JP2002235495A - Concrete placing method and device for tunnel widening work - Google Patents

Concrete placing method and device for tunnel widening work

Info

Publication number
JP2002235495A
JP2002235495A JP2001030814A JP2001030814A JP2002235495A JP 2002235495 A JP2002235495 A JP 2002235495A JP 2001030814 A JP2001030814 A JP 2001030814A JP 2001030814 A JP2001030814 A JP 2001030814A JP 2002235495 A JP2002235495 A JP 2002235495A
Authority
JP
Japan
Prior art keywords
tunnel
concrete
work
protective
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001030814A
Other languages
Japanese (ja)
Other versions
JP4522596B2 (en
Inventor
Tsutomu Kitagawa
勉 北川
Kazuhiro Okuda
和弘 奥田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gifu Industry Co Ltd
Original Assignee
Gifu Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gifu Industry Co Ltd filed Critical Gifu Industry Co Ltd
Priority to JP2001030814A priority Critical patent/JP4522596B2/en
Publication of JP2002235495A publication Critical patent/JP2002235495A/en
Application granted granted Critical
Publication of JP4522596B2 publication Critical patent/JP4522596B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To install a protector and place concrete in a widened tunnel extremely easily in the tunnel widening work. SOLUTION: Concrete is placed by using a form 16 capable of securing a vehicle traffic section 18 below it in the widening work of the tunnel 12. The protective member 20, which is suspended from the vehicle traffic section 18 of the form 16 along the whole length of the form 16 and is opened in the longitudinal direction, is installed in the vehicle traffic zone 24 of the tunnel 12 to protect passing vehicles, and concrete 14 is placed between the form 16 and the inner wall face 40 of the widened tunnel.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、拡幅工事により拡
幅させたトンネル内にコンクリート、主に二次覆工用コ
ンクリートを打設する方法およびその装置に関するもの
である。なお、本明細書中、「打設」とは、養生硬化さ
せていない泥状のコンクリートを型枠とトンネル内壁面
との間に充填させることをいう。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for placing concrete, mainly concrete for secondary lining, in a tunnel widened by widening work. In addition, in this specification, "casting" refers to filling mud-like concrete that has not been cured and hardened between the formwork and the inner wall surface of the tunnel.

【0002】[0002]

【従来の技術】元来、既存トンネルの拡幅工事は、図4
および図5に示すように、トンネル外周から均一に外方
に拡幅させているが、図6に示すように、岩盤状況によ
りトンネル中心から偏心させた状態で拡幅させることも
ある。
2. Description of the Related Art Originally, widening work of an existing tunnel is shown in FIG.
As shown in FIG. 5 and FIG. 5, the width is increased outward uniformly from the outer periphery of the tunnel. However, as shown in FIG.

【0003】また、拡幅工事中のトンネル内には、一般
車両の全面通行止めとするのではなく、通行させながら
工事を進行させる都合上、掘削により発生する粉塵、コ
ンクリート屑等から通行車両を保護するための防護工
(プロテクター)を、拡幅させたトンネル内へコンクリ
ートを打設するための型枠の下部を含めトンネル全長に
わたり、設置させていた。
Also, in a tunnel during widening work, the vehicle is protected from dust, concrete debris, etc. generated by excavation in order to allow the construction to proceed while the vehicle is running, rather than blocking the entire vehicle from traffic. Protection was installed over the entire length of the tunnel, including the bottom of the formwork for casting concrete into the widened tunnel.

【0004】この防護工は、鋼材により枠組された枠体
の両側面および上側面に覆板を止着させ、前後方向およ
び下方を開口させて底板を省略した正面略四角形状に形
成されていた。
[0004] In this protective work, cover plates are fixed to both side surfaces and upper side surfaces of a frame body formed of steel material, and are formed in a substantially square frontal shape in which the bottom plate is omitted by opening the front and rear directions and the lower side. .

【0005】また、トンネルには直線部と曲線部とが配
されていることが多く、曲線部においては予め防護工を
この曲線部に沿わせて設置させていた。
[0005] In addition, a tunnel is often provided with a straight portion and a curved portion, and in the curved portion, protective works have been installed in advance along the curved portion.

【0006】また、拡幅させたトンネル内へのコンクリ
ート、主に二次覆工用のコンクリートの打設は、コンク
リート打設終了後、前方に折畳んで搬送し、展開させて
再び設置し、その個所でコンクリートを打設する形式の
移動式型枠により行われていた。
[0006] In addition, concrete placement into the widened tunnel, mainly for secondary lining, is carried out after the concrete placement is completed, folded forward, transported, unfolded and installed again. This was done using a movable formwork in which concrete was cast at each location.

【0007】このため、移動式型枠を移動させる場合、
予め設置された防護工を避けて移動させていた。
For this reason, when moving the movable formwork,
They were moving around avoiding the protective equipment installed in advance.

【0008】また、移動式型枠とトンネル内壁面との間
へのコンクリート打設は、ラップ側(トンネル掘削側と
反対側)の下部、妻側(トンネル掘削側)の下部、ラッ
プ側の上部、妻側の上部へと順次打設するのが常であ
る。
In addition, concrete is placed between the movable formwork and the inner wall of the tunnel by lowering the lap side (opposite to the tunnel digging side), lowering the wife side (tunnel digging side), and uppering the lap side. , And is usually placed sequentially on the upper part of the wife's side.

【0009】この移動式型枠に、トンネル拡幅工事にお
ける掘削により発生する粉塵、コンクリート屑、等を集
塵するための集塵機が装着されている。
[0009] A dust collector for collecting dust, concrete debris, and the like generated by excavation in tunnel widening work is mounted on the movable formwork.

【0010】なお、図4〜図6中、42は既存トンネ
ル、44は拡幅させたトンネル、46は防護工(プロテ
クター)を示す。
In FIGS. 4 to 6, reference numeral 42 denotes an existing tunnel, 44 denotes a widened tunnel, and 46 denotes a protector.

【0011】[0011]

【発明が解決しようとする課題】従来、トンネル拡幅工
事において、工事の前工程として、通行車両を保護する
ための防護工(プロテクター)をトンネル全長にわたっ
て予め設置させる必要があり、この作業が煩雑であるば
かりか、工期遅延の要因となっていた。
Conventionally, in tunnel widening work, as a pre-process of the work, it is necessary to install a protective work (protector) for protecting the passing vehicles in advance over the entire length of the tunnel, which is complicated. Not only that, but it was a factor in delaying the construction period.

【0012】また、移動式型枠の移動において、移動式
型枠の下方に設置された防護工内には一般車両が通行し
ているため、この防護工を避けて移動させる必要があ
り、特にトンネル中心から偏心させた状態で拡幅する場
合、トンネルの曲線部である場合、の移動においては、
より慎重に行わなければならず、作業性が極めて良くな
いことが問題となっていた。
[0012] Further, in the movement of the movable formwork, since ordinary vehicles pass through the protective work installed below the movable formwork, it is necessary to move the movable formwork while avoiding the protective work. In the case of widening in the state of being eccentric from the center of the tunnel, in the case of the curved part of the tunnel,
It had to be done more carefully and the workability was extremely poor.

【0013】本発明は、このような欠点に鑑み、トンネ
ル拡幅工事において、防護工の設置および拡幅させたト
ンネル内へのコンクリート打設を極めて容易に行うこと
ができるトンネル拡幅工事におけるコンクリート打設方
法および装置を提供することを目的とするものである。
SUMMARY OF THE INVENTION In view of the above drawbacks, the present invention provides a concrete casting method in tunnel widening work in which protection works can be installed and concrete can be cast into the widened tunnel very easily. And an apparatus.

【0014】[0014]

【課題を解決するための手段】本発明は、トンネルの拡
幅工事における、下方に車両通行部を確保できる型枠を
使用してコンクリートを打設する方法、装置において、
型枠の車両通行部に型枠の全長に沿わせて吊下させた、
通行車両を保護するための前後方向を開口させた防護工
を、トンネルの車両通行帯に設置し、通行車両を保護し
た後、型枠と拡幅させたトンネル内壁面との間にコンク
リートを打設することを特徴とするもの、または防護工
を型枠に対して水平方向または/および上下方向に移動
自在とし、トンネルの車両通行帯に沿わせて設置させる
ことを特徴とするもの、または防護工の両側下部を伸縮
自在とし、防護工の両側下端縁をトンネルの車両通行帯
と密着させることを特徴とするもの、または防護工を長
さ方向に屈曲自在とし、トンネルの車両通行帯への対応
性を向上させることを特徴とするものである。
SUMMARY OF THE INVENTION The present invention relates to a method and an apparatus for placing concrete using a formwork capable of securing a vehicle traffic section below during widening work of a tunnel.
It was suspended along the entire length of the formwork in the vehicle traffic section of the formwork,
Protectors with open front and rear sides to protect the passing vehicles are installed in the tunnel's vehicle lane, and after protecting the passing vehicles, concrete is poured between the formwork and the widened inner wall of the tunnel. Or a protector capable of moving horizontally or / and vertically with respect to a formwork, and being installed along a vehicle lane of a tunnel, or a protector. The lower part of both sides can be extended and contracted, and the lower edge on both sides of the protective structure is in close contact with the vehicle lane of the tunnel, or the protective structure can be bent in the length direction to accommodate the vehicle lane of the tunnel It is characterized by improving the performance.

【0015】[0015]

【発明の実施の形態】本発明に係るトンネル拡幅工事に
おけるコンクリート打設装置は、トンネル12内にコン
クリート14、主に二次覆工用コンクリートを打設する
ための移動式の型枠16に装着されるものであり、図1
〜図3に示すように、以下の構成からなるものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A concrete casting apparatus for widening a tunnel according to the present invention is mounted on a movable formwork 16 for placing concrete 14 in a tunnel 12, mainly concrete for secondary lining. Figure 1
As shown in FIG. 3, it has the following configuration.

【0016】なお、本明細書中、「車両通行帯」は、既
存トンネルの車両道路部のことをいう。
In the present specification, "vehicle lane" refers to a vehicle road portion of an existing tunnel.

【0017】型枠16の下方に車両通行部18が確保さ
れている。
A vehicle traffic section 18 is secured below the formwork 16.

【0018】この型枠16の車両通行部18に、型枠1
6の全長に沿わせて、通行車両を保護するための前後方
向を開口させた防護工20を、型枠16に対して水平方
向に移動自在に吊下させてある。
The vehicle 1 has a form 1
A protector 20 having an opening in the front-rear direction for protecting the passing vehicle is suspended along the full length of the mold 6 so as to be movable in the horizontal direction with respect to the formwork 16.

【0019】本例において、防護工20の型枠16に対
して水平方向への移動手段は、伸縮シリンダー22であ
る。
In this embodiment, the means for moving the protective member 20 in the horizontal direction with respect to the mold 16 is an extendable cylinder 22.

【0020】防護工20の両側下端縁をトンネル12の
車両通行帯24と密着させるため、防護工20の両側下
部を伸縮自在としてある。
In order to make the lower edges of both sides of the protective structure 20 adhere to the vehicle lane 24 of the tunnel 12, the lower portions on both sides of the protective structure 20 are extendable and contractible.

【0021】また、防護工20の両側下部の伸縮手段
は、防護工20の下部を二重構造とし、内部防護工26
を防護工20に対して上下方向に移動させる伸縮ジャッ
キ28である。
The extension means at the lower part on both sides of the protective member 20 has a double structure at the lower part of the protective member 20, and the inner protective member 26 has a double structure.
Is a telescopic jack 28 for vertically moving the protective jack 20 with respect to the protective worker 20.

【0022】また、防護工20は枠体と覆板とにより前
後方向および下方を開口させてコ字型とし、底板を省略
した形状に形成され、さらに長さ方向において、車両通
行帯24への対応性を向上させるため、ヒンジ構造30
を採用することにより屈曲自在としてある。
Further, the protective member 20 is formed in a U-shape by opening the front and rear directions and a lower portion by a frame and a cover plate, and is formed in a shape omitting a bottom plate. In order to improve compatibility, the hinge structure 30
It is bendable by adopting.

【0023】この防護工20の下方を開口させてコ字型
とし、底板を省略するのは、防護工20の軽量化を図
り、取扱性を向上させるためである。
The reason why the lower part of the protective member 20 is opened to form a U-shape and the bottom plate is omitted is to reduce the weight of the protective member 20 and to improve the handleability.

【0024】なお、図中32は型枠16を移動させるた
めの駆動部、34は既二次覆工部、36は掘削部、38
は掘削部用プロテクター、40は拡幅させたトンネル内
壁面を示す。
In the drawing, reference numeral 32 denotes a drive unit for moving the form 16; 34, a secondary lining unit; 36, an excavation unit;
Indicates a protector for an excavated portion, and 40 indicates an inner wall surface of the tunnel which is widened.

【0025】本装置を使用してトンネル12の拡幅工事
におけるコンクリート14、主に二次覆工用コンクリー
トを打設する方法を以下に詳述する。
A method of placing concrete 14, mainly concrete for secondary lining in widening work of the tunnel 12 using the present apparatus will be described in detail below.

【0026】まず、型枠16を掘削により拡幅させたト
ンネル12の所定位置まで移動させる。
First, the form 16 is moved to a predetermined position of the tunnel 12 whose width has been widened by excavation.

【0027】この際、型枠16のラップ側(トンネル掘
削側と反対側)は既二次覆工部34に重合させる必要が
ある。
At this time, the wrap side (the side opposite to the tunnel excavation side) of the formwork 16 needs to be overlapped with the existing secondary lining portion 34.

【0028】次に、防護工20を、型枠16下方のトン
ネル12の車両通行帯24の所定部位へ移動させ、設置
する。
Next, the protective work 20 is moved to a predetermined portion of the vehicle lane 24 of the tunnel 12 below the formwork 16 and installed.

【0029】この際、防護工20の型枠16に対する水
平方向の移動は伸縮シリンダー22により行い、また防
護工20を長さ方向に対してヒンジ構造30により屈曲
させ、車両通行帯24の平面形状、例えば曲線に対応さ
せる。
At this time, the protection man 20 is moved in the horizontal direction with respect to the formwork 16 by the telescopic cylinder 22, and the protection man 20 is bent by the hinge structure 30 in the longitudinal direction, so that the plane shape of the vehicle lane 24 is changed. , For example, corresponding to a curve.

【0030】また、防護工20の両側下端縁を伸縮ジャ
ッキ28によりそれぞれ伸縮させ、トンネル12の車両
通行帯24の傾斜等の形状に対応させて、防護工20の
両側下端縁をトンネル12の車両通行帯24にそれぞれ
密着させることができ、本例のように下方を開口させて
コ字型とし、底板を省略した防護工20を使用する際に
は極めて有用である。
The lower edges of both sides of the protective structure 20 are expanded and contracted by the expansion jacks 28 so as to correspond to the shape of the vehicle lane 24 of the tunnel 12 such as the inclination of the vehicle. It can be in close contact with each of the traffic belts 24, and is very useful when using a protective work 20 having a U-shape with an opening at the bottom as in this example and omitting the bottom plate.

【0031】このため、トンネル12の車両通行帯24
が防護工20により確実に保護されるため、車両通行帯
24を通行する車両へのトンネル拡幅工事により発生す
る粉塵、コンクリート屑、およびコンクリート打設時に
発生するコンクリート屑、等の影響が全くなく、車両は
安全に通行することができる。
Therefore, the vehicle traffic zone 24 of the tunnel 12
Is reliably protected by the protective work 20, so there is no influence of dust, concrete debris generated by tunnel widening work on vehicles passing through the vehicle lane 24, and concrete debris generated at the time of placing concrete, etc. The vehicle can pass safely.

【0032】次に、型枠16の妻側周縁を確実に被覆
(妻止め)する。
Next, the peripheral edge on the wife side of the formwork 16 is securely covered with the wife edge.

【0033】次に、型枠16と拡幅させたトンネル内壁
面40との間にコンクリート14を打設する。
Next, concrete 14 is cast between the formwork 16 and the widened inner wall surface 40 of the tunnel.

【0034】この際、コンクリート打設量に応じて、振
動具(図示略)を介してコンクリート14を振動させ、
締固めると共に、気泡を除去することにより、養生硬化
後のコンクリートの強度、耐久性を向上させることが望
ましい。
At this time, the concrete 14 is vibrated via a vibrator (not shown) in accordance with the amount of concrete poured.
It is desirable to improve the strength and durability of the concrete after curing and hardening by compacting and removing bubbles.

【0035】次に、型枠16が設置された個所のコンク
リート打設完了後、打設コンクリート14を養生硬化さ
せ、型枠16を脱型する。
Next, after the concrete placement at the place where the form 16 is installed is completed, the cast concrete 14 is cured and hardened, and the form 16 is removed from the mold.

【0036】この型枠16の脱型により、拡幅させたト
ンネル12内への二次覆工用のコンクリート14の打設
が完了する。
The removal of the mold 16 completes the placement of the concrete 14 for secondary lining into the widened tunnel 12.

【0037】次に、防護工20を型枠16の車両通行部
18の上方へ吊揚げ、型枠16を防護工20と共に次工
程位置へ移動させ、防護工20を移動させたトンネル1
2の車両通行帯24に設置後、コンクリート14の打
設、コンクリート14の養生硬化、型枠16の脱型、等
を拡幅させたトンネル12の全長にわたり連続して行
う。
Next, the protector 20 is lifted above the vehicle passing portion 18 of the formwork 16, the formwork 16 is moved together with the protector 20 to the next process position, and the tunnel 1 where the protector 20 is moved is moved.
After installation in the vehicle traffic zone 24, casting of concrete 14, curing and curing of concrete 14, removal of the mold 16 and the like are performed continuously over the entire length of the widened tunnel 12.

【0038】また、掘削部用プロテクター38と、本防
護工20との間に空隙が生ずるが、型枠16には従来と
同様、集塵機(図示略)が装着されており、この集塵機
により掘削部36で発生する粉塵、コンクリート屑、お
よびコンクリート打設時に発生するコンクリート屑、等
を集塵するため、この空隙を通行する一般車両には何ら
影響を及ぼすことがない。
Although a gap is formed between the protector 38 for the excavation part and the protective body 20, a dust collector (not shown) is mounted on the form 16 as in the prior art. Since dust and concrete debris generated at 36 and concrete debris generated at the time of concrete casting are collected, there is no effect on ordinary vehicles passing through this gap.

【0039】このように、本発明に係る拡幅工事におけ
るコンクリート打設方法においては、型枠16に吊下さ
せた防護工20を、型枠16に対して水平方向に移動さ
せ、防護工20の両側下端縁を伸縮させることにより、
防護工20をトンネル12の車両通行帯24に対応さ
せ、かつ密着させた状態で設置させるため、従来のよう
にトンネル12の全長にわたって防護工(プロテクタ
ー)を設置する必要が全くなく、防護工20の内部が拡
幅工事により発生する粉塵、コンクリート屑、およびコ
ンクリート打設により発生するコンクリート屑、等に影
響されることがなく、防護工20内部を車両が安全に通
行することができる。
As described above, in the concrete casting method for widening work according to the present invention, the protective work 20 suspended from the formwork 16 is moved in the horizontal direction with respect to the formwork 16 so that the protective work 20 By expanding and contracting both lower edges,
Since the protector 20 is installed so as to correspond to the vehicle lane 24 of the tunnel 12 and is in close contact therewith, there is no need to install a protector (protector) over the entire length of the tunnel 12 as in the related art. The interior of the vehicle is not affected by dust, concrete debris generated by widening work, concrete debris generated by concrete casting, and the like, and the vehicle can safely pass through the inside of the protective work 20.

【0040】なお、本例において、防護工20は型枠1
6に対して水平方向に移動自在に吊下され、その両側下
部を伸縮自在としてあるが、拡幅工事させるトンネル1
2の車両通行帯24がトンネル12の全長にわたり直線
部のみで構成される場合には、防護工20の型枠16に
対する水平方向への移動、防護工20の両側下部の伸
縮、は必要がなく、各移動、伸縮手段並びにヒンジ構造
30を省略できることは自明である。
In this example, the protective work 20 is the formwork 1
6 is suspended movably in the horizontal direction, and the lower part on both sides is stretchable.
In the case where the second vehicle lane 24 is composed of only a straight portion over the entire length of the tunnel 12, it is not necessary to move the protective member 20 in the horizontal direction with respect to the formwork 16 and expand and contract the lower portions on both sides of the protective member 20. It is self-evident that each moving and expanding / contracting means and the hinge structure 30 can be omitted.

【0041】この防護工20の型枠16に対する水平方
向への移動、または防護工20の両側下部の伸縮、をさ
せない場合であっても、従来のようにトンネル全長にわ
たって防護工(プロテクター)を設置する必要がなく、
作業性を向上できることは自明である。
Even if the protection work 20 is not moved in the horizontal direction with respect to the formwork 16 or the lower portions on both sides of the protection work 20 are not expanded or contracted, a protection work (protector) is installed over the entire length of the tunnel as in the conventional case. No need to
It is obvious that workability can be improved.

【0042】これに加え、防護工20に型枠16に対す
る水平方向への移動手段、防護工20の両側下部の伸縮
手段、ヒンジ構造30を省略する場合には、構造が極め
て簡易となり、製造コストを激減できることは自明であ
る。
In addition, in the case where the protective means 20 is not provided with the means for moving the protector 20 in the horizontal direction with respect to the formwork 16, the expansion and contraction means on both lower sides of the protective means 20, and the hinge structure 30, the structure becomes extremely simple and the manufacturing cost is reduced. It is self-evident that we can drastically reduce this.

【0043】また、防護工20の型枠16に対する水平
方向への移動手段は伸縮シリンダー22であり、防護工
20の両側下部の伸縮手段は伸縮ジャッキ30によるも
のであるが、他の移動、伸縮手段を採用することは自由
である。
The means for moving the protective worker 20 in the horizontal direction with respect to the formwork 16 is the telescopic cylinder 22, and the telescopic means at the lower portion on both sides of the protective worker 20 is provided by the telescopic jack 30. It is free to adopt means.

【0044】また、防護工20は、型枠16に対して水
平方向に移動させるものであるが、上下方向にも移動さ
せること、あるいは水平方向または上下方向の一方にの
み移動させることは自明である。
The protective worker 20 moves the mold 16 in the horizontal direction, but it is obvious that the protector 20 can also move in the vertical direction or move only in one of the horizontal direction and the vertical direction. is there.

【0045】また、防護工20は前後方向および下方を
開口させてコ字型とし、底板を省略した形状であるが、
下方を開口させなくてもよく、また形状においても本形
状に限定されるものではない。
The protective member 20 has a U-shape with an opening in the front-rear direction and below, and has a shape in which the bottom plate is omitted.
It is not necessary to open the lower part, and the shape is not limited to this shape.

【0046】また、本発明の方法および装置は、略半円
形のトンネル円形のトンネル、例えば海中トンネル、下
水道等、特に用途は限定されない。
The method and apparatus of the present invention are not particularly limited for use, such as a substantially semicircular tunnel, a circular tunnel, for example, an underwater tunnel and a sewer.

【0047】[0047]

【発明の効果】本発明に係るトンネル拡幅工事における
コンクリート打設方法およびその装置によれば、型枠の
下方の車両通行部に吊下させた防護工を、トンネルの車
両通行帯に設置し、通行車両を保護した後、型枠と拡幅
させたトンネル内壁面との間にコンクリートを打設する
ため、従来のように予め防護工をトンネル全長にわたっ
て設置させる必要がなく、この作業負担を激減させるこ
とができ、ひいては工期の大幅な短縮を図ることができ
る。
According to the concrete casting method and apparatus for widening a tunnel according to the present invention, a protective work suspended in a vehicle traffic section below a formwork is installed in a vehicle traffic zone of a tunnel. After protecting the passing vehicle, concrete is cast between the formwork and the widened inner wall of the tunnel, so there is no need to install protective works in advance over the entire length of the tunnel as in the past, and this work load is drastically reduced. Thus, the construction period can be significantly reduced.

【0048】また、防護工を型枠に対して水平方向また
は/および上下方向に移動自在とし、トンネルの車両通
行帯に沿わせて設置させることにより、車両通行帯の所
定部位へ防護工を極めて容易に設置することができ、防
護工設置に係る作業性を向上させることができる。
Further, the protective device can be moved in the horizontal direction and / or the vertical direction with respect to the formwork and installed along the vehicle traffic band of the tunnel, so that the protective structure can be extremely positioned at a predetermined portion of the vehicle traffic band. It can be easily installed, and the workability related to the installation of protective works can be improved.

【0049】また、防護工の両側下部を伸縮自在とし、
防護工の両側下端縁をトンネルの車両通行帯と密着させ
ることにより、防護工の内部が拡幅工事により発生する
粉塵、コンクリート屑、およびコンクリート打設により
発生するコンクリート屑、等に影響されることがなく、
防護工内部を車両が安全に通行することができるばかり
か、拡幅工事によるコンクリート打設作業を安全に行う
ことができ、下方を開口させてコ字型とし、底板を省略
した防護工には極めて有用である。
Also, the lower parts on both sides of the protective work are made to be able to expand and contract,
By adhering the lower edges of both sides of the protective structure to the traffic lane of the tunnel, the inside of the protective structure may be affected by dust, concrete debris generated by widening work, and concrete debris generated by concrete casting. Not
Not only can the vehicle pass safely through the inside of the protective work, but also concrete casting work by widening work can be performed safely. Useful.

【0050】また、防護工を長さ方向に対して屈曲自在
とすることにより、車両通行帯の平面形状、例えば曲線
に容易に対応させることができ、車両通行帯への対応性
を向上させることができる。
Further, by making the protective work bendable in the longitudinal direction, it is possible to easily correspond to the plane shape of the vehicle lane, for example, a curve, and to improve the compatibility with the vehicle lane. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る拡幅工事におけるコンクリート打
設装置の正面図。
FIG. 1 is a front view of a concrete placing device in widening work according to the present invention.

【図2】同、側面図。FIG. 2 is a side view of the same.

【図3】同、使用状態を示す側面図。FIG. 3 is a side view showing the state of use.

【図4】拡幅工事前のトンネルの正面図。FIG. 4 is a front view of a tunnel before widening work.

【図5】トンネル外周から均一に外方に拡幅工事を行っ
たトンネルの正面図。
FIG. 5 is a front view of a tunnel in which widening work has been performed uniformly outward from the outer periphery of the tunnel.

【図6】トンネル中心から偏心させて拡幅工事を行った
トンネルの正面図。
FIG. 6 is a front view of a tunnel in which widening work is performed by eccentricity from the center of the tunnel.

【符号の説明】[Explanation of symbols]

12 トンネル 14 コンクリート 16 型枠 18 車両通行部 20 防護工 24 車両通行帯 40 トンネル内壁面 DESCRIPTION OF SYMBOLS 12 Tunnel 14 Concrete 16 Formwork 18 Vehicle traffic section 20 Protective work 24 Vehicle traffic zone 40 Tunnel inner wall surface

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 トンネル(12)の拡幅工事における、下方
に車両通行部(18)を確保できる型枠(16)を使用してコン
クリート(14)を打設する方法において、型枠(16)の車両
通行部(18)に型枠(16)の全長に沿わせて吊下させた、通
行車両を保護するための前後方向を開口させた防護工(2
0)を、トンネル(12)の車両通行帯(24)に設置し、通行車
両を保護した後、型枠(16)と拡幅させたトンネル内壁面
(40)との間にコンクリート(14)を打設することを特徴と
するトンネル拡幅工事におけるコンクリート打設方法。
1. A method for casting concrete (14) using a form (16) capable of securing a vehicle traffic section (18) below in widening work of a tunnel (12). A protective work (2) suspended along the entire length of the formwork (16) on the vehicle traffic section (18)
(0) is installed in the vehicle lane (24) of the tunnel (12) to protect the vehicles, then the formwork (16) and the widened inner wall of the tunnel
A method for placing concrete in tunnel widening work, comprising placing concrete (14) between the concrete and the (40).
【請求項2】 防護工(20)を、型枠(16)に対して水平方
向または/および上下方向に移動自在とし、トンネル(1
2)の車両通行帯(24)に沿わせて設置させることを特徴と
する請求項1記載のトンネル拡幅工事におけるコンクリ
ート打設方法。
2. The tunnel protector (20) is movable horizontally and / or vertically with respect to the formwork (16).
2. The concrete placing method in tunnel widening work according to claim 1, wherein the concrete placing method is installed along the vehicle lane (24).
【請求項3】 防護工(20)の両側下部を伸縮自在とし、
防護工(20)の両側下端縁をトンネル(12)の車両通行帯(2
4)と密着させることを特徴とする請求項1または請求項
2記載のトンネル拡幅工事におけるコンクリート打設方
法。
3. The lower part on both sides of the protective work (20) is made to be telescopic,
Connect the lower edge of both sides of the protective work (20) to the vehicle lane (2) of the tunnel (12).
3. The method for placing concrete in tunnel widening work according to claim 1 or 2, wherein the concrete is placed in close contact with (4).
【請求項4】 防護工(20)を長さ方向に対して屈曲自在
とし、トンネル(12)の車両通行帯(24)への対応性を向上
させることを特徴とする請求項1、請求項2または請求
項3記載のトンネル拡幅工事におけるコンクリート打設
方法。
4. The protection device according to claim 1, wherein the protection work is made flexible in the longitudinal direction so as to improve the responsiveness of the tunnel to the traffic zone of the vehicle. 4. The method for placing concrete in tunnel widening work according to claim 2.
【請求項5】 トンネル(12)の拡幅工事における、下方
に車両通行部(18)を確保できる型枠(16)を使用してコン
クリート(14)を打設する装置において、型枠(16)の車両
通行部(18)に、型枠(16)の全長に沿わせて、通行車両を
保護するための前後方向を開口させた防護工(20)を、吊
下させてなり、防護工(20)をトンネル(12)の車両通行帯
(24)に設置し、通行車両を保護した後、型枠(16)と拡幅
させたトンネル内壁面(40)との間にコンクリート(14)を
打設することを特徴とするトンネル拡幅工事におけるコ
ンクリート打設装置。
5. An apparatus for placing concrete (14) using a formwork (16) capable of securing a vehicle traffic section (18) below during widening work of a tunnel (12). In the vehicle traffic section (18), along the entire length of the formwork (16), a protective work (20) having an opening in the front-rear direction for protecting the passing vehicle is suspended, and the protective work ( 20) Tunnel (12) vehicle lane
(24) to protect the passing vehicles, and then cast concrete (14) between the formwork (16) and the widened tunnel inner wall surface (40). Concrete casting equipment.
【請求項6】 防護工(20)を、型枠(16)に対して水平方
向または/および上下方向に移動自在とし、トンネル(1
2)の車両通行帯(24)に沿わせて設置させることを特徴と
する請求項5記載のトンネル拡幅工事におけるコンクリ
ート打設装置。
6. The protective device (20) is movable horizontally or / and vertically with respect to the formwork (16), and the tunnel (1) is provided.
6. The concrete placing device according to claim 5, wherein the concrete placing device is installed along the vehicle lane (24).
【請求項7】 防護工(20)の両側下部を伸縮自在とし、
防護工(20)の両側下端縁をトンネル(12)の車両通行帯(2
4)と密着させることを特徴とする請求項5または請求項
6記載のトンネル拡幅工事におけるコンクリート打設装
置。
7. The lower part on both sides of the protective work (20) is made to be able to expand and contract,
Connect the lower edge of both sides of the protective work (20) to the vehicle lane (2) of the tunnel (12).
7. The concrete placing device in tunnel widening work according to claim 5, wherein the concrete placing device is brought into close contact with (4).
【請求項8】 防護工(20)を長さ方向に対して屈曲自在
とし、トンネル(12)の車両通行帯(24)への対応性を向上
させることを特徴とする請求項5、請求項6または請求
項7記載のトンネル拡幅工事におけるコンクリート打設
装置。
8. The protection device according to claim 5, wherein the protective member is made freely bendable in the longitudinal direction so as to improve the responsiveness of the tunnel to the vehicle lane. The concrete placing device according to claim 6 or 7, wherein the concrete is placed in a tunnel widening work.
JP2001030814A 2001-02-07 2001-02-07 Method and apparatus for placing concrete in tunnel widening work Expired - Lifetime JP4522596B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001030814A JP4522596B2 (en) 2001-02-07 2001-02-07 Method and apparatus for placing concrete in tunnel widening work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001030814A JP4522596B2 (en) 2001-02-07 2001-02-07 Method and apparatus for placing concrete in tunnel widening work

Publications (2)

Publication Number Publication Date
JP2002235495A true JP2002235495A (en) 2002-08-23
JP4522596B2 JP4522596B2 (en) 2010-08-11

Family

ID=18894982

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001030814A Expired - Lifetime JP4522596B2 (en) 2001-02-07 2001-02-07 Method and apparatus for placing concrete in tunnel widening work

Country Status (1)

Country Link
JP (1) JP4522596B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100424322C (en) * 2006-08-23 2008-10-08 中铁隧道集团有限公司 Full circle once lining segregation type nose girder module bench and its construction method
KR101063773B1 (en) * 2011-05-06 2011-09-08 (주)대우건설 Tunnel side corresponding protector for expanding running tunnel
CN102619535A (en) * 2012-04-12 2012-08-01 中铁十二局集团有限公司 Folding tunnel widening trolley
CN105569670A (en) * 2016-01-29 2016-05-11 河南铁福来装备制造股份有限公司 Coal mine tunnel track walking large-span truss type operation platform
JP2017193885A (en) * 2016-04-21 2017-10-26 株式会社鴻池組 Reconstruction method of lining part in existing 2-traffic lane road tunnel
JP2018127846A (en) * 2017-02-10 2018-08-16 鉄建建設株式会社 Silencer for tunnel and silencer system
CN108952769A (en) * 2018-08-31 2018-12-07 中国十九冶集团有限公司 Tunnel Second Lining formwork jumbo method for maintaining
JP2021173093A (en) * 2020-04-28 2021-11-01 国立研究開発法人土木研究所 Method for remodeling existing road tunnel lining part and device used therefor

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726897A (en) * 1993-07-13 1995-01-27 Fukudagumi:Kk Automatic setting method of arch center and automatic setter for arch center used for automatic setting method
JPH11229751A (en) * 1998-02-17 1999-08-24 Taisei Corp Widening device for existing tunnel

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726897A (en) * 1993-07-13 1995-01-27 Fukudagumi:Kk Automatic setting method of arch center and automatic setter for arch center used for automatic setting method
JPH11229751A (en) * 1998-02-17 1999-08-24 Taisei Corp Widening device for existing tunnel

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100424322C (en) * 2006-08-23 2008-10-08 中铁隧道集团有限公司 Full circle once lining segregation type nose girder module bench and its construction method
KR101063773B1 (en) * 2011-05-06 2011-09-08 (주)대우건설 Tunnel side corresponding protector for expanding running tunnel
CN102619535A (en) * 2012-04-12 2012-08-01 中铁十二局集团有限公司 Folding tunnel widening trolley
CN102619535B (en) * 2012-04-12 2015-04-29 中铁十二局集团有限公司 Folding tunnel widening trolley
CN105569670A (en) * 2016-01-29 2016-05-11 河南铁福来装备制造股份有限公司 Coal mine tunnel track walking large-span truss type operation platform
JP2017193885A (en) * 2016-04-21 2017-10-26 株式会社鴻池組 Reconstruction method of lining part in existing 2-traffic lane road tunnel
JP2018127846A (en) * 2017-02-10 2018-08-16 鉄建建設株式会社 Silencer for tunnel and silencer system
CN108952769A (en) * 2018-08-31 2018-12-07 中国十九冶集团有限公司 Tunnel Second Lining formwork jumbo method for maintaining
JP2021173093A (en) * 2020-04-28 2021-11-01 国立研究開発法人土木研究所 Method for remodeling existing road tunnel lining part and device used therefor
JP7266774B2 (en) 2020-04-28 2023-05-01 国立研究開発法人土木研究所 Reconstruction method of existing road tunnel lining and equipment used therefor

Also Published As

Publication number Publication date
JP4522596B2 (en) 2010-08-11

Similar Documents

Publication Publication Date Title
JP2002235495A (en) Concrete placing method and device for tunnel widening work
JP4044719B2 (en) Method and apparatus for extending waterproof sheet or gap suppressing material to tunnel
JP2003232196A (en) Tunnel invert construction method and device for the same
JP4156436B2 (en) Tunnel invert construction method using mobile jetty and mobile jetty
JP3822525B2 (en) Tunnel invert construction method using mobile jetty and mobile jetty
JP3789100B2 (en) How to build a widening tunnel
JP4283419B2 (en) Method and apparatus for fixing concrete for tunnel lining
JP7182176B2 (en) Tunnel lining method
JPH10238296A (en) End stopping method for first tunnel lining concrete and its device and for end stop use air bag
JP3856301B2 (en) Expansion method of existing tunnel using mobile work platform
JP4080226B2 (en) Mobile jetty
JPH08338006A (en) Pier for construction work in tunnel
JP3527106B2 (en) Concrete placement method using formwork fitted with boxless foam
JP2003129800A (en) Concrete placing method and its apparatus for tunnel
JP3523818B2 (en) Pier for tunnel construction
CN110387885A (en) The construction method that prefabricated PC temporarily covers
JPH1162489A (en) Tonnel covering method and device, and permanently covering body for tonnel
JPH07269109A (en) Form device and constructing method for guide way for motor car using above device
JP3278371B2 (en) Direct casting method of tunnel interior plate and its equipment
JP3950208B2 (en) Apparatus for placing concrete for secondary lining in tunnel and method for placing concrete for secondary lining using the apparatus
JP2634931B2 (en) Wife stop
JP2796694B2 (en) Formwork for sub pipe protection concrete construction
JP4044654B2 (en) Method of placing concrete for tunnels using forms with different cross-sectional shapes on the wife side
JPH01275897A (en) Tunnel covering construction and its apparatus
JP2002021468A (en) Landing bridge for tunneling work

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091201

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100427

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100526

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4522596

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160604

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term