Construction method for opening part in existing masonry construction wall

Info

Publication number
JP2002242452A
JP2002242452A JP2001037432A JP2001037432A JP2002242452A JP 2002242452 A JP2002242452 A JP 2002242452A JP 2001037432 A JP2001037432 A JP 2001037432A JP 2001037432 A JP2001037432 A JP 2001037432A JP 2002242452 A JP2002242452 A JP 2002242452A
Authority
JP
Japan
Prior art keywords
wall
opening
existing
brick wall
masonry wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001037432A
Other languages
Japanese (ja)
Other versions
JP3707006B2 (en
Inventor
Yukito Nanbu
幸仁 南部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2001037432A priority Critical patent/JP3707006B2/en
Publication of JP2002242452A publication Critical patent/JP2002242452A/en
Application granted granted Critical
Publication of JP3707006B2 publication Critical patent/JP3707006B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0274Temporary shoring of wall opening

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for constructing an opening for a window or an entrance/exit in an existing masonry construction wall. SOLUTION: Multiple through holes 4 are horizontally formed in a line in the existing brick wall 1, two C-shaped channels 6 are laterally disposed on the front/rear of the existing brick wall 1 in such a state as matching their holes to each other, a PC(Prestressed Concrete) steel bar 7 is inserted into the holes of one C-shaped channel 6, the established brick wall 1, and the other C-shaped channel 6 in this order, the PC steel bar 7 is tensed by a hydraulic jack so as to shorten the interval between the C-shaped channels 6 and fixed by nuts 8, and a part of the existing brick wall 1 is pressurized by and supported to the pair of front/rear C-shaped channels 6. The all the bricks 1a positioned in a planned opening part 3 are removed by being cut by a cutter along a cutting line 2 so as to form a large opening 9 for working. Concrete 10 is placed in the appearing end faces of the existing brick wall 1 and an opening 12 having lintel 11 in its upper part is formed in the existing brick wall 1. The pair of front/rear C-shaped channels 6 are removed, and the through hole 4 is filled so that the construction of the opening 12 in the existing brick wall is completed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、レンガ、コンク
リートブロック、石などの壁構造材を組み上げて形成さ
れている崩れ易い組積造りの既設壁に、窓や出入口とな
る開口部を新たに形成する方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a new masonry wall, which is formed by assembling wall structural materials such as bricks, concrete blocks, and stones. How to do it.

【0002】[0002]

【従来の技術】従来は、例えば図2(A)に示したよう
に、既設組積造壁が既設レンガ壁1であるときには、そ
の既設レンガ壁1が崩れ落ちることがないように縦長の
作業用小開口21を適宜の間隔(例えば1m程度)に形
成し、その作業用小開口21の上方のレンガ1aをH型
鋼22と支保工23とで支持して作業用小開口21の側
方にあるレンガ1aを取り除き、図2(B)に示したよ
うな作業用大開口9を形成する。そして、さらに図2
(C)に示したようにその作業用大開口9の周囲に鉄筋
10Aおよび図示しない型枠を配してコンクリート10
を打設し、窓、出入口などとする上部にまぐさ11を備
えた開口12を形成している。
2. Description of the Related Art Conventionally, as shown in FIG. 2 (A), when an existing masonry wall is an existing brick wall 1, a vertically long work wall is used so that the existing brick wall 1 does not collapse. The small openings 21 are formed at appropriate intervals (for example, about 1 m), and the brick 1a above the small working opening 21 is supported by the H-shaped steel 22 and the shoring 23 to be on the side of the small working opening 21. The brick 1a is removed to form a large working opening 9 as shown in FIG. And further, FIG.
As shown in (C), a reinforcing bar 10A and a formwork (not shown) are arranged around the large opening 9 for work and concrete 10
Is formed, and an opening 12 having a lintel 11 is formed at an upper portion such as a window or an entrance.

【0003】[0003]

【発明が解決しようとする課題】しかし、上記従来の施
工方法においては、既設の組積造壁を2度に分けて取
り除かねばならない、既設組積造壁に設けた作業用大
開口にはH型鋼と支保工とがあるため、まぐさを形成す
る際に邪魔で作業がし難いだけでなく、収まりも悪い、
などと云った問題点があったので、これら問題点を解決
する必要があった。
However, in the above-mentioned conventional construction method, the existing masonry wall has to be separated and removed twice. Because there is a mold steel and a shoring, not only is it difficult to work due to obstruction when forming the lintel, but also the fit is poor,
There were problems such as the above, so it was necessary to solve these problems.

【0004】[0004]

【課題を解決するための手段】この発明は上記従来技術
の問題点を解決するためになされたもので、第1の発明
は、レンガ、コンクリートブロックなどの壁構造材を組
み上げて形成した既設組積造壁の表裏に配設する一対の
横置長尺部材により組積造壁の一部の壁構造材を両面か
ら押圧支持した後、横置長尺部材により押圧支持された
壁構造材の下方に位置する壁構造材を除去して既設組積
造壁に開口部を形成することを特徴とする既設組積造壁
における開口部の新設方法である。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems of the prior art, and a first invention is an existing assembly formed by assembling a wall structural material such as a brick or a concrete block. After pressing and supporting a part of the wall structure material of the masonry wall from both sides by a pair of horizontal elongate members disposed on the front and back of the masonry wall, the wall structural material pressed and supported by the horizontal elongate member A new method of installing an opening in an existing masonry wall, wherein an opening is formed in the existing masonry wall by removing a wall structural member located below.

【0005】第2の発明は、前記第1の発明において、
横置長尺部材の壁構造材に対する押圧力を、既設組積造
壁を貫通して配設されて一対の横置長尺部材と係合する
押圧力付与部材により付与するようにしたことを特徴と
する既設組積造壁における開口部の新設方法である。
According to a second aspect, in the first aspect,
The pressing force applied to the wall structural member of the horizontal elongate member is provided by a pressing force applying member that is disposed through the existing masonry wall and engages with the pair of horizontal elongate members. This is a new method of installing an opening in an existing masonry wall.

【0006】第3の発明は、前記第1または第2の発明
において、壁構造材が除去されて形成される既設組積造
壁の開口端面部に鉄筋コンクリートを打設するようにし
たことを特徴とする既設組積造壁における開口部の新設
方法である。
A third invention is characterized in that, in the first or second invention, reinforced concrete is poured into an opening end face of an existing masonry wall formed by removing a wall structural material. This is a new method of installing an opening in an existing masonry wall.

【0007】第4の発明は、前記第3の発明において、
鉄筋コンクリートの打設後、一対の横置長尺部材を撤去
するようにしたことを特徴とする既設組積造壁における
開口部の新設方法である。
According to a fourth aspect, in the third aspect,
A method of newly forming an opening in an existing masonry wall, wherein a pair of horizontally long members are removed after the reinforced concrete is cast.

【0008】[0008]

【発明の実施の形態】以下、この発明の一実施形態を図
1に基づいて詳細に説明する。なお、理解を容易にする
ため、この図1においても前記図2において説明した部
分と同様の機能を有する部分には、同一の符号を付し
た。また、既設組積造壁は、既設レンガ壁1であるとし
て説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to FIG. Note that, in order to facilitate understanding, in FIG. 1 also, portions having the same functions as the portions described in FIG. 2 are denoted by the same reference numerals. Moreover, the existing masonry wall is described as the existing brick wall 1.

【0009】先ず、図1(A)に示したように、後に切
断除去することになる既設レンガ壁1の切断部位を示す
切断線2によって囲われた開口予定部3の上方に、複数
個の貫通穴4を適宜の間隔で水平方向に列設する。
First, as shown in FIG. 1 (A), a plurality of bricks 1 are to be cut and removed later. The through holes 4 are arranged horizontally at appropriate intervals.

【0010】そして、貫通穴4と同一ピッチに貫通長穴
5が長手方向に列設された実質的に剛体からなる2本の
C型チャンネル材6を、穴同士が一致するように既設レ
ンガ壁1の表裏に横置き配置し、押圧力付与部材として
機能させるPC鋼棒7を一方のC型チャンネル材6の貫
通長穴5、既設レンガ壁1の貫通穴4、他方のC型チャ
ンネル材6の貫通長穴5の順に刺し通し、表裏に配置し
た一対のC型チャンネル材6同士の間隔が狭まるよう
に、図示しない油圧ジャッキを用いてPC鋼棒7を所定
の応力に緊張した後ナット8で緊締固定し、表裏両側に
配置した一対のC型チャンネル材6により既設レンガ壁
1の一部、すなわち開口予定部3上方のレンガ1aを押
圧支持する。
Then, two substantially C-shaped channel members 6 each formed of a rigid body and having elongated through-holes 5 arranged in the longitudinal direction at the same pitch as the through-holes 4 are connected to the existing brick wall so that the holes are aligned with each other. 1, a PC steel rod 7 to be placed horizontally on the front and back and functioning as a pressing force applying member is provided with a through-hole 5 of one C-shaped channel material 6, a through-hole 4 of an existing brick wall 1, and another C-shaped channel material 6. Then, the PC steel rod 7 is tensioned to a predetermined stress by using a hydraulic jack (not shown) so that the distance between the pair of C-shaped channel members 6 arranged on the front and back sides is narrowed. Then, a part of the existing brick wall 1, that is, the brick 1a above the opening portion 3 is pressed and supported by the pair of C-shaped channel members 6 arranged on both sides.

【0011】表裏一対のC型チャンネル材6によって既
設レンガ壁1の一部のレンガ1aを所定の力で押圧支持
した後、図1(B)に示したように、切断線2に沿って
既設レンガ壁1をカッター切断などにより開口予定部3
にある全てのレンガ1aを除去し、作業用大開口9を形
成する。
After a part of the brick 1a of the existing brick wall 1 is pressed and supported by a predetermined force by a pair of front and back C-shaped channel members 6, as shown in FIG. Expected opening 3 of brick wall 1 by cutter cutting
, All the bricks 1a are removed to form a large working opening 9.

【0012】さらに、図1(C)に示したように、カッ
ター切断などによりレンガ1aが除去されて出現した既
設レンガ壁1の端面部に鉄筋10Aおよび図示しない型
枠を配した後にコンクリート10を打設し、上部にまぐ
さ11が設けられた開口12を既設レンガ壁1に形成す
る。
Further, as shown in FIG. 1 (C), after arranging a reinforcing bar 10A and a not-shown formwork on the end face of the existing brick wall 1 where the brick 1a has been removed by cutting with a cutter or the like, the concrete 10 is removed. The brick 12 is cast, and an opening 12 provided with a lintel 11 is formed in the existing brick wall 1.

【0013】そして、打設したコンクリート10が硬化
し、所定の強度が発現するのを待って表裏一対のC型チ
ャンネル材6を撤去し、貫通穴4を埋めて既設レンガ壁
1に対する開口12の新設施工を終了する。
After the cast concrete 10 has hardened and a predetermined strength has been developed, the pair of front and back C-shaped channel members 6 are removed, the through holes 4 are filled, and the openings 12 for the existing brick wall 1 are formed. New construction is completed.

【0014】なお、本発明は上記実施形態に限定される
ものではないので、特許請求の範囲に記載の趣旨から逸
脱しない範囲で各種の変形実施が可能である。
Since the present invention is not limited to the above embodiment, various modifications can be made without departing from the spirit of the appended claims.

【0015】例えば、両端部に位置する穴5、4、5の
代替としてケミカルアンカーを施工し、中央部側に位置
する穴5、4、5には押圧力付与部材として機能するP
C鋼棒7を刺し通してナット8により緊締固定し、開口
予定部3の中央部側のレンガ1aを重点的に押圧支持し
て開口予定部3上方のレンガ1aが崩れ落ちないように
構成することもできる。
For example, chemical anchors are provided in place of the holes 5, 4, 5 located at both ends, and P, which functions as a pressing force applying member, is provided in the holes 5, 4, 5 located at the center.
The C steel rod 7 is pierced and tightened and fixed by the nut 8, and the brick 1a at the center of the planned opening 3 is pressed and supported so that the brick 1a above the planned opening 3 does not collapse. Can also.

【0016】このようなC型チャンネル材6の取り付け
方法を採用すると、全て部位の穴に押圧力付与部材とし
て機能させるPC鋼棒7を刺し通してナット8により緊
締固定する方法に比べると、両端部のケミカルアンカー
によりC型チャンネル材6の取り付け/取り外しが速や
かに行えるようになる。また、貫通穴の数が減少するの
で、工期が短縮できる。
When such a mounting method of the C-shaped channel member 6 is adopted, both ends are compared with a method in which a PC steel rod 7 functioning as a pressing force applying member is pierced into all holes and the nut 8 is tightly fixed. The C-channel material 6 can be quickly attached / detached by the chemical anchor of the portion. Further, since the number of through holes is reduced, the construction period can be shortened.

【0017】また、C型チャンネル材6は、通常は開口
予定部3のスパンより多少長いものを使用して、開口予
定部3上方のレンガ1aを確実に押圧支持できるように
するのが好ましい。
It is preferable to use a C-shaped channel member 6 which is usually slightly longer than the span of the opening 3 so that the brick 1a above the opening 3 can be reliably pressed and supported.

【0018】また、C型チャンネル材6とレンガ1aと
の間に、フェルト、不織布、硬質ゴムなどのような可撓
性と多少の圧縮性を備えたシートを介在させて、表裏一
対のC型チャンネル材6とレンガ1aとの密着性を改善
し、これによりC型チャンネル材6によるレンガ1aに
対する押圧支持性を高めるようにしても良い。
Between the C-shaped channel member 6 and the brick 1a, a sheet having flexibility and some compressibility such as felt, non-woven fabric, hard rubber, etc. is interposed to form a pair of front and back C-shaped members. The adhesion between the channel material 6 and the bricks 1a may be improved, so that the C-type channel material 6 may enhance the pressing support of the bricks 1a.

【0019】また、この開口部の新設方法は、レンガを
積み上げたレンガ壁だけでなく、コンクリートブロック
や石などを積み上げて形成した壁にももちろん適用でき
る。
The method of newly forming the opening can be applied not only to a brick wall having bricks stacked thereon but also to a wall formed by stacking concrete blocks or stones.

【0020】さらに、仮設補強だけでなく、本設補強に
利用することなども可能である。
Further, the present invention can be used not only for temporary reinforcement but also for permanent reinforcement.

【0021】[0021]

【発明の効果】以上説明したように、本発明は既設組積
造壁の表裏に配置した一対の押圧部材によって一部の壁
構造材を押圧支持した後、その下方の壁構造材を除去し
て開口を形成する方法であるので、壁構造材の除去が一
度に行えるので作業効率が良い。
As described above, according to the present invention, after a part of the wall structural member is pressed and supported by the pair of pressing members arranged on the front and back of the existing masonry wall, the wall structural member below the part is removed. This is a method of forming an opening, so that the wall structure material can be removed at one time, so that the working efficiency is good.

【0022】しかも、広いスパンで壁構造材を除去して
も既設の組積造壁は崩れることはないし、開口の上部に
まぐさを形成するための鉄筋および型枠を組むときにも
邪魔になるものがないので作業は一層速やかに行える。
Moreover, even if the wall structural material is removed over a wide span, the existing masonry wall does not collapse, and it does not hinder the assembly of reinforcing bars and formwork for forming a lintel over the opening. Since there is nothing to do, the work can be performed more quickly.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の一実施形態を示す説明図である。FIG. 1 is an explanatory diagram showing one embodiment of the present invention.

【図2】 従来技術を示す説明図である。FIG. 2 is an explanatory diagram showing a conventional technique.

【符号の説明】[Explanation of symbols]

1 既設レンガ壁 1a レンガ 2 切断線 3 開口予定部 4 貫通穴 5 貫通長穴 6 C型チャンネル材 7 PC鋼棒 8 ナット 9 作業用大開口 10 コンクリート 10A 鉄筋 11 まぐさ 12 開口 21 作業用小開口 22 H型鋼 23 支保工 DESCRIPTION OF SYMBOLS 1 Existing brick wall 1a brick 2 Cutting line 3 Expected opening part 4 Through hole 5 Through long hole 6 C-shaped channel material 7 PC steel rod 8 Nut 9 Large working opening 10 Concrete 10A Reinforcing bar 11 Forage 12 Opening 21 Small working opening 22 H-shaped steel 23 Shoring

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 レンガ、コンクリートブロックなどの壁
構造材を組み上げて形成した既設組積造壁の表裏に配設
する一対の横置長尺部材により組積造壁の一部の壁構造
材を両面から押圧支持した後、横置長尺部材により押圧
支持された壁構造材の下方に位置する壁構造材を除去し
て既設組積造壁に開口部を形成することを特徴とする既
設組積造壁における開口部の新設方法。
1. A part of a masonry wall of a masonry wall is provided by a pair of horizontally long members arranged on the front and back of an existing masonry wall formed by assembling a wall structural material such as a brick or a concrete block. An existing assembly characterized by removing the wall structural material located below the wall structural material pressed and supported by the horizontal elongate member after pressing and supporting from both surfaces to form an opening in the existing masonry wall. A new method of opening a masonry wall
【請求項2】 横置長尺部材の壁構造材に対する押圧力
が、既設組積造壁を貫通して配設されて一対の横置長尺
部材と係合する押圧力付与部材により付与されることを
特徴とする請求項1記載の既設組積造壁における開口部
の新設方法。
2. A pressing force applied to the wall structural member of the horizontally long member by a pressing force applying member disposed through the existing masonry wall and engaged with the pair of horizontally long members. 2. The method according to claim 1, wherein the opening is formed in an existing masonry wall.
【請求項3】 壁構造材が除去されて形成される既設組
積造壁の開口端面部に鉄筋コンクリートが打設されるこ
とを特徴とする請求項1または2記載の既設組積造壁に
おける開口部の新設方法。
3. An opening in an existing masonry wall according to claim 1 or 2, wherein reinforced concrete is cast into an opening end surface of the existing masonry wall formed by removing the wall structural material. How to establish a new department.
【請求項4】 鉄筋コンクリートの打設後、一対の横置
長尺部材が撤去されることを特徴とする請求項3記載の
既設組積造壁における開口部の新設方法。
4. The method according to claim 3, wherein the pair of elongated members is removed after the reinforced concrete is cast.
JP2001037432A 2001-02-14 2001-02-14 New method for opening openings in existing masonry walls Expired - Fee Related JP3707006B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001037432A JP3707006B2 (en) 2001-02-14 2001-02-14 New method for opening openings in existing masonry walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001037432A JP3707006B2 (en) 2001-02-14 2001-02-14 New method for opening openings in existing masonry walls

Publications (2)

Publication Number Publication Date
JP2002242452A true JP2002242452A (en) 2002-08-28
JP3707006B2 JP3707006B2 (en) 2005-10-19

Family

ID=18900564

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001037432A Expired - Fee Related JP3707006B2 (en) 2001-02-14 2001-02-14 New method for opening openings in existing masonry walls

Country Status (1)

Country Link
JP (1) JP3707006B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU173168U1 (en) * 2017-02-27 2017-08-15 Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" Device for making a large-sized opening in a bearing reinforced concrete or stone wall
IT201700057611A1 (en) * 2017-05-26 2017-08-26 Michele Vinci REINFORCEMENT TECHNIQUE THAT HAS THE FUNCTION OF INCREASING THE RESISTANCE OF BUILDINGS IN ORDINARY WALLS IN RELATION TO SEISMIC ACTION THROUGH THE USE OF HORIZONTAL AND VERTICAL METALLIC ELEMENTS THEREOUSLY RELATED
RU188527U1 (en) * 2018-10-15 2019-04-16 Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" Device for cutting reinforced concrete structures
RU188949U1 (en) * 2019-02-04 2019-04-30 Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" Device for cutting a large-sized opening with a diamond saw in the bearing wall
CN110630029A (en) * 2019-09-17 2019-12-31 山东建筑大学 Wall body opening underpinning device and using method
WO2022241750A1 (en) * 2021-05-19 2022-11-24 山东大学 Large-area dismantling device for wall body structure of subway station and process therefor
JP7511206B2 (en) 2021-06-19 2024-07-05 大成建設株式会社 How to relocate a structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441134A (en) * 2018-11-27 2019-03-08 大连久鼎特种建筑工程有限公司 Building brick mix structure underpins into frame structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU173168U1 (en) * 2017-02-27 2017-08-15 Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" Device for making a large-sized opening in a bearing reinforced concrete or stone wall
IT201700057611A1 (en) * 2017-05-26 2017-08-26 Michele Vinci REINFORCEMENT TECHNIQUE THAT HAS THE FUNCTION OF INCREASING THE RESISTANCE OF BUILDINGS IN ORDINARY WALLS IN RELATION TO SEISMIC ACTION THROUGH THE USE OF HORIZONTAL AND VERTICAL METALLIC ELEMENTS THEREOUSLY RELATED
RU188527U1 (en) * 2018-10-15 2019-04-16 Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" Device for cutting reinforced concrete structures
RU188949U1 (en) * 2019-02-04 2019-04-30 Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" Device for cutting a large-sized opening with a diamond saw in the bearing wall
CN110630029A (en) * 2019-09-17 2019-12-31 山东建筑大学 Wall body opening underpinning device and using method
WO2022241750A1 (en) * 2021-05-19 2022-11-24 山东大学 Large-area dismantling device for wall body structure of subway station and process therefor
JP7511206B2 (en) 2021-06-19 2024-07-05 大成建設株式会社 How to relocate a structure

Also Published As

Publication number Publication date
JP3707006B2 (en) 2005-10-19

Similar Documents

Publication Publication Date Title
KR100935096B1 (en) Prestressed-precast-segmental stone arch bridge and its constructing method
US7191572B2 (en) Construction method and system
JP2007239301A (en) Method of integrating precast concrete members interposed by filling concrete
JP2002242452A (en) Construction method for opening part in existing masonry construction wall
JP3029411U (en) Formwork attachment device for forming concrete bands and lintels
JP3208530B2 (en) Precast concrete formwork and structure using the same
JP4001058B2 (en) Seismic reinforcement method for wall structures
JP4122093B2 (en) Building frame and its formation method
JP3138129B2 (en) Reverse beam construction method and driving beam side formwork
JP2004011300A (en) Pc composite structure, pc bridge and prestressing method
KR200433720Y1 (en) Concrete composites with honeycomb type reinforced materials
JP2651550B2 (en) Concrete tank side wall construction method
JP2000356041A (en) Method for placing concrete
JP3245753B2 (en) Slope stabilization method
JPH06346471A (en) Construction of reinforced concrete retaining wall by use of large size precast slab
JP3010355B1 (en) Construction method of joint of prestressed concrete floor
JPH1046814A (en) Method of placing concrete separately
JP2004107961A (en) Flexural reinforcement construction method for junction of existing pillar and beam or slab
JPH09112042A (en) Method for reinforcing vibration resistance of building
JPH0313643A (en) Construction method for long and large structure with expansion joint section
JPH031531Y2 (en)
JPH06146595A (en) Construction for formless stone wall for building or the like, and jig to be used on its construction
KR200237627Y1 (en) Construction joint structure at the reinforced concrete of building
JP2849927B2 (en) Construction method of earthquake-resistant wall with large reinforcing block
JPH08105059A (en) Concrete strip footing and forming method thereof

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050603

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050705

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050720

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080812

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110812

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110812

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120812

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120812

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130812

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees