Device for making a large-sized opening in a bearing reinforced concrete or stone wall Download PDFInfo
- Publication number
- RU173168U1 RU173168U1 RU2017106511U RU2017106511U RU173168U1 RU 173168 U1 RU173168 U1 RU 173168U1 RU 2017106511 U RU2017106511 U RU 2017106511U RU 2017106511 U RU2017106511 U RU 2017106511U RU 173168 U1 RU173168 U1 RU 173168U1
- Authority
- RU
- Russia
- Prior art keywords
- reinforced concrete
- stone wall
- pendulum
- steel reinforcement
- reinforcement frame
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
- B28D1/02—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
- B28D1/04—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with circular or cylindrical saw-blades or saw-discs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0274—Temporary shoring of wall opening
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0277—Repairing or restoring window or door frames
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
Полезная модель относится к области строительства и может быть использована при капитальном ремонте и реконструкции домов с изменением их объемно-планировочных решений. Устройство для выполнения крупноразмерного проема в несущей железобетонной или каменной стене включает стальную раму усиления, направляющую маятниковой алмазной дисковой пилы, резьбовые соединения. Стальная рама усиления расположена с одной стороны несущей железобетонной или каменной стены и прикреплена к ней с помощью резьбовых соединений, а направляющая маятниковой алмазной дисковой пилы расположена с противоположной стороны несущей железобетонной или каменной стены и прикреплена к стальной раме усиления с помощью резьбовых соединений через сквозные отверстия в несущей железобетонной или каменной стене. Использование устройства для выполнения крупноразмерного проема в несущей железобетонной или каменной стене новой конструкции обеспечивает снижение подводимой мощности алмазного маятникового дискового оборудования для резки путем обеспечения конструктивного уменьшения до технически возможного диаметра режущего алмазного диска. 4 ил.The utility model relates to the field of construction and can be used for overhaul and reconstruction of houses with a change in their space-planning decisions. A device for making a large-sized opening in a bearing reinforced concrete or stone wall includes a steel reinforcement frame guiding the pendulum diamond saw blade, threaded connections. The steel reinforcement frame is located on one side of the supporting reinforced concrete or stone wall and is attached to it with threaded connections, and the guide of the pendulum diamond saw blade is located on the opposite side of the supporting reinforced concrete or stone wall and is attached to the steel reinforcement frame with threaded connections through the through holes in bearing reinforced concrete or stone wall. The use of a device for making a large-sized opening in a reinforced concrete or stone wall of a new design reduces the input power of the diamond pendulum disk cutting equipment by providing a constructive reduction to the technically possible diameter of the cutting diamond disk. 4 ill.
Description
Полезная модель относится к области строительства и может быть использована при капитальном ремонте и реконструкции домов с изменением их объемно-планировочных решений. При этом достаточно часто возникает задача устройства крупногабаритного проема в несущей стене таким образом, чтобы ее несущая способность не изменилась при непременном условии обеспечения безопасности производства работ и последующей эксплуатации объекта.The utility model relates to the field of construction and can be used for overhaul and reconstruction of houses with a change in their space-planning decisions. In this case, quite often the problem arises of arranging a large-sized opening in the bearing wall in such a way that its bearing capacity does not change under an indispensable condition for ensuring the safety of work and the subsequent operation of the facility.
Для небольших пролетов образуемых проемов в несущих каменных стенах используют известный способ их образования путем устройства штраб, в которые затем с двух сторон стены устанавливают стальные швеллеры с отверстиями. Через эти отверстия в швеллерах, как по шаблону, просверливают отверстия и в каменной стене, куда монтируют резьбовые соединения, попарно стягивающие швеллеры полученной таким образом конструкции усиления (Голов Г.И. Демонтажные работы при реконструкции зданий. - М.: Стройиздат, 1990. - 144 с. - С. 95-96). А затем уже под защитой созданной таким образом несущей конструкции перемычки любым известным оборудованием или инструментом производят разрушение материала стены для образования и последующей эксплуатации проема.For small spans of formed openings in bearing stone walls, a well-known method of their formation is used by means of a device, in which then steel channels with holes are installed on both sides of the wall. Through these holes in the channels, as in the pattern, holes are also drilled in the stone wall where threaded joints are mounted, pairwise tightening the channels of the reinforcement structure obtained in this way (Golov G.I.Dismantling during reconstruction of buildings. - M .: Stroyizdat, 1990. - 144 p. - S. 95-96). And then, under the protection of the supporting structure created in this way, the lintels by any known equipment or tool destroy the wall material for the formation and subsequent operation of the opening.
Как уже отмечалось, описанным способом невозможно устраивать проемы больших размеров, так как для их усиления обычно уже не достаточно одной горизонтальной перемычки из швеллеров над будущим проемом, а требуется стальная рамная конструкция усиления, включающая и вертикальные стойки по периметру будущего проема.As already noted, it is impossible to arrange large openings in the described way, since to strengthen them usually one horizontal jumper from the channels above the future opening is usually not enough, but a steel frame reinforcement structure is required, including vertical posts around the perimeter of the future opening.
Такое развитие технологии подтверждает известный способ устройства крупноразмерного проема в несущей железобетонной стене (Патент Украины №47190, МПК (2009) E04G 23/02, опубл. 25.01.2010, Бюл. №2), принятый в качестве прототипа, в котором используют с двух сторон стены стальные рамы усиления путем их попарного стягивания резьбовыми соединениями, последующей установкой направляющих маятниковой алмазной дисковой пилы, размещающейся и перемещающейся вдоль элементов рамы усиления при производстве работ по последовательному вырезанию частей будущего проема.This development of technology confirms the known method of creating a large-sized opening in a bearing reinforced concrete wall (Patent of Ukraine No. 47190, IPC (2009) E04G 23/02, published on January 25, 2010, Bull. No. 2), adopted as a prototype, which is used with two the sides of the wall are steel reinforcement frames by tightening them in pairs with threaded joints, then installing guides of the pendulum diamond saw blade, which is placed and moving along the elements of the reinforcement frame during work on sequential cutting of parts of the future oem.
Но установка направляющей маятниковой дисковой пилы на стальных элементах рамы усиления требует применения пилы с диском существенно большего диаметра, а, следовательно, и большей подводимой мощности оборудования для резки бетона.But the installation of the guide of the pendulum circular saw on the steel elements of the reinforcement frame requires the use of a saw with a disk of a significantly larger diameter, and, consequently, a greater input power of the equipment for cutting concrete.
Технической задачей полезной модели является усовершенствование устройства для выполнения крупноразмерного проема в несущей железобетонной или каменной стене.The technical task of the utility model is to improve the device for making a large-sized opening in a bearing reinforced concrete or stone wall.
Техническим результатом полезной модели является снижение подводимой мощности алмазного маятникового дискового оборудования для резки путем обеспечения конструктивного уменьшения до технически возможного диаметра режущего алмазного диска.The technical result of the utility model is to reduce the input power of the diamond pendulum disk cutting equipment by providing a constructive reduction to the technically possible diameter of the cutting diamond disk.
Указанный технический результат достигается тем, что устройство для выполнения крупноразмерного проема в несущей железобетонной или каменной стене, включающее стальную раму усиления, направляющую маятниковой алмазной дисковой пилы, резьбовые соединения, согласно полезной модели стальная рама усиления расположена с одной стороны несущей железобетонной или каменной стены и прикреплена к ней с помощью резьбовых соединений, а направляющая маятниковой алмазной дисковой пилы расположена с противоположной стороны несущей железобетонной или каменной стены и прикреплена к стальной раме усиления с помощью резьбовых соединений через сквозные отверстия в несущей железобетонной или каменной стене.The specified technical result is achieved in that the device for making a large-sized opening in a bearing reinforced concrete or stone wall, including a steel reinforcement frame, a guide of the pendulum diamond saw blade, threaded connections, according to a utility model, a steel reinforcement frame is located on one side of the bearing reinforced concrete or stone wall and is attached to it using threaded connections, and the guide of the pendulum diamond saw blade is located on the opposite side of the supporting reinforced concrete or a stone wall and is attached to a steel reinforcement frame with threaded connections through holes in a reinforced concrete or stone wall.
Общими признаками является наличие стальной рамы усиления, направляющей маятниковой алмазной дисковой пилы и резьбовых соединений.Common signs are the presence of a steel reinforcement frame, a guiding pendulum diamond saw blade and threaded joints.
Отличительными признаками полезной модели являются: стальная рама усиления расположена с одной стороны несущей железобетонной или каменной стены и прикреплена к ней с помощью резьбовых соединений, а направляющая маятниковой алмазной дисковой пилы расположена с противоположной стороны несущей железобетонной или каменной стены и прикреплена к стальной раме усиления с помощью резьбовых соединений через сквозные отверстия в несущей железобетонной или каменной стене.The distinguishing features of the utility model are: a steel reinforcement frame is located on one side of the supporting reinforced concrete or stone wall and attached to it with threaded connections, and a guide of the pendulum diamond saw blade is located on the opposite side of the supporting reinforced concrete or stone wall and is attached to the steel reinforcement frame with threaded connections through holes in a reinforced concrete or stone wall.
Совокупность существенных признаков обеспечивает снижение подводимой мощности алмазного маятникового дискового оборудования для резки путем обеспечения конструктивного уменьшения до технически возможного диаметра режущего алмазного диска.The combination of essential features reduces the input power of the diamond pendulum disk cutting equipment by providing a constructive reduction to the technically possible diameter of the cutting diamond disk.
Полезная модель поясняется графическими материалами, где:The utility model is illustrated by graphic materials, where:
на Фиг. 1 изображен вид сбоку подготовленной к вырезанию проема несущей железобетонной или каменной стены с прикрепленной к ней с помощью резьбовых соединений стальной рамой усиления;in FIG. 1 is a side view of a reinforced concrete or stone wall prepared for cutting out an aperture, with a steel reinforcement frame attached to it using threaded connections;
на Фиг. 2 - то же, с противоположной стороны этой стены с элементами временной разгрузки и направляющей маятниковой алмазной дисковой пилы;in FIG. 2 - the same, on the opposite side of this wall with elements of temporary unloading and the guide of the pendulum diamond saw blade;
на Фиг. 3 показан горизонтальный разрез 1-1 на Фиг. 1 с устанавливаемой на направляющей маятниковой алмазной дисковой пилой в процессе разрезания железобетонной или каменной стены по вертикали;in FIG. 3 shows a horizontal section 1-1 in FIG. 1 with a pendulum diamond circular saw mounted on a guide during vertical cutting of a reinforced concrete or stone wall;
на Фиг. 4 представлен вертикальный разрез 2-2 на Фиг. 1 и 2 в процессе резки проема железобетонной или каменной стены по вертикали.in FIG. 4 is a vertical section 2-2 in FIG. 1 and 2 in the process of cutting the opening of a reinforced concrete or stone wall vertically.
Устройство для выполнения крупноразмерного проема в несущей железобетонной или каменной стене содержит стальную раму усиления 1, направляющую 2 маятниковой алмазной дисковой пилы 3, резьбовые соединения 4, причем стальная рама усиления 1 расположена с одной стороны несущей железобетонной или каменной стены и прикреплена к ней с помощью резьбовых соединений 4, а направляющая 2 маятниковой алмазной дисковой пилы 3 расположена с противоположной стороны несущей железобетонной или каменной стены и прикреплена к стальной раме усиления 1 с помощью резьбовых соединений 4 через сквозные отверстия в несущей железобетонной или каменной стене.A device for making a large opening in a bearing reinforced concrete or stone wall comprises a
Осуществляют выполнение крупноразмерного проема в несущей железобетонной или каменной стене следующим образом. После разметки несущей железобетонной или каменной стены с положением будущего крупноразмерного проема устанавливают временную разгрузочную систему из стоек 5 и балок 6, и далее все работы производят под ее защитой. По шаблону, предварительно выполненной разметке или через отверстия в прислоненной к стене стальной раме усиления 1 будущего проема сверлят сквозные отверстия в несущей железобетонной или каменной стене. В этих отверстиях устраивают резьбовые соединения 4 таким образом, чтобы зафиксировать стальную раму усиления 1 на несущей железобетонной или каменной стене, а не менее чем на двух, с противоположной от стальной рамы усиления 1 стороны стены, одновременно закрепить еще и направляющую 2 маятниковой алмазной дисковой пилы 3.Carry out the implementation of a large-sized opening in a bearing reinforced concrete or stone wall as follows. After marking the load-bearing reinforced concrete or stone wall with the position of the future large-sized opening, a temporary unloading system of racks 5 and
На закрепленную таким образом направляющую 2 маятниковой алмазной дисковой пилы 3 монтируют маятниковую алмазную дисковую пилу 3 и ею производят разрезание железобетонной или каменной стены для образования в ней проема. Для чего направляющую 2 маятниковой алмазной дисковой пилы 3 последовательно переставляют на другие элементы стальной рамы усиления 1, как показано на Фиг. 3, совершая как вертикальную, так и горизонтальную разрезку. После вырезания проема направляющую 2 маятниковой алмазной дисковой пилы 3 снимают, а на все резьбовые соединения 4 монтируют и притягивают противоположную часть предусмотренной проектом стальной рамы усиления 1. И только после этого снимают временную разгрузочную систему из стоек 5 и балок 6.On the
В предложенном устройстве для выполнения проема в несущей железобетонной или каменной стене направляющая маятниковой алмазной дисковой пилы закрепляется непосредственно на разрезаемой конструкции (как и предусмотрено инструкцией изготовителей), чем достигается максимально возможное использование ее паспортной мощности на минимальном диаметре установленного алмазного диска. В то же время обеспечивается требуемая безопасность производства работ по устройству крупноразмерных проемов в несущих каменных и железобетонных стенах.In the proposed device for making an opening in a bearing reinforced concrete or stone wall, the guide of the pendulum diamond saw blade is mounted directly on the structure being cut (as provided by the manufacturers' instructions), which ensures the maximum possible use of its nameplate power on the minimum diameter of the installed diamond blade. At the same time, the required safety is ensured for the construction of large-sized openings in bearing stone and reinforced concrete walls.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017106511U RU173168U1 (en) | 2017-02-27 | 2017-02-27 | Device for making a large-sized opening in a bearing reinforced concrete or stone wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2017106511U RU173168U1 (en) | 2017-02-27 | 2017-02-27 | Device for making a large-sized opening in a bearing reinforced concrete or stone wall |
Publications (1)
Publication Number | Publication Date |
---|---|
RU173168U1 true RU173168U1 (en) | 2017-08-15 |
Family
ID=59633391
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2017106511U RU173168U1 (en) | 2017-02-27 | 2017-02-27 | Device for making a large-sized opening in a bearing reinforced concrete or stone wall |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU173168U1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU188527U1 (en) * | 2018-10-15 | 2019-04-16 | Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" | Device for cutting reinforced concrete structures |
RU188949U1 (en) * | 2019-02-04 | 2019-04-30 | Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" | Device for cutting a large-sized opening with a diamond saw in the bearing wall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2131076A (en) * | 1982-12-02 | 1984-06-13 | Denis George Mcmahon | Making an opening in a wall |
JP2002242452A (en) * | 2001-02-14 | 2002-08-28 | Shimizu Corp | Construction method for opening part in existing masonry construction wall |
UA47190U (en) * | 2009-06-22 | 2010-01-25 | Приднепровская Государственная Академия Строительства И Архитектуры | Method to make an opening in structural wall |
UA65414U (en) * | 2011-04-12 | 2011-12-12 | Национальная Академия Природоохранного И Курортного Строительства | Method for arrangement of an aperture in a bearing wall |
-
2017
- 2017-02-27 RU RU2017106511U patent/RU173168U1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2131076A (en) * | 1982-12-02 | 1984-06-13 | Denis George Mcmahon | Making an opening in a wall |
JP2002242452A (en) * | 2001-02-14 | 2002-08-28 | Shimizu Corp | Construction method for opening part in existing masonry construction wall |
UA47190U (en) * | 2009-06-22 | 2010-01-25 | Приднепровская Государственная Академия Строительства И Архитектуры | Method to make an opening in structural wall |
UA65414U (en) * | 2011-04-12 | 2011-12-12 | Национальная Академия Природоохранного И Курортного Строительства | Method for arrangement of an aperture in a bearing wall |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU188527U1 (en) * | 2018-10-15 | 2019-04-16 | Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" | Device for cutting reinforced concrete structures |
RU188949U1 (en) * | 2019-02-04 | 2019-04-30 | Федеральное государственное автономное образовательное учреждение высшего образования "Крымский федеральный университет имени В.И. Вернадского" | Device for cutting a large-sized opening with a diamond saw in the bearing wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5237895B2 (en) | Anti-scatter device | |
RU173168U1 (en) | Device for making a large-sized opening in a bearing reinforced concrete or stone wall | |
CN104947926A (en) | Core tube inner tank upper formwork system hard protection device and construction method thereof | |
CN208068549U (en) | A kind of prefabricated piping lane segment framework of steel reinforcement installation molding bed rack | |
CN109208938B (en) | Directional nondestructive static cutting demolition processing method for reinforced concrete slab | |
KR20100088822A (en) | Eco automatic building demolition method and demolition device | |
CN105484165B (en) | Integrated prestress tensioning frame structure and manufacturing and using methods thereof | |
JP2010242308A (en) | Method for demolishing high-rise building of concrete slab structure, and concrete slab demolition equipment | |
CN103696437A (en) | Construction method for cutting latticed column | |
CN107327176B (en) | Prefabricated assembled substation cabin base | |
JP5693869B2 (en) | Bridge girder construction method | |
JP2011074632A (en) | Unit structure of anchor bolt used for construction of foundation for equipment, and method of construction of foundation for equipment using the unit structure | |
JP2014201935A (en) | Method of demolishing building | |
CN108643925A (en) | Intersect the cycle construction method of the tunneling section under mid-board engineering method | |
JP2017214738A (en) | Demolition system and demolition method for high-rise building | |
KR102332718B1 (en) | Deck road | |
RU188949U1 (en) | Device for cutting a large-sized opening with a diamond saw in the bearing wall | |
CN111997063A (en) | Static cutting method for pre-buried pipe-penetrating type concrete structure | |
JP2012127131A (en) | Structure demolition method and structure demolition system | |
JP2016108120A (en) | Floor climbing-type tower crane and construction method for building | |
JP2000320142A (en) | Device and method for reinforcement assembly in construction work | |
JP6436733B2 (en) | Demolition method of concrete slab | |
JP2016145477A (en) | Demolition system and demolition method | |
CN109138418A (en) | A kind of fixing templates and construction method | |
CN202788016U (en) | Protective shed for construction field operation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM9K | Utility model has become invalid (non-payment of fees) |
Effective date: 20190228 |