JP2006169919A - Diagonal brace and preceding diagonal brace handrail using this diagonal brace - Google Patents

Diagonal brace and preceding diagonal brace handrail using this diagonal brace Download PDF

Info

Publication number
JP2006169919A
JP2006169919A JP2004367644A JP2004367644A JP2006169919A JP 2006169919 A JP2006169919 A JP 2006169919A JP 2004367644 A JP2004367644 A JP 2004367644A JP 2004367644 A JP2004367644 A JP 2004367644A JP 2006169919 A JP2006169919 A JP 2006169919A
Authority
JP
Japan
Prior art keywords
holder
handrail
diagonal brace
brace
diagonal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2004367644A
Other languages
Japanese (ja)
Other versions
JP4608305B2 (en
Inventor
Satoru Ota
覚 大田
Eiichi Aikawa
映一 合川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUKO MAINTENANCE KK
Original Assignee
YUKO MAINTENANCE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=36670961&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2006169919(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by YUKO MAINTENANCE KK filed Critical YUKO MAINTENANCE KK
Priority to JP2004367644A priority Critical patent/JP4608305B2/en
Publication of JP2006169919A publication Critical patent/JP2006169919A/en
Application granted granted Critical
Publication of JP4608305B2 publication Critical patent/JP4608305B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a preceding diagonal brace handrail capable of surely providing joining strength of a column by a diagonal brace, capable of absorbing a dimensional error on a holder of the column, by vertically moving a locking metal fitting of the diagonal brace along an inclined oblong hole. <P>SOLUTION: An upper end part of the diagonal brace 4 obliquely installed between the holders 2 existing in a diagonal position of both side columns 1, is pivoted on both ends of the handrail 3 horizontally arranged between the columns 1 erected and arranged on both sides. The diagonal brace 4 fixes a locking hook 6 to an upper holder 2 of the holder existing in the diagonal position in one end part of a steel pipe, and is formed by arranging a locking metal fitting 7 to a lower holder 2 of the holder existing in the diagonal position in the other end part of the steel pipe. This locking metal fitting 7 is installed on the diagonal brace 4 so as to be freely rotatable and movable along the inclined oblong hole 12 by a pin 13 penetrating through the inclined oblong hole 12 arranged in the locking metal fitting 7. <P>COPYRIGHT: (C)2006,JPO&NCIPI

Description

この発明は、鋼管を用いた仮設構造物である足場や支保工の組み立てに使用する筋交いとこれを用いた先行筋交い手摺りに関する。   The present invention relates to a brace used for assembling a scaffolding or a support structure, which is a temporary structure using a steel pipe, and a preceding bracing handrail using the same.

各種建築や土木工事で用いられるパイプ構造物である仮設足場や支保工は、起立配置した鋼管製の支柱を布材で結合し、このようにして支柱の継足しと平面方向への増築を行い、隣接する布材間に足場板を敷設することによって作業床を形成して構築するものである。   Temporary scaffolds and supporters, which are pipe structures used in various constructions and civil engineering work, connect steel pipe columns that are erected and are connected with cloth materials, thus extending the columns and extending them in the plane direction. The working floor is formed and constructed by laying a scaffolding plate between adjacent cloth materials.

上記のような足場や支保工を構築するために用いる支柱1として、図6に示すように、所定長さを有する鋼管の外面で上下端部や中間部の位置に、合計四個のホルダー2を直角の配置で溶接固定した構造を有するものが用いられている。   As shown in FIG. 6, as a support 1 used for constructing a scaffold or a support as described above, a total of four holders 2 are provided at the positions of the upper and lower ends and the intermediate portion on the outer surface of a steel pipe having a predetermined length. Are used which have a structure in which they are welded and fixed at a right angle.

この支柱1を用いて足場を構築するには、支柱1を建物の内外方向に沿って起立配置した状態で、図示省略した布材を用い、その端部に固定したフック金具を両側支柱1の同じ高さ位置にあるホルダー2に係止することによって両側支柱1を結合し、この結合足場を建物の面方向に沿って配置し、対向する結合支柱の布材間に足場板を架設し、これを上方及び平面的に増築することで構築される。   In order to construct a scaffold using this support column 1, with the support column 1 standing up and down along the inside and outside directions of the building, a cloth material not shown is used, and a hook fitting fixed to the end of the support member is attached to the both ends of the support column 1. Both struts 1 are joined by locking to the holder 2 at the same height, this joining scaffold is arranged along the surface direction of the building, and a scaffolding plate is constructed between the cloth materials of the opposing joining struts, It is constructed by extending this upward and planarly.

また、支保工の場合は、四方に配置した支柱を布材で順次枠状に結合し、これを上方及び平面的に増築することで構築され、所要高さの布材間に足場板を敷設して作業床を形成するものである。   In addition, in the case of support work, it is constructed by sequentially connecting pillars arranged in four directions in a frame shape with a cloth material, and extending this upward and planarly, and laying a scaffolding plate between the cloth materials of the required height Thus, a work floor is formed.

上記のような足場においては、建物と反対側の面に位置する隣接支柱1を傾斜状の筋交いで結合し、また、支保工では、外側面における支柱1間を傾斜状の筋交いで結合し、足場や支保工の強度を向上させるようにしている。   In the above scaffolding, the adjacent struts 1 located on the opposite side of the building are joined with slanted braces, and in the support work, the struts 1 on the outer side are joined with slanted braces, The strength of scaffolding and support work is improved.

上記筋交いとしては、図5に示したように、手摺り3の両端に対角位置のホルダー2間に斜めに架設する筋交い4の上端部をそれぞれピン5で枢止し、前記筋交い4の上端部に上位ホルダー2に対する係止フック6を設け、前記筋交い4の下端部に、下位ホルダー2に対する係止金具7を設けた先行筋交い手摺り8の使用が、足場や支保工の組立て作業時の安全性確保の観点から優れている。   As the bracing, as shown in FIG. 5, the upper ends of the braces 4 that are diagonally installed between the holders 2 at the diagonal positions on both ends of the handrail 3 are pivoted by pins 5 respectively, and the upper ends of the braces 4 are The hook 6 for the upper holder 2 is provided in the upper part, and the use of the leading brace handrail 8 having the lower fitting 2 for the lower holder 2 at the lower end of the brace 4 is used when assembling the scaffolding or the supporting work. Excellent from the viewpoint of ensuring safety.

この先行筋交い手摺り8は、足場や支保工の組立て時において、足場板よりも上部に立設した支柱1間の上部に筋交い4の上端係止フック6を上位ホルダー2に対して係止し、このあと係止金具7を対角位置にある下位ホルダー2に係止することにより、両筋交い4を交差状の配置とし、両側支柱1間の上部に手摺り3を水平に配置し、両筋交い4で両側の支柱1を結合するものである。   The front bracing handrail 8 locks the upper end locking hook 6 of the bracing 4 to the upper holder 2 at the upper part between the columns 1 erected above the scaffolding plate when assembling the scaffolding or supporting work. After this, the locking bracket 7 is locked to the lower holder 2 at the diagonal position, so that the two braces 4 are arranged in an intersecting manner, and the handrail 3 is horizontally arranged on the upper part between the both side supports 1. The braces 4 are used to connect the struts 1 on both sides.

このような先行筋交い手摺り8を採用することにより、手摺り3を現在作業している足場板の上部に先行して位置させることができ、足場や支保工の組立て作業の安全性を確保することができる。   By adopting such a hand-joining handrail 8, the handrail 3 can be positioned in front of the upper part of the currently working scaffolding plate, and the safety of the assembly work of the scaffolding and the support work is ensured. be able to.

ところで、上記先行筋交い手摺り8は、筋交い4の上端に設けた係止フック6が上位ホルダー2に対して上部から挿入し、内角側の上縁を上位ホルダー2の上端に載せるような構造になっている。   By the way, the preceding brace handrail 8 has a structure in which a locking hook 6 provided at the upper end of the brace 4 is inserted into the upper holder 2 from above and the upper edge of the inner corner is placed on the upper end of the upper holder 2. It has become.

また、係止金具7は、筋交い4の下端部にピン9で回動可能に枢止され、下位ホルダー2に対して外面から外嵌し、上部に設けた係止具10を下位ホルダー2の上端に係止するようになっている。   Further, the locking fitting 7 is pivotally fixed to the lower end portion of the brace 4 by a pin 9, is fitted from the outer surface to the lower holder 2, and the locking tool 10 provided on the upper portion is attached to the lower holder 2. It is designed to be locked at the upper end.

ところで、上記支柱1におけるホルダー2は溶接によって固定されているが、ホルダー2の寸法形状及び支柱1に対するホルダー2の固定位置には精度的に寸法誤差がある製品があり、このため従来の先行筋交い手摺り8のように、上端の係止フック6と下端の係止金具7の枢止点までの距離寸法が一定化している構造では、ホルダー2に関する寸法誤差を吸収することができず、隣接した支柱1間に先行筋交い手摺り8を架設した場合に、上端の係止フック6が上位ホルダー2から浮き上がったり、係止金具7を下位ホルダー2に対して係止することが困難になり、その結果、先行筋交い手摺り8による支柱1の結合強度が得られなくなり、実質的に補強としての筋交いの役目を果たすことができない事態が発生するという問題がある。   By the way, the holder 2 in the support column 1 is fixed by welding, but there is a product having a dimensional error in accuracy in the dimension shape of the holder 2 and the fixing position of the holder 2 with respect to the support column 1, and for this reason, there is a conventional leading muscle crossing. In the structure in which the distance between the upper end locking hook 6 and the lower end locking bracket 7 is fixed, as in the case of the handrail 8, the dimensional error related to the holder 2 cannot be absorbed. When a handrail 8 that crosses the preceding struts is installed between the supported struts 1, it becomes difficult for the upper end locking hook 6 to lift from the upper holder 2 or to lock the locking bracket 7 to the lower holder 2. As a result, there is a problem in that the connection strength of the support column 1 by the preceding bracing handrail 8 cannot be obtained, and the situation that the role of bracing as a reinforcement cannot be substantially achieved occurs.

そこで、この発明の課題は、筋交いの係止金具を筋交いに対して傾斜長孔で上下可動とすることにより、支柱のホルダーに関する寸法誤差を吸収することができ、筋交いによる支柱の結合が確実になり、支持強度を確実に得ることができる筋交いとこれを用いた先行筋交い手摺りを提供することにある。   Accordingly, an object of the present invention is to make it possible to absorb a dimensional error related to the support of the support column by making the locking bracket for the support system vertically movable with a slanted long hole with respect to the reinforcement, so that the connection of the support column by the brace is ensured. Therefore, it is to provide a brace that can surely obtain a support strength and a handrail for a preceding brace using the brace.

上記のような課題を解決するため、請求項1の発明は、上下に所定の間隔でホルダーが設けられ、両側に起立配置された支柱の対角位置にあるホルダー間に斜めに架設する筋交いであり、鋼管の一方端部に、対角位置にあるホルダーの上位ホルダーに対する係止フックを固定し、前記鋼管の他方端部に、対角位置にあるホルダーの下位ホルダーに対する係止金具を、この係止金具に設けた傾斜長孔を貫通するピンで、回動と傾斜長孔に沿う移動とが自在となるよう取付けた構成を採用したものである。   In order to solve the above-described problems, the invention of claim 1 is a bracing method in which holders are provided at predetermined intervals in the vertical direction, and are obliquely installed between the holders at diagonal positions of the support columns arranged upright on both sides. A locking hook for the upper holder of the holder in the diagonal position is fixed to one end of the steel pipe, and a locking bracket for the lower holder of the holder in the diagonal position is fixed to the other end of the steel pipe. A pin that penetrates through the inclined long hole provided in the locking metal fitting is used so that it can be rotated and moved along the inclined long hole.

請求項2の発明は、上下に所定の間隔でホルダーが設けられ、両側に起立配置された支柱間に水平に配置する手摺りの両端に、両側支柱の対角位置にあるホルダー間に斜めに架設する筋交いの上端部を枢止して形成され、前記筋交いが、鋼管の一方端部に、対角位置にあるホルダーの上位ホルダーに対する係止フックを固定し、前記鋼管の他方端部に、対角位置にあるホルダーの下位ホルダーに対する係止金具を、この係止金具に設けた傾斜長孔を貫通するピンで、回動と傾斜長孔に沿う移動とが自在となるよう取付けて形成されている構成を採用したものである。   In the invention of claim 2, holders are provided at predetermined intervals on the upper and lower sides, and obliquely between the holders at the diagonal positions of the both-side columns on both ends of the handrail horizontally disposed between the columns arranged upright on both sides. It is formed by pivoting the upper end of the bracing to be installed, and the bracing is fixed to one end of the steel pipe, a locking hook for the upper holder of the holder in a diagonal position, and to the other end of the steel pipe, The locking bracket for the lower holder of the diagonal holder is attached and formed so that it can freely rotate and move along the inclined long hole with a pin that penetrates the inclined long hole provided in this locking bracket. The configuration is adopted.

この発明によると、筋交いの係止金具が傾斜長孔に沿って上下可動となり、上位ホルダーに係止フックを係止し、係止金具を下位ホルダーに係止して、筋交いを対角位置にあるホルダーの間に架設した状態で、筋交いは下端のピンが傾斜長孔に対して、対角位置のホルダーの間隔に対応した位置に停止することになり、これによってホルダーに関する寸法誤差を吸収することができ、対角位置のホルダー間において筋交いは緊張状態となり、支柱に加わる外力を筋交いで受けることができ、従って、筋交いによる支柱の結合強度を確実に得ることができ、強度的に優れた安全性の高い足場や支保工を組み立てることができる。   According to the present invention, the bracing bracket is vertically movable along the inclined long hole, the latch hook is latched to the upper holder, the latch bracket is latched to the lower holder, and the brace is placed diagonally. In the state of being laid between the holders, the brace stops at the position corresponding to the distance between the diagonal holders with respect to the slanted long hole, thereby absorbing the dimensional error related to the holder. The bracing between the diagonally positioned holders is in a tension state, and external force applied to the strut can be received by strutting, so that the strength of the strut coupling by bracing can be reliably obtained, and the strength is excellent Highly secure scaffolding and support can be assembled.

また、手摺りの両端に筋交いの上端部を枢止したので、足場や支保工の構築時において、組み立て作業を行う足場板の架設に先行して、その上部に手摺りを配置することができ、足場や支保工の組み立て作業の安全性を向上させることができる。   In addition, since the upper end of the brace is pivoted at both ends of the handrail, it is possible to place the handrail on the top of the scaffolding plate for the assembly work prior to the construction of the scaffolding or support work. And, the safety of the assembly work of scaffolding and support work can be improved.

以下、この発明の実施の形態を添付図面に基づいて説明する。   Embodiments of the present invention will be described below with reference to the accompanying drawings.

図1乃至図3に示すように、足場や支保工の構築に用いる支柱1は、所定長さを有する鋼管の外面で周囲四箇所の位置に下部すぼまりのホルダー2を溶接固定し、このホルダー2群を鋼管の上下端部や中間部の位置に配置した構造を有し、図示省略したが鋼管の上端には支柱1を継足すためのジョイントが設けられている。   As shown in FIG. 1 to FIG. 3, the support column 1 used for constructing a scaffold or a support work is constructed by welding and fixing a holder 2 having a lower concavity at four positions on the outer surface of a steel pipe having a predetermined length. The holder 2 group has a structure in which the steel pipes are arranged at the upper and lower end portions and the middle portion of the steel pipe. Although not shown, a joint for adding the support column 1 is provided at the upper end of the steel pipe.

この支柱1を用いて組み立てた仮設足場や支保工を補強するための先行筋交い手摺り8aは、両側に起立配置された支柱1間に水平に配置する鋼管製手摺り3の両端に、両側支柱1の対角位置にあるホルダー2間に斜めに架設する筋交い4の上端部をピン5で枢止して形成されている。   The leading brace handrail 8a for reinforcing the temporary scaffolding and supporting work assembled using the support column 1 is provided on both ends of the steel pipe handrail 3 horizontally disposed between the support columns 1 standing upright on both sides. The upper end of the brace 4 that is installed diagonally between the holders 2 at the diagonal position 1 is pivotally fixed by a pin 5.

上記筋交い4は、鋼管の上端部にホルダー2に対する係止フック6を固定し、下端部にホルダー2への係止金具7を設けて形成され、図1(a)のように、手摺り3に沿う折畳み状態から回転させ、図1(b)のように扁平に加工した略中央部の位置でクロスさせることができるようになっている。   The bracing 4 is formed by fixing a locking hook 6 to the holder 2 at the upper end of the steel pipe and providing a locking fitting 7 to the holder 2 at the lower end, as shown in FIG. It can be made to cross in the position of the substantially central part processed from flat like FIG.1 (b).

前記係止フック6は、金属板を用いて伏倒L字形に形成され、下向きの垂下部分がホルダー2内への挿入片6aとなり、この挿入片6aの内角側にホルダー2の高さに適応する高さ寸法の切り欠き部分6bが設けられ、挿入片6aにおける切り欠き部分6bの下端が抜け止めのための屈曲片6cになっている。   The locking hook 6 is formed in a protrusive L shape using a metal plate, and the downward hanging portion becomes an insertion piece 6a into the holder 2, and adapts to the height of the holder 2 on the inner corner side of the insertion piece 6a. A cutout portion 6b having a height dimension is provided, and a lower end of the cutout portion 6b of the insertion piece 6a is a bent piece 6c for preventing the removal.

この係止フック6は、水平部分の端部寄りの位置が手摺り3の端部下面に下向きに突設したブラケット11にピン5で回転可能となるよう枢止され、水平部分の後端に筋交い4の上端が所定の傾斜角度で溶接により固定されている。   The locking hook 6 is pivotally fixed to a bracket 11 projecting downward on the lower surface of the end portion of the handrail 3 so that the position close to the end portion of the horizontal portion can be rotated by the pin 5, and is attached to the rear end of the horizontal portion. The upper end of the brace 4 is fixed by welding at a predetermined inclination angle.

上記係止金具7は、金属板を用いて略矩形状に形成され、その前縁にホルダー2の高さに適応する高さ寸法のコ字状切り欠き7aが設けられ、この係止金具7の上端で切り欠き7aの上方位置に、伏倒状態で先端の下向き屈曲片がホルダー2の内面側に係合する係止具10が起伏回動可能に取り付けられている。   The locking metal 7 is formed in a substantially rectangular shape by using a metal plate, and a U-shaped notch 7a having a height suitable for the height of the holder 2 is provided on the front edge thereof. At the upper end of the notch 7a, a locking tool 10 is attached so as to be able to turn up and down.

この係止金具7には、図4(a)と(b)に示すように、コ字状切り欠き7aの後方下部の位置に傾斜長孔12が形成され、係止金具7は、前記傾斜長孔12を貫通するピン13で筋交い4の下端部に回動と傾斜長孔12の範囲内での移動とが可能に取付けられている。   As shown in FIGS. 4 (a) and 4 (b), the locking bracket 7 is formed with an inclined long hole 12 at a lower rear position of the U-shaped notch 7a. A pin 13 passing through the long hole 12 is attached to the lower end of the brace 4 so as to be able to rotate and move within the range of the inclined long hole 12.

上記係止金具7に形成された傾斜長孔12は、図3に示すように、コ字状切り欠き7aに対して下端側か漸次離れる方向の傾斜となり、係止金具7はホルダー2に取付けるための垂直姿勢にある状態で、筋交い4のピン13に対して斜めに移動可能となる。   As shown in FIG. 3, the inclined long hole 12 formed in the locking metal 7 is inclined in a direction gradually moving away from the lower end side with respect to the U-shaped notch 7 a, and the locking metal 7 is attached to the holder 2. Therefore, it is possible to move obliquely with respect to the pin 13 of the brace 4 in a state of being in a vertical posture.

上記のような先行筋交い手摺り8aにおいて、手摺り3は支柱1の配置ピッチに対応する長さを有し、筋交い4は、一方支柱1の上位ホルダー2に上端の係止フック6を係止した状態で、他方支柱1の対角位置にある下位ホルダー2に係止金具7を固定することができる長さに設定され、ちなみに支柱1の配置ピッチは、図2のような1800mmや図5のような900mm等があり、各図のように先行筋交い手摺り8aは、手摺り3や筋交い4の長さがこれらに対応するものが用意されている。   In the preceding brace handrail 8a as described above, the handrail 3 has a length corresponding to the arrangement pitch of the struts 1, and the brace 4 locks the upper hook 2 on the upper holder 2 of the strut 1. In such a state, the length is set such that the locking bracket 7 can be fixed to the lower holder 2 at the diagonal position of the other support column 1, and the arrangement pitch of the support columns 1 is 1800 mm as shown in FIG. As shown in the drawings, the leading brace handrail 8a is prepared in such a manner that the length of the handrail 3 and the brace 4 corresponds to these.

なお、図示の場合、手摺り3の両端に筋交い4を枢止した先行筋交い手摺り8aを示したが、手摺り3を省いて筋交い4を単独で用いることも当然可能である。   In the case shown in the figure, the preceding bracing handrail 8a in which the brace 4 is pivoted at both ends of the handrail 3 is shown, but it is naturally possible to omit the handrail 3 and use the brace 4 alone.

この発明の先行筋交い手摺り8aは、上記のような構成であり、次に、この先行筋交い手摺り8aを用いた作業足場の組み立て方法を説明する。   The preceding barbed handrail 8a of the present invention has the above-described configuration. Next, a method for assembling a work scaffold using the preceding barbed handrail 8a will be described.

図2のように、両側に支柱1を所定のスパンで起立配置し、隣接する支柱1を布材で結合すると共に、布材間に足場板を架設して作業床を確保し、この作業床上に位置する作業者は先行筋交い手摺り8aを図1(b)のように下方に回動させた両筋交い4を保持して持ち上げ、両筋交い4の上端に設けた係止フック6を各支柱1における上位のホルダー2に係止し、これによって手摺り3を支柱1の上端間に架設状となるよう配置し、次に、各筋交い4の下端部に設けた係止金具7を上端の係止フック2と対角位置にある下位ホルダー2に対して固定し、両筋交い4をクロス状に配置することによって両側の支柱1を結合する。   As shown in FIG. 2, the struts 1 are arranged upright on both sides with a predetermined span, the adjacent struts 1 are joined with a cloth material, and a work board is secured between the cloth materials by securing a work floor. The operator located at the upper position holds and lifts the front bracing handrail 8a downwardly as shown in FIG. 1B, and lifts the locking hook 6 provided at the upper end of the both bracings 4 to each column. The handrail 3 is arranged so as to be bridged between the upper ends of the columns 1, and then, the locking metal fittings 7 provided at the lower ends of the braces 4 are It fixes with respect to the latching hook 2 and the lower holder 2 in a diagonal position, and the both struts 1 are joined by arranging both braces 4 in a cross shape.

図5(a)乃至(d)は、支柱1に対する先行筋交い手摺り8aの結合工程を順番に示し、図5(a)乃至(c)のように、両筋交い4を下方に回動させた先行筋交い手摺り8aにおいて、筋交い4の上端に設けた係止フック6の挿入片6aを支柱1における上位のホルダー2に上から挿入し、切り欠き部分6bをホルダー2の周壁部分に嵌め込むことにより、両側の支柱1間に手摺り3を水平に架設する。   FIGS. 5 (a) to 5 (d) sequentially show the joining process of the leading brace handrail 8a to the support column 1, and the both braces 4 are rotated downward as shown in FIGS. 5 (a) to 5 (c). In the leading bracing handrail 8a, the insertion piece 6a of the locking hook 6 provided at the upper end of the bracing 4 is inserted into the upper holder 2 of the column 1 from above, and the notch portion 6b is fitted into the peripheral wall portion of the holder 2. Thus, the handrail 3 is installed horizontally between the pillars 1 on both sides.

次に、筋交い4の下端部に設けた係止金具7のコ字状切り欠き7aを下位ホルダー2に外面から嵌め合わせ、図5(d)のように、係止具10を伏倒させて先端の下向き屈曲片がホルダー2の内面側に係合させることにより、係止金具7をホルダー2に対して固定する。   Next, the U-shaped notch 7a of the locking bracket 7 provided at the lower end of the brace 4 is fitted to the lower holder 2 from the outer surface, and the locking tool 10 is turned over as shown in FIG. 5 (d). The locking fitting 7 is fixed to the holder 2 by engaging the downward bent piece of the tip with the inner surface side of the holder 2.

このように、両側の支柱1を先行筋交い手摺り8aで結合すると、図2のように、両側の支柱1間に手摺り3が水平に架設され、筋交い4がクロス状の配置となって支柱1を結合する。   In this way, when the struts 1 on both sides are joined by the preceding bracing handrail 8a, the handrail 3 is installed horizontally between the struts 1 on both sides as shown in FIG. 2, and the bracing 4 becomes a cross-shaped arrangement. Combine 1

上記のように、足場や支保工の構築時において、組み立て作業を行う足場板の架設に先行して、その上部に手摺り3を配置することができ、足場や支保工の組み立て作業の安全性を向上させることができる。   As described above, when constructing a scaffold or a supporting work, the handrail 3 can be disposed on the upper part of the scaffolding plate prior to the construction of the scaffolding plate for the assembling work. Can be improved.

上記した先行筋交い手摺り8aによる支柱1の結合において、ホルダー2に対して固定した両側係止金具7の傾斜長孔12は、下端が相手係止金具7に接近する傾斜になっているので、この傾斜長孔12に貫通するピン13で結合されている筋交い4の下端部は、傾斜長孔12の範囲で上下動可能の状態になる。   In the coupling of the column 1 by the above-mentioned leading bar crossing handrail 8a, the inclined long hole 12 of the both-side locking bracket 7 fixed to the holder 2 is inclined so that the lower end approaches the mating locking bracket 7. The lower end portion of the brace 4 connected by the pin 13 penetrating the inclined long hole 12 is movable up and down within the range of the inclined long hole 12.

このため、対角位置の上下ホルダー2間に筋交い4を架設すると、筋交い4のピン13は対角位置のホルダー2の間隔に対応した条件の位置で傾斜長孔12の途中に当接して停止し、筋交い4は対角位置の上下ホルダー2間においてガタツキのない状態で両側支柱1を結合する。   For this reason, when the bracing 4 is installed between the upper and lower holders 2 at the diagonal position, the pin 13 of the bracing 4 stops in contact with the middle of the inclined elongated hole 12 at a position corresponding to the interval between the holders 2 at the diagonal position. The brace 4 joins the two struts 1 with no backlash between the upper and lower holders 2 at the diagonal positions.

このように、筋交い4と係止金具7の結合が、傾斜長孔12の範囲で相対的に上下動可能の状態になっていると、対角位置のホルダー2の間隔に対応した条件の位置で、ピン13が傾斜長孔12の側縁に対して自動的に当接し、筋交い4を支柱1間に遊びのない状態で掛け渡すことができ、支柱1に対するホルダー2の固定位置に精度的な寸法誤差がある場合でも、これを傾斜長孔12に対するピン13の停止位置の変動で吸収することができ、対角位置のホルダー2間において筋交い4は緊張状態となり、支柱1に加わる外力を筋交い4で受けることができ、従って、筋交い4による支柱1の結合強度を確実に得ることができ、強度的に優れた安全性の高い足場や支保工を組み立てることができる。   As described above, when the connection between the brace 4 and the locking fitting 7 is relatively movable up and down within the range of the inclined long hole 12, the position of the condition corresponding to the distance between the holders 2 at the diagonal positions is obtained. Thus, the pin 13 automatically abuts against the side edge of the inclined long hole 12, and the bracing 4 can be spanned between the support columns 1 without any play. Even if there is a large dimensional error, this can be absorbed by the change in the stop position of the pin 13 with respect to the inclined long hole 12, and the bracing 4 becomes tensioned between the holders 2 at the diagonal positions, and the external force applied to the column 1 is reduced. It can be received by the brace 4 and, therefore, the coupling strength of the strut 1 by the brace 4 can be obtained with certainty, and a highly secure scaffolding and support structure excellent in strength can be assembled.

(a)はこの発明にかかる先行筋交い手摺りの折畳み状態を示す正面図、(b)は同先行筋交い手摺りの筋交いを開いた状態を示す正面図(A) is a front view which shows the folding state of the hand brace handrail according to this invention, (b) is a front view which shows the state which opened the brace of the same hand brace handrail 先行筋交い手摺りの使用状態を示す作業足場の正面図Front view of the working scaffold showing the state of use of the handrail handrail (a)は先行筋交い手摺りの支柱への結合部分を示す正面図、(b)は同部分の分解斜視図(A) is a front view which shows the coupling | bond part to the support | pillar of a handrail crossing handrail, (b) is an exploded perspective view of the part (a)は係止金具の支柱への結合状態を拡大した正面図、(b)は係止金具の斜視図(A) is the front view which expanded the coupling state to the support | pillar of a latching metal, (b) is a perspective view of a latching metal. (a)乃至(d)のそれぞれは先行筋交い手摺りの支柱への結合工程を順番に示す説明図(A) thru | or (d) each is explanatory drawing which shows in order the coupling | bonding process to the support | pillar of a preceding bracing handrail 従来の先行筋交い手摺りの使用状態を示す作業足場の正面図Front view of the working scaffold showing the state of use of a conventional handrail crossing handrail

符号の説明Explanation of symbols

1 支柱
2 ホルダー
3 手摺り
4 筋交い
5 ピン
6 係止フック
7 係止金具
8a 先行筋交い手摺り
9 ピン
10 係止具
11 ブラケット
12 傾斜長孔
13 ピン
DESCRIPTION OF SYMBOLS 1 Support | pillar 2 Holder 3 Handrail 4 Bracing 5 Pin 6 Locking hook 7 Locking bracket 8a Leading bracing handrail 9 Pin 10 Locking tool 11 Bracket 12 Inclined slot 13 Pin

Claims (2)

上下に所定の間隔でホルダーが設けられ、両側に起立配置された支柱の対角位置にあるホルダー間に斜めに架設する筋交いであり、鋼管の一方端部に、対角位置にあるホルダーの上位ホルダーに対する係止フックを固定し、前記鋼管の他方端部に、対角位置にあるホルダーの下位ホルダーに対する係止金具を、この係止金具に設けた傾斜長孔を貫通するピンで、回動と傾斜長孔に沿う移動とが自在となるよう取付けた筋交い。   It is a brace that is installed diagonally between the holders at the diagonal positions of the pillars that are erected on both sides, with holders at predetermined intervals on the upper and lower sides, and at the upper end of the holder at the diagonal position at one end of the steel pipe Lock the hook to the holder, and turn the other end of the steel pipe to the lower bracket of the holder at the diagonal position with the pin that penetrates the slanted long hole provided in this bracket. And braces attached so that movement along the slanted long hole is free. 上下に所定の間隔でホルダーが設けられ、両側に起立配置された支柱間に水平に配置する手摺りの両端に、両側支柱の対角位置にあるホルダー間に斜めに架設する筋交いの上端部を枢止して形成され、前記筋交いが、鋼管の一方端部に、対角位置にあるホルダーの上位ホルダーに対する係止フックを固定し、前記鋼管の他方端部に、対角位置にあるホルダーの下位ホルダーに対する係止金具を、この係止金具に設けた傾斜長孔を貫通するピンで、回動と傾斜長孔に沿う移動とが自在となるよう取付けて形成されている先行筋交い手摺り。   Holders are provided at predetermined intervals on the top and bottom, and the upper ends of the braces that are diagonally installed between the holders at the diagonal positions of the both-side columns are attached to both ends of the handrails that are horizontally disposed between the columns that are erected on both sides. The bracing is formed, and the bracing is fixed to one end of the steel pipe with a locking hook for the upper holder of the holder in the diagonal position, and the other end of the steel pipe is fixed to the diagonal position of the holder. A handrail crossing handrail that is formed by attaching a locking bracket to the lower holder with a pin that penetrates the inclined long hole provided in the locking bracket so as to freely rotate and move along the inclined long hole.
JP2004367644A 2004-12-20 2004-12-20 Braces and handrails with preceding braces using this Active JP4608305B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004367644A JP4608305B2 (en) 2004-12-20 2004-12-20 Braces and handrails with preceding braces using this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004367644A JP4608305B2 (en) 2004-12-20 2004-12-20 Braces and handrails with preceding braces using this

Publications (2)

Publication Number Publication Date
JP2006169919A true JP2006169919A (en) 2006-06-29
JP4608305B2 JP4608305B2 (en) 2011-01-12

Family

ID=36670961

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004367644A Active JP4608305B2 (en) 2004-12-20 2004-12-20 Braces and handrails with preceding braces using this

Country Status (1)

Country Link
JP (1) JP4608305B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009150197A (en) * 2007-12-19 2009-07-09 Tootekkusu:Kk Preceding handrail with bracing
JP2010242424A (en) * 2009-04-08 2010-10-28 Hory Corp Temporary scaffold for outside angle and construction method therefor
JP2011099234A (en) * 2009-11-05 2011-05-19 Daisan:Kk Above-eaves construction method
JP2012087595A (en) * 2010-10-22 2012-05-10 Krh Kk Brace for temporary scaffold
JP2012087596A (en) * 2010-10-22 2012-05-10 Krh Kk Brace for temporary scaffold
JP2015004261A (en) * 2013-06-21 2015-01-08 光洋機械産業株式会社 Handrail for temporary scaffold
CN115290502A (en) * 2022-08-02 2022-11-04 中煤科工集团重庆研究院有限公司 Method for rapidly determining gas content of coal seam under critical gas pressure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035135B (en) * 2017-04-26 2019-05-21 上海森大机械制造有限公司 A kind of door-type scaffold

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0416241U (en) * 1990-05-30 1992-02-10
JPH09268755A (en) * 1996-03-28 1997-10-14 Daisan:Kk Stile for protection of temporary scaffolding
JP2001200632A (en) * 2000-01-20 2001-07-27 Asahi Sangyo Kk Construction method for temporary structure
JP2003090131A (en) * 2001-09-17 2003-03-28 Eagle Kuranpu Kk Beam fall preventing device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0416241U (en) * 1990-05-30 1992-02-10
JPH09268755A (en) * 1996-03-28 1997-10-14 Daisan:Kk Stile for protection of temporary scaffolding
JP2001200632A (en) * 2000-01-20 2001-07-27 Asahi Sangyo Kk Construction method for temporary structure
JP2003090131A (en) * 2001-09-17 2003-03-28 Eagle Kuranpu Kk Beam fall preventing device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009150197A (en) * 2007-12-19 2009-07-09 Tootekkusu:Kk Preceding handrail with bracing
JP4567723B2 (en) * 2007-12-19 2010-10-20 株式会社トーテックス Handrail with hand delivery
JP2010242424A (en) * 2009-04-08 2010-10-28 Hory Corp Temporary scaffold for outside angle and construction method therefor
JP2011099234A (en) * 2009-11-05 2011-05-19 Daisan:Kk Above-eaves construction method
JP2012087595A (en) * 2010-10-22 2012-05-10 Krh Kk Brace for temporary scaffold
JP2012087596A (en) * 2010-10-22 2012-05-10 Krh Kk Brace for temporary scaffold
JP2015004261A (en) * 2013-06-21 2015-01-08 光洋機械産業株式会社 Handrail for temporary scaffold
CN115290502A (en) * 2022-08-02 2022-11-04 中煤科工集团重庆研究院有限公司 Method for rapidly determining gas content of coal seam under critical gas pressure

Also Published As

Publication number Publication date
JP4608305B2 (en) 2011-01-12

Similar Documents

Publication Publication Date Title
JP4567432B2 (en) Slope work floor construction system, work floor construction device and work floor panel
JP4608305B2 (en) Braces and handrails with preceding braces using this
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
JP3892710B2 (en) Method and apparatus for attaching pipe structure to temporary scaffold
JP3907367B2 (en) Construction method of temporary structure
JP4204605B2 (en) Assembly scaffold
JP3143339U (en) Scaffold auxiliary material mounting bracket
JP3400794B2 (en) Temporary members for handrails
JP6874243B1 (en) Temporary scaffolding cane
JP2011099259A (en) Fitting for attaching baseboard
JP2005336742A (en) Earthquake resisting device of building
JP2023117755A (en) Suspension scaffold
KR200491378Y1 (en) Supporter for safety foot plate and scaffolding
JP5485579B2 (en) Temporary scaffold for exit corner and its construction method
JPH0533623Y2 (en)
JP6276073B2 (en) Widening / narrowing scaffolding member and temporary scaffolding incorporating this scaffolding member
JP2500350Y2 (en) Building frame holder for handrail frame for temporary scaffolding
JP3863883B2 (en) Fabric board support and combination framework scaffold
JP4083709B2 (en) Temporary scaffolding fixture
JP3132993U (en) Wooden building coupler
JP5930202B2 (en) Hardware for mounting the handrail pillar formwork
JP2022139622A (en) Preceding brace for single-pipe scaffolding, and temporary scaffolding
JP2010248881A (en) Temporary scaffolding and temporary scaffolding member fitting
KR100520720B1 (en) Side reinforcement structure of steel sheeting fof construction
JP2005299172A (en) Bracket for handrail strut, preceding handrail assembly set and framework scaffold

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071218

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100625

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100629

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100816

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100914

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101008

R150 Certificate of patent or registration of utility model

Ref document number: 4608305

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131015

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250