JP2001200632A - Construction method for temporary structure - Google Patents

Construction method for temporary structure

Info

Publication number
JP2001200632A
JP2001200632A JP2000011684A JP2000011684A JP2001200632A JP 2001200632 A JP2001200632 A JP 2001200632A JP 2000011684 A JP2000011684 A JP 2000011684A JP 2000011684 A JP2000011684 A JP 2000011684A JP 2001200632 A JP2001200632 A JP 2001200632A
Authority
JP
Japan
Prior art keywords
flange
handrail frame
frame
scaffold
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000011684A
Other languages
Japanese (ja)
Other versions
JP3907367B2 (en
Inventor
Eiichi Aikawa
映一 合川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Sangyo Co Ltd
Original Assignee
Asahi Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18539518&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2001200632(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Asahi Sangyo Co Ltd filed Critical Asahi Sangyo Co Ltd
Priority to JP2000011684A priority Critical patent/JP3907367B2/en
Publication of JP2001200632A publication Critical patent/JP2001200632A/en
Application granted granted Critical
Publication of JP3907367B2 publication Critical patent/JP3907367B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method for a temporary structure capable of arranging a safety handrail frame prior to upper surrounding of a scaffold board and ensuring safety of assembly work on the scaffold board which is carried out at an elevated level. SOLUTION: In this temporary structure assembled by joining support columns 3 on which a flange with hole is fixed sequentially, connecting adjacent support columns 3 at a predetermined interval, and constructing the scaffold board, the support columns 3 are joined on the scaffold board at a lower story and the preceding handrail frame 7 is attached between joined support columns 3 prior to the construction of the scaffold board at an upper story, and the support columns 3 and the preceding handrail frame 7 are already positioned in upper surrounding of the scaffold board at the upper story when the works for joining the support columns 3 on the scaffold board at the upper story and mounting the preceding handrail frame 7 are done so as to safely perform assembly of the temporary structure on the scaffold boards at an elevated level.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、建設工事の仮設
足場やローリングタワー、室内足場等の多目的な用途に
用いることができる仮設構造物の構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a temporary structure that can be used for various purposes such as a temporary scaffold for construction work, a rolling tower, and an indoor scaffold.

【0002】[0002]

【従来の技術】従来、各種建物や土木等の建設工事に使
用される一般的な仮設枠組足場は、門型や鳥居型の建枠
と交差筋交い及び足場板を使用し、対向させた建枠を交
差筋交いで結合すると共に、対向する建枠の上部に足場
板を架設し、建枠の上方への継ぎ足しと水平方向への建
て増しを行なうことにより、所望する高さと平面的な長
さを有する足場を構築するものである。
2. Description of the Related Art Conventionally, a temporary framed scaffold used for construction work of various buildings, civil engineering works, etc. is a gate-shaped or torii-shaped frame, a crossed brace and a scaffold plate, which are opposed to each other. Have a desired height and planar length by connecting the crossing braces and constructing a scaffold plate on the upper part of the opposing building frame, extending the building frame upward and adding it horizontally. Build a scaffold.

【0003】[0003]

【発明が解決しようとする課題】ところで、上記従来の
枠組足場の構築方法では、対向する建枠の上部間に架設
した足場板の上で上方への継ぎ足し作業を行なうとき、
足場板の上部周囲に何も存在しないことになり、このた
め、高所作業となる足場板上での組み立て作業の安全対
策が取れず、墜落のような事故が発生する危険性がある
という問題がある。 そこで、この発明の課題は、足場
板の上部周囲に先行して安全手摺り枠を配置することが
でき、高所作業となる足場板上での組み立て作業の安全
確保が実現できる仮設構造物の構築方法を提供すること
にある。
By the way, in the above-described conventional method of constructing a frame scaffold, when performing an upward addition work on a scaffold plate erected between upper portions of opposing building frames,
There is nothing around the upper part of the scaffolding board, and as a result, safety measures cannot be taken for assembling work on the scaffolding board, which is a work at height, and there is a risk that an accident such as a crash may occur. There is. Therefore, an object of the present invention is to provide a temporary structure that can arrange a safety handrail frame in advance around the upper part of a scaffold plate and can ensure the safety of the assembling work on the scaffold plate, which is a work at a high place. It is to provide a construction method.

【0004】[0004]

【課題を解決するための手段】上記のような課題を解決
するため、請求項1の発明は、上下軸方向に所定の間隔
で孔付きのフランジが固定され、順次継ぎ足しが可能と
なる支柱と、上部両側に支柱へ上下スライド可能に係合
する係止金具と下部両側にフランジへの結合金具が取り
付けられた手摺り枠と、フランジとの結合により隣接す
る二本の支柱を所定の間隔で結合するための結合部材
と、対向する結合部材間に架設する足場板とを用い、結
合部材で結合した二本一組の支柱を対向状に配置し、対
向する結合部材間に架設した足場板上で、先ず、上記各
支柱の上端に上位支柱の継ぎ足し作業を行い、次に、両
側に対向する継ぎ足し支柱間に手摺り枠を臨ませ、上部
両側の係止金具を両側の継ぎ足し支柱にそれぞれ係合さ
せた状態で継ぎ足し支柱をガイドに手摺り枠を上方にス
ライドさせ、その押し上げ位置で下部両側の結合金具を
上部継ぎ足し支柱のフランジに結合して手摺り枠の取り
付け作業を行い、上部継ぎ足し支柱への足場板の架設前
に先行して上部継ぎ足し支柱間に手摺り枠を取り付ける
構成を採用したものである。
In order to solve the above-mentioned problems, a first aspect of the present invention is to provide a support having fixed flanges with holes at predetermined intervals in the vertical axis direction and capable of successively adding. At a predetermined interval, two adjacent columns are connected at a predetermined interval by coupling with a locking bracket that is slidably engaged with the column on the upper side and a handrail frame with a coupling bracket to the flange on the lower side. Using a connecting member for connection and a scaffold plate erected between the opposing connecting members, a pair of two columns connected by the connecting member are arranged in opposition, and a scaffold plate erected between the opposing connecting members. Above, first, the upper strut extension work is performed on the upper end of each of the above-mentioned struts, and then the handrail frame is faced between the extension struts opposed to both sides, and the locking metal fittings on both upper sides are respectively attached to the extension struts on both sides. In the engaged state, add Slide the handrail frame upward using the pillar as a guide, and at the pushed-up position, add the upper and lower joint fittings to the upper part of the support column and join it to the flange of the support column to perform the work of attaching the handrail frame, and build the scaffold plate on the upper additional support column A configuration is adopted in which a handrail frame is attached between the supporting pillars by adding the upper part in advance.

【0005】請求項2の発明は、上下軸方向に所定の間
隔で孔付きのフランジが固定され、順次継ぎ足しが可能
となる支柱と、上部両側にフランジへの係止金具と下部
両端にフランジへの結合金具が取り付けられ、斜材の交
差角度の変化で上下の高さ寸法が変化する機能のある筋
交い手摺り枠と、フランジとの結合により隣接する二本
の支柱を所定の間隔で結合するための結合部材と、対向
する結合部材間に架設する足場板とを用い、結合部材で
結合した二本一組の支柱を対向状に配置し、対向する結
合部材間に架設した足場板上で、先ず、上記各支柱の上
端に上位支柱の継ぎ足し作業を行い、次に、両側に対向
する継ぎ足し支柱間に筋交い手摺り枠を臨ませ、この筋
交い手摺り枠を上下に伸ばした状態にして上部両側の係
止金具を両側の継ぎ足し支柱の上位フランジにそれぞれ
係合させ、続いて筋交い手摺り枠を縮めた状態にして下
部両端の結合金具を上部継ぎ足し支柱の中間フランジに
結合して筋交い手摺り枠の取り付け作業を行い、上部継
ぎ足し支柱への足場板の架設前に先行して上部継ぎ足し
支柱間に筋交い手摺り枠を取り付ける構成を採用したも
のである。
According to a second aspect of the present invention, there is provided a support having fixed flanges with holes at predetermined intervals in the vertical axis direction, which can be successively extended, a metal fitting to the flange on both upper sides and a flange on both lower ends. Bracing handrail frame, which has the function of changing the vertical height according to the change of the crossing angle of the diagonal material, and the two adjacent columns are connected at a predetermined interval by connecting with the flange Using a connecting member for, and a scaffold plate erected between the opposing connecting members, a pair of two columns connected by the connecting member are arranged in an opposing manner, and on a scaffold plate erected between the opposing connecting members. First, the upper strut is added to the upper end of each of the above-mentioned struts, and then the bracing handrail frame is made to face between the extending struts opposed to both sides. Connect the metal fittings on both sides Engage with the upper flange of the supporting column, and then, with the brace rail frame in a contracted state, connect the lower and both ends of the connecting brackets to the upper connecting column and connect it to the middle flange of the supporting column to perform the mounting work of the brace rail frame. Prior to erection of the scaffolding plate on the extension column, a configuration is adopted in which the upper hand extension frame is attached with a brace railing frame between the upper extension columns.

【0006】[0006]

【発明の実施の形態】以下、この発明の実施の形態を図
示例と共に説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0007】図1乃至図11は、先行手摺り枠を用いた
仮設足場の組み立てた状態とこれに用いる構成部材を示
し、この仮設足場の基本的な構成部材には、図4に示す
ように、ジャッキベース1と、このジャッキベース1上
に起立させる下部支柱2と、下部支柱2上に接続すると
共に上方に継ぎ足して行く支柱3と、必要な長さだけ順
次継ぎ足していく中間支柱4と、図5乃至図7に示すよ
うに、隣接する支柱2を互いに結合する筋交い部材5
と、筋交い部材5の間に架設する足場板6と、対向する
支柱2間に取り付ける先行手摺り枠7と、対向する下部
支柱2や中間支柱4等を互いに結合するための水平材8
等が用意されている。
FIGS. 1 to 11 show an assembled state of a temporary scaffold using a preceding handrail frame and constituent members used for the temporary scaffold. The basic constituent members of this temporary scaffold are shown in FIG. A jack base 1, a lower support 2 standing on the jack base 1, a support 3 connected to the lower support 2 and extending upward, and an intermediate support 4 sequentially extending the required length. As shown in FIGS. 5 to 7, a brace member 5 for connecting adjacent columns 2 to each other
, A scaffold plate 6 laid between the brace members 5, a preceding handrail frame 7 attached between the opposing columns 2, and a horizontal member 8 for connecting the opposing lower columns 2, the intermediate columns 4, and the like to each other.
Etc. are prepared.

【0008】先ず、下部支柱2と中間支柱4は、所定の
直径を有する短い鋼管を用いて形成し、上端に支柱3を
接続するための小径ジョイントパイプ9が設けられ、下
部支柱2は上端部に孔付きのフランジ10が固定され、
中間支柱4は、下部支柱2よりも少し長く、上下三箇所
にフランジ10が固定されている。
First, the lower support 2 and the intermediate support 4 are formed using a short steel pipe having a predetermined diameter, and a small-diameter joint pipe 9 for connecting the support 3 is provided at the upper end. The holed flange 10 is fixed to
The intermediate support 4 is slightly longer than the lower support 2, and the flanges 10 are fixed at three upper and lower positions.

【0009】また、支柱3は、所定の直径を有する鋼管
を用いて形成し、上端に接続用の小径ジョイントパイプ
9が設けられ、中間部と上端部の位置に孔付きのフラン
ジ10を固定して形成され、上記ジョイントパイプ9と
下部支柱2、支柱3や中間支柱4の接続は、嵌合部分を
ピン結合したり、ジョイントパイプ9に設けた既知のロ
ック機構によって結合するようになっている。ちなみ
に、この支柱3の高さ寸法は、1800mmになってい
る。
The column 3 is formed by using a steel pipe having a predetermined diameter. A small-diameter joint pipe 9 for connection is provided at an upper end, and a flange 10 with a hole is fixed at a position between an intermediate portion and an upper end. The connection between the joint pipe 9 and the lower support 2, the support 3 and the intermediate support 4 is made by connecting the fitting portions with a pin or by a known locking mechanism provided on the joint pipe 9. . Incidentally, the height of the support 3 is 1800 mm.

【0010】次に、図5(A)は、二本の支柱3を互い
に接続するための筋交い部材5の第1の例を示し、両端
に支柱3のフランジ10との結合金具11が取り付けら
れ、両側に起立させた支柱3を結合する鋼管製の水平パ
イプ12と、この水平パイプ12の中間下部に上端が溶
接で固定され、下端に支柱3への外嵌金具13が設けら
れ、水平パイプ12と支柱3の途中の間に設ける斜材1
4と、水平パイプ12の端部と斜材14の下部を固定す
る縦材15とで形成されている。
Next, FIG. 5A shows a first example of a brace member 5 for connecting the two columns 3 to each other, and fittings 11 to the flanges 10 of the columns 3 are attached to both ends. A horizontal pipe 12 made of a steel pipe for connecting the columns 3 erected on both sides, an upper end is fixed to the middle lower portion of the horizontal pipe 12 by welding, and an external fitting 13 for the column 3 is provided at a lower end. Diagonal material 1 provided between 12 and the support 3
4 and a vertical member 15 for fixing an end of the horizontal pipe 12 and a lower portion of the diagonal member 14.

【0011】図5(B)は、筋交い部材5の第2の例を
示し、両端に支柱3のフランジ10との結合金具11が
取り付けられ、両側に起立させた支柱3を結合する鋼管
製の水平パイプ16と、この水平パイプ16の途中にそ
れぞれ上端がピン17で枢止され、ハ字状の下部広がり
に配置することができる二本の斜材18とからなり、斜
材18の下端部に支柱3の下位フランジ10に対する結
合金具11が取り付けられている。
FIG. 5 (B) shows a second example of the brace member 5, in which fittings 11 to the flanges 10 of the columns 3 are attached to both ends, and made of a steel pipe for connecting the columns 3 erected on both sides. A horizontal pipe 16 and two diagonal members 18 each having an upper end pivoted by a pin 17 in the middle of the horizontal pipe 16 and capable of being arranged in a C-shaped lower spread, the lower end of the diagonal member 18. , A fitting 11 for the lower flange 10 of the column 3 is attached.

【0012】この第2の例の筋交い部材5は、支柱3の
上位に位置するフランジ10に結合金具11を締結する
ことで、両側の支柱3を水平パイプ16で結合したと
き、斜材18の結合金具11が中間のフランジ10と結
合できるような条件になっていると共に、使用しないと
きは水平パイプ16に斜材18が沿うよう嵩低く折り畳
むことができる。
The brace member 5 of the second example is configured such that when the connecting columns 3 on both sides are connected by the horizontal pipe 16, the connecting members 11 are fastened to the flange 10 located above the supporting columns 3. The condition is such that the coupling fitting 11 can be coupled to the intermediate flange 10, and when not in use, the horizontal pipe 16 can be folded low so that the diagonal member 18 follows the horizontal pipe 16.

【0013】この筋交い部材5は、何れの例において
も、例えば支柱3の結合間隔が、1800mm、120
0mm、900mmの三種類が用意され、仮設足場の組
み立て条件に応じて選択できるようにしている。
In any of the examples, the brace member 5 has a connection interval between the columns 3 of 1800 mm and 120 mm, for example.
Three types, 0 mm and 900 mm, are prepared and can be selected according to the conditions for assembling the temporary scaffold.

【0014】前記した足場板6は、図7に示すように、
両端部に一対のフック19を設けた周知の構造を有し、
筋交い部材5の水平パイプ12や16間に架設するよう
になっている。この足場板は1800mmの間隔の水平
パイプ16間に架設することができ、また、幅は複数種
類の組み合わせによって、1800mm、1200m
m、900mmの三種類に対応し得るよう、三種類の幅
の異なるものが用意されている。
The above-mentioned scaffold plate 6 is, as shown in FIG.
It has a well-known structure in which a pair of hooks 19 are provided at both ends,
It is to be installed between the horizontal pipes 12 and 16 of the brace member 5. This scaffold plate can be installed between the horizontal pipes 16 at an interval of 1800 mm, and the width is 1800 mm, 1200 m by a combination of a plurality of types.
Three types with different widths are prepared so as to correspond to three types of m and 900 mm.

【0015】図6は、先行手摺り枠7を示し、パイプを
下向きコ字状に折り曲げ、中間に水平の中桟20aを設
けた枠体20の上部両側の位置に、支柱3に対して係脱
自在で上下スライド可能に係合する係止金具21、22
を固定し、枠体20の下端部間を幅木又はパイプ23で
結合し、該枠体20の両側下端部に支柱3のフランジ1
0に対する結合金具11を取り付けた構造になってい
る。
FIG. 6 shows the preceding handrail frame 7, which is formed by bending a pipe downward in a U-shape and engaging the support column 3 at positions on both upper sides of a frame body 20 provided with a horizontal middle rail 20a in the middle. Locking metal fittings 21 and 22 detachable and vertically slidably engaged
Is fixed, and the lower ends of the frame 20 are connected to each other with a skirting board or a pipe 23.
It has a structure in which a connection fitting 11 for 0 is attached.

【0016】この先行手摺り枠7は、1800mmの間
隔で支柱を結合するよう、枠体20の幅と係止金具2
1、22及び結合金具11の取り付け関係が設定され、
枠体20の高さは、支柱3の中間フランジ10と上部フ
ランジ10の間隔に略一致する程度になっている。
The leading handrail frame 7 is provided with the width of the frame body 20 and the locking fitting 2 so as to connect the columns at intervals of 1800 mm.
The mounting relationship between 1, 22, and the fitting 11 is set,
The height of the frame 20 is substantially equal to the distance between the intermediate flange 10 and the upper flange 10 of the column 3.

【0017】上記枠体20の上部両側に設けた結合金具
21、22は左右で構造が異なり、一方の結合金具21
は、図6(B)、(C)に示すように、金属線材を用
い、支柱3に対して外嵌する平面欠円形状で、正面から
見て傾斜部の両端が上下方向へ傾斜状に屈曲し、この屈
曲片間が枠体20の形成パイプを外嵌通過する間隔で開
口する形状に形成され、枠体20の外面に水平に突設し
た腕片24の先端に固定されている。
The joints 21 and 22 provided on both sides of the upper part of the frame 20 have different structures on the left and right.
As shown in FIGS. 6 (B) and 6 (C), a metal wire is used, and has a flat circular shape externally fitted to the column 3, and both ends of the inclined portion are vertically inclined when viewed from the front. The frame 20 is bent so as to be open at an interval so as to pass through the pipe for forming the frame 20, and is fixed to the end of an arm 24 projecting horizontally from the outer surface of the frame 20.

【0018】また、他方の結合金具22は、図6
(D)、(E)に示すように、金属線材を用い、支柱3
に対して外嵌する平面コ字状に形成され、枠体20の外
面に水平に突設した腕片25の先端に固定されている。
The other fitting 22 is shown in FIG.
As shown in (D) and (E), the support 3
And is fixed to the tip of an arm piece 25 projecting horizontally from the outer surface of the frame body 20.

【0019】この先行手摺り枠7の上部を対向する支柱
3に取り付けるには、図8(C)のように、一方の結合
金具21が水平になるよう、先行手摺り枠7を該一方の
結合金具21が下がる傾斜状に保持して対向する支柱3
間に配置し、先ず、この姿勢で一方の結合金具21を一
方の支柱3に外嵌し、次に、先行手摺り枠7を水平にす
れば他方の結合金具22が他方の支柱3に外嵌すること
になり、これによって、図9(A)のように、先行手摺
り枠7の上部の支柱3間への取り付けが行なえ、両結合
金具21、22は、それぞれ支柱3に外嵌しているの
で、先行手摺り枠7は支柱3に沿って上下方向にスライ
ド可能となる。
In order to attach the upper part of the preceding handrail frame 7 to the opposing column 3, as shown in FIG. 8 (C), the preceding handrail frame 7 is moved so that one of the fittings 21 is horizontal. Opposite support column 3 holding the fitting 21 in a downwardly inclined shape.
In this position, first, one connecting fitting 21 is externally fitted to one of the columns 3 in this posture, and then, if the preceding handrail frame 7 is made horizontal, the other connecting metal 22 is detached from the other supporting column 3. As a result, as shown in FIG. 9A, it is possible to mount the leading handrail frame 7 between the columns 3 on the upper side, and the two fittings 21 and 22 are fitted to the columns 3 respectively. Therefore, the preceding handrail frame 7 can be slid up and down along the column 3.

【0020】図5(C)は、対向する下部支柱2や中間
支柱4等を互いに結合するための水平材8を示し、所定
の長さを有する鋼管パイプの両端にフランジ10に対す
る結合金具11を設けた構造になっていて、先行手摺り
枠7と同様、1800mmの間隔で下部支柱2や中間支
柱4を結合するものと、1200mm、900mmの間
隔で結合するものとが用意されている。
FIG. 5C shows a horizontal member 8 for connecting the opposing lower support 2, intermediate support 4 and the like to each other. A connecting fitting 11 for a flange 10 is provided at both ends of a steel pipe having a predetermined length. Like the preceding handrail frame 7, there are prepared a structure in which the lower support 2 and the intermediate support 4 are connected at an interval of 1800 mm, and a structure in which the lower support 2 and the intermediate support 4 are connected at an interval of 1200 mm and 900 mm.

【0021】図11(A)乃至(D)は、下部支柱2や
中間支柱4、支柱3のフランジ10に対して固定する結
合金具11の具体的な構造を示している。
FIGS. 11 (A) to 11 (D) show the specific structure of the fitting 11 fixed to the lower support 2, the intermediate support 4, and the flange 10 of the support 3. FIG.

【0022】この結合金具11は、上記した先行手摺り
枠7の下部両側、水平材8の両端、筋交い部材5の端部
にそれぞれ水平状態で固定されるホルダー部材31と、
このホルダー部材31内でフランジ10とホルダー部材
31を締結する楔部材32との組み合わせからなり、ホ
ルダー部材31は、上下に細長い前壁33の両側に後方
へ屈曲する側壁を折り曲げ連成し、該水平パイプや斜材
等の端部に対して対向する両側壁の後端を溶接し、両側
壁間の上下面が楔部材32を挿通するための開口34に
なっている。
The joining fitting 11 includes a holder member 31 which is fixed horizontally to both lower sides of the preceding handrail frame 7, both ends of the horizontal member 8, and an end of the brace member 5, respectively;
The holder member 31 includes a combination of a flange 10 and a wedge member 32 for fastening the holder member 31 within the holder member 31. The holder member 31 is formed by bending and coupling a side wall that is bent rearward on both sides of a vertically elongated front wall 33. The rear ends of both side walls facing the ends of the horizontal pipe, the diagonal member, and the like are welded, and the upper and lower surfaces between the both side walls are openings 34 for inserting the wedge member 32.

【0023】このホルダー部材31の前後方向の長さ
が、フランジ10の結合用の孔35を設けた部分の半径
方向の長さよりも長く形成され、このホルダー部材31
には、フランジ10の厚みに対して外嵌挿する切り欠き
36が先端部から水平方向に沿って設けられ、その先端
壁33を支柱3の外周に当接させることができるように
切り欠き36の深さが設定されている。上記切り欠き3
6をフランジ10に外嵌挿すれば、ホルダー部材31と
水平パイプや斜材等は回転が阻止されることになる。
The length of the holder member 31 in the front-rear direction is formed to be longer than the radial length of the portion of the flange 10 where the coupling hole 35 is provided.
A notch 36 is provided along the horizontal direction from the distal end portion so as to be fitted externally with respect to the thickness of the flange 10, and the notch 36 is formed so that the distal end wall 33 can be brought into contact with the outer periphery of the column 3. The depth is set. Notch 3 above
If the outer member 6 is inserted into the flange 10, the rotation of the holder member 31 and the horizontal pipe, diagonal member, and the like will be prevented.

【0024】上記楔部材32は、フランジ10の結合用
の孔35に対して上部から差し込む楔部37と、この楔
部37の途中に設けた水平部38と、該水平部38の先
端から直角に垂下してフランジ10の外周と水平パイプ
や斜材等の端部間に納まる杆状部39とで二又状に形成
され、楔部37は下端に向けて狭幅となり、ホルダー部
材31の前壁33の内面に当接させる前縁が垂直で結合
用の孔35の端部に当接する後縁が傾斜縁になってい
る。なお、楔部37は図示のような下部狭幅形状以外
に、ストレートな形状を採用してもよい。
The wedge member 32 includes a wedge portion 37 inserted from above into the coupling hole 35 of the flange 10, a horizontal portion 38 provided in the middle of the wedge portion 37, and a right angle from the tip of the horizontal portion 38. The wedge 37 has a narrow width toward the lower end, and the wedge 37 has a narrow width toward the lower end. The front edge which comes into contact with the inner surface of the front wall 33 is vertical, and the rear edge which comes into contact with the end of the coupling hole 35 is an inclined edge. The wedge portion 37 may have a straight shape other than the lower narrow shape as shown.

【0025】この楔部37の上端と杆状部39の下端に
抜け止め用のピン40、41が固定され、ホルダー部材
31内に挿入した楔部材32の楔部37を結合用の孔3
5に差し込んだ状態で、楔部37の上端がホルダー部材
31の上面に突出すると共に、杆状部39の下端がホル
ダー部材31の下面から下方に突出することになる。
Pins 40 and 41 for retaining are fixed to the upper end of the wedge portion 37 and the lower end of the rod-shaped portion 39, and the wedge portion 37 of the wedge member 32 inserted into the holder member 31 is connected to the hole 3 for connection.
5, the upper end of the wedge portion 37 projects from the upper surface of the holder member 31, and the lower end of the rod portion 39 projects downward from the lower surface of the holder member 31.

【0026】また、杆状部39の内側縁には、係止段部
42が設けてあり、この係止段部42をホルダー部材3
1の下部横桟43に係止すれば、図11(A)の如く、
楔部材32の楔部37がフランジ10と干渉しない位置
に保持でき、ホルダー部材31の切り欠き36をフラン
ジ10に対して楔部材32に関係なく嵌挿することがで
きる。
A locking step 42 is provided on the inner edge of the rod 39, and the locking step 42 is
1 and the lower horizontal rail 43, as shown in FIG.
The wedge portion 37 of the wedge member 32 can be held at a position where it does not interfere with the flange 10, and the notch 36 of the holder member 31 can be inserted into the flange 10 regardless of the wedge member 32.

【0027】フランジ10にホルダー部材31を嵌挿す
ると、杆状部39の内側縁がフランジ10に当接するこ
とにより、係止段部42が下部横桟43から外れ、楔部
材32は、自重で落下して楔部37が結合用の孔35に
落ち込み、図11(C)に示すように、前壁33が支柱
3等に圧接した状態で楔部37がフランジ10とホルダ
ー部材31を固定化することになる。
When the holder member 31 is inserted into the flange 10, the inner edge of the rod-shaped portion 39 comes into contact with the flange 10, so that the locking step portion 42 comes off from the lower horizontal rail 43, and the wedge member 32 has its own weight. After dropping, the wedge portion 37 falls into the coupling hole 35, and as shown in FIG. 11C, the wedge portion 37 fixes the flange 10 and the holder member 31 in a state in which the front wall 33 is pressed against the column 3 or the like. Will do.

【0028】次に、先行手摺り枠を用いた足場の構築方
法を説明する。
Next, a method of constructing a scaffold using the preceding handrail frame will be described.

【0029】先ず、図8(A)と(B)のように、床面
の四箇所の位置にジャッキベース1を配置し、このジャ
ッキベース1上に下部支柱2を接続し、四方の下部支柱
2をフランジ10への結合金具11の締結により水平材
8で枠状に結合し、続いて上記各下部支柱2上に支柱3
を接続し、四方に起立させた支柱3の一組の対向する二
面において、図9(C)のように隣接する支柱3の中間
フランジ10を筋交い部材5の水平パイプ12で結合す
る。
First, as shown in FIGS. 8 (A) and 8 (B), jack bases 1 are arranged at four positions on the floor surface, and a lower support 2 is connected on the jack base 1, and four lower supports are provided. 2 are connected to each other in a frame shape by a horizontal member 8 by fastening a connection fitting 11 to a flange 10.
9C, the intermediate flanges 10 of the adjacent columns 3 are joined by a horizontal pipe 12 of the brace member 5 on one pair of two opposing surfaces of the columns 3 standing upright.

【0030】また、建物と反対側の面に位置して対向す
る二本の支柱3間に先行手摺り枠7を臨ませ、図8
(C)のように一方の結合金具21が水平になるよう、
先行手摺り枠7を該一方の結合金具21が下がる傾斜状
に保持し、先ず、この姿勢で一方の結合金具21を一方
の支柱3に外嵌し、次に、先行手摺り枠7を水平にすれ
ば他方の結合金具22が他方の支柱3に外嵌することに
なり、両結合金具21、22は、それぞれ支柱3に外嵌
しているので、図9(A)のように、先行手摺り枠7は
支柱3に沿って上下方向にスライド可能となり、枠体2
0の下部両端に設けた結合金具11の支柱3の中間フラ
ンジ10に対する位置合わせが簡単に行なえ、中間フラ
ンジ10に結合金具11を締結すれば、これによって、
先行手摺り枠7の支柱3間への取り付けが行なえ、この
後、筋交い部材5の水平パイプ12間に足場板6を架設
する。
Further, the leading handrail frame 7 faces between the two pillars 3 which are located on the opposite side to the building and are opposed to each other.
As shown in (C), one of the joints 21 is horizontal.
The leading handrail frame 7 is held in an inclined shape in which the one connecting metal fitting 21 is lowered. First, in this posture, one connecting metal fitting 21 is fitted onto one of the columns 3, and then the preceding handrail frame 7 is horizontally moved. In this case, the other connecting metal fitting 22 is externally fitted to the other column 3, and the two connecting metal fittings 21, 22 are externally fitted to the column 3, respectively, as shown in FIG. The handrail frame 7 can be slid up and down along the column 3, and the
The position of the joints 11 provided at both lower ends of the support column 3 with respect to the intermediate flange 10 can be easily adjusted, and if the joints 11 are fastened to the intermediate flange 10,
The preceding handrail frame 7 can be attached between the columns 3, and thereafter, the scaffold plate 6 is erected between the horizontal pipes 12 of the brace members 5.

【0031】足場の構築は、上記足場板6の上に載り、
各支柱3の上端への支柱3の継ぎ足しと、継ぎ足した支
柱3の二面において、中間フランジ10を筋交い部材5
の水平パイプ12で結合し、かつ、対向する支柱3間へ
の先行手摺り枠7の取り付けを上方へ順次繰り返して行
なうものである。
The construction of the scaffold is carried out on the scaffold plate 6,
At the upper end of each support 3, the intermediate flange 10 is attached to the brace member 5 at two sides of the support 3 at the two ends of the support 3.
And the mounting of the preceding handrail frame 7 between the opposing columns 3 is sequentially repeated upward.

【0032】この時、足場板6の上部には、四隅に支柱
3が起立すると共に、対向する支柱3間には足場板6の
上方に先行手摺り枠7が位置することになるので、これ
らによって、高所作業となる足場板6上での継ぎ足し作
業が安全に行なえることになる。
At this time, the columns 3 stand upright at the four corners above the scaffold plate 6, and the preceding handrail frame 7 is located above the scaffold plate 6 between the opposing columns 3. Thereby, the replenishment work on the scaffold plate 6, which is a work at a high place, can be performed safely.

【0033】また、上記のような支柱3の立設と筋交い
部材5での結合、支柱3間への先行手摺り枠7の取り付
けと、筋交い部材5間への足場板6の架設作業を横方向
に繰り返すことにより、図1と図2のように、足場を組
み上げることができる。
Also, the operation of erecting the column 3 and connecting it with the brace members 5, attaching the preceding handrail frame 7 between the columns 3, and erection of the scaffold plate 6 between the brace members 5 are described below. By repeating in the direction, the scaffold can be assembled as shown in FIGS.

【0034】次に、図12乃至図15は、筋交い手摺り
枠51を用いた仮設足場の組み立てた状態と構成部材を
示し、この仮設足場の基本的な構成部材は、上述した先
行手摺り枠7を用いた仮設足場の場合において、先行手
摺り枠7に代えて筋交い手摺り枠51を用いる以外は同
じである。
Next, FIGS. 12 to 15 show the assembled state and constituent members of a temporary scaffold using the brace railing frame 51. The basic constituent members of this temporary scaffold are the above-described preceding handrail frame. In the case of a temporary scaffold using the handrail 7, the same is true except that a bracing handrail frame 51 is used instead of the preceding handrail frame 7.

【0035】上記筋交い手摺り枠51は、図14に示す
ように、水平パイプ52と二本の斜材53の組み合わせ
からなり、水平パイプ52の両端下部に、フランジ10
の結合用の孔35に対して差し込む楔状の差し込み片5
4と、この差し込み片54よりも内側寄りの位置に間隔
を設けて斜材取り付け片55を下向きに固定し、斜材取
り付け片55にピン56で枢止したロック部材57にそ
れぞれ斜材53の上端を固定し、両斜材53の下端にフ
ランジ10への結合金具11を取り付け、二本の斜材5
3の交差部分を紐や番線、ワイヤー等を用いた環状体5
8で保持するようにしたものである。
As shown in FIG. 14, the brace railing frame 51 is composed of a combination of a horizontal pipe 52 and two diagonal members 53.
Wedge-shaped insertion piece 5 to be inserted into the coupling hole 35
4 and the diagonal member mounting piece 55 is fixed downward with an interval provided at a position closer to the inside than the insertion piece 54, and each of the diagonal member 53 is fixed to a lock member 57 pivotally secured to the diagonal member mounting piece 55 by a pin 56. The upper ends are fixed, and the fittings 11 to the flanges 10 are attached to the lower ends of the two oblique members 53, and the two oblique members 5
An annular body 5 using a string, a track, a wire, etc. at the intersection of 3
8 is held.

【0036】従って、両斜材53の下端を握り、両斜材
53の交差角度が変化するように操作すれば、水平パイ
プ52の上下位置が変動することになり、交差部分に遊
嵌する環状体58の移動で両斜材53の交差角度を変化
させることができる。
Therefore, if the lower end of the two diagonal members 53 is gripped and operated so that the intersection angle of the two diagonal members 53 changes, the vertical position of the horizontal pipe 52 changes, and the annular pipe 52 which fits loosely at the intersection part. By moving the body 58, the intersection angle between the two oblique members 53 can be changed.

【0037】上記ロック部材54と斜材53は一体に回
動し、図14(C)のように、両斜材53の下端を握
り、両斜材53を下端部で交差するような角度にしたと
き、ロック部材57は差し込み片54から離反した位置
に回動し、差し込み片54のフランジ10の孔35への
挿入を可能にし、また、図14(B)のように、両斜材
53を中央で交差させた支柱3間への取り付け姿勢にす
ると、ロック部材57は差し込み片54に接近動し、差
し込み片54をフランジ10の孔35へ挿入した状態で
フランジ10の下面側に係合し、これにより、フランジ
10の孔35から差し込み片54が抜けないようにロッ
クすることになる。
The lock member 54 and the diagonal member 53 rotate integrally, as shown in FIG. 14 (C), grip the lower ends of the diagonal members 53 and form an angle such that the diagonal members 53 intersect at the lower ends. Then, the locking member 57 rotates to a position away from the insertion piece 54 to enable the insertion piece 54 to be inserted into the hole 35 of the flange 10 and, as shown in FIG. The locking member 57 moves closer to the insertion piece 54 and engages with the lower surface of the flange 10 in a state where the insertion piece 54 is inserted into the hole 35 of the flange 10. This locks the insertion piece 54 so that it does not come out of the hole 35 of the flange 10.

【0038】この筋交い手摺り枠51の支柱3を結合す
る間隔は 先行手摺り枠7と同様、1800mmに設定
され、支柱3の上部フランジ10に水平パイプ52を架
設した状態で、斜材53の下端結合金具11を中間フラ
ンジ10に結合することができるようになっている。
The interval at which the struts 3 of the bracing handrail frame 51 are joined is set to 1800 mm, similarly to the preceding handrail frame 7, and the horizontal pipe 52 is installed on the upper flange 10 of the strut 3. The lower end fitting 11 can be connected to the intermediate flange 10.

【0039】この筋交い手摺り枠51を用いた足場の構
築方法は、上述した先行手摺り枠7を用いた足場と同様
の構築において、先行手摺り枠7に代えて筋交い手摺り
枠51を使用するものであり、支柱3の継ぎ足しを行な
った後、この継ぎ足した支柱3間に筋交い手摺り枠51
を臨ませ、先ず、図15(A)のように、両斜材53の
下端を接近させて両斜材53の交差位置を下方に移動さ
せれば、水平パイプ52が上昇する持ち上げ状態にな
り、上昇した水平パイプ52の両端の差し込み片54を
支柱3の上部フランジ10の孔35に差し込んで、支柱
3の上部フランジ10間に水平パイプ52を架設し、次
に、図15(B)のように、一方の斜材53を上方に回
動させてその下端に設けた結合金具11を支柱3の中間
フランジ10に結合し、この後、他方の斜材53を上方
に回動させてその下端に設けた結合金具11を支柱3の
中間フランジ10に結合すれば、図15(C)のよう
に、足場板6の架設に先行して支柱3間への筋交い手摺
り枠51の取り付けが行なえる。
The method of constructing a scaffold using the brace railing frame 51 is similar to that of the scaffold using the preceding handrail frame 7 in that the brace railing frame 51 is used instead of the preceding handrail frame 7. After the support columns 3 are added, the handrail frame 51 is provided between the added support columns 3.
15A, first, as shown in FIG. 15 (A), if the lower ends of the two oblique members 53 are brought close to each other to move the intersection of the two oblique members 53 downward, the horizontal pipe 52 is in a raised state in which it rises. Then, the insertion pieces 54 at both ends of the raised horizontal pipe 52 are inserted into the holes 35 of the upper flange 10 of the support 3, and the horizontal pipe 52 is erected between the upper flanges 10 of the support 3, and then, as shown in FIG. As described above, one of the diagonal members 53 is rotated upward, and the coupling metal 11 provided at the lower end thereof is coupled to the intermediate flange 10 of the column 3, and thereafter, the other diagonal member 53 is rotated upward and If the connecting metal 11 provided at the lower end is connected to the intermediate flange 10 of the column 3, as shown in FIG. 15C, the bracing handrail frame 51 can be attached between the columns 3 prior to the installation of the scaffold plate 6. I can do it.

【0040】このように、支柱3の上部フランジ10が
作業者の手が届かない位置にあっても、筋交い手摺り枠
51を上下に長い状態にすれば、両斜材53の下端を握
った状態で上部フランジ10間に水平パイプ52を架設
することができ、また、足場板6の架設前に先行して筋
交い手摺り枠51を取り付けることにより、継ぎ足し作
業を行なう足場板6の上部に支柱3と筋交い手摺り枠5
1が位置することになり、継ぎ足し作業の安全性を確保
することができる。
As described above, even if the upper flange 10 of the column 3 is located at a position where the hand of the operator cannot reach, the lower ends of the both slant members 53 are grasped by making the bracing handrail frame 51 vertically long. A horizontal pipe 52 can be erected between the upper flanges 10 in this state, and a brace railing frame 51 is attached before the erection of the scaffolding plate 6, so that a support pillar 3 and brace rail frame 5
1 is located, and safety of the replenishment work can be ensured.

【0041】なお、上記した何れの足場においても、解
体作業は、作業する足場板6の上部に支柱3と先行手摺
り枠7又は筋交い手摺り枠51が残るように、上階足場
板6の取り外し、筋交い部材5の取り外し、先行手摺り
枠7又は筋交い手摺り枠51の取り外し、支柱3の抜き
取りを下方に移行していけばよい。
In any of the scaffolds described above, the dismantling operation is carried out on the upper-floor scaffold plate 6 such that the support 3 and the preceding handrail frame 7 or the bracing handrail frame 51 remain on the upper part of the working scaffold plate 6. The removal, the removal of the brace member 5, the removal of the preceding handrail frame 7 or the brace handrail frame 51, and the removal of the column 3 may be shifted downward.

【0042】図16乃至図21は、上述した仮設足場の
各構成材を基本的に使用し、これに他の部材を組み合わ
せ使用することによって構築することのできる仮設構造
物の幾つかの例を示している。
FIGS. 16 to 21 show some examples of the temporary structure which can be constructed by basically using the above-mentioned respective constituent materials of the temporary scaffold and combining and using other members. Is shown.

【0043】図16は、ローリングタワーを示し、車輪
61上に下部支柱2とその上に支柱3を順次継ぎ足し、
隣接する二本の下部支柱2を水平材や筋交い部材で結合
し、この結合した二本の支柱3を所定の間隔で対向する
ように配置し、対向する支柱3間に先行手摺り枠7を取
り付けると共に、対向する支柱3の水平材や筋交い部材
間に足場板を架設し、上下の足場板間に階段62をかけ
渡したものである。
FIG. 16 shows a rolling tower, in which a lower column 2 and a column 3 are successively added on wheels 61,
Two adjacent lower struts 2 are joined by a horizontal member or a brace member, and the joined two struts 3 are arranged so as to face each other at a predetermined interval, and a leading handrail frame 7 is provided between the opposed struts 3. At the same time, a scaffold is provided between the horizontal members and the brace members of the opposing columns 3, and a stair 62 is provided between the upper and lower scaffolds.

【0044】図示のように、隣接する足場板と先行手摺
り枠7が段差のあるように配置すると、上下の足場板間
の間隔が短くなり、階段62の短尺化が可能になる。
As shown in the drawing, when the adjacent scaffolding plate and the preceding handrail frame 7 are arranged so as to have a step, the distance between the upper and lower scaffolding plates becomes shorter, and the stairs 62 can be shortened.

【0045】図17は、支保工を示し、ジャッキベース
1上に下部支柱2を継ぎ足すことによって形成した柱を
水平材8で順次結合して枠状に組み立て、必要な部分に
足場板を架設すると共に斜材63で補強し、柱の上端に
大引64等の支持部材65を取り付けた構造になってい
る。
FIG. 17 shows a shoring method, in which columns formed by adding a lower support 2 on a jack base 1 are sequentially connected with a horizontal member 8 to assemble into a frame shape, and a scaffold plate is erected on a necessary portion. At the same time, the structure is reinforced with a diagonal member 63 and a support member 65 such as a large pulley 64 is attached to the upper end of the pillar.

【0046】図18は、室内足場を示し、ジャッキベー
ス1上に下部支柱2を継ぎ足すことによって形成した柱
を水平材8で順次結合して枠状に組み立て、上面に足場
板を架設することによって形成した構造になっている。
FIG. 18 shows an indoor scaffold, in which pillars formed by adding a lower support 2 on a jack base 1 are sequentially joined by horizontal members 8 to assemble them into a frame shape, and a scaffold plate is erected on the upper surface. It has a structure formed by.

【0047】図19は、安全通路を示し、ジャッキベー
ス1上に下部支柱2を継ぎ足すことによって形成した柱
と、支柱3を混合して用い、柱相互及び支柱相互を水平
材8で結合し、水平材8間に足場板6を架設すると共
に、柱と支柱3間、支柱3と支柱3間に先行手摺り枠7
を取り付けると共に、必要な部分を斜材63で補強した
構造になっている。
FIG. 19 shows a safety passage, in which a column formed by adding a lower column 2 on a jack base 1 and a column 3 are used in combination, and the columns and the columns are joined by a horizontal member 8. , A scaffold plate 6 is erected between the horizontal members 8 and a handrail frame 7 is provided between the columns 3 and the columns 3 and between the columns 3.
And a required portion is reinforced with a diagonal member 63.

【0048】図20と21は、仮設足場に組み合わせる
ベランダブリッジを示し、建物のベランダ上に伸縮支柱
66と下部支柱2を継ぎ足すことによって形成した柱を
立設し、この二本の柱を水平材8で結合すると共に、こ
の柱と仮設足場の支柱3を水平材8で結合し、水平材8
間に足場板6を架設すると共に、足場板6とベランダの
床面間に階段62をかけ渡したものである。
FIGS. 20 and 21 show a veranda bridge combined with a temporary scaffold. A pillar formed by adding a telescopic strut 66 and a lower strut 2 on a veranda of a building is erected, and these two struts are horizontally mounted. At the same time, the pillar and the support 3 of the temporary scaffold are connected by a horizontal member 8, and the horizontal member 8
A scaffold plate 6 is erected between the scaffold plates 6 and a stair 62 is extended between the scaffold plate 6 and the floor of the veranda.

【0049】このように、上述した仮設足場の各構成材
は、各種仮設構造物の構成材として多目的な用途に使用
することができる。
As described above, each component of the temporary scaffold described above can be used for various purposes as a component of various temporary structures.

【0050】[0050]

【発明の効果】以上のように、この発明によると、孔付
きのフランジが固定された支柱を順次継ぎ足し、隣接す
る支柱を所定の間隔で結合すると共に、足場板を架設す
ることによって組み立てる仮設構造物において、下階の
足場板上で支柱の継ぎ足しと、継ぎ足した支柱間への先
行手摺り枠又は筋交い手摺り枠の取り付けを、上階足場
板の架設に先行して行なうようにしたので、足場板の上
部周囲に先行して安全手摺り枠を配置することができ、
上階足場板上での支柱の継ぎ足しや先行手摺り枠又は筋
交い手摺り枠の取り付け作業を行なうとき、すでに上階
足場板の上部周囲に、支柱と先行手摺り枠又は筋交い手
摺り枠が位置することになり、従って、高所作業となる
足場板上での組み立て作業の安全性を支柱と先行手摺り
枠又は筋交い手摺り枠で確保でき、仮設構造物の組み立
てが安全に行なえるようになる。
As described above, according to the present invention, a temporary structure in which pillars with perforated flanges are successively added, adjacent pillars are connected at predetermined intervals, and a scaffold plate is erected to assemble the temporary structure. In the product, the extension of the support on the scaffold board on the lower floor and the installation of the leading handrail frame or the bracing handrail frame between the added supports were performed prior to the erection of the upper floor scaffold board, A safety handrail frame can be placed ahead of the top of the scaffold,
When performing the work of adding a support on the upper floor scaffolding plate or installing the leading handrail frame or bracing handrail frame, the support pillar and the preceding handrail frame or bracing handrail frame are already located around the upper part of the upper floor scaffolding plate. Therefore, the safety of the assembling work on the scaffold plate, which is to be performed at a high place, can be secured by the support pillar and the preceding handrail frame or the bracing handrail frame, so that the temporary structure can be safely assembled. Become.

【0051】また、仮設構造物の構成部材である支柱、
先行手摺り枠又は筋交い手摺り枠等は汎用性があり、既
存の部材との組み合わせで多様な仮設構造物の構築が可
能となり、構成部材の多目的利用によって種々の仮設構
造物を構築することができる。
Further, a column, which is a constituent member of the temporary structure,
The leading handrail frame or the bracing handrail frame has versatility, and it is possible to construct various temporary structures by combining with existing members, and it is possible to construct various temporary structures by multipurpose use of the constituent members. it can.

【図面の簡単な説明】[Brief description of the drawings]

【図1】先行手摺り枠を用いた仮設足場の組み立てた状
態を示す正面図
FIG. 1 is a front view showing an assembled state of a temporary scaffold using a preceding handrail frame.

【図2】同上の側面図FIG. 2 is a side view of the above.

【図3】同上において第2の例の筋交い部材を用いた側
面図
FIG. 3 is a side view using the brace member of the second example in the above.

【図4】(A)乃至(C)は支柱の異なった例を示す正
面図、(D)はジャッキベースの正面図
FIGS. 4A to 4C are front views showing different examples of columns, and FIG. 4D is a front view of a jack base;

【図5】(A)は第1の例の筋交い部材の正面図、
(B)は同第2の例の筋交い部材の正面図、(C)は水
平材の正面図
FIG. 5A is a front view of the brace member of the first example,
(B) is a front view of the brace member of the second example, and (C) is a front view of a horizontal member.

【図6】(A)は先行手摺り枠の正面図、(B)は同上
に設ける一方の結合金具を示す拡大平面図、(C)は同
正面図、(D)は同上に設ける他方の結合金具を示す拡
大平面図、(E)は同正面図
6A is a front view of a preceding handrail frame, FIG. 6B is an enlarged plan view showing one of the fittings provided on the same, FIG. 6C is a front view of the same, FIG. 6D is another view provided on the same. An enlarged plan view showing a coupling fitting, and FIG.

【図7】(A)乃至(C)は幅の異なる足場板の平面図FIGS. 7A to 7C are plan views of scaffolds having different widths.

【図8】(A)乃至(C)は仮設足場の構築工程を示す
説明図
FIGS. 8A to 8C are explanatory diagrams showing a process of constructing a temporary scaffold.

【図9】(A)乃至(C)は仮設足場の構築工程を示す
説明図
FIGS. 9A to 9C are explanatory diagrams showing a process of constructing a temporary scaffold.

【図10】(A)と(B)は仮設足場の構築工程を示す
説明図
FIGS. 10A and 10B are explanatory diagrams showing a process of constructing a temporary scaffold.

【図11】(A)は結合金具の縦断正面図、(B)は同
上のフランジに対する結合途中の状態を示す縦断正面
図、(C)は同結状態を示す縦断正面図、(D)は同結
状態の平面図
11A is a longitudinal sectional front view of a coupling fitting, FIG. 11B is a longitudinal sectional front view showing a state in the middle of coupling to the flange, FIG. 11C is a longitudinal sectional front view showing the coupling state, and FIG. Top view of the connected state

【図12】筋交い手摺り枠を用いた仮設足場の組み立て
た状態を示す正面図
FIG. 12 is a front view showing an assembled state of a temporary scaffold using a brace railing frame;

【図13】同上の側面図FIG. 13 is a side view of the above.

【図14】(A)は筋交い手摺り枠の正面図、(B)は
同上におけるロック部材の開放姿勢を示す拡大正面図、
(C)は同上におけるロック部材の係合姿勢を示す拡大
正面図
14A is a front view of a brace railing frame, FIG. 14B is an enlarged front view showing an opening posture of a lock member in the same, FIG.
(C) is an enlarged front view showing the engagement posture of the lock member in the above.

【図15】(A)乃至(C)は筋交い手摺り枠の姿勢の
変化を示す正面図
FIGS. 15A to 15C are front views showing changes in the posture of a brace railing frame;

【図16】仮設構造物として組み立てたローリングタワ
ーを示す正面図
FIG. 16 is a front view showing a rolling tower assembled as a temporary structure.

【図17】仮設構造物として組み立てた支保工を示す正
面図
FIG. 17 is a front view showing the shoring assembled as a temporary structure.

【図18】仮設構造物として組み立てた室内足場を示す
正面図
FIG. 18 is a front view showing an indoor scaffold assembled as a temporary structure.

【図19】(A)は仮設構造物として組み立てた安全通
路を示す正面図、(B)は同側面図
19A is a front view showing a safety passage assembled as a temporary structure, and FIG. 19B is a side view of the same.

【図20】(A)は仮設構造物として組み立てたベラン
ダブリッジを示す正面図
FIG. 20A is a front view showing a veranda bridge assembled as a temporary structure.

【図21】同上の側面図FIG. 21 is a side view of the above.

【符号の説明】[Explanation of symbols]

1 ジャッキベース 2 下部支柱 3 支柱 4 中間支柱 5 筋交い部材 6 足場板 7 先行手摺り枠 8 水平材 51 筋交い手摺り枠 DESCRIPTION OF SYMBOLS 1 Jack base 2 Lower support 3 Support 4 Intermediate support 5 Brace member 6 Scaffolding board 7 Prior handrail frame 8 Horizontal material 51 Brace handrail frame

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 上下軸方向に所定の間隔で孔付きのフラ
ンジが固定され、順次継ぎ足しが可能となる支柱と、上
部両側に支柱へ上下スライド可能に係合する係止金具と
下部両側にフランジへの結合金具が取り付けられた手摺
り枠と、フランジとの結合により隣接する二本の支柱を
所定の間隔で結合するための結合部材と、対向する結合
部材間に架設する足場板とを用い、結合部材で結合した
二本一組の支柱を対向状に配置し、対向する結合部材間
に架設した足場板上で、先ず、上記各支柱の上端に上位
支柱の継ぎ足し作業を行い、次に、両側に対向する継ぎ
足し支柱間に手摺り枠を臨ませ、上部両側の係止金具を
両側の継ぎ足し支柱にそれぞれ係合させた状態で継ぎ足
し支柱をガイドに手摺り枠を上方にスライドさせ、その
押し上げ位置で下部両側の結合金具を上部継ぎ足し支柱
のフランジに結合して手摺り枠の取り付け作業を行い、
上部継ぎ足し支柱への足場板の架設前に先行して上部継
ぎ足し支柱間に手摺り枠を取り付けることを特徴とする
仮設構造物の構築方法。
1. A strut having fixed flanges with holes at predetermined intervals in the vertical axis direction and capable of successively extending, a locking metal fitting on both upper sides so as to be vertically slidable with the pillar, and a flange on both lower sides. Using a handrail frame with a connecting bracket attached to it, a connecting member for connecting two adjacent columns at a predetermined interval by connecting with a flange, and a scaffold plate spanning between the opposing connecting members. A pair of two columns joined by a coupling member are arranged in opposition, and on a scaffold plate erected between the opposed coupling members, first, a work of adding a higher-order column to the upper end of each column is performed, and then With the handrail frame facing between the extension pillars facing the both sides, the upper and lower latches are engaged with the extension pillars on both sides, respectively. Lower at push-up position Attach the handrail frame by connecting the joining brackets on both sides to the upper part of the support flange, and then attach the handrail frame.
A method of constructing a temporary structure, characterized in that a handrail frame is attached between the upper reinforced pillars prior to erection of the scaffold plate on the upper reinforced pillars.
【請求項2】 上下軸方向に所定の間隔で孔付きのフラ
ンジが固定され、順次継ぎ足しが可能となる支柱と、上
部両側にフランジへの係止金具と下部両端にフランジへ
の結合金具が取り付けられ、斜材の交差角度の変化で上
下の高さ寸法が変化する機能のある筋交い手摺り枠と、
フランジとの結合により隣接する二本の支柱を所定の間
隔で結合するための結合部材と、対向する結合部材間に
架設する足場板とを用い、結合部材で結合した二本一組
の支柱を対向状に配置し、対向する結合部材間に架設し
た足場板上で、先ず、上記各支柱の上端に上位支柱の継
ぎ足し作業を行い、次に、両側に対向する継ぎ足し支柱
間に筋交い手摺り枠を臨ませ、この筋交い手摺り枠を上
下に伸ばした状態にして上部両側の係止金具を両側の継
ぎ足し支柱の上位フランジにそれぞれ係合させ、続いて
筋交い手摺り枠を縮めた状態にして下部両端の結合金具
を上部継ぎ足し支柱の中間フランジに結合して筋交い手
摺り枠の取り付け作業を行い、上部継ぎ足し支柱への足
場板の架設前に先行して上部継ぎ足し支柱間に筋交い手
摺り枠を取り付けることを特徴とする仮設構造物の構築
方法。
2. A flange having holes fixed thereto at predetermined intervals in the vertical axis direction, and a pillar which can be successively extended, a metal fitting to the flange on both upper sides, and a metal fitting to the flange on both lower sides. Brace railing frame with the function of changing the height dimension up and down by changing the intersection angle of the diagonal,
Using a joining member for joining two adjacent columns at a predetermined interval by coupling with a flange, and a scaffold plate erected between the opposed joining members, a pair of two columns joined by the joining member is used. On a scaffolding plate arranged in an opposed manner and erected between the joining members opposed to each other, first, an upper strut is added to the upper end of each of the above-mentioned struts, and then, a bracing handrail frame is provided between the extending struts opposed to both sides. With the brace railing frame extended vertically, the upper and lower locking brackets are engaged with the upper flanges of both extension pillars, respectively, and then the brace railing frame is contracted and the lower part is lowered. Attach the bracing handrail frame between the upper reinforced pillars before installing the scaffold plate on the upper reinforced pillar by attaching the connecting metal fittings on both ends to the upper flange of the upper joint and connecting to the middle flange of the column. Method for constructing a temporary structure, characterized in that.
JP2000011684A 2000-01-20 2000-01-20 Construction method of temporary structure Expired - Lifetime JP3907367B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000011684A JP3907367B2 (en) 2000-01-20 2000-01-20 Construction method of temporary structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000011684A JP3907367B2 (en) 2000-01-20 2000-01-20 Construction method of temporary structure

Publications (2)

Publication Number Publication Date
JP2001200632A true JP2001200632A (en) 2001-07-27
JP3907367B2 JP3907367B2 (en) 2007-04-18

Family

ID=18539518

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000011684A Expired - Lifetime JP3907367B2 (en) 2000-01-20 2000-01-20 Construction method of temporary structure

Country Status (1)

Country Link
JP (1) JP3907367B2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169919A (en) * 2004-12-20 2006-06-29 Satoru Ota Diagonal brace and preceding diagonal brace handrail using this diagonal brace
JP2006291473A (en) * 2005-04-06 2006-10-26 Sumitomo Metal Steel Products Inc Preceding handrail frame and bound-type prefabricated scaffolding
JP2008297704A (en) * 2007-05-29 2008-12-11 Alinco Inc Brace serving also as handrail
FR2922929A1 (en) * 2007-10-29 2009-05-01 Cdh Group Floor railing's ledger strip for scaffolding, has housing formed by hook or by co-operation of hook with strip, where hook is provided with return part and housing forms passage of strip for slidably displacing strip transversely to bar
FR2922928A1 (en) * 2007-10-29 2009-05-01 Cdh Group Secured assembly protection for scaffolding in building, has locking unit coupled to perch for moving from locking position to unlocking position, where perch forms driving unit to displaceably drive locking unit
JP2011099234A (en) * 2009-11-05 2011-05-19 Daisan:Kk Above-eaves construction method
JP2012097513A (en) * 2010-11-04 2012-05-24 Heiwa Giken Kk Preceding handrail for temporary scaffold
EP2253778B1 (en) * 2009-05-20 2016-08-03 Ui Property Limited An advance guard rail
CN106906992A (en) * 2017-04-20 2017-06-30 江苏跃发建设工程有限公司 A kind of scaffolding structure
JP2021059845A (en) * 2019-10-03 2021-04-15 信和株式会社 Handrail brace

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006169919A (en) * 2004-12-20 2006-06-29 Satoru Ota Diagonal brace and preceding diagonal brace handrail using this diagonal brace
JP4608305B2 (en) * 2004-12-20 2011-01-12 覚 大田 Braces and handrails with preceding braces using this
JP2006291473A (en) * 2005-04-06 2006-10-26 Sumitomo Metal Steel Products Inc Preceding handrail frame and bound-type prefabricated scaffolding
JP2008297704A (en) * 2007-05-29 2008-12-11 Alinco Inc Brace serving also as handrail
FR2922929A1 (en) * 2007-10-29 2009-05-01 Cdh Group Floor railing's ledger strip for scaffolding, has housing formed by hook or by co-operation of hook with strip, where hook is provided with return part and housing forms passage of strip for slidably displacing strip transversely to bar
FR2922928A1 (en) * 2007-10-29 2009-05-01 Cdh Group Secured assembly protection for scaffolding in building, has locking unit coupled to perch for moving from locking position to unlocking position, where perch forms driving unit to displaceably drive locking unit
EP2253778B1 (en) * 2009-05-20 2016-08-03 Ui Property Limited An advance guard rail
JP2011099234A (en) * 2009-11-05 2011-05-19 Daisan:Kk Above-eaves construction method
JP2012097513A (en) * 2010-11-04 2012-05-24 Heiwa Giken Kk Preceding handrail for temporary scaffold
CN106906992A (en) * 2017-04-20 2017-06-30 江苏跃发建设工程有限公司 A kind of scaffolding structure
JP2021059845A (en) * 2019-10-03 2021-04-15 信和株式会社 Handrail brace
JP7130251B2 (en) 2019-10-03 2022-09-05 信和株式会社 handrail brace

Also Published As

Publication number Publication date
JP3907367B2 (en) 2007-04-18

Similar Documents

Publication Publication Date Title
JP4567432B2 (en) Slope work floor construction system, work floor construction device and work floor panel
JP5422075B1 (en) Steel pipe for scaffolding or support column
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
JP2001200632A (en) Construction method for temporary structure
JP3892710B2 (en) Method and apparatus for attaching pipe structure to temporary scaffold
JPH10280669A (en) Scaffolding unit
JP4204605B2 (en) Assembly scaffold
JP2006169919A (en) Diagonal brace and preceding diagonal brace handrail using this diagonal brace
JP2878589B2 (en) Temporary structure
JP2009209543A (en) Scaffolding board, and single pipe and coupler scaffolding structure using the same
JPH06248794A (en) Large-sized assembled-type moving scaffold
JP4183654B2 (en) Handrail support bracket, preceding handrail assembly set, frame scaffold
JP3111854B2 (en) Elevating guide mechanism of jumping scaffold for building construction
JP2001159231A (en) Temporary structure and its construction method
CN219491671U (en) Foldable PC stair construction operation platform
JP4065798B2 (en) Prop work scaffold and method for constructing support work scaffold
KR100636409B1 (en) Scaffold
JP6968327B1 (en) Leading braces and temporary scaffolding for single-tube scaffolding
KR200355444Y1 (en) Scaffold
JP7048003B2 (en) Vertically movable outer scaffolding for high-rise buildings with no vacant land next door
JP4052905B2 (en) Scaffolding equipment
JP4182012B2 (en) How to build frame scaffolds and frame scaffolds
JP2006307506A (en) Scaffolding
JPH07269097A (en) Crossing connection member of temporary scaffold frame
JP2500347Y2 (en) Brace handrail frame for temporary scaffolding

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070116

R150 Certificate of patent or registration of utility model

Ref document number: 3907367

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100126

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110126

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120126

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140126

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term