CN219175814U - Adjustable overhanging operation platform - Google Patents

Adjustable overhanging operation platform Download PDF

Info

Publication number
CN219175814U
CN219175814U CN202320303712.5U CN202320303712U CN219175814U CN 219175814 U CN219175814 U CN 219175814U CN 202320303712 U CN202320303712 U CN 202320303712U CN 219175814 U CN219175814 U CN 219175814U
Authority
CN
China
Prior art keywords
horizontal
overhanging
overturning
rod
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320303712.5U
Other languages
Chinese (zh)
Inventor
李梦
李东良
匡伟
周国民
武哲超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202320303712.5U priority Critical patent/CN219175814U/en
Application granted granted Critical
Publication of CN219175814U publication Critical patent/CN219175814U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The adjustable overhanging operation platform is arranged between the upper floor supporting plate and the lower floor supporting plate, comprises an anti-overturning upright post and at least two horizontal overhanging rods arranged on the anti-overturning upright post, one end of each horizontal overhanging rod is fixed with the anti-overturning upright post, the other end of each horizontal overhanging rod is overhanging outside a building, the overhanging operation platform is arranged at the end part of each overhanging outside the building, and each overhanging operation platform comprises a connecting rod arranged between the horizontal overhanging rods and a railing arranged on each horizontal overhanging rod; the horizontal cantilever rod is connected with the anti-overturning upright post through lower horizontal round steel, and two ends of the lower horizontal round steel respectively penetrate through the horizontal cantilever rod and the anti-overturning upright post and then are connected through bolts, and the bolts are fixed on horizontal rod adjustable hole sites on the horizontal cantilever rod at intervals. The anti-overturning upright post is connected with the adjustable bracket, can be adjusted according to different structure heights, and is tightly jacked on the upper and lower layers of structural plates or structural beams of the main structure, so that the stability is enhanced.

Description

Adjustable overhanging operation platform
Technical Field
The application relates to the field of building construction, in particular to an adjustable overhanging operation platform.
Background
The prior patent with publication number CN115324321A proposes a telescopic quick-dismantling overhanging operation platform for elevator track installation and a construction method. The telescopic overhanging operation platform provided by the operation platform not only avoids the situation that the bracket is built again in the hoistway, but also optimizes the defect that the traditional overhanging operation platform is built only once, and is quickly installed at the hoistway opening without affecting other constructions in the hoistway, so that the telescopic overhanging operation platform is suitable for constructions such as guide rail brackets and car installation in all elevator hoistways, and is especially suitable for working conditions in high-rise structure hoistways, wherein the brackets are not suitable for being built again. The platform has no safety protection measures and is only suitable for the operation of an elevator shaft, and is limited.
Disclosure of Invention
The utility model aims to provide an adjustable overhanging operation platform, which solves the problem of local construction operation when no operation frame exists on the outer vertical surface of a building and the problem of high-altitude dismantling of I-steel when a traditional I-steel overhanging frame is erected by using a simple and shaped overhanging operation platform.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an adjustable operation platform that encorbelments locates between upper floor's carrier plate and the lower floor's carrier plate, its characterized in that: the anti-overturning device comprises an anti-overturning upright post and at least two horizontal cantilever rods arranged on the anti-overturning upright post, wherein one end of each horizontal cantilever rod is fixed with the anti-overturning upright post, the other end of each horizontal cantilever rod is overhanging outside a building, and an overhanging operation platform is arranged at the end of each overhanging part outside the building and comprises a connecting rod arranged between the horizontal cantilever rods and a railing arranged on the horizontal cantilever rods; the horizontal cantilever rod is connected with the anti-overturning upright post through lower horizontal round steel, two ends of the lower horizontal round steel respectively penetrate through the horizontal cantilever rod and the anti-overturning upright post and then are connected through bolts, and the bolts are fixed on horizontal rod adjustable hole sites on the horizontal cantilever rod at intervals.
Further preferably, the bottom of the anti-overturning upright post is provided with an adjustable bracket, the adjustable bracket comprises a bottom plate arranged on the bottom surface of the anti-overturning upright post, a nut welded and fixed on the bottom plate and a screw rod connected with the nut in a threaded manner, and the bottom of the screw rod is provided with a supporting plate.
Further, the top surface of the anti-overturning upright post is provided with a top plate, and the top plate is abutted to the bottom surface of the upper floor support plate.
Further, four anti-overturning upright posts are arranged, upper horizontal round steel is further arranged between every two adjacent anti-overturning upright posts, and two ends of the upper horizontal round steel respectively penetrate through the anti-overturning upright posts and are connected through bolts.
In addition, two the horizontal cantilever rods are respectively attached to the two anti-overturning upright posts on two sides, and the railing encloses into a U-shaped structure with an opening facing the inside of the building structure.
More preferably, the screw is welded and fixed with a knob.
Compared with the prior art, the utility model has the following characteristics and beneficial effects:
the adjustable hole sites are arranged on the upper horizontal round steel, the lower horizontal round steel and the horizontal cantilever rod, so that the cantilever frame body can be adjusted in size, and the cantilever frame body is ensured to be suitable for different structural modeling sizes; the anti-overturning upright post is connected with the adjustable bracket, can be adjusted according to different structure heights, and is tightly propped against the upper and lower layers of structural plates or structural beams of the main structure, so that the stability is enhanced.
Drawings
FIG. 1 is a schematic view of an adjustable overhanging operation platform;
FIG. 2 is a side view of the adjustable overhanging operating platform of the present application;
fig. 3 is a schematic perspective view of an adjustable overhanging operation platform.
Detailed Description
The present utility model will be further described below in order to make the technical means, innovative features, achieved objects and effects achieved by the present utility model easy to understand.
The examples described herein are specific embodiments of the present utility model, which are intended to illustrate the inventive concept, are intended to be illustrative and exemplary, and should not be construed as limiting the utility model to the embodiments and scope of the utility model. In addition to the embodiments described herein, those skilled in the art can adopt other obvious solutions based on the disclosure of the claims and specification of the present application, including those adopting any obvious substitutions and modifications to the embodiments described herein.
An adjustable overhanging operation platform is shown in fig. 1 and 2, is arranged between an upper floor supporting plate 1 and a lower floor supporting plate 2, comprises an anti-overturning upright post 10 and at least two horizontal overhanging rods 3 arranged on the anti-overturning upright post 10, one end of each horizontal overhanging rod 3 is fixed with the anti-overturning upright post 10, the other end of each horizontal overhanging rod is overhanging outside a building, an overhanging operation platform 4 is arranged at the end of each overhanging operation platform outside the building, and each overhanging operation platform 4 comprises a connecting rod arranged between the corresponding horizontal overhanging rods 3 and a railing arranged on each horizontal overhanging rod 3; the horizontal cantilever rod 3 is connected with the anti-overturning upright post 10 through the lower horizontal round steel 5, two ends of the lower horizontal round steel 5 respectively penetrate through the horizontal cantilever rod 3 and the anti-overturning upright post 10 and then are connected through the bolt 6, the bolt 6 is fixed on a horizontal rod adjustable hole site which is arranged on the horizontal cantilever rod 3 at intervals, and a plurality of adjustable hole sites are arranged on the horizontal cantilever rod 3, the lower horizontal round steel 5 and the lower horizontal round steel 5.
The bottom of the anti-overturning upright post 10 is provided with an adjustable bracket 8, the adjustable bracket 8 comprises a bottom plate 81 arranged on the bottom surface of the anti-overturning upright post 10, a nut 82 welded and fixed on the bottom plate 81 and a screw 83 connected to the nut 82 in a threaded manner, and a supporting plate 84 is arranged at the bottom of the screw 83.
The top surface of the anti-overturning upright post 10 is provided with a top plate 11, the top plate 11 is abutted to the bottom surface of the upper floor support plate 1, four anti-overturning upright posts 10 are arranged, an upper horizontal round steel 9 is further arranged between the adjacent anti-overturning upright posts 10, and two ends of the upper horizontal round steel 9 respectively penetrate through the anti-overturning upright posts 10 and are connected through bolts 6.
The two horizontal cantilever rods 3 are respectively attached to the anti-overturning upright posts 10 on two sides, the railing 42 encloses a U-shaped structure with an opening facing the inside of the building structure, a knob part is fixedly welded on the screw 83, and the knob part is used for providing holding sites for knob tools.
Specifically, as shown in fig. 3, the adjustable overhanging operation platform comprises a finalized overhanging operation platform which can stand for outdoor operation, an overhanging platform is placed to overturn, an anti-overturning upright post for providing stress support for the overhanging platform, an adjustable bracket for adjusting the upright post to ensure the top and bottom of the upright post to be tightly propped against the structure according to the height of an indoor structure, a stable horizontal round steel for enhancing the stability of the upright post, an adjustable hole bolt for adjusting the size of a frame body according to construction needs and fixing the frame body by adopting a bolt, a horizontal rod adjustable hole site and an adjustable hole site of the overhanging operation platform.
The cantilever operation platform consists of two main stress components, three sides of the cantilever operation platform are protected by adopting small square steel to ensure safety, the square steel is welded as a platform for personnel to stand according to the size requirement, and the cantilever operation platform is integrally connected in a welded mode. Offer adjustable hole site and prevent toppling the stand and be connected, connect and adopt adjustable hole bolt to connect, improve whole stable and can adjust by oneself according to the structural style, prevent toppling the stand and adopt steel sheet and square steel stand welding from top to bottom, increase the building area with the structure, the atress is steady. The lower part is connected with the adjustable bracket, and the height of the adjustable bracket is adjusted, so that the adjustable bracket is tightly propped against the structure, and the upright post is stable. To increase the stability of the platform and the upright posts, and connect the platform and the upright posts into a stable frame body. The device is provided with the dimensionally stable horizontal round steel, the dimensionally stable horizontal round steel is provided with the horizontal rod adjustable hole site, and the device can be synchronously adjusted with the overhanging operation platform adjustable hole site of the overhanging operation platform, so that the overhanging platform can be adjusted according to the structure. The component of this patent design is all portable and turnover is used.
1) According to the anti-overturning vertical column, the overhanging operation platform and the maintenance and stability horizontal round steel hole opening mode, the rear support frame body of the overhanging platform can be adjusted, and therefore the situation of single size is avoided;
2) In the application, the cantilever operation platform is adopted to solve the problem of local construction operation when the outer vertical surface of the building has no operation frame and the problem of high-altitude dismantling of the I-steel when the traditional I-steel cantilever frame is erected, so that the safety of construction operation is enhanced, and the operation safety of operators is ensured;
3) The application adopts the formalized form, sets up adjustable hole site, can assemble on the spot, and can turnover use, save material.
The utility model is not related in part to the same as or can be practiced with the prior art.
While the fundamental and principal features of the utility model and advantages of the utility model have been shown and described, it will be apparent to those skilled in the art that the utility model is not limited to the details of the foregoing exemplary embodiments, but may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (6)

1. An adjustable operation platform that encorbelments locates between upper floor's carrier plate (1) and lower floor's carrier plate (2), its characterized in that: the anti-overturning vertical column (10) and at least two horizontal cantilever rods (3) arranged on the anti-overturning vertical column (10), wherein one end of each horizontal cantilever rod (3) is fixed with the anti-overturning vertical column (10), the other end of each horizontal cantilever rod is overhanging outside a building, an overhanging operation platform (4) is arranged at the end of each overhanging part outside the building, and each overhanging operation platform (4) comprises a connecting rod arranged between the corresponding horizontal cantilever rods (3) and a railing arranged on each horizontal cantilever rod (3); the horizontal cantilever rod (3) is connected with the anti-overturning upright post (10) through the lower horizontal round steel (5), two ends of the lower horizontal round steel (5) respectively penetrate through the horizontal cantilever rod (3) and the anti-overturning upright post (10) and then are connected through the bolt (6), and the bolt (6) is fixed on a horizontal rod adjustable hole site arranged on the horizontal cantilever rod (3) at intervals.
2. An adjustable overhanging operation platform according to claim 1, characterized in that: the anti-overturning upright post (10) bottom is provided with an adjustable bracket (8), the adjustable bracket (8) comprises a bottom plate (81) arranged on the bottom surface of the anti-overturning upright post (10), a nut (82) welded and fixed on the bottom plate (81) and a screw rod (83) connected onto the nut (82) in a threaded mode, and a supporting plate (84) is arranged at the bottom of the screw rod (83).
3. An adjustable overhanging operation platform according to claim 1, characterized in that: the top surface of the anti-overturning upright post (10) is provided with a top plate (11), and the top plate (11) is abutted to the bottom surface of the upper floor support plate (1).
4. An adjustable overhanging operation platform according to claim 1, characterized in that: four anti-overturning upright posts (10) are arranged, upper horizontal round steels (9) are arranged between every two adjacent anti-overturning upright posts (10), and two ends of each upper horizontal round steel (9) respectively penetrate through the corresponding anti-overturning upright posts (10) and are connected through bolts (6).
5. An adjustable overhanging operation platform according to claim 1, characterized in that: the two horizontal cantilever rods (3) are respectively attached to the two anti-overturning upright posts (10) on the two sides, and the railing (42) encloses a U-shaped structure with an opening facing the inside of the building structure.
6. An adjustable overhanging operation platform according to claim 2, characterized in that: the screw (83) is fixedly welded with a knob part.
CN202320303712.5U 2023-02-24 2023-02-24 Adjustable overhanging operation platform Active CN219175814U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320303712.5U CN219175814U (en) 2023-02-24 2023-02-24 Adjustable overhanging operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320303712.5U CN219175814U (en) 2023-02-24 2023-02-24 Adjustable overhanging operation platform

Publications (1)

Publication Number Publication Date
CN219175814U true CN219175814U (en) 2023-06-13

Family

ID=86675882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320303712.5U Active CN219175814U (en) 2023-02-24 2023-02-24 Adjustable overhanging operation platform

Country Status (1)

Country Link
CN (1) CN219175814U (en)

Similar Documents

Publication Publication Date Title
WO2023082828A1 (en) Integral duplex lifting device and method for using same
CN113404281A (en) Climbing type scaffold, climbing and mounting method thereof and construction method of fabricated building
CN216076228U (en) Rail mounted hanging flower basket support device
CN110565937A (en) Door type integral lifting steel platform
CN213626572U (en) Tool type external cantilever operation platform
CN219175814U (en) Adjustable overhanging operation platform
CN111847242A (en) Special trolley for mounting movable adjustable sliding contact line
CN209741895U (en) Connection structure of assembled elevator steel construction and base
CN212613656U (en) Elevator shaft support
CN212151231U (en) A general protection platform of floor for construction elevator
CN212714563U (en) Fast-assembling recyclable pier body template combined operation platform
CN212245942U (en) Special trolley for mounting movable adjustable sliding contact line
CN211257773U (en) Door type integral lifting steel platform
CN212478487U (en) Construction platform for building construction
CN109372242B (en) Elevator shaft construction safety lifting platform device and using method
CN113202280A (en) Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
CN216587576U (en) Truss overhauls platform
CN217299928U (en) Outer frame faces limit protective structure
CN220645132U (en) Climbing frame device
CN211421976U (en) Steel structure corridor type platform for train loading operation
CN217998662U (en) Can dismantle step ladder of turnover use
CN213774374U (en) Support for installing reinforcing steel bars
CN213555003U (en) Safety belt hanging support
CN219431321U (en) Adjustable operation platform for elevator well construction
CN219652554U (en) Maintenance platform for attachment device of folding support tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant