30 is moved in parallel toward the support base 20 by operating a crane while maintaining the above-mentioned facing state, so that the upper rail member 51 is moved.
The vertical rail portion is fitted between a pair of upper horizontal rollers 54c and is supported by a vertical roller 53c (FIG. 3), and the lower rail member 52 has a C-shaped opening at the lower horizontal portion. The roller 55c is externally fitted.

【0070】この状態で足場用枠体30を支持架台20
の方向に移動させることにより、以後は、上部レール部
材51が垂直ローラ53cのローラ軸53b回りの回転
に案内されるとともに、下部レール部材52が下部水平
ローラ55cのローラ軸55b回りの回転に案内されな
がら支持架台20の方向に移動する。そして、図8の
(ロ)に示すように、足場用枠体30を支持架台20に
対して正対させる。
In this state, the scaffold frame 30 is attached to the support base 20.
Then, the upper rail member 51 is guided by the rotation of the vertical roller 53c around the roller shaft 53b, and the lower rail member 52 is guided by the rotation of the lower horizontal roller 55c around the roller shaft 55b. While moving in the direction of the support base 20. Then, as shown in FIG. 8B, the scaffold frame 30 is directly opposed to the support base 20.

【0071】足場用枠体30が支持架台20に正対した
状態で、図6に示すように、上下で互いに対向している
ストッパー70の第一および第二突設板71,72の第
一および第二ピン孔71a,72aにストップピン73
を差し通すことにより、足場用枠体30は、支持架台2
0に対して移動が阻止された状態になる(図8の
(ロ))。この状態では、足場用枠体30は、三本の遮
音壁支持支柱81を水平方向に横断した状態になってい
る。
In a state where the scaffold frame 30 faces the support frame 20, as shown in FIG. 6, the first and second projecting plates 71 and 72 of the stopper 70 which are vertically opposed to each other. And stop pins 73 in the second pin holes 71a and 72a.
The scaffolding frame 30 is attached to the support base 2
The movement is stopped with respect to 0 ((b) in FIG. 8). In this state, the scaffold frame 30 is in a state of horizontally crossing the three sound insulating wall support columns 81.

【0072】ついで移動工程においては、図9の(イ)
に示すように、クレーンで一旦吊り上げられた遮音壁8
0を一対の遮音壁支持支柱81間に吊り降ろす。二枚の
遮音壁80を吊り降ろすことにより、図9の(ロ)に示
すように、足場用枠体30の前方位置には二枚の遮音壁
80が遮音壁支持支柱81間に嵌め込まれた状態になっ
ている。この状態で、足場板31上に載った作業者が遮
音壁80を遮音壁支持支柱81に固定する作業を行うこ
とになる。
Next, in the moving step, FIG.
As shown in the figure, the noise barrier 8 once suspended by a crane
0 is suspended between the pair of sound insulating wall support columns 81. By suspending the two sound insulating walls 80, as shown in FIG. 9B, the two sound insulating walls 80 are fitted between the sound insulating wall support columns 81 at the front position of the scaffold frame 30. ing. In this state, the worker placed on the scaffold plate 31 performs the work of fixing the sound insulation wall 80 to the sound insulation wall support column 81.

【0073】そして、二枚の遮音壁80の遮音壁支持支
柱81に対する固定作業が完了すると、第一および第二
突設板71,72に挿通されているストップピン73
(図6)を引き抜いた上で足場用枠体30を遮音壁支持
支柱81の二スパン分だけ移動させる。この移動は、上
部および下部レール部材51,52が垂直ローラ53
c、上部水平ローラ54cおよび下部水平ローラ55c
の回転に案内されつつ行われるため、この移動操作は手
動であっても極めて容易である。
When the work of fixing the two sound insulating walls 80 to the sound insulating wall support columns 81 is completed, the stop pins 73 inserted through the first and second projecting plates 71 and 72 are completed.
After pulling out (FIG. 6), the scaffold frame 30 is moved by two spans of the sound-insulating-wall support column 81. This movement is caused by the upper and lower rail members 51 and 52 being moved by the vertical rollers 53.
c, upper horizontal roller 54c and lower horizontal roller 55c
This movement operation is very easy even if it is manually performed because the movement is performed while being guided by the rotation of.

【0074】かかる移動操作によって、足場用枠体30
は、図10に示すように、支持架台20から平行移動し
た状態になる。図10の例では足場用枠体30は、支持
架台20の右側に向かって移動している。かかる足場用
枠体30の移動によって、足場用枠体30は遮音壁80
が装着されていない2本の遮音壁支持支柱81に正対し
た状態になるため、支持架台20を装着し直すことな
く、近接した左右の遮音壁支持支柱81間に遮音壁80
を装着することが可能になる。
By such a moving operation, the scaffolding frame 30
Is in a state of being translated from the support base 20 as shown in FIG. In the example of FIG. 10, the scaffold frame 30 is moving toward the right side of the support gantry 20. By the movement of the scaffolding frame 30, the scaffolding frame 30 is moved to the sound insulating wall 80.
Are placed directly on the two sound insulating wall support struts 81 to which the sound insulating wall 80 is not mounted, so that the sound insulating wall 80 is interposed between the adjacent left and right sound insulating wall support struts 81 without remounting the support base 20.
Can be mounted.

【0075】そして、本実施形態の足場装置10は、足
場用枠体30の左右への移動によって遮音壁80の6ス
パン分をカバーすることができるため、全工事区間に亘
って7スパン毎に足場装置10の支持架台20を高欄K
に予め固定しておくことにより、以後は、支持架台20
の付け替えを行うことなく工事を続行することが可能に
なり、高欄Kに係る工事の迅速化を図ることが可能にな
る。
Since the scaffolding device 10 of the present embodiment can cover six spans of the sound insulating wall 80 by moving the scaffolding frame 30 to the left and right, the scaffolding is provided every seven spans over the entire construction section. The support base 20 of the apparatus 10 is set
Is fixed to the support base 20 in advance.
It is possible to continue the construction without changing the construction, and it is possible to speed up the construction related to the railroad K.

【0076】また、工区が長いときには、本発明に係る
支持枠体移設工程が実行される。具体的には、遮音壁支
持支柱81の所定スパンごとに少なくとも2体の支持架
台20を高欄Kに装着しておき、最後の支持架台20に
対応した遮音壁80の工事が完了する頃合いを見計らっ
て最初の支持架台20を高欄Kから取り外し、この取り
外した支持架台20を最後の支持架台20の隣に設置す
る。このような支持架台20の移設を順次行っていくこ
とにより、図10に示すように、移し替えられた支持架
台20(図10の右側の支持架台20)に足場用枠体3
0を移動させることで足場用枠体30を使用した高欄K
に対する工事を中断することなく長い工区の工事を迅速
に行う可能になる。かかる支持枠体移設工程の工事の迅
速化、引いては工期の短縮化に果す役割は大きい。
When the construction section is long, the support frame transferring step according to the present invention is executed. Specifically, at least two support frames 20 are attached to the railing K at predetermined intervals of the sound-insulating-wall support columns 81, and when the construction of the sound-insulating wall 80 corresponding to the last support frame 20 is completed, the timing is completed. The first support gantry 20 is removed from the railing K, and the removed support gantry 20 is placed next to the last support gantry 20. As shown in FIG. 10, by sequentially transferring the support gantry 20, the scaffold frame 3 is attached to the transferred support gantry 20 (the support gantry 20 on the right side in FIG. 10).
The railroad K using the scaffolding frame 30 by moving 0
The construction of a long construction section can be performed quickly without interrupting the construction work. This support frame transfer process has a large role to play in speeding up the construction, and thus shortening the construction period.

【0077】以上詳述したように、本実施形態の足場装
置10は、高架橋の高欄Kに遮音壁80等の付帯施工物
を付設施工するに際して用いられるものであり、高欄K
に着脱可能に固定される支持架台20と、この支持架台
20に連結部材を介して平行に移動可能に連結される足
場板31を備えた足場用枠体30とを備えて構成されて
いるため、高欄Kに支持架台20を固定した状態で、連
結構造50を介して足場用枠体30を支持架台20に支
持させることにより、足場用枠体30を高欄Kの外側位
置で上記支持架台20に連結された状態にすることがで
きる。従って、作業者は、足場用枠体30の足場板31
の上に載ることにより、高欄Kの外側位置に位置するこ
とが可能になり、これによって高欄Kの外側から付帯施
工物を施工することができる。
As described in detail above, the scaffolding device 10 of the present embodiment is used when ancillary works such as the sound insulating walls 80 are attached to the viaduct K of the viaduct.
And a scaffold frame 30 having a scaffold plate 31 movably connected in parallel to the support cradle 20 via a connecting member. The scaffolding frame 30 is supported by the supporting frame 20 via the connecting structure 50 with the supporting frame 20 fixed to the column K, so that the scaffolding frame 30 is positioned outside the column K at the position outside the column K. Can be connected. Therefore, the worker can use the scaffold plate 31 of the scaffold frame 30.
Is placed on the outside of the railing K, whereby it is possible to construct the incidental work from the outside of the railing K.

【0078】そして、足場用枠体30は、連結構造50
を介して支持架台20に対し移動可能になっているた
め、位置設定された作業域での作業が完了した時点で、
足場用枠体30をつぎの作業域まで移動させることによ
り、足場用枠体30の作業可能範囲を拡大することが可
能になり、一作業域での作業が完了する都度、足場を解
体してつぎの作業域で再度構築するような従来の足場の
不都合が解消され、足場の構築コストの低減化および作
業効率の向上を図ることができる。
The scaffold frame 30 is connected to the connecting structure 50.
Can be moved with respect to the support base 20 through the work area, so that when the work in the set work area is completed,
By moving the scaffold frame 30 to the next work area, the workable range of the scaffold frame 30 can be expanded, and the scaffold is disassembled every time work in one work area is completed. The inconvenience of the conventional scaffold, such as rebuilding in the next work area, is eliminated, and the construction cost of the scaffold can be reduced and the work efficiency can be improved.

【0079】そして、支持架台20を、高欄Kを跨ぐよ
うに側面視で逆U字状に形成された逆U字状フレーム2
0aを備えて構成したため、支持架台20は、その逆U
字フレームの下面開口部を高欄Kに被せるだけで高欄K
に安定した状態で装着され、支持架台20の高欄Kに対
する装着作業の作業性が良好になる。
Then, the support frame 20 is formed so that the inverted U-shaped frame 2 formed in an inverted U-shape in side view so as to straddle the row K.
0a, the support frame 20 is
Simply put the lower surface opening of the character frame on the high
, And the workability of the mounting work of the support gantry 20 on the row K is improved.

【0080】また、足場用枠体30は、支持架台20に
連結構造50を介して移動可能に吊持しているため、足
場用枠体30の支持架台20に対する連結構造が簡単に
なり、設備コストの低減化に貢献することができる。
Further, since the scaffolding frame 30 is movably suspended from the supporting frame 20 via the connecting structure 50, the connecting structure of the scaffolding frame 30 to the supporting frame 20 is simplified, and equipment is provided. This can contribute to cost reduction.

【0081】また、連結構造50を、足場用枠体30に
設けられた上部レール部材51および下部レール部材5
2と、これらに対応して支持架台20に設けられた垂直
ローラ部材53および上部水平ローラ部材54並びに下
部水平ローラ部材55によって構成したため、各レール
部材51,52がローラー部材53,54,55の軸心
回りの回転に案内されて移動することにより、足場用枠
体30は、支持架台20に対して円滑に移動することが
できる。従って、単に摺接状態で足場用枠体30が支持
架台20に連結されている場合に比較し、小さな力で足
場用枠体30を動かすことが可能になり、作業域変更の
ための足場用枠体30の移動作業を効率的に行うことが
できる。
The connecting structure 50 is connected to the upper rail member 51 and the lower rail member 5 provided on the scaffold frame 30.
2 and a vertical roller member 53, an upper horizontal roller member 54, and a lower horizontal roller member 55 provided on the support frame 20 corresponding to these, so that each of the rail members 51, 52 is formed of the roller members 53, 54, 55. The scaffold frame 30 can move smoothly with respect to the support gantry 20 by being guided by the rotation about the axis and moving. Therefore, it is possible to move the scaffolding frame 30 with a small force as compared with a case where the scaffolding frame 30 is simply connected to the support frame 20 in the sliding contact state, and it is possible to move the scaffolding frame 30 for changing the working area. The work of moving the frame 30 can be performed efficiently.

【0082】また、足場用枠体30には、当該足場用枠
体30の支持架台20に対する相対移動を規制するスト
ッパー70を設けたため、高欄Kに対する足場用枠体3
0による作業域が設定された状態で、ストッパー70を
操作して足場用枠体30の移動を規制することにより、
足場用枠体30が風圧等で勝手に移動するような不具合
の生じることがなくなり安全性および作業性を向上させ
ることができる。
Further, since the scaffolding frame 30 is provided with the stopper 70 for regulating the relative movement of the scaffolding frame 30 with respect to the support frame 20, the scaffolding frame 3 with respect to the railroad K is provided.
By controlling the movement of the scaffold frame 30 by operating the stopper 70 in a state where the work area is set to 0,
The problem that the scaffolding frame body 30 moves freely by wind pressure or the like does not occur, and safety and workability can be improved.

【0083】さらに、足場用枠体30には、当該足場用
枠体30を取り囲むように防護ネット63を張設したた
め、足場板31の上での作業中にボルトやナットなどの
設備資材や、ハンマーやドライバー等の施工工具を誤っ
て落としても、防護ネット63によって捕捉され、これ
によって作業域直下に設備資材等が落下することによる
危険な事態を確実に回避することができる。
Further, since the protective net 63 is stretched around the scaffolding frame 30 so as to surround the scaffolding frame 30, equipment materials such as bolts and nuts during work on the scaffolding plate 31, Even if a construction tool such as a hammer or a driver is accidentally dropped, the construction tool is caught by the protection net 63, whereby a dangerous situation caused by dropping of equipment materials or the like directly below the work area can be reliably avoided.

【0084】図11は、本発明に係る足場装置10aの
第二実施形態を示す側面図である。第一実施形態におい
ては、足場用枠体30は、上部レール部材51を介して
上部梁材25の上面に設けられた垂直ローラ部材53に
よって吊持されたいわゆる上吊り方式が採用されている
が、第二実施形態の足場装置10aは、かかる上吊り方
式に代えて、図11に示すように、垂直ローラ部材53
および一対の上部水平ローラ部材54をオーバーハング
支柱24の上端部に外方に向かって突出するように設
け、上部レール部材51をこれら垂直ローラ部材53お
よび上部水平ローラ部材54に支持させるいわゆる横吊
り方式を採用している。こうすることによって、オーバ
ーハング支柱24の上下寸法および足場用枠体30の上
下寸法を小さくすることが可能になり、これによって足
場装置10の設備コストの軽減化を図ることができる。
図12は、本発明に係る足場装置10bの第三実施形態
を示す側面図である。この実施形態は、高架橋Brに高
欄Kが設けられていない場合に適用されるものであり、
支持架台200を、高架橋Brの側部に設けられて足場
用枠体を支持する矩形フレーム201と、この矩形フレ
ームに着脱自在に連結された状態で路面K1上に配設さ
れる路面側架台210と、この路面側架台210に載置
される錘220とを備えて構成している。従って、足場
用枠体30、連結構造50およびネット張設構造60は
先の実施形態と同様に構成されているが(因みに図12
では第一実施形態のものを描いている)、支持架台20
0は、逆U字状フレーム20aを有しておらず、これに
代えて側面視で矩形状を呈した矩形フレーム201が採
用されている。
FIG. 11 is a side view showing a second embodiment of the scaffold device 10a according to the present invention. In the first embodiment, the scaffold frame 30 employs a so-called upper suspension method in which the scaffold frame 30 is suspended by a vertical roller member 53 provided on the upper surface of the upper beam member 25 via the upper rail member 51. The scaffolding device 10a according to the second embodiment is different from the above-described hanging method in that a vertical roller member 53 is provided as shown in FIG.
A pair of upper horizontal roller members 54 is provided at the upper end of the overhanging support 24 so as to protrude outward, and the upper rail member 51 is supported by the vertical roller member 53 and the upper horizontal roller member 54, so-called horizontal suspension. The method is adopted. By doing so, it is possible to reduce the vertical dimension of the overhanging support 24 and the vertical dimension of the scaffold frame 30, thereby reducing the equipment cost of the scaffolding device 10.
FIG. 12 is a side view showing a third embodiment of the scaffold device 10b according to the present invention. This embodiment is applied to a case where the bridge K is not provided in the viaduct Br,
A support frame 200 is provided on a side surface of a viaduct Br to support a scaffold frame, and a road surface frame 210 mounted on a road surface K1 while being detachably connected to the rectangular frame. And a weight 220 mounted on the road surface-side base 210. Therefore, the scaffold frame 30, the connecting structure 50, and the net extending structure 60 are configured in the same manner as in the previous embodiment (see FIG. 12).
Here, the first embodiment is illustrated).
No. 0 has no inverted U-shaped frame 20a, and instead employs a rectangular frame 201 having a rectangular shape in a side view.

【0085】この矩形フレーム201は、上記路面側支
柱22に対応する、路面K1に対して直交した路面側支
柱22aと、上記同様のオーバーハング支柱24、上部
梁材25および中間部梁材26と、路面側支柱22aお
よびオーバーハング支柱24の下端部間に架設された下
部梁材25aとを備えて構成されている。
The rectangular frame 201 includes a road-side support 22a corresponding to the road-side support 22 and orthogonal to the road surface K1, an overhang support 24, an upper beam 25 and an intermediate beam 26 similar to the above. , And a lower beam member 25a erected between the lower ends of the road surface side support 22a and the overhang support 24.

【0086】そして、このような矩形フレーム201を
支持するために、路面K1上で高架橋Brの延びる方向
に移動可能な路面側架台210が設けられている。この
路面側架台210は、平面視で矩形状の基礎フレーム2
11と、この基礎フレーム211の先端側(図12の左
側)に前後方向(図12の紙面に直交する方向)に延び
るように設けられた堰フレーム212と、基礎フレーム
211の基端側に前後方向に延びるように立設された基
端側フレーム213と、この基端側フレーム213およ
び基礎フレーム211間に架橋された筋交いフレーム2
14とを備えている。
[0086] In order to support such a rectangular frame 201, a road-side base 210 is provided which is movable in the direction in which the viaduct Br extends on the road surface K1. The road-side base 210 is a rectangular base frame 2 in plan view.
11, a weir frame 212 provided on the distal end side (left side in FIG. 12) of the basic frame 211 so as to extend in the front-rear direction (direction perpendicular to the paper surface of FIG. 12), and Base frame 213 erected to extend in the direction, and the brace frame 2 bridged between the base frame 213 and the base frame 211.
14 is provided.

【0087】また、基礎フレーム211の裏面側の前後
位置には、それぞれ幅方向一対のキャスター215が設
けられている一方、高架橋Brの路面K1上には、上記
各キャスター215に対応し、かつ、前後方向に延びる
2本のガイドレール216が敷設されている。本実施形
態においては、このガイドレール216はU字鋼が採用
され、このU字鋼の上面開口を上に向けた状態で路面K
1の上面に固定されている。従って、路面側架台210
は、キャスター215がガイドレール216の溝内に嵌
まり込んだ状態で案内されるる前後動し得るようになっ
ている。
A pair of casters 215 in the width direction are provided at the front and rear positions on the back side of the base frame 211, respectively. On the road surface K1 of the viaduct Br, the casters 215 correspond to the casters 215 and Two guide rails 216 extending in the front-rear direction are laid. In the present embodiment, the guide rail 216 is made of U-shaped steel, and the road surface K is formed with the upper opening of the U-shaped steel facing upward.
1 is fixed to the upper surface. Therefore, the road surface side mount 210
Can move back and forth while being guided while the casters 215 are fitted in the grooves of the guide rails 216.

【0088】また、基礎フレーム211の図12におけ
る差端部には錘220が搭載されている。かかる基礎フ
レーム211は、幅寸法が矩形フレーム201と足場用
枠体30とを合わせた幅寸法との合計寸法より相当長く
設定され(図12に示す例では略2.5倍)、これによ
って矩形フレーム201と、足場用枠体30と、ネット
張設構造60とを合わせた重量より軽い目の錘220を
採用することができるようにしている。
A weight 220 is mounted on the opposite end of the base frame 211 in FIG. The width of the base frame 211 is set to be considerably longer than the total size of the width of the rectangular frame 201 and the frame 30 for the scaffold (approximately 2.5 times in the example shown in FIG. 12). A weight 220 having a lighter weight than the combined weight of the frame 201, the scaffold frame 30, and the net extending structure 60 can be adopted.

【0089】すなわち、基礎フレーム211の幅寸法を
足場用枠体30等の幅寸法より長い目に設定することに
より、錘220が足場部材30等より軽くても、外側の
ガイドレール回りの反時計方向に向かう錘220の重心
位置のモーメントを、足場用枠体30等の上記ガイドレ
ール回りの時計方向に向かう重心位置のモーメントより
大きくすることが可能になり、これによって取り扱いが
困難な重い錘220を用いなくても足場装置10bが高
架橋Brの側部に安定した状態で据え付けられるように
なっている。
That is, by setting the width dimension of the base frame 211 to be longer than the width dimension of the scaffolding frame 30 or the like, even if the weight 220 is lighter than the scaffolding member 30 or the like, the counterclockwise around the outer guide rail is used. The moment at the position of the center of gravity of the weight 220 toward the direction can be made larger than the moment at the position of the center of gravity around the guide rail such as the scaffolding frame 30 in the clockwise direction. The scaffolding device 10b can be stably installed on the side portion of the viaduct Br without using.

【0090】また、基端側フレーム213および矩形フ
レーム201の路面側支柱22aには、それぞれ上下一
対の係止突片230が対向方向に向けて突設されている
とともに、これらが重ねられた状態で係止ピン231を
貫通することによって、矩形フレーム201が路面側架
台210に連結されるようになっている。そして、両者
が連結された状態で、下部梁材25aの左端面が基礎フ
レーム211の右端面に当止することによって、連結状
態が確実なものになるようにしている。
A pair of upper and lower locking projections 230 project from the base end frame 213 and the road-side support 22a of the rectangular frame 201 in the facing direction, respectively, and are superposed. The rectangular frame 201 is connected to the road surface-side base 210 by penetrating the locking pin 231 with the. Then, in a state where the two are connected, the left end face of the lower beam member 25a abuts on the right end face of the base frame 211, so that the connection state is ensured.

【0091】また、錘220の右側のガイドレール21
6回りの反時計方向に向かうモーメントは、支持架台2
0および足場用枠体30等によるガイドレール216回
りの時計方向に向かうモーメントより大きいため、足場
装置10bがガイドレール216を中心として時計方向
に回動するような不都合は確実に防止される。
The guide rail 21 on the right side of the weight 220
The six counterclockwise moments are applied to the support
Since it is larger than the moment 0 and the clockwise moment around the guide rail 216 by the scaffold frame 30 and the like, the inconvenience of the scaffolding device 10b rotating clockwise around the guide rail 216 is reliably prevented.

【0092】なお、路面側架台210の位置決めが行わ
れた後は、キャスター215とガイドレール216との
間に車止めを差し込むようにしているため、作業中に路
面側架台210が移動するようなことはない。
[0092] After the positioning of the road surface mount 210 is performed, the stop is inserted between the casters 215 and the guide rails 216, so that the road surface mount 210 may move during the work. There is no.

【0093】第三実施形態の足場装置10bによれば、
高架橋Brに高欄Kが設けられていない場合であって
も、足場装置10bを高架橋Brの側部に取り付けるこ
とが可能になる。また、矩形フレーム201および足場
用枠体30をつぎのスパンに移すに際しては、矩形フレ
ーム201を外した状態で路面側架台210をガイドレ
ール216に沿って移動させるだけでよく、作業性も良
好になる。
According to the scaffold device 10b of the third embodiment,
Even when the bridge K is not provided in the viaduct Br, the scaffolding device 10b can be attached to the side of the viaduct Br. Further, when the rectangular frame 201 and the scaffolding frame 30 are moved to the next span, it is only necessary to move the road-side pedestal 210 along the guide rails 216 with the rectangular frame 201 removed, and the workability is improved. Become.

【0094】本発明は、上記の実施形態に限定されるも
のではなく、以下の内容をも包含するものである。
The present invention is not limited to the above embodiment, but also includes the following contents.

【0095】(1)上記の実施形態においては、上部レ
ール部材51および下部レール部材52が足場用枠体3
0に設けられ、これらに対応する垂直ローラ部材53、
上部水平ローラ部材54および下部水平ローラ部材55
が支持架台20に設けられているが、こうする代わりに
レール部材を支持架台20に設けるとともに、ローラ部
材を足場用枠体30に設けるようにしてもよい。
(1) In the above embodiment, the upper rail member 51 and the lower rail member 52 are
0, and corresponding vertical roller members 53,
Upper horizontal roller member 54 and lower horizontal roller member 55
Are provided on the support gantry 20, but instead of this, a rail member may be provided on the support gantry 20, and a roller member may be provided on the scaffold frame 30.

【0096】(2)上記の実施形態においては、足場用
枠体30が支持架台20に吊持されているが、本発明
は、足場用枠体30が支持架台20に吊持されることに
限定されるものではなく、例えば、支持架台20のオー
バーハング支柱24を上記の実施形態の場合よりも下方
に長いものとし、このオーバーハング支柱24の下端部
に外方に向けて突出したフロアを設け、このフロアにレ
ールを敷設してこのレール上に足場用枠体30を車輪を
介して配設するようにしてもよい。
(2) In the above embodiment, the scaffolding frame 30 is hung on the support gantry 20, but the present invention relates to the scaffolding frame 30 being hung on the support gantry 20. The present invention is not limited to this. For example, the overhang column 24 of the support base 20 may be longer than that of the above embodiment, and a floor protruding outward at the lower end of the overhang column 24 may be provided. A rail may be laid on this floor, and the scaffold frame 30 may be arranged on the rail via wheels.

【0097】(3)上記の実施形態においては、ネット
張設用枠体61は足場用枠体30に対して展開状態で足
場用枠体30に固定されているが、こうする代わりにネ
ット張設用枠体61を蝶番を介して足場用枠体30に対
して折り畳み可能に構成してもよい。こうすることによ
って、足場用枠体30を支持架台20に連結操作すると
きや、防護ネット63が不要な場合にネット張設用枠体
61を折り畳んで邪魔にならないようにすることが可能
になり、作業性が向上する。
(3) In the above embodiment, the net stretching frame 61 is fixed to the scaffolding frame 30 in a deployed state with respect to the scaffolding frame 30, but instead of this, the net stretching is performed. The installation frame 61 may be configured to be foldable with respect to the scaffold frame 30 via a hinge. In this way, when connecting the scaffolding frame 30 to the support base 20 or when the protective net 63 is unnecessary, the net extending frame 61 can be folded so as not to be in the way. , Workability is improved.

【0098】[0098]

【発明の効果】請求項1および2記載の発明によれば、
高架橋の側部に着脱可能に固定される支持架台と、この
支持架台に高架橋の延びる方向に連結部材を介して移動
可能に連結される足場板を備えた足場用枠体とを備えて
高架橋の付設工事用足場装置を構成したため、位置設定
された作業域での作業が完了した時点で、足場用枠体を
つぎの作業域まで移動させれることによって、足場用枠
体の作業可能範囲を拡大することが可能になり、一作業
域での作業が完了する都度、足場を解体してつぎの作業
域で再度構築するような従来の足場の不都合が解消さ
れ、足場の構築コストの低減化を図ることができるとと
もに、作業効率を向上させることができる。
According to the first and second aspects of the present invention,
A supporting frame detachably fixed to a side portion of the viaduct, and a scaffolding frame body having a scaffold plate movably connected to the supporting frame via a connecting member in a direction in which the viaduct extends. By constructing a scaffolding device for additional work, the work area of the scaffolding frame is moved to the next working area when the work in the work area where the position is set is completed, thereby expanding the workable area of the scaffolding frame. Each time the work in one work area is completed, the inconvenience of the conventional scaffolding of dismantling the scaffold and rebuilding it in the next work area is eliminated, and the construction cost of the scaffold is reduced. It is possible to improve the working efficiency.

【0099】また、足場用枠体を、高架橋の外側位置で
支持架台に連結しているため、作業者は高架橋の外側位
置に位置することができ、これによって高架橋の外側か
ら付帯施工物を施工することができる。
Further, since the scaffold frame is connected to the support stand at the outside position of the viaduct, the worker can be located at the outside position of the viaduct. can do.

【0100】請求項3記載の発明によれば、支持架台
を、高欄を跨ぐように側面視で逆U字状に形成された逆
U字状フレームを備えて構成したため、逆U字フレーム
の下面開口部を高欄に被せるという簡単な操作だけで支
持架台を高欄に安定した状態で装着することができ、支
持架台の高欄に対する装着作業の作業性を良好なものに
することができる。
According to the third aspect of the present invention, since the support base is provided with the inverted U-shaped frame formed in an inverted U shape in side view so as to straddle the row, the lower surface of the inverted U-shaped frame is provided. The support gantry can be stably mounted on the railing by a simple operation of covering the opening on the railing, and the workability of mounting the support gantry on the railing can be improved.

【0101】請求項4記載の発明によれば、支持架台に
足場用枠体を連結部材を介して移動可能に吊持させるよ
うにしたため、足場用枠体の支持架台に対する連結構造
が簡単になり、設備コストの低減化に貢献することがで
きる。
According to the fourth aspect of the present invention, since the scaffold frame is movably suspended from the support frame via the connecting member, the structure for connecting the scaffold frame to the support frame is simplified. This can contribute to a reduction in equipment costs.

【0102】請求項5記載の発明によれば、連結部材
を、支持架台および足場用枠体の一方側に高架橋の長手
方向に向けて延びるように設けられたレール部材と、同
他方側にレール部材に案内されてレール部材と相対移動
可能に設けられたローラ部材とから構成したため、ロー
ラー部材がレール部材に案内されて軸心回りに回転する
ことにより、足場用枠体は、支持架台に対して円滑に移
動することができる。従って、単に摺接状態で足場用枠
体が支持架台に連結されている場合に比較し、小さな力
で足場用枠体を動かすことが可能になり、作業域変更の
ための足場用枠体の移動作業を効率化することができ
る。
According to the fifth aspect of the present invention, the connecting member includes a rail member provided on one side of the support base and the scaffold frame so as to extend in the longitudinal direction of the viaduct, and a rail member provided on the other side. Since the roller member is guided by the member and the roller member is provided so as to be relatively movable, the roller member is guided by the rail member and rotates about the axis, so that the scaffolding frame body is moved with respect to the support frame. It can move smoothly. Therefore, it becomes possible to move the scaffold frame with a small force compared to a case where the scaffold frame is simply connected to the support frame in the sliding contact state, and the scaffold frame for changing the working area can be moved. Moving work can be made more efficient.

【0103】請求項6記載の発明によれば、レール部材
を足場用枠体に設けたため、支持架台を高架橋の側部に
沿って連設するような状況では、支持架台にレール部材
を設けた場合に比較してレール部材を1本で済ませるこ
とができ、これによって部品コストの低減化を図ること
ができる。
According to the sixth aspect of the present invention, since the rail member is provided on the scaffold frame, the rail member is provided on the support gantry in a situation where the support gantry is continuously provided along the side of the viaduct. Compared to the case, only one rail member can be used, and thus the cost of parts can be reduced.

【0104】請求項7記載の発明によれば、上部レール
部材が上部ローラ部材に支持された状態で、足場用枠体
には上部レール部材と上部ローラ部材との当接点を支点
にして支持架台の方向に向かうモーメントが作用する
が、このモーメントは、下部レール部材を介して下部ロ
ーラ部材に受けられるため、足場用枠体が傾倒するよう
な不都合を確実に防止することができる。
According to the seventh aspect of the present invention, in a state where the upper rail member is supported by the upper roller member, the support frame is provided on the scaffold frame with the contact point between the upper rail member and the upper roller member as a fulcrum. However, since this moment is received by the lower roller member via the lower rail member, the inconvenience of the scaffolding frame body being tilted can be reliably prevented.

【0105】請求項8記載の発明によれば、足場用枠体
には、当該足場用枠体の支持架台に対する相対移動を規
制するストッパーを設けたため、高架橋の側部に対する
足場用枠体による作業域が設定された状態で、ストッパ
ーを操作して足場用枠体の移動を規制することにより、
足場用枠体が風圧等で勝手に移動するような不具合の生
じることがなくなり安全性の向上を実現することができ
るとともに、作業性も向上させることができる。
According to the eighth aspect of the present invention, since the scaffold frame is provided with the stopper for restricting the relative movement of the scaffold frame with respect to the support frame, the scaffold frame works on the side of the viaduct. With the area set, by operating the stopper to regulate the movement of the scaffold frame,
Problems such as the scaffolding frame moving on its own due to wind pressure or the like do not occur, so that safety can be improved and workability can be improved.

【0106】請求項9記載の発明によれば、足場用枠体
には、当該足場用枠体を取り囲むようにネットを張設し
たため、足場板の上での作業中にボルトやナットなどの
設備資材や、ハンマーやドライバー等の施工工具が誤っ
て落下しても、足場用枠体には、誤って落とした設備資
材や施工工具はこのネットによって捕捉され、これによ
って作業域の直下に設備資材等が落下することによる危
険な事態を確実に回避することができる。
According to the ninth aspect of the present invention, since the scaffolding frame is provided with a net so as to surround the scaffolding frame, equipment such as bolts and nuts can be used during work on the scaffolding plate. Even if materials or construction tools such as a hammer or screwdriver fall accidentally, the scaffolding frame captures the equipment materials and construction tools that were accidentally dropped by this net. It is possible to reliably avoid a dangerous situation caused by the falling of the apparatus.

【0107】請求項10記載の発明によれば、足場装置
の施行方法を、複数の支持架台を高架橋の側部に直列に
並設架設する支持架台架設工程と、上記複数の支持架台
のいずれかに並設方向に移動可能に足場用枠体を設置す
る足場用枠体設置工程と、足場用枠体を一端の支持架台
から他端の支持架台に向けて移動させつつ高架橋の側部
に対して所定の工事を施工する移動工程と、この移動工
程の完了後に足場用枠体後方の支持架台を足場用枠体前
方に移し替える支持架台移設工程とから構成したため、
支持架台が並設されている範囲内の工事については、足
場用枠体を端から順次各支持架台間で移動させながら高
架橋の側部に対して所定の工事を施工していくことがで
きる。
[0107] According to the tenth aspect of the present invention, the method of implementing the scaffolding device includes: a supporting gantry erection step of arranging a plurality of gantry in parallel on a side portion of the viaduct; A scaffold frame installation step of installing a scaffold frame so as to be movable in a side-by-side direction, and moving the scaffold frame from the support frame at one end to the support frame at the other end while moving the scaffold frame to the side of the viaduct. And the supporting frame transfer process of transferring the supporting frame behind the scaffold frame to the front of the scaffold frame after completion of the moving process.
As for the work within the range where the support gantry is juxtaposed, predetermined work can be performed on the side of the viaduct while moving the scaffolding frame from one end to another between the support gantry.

【0108】また、上記範囲内の工事が完了する頃合い
を見計らい、足場用枠体後方の支持架台を足場用枠体前
方に移し替えることにより、足場用枠体をこの移設され
た支持架台に移動させて高架橋の側部のつぎのスパンの
工事を施工することができる。
When the construction within the above range is completed, the support frame behind the scaffold frame is moved to the front of the scaffold frame, and the scaffold frame is moved to the relocated support frame. It can be moved to complete the next span of work on the side of the viaduct.

【0109】従って、予め設定された施工範囲内の高架
橋の側部に対する付設工事が完了した都度、足場の撤去
作業を行った上で新たな施工範囲を対象として再度足場
の組み付け作業を行い、かかる面倒でコストの嵩む足場
の撤去および構築を繰り返す従来の足場の施工方法に比
べて足場施工が極めて簡単になり、足場の組付けコスト
の低減化および工事施工の迅速化を実現することができ
る。
[0109] Therefore, every time when the installation work on the side of the viaduct in the preset construction area is completed, the scaffold is removed, and the scaffold is assembled again for the new construction area. Compared with the conventional scaffolding construction method that repeatedly removes and constructs a cumbersome and costly scaffold, scaffold construction becomes extremely simple, and it is possible to reduce the scaffold assembly cost and speed up construction work.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1は、本発明に係る足場装置の第一実施形態
を示す斜視図であり、支持架台および足場用枠体が互い
に分離された状態を示している。
FIG. 1 is a perspective view showing a first embodiment of a scaffold device according to the present invention, and shows a state in which a support base and a scaffold frame are separated from each other.

【図2】図1に示す支持架台および足場用枠体が高欄に
取り付けられた状態を示す斜視図である。
FIG. 2 is a perspective view showing a state in which a support base and a scaffold frame shown in FIG. 1 are attached to a railing;

【図3】図2のA線矢視図である。FIG. 3 is a view taken in the direction of the arrow A in FIG. 2;

【図4】図2のB線矢視図である。FIG. 4 is a view on arrow B of FIG. 2;

【図5】垂直ローラ部材および上部水平ローラ部材によ
る上部レール部材の支持を説明するための図3の部分拡
大図である。
FIG. 5 is a partially enlarged view of FIG. 3 for explaining support of an upper rail member by a vertical roller member and an upper horizontal roller member.

【図6】下部水平ローラ部材による下部レール部材の支
持を説明するための図3の部分拡大図である。
FIG. 6 is a partially enlarged view of FIG. 3 for explaining support of a lower rail member by a lower horizontal roller member.

【図7】高欄に遮音壁を施工する場合を例に挙げて足場
装置の作用を説明するための説明図であり、(イ)は、
支持架台が高欄に向けて吊り降ろされつつある状態、
(ロ)は、支持架台が高欄に固定された状態をそれぞれ
示している。
FIG. 7 is an explanatory diagram for explaining the operation of the scaffolding device, taking as an example a case where a sound insulating wall is constructed on a railing;
The state where the support base is being suspended toward the railing,
(B) has shown the state where the support base was fixed to the railing, respectively.

【図8】高欄に遮音壁を施工する場合を例に挙げて足場
装置の作用を説明するための説明図であり、(イ)は、
足場用枠体が支持架台に向けて吊り降ろされつつある状
態、(ロ)は、足場用枠体が支持架台に連結された状態
をそれぞれ示している。
FIG. 8 is an explanatory diagram for explaining the operation of the scaffolding device by taking as an example a case where a sound insulation wall is constructed on a railing;
The state in which the scaffold frame is being suspended toward the support gantry, and the state (b) shows the state in which the scaffold frame is connected to the support gantry, respectively.

【図9】高欄に遮音壁を施工する場合を例に挙げて足場
装置の作用を説明するための説明図であり、(イ)は、
遮音壁支持支柱間に遮音壁が嵌め込まれつつある状態、
(ロ)は、2スパンの遮音壁が施工された状態をそれぞ
れ示している。
FIG. 9 is an explanatory diagram for explaining an operation of the scaffolding device, taking as an example a case where a sound insulation wall is constructed on a railing;
A state where the sound insulation wall is being fitted between the sound insulation wall support columns,
(B) shows a state in which a two-span sound insulation wall is constructed.

【図10】高欄に遮音壁を施工する場合を例に挙げて足
場装置の作用を説明するための説明図であり、足場用枠
体が1スパン分移動された状態をそれぞれ示している。
FIG. 10 is an explanatory diagram for explaining the operation of the scaffolding device, taking as an example a case where a sound insulation wall is constructed on a railing, and shows a state in which the scaffolding frame is moved by one span.

【図11】足場用枠体の支持架台に対する吊持構造の他
の実施形態を示す説明図である。
FIG. 11 is an explanatory view showing another embodiment of a structure for suspending a scaffold frame to a support base.

【図12】本発明に係る足場装置の第三実施形態を示す
側面図である。
FIG. 12 is a side view showing a third embodiment of the scaffolding device according to the present invention.

【符号の説明】[Explanation of symbols]

10,10a,10b 足場装置 20,200 支持架台 20a 逆U字状フレーム 21 櫛形フレーム 22,22a 路面側支柱 23 外面側支柱 24 オーバーハング支柱 25 上部梁材 25a 下部梁材 256 補強板 26 中間部梁材 27 アングル材 27a 上部アングル材 27b 下部アングル材 28 短尺支柱 29 吊持用ブラケット 29a 貫通孔 201 矩形フレーム 210 路面側架台 211 基礎フレーム 212 堰フレーム 213 基端側フレーム 214 筋交いフレーム 215 キャスター 216 ガイドレール 220 錘 230 係止突片 231 係止ピン 30 足場用枠体 31 足場板 32 足場板支持フレーム 33 垂直フレーム 34 長尺水平フレーム 35 短尺水平フレーム 36 中間水平フレーム 37 筋交い37 40 支持架台固定構造 41 ボルト支持ブラケット 42 係止ボルト 42a 当接円盤 43 当接突起 44 緩衝材 50 連結構造 51 上部レール部材 52 下部レール部材 53 垂直ローラ部材(上部ローラ部材) 53a ローラ受部材 53b ローラ軸 53c 垂直ローラ 54 上部水平ローラ部材(上部ローラ部材) 54a ローラ受部材 54b ローラ軸 54c 上部水平ローラ 55 下部水平ローラ部材(下部ローラ部材) 55a ローラ受部材 55b ローラ軸 55c 下部水平ローラ 60 ネット張設構造 61 ネット張設用枠体 61a 短尺フレーム 61b 長尺フレーム 61c 中間フレーム 62 筋交いフレーム 63 防護ネット 70 ストッパー 71 第一突設板 71a 第一ピン孔 72 第二突設板 72a 第二ピン孔 73 ストップピン 73a ピン本体 73b 頭部 80 遮音壁 81 遮音壁支持支柱 K 高欄 K1 路面 10, 10a, 10b Scaffolding device 20, 200 Support gantry 20a Inverted U-shaped frame 21 Comb frame 22, 22a Road surface support 23 Outer surface support 24 Overhang support 25 Upper beam material 25a Lower beam material 256 Reinforcement plate 26 Intermediate beam Material 27 Angle material 27a Upper angle material 27b Lower angle material 28 Short strut 29 Suspension bracket 29a Through hole 201 Rectangular frame 210 Road surface mount 211 Basic frame 212 Weir frame 213 Base end side frame 214 Brace frame 215 Caster 216 Guide rail 220 Weight 230 Locking protruding piece 231 Locking pin 30 Scaffold frame 31 Scaffolding board 32 Scaffolding board support frame 33 Vertical frame 34 Long horizontal frame 35 Short horizontal frame 36 Intermediate horizontal frame 37 Brace 37 40 Support frame Table fixing structure 41 Bolt support bracket 42 Locking bolt 42a Contact disk 43 Contact protrusion 44 Buffer material 50 Connection structure 51 Upper rail member 52 Lower rail member 53 Vertical roller member (upper roller member) 53a Roller receiving member 53b Roller shaft 53c Vertical roller 54 Upper horizontal roller member (upper roller member) 54a Roller receiving member 54b Roller shaft 54c Upper horizontal roller 55 Lower horizontal roller member (lower roller member) 55a Roller receiving member 55b Roller shaft 55c Lower horizontal roller 60 Net tension structure 61 Net stretching frame 61a Short frame 61b Long frame 61c Intermediate frame 62 Brace frame 63 Protective net 70 Stopper 71 First protruding plate 71a First pin hole 72 Second protruding plate 72a Second pin hole 73 Stop pin 73aEmissions body 73b head 80 sound insulation wall 81 the sound insulating wall supporting struts K railing K1 road

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 高架橋の側部に付帯施工物を付設施工す
るに際して用いられる高架橋の付設工事用足場装置であ
って、上記高架橋の側部に着脱可能に固定される支持架
台と、この支持架台に連結部材を介して高架橋の延びる
方向に移動可能に連結される足場用枠体とが備えられ、
かつ、この足場用枠体は、高架橋よりも外側の位置で上
記支持架台に連結されていることを特徴とする高架橋の
付設工事用足場装置。
1. A scaffolding device for an additional work of a viaduct to be used when attaching an additional work to a side portion of the viaduct, the support base being detachably fixed to a side portion of the viaduct, and the support base. And a scaffolding frame that is movably connected in the direction in which the viaduct extends through a connecting member,
In addition, the scaffold frame is connected to the support cradle at a position outside the viaduct, and the viaduct is attached to the scaffolding.
【請求項2】 上記支持架台は、高架橋の側部に施工さ
れた高欄に着脱可能に固定されていることを特徴とする
請求項1記載の高架橋の付設工事用足場装置。
2. The scaffolding device according to claim 1, wherein the support base is detachably fixed to a railing constructed on a side portion of the viaduct.
【請求項3】 上記支持架台は、高欄の内側面からその
上端を跨いで外側面に到る形状の固定部を含むフレーム
を備えていることを特徴とする請求項2記載の高架橋の
付設工事用足場装置。
3. The installation work for a viaduct according to claim 2, wherein the support base is provided with a frame including a fixing portion having a shape extending from an inner side surface of the railing to an outer side surface of the support frame over an upper end thereof. For scaffolding equipment.
【請求項4】 上記足場用枠体は、その上側および上記
支持架台に対向した側が当該支持架台に上記連結部材を
介して連結されることにより吊り下げられていることを
特徴とする請求項1乃至3のいずれかに記載の高架橋の
付設工事用足場装置。
4. The scaffolding frame is suspended by connecting the upper side and the side facing the support base to the support base via the connecting member. 4. The scaffolding device for installation work of a viaduct according to any one of claims 3 to 3.
【請求項5】 上記連結部材は、支持架台および足場用
枠体の一方側に高架橋の長手方向に向けて延びるように
設けられるレール部材と、同他方側に上記レール部材に
案内されてレール部材と相対移動可能となるように設け
られるローラ部材を含むことを特徴とする請求項1乃至
4のいずれかに記載の高架橋の付設工事用足場装置。
5. A rail member provided on one side of a support base and a frame for a scaffold so as to extend in a longitudinal direction of a viaduct, and a rail member guided by the rail member on the other side. The scaffolding device according to any one of claims 1 to 4, further comprising a roller member provided so as to be relatively movable.
【請求項6】 上記レール部材は、足場用枠体に設けら
れていることを特徴とする請求項5記載の高架橋の付設
工事用足場装置。
6. The scaffolding device according to claim 5, wherein the rail member is provided on a scaffold frame.
【請求項7】 上記レール部材は、足場用枠体の上部に
設けられた上部レール部材と、この上部レール部材より
下部に設けられた下部レール部材とを備えている一方、
上記支持架台は、頂部または上側部に設けられた上記上
部レールを支持する上部ローラ部材と、下部に設けられ
た上記下部レール部材を支持する下部ローラ部材とを備
え、上記下部ローラ部材は、上部レール部材と上部ロー
ラ部材との当接点を支点とした足場用枠体の支持架台の
方向に向かうモーメントを受けるように支持架台に取り
付けられていることを特徴とする請求項6記載の高架橋
の付設工事用足場装置。
7. The rail member includes an upper rail member provided above the scaffold frame, and a lower rail member provided below the upper rail member.
The support pedestal includes an upper roller member that supports the upper rail provided at the top or the upper portion, and a lower roller member that supports the lower rail member provided at a lower portion, and the lower roller member has an upper portion. 7. The viaduct according to claim 6, wherein the viaduct is attached to the support base so as to receive a moment directed toward the support base of the scaffold frame with the contact point between the rail member and the upper roller member as a fulcrum. Scaffolding equipment for construction.
【請求項8】 上記足場用枠体には、当該足場用枠体の
支持架台に対する相対移動を規制するストッパーが設け
られていることを特徴とする請求項1乃至7のいずれか
に記載の高架橋の付設工事用足場装置。
8. The viaduct according to claim 1, wherein the scaffold frame is provided with a stopper for restricting relative movement of the scaffold frame with respect to the support frame. Scaffolding equipment for additional construction.
【請求項9】 上記足場用枠体には、当該足場用枠体を
取り囲むようにネットが張設されていることを特徴とす
る請求項1乃至8のいずれかに記載の高架橋の付設工事
用足場装置。
9. The viaduct installation work according to claim 1, wherein a net is stretched around the scaffolding frame so as to surround the scaffolding frame. Scaffolding equipment.
【請求項10】 複数の支持架台を高架橋の側部に沿っ
て直列に架設する支持架台架設工程と、上記複数の支持
架台のいずれかにその並び方向に移動可能に足場用枠体
を設置する足場用枠体設置工程と、足場用枠体を用いて
工事中あるいは工事の前後に足場用枠体をつぎの支持架
台へ移動させる移動工程と、この移動工程の完了後に足
場用枠体後方の支持架台を足場用枠体前方に移し替える
支持架台移設工程とを含むことを特徴とする高架橋の付
設工事方法。
10. A supporting frame mounting step for mounting a plurality of supporting frames in series along the side of the viaduct, and a scaffold frame is mounted on any of the plurality of supporting frames so as to be movable in the direction in which the frames are arranged. A scaffolding frame setting process, a moving process of moving the scaffolding frame to the next support frame during or before and after construction using the scaffolding frame, and And a step of transferring the support gantry to the front of the scaffold frame.
JP2001070640A 2001-03-13 2001-03-13 Scaffolding equipment for viaduct installation and method for installation Expired - Fee Related JP4500462B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001070640A JP4500462B2 (en) 2001-03-13 2001-03-13 Scaffolding equipment for viaduct installation and method for installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001070640A JP4500462B2 (en) 2001-03-13 2001-03-13 Scaffolding equipment for viaduct installation and method for installation

Publications (2)

Publication Number Publication Date
JP2002275830A true JP2002275830A (en) 2002-09-25
JP4500462B2 JP4500462B2 (en) 2010-07-14

Family

ID=18928472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001070640A Expired - Fee Related JP4500462B2 (en) 2001-03-13 2001-03-13 Scaffolding equipment for viaduct installation and method for installation

Country Status (1)

Country Link
JP (1) JP4500462B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010059632A (en) * 2008-09-02 2010-03-18 Resin Corp Suspended scaffolding
JP2016050397A (en) * 2014-08-29 2016-04-11 大成建設株式会社 Temporary scaffolding unit and temporary pier
JP2018145749A (en) * 2017-03-08 2018-09-20 第一建設工業株式会社 Installation method of cofferdam structure for use in bridge pier repair and reinforcement construction
CN113174861A (en) * 2021-04-28 2021-07-27 深圳市文业照明实业有限公司 Bridge lighting system installs carrier
CN114319106A (en) * 2021-10-19 2022-04-12 湖南交通国际经济工程合作有限公司 Novel auxiliary trolley is used in construction of bridge anticollision barrier
JP7430071B2 (en) 2020-02-12 2024-02-09 株式会社タカミヤ Mobile scaffolding, mobile scaffolding system, and installation method of mobile scaffolding system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172920A (en) * 1999-12-21 2001-06-26 Ps Corp Work scaffolding for existing bridge

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172920A (en) * 1999-12-21 2001-06-26 Ps Corp Work scaffolding for existing bridge

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010059632A (en) * 2008-09-02 2010-03-18 Resin Corp Suspended scaffolding
JP4574705B2 (en) * 2008-09-02 2010-11-04 株式会社レジン Suspended scaffolding
JP2016050397A (en) * 2014-08-29 2016-04-11 大成建設株式会社 Temporary scaffolding unit and temporary pier
JP2018145749A (en) * 2017-03-08 2018-09-20 第一建設工業株式会社 Installation method of cofferdam structure for use in bridge pier repair and reinforcement construction
JP7430071B2 (en) 2020-02-12 2024-02-09 株式会社タカミヤ Mobile scaffolding, mobile scaffolding system, and installation method of mobile scaffolding system
CN113174861A (en) * 2021-04-28 2021-07-27 深圳市文业照明实业有限公司 Bridge lighting system installs carrier
CN114319106A (en) * 2021-10-19 2022-04-12 湖南交通国际经济工程合作有限公司 Novel auxiliary trolley is used in construction of bridge anticollision barrier

Also Published As

Publication number Publication date
JP4500462B2 (en) 2010-07-14

Similar Documents

Publication Publication Date Title
JP2609170B2 (en) Scaffold
JP4226488B2 (en) Mobile suspension scaffolding for repairing bridges, elevated roads, etc.
JP2918475B2 (en) Pier construction method, pier dismantling method and lift-up / rotation device
JP2012132157A (en) Preceding balustrade
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP2002275830A (en) Scaffold device for subsidiary work and subsidiary work method of elevated bridge
JPH10280669A (en) Scaffolding unit
JPH10339033A (en) Concrete multistory building construction device and construction method for concrete oblique post
KR100495730B1 (en) A working device for assembly tunnel soundproofed wall
JP2006291473A (en) Preceding handrail frame and bound-type prefabricated scaffolding
JP2001200632A (en) Construction method for temporary structure
JP2002070313A (en) Traveling construction method
JP2819238B2 (en) Beam form support apparatus and assembly and disassembly method thereof
KR200358247Y1 (en) Downward construction structure using bracket support type
JP3214407B2 (en) Connection method of beam members and scaffolding equipment for work at height
JPH0712541Y2 (en) Scaffolding equipment
JP2004150123A6 (en) Rapid construction method and jig in steel plate reinforcement work of multi-layered ramen viaduct
JP2004150123A (en) Rapid work execution method and tool in steel plate winding reinforcing work of multilayer rigid-frame viaduct
JPH10280545A (en) Folding type structure and its assembling structure
JPH1088786A (en) Scaffold for columnar structure
CN219175814U (en) Adjustable overhanging operation platform
JP7011613B2 (en) How to build a simple temporary bridge
JP2526657Y2 (en) Slope movable scaffold
JP5305432B2 (en) Moving scaffold
JPH0624524Y2 (en) Widening frame device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080219

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100126

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100318

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100413

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100419

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130423

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4500462

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140423

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees