JPH08338006A - Pier for construction work in tunnel - Google Patents

Pier for construction work in tunnel

Info

Publication number
JPH08338006A
JPH08338006A JP7147609A JP14760995A JPH08338006A JP H08338006 A JPH08338006 A JP H08338006A JP 7147609 A JP7147609 A JP 7147609A JP 14760995 A JP14760995 A JP 14760995A JP H08338006 A JPH08338006 A JP H08338006A
Authority
JP
Japan
Prior art keywords
pier
tunnel
invert
work
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7147609A
Other languages
Japanese (ja)
Other versions
JP2736761B2 (en
Inventor
Katsumi Hayasaka
勝美 早坂
Tadashi Miyayasu
正 宮保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUKUDAGUMI KK
SAGA KOGYO KK
Original Assignee
FUKUDAGUMI KK
SAGA KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUKUDAGUMI KK, SAGA KOGYO KK filed Critical FUKUDAGUMI KK
Priority to JP7147609A priority Critical patent/JP2736761B2/en
Publication of JPH08338006A publication Critical patent/JPH08338006A/en
Application granted granted Critical
Publication of JP2736761B2 publication Critical patent/JP2736761B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE: To improve workability by mounting a horizontally rotatable inclined plate in front of a movable pier, installing the pier at the central section of tunnel width and alternately placing invert concrete left and right. CONSTITUTION: A pier 5 for tunnel construction works, in which inclined plates 4 capable of being suspended are set up before and behind a fixed section 1 movable by wheels 10 and the inclined plate 4 in front is fitted rotatably in the horizontal direction, is installed at the central section of tunnel width. An unexcavated invert section B is excavated as alternately rotating the front inclined plate 4 left and right while concrete C is placed on an excavated invert section D, and the pier 5 is shifted successively as the excavation of a tunnel progresses. An internal-surface lining device (a centering) movable while crossing over the pier 5 is mounted, and the lining works of the tunnel is conducted in parallel with excavation operation. Accordingly, execution works can be performed efficiently.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、インバート施工作業に
使用するトンネル内工事用桟橋に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pier for construction in a tunnel used for invert construction work.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】従来か
ら行われているトンネル53のインバート(床部分)にコ
ンクリートを打設する作業は、トンネル53のインバート
を掘削し(インバート掘削作業)、続いて、該掘削箇所
にコンクリートを打設し(インバートコンクリート打設
作業)、続いて、埋め戻すという作業(以下、この一連
の作業をインバート施工作業という。)を片側ずつ行
い、抗口側から切羽側へ向かってこのインバート施工作
業を順次進めていく手順となる(図1参照)。図1中51
はインバートコンクリート打設終了箇所、52はインバー
ト未掘削箇所である。
2. Description of the Related Art Conventionally, the work of placing concrete in the invert (floor portion) of the tunnel 53 is performed by excavating the invert of the tunnel 53 (invert excavation work), and Then, concrete is placed in the excavation site (invert concrete placement work), and then backfilling (hereinafter, this series of work is called invert construction work) is performed one by one, and the face is cut from the side This is a procedure for sequentially proceeding with this invert construction work toward the side (see Fig. 1). 51 in Figure 1
Is the invert concrete pouring end point, and 52 is the invert unexcavated point.

【0003】ところで、このインバート施工作業は、同
時に切羽で行われている掘削作業で生じる掘削土砂をト
ンネル外に搬出する作業に支障を来さないようにして行
われなければならない。即ち、インバート施工作業時に
おいても切羽から抗口までの作業車両等の通行路が確保
されていることが必要不可欠とされている(図1参
照)。切羽での掘削作業の他、トンネル側壁へのコンク
リート打設作業等の為の作業車両の通行路確保も必要と
なる。
By the way, this invert construction work must be carried out so as not to hinder the work of carrying out the excavated earth and sand generated by the excavation work being carried out by the face at the same time out of the tunnel. That is, it is indispensable that a passage for work vehicles and the like from the face to the entrance is secured during the invert construction work (see FIG. 1). In addition to excavation work using a face, it is also necessary to secure a passageway for work vehicles for concrete placing work on the side wall of the tunnel.

【0004】そこで、インバート施工作業箇所に架設さ
れる桟橋41、即ち、インバートコンクリート打設作業終
了後埋め戻した箇所42とインバート未掘削作業箇所43と
の間に架設される作業車両通行用の図2に図示した桟橋
41が提案されている。
Therefore, a pier 41 to be erected at the invert construction work site, that is, a drawing for a work vehicle to be erected between the pier 41 which is backfilled after the completion of the invert concrete pouring work and the invert unexcavated work site 43 Pier illustrated in 2
41 have been proposed.

【0005】しかし、この桟橋41は該桟橋41の下側のイ
ンバート施工作業が厄介であり、作業効率が悪いという
欠点を有している。
However, this pier 41 has a drawback that the invert construction work on the lower side of the pier 41 is troublesome and the work efficiency is poor.

【0006】このような問題点を解決すべく、近年、図
3に図示したようなインバート施工作業用の桟橋24(以
下、従来例という。)が提案されている。この従来例に
係る桟橋24は、中央部21の前後に該中央部21に対して擺
動する傾斜板22,23を連設したもので、この桟橋24の中
央部21にはトンネル巾方向いっぱいに延設されるレール
25が油圧機構等の適宜な昇降手段28を介して付設され、
また、該中央部21の裏面には該中央部21即ち桟橋24をト
ンネル長さ方向に移動させる車輪26が設けられている。
In order to solve such a problem, a jetty 24 for invert construction work (hereinafter referred to as a conventional example) as shown in FIG. 3 has been proposed in recent years. The jetty 24 according to this conventional example is one in which inclined plates 22 and 23 that slide relative to the central portion 21 are provided in front of and behind the central portion 21, and the central portion 21 of the jetty 24 extends over the entire width of the tunnel. Rail extended
25 is attached via an appropriate lifting means 28 such as a hydraulic mechanism,
Wheels 26 for moving the central portion 21, that is, the pier 24 in the tunnel length direction are provided on the back surface of the central portion 21.

【0007】尚、この桟橋24の裏面にはレール25上を転
動して該桟橋24をトンネル巾方向に移動させる為の転動
体27が設けられている。
A rolling element 27 for rolling on the rail 25 and moving the jetty 24 in the width direction of the tunnel is provided on the back surface of the jetty 24.

【0008】この従来例は、桟橋24を所定の場所に車輪
26を利用して移動させ、インバートコンクリート打設終
了後埋め戻した箇所29とインバート未掘削作業箇所30と
の間に該桟橋24を架設し(符号31はインバート掘削作業
は終了しているが、未だコンクリートを打設していない
箇所である。)、前記適宜な昇降手段28によりレール25を
降下接地させ、車輪26を地面から浮き上がらせる。そし
て、この状態で桟橋24をトンネル巾方向の片側に転動体
27により移動させ、該桟橋24により通行路を確保しつつ
該桟橋24の側方のインバートコンクリート打設作業及び
埋め戻し作業を行い、続いて、桟橋24を反対側に移動さ
せ同様な作業を行うものである。
In this conventional example, the pier 24 is wheeled at a predetermined position.
The pier 24 is erected between the location 29 and the invert unexcavated work location 30 that were moved back using the 26 and after the invert concrete placement was completed (the reference numeral 31 indicates that the invert excavation work has been completed, (It is a place where concrete is not yet laid.), The rail 25 is lowered and grounded by the appropriate lifting means 28, and the wheels 26 are lifted from the ground. Then, in this state, the pier 24 is rolled to one side in the width direction of the tunnel.
27 and move the pier 24 to secure the passage, and perform the invert concrete placing work and backfilling work on the side of the pier 24, and then move the pier 24 to the opposite side and perform the same work. It is a thing.

【0009】しかしながら、前記従来例には次の問題点
があることを確認した。
However, it was confirmed that the above conventional example has the following problems.

【0010】 従来例は桟橋24により通行路を確保し
た際には、該桟橋24が必ずトンネル巾方向一側、即ち、
トンネル側壁に可及的に近い位置に存することになる。
In the conventional example, when a passage is secured by the pier 24, the pier 24 is always on one side in the tunnel width direction, that is,
It will be located as close as possible to the side wall of the tunnel.

【0011】ところで、インバート施工作業と同時にト
ンネル内周面(側壁及び天井部)にコンクリートを打設
する作業が行われる。
By the way, at the same time as the invert construction work, the work of placing concrete on the inner peripheral surface (side wall and ceiling portion) of the tunnel is performed.

【0012】この作業は掘削したトンネル孔35内に配設
される図4に図示したような門型の装置(セントル32と
一般的に言われている。)により行われる。
This operation is carried out by a gate-type device (generally referred to as a center 32) arranged in the excavated tunnel hole 35 as shown in FIG.

【0013】このセントル32の開口部33の巾Lは作業車
両が一台通過可能な程度の巾Lであるのが一般的であ
り、また、桟橋24もトンネル巾のほぼ1/2の巾を有し
ている為、桟橋24がトンネル巾方向一側にある場合、セ
ントル32を可及的に桟橋24に近接させてしまうと、セン
トル32の開口部33を通過する作業車両34は桟橋24を通行
できなくなるという問題がある(図5参照)。 そこで、現状においては桟橋24とセントル32との距離を
所定の間隔に保持して各作業を進めなければならず、こ
の点が作業効率の低下を招いている。トンネルは内周面
をコンクリートで固め、更に、インバートを固めること
による迅速な閉合が要求されるが、桟橋24とセントル32
との距離を考慮しての作業は作業効率の極端な低下を招
来するのである。
The width L of the opening 33 of the center 32 is generally such that one work vehicle can pass through, and the pier 24 has a width of about 1/2 of the tunnel width. Therefore, when the pier 24 is located on one side in the tunnel width direction, if the centle 32 is brought as close as possible to the pier 24, the work vehicle 34 passing through the opening 33 of the centle 32 will cross the pier 24. There is a problem that it cannot be passed (see Fig. 5). Therefore, under the present circumstances, it is necessary to maintain the distance between the pier 24 and the center 32 at a predetermined interval to proceed with each work, which causes a decrease in work efficiency. Although the tunnel is required to be quickly closed by solidifying the inner surface with concrete and further hardening the invert, the pier 24 and the center 32
The work taking into account the distance between and causes a drastic decrease in work efficiency.

【0014】ところで、桟橋24をトンネル巾方向中央に
位置させておけば、このような問題は解消するが、桟橋
24をトンネルの側壁に可及的に近づけて初めてこのよう
な構造の従来例は意義を有するのであり、トンネル側壁
に該桟橋24を可及的に近づけることができない以上、従
来例はその特徴が十分発揮できない。
By the way, if the pier 24 is located at the center in the width direction of the tunnel, such a problem will be solved.
The conventional example of such a structure is meaningful only when the 24 is brought as close as possible to the side wall of the tunnel.Since the jetty 24 cannot be brought as close as possible to the side wall of the tunnel, the conventional example has the feature. I can't show enough.

【0015】 また、従来例はトンネル巾方向にして
所定の間隔をおいて2本の接地したレール25が存する
為、該レール25がインバート施工作業に支障を来すこと
になる。 また、従来例はトンネルが曲がっているような場
合、桟橋24をトンネル側壁に可及的に近づけることがで
きず、この点においてもインバート施工作業に支障を来
すことになる。
Further, in the conventional example, since there are two grounded rails 25 at a predetermined interval in the tunnel width direction, the rails 25 hinder the invert construction work. Further, in the conventional example, when the tunnel is bent, the pier 24 cannot be brought as close as possible to the side wall of the tunnel, and this also hinders the invert construction work.

【0016】本発明は、このような問題点を解決したト
ンネル内工事用桟橋を提供するものである。
The present invention provides a jetty for construction in a tunnel which solves the above problems.

【0017】[0017]

【課題を解決するための手段】添付図面を参照して本発
明の要旨を説明する。
The gist of the present invention will be described with reference to the accompanying drawings.

【0018】トンネルのインバートにコンクリートを打
設する場合に使用する移動部3を設けた桟橋5であっ
て、当該桟橋5は固定部1と該固定部1に対して水平方
向に回動する可動部2とで構成されていることを特徴と
するトンネル内工事用桟橋に係るものである。
A jetty 5 provided with a moving portion 3 used for placing concrete in an invert of a tunnel, the jetty 5 being a movable portion which rotates horizontally with respect to the fixed portion 1 and the fixed portion 1. The present invention relates to a pier for construction in a tunnel, which is characterized by being configured with a part 2.

【0019】請求項1記載のトンネル内工事用桟橋にお
いて、桟橋5として移動部3上にして抗口側に固定部1
が固着され、また、移動部3上にして切羽側に該移動部
3の抗口側寄りを支点にして水平方向に回動する可動部
2が設けられている桟橋5を採用したことを特徴とする
トンネル内工事用桟橋に係るものである。
In the pier for construction in a tunnel according to claim 1, the pier 5 is fixed on the movable portion 3 on the moving side 3 as the pier 5.
The pier 5 is adopted in which the movable part 2 is fixed to the moving part 3 and the movable part 2 is provided on the face of the moving part 3 which horizontally rotates about the face side of the moving part 3 as a fulcrum. It relates to the pier for construction in the tunnel.

【0020】請求項1,2いずれか1項に記載のトンネ
ル内工事用桟橋において、固定部1並びに可動部2に車
輪10を設けて移動部3とし、固定部1並びに可動部2に
作業車両等の乗り上げを可能にする傾斜板4を設け、こ
の傾斜板4を該固定部1、可動部2に対して夫々上方に
吊り上げ可能に構成したことを特徴とするトンネル内工
事用桟橋に係るものである。
In the pier for construction in a tunnel according to any one of claims 1 and 2, the fixed portion 1 and the movable portion 2 are provided with wheels 10 to form a moving portion 3, and the fixed portion 1 and the movable portion 2 are a working vehicle. A pier for construction in a tunnel, characterized in that a sloping plate 4 is provided to enable the pedestal and the like to be climbed up, and the sloping plate 4 can be lifted upwards with respect to the fixed part 1 and the movable part 2, respectively. Is.

【0021】[0021]

【作用】桟橋をトンネル内の適宜な位置まで移動させ、
固定部をトンネル巾方向ほぼ中央に位置せしめ、可動部
を水平方向に所定角度回動させ作業車両の通行路を確保
するとともに可動部の側方においてインバート施工作業
を行い、続いて、該可動部を反対側に回動させ、同様に
側方においてインバート施工作業を行う。
[Operation] Move the pier to an appropriate position in the tunnel,
The fixed part is located almost in the center in the width direction of the tunnel, the movable part is horizontally rotated by a predetermined angle to secure a passage for the work vehicle, and the invert construction work is performed on the side of the movable part. Rotate to the opposite side and perform the invert construction work on the same side.

【0022】[0022]

【実施例】本実施例は、抗口側に固定部1が、また、切
羽側に該固定部1に対して水平方向に所定角度回動する
可動部2が設けられた桟橋5である。この桟橋5は、固
定部1並びに可動部2の端部に作業車両の当該桟橋5へ
の乗り上げが可能となる傾斜板4が設けられ、この傾斜
板4は該固定部1、可動部2夫々に対して上方に吊り上
げ擺動可能に設けられている。また、該桟橋5の下部に
は、移動部3としての車輪10付の台車9が設けられ、該
桟橋5はトンネル長さ方向に移動可能に構成されてい
る。
EXAMPLE This example is a pier 5 provided with a fixed portion 1 on the side of the mouth and a movable portion 2 which rotates on the face of the face 1 at a predetermined angle in the horizontal direction with respect to the fixed portion 1. The pier 5 is provided with an inclined plate 4 at the ends of the fixed part 1 and the movable part 2 so that a work vehicle can ride on the pier 5, and the inclined plate 4 has the fixed part 1 and the movable part 2 respectively. It is provided so that it can be lifted and slid upward. A trolley 9 with wheels 10 as a moving unit 3 is provided below the pier 5, and the pier 5 is movable in the tunnel length direction.

【0023】以下、具体的に説明する。A detailed description will be given below.

【0024】桟橋5について。この桟橋5は前記のとお
り傾斜板4付の固定部1並びに傾斜板4付の可動部2か
らなる構造で、該固定部1は平面視扇形状の板状体であ
り、この固定部1の先端には板状の可動部2が連設さ
れ、この可動部2は固定部1の裏面において枢着されて
いる(符号16は枢着部である。)。尚、可動部2の固定部
1と当接する段部は該固定部1の先端縁と合致する凹湾
曲縁に形成されている。傾斜板4について。この傾斜板
4は前記固定部1並びに可動部2の端部と連設され、こ
の連設部を軸部として油圧シリンダ6により上下擺動可
能に構成されている。尚、符号7は傾斜板4を擺動させ
る吊り体、8は支柱である。
About the pier 5. As described above, the pier 5 has a structure including the fixed portion 1 with the inclined plate 4 and the movable portion 2 with the inclined plate 4. The fixed portion 1 is a fan-shaped plate body in plan view. A plate-shaped movable portion 2 is continuously provided at the tip, and the movable portion 2 is pivotally attached to the back surface of the fixed portion 1 (reference numeral 16 is a pivotal attachment portion). The step portion of the movable portion 2 that abuts the fixed portion 1 is formed as a concave curved edge that matches the tip edge of the fixed portion 1. About the inclined plate 4. The inclined plate 4 is connected to the end portions of the fixed portion 1 and the movable portion 2 and is configured to be vertically slidable by a hydraulic cylinder 6 with the connected portion as a shaft portion. In addition, reference numeral 7 is a suspension body for moving the inclined plate 4, and 8 is a support.

【0025】台車9について。この台車9は前記桟橋5
の下側に設けられたもので、該台車9には桟橋5を前後
(トンネル長さ方向)に移動させる車輪10が設けられて
いる。この台車9は固定部1の裏面においては固着さ
れ、可動部2の裏面においては2本のレール11及び車輪
12を介して付設されている。即ち、台車9の図6中の切
羽側上部には2本のレール11が固着され、また可動部2
の裏面には車輪12が付設され、この車輪12がレール11上
を転動し、可動部2は固定部1(台車9)に対して枢着
部16を支点にして水平方向に回動することになる(図
6,8,9参照)。符号13は車輪10を浮かせたり、また、
車輪10を接地させたりする油圧ジャッキ、14は該油圧ジ
ャッキ13に連設される接地体、15は作業者用の手摺りで
ある。
Regarding the carriage 9. This dolly 9 is the pier 5
It is provided on the lower side of the vehicle, and the carriage 9 is provided with wheels 10 for moving the pier 5 back and forth (in the tunnel length direction). This dolly 9 is fixed on the back surface of the fixed portion 1, and on the back surface of the movable portion 2 there are two rails 11 and wheels.
It is attached through 12. That is, two rails 11 are fixed to the upper part of the trolley 9 on the face side in FIG.
A wheel 12 is attached to the rear surface of the wheel 12, and the wheel 12 rolls on a rail 11 so that the movable portion 2 horizontally rotates about a fixed portion 1 (carriage 9) with a pivotal portion 16 as a fulcrum. (See FIGS. 6, 8 and 9). Reference numeral 13 floats the wheel 10, or
A hydraulic jack for grounding the wheel 10, a grounding body 14 connected to the hydraulic jack 13, and a handrail for an operator 15.

【0026】本実施例は上述のように構成したものであ
り、本実施例を使用して次のようにインバート施工作業
を行う。
This embodiment is constructed as described above, and the invert construction work is carried out as follows using this embodiment.

【0027】先ず、傾斜板4を吊り上げた状態にして桟
橋5を台車9によりトンネル内の適宜な位置まで前進移
動し、油圧ジャッキ13のロッドを伸長させ、接地体14を
接地させて該桟橋5を固定後、可動部2を左側へ水平方
向に所定角度回動させ、続いて、抗口側の傾斜板4をイ
ンバートコンクリート打設終了後埋め戻した箇所Aに、
また、切羽側の傾斜板4をインバートコンクリート未掘
削作業箇所Bに当接させ、インバートコンクリート打設
終了後埋め戻した箇所Aとインバート未掘削作業箇所B
との間に該桟橋5を架設する(図6参照、符号Cはイン
バートコンクリート打設終了箇所、Dはインバート掘削
作業は終了しているが、未だコンクリートを打設してい
ない箇所である。)。この状態で桟橋5周辺のインバート
施工作業を行う。符号17は掘削機である。
First, with the inclined plate 4 being lifted, the pier 5 is moved forward by the carriage 9 to an appropriate position in the tunnel, the rod of the hydraulic jack 13 is extended, and the grounding body 14 is grounded. After fixing, the movable part 2 is rotated leftward in the horizontal direction by a predetermined angle, and subsequently, the slope plate 4 on the mouth side is refilled after the end of the invert concrete placement, at a position A.
Further, the slope plate 4 on the face side is brought into contact with the unexcavated concrete work site B of the invert concrete, and the backfilled place A and the unexcavated work site B of the invert concrete are completed.
The pier 5 is erected between the above and the pier (refer to FIG. 6, reference numeral C is a portion where the invert concrete pouring is completed, and D is a portion where the invert excavation work has been completed but concrete has not been poured yet). . In this state, the invert construction work around the pier 5 is performed. Reference numeral 17 is an excavator.

【0028】可動部2を図7に図示したように反対側に
回動させ同様にインバート施工作業を行う。
The movable portion 2 is rotated to the opposite side as shown in FIG. 7, and the invert construction work is performed in the same manner.

【0029】続いて、このようにして所定の領域のイン
バート施工作業(インバート打設終了箇所C上の埋め戻
し、インバートコンクリート未掘削作業箇所B、インバ
ートコンクリートの打設等)が終了したら、両傾斜板4
を上昇擺動させ、可動部2を元の位置に戻し、即ち、固
定部1と可動部2とを直線状にし、油圧ジャッキ13を短
縮して車輪10を接地させ、桟橋5を前進させる(図8参
照)。この繰り返しによりインバート施工作業を順次切羽
側へ進行させて行く。
Subsequently, when the invert construction work in a predetermined area (refilling on the end point C of the invert pouring, re-excavation work of the invert concrete B, pouring of the invert concrete, etc.) is completed in this way, both inclines are completed. Board 4
To move the movable part 2 back to its original position, that is, to make the fixed part 1 and the movable part 2 linear, shorten the hydraulic jack 13 to ground the wheel 10, and move the pier 5 forward (Fig. 8). By repeating this, the invert construction work is sequentially advanced to the face.

【0030】従って、本実施例によれば、切羽からの掘
削土砂を搬出する為の通行路を確保しつつインバート施
工作業を行うことが可能となる。
Therefore, according to the present embodiment, it is possible to carry out the invert construction work while ensuring the passage for carrying out the excavated earth and sand from the face.

【0031】よって、本実施例によれば、 固定部1は常にトンネル巾方向の中央に位置する
為、セントル32を本実施例に係る桟橋5に可及的に近づ
けてもセントル32から桟橋5への作業車両34の通行が不
能となることはなく、よって、桟橋5とセントル32との
距離を管理することなく作業が行える為、それだけ迅速
な作業が行え、作業効率が向上することになる。
Therefore, according to the present embodiment, since the fixed portion 1 is always located in the center in the tunnel width direction, even if the centle 32 is brought as close as possible to the jetty 5 according to the present embodiment, the centle 32 is moved from the jetty 5 to the jetty 5. The work vehicle 34 does not become inaccessible to the work, and therefore work can be carried out without managing the distance between the pier 5 and the center 32, so that quick work can be carried out and work efficiency is improved. .

【0032】 また、本実施例は、接地されるトンネ
ル巾方向いっぱいの2本のレールが存しない為、桟橋5
の側方におけるインバート施工作業が良好に行えること
になる。
In addition, in this embodiment, since there are no two rails which are grounded and are full in the width direction of the tunnel, the pier 5
Inverting construction work on the side of can be performed well.

【0033】 そして、更に、本実施例は固定部1に
対して可動部2を回動せしめることができる構成の為、
たとえ、トンネルが曲がっていても何ら支障なくインバ
ート施工作業が行えることになる。
Further, in this embodiment, since the movable portion 2 can be rotated with respect to the fixed portion 1,
Even if the tunnel is bent, the invert work can be done without any problems.

【0034】[0034]

【発明の効果】本発明は上述のように、トンネル内に通
行路を確保する際、固定部はトンネル巾方向ほぼ中央に
位置し、可動部は平面視において該固定部に対して所定
角度の状態で連設せしめられることになるから、セント
ルを本発明に係る桟橋に可及的に近づけても作業車両の
通行が不能となることはない等秀れた効果を発揮するト
ンネル内工事用桟橋となる。
As described above, according to the present invention, when securing the passage in the tunnel, the fixed portion is located substantially in the center in the tunnel width direction, and the movable portion is at a predetermined angle with respect to the fixed portion in plan view. Since it will be connected in a state, the work vehicle will not be impeded even if the Centle is brought as close as possible to the jetty according to the present invention. Becomes

【図面の簡単な説明】[Brief description of drawings]

【図1】インバート施工作業の説明正断面図である。FIG. 1 is an explanatory front sectional view of an invert construction work.

【図2】桟橋41の説明側断面図である。FIG. 2 is an explanatory side sectional view of a pier 41.

【図3】従来例の説明平面図である。FIG. 3 is an explanatory plan view of a conventional example.

【図4】同上の説明正面図である。FIG. 4 is an explanatory front view of the above.

【図5】同上の説明平面図である。FIG. 5 is an explanatory plan view of the above.

【図6】本実施例の説明側断面図である。FIG. 6 is an explanatory side sectional view of the present embodiment.

【図7】本実施例の説明平面図である。FIG. 7 is an explanatory plan view of the present embodiment.

【図8】本実施例の説明側断面図である。FIG. 8 is an explanatory side sectional view of the present embodiment.

【図9】本実施例の要部の斜視図である。FIG. 9 is a perspective view of a main part of this embodiment.

【符号の説明】[Explanation of symbols]

1 固定部 2 可動部 3 移動部 4 傾斜板 5 桟橋 10 車輪 1 Fixed part 2 Movable part 3 Moving part 4 Sloping plate 5 Pier 10 Wheels

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 トンネルのインバートにコンクリートを
打設する場合に使用する移動部を設けた桟橋であって、
当該桟橋は固定部と該固定部に対して水平方向に回動す
る可動部とで構成されていることを特徴とするトンネル
内工事用桟橋。
1. A pier provided with a moving part used when placing concrete in an invert of a tunnel,
The jetty for construction in a tunnel, wherein the jetty is composed of a fixed portion and a movable portion that rotates in a horizontal direction with respect to the fixed portion.
【請求項2】 請求項1記載のトンネル内工事用桟橋に
おいて、桟橋として移動部上にして抗口側に固定部が固
着され、また、移動部上にして切羽側に該移動部の抗口
側寄りを支点にして水平方向に回動する可動部が設けら
れている桟橋を採用したことを特徴とするトンネル内工
事用桟橋。
2. The jetty for construction in a tunnel according to claim 1, wherein the fixed portion is fixed on the moving side as a jetty and on the side of the opening, and the opening of the moving portion is on the side of the face facing the moving section. A pier for construction in a tunnel, which uses a pier that has a movable part that rotates horizontally with the lateral side as a fulcrum.
【請求項3】 請求項1,2いずれか1項に記載のトン
ネル内工事用桟橋において、固定部並びに可動部に車輪
を設けて移動部とし、固定部並びに可動部に作業車両等
の乗り上げを可能にする傾斜板を設け、この傾斜板を該
固定部、可動部に対して夫々上方に吊り上げ可能に構成
したことを特徴とするトンネル内工事用桟橋。
3. The pier for construction in a tunnel according to any one of claims 1 and 2, wherein wheels are provided in a fixed portion and a movable portion to make a moving portion, and a work vehicle or the like is ridden on the fixed portion and the movable portion. A pier for tunnel construction, wherein a sloping plate for enabling the sloping plate is provided, and the sloping plate can be lifted upward with respect to the fixed portion and the movable portion, respectively.
JP7147609A 1995-06-14 1995-06-14 Pier for construction in tunnel Expired - Fee Related JP2736761B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7147609A JP2736761B2 (en) 1995-06-14 1995-06-14 Pier for construction in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7147609A JP2736761B2 (en) 1995-06-14 1995-06-14 Pier for construction in tunnel

Publications (2)

Publication Number Publication Date
JPH08338006A true JPH08338006A (en) 1996-12-24
JP2736761B2 JP2736761B2 (en) 1998-04-02

Family

ID=15434204

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7147609A Expired - Fee Related JP2736761B2 (en) 1995-06-14 1995-06-14 Pier for construction in tunnel

Country Status (1)

Country Link
JP (1) JP2736761B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725073A (en) * 2017-11-06 2018-02-23 中建八局第建设有限公司 A kind of simple more straddle type tunnel inverted arch trestle structure and construction methods
CN108442948A (en) * 2018-05-17 2018-08-24 湖南五新模板有限公司 A kind of two-way traffic inverted arch trestle and construction method
JP2018155020A (en) * 2017-03-17 2018-10-04 株式会社東宏 Invert pier and tunnel invert construction method
JP2019007305A (en) * 2017-06-28 2019-01-17 鉄建建設株式会社 Invert pier and tunnel invert construction method
CN111794079B (en) * 2020-07-02 2022-04-01 邱磊 Temporary bridge capable of passing through vehicles based on bridge construction
JP2022169403A (en) * 2021-04-27 2022-11-09 株式会社 キナン Elevated structure for testing work vehicles for bridge inspection

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535148A (en) * 2020-05-27 2020-08-14 李军 Self-propelled landing stage dolly for inverted arch landing stage platform truck

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018155020A (en) * 2017-03-17 2018-10-04 株式会社東宏 Invert pier and tunnel invert construction method
JP2019007305A (en) * 2017-06-28 2019-01-17 鉄建建設株式会社 Invert pier and tunnel invert construction method
CN107725073A (en) * 2017-11-06 2018-02-23 中建八局第建设有限公司 A kind of simple more straddle type tunnel inverted arch trestle structure and construction methods
CN107725073B (en) * 2017-11-06 2024-04-02 中建八局第一建设有限公司 Tunnel construction method based on simple trestle
CN108442948A (en) * 2018-05-17 2018-08-24 湖南五新模板有限公司 A kind of two-way traffic inverted arch trestle and construction method
CN111794079B (en) * 2020-07-02 2022-04-01 邱磊 Temporary bridge capable of passing through vehicles based on bridge construction
JP2022169403A (en) * 2021-04-27 2022-11-09 株式会社 キナン Elevated structure for testing work vehicles for bridge inspection

Also Published As

Publication number Publication date
JP2736761B2 (en) 1998-04-02

Similar Documents

Publication Publication Date Title
JPH08338006A (en) Pier for construction work in tunnel
BG61312B1 (en) Equipment for driving foundations mainlly designed for pylons
JP2539151B2 (en) Excavation method for bottom floor in tunnel
JP2004332380A (en) Tunnel invert construction method by movable pier, and the movable pier
JP4080226B2 (en) Mobile jetty
JP3822525B2 (en) Tunnel invert construction method using mobile jetty and mobile jetty
JP4142397B2 (en) Tunnel invert construction method using mobile jetty and mobile jetty
JP3079197B2 (en) Laterally movable pier and construction method using the pier
JPH0357248B2 (en)
JPS58222297A (en) Road reinforcing method and apparatus
JP4602597B2 (en) Tunnel construction machine
JP2797218B2 (en) Wife stop
JPH08177396A (en) Tunnel invert construction method and scaffold board device for tunnel invert construction
JP3653684B2 (en) Excavator
JP4172330B2 (en) Widening equipment and widening method for existing tunnels
JP4955478B2 (en) Pile ground improvement system
JP2002021468A (en) Landing bridge for tunneling work
JP3523818B2 (en) Pier for tunnel construction
JP2001073700A (en) Movable scaffold for tunnel works
JP3023575B2 (en) Track reinforcement machine
JP2581772Y2 (en) Roof shield device
JPH01187285A (en) Width-widening excavation work for tunnel
JPH09242326A (en) Moving working platform for construction work and usage thereof
JP3075434U (en) Shaft excavator coupling device
JP3963199B2 (en) Segment assembly method and apparatus

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090116

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100116

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110116

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110116

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120116

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130116

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees