JP2002138408A - Foundation block for sidewalk and road-way boundary block - Google Patents

Foundation block for sidewalk and road-way boundary block

Info

Publication number
JP2002138408A
JP2002138408A JP2000370768A JP2000370768A JP2002138408A JP 2002138408 A JP2002138408 A JP 2002138408A JP 2000370768 A JP2000370768 A JP 2000370768A JP 2000370768 A JP2000370768 A JP 2000370768A JP 2002138408 A JP2002138408 A JP 2002138408A
Authority
JP
Japan
Prior art keywords
block
foundation
sidewalk
concrete
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000370768A
Other languages
Japanese (ja)
Inventor
Makoto Maeda
誠 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2000370768A priority Critical patent/JP2002138408A/en
Publication of JP2002138408A publication Critical patent/JP2002138408A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve the problem of the shortening of days on the execution of works and an improvement in the quality of concrete regarding the foundation of a sidewalk and road-way boundary block although a part of base concrete is executed small for installing the block and foundation forms for finishing are assembled and ready-mixed concrete is placed after the installation of the block in the foundation works of the conventional sidewalk and road-way boundary block. SOLUTION: A foundation block 1 for the sidewalk and road-way boundary block is composed of a recessed section for installation, a recessed section for connection and a circular hole 4 for connecting, and days on the execution of works and an improvement in the quality of concrete are attained because forms and concrete works at a site can be omitted only by installing a previously manufactured and prepared product at the site.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、道路構造物である
歩車道境界ブロック用の基礎施工に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation for a pedestrian road boundary block which is a road structure.

【0002】[0002]

【従来の技術】従来の歩車道境界ブロックの施工は、基
礎砕石の上に型枠を組立て次に生コンクリートを打設
し、コンクリートの強度が出るまで養生した後に、歩車
道境界ブロックを据付けて、再度、型枠を組立て仕上げ
の生コンクリートを打設していた為に、型枠およびコン
クリートの施工日数も必要となり、コンクリートの仕上
り面に関しても個人的な技術に差異を生じた。
2. Description of the Related Art Conventionally, a pedestrian road boundary block is constructed by assembling a formwork on a foundation crushed stone, then pouring ready-mixed concrete, curing the concrete until the strength is obtained, and then installing the pedestrian road boundary block. Again, since the formwork was assembled again and the finished ready-mixed concrete was cast, the number of days required for the formwork and concrete was also required, and there was a difference in personal skills regarding the finished surface of the concrete.

【0003】[0003]

【発明が解決しょうとする課題】このような従来の歩車
道境界ブロック基礎の施工方法では、施工日数の短縮お
よび品質管理の改善が出来なかった。そこで、本発明は
歩車道境界ブロック基礎の現場での施工を簡略化し、コ
ンクリートの強度確保および仕上り面を均一化した製品
を提供できるようにすることを課題とする。
However, such a conventional method of constructing a footway boundary block foundation could not reduce the number of construction days and improve quality control. Accordingly, it is an object of the present invention to simplify the on-site construction of a footway boundary block foundation, and to provide a product in which the strength of concrete is ensured and the finished surface is uniform.

【0004】[0004]

【課題を解決するための手段】上記課題を解決するため
に、請求項1記載の連結組立のできる歩車道境界ブロッ
ク用の基礎ブロックは、工場生産を基本とし予め製作準
備しておいた製品を運搬し、現場では基礎砕石の上に据
付けるだけで歩車道境界ブロックの基礎が完成するの
で、施工日数の短縮と品質管理におけるコンクリートの
強度確保および仕上り面均一化の改善となる。
In order to solve the above-mentioned problems, a base block for a sidewalk boundary block which can be connected and assembled according to the first aspect of the present invention is a product prepared in advance based on factory production and based on factory production. The foundation of the sidewalk boundary block can be completed simply by transporting and installing it on the foundation crushed stone, so that the number of construction days can be shortened, concrete strength can be secured in quality control, and the finished surface uniformity can be improved.

【0005】[0005]

【発明の実施の形態】以下、本発明の実体の形態を、図
面に基づいて説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to the drawings.

【0006】図1は、本発明の歩車道境界ブロック用の
基礎ブロックの斜視図である。この基礎ブロック1は、
据付け凹部2、連結用凹部3、連結用円孔4、から構成
されており、製作は図1の形状となる型枠を複数個準備
し、工事に必要な個数を予め準備する。施工は準備した
基礎ブロック1を運搬し、所定の位置に据付ける。
FIG. 1 is a perspective view of a base block for a footway boundary block according to the present invention. This basic block 1
It is composed of an installation recess 2, a connection recess 3, and a connection hole 4. A plurality of molds having the shape shown in FIG. 1 are prepared, and the number required for construction is prepared in advance. In the construction, the prepared base block 1 is transported and installed at a predetermined position.

【0007】図4は、所定の位置に据付けた基礎ブロッ
ク1を連結用金物6と連結用ボルト5により連結し、連
結目地モルタル7を仕上げて歩車道境界ブロック用の基
礎が完成する。
In FIG. 4, the base block 1 installed at a predetermined position is connected to the connection hardware 6 and the connection bolt 5, and the connection joint mortar 7 is completed to complete the foundation for the sidewalk block.

【0008】図6は、完成した状態の断面図であが、施
工手順は基礎砕石12の上に基礎ブロック1を完成さ
せ、次に、基礎ブロック1の据付け凹部2の上に据付け
モルタル9を敷き均し歩車道境界ブロック8を据付け
る。次に、間詰めモルタル10、目地モルタル11を仕
上げて完成となる。
FIG. 6 is a cross-sectional view of the completed state. The construction procedure is as follows. The foundation block 1 is completed on the foundation crushed stone 12, and then the installation mortar 9 is placed on the installation recess 2 of the foundation block 1. The spread-walking roadway boundary block 8 is installed. Next, the filling mortar 10 and the joint mortar 11 are finished to complete.

【0009】[0009]

【発明の効果】本発明は以上に説明したような構成によ
り次のような効果を奏する。請求項1に記載されている
発明は、現場において型枠およびコンクリート工事の施
工を省略し、据付けるだけで歩車道境界ブロック工事の
一連の施工が可能となるので、施工日数の短縮と品質管
理の改善となる。
According to the present invention, the following effects can be obtained by the configuration described above. According to the first aspect of the present invention, since the construction of the formwork and the concrete work can be omitted at the site and a series of work of the pedestrian road boundary block work can be performed only by installation, the number of work days can be shortened and quality control can be performed. Will be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の歩車道境界ブロック用の基礎ブロック
の斜視図である。
FIG. 1 is a perspective view of a foundation block for a footway boundary block according to the present invention.

【図2】その基礎ブロックの拡大斜視図である。FIG. 2 is an enlarged perspective view of the basic block.

【図3】基礎砕石の上に基礎ブロック、歩車道境界ブロ
ックを据付けて、完成した状態の斜視図である。
FIG. 3 is a perspective view of a completed state in which a foundation block and a sidewalk roadway boundary block are installed on foundation crushed stone.

【図4】基礎ブロックを据付けて連結した状態の平面図
である。
FIG. 4 is a plan view showing a state where the base blocks are installed and connected.

【図5】基礎ブロックを据付けて連結した状態の側面図
である。
FIG. 5 is a side view of a state where the base blocks are installed and connected.

【図6】基礎砕石の上に基礎ブロック、歩車道境界ブロ
ックを据付けて、完成した状態の断面図である。
FIG. 6 is a sectional view of a completed state in which a foundation block and a sidewalk boundary block are installed on foundation crushed stone.

【符号の説明】[Explanation of symbols]

1基礎ブロック 2据付け凹部 3連結用凹部 4連結用円孔 5連結用ボルト 6連結用金物 7連結目地モルタル 8歩車道境界ブロック 9据付けモルタル 10間詰めモルタル 11目地モルタル 12基礎砕石 1 foundation block 2 installation recess 3 connection recess 4 connection hole 5 connection bolt 6 connection hardware 7 connection joint mortar 8 walkway boundary block 9 installation mortar 10 filling mortar 11 joint mortar 12 foundation crushed stone

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 連結組立のできる歩車道境界ブロック
用の基礎ブロック。
1. A base block for a sidewalk boundary block that can be connected and assembled.
JP2000370768A 2000-10-30 2000-10-30 Foundation block for sidewalk and road-way boundary block Pending JP2002138408A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000370768A JP2002138408A (en) 2000-10-30 2000-10-30 Foundation block for sidewalk and road-way boundary block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000370768A JP2002138408A (en) 2000-10-30 2000-10-30 Foundation block for sidewalk and road-way boundary block

Publications (1)

Publication Number Publication Date
JP2002138408A true JP2002138408A (en) 2002-05-14

Family

ID=18840596

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000370768A Pending JP2002138408A (en) 2000-10-30 2000-10-30 Foundation block for sidewalk and road-way boundary block

Country Status (1)

Country Link
JP (1) JP2002138408A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004048700A1 (en) * 2002-11-25 2004-06-10 B.R. Line Co., Ltd. A supporting device for a borderline stone placed on a border line of a sidewalk or a roadway
KR100927846B1 (en) * 2009-02-13 2009-11-25 홍재호 Apparatus of forming a road boundary part and method of forming the road boundary part using the same
KR101052442B1 (en) 2007-12-05 2011-07-28 신 오 황 Dry construction method of boundary stone
JP2018025012A (en) * 2016-08-09 2018-02-15 ゴトウコンクリート株式会社 Laying method for side-ditch with curb stones

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004048700A1 (en) * 2002-11-25 2004-06-10 B.R. Line Co., Ltd. A supporting device for a borderline stone placed on a border line of a sidewalk or a roadway
KR101052442B1 (en) 2007-12-05 2011-07-28 신 오 황 Dry construction method of boundary stone
KR100927846B1 (en) * 2009-02-13 2009-11-25 홍재호 Apparatus of forming a road boundary part and method of forming the road boundary part using the same
JP2018025012A (en) * 2016-08-09 2018-02-15 ゴトウコンクリート株式会社 Laying method for side-ditch with curb stones

Similar Documents

Publication Publication Date Title
KR101482522B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR100369757B1 (en) Incremental launching method type pc box girder bridge making mold system and segment making method thereof
KR20060127632A (en) Wall structure using precast concrete panel with multi rib rows
KR100443809B1 (en) Fabricated arch tunnel and construction method thereof
JP2002138408A (en) Foundation block for sidewalk and road-way boundary block
KR20020061899A (en) The construction method of rc structure using improved precast wall members
JPH06316942A (en) Precast product for foundation of steel tower, and construction of steel tower therewith
JPH11241311A (en) Construction method of concrete bridge pier
JP3511159B2 (en) Concrete casting method
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
JP2830703B2 (en) Buried concrete formwork and concrete structures
KR100203012B1 (en) Executing method of building works used a pc slab
JPH045331A (en) Method for constructing foundation
JPH10299003A (en) Foundation work using precast concrete member
KR200189326Y1 (en) Incremental launching method type pc box girder bridge making mold system
JPH1096210A (en) Method of executing enlargement of bridge pier
CN219410557U (en) Cast-in-situ template structure of bridge sidewalk
KR20060136234A (en) Building Constuction Method using Precast Structure
KR20070000264A (en) Building constuction method using precast structure
KR200403734Y1 (en) Concret block for shoe
KR20160065799A (en) Concrete slab and concrete slab manufacturing method and method for manufacturing a concrete constructure provided the same
JPS6123092Y2 (en)
JPH06146215A (en) Assembled bridge like arch bridge
JP2002356858A (en) Foundation
JPH03279533A (en) Constructing method for rigid-frame type rc super-high building