JP3029411U - Formwork attachment device for forming concrete bands and lintels - Google Patents

Formwork attachment device for forming concrete bands and lintels

Info

Publication number
JP3029411U
JP3029411U JP1996003099U JP309996U JP3029411U JP 3029411 U JP3029411 U JP 3029411U JP 1996003099 U JP1996003099 U JP 1996003099U JP 309996 U JP309996 U JP 309996U JP 3029411 U JP3029411 U JP 3029411U
Authority
JP
Japan
Prior art keywords
pipe member
attached
steel member
assemblies
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1996003099U
Other languages
Japanese (ja)
Inventor
アルザモラ, バルトロメ リッテラス
ギナード, アントニオ マッサネット
Original Assignee
アルザモラ, バルトロメ リッテラス
ギナード, アントニオ マッサネット
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アルザモラ, バルトロメ リッテラス, ギナード, アントニオ マッサネット filed Critical アルザモラ, バルトロメ リッテラス
Application granted granted Critical
Publication of JP3029411U publication Critical patent/JP3029411U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/04Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for lintels, beams, or transoms to be encased separately; Special tying or clamping means therefor

Abstract

(57)【要約】 【課題】 コンクリートバンドやリンテルを容易に作れ
る型枠取付装置を提供することを目的とする。 【解決手段】 矩形断面の管部材1にT形断面の形鋼部
材2を取りつけて成る組立体を対をなして備え、上記管
部材1には貫通孔4が形成され、該管部材1の上端側外
面に上記形鋼部材2が固定され、該型鋼部材2の管部材
1からの突出部分に複数の孔5が縦方向に配列されるよ
うに穿設され、上記両組立体は上記貫通孔4に通される
ロッド6により連結されかつロッド6が管部材1から突
出する両端部分にクランプ部材8が取りつけられ、上記
ロッド6が取りつけられた後に上記両組立体が壁11の
上部に取りつけられ、釘12により型鋼部材2に対して
所定位置に取りつけられた対向せる型板材9の間でコン
クリートバンドが形成される。
(57) 【Abstract】 PROBLEM TO BE SOLVED: To provide a form fitting device capable of easily producing a concrete band or a lintell. SOLUTION: The pipe member 1 having a rectangular cross section is provided with a pair of assemblies each having a shaped steel member 2 having a T-shaped cross section, and a through hole 4 is formed in the pipe member 1, and the pipe member 1 has a through hole 4 formed therein. The shaped steel member 2 is fixed to the outer surface on the upper end side, and a plurality of holes 5 are bored in a projecting portion of the shaped steel member 2 from the pipe member 1 so as to be vertically arranged. Clamping members 8 are attached to both ends of the rod 6 which are connected to each other through the holes 4 and project from the pipe member 1. After the rods 6 are attached, the both assemblies are attached to the upper portion of the wall 11. Then, the concrete band is formed between the facing mold plate members 9 attached to the mold steel member 2 at predetermined positions by the nails 12.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the device belongs]

本考案は型を用いてコンクリートバンドそしてリンテルを打込みするための型 枠取付装置に関し、特にその水準を向上させるものである。 The present invention relates to a form fitting device for driving concrete bands and lintels using a mold, and particularly, to improve its level.

【0002】[0002]

【従来の技術】[Prior art]

周知のように、多くの部材から成る一般の建築構造は、縦型強度要素としての 荷重支持壁と、横型強度要素を備えたフレームとを有している。上記荷重支持壁 は、コンクリートブロック、陶窯物、切石等の種々の石材を組積材として用いて 作られる。又、フレームは上記荷重支持壁によって支えられる一連のプレストレ スト(pre−stressed)あるいはセミストレスト(semi−str essed)鉄筋コンクリート梁を有している。 As is well known, a typical building structure consisting of many members has a load bearing wall as a vertical strength element and a frame with horizontal strength elements. The load-bearing wall is made by using various stone materials such as concrete blocks, porcelain stoneware, and cut stones as masonry materials. The frame also has a series of pre-stressed or semi-stressed reinforced concrete beams supported by the load bearing walls.

【0003】 かかる構造の標準的作業では、必要に応じ壁に筋かいや笠木を設けると共に、 梁を支持あるいは埋め込むために鉄筋コンクリートバンド(reinforce d concrete bands)を作る型枠取付装置を用いている。[0003] The standard work of such a structure uses formwork attachments to make reinforced concrete bands (reinforced concrete bands) to support or embed the beams, as well as to provide braces or shelters on the walls as needed.

【0004】 上記型枠取付装置は、それがコンクリートバンドの上で支持されるときには、 さらにフレームの外縁や積載層を仕上げるために用いられる。The formwork mounting device is used to further finish the outer edge of the frame and the loading layer when it is supported on a concrete band.

【0005】 最後に、事実上ほとんどの場合に要求されることであるが、荷重支持壁構造に おいて、そして鉄筋コンクリート支柱や桁あるいは四角なフレームを用いる構造 において、上記作業は、概して建築物の正面で、壁に開口部を形成するために補 強されたリンテルや荷重支持材を型により打ち込む。Finally, in practically most cases, in load bearing wall structures and in structures using reinforced concrete struts or girders or square frames, the work described above is generally At the front, a mold drives in reinforced lintel or load bearing material to form openings in the wall.

【0006】[0006]

【考案が解決しようとする課題】[Problems to be solved by the device]

型による打込み作業は、概念上は簡単であるが、標準的なシステムを使ってい るので、この種の仕事に望まれるよりもずっと困難である。そして、構造あるい は仕上げの観点からは品質が低下することはないが、作業時間を短縮してコスト を低下させるために、作業の遂行を容易にする何らかのシステムを用いる方が好 ましいという経済的条件を含有している。 The typing operation is conceptually simple, but using a standard system is much more difficult than desired for this kind of work. And while there is no loss of quality from a structural or finishing point of view, it is preferable to use some system that facilitates the performance of the work in order to shorten the work time and reduce the cost. Contains economic conditions.

【0007】 本考案は、これらの問題を解決することを目的としている。本考案装置はこれ らの要請に応えるべく案出されたもので、これにより鉄筋コンクリートバンドや リンテルが容易に壁に打ち込まれる。本考案装置によれば、作業工数が少なく用 いられる補助部材も少ない。The present invention aims to solve these problems. The device of the present invention has been devised to meet these demands, by which reinforced concrete bands and linters can be easily driven into the wall. According to the device of the present invention, the number of work steps is small and the number of auxiliary members used is small.

【0008】[0008]

【課題を解決するための手段】[Means for Solving the Problems]

本考案装置は、矩形断面を有し縦方向を長手方向として配された管部材にT形 断面の形鋼部材を取りつけて成る組立体を対をなして備えている。上記管部材に は横方向に貫通孔が形成され、該管部材の上端側外面に上記形鋼部材が上方に突 出するように固定されている。該型鋼部材の管部材からの突出部分に複数の孔が 縦方向に配列されるように穿設されている。上記両組立体は上記貫通孔に通され るロッドにより連結されかつロッドが管部材から突出する両端部分にクランプ部 材が取りつけられ、上記ロッドが取りつけられた後に上記両組立体が壁の上部に 取りつけられる。かくして、釘により型鋼部材に対して所定位置に取りつけられ た対向せる型板材の間でコンクリートバンドが形成される。 The device of the present invention comprises a pair of assemblies each having a T-shaped section steel member attached to a tubular member having a rectangular cross section and arranged with the longitudinal direction being the longitudinal direction. A through hole is formed in the pipe member in the lateral direction, and the shaped steel member is fixed to the outer surface of the upper end side of the pipe member so as to project upward. A plurality of holes are formed in a portion of the shaped steel member projecting from the pipe member so as to be vertically arranged. The two assemblies are connected by rods that pass through the through holes, and clamp members are attached to both ends of the rods where the rods project from the pipe member.After the rods are attached, the two assemblies are attached to the upper part of the wall. Can be installed. Thus, the concrete band is formed between the facing template plates mounted in place by the nails on the template steel member.

【0009】[0009]

【考案の実施の形態】[Embodiment of device]

以下、添付図面の図1ないし図4にもとづいて、本考案の実施の形態を説明す る。 Embodiments of the present invention will be described below with reference to FIGS. 1 to 4 of the accompanying drawings.

【0010】 本考案に係る装置は、図示の実施形態においては、図1によく見られるように 、溶接により一体化された矩形断面の管部材1とT形断面の型鋼部材2により構 成される組立体を二つ有している。型鋼部材2はその側壁の縁部で上記管部材1 の一つの側面の縁部、特に短い辺をなす側面の縁部にて該管部材1に溶接され一 つの組立体をなしている(溶接部3参照)。この溶接部3は、例えば長さ10c m程度である。この組立体は保護ペイント等により表面がコーティングされ、両 端部にはプラスチックキャップ等の端板部材7が取りつけられている。The apparatus according to the present invention, in the illustrated embodiment, as shown in FIG. 1, is composed of a tubular member 1 having a rectangular cross section and a die steel member 2 having a T-shaped cross section, which are integrated by welding. It has two assemblies. The shape steel member 2 is welded to the pipe member 1 at one side edge of the pipe member 1 at the side wall edge thereof, particularly at the side face edge forming a short side to form one assembly (welding). See Part 3). The welded portion 3 has a length of, for example, about 10 cm. The surface of this assembly is coated with protective paint or the like, and end plate members 7 such as plastic caps are attached to both ends.

【0011】 上記本考案装置は、扱いにくい従来の諸器具を用いることなく、鉄筋コンクリ ートバンド10やリンテルを型に打込むために用いられる木製の型板材9を両側 で支える。この目的のために従来使用されていた上記諸器具は多くの補助部材を 要し、又取扱いが困難な上に危険を伴うこともある。正面壁が構築される多くの 場合で、地面から離れているときにはなおさらである。The device of the present invention supports, on both sides, the wooden mold plate material 9 used for driving the reinforcing bar concrete band 10 and the lintel into the mold without using the complicated conventional equipment. The above-mentioned devices conventionally used for this purpose require many auxiliary members, are difficult to handle, and may be dangerous. In many cases the front wall is constructed, especially when it is far from the ground.

【0012】 この装置の使用に際して要求されることは、バンドあるいはリンテルが構築さ れるべき壁11が完成されているということだけである。The only requirement for using this device is that the wall 11 on which the band or linter is to be constructed is complete.

【0013】 一対の組立体は、図2ないし図4に見られるように、管部材1に形成された孔 4に貫通せられたロッド6により互いに保持し合い、表面に二つのクランプ部材 8が取りつけられている。かかる組立体は、スパイクや釘12が使用できる板材 で成る型板材9を支える。該型板材9は型鋼部材2の孔5を通して上記釘12に よって該型鋼部材2に固定される。本考案ではこれ以上のものは何も必要ではな い。As shown in FIGS. 2 to 4, the pair of assemblies hold each other by a rod 6 penetrating a hole 4 formed in the tube member 1, and two clamp members 8 are provided on the surface of the assembly. It is installed. Such an assembly supports a template 9 made of a plate that spikes and nails 12 can use. The mold plate material 9 is fixed to the mold steel member 2 by the nails 12 through the holes 5 of the mold steel member 2. Nothing more is needed in the present invention.

【0014】 本考案装置は構成が単純であるが、使用上の多様性は応用において使用者の工 夫によりさらに発展される。Although the device of the present invention is simple in construction, the versatility of use is further developed by the user's technician in the application.

【0015】 本考案装置について以上十分に説明したが、本考案はその本質を変えることな く請求の範囲内で種々変更が可能である。Although the device of the present invention has been fully described above, the present invention can be variously modified within the scope of the claims without changing the essence of the device.

【0016】[0016]

【考案の効果】[Effect of device]

このように、本考案によれば、管部材に型鋼部材が固定されて成る組立体を一 対用意して、これをロッドで連結するようにして壁の上部に取りつけ、型鋼部材 で支持される対向せる型板材間にコンクリートを打ち込んでコンクリートバンド やリンテルを作ることとしたので、装置がきわめて単純化し又作業が容易になる という効果をもたらす。 As described above, according to the present invention, a pair of assemblies in which a steel mold member is fixed to a pipe member is prepared, and the assembly is attached to the upper part of the wall by connecting with a rod and supported by the steel mold member. Since concrete was cast between the facing template materials to make a concrete band or a linter, the equipment is extremely simple and the work is easy.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施形態としての装置をクランプ部
材のない状態で示す斜視図である。
FIG. 1 is a perspective view showing an apparatus according to an embodiment of the present invention without a clamp member.

【図2】クランプ部材をも備えた図1装置の正面図であ
る。
FIG. 2 is a front view of the device of FIG. 1 that also includes a clamp member.

【図3】クランプ部材の正面図である。FIG. 3 is a front view of a clamp member.

【図4】クランプ部材の平面図である。FIG. 4 is a plan view of a clamp member.

【図5】図2装置の使用状態を示す正面図である。FIG. 5 is a front view showing a usage state of the apparatus shown in FIG.

【符号の説明】[Explanation of symbols]

1 管部材 2 型鋼部材 4 貫通孔 5 孔 6 ロッド 8 クランプ部材 9 型板材 1 Pipe Member 2 Type Steel Member 4 Through Hole 5 Hole 6 Rod 8 Clamp Member 9 Type Plate Material

───────────────────────────────────────────────────── フロントページの続き (72)考案者 リッテラス アルザモラ, バルトロメ スペイン国、 マロルカ アルタ、 ゴメ ス ウルラ 58 (72)考案者 マッサネット ギナード, アントニオ スペイン国、 マロルカ アルタ、 ゴメ ス ウルラ 58 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Litteras Alzamora, Bartolome Spain, Mallorca Alta, Gomes Urla 58 (72) Inventor Massanet Guinard, Antonio Spain, Mallorca Alta, Gomes Urla 58

Claims (2)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 矩形断面を有し縦方向を長手方向として
配された管部材にT形断面の形鋼部材を取りつけて成る
組立体を対をなして備え、上記管部材には横方向に貫通
孔が形成され、該管部材の上端側外面に上記形鋼部材が
上方に突出するように固定され、該型鋼部材の管部材か
らの突出部分に複数の孔が縦方向に配列されるように穿
設され、上記両組立体は上記貫通孔に通されるロッドに
より連結されかつロッドが管部材から突出する両端部分
にクランプ部材が取りつけられ、上記ロッドが取りつけ
られた後に上記両組立体が壁の上部に取りつけられ、釘
により型鋼部材に対して所定位置に取りつけられた対向
せる型板材の間でコンクリートバンドが形成されること
を特徴とするコンクリートバンドそしてリンテルを形成
するための形枠取付装置。
1. A pair of assemblies, each having a T-shaped section steel member attached to a pipe member having a rectangular cross section and arranged with the longitudinal direction as the longitudinal direction, are provided in pairs, and the pipe member has a transverse direction. A through hole is formed, the shaped steel member is fixed to the outer surface of the upper end side of the pipe member so as to project upward, and a plurality of holes are vertically arranged at the projecting portion of the shaped steel member from the pipe member. The two assemblies are connected by a rod that is passed through the through hole, and clamp members are attached to both ends of the rod where the rod projects from the pipe member. Forming for forming a concrete band and linters, characterized in that a concrete band is formed between facing mold plates attached to the upper part of the wall and fixed in position with respect to the mold steel member by nails apparatus.
【請求項2】 管部材の両端にプラスチックキャップが
取りつけられていることとする請求項1に記載のコンク
リートバンドそしてリンテルを形成するための形枠取付
装置。
2. A form fitting device for forming a concrete band and a linter according to claim 1, wherein plastic caps are attached to both ends of the pipe member.
JP1996003099U 1995-03-30 1996-03-26 Formwork attachment device for forming concrete bands and lintels Expired - Lifetime JP3029411U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES9500858U ES1030662Y (en) 1995-03-30 1995-03-30 DEVICE TO FACILITATE THE FORMWORK OF CONCRETE HOOKS AND LINTELS.
ES9500858 1995-03-30

Publications (1)

Publication Number Publication Date
JP3029411U true JP3029411U (en) 1996-10-01

Family

ID=8290266

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1996003099U Expired - Lifetime JP3029411U (en) 1995-03-30 1996-03-26 Formwork attachment device for forming concrete bands and lintels

Country Status (3)

Country Link
EP (1) EP0735214A1 (en)
JP (1) JP3029411U (en)
ES (1) ES1030662Y (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007045713A1 (en) * 2005-10-21 2007-04-26 Antonio Navalon Argente Apparatus for fixing slab edge forms for wall coping in buildings
CN104120878A (en) * 2013-04-25 2014-10-29 郭光德 H-shaped fastener
CN108532943A (en) * 2018-03-21 2018-09-14 五冶集团上海有限公司 A kind of Vierendeel girder shuttering supporting reinforcement means
CN110172912A (en) * 2019-05-04 2019-08-27 湖北省路桥集团有限公司 A kind of solid pier capping beam processing construction method
CN111021252A (en) * 2019-12-13 2020-04-17 湖北省路桥集团有限公司 Construction method of bent cap core rod penetrating hanging rack formwork supporting system
CN113323384B (en) * 2021-06-29 2023-09-29 重庆瑞鑫科五金制品有限公司 Reverse bank clamp
CN115419260B (en) * 2022-09-29 2023-08-11 中建八局第一建设有限公司 Permanent prefabricated combined template system and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2442319A1 (en) * 1978-11-27 1980-06-20 Poineuf Alain Shutter mounting for breeze block wall - has risers connected through existing wall extending upwards for shutter support
DE3424001A1 (en) * 1984-06-29 1986-01-02 Wolfgang 7958 Laupheim Baumann Apparatus for holding a peripheral shuttering board of a ceiling shuttering
DE8800054U1 (en) * 1987-11-11 1988-03-03 Moenter, Johannes, 4518 Bad Laer, De
CH676135A5 (en) * 1987-12-29 1990-12-14 Claude Savoy Holder for shuttering elements - has support, forming parallel, offset extension of rail fixed below wall top surface
DE3841023C2 (en) * 1988-12-06 1997-08-07 Wolfgang Baumann Device to be used in construction for holding an object on a brick wall

Also Published As

Publication number Publication date
EP0735214A1 (en) 1996-10-02
ES1030662U (en) 1995-09-16
ES1030662Y (en) 1996-03-01

Similar Documents

Publication Publication Date Title
JP3029411U (en) Formwork attachment device for forming concrete bands and lintels
JP3707006B2 (en) New method for opening openings in existing masonry walls
US3826460A (en) Monolithic structure forming means with metal tubular bracing
JP2002030615A (en) Construction method of tower structure
JPH05287901A (en) Construction of stairs
CN211286623U (en) Secondary structure concrete inverted beam template reinforcing apparatus
JPH06248757A (en) Truss assembled body and frame body using this truss assembled body and composite material
US4915346A (en) Spacers for use in forming modular buildings
JP2584052Y2 (en) Level adjustment jig for perforated panel of driving formwork
JP3060292B2 (en) Cross-beam block and construction method of block building using this cross-beam block
JP2002227220A (en) Foundation for dwelling and foundation construction method
CN213806724U (en) Beam enlarging and reinforcing device for reconstruction engineering
CN218264972U (en) Frame shear wall column root's leak protection thick liquid device
CN218466877U (en) Fixing device of reinforced concrete protective layer cushion block
CN217054390U (en) Regularization but height-adjusting concrete beam side protective layer controlling means
JP3025671U (en) Reinforcing bar support for construction
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JPH0235951Y2 (en)
CN114439202A (en) Thin-wall ultrahigh wall body double-side template operation platform and adjustable fixing system
JPH069245Y2 (en) Pillar formwork equipment
JPH08105059A (en) Concrete strip footing and forming method thereof
JPH02157325A (en) Construction of continuous footing concrete with footing part and sacrificial formwork used therefor
CN116591468A (en) Temporary supporting device of concrete overhanging structure and construction method thereof
JP2001227094A (en) Floor structure of steel framed building
CN117432239A (en) Construction method for newly-added floor beam of old building