KR20020061899A - The construction method of rc structure using improved precast wall members - Google Patents
The construction method of rc structure using improved precast wall members Download PDFInfo
- Publication number
- KR20020061899A KR20020061899A KR1020010002983A KR20010002983A KR20020061899A KR 20020061899 A KR20020061899 A KR 20020061899A KR 1020010002983 A KR1020010002983 A KR 1020010002983A KR 20010002983 A KR20010002983 A KR 20010002983A KR 20020061899 A KR20020061899 A KR 20020061899A
- Authority
- KR
- South Korea
- Prior art keywords
- precast
- wall
- precast wall
- formwork
- slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
본 발명은 프리캐스트 벽체 부재를 이용한 철근 콘크리트 구조물의 시공방법에 관한 것으로, 더욱 자세하게는 아파트와 같은 공동 주택의 시공 시에 모서리 부분의 벽체는 공장에서 미리 제작된 프리캐스트 부재를 사용하고, 현장에서는 일직선 벽체에 대해서만 콘크리트 타설을 통해 구축함으로써, 프리캐스트 공법과 현장 타설 공법의 장점을 살린 프리캐스트 벽체 부재를 이용한 철근 콘크리트 구조물의 시공방법에 관한 것이다.The present invention relates to a method of constructing a reinforced concrete structure using a precast wall member, and more particularly, in the construction of a multi-family house such as an apartment, the wall of the corner portion uses a precast member prefabricated in a factory. The construction of reinforced concrete structures using precast wall members utilizing the advantages of precast method and site casting method by constructing concrete wall only through straight-lined concrete.
본 발명에 따른 시공방법은, 슬라브 위에 먹선으로 벽체 시공 위치를 표시하는 제1 단계; 벽과 벽이 만나 모서리를 만드는 부분에 대해서는 그 위치에 따라 "┓"형, "┳"형, "╋"형과 같은 프리캐스트 벽체 부재를 미리 제작하고, 상기 프리캐스트 벽체 부재를 현장에서 그 필요 위치에 따라 설치하며, 아래층의 상기 프리캐스트 벽체 부재로부터 올라온 대구경 철근과 현재 설치하는 상기 프리캐스트 벽체 부재의 대구경 철근을 기계적 이음하는 제2 단계; 상기 프리캐스트 벽체 부재들 사이의 직선 벽체에 대해서는 현장에서 타설하기 위해, 선조립된 철근을 상기 프리캐스트 벽체 부재들 사이에 배근하고, 상기 선조립 철근망과 상기 프리캐스트 벽체 부재를 일체화하기 위해 스터드 볼트를 상기 프리캐스트 벽체 부재의 단부에 매립된 철물에 설치하는 제3 단계; 상기 제3단계 수행 후, 상기 직선 벽체를 구축하기 위한 거푸집을 설치하는 제4 단계; 상기 제4단계 수행 후, 슬라브 거푸집을 설치하고, 슬라브 상하부 철근을 배근하는 제5단계; 및 상기 벽체 거푸집과 슬라브 거푸집에 콘크리트를 타설하여, 양생하는 제6단계를 포함하는 것을 특징으로 한다.The construction method according to the present invention includes a first step of displaying a wall construction position with a black line on the slab; For the part where the wall meets the edges, precast wall members such as “┓” type, “┳” type, and “╋” type are pre-fabricated according to their position, and the precast wall member is required in the field. A second step of installing according to a position and mechanically joining the large diameter reinforcing bar raised from the precast wall member below and the large diameter reinforcing bar of the precast wall member currently installed; To cast in situ for straight walls between the precast wall members, prefabricated reinforcing bars are placed between the precast wall members, and studs for integrating the prefabricated rebar network and the precast wall member. A third step of installing a bolt on a hardware embedded in an end of the precast wall member; A fourth step of installing a formwork for building the straight wall after performing the third step; A fifth step of installing the slab formwork and reinforcing the upper and lower slabs of the slab after performing the fourth step; And pouring a concrete into the wall formwork and the slab formwork, characterized in that it comprises a sixth step of curing.
Description
본 발명은 프리캐스트 벽체 부재를 이용한 철근 콘크리트 구조물의 시공방법에 관한 것으로, 더욱 자세하게는 아파트와 같은 공동 주택의 시공 시에 모서리 부분의 벽체는 공장에서 미리 제작된 프리캐스트 부재를 사용하고, 현장에서는 일직선 벽체에 대해서만 콘크리트 타설을 통해 구축함으로써, 프리캐스트 공법과 현장타설 공법의 장점을 살린 프리캐스트 벽체 부재를 이용한 철근 콘크리트 구조물의 시공방법에 관한 것이다.The present invention relates to a method of constructing a reinforced concrete structure using a precast wall member, and more particularly, in the construction of a multi-family house such as an apartment, the wall of the corner portion uses a precast member prefabricated in a factory. The construction of reinforced concrete structures using precast wall members utilizing the advantages of precast and in-situ construction methods by constructing concrete walls only through straight casting.
콘크리트 벽식 구조는 콘크리트 내력 벽이 건물의 기둥역할을 담당하고, 보(beam/girder) 없이 슬라브를 바로 시공하는 방법으로서, 층고를 줄이는데 효과적이며, 공사비가 절감되어, 아파트 공사에 많이 채택되는 구조형식이다.The concrete wall structure is a method in which the concrete bearing wall plays the role of pillar of the building and directly installs the slab without beam / girder, which is effective in reducing the height of the floor, and the construction cost is reduced, so it is widely adopted in the apartment construction. to be.
그러나, 근래에 아파트 평면이 다양화되면서, 내력 벽체의 배치가 복잡해져가고 있어서, 벽체 거푸집 및 철근작업에 투입되는 인력이 증가되고 있다.However, as apartment flats diversify in recent years, the arrangement of bearing walls has become complicated, and the manpower input to wall formwork and reinforcing work has increased.
10여년전에 우리 나라에 도입된 프리캐스트(PC) 공법은 기계화 시공의 장점은 있으나, 고성능 양중 장비의 소요가 많이 필요하게 되고, 수직 접합부의 처리가 어려워 사장된 실정이다.The precast (PC) method introduced in our country more than 10 years ago has merit of mechanized construction, but it requires a lot of high-performance lifting equipment and difficult to handle vertical joints.
즉, 국내 특허공보 1992-2117호에는 프리캐스트 철근 콘크리트 구조물의 구축방법이 개시되어 있는데, 이 특허에서는 기둥과 보, 바닥을 프리캐스트화하고, 이들을 양중 장비를 이용해 들어 결합하고, 결합부에는 철근 이음과 현장 콘크리트 타설을 통해 구조물을 구축하는 방법이 개시되어 있다.That is, Korean Patent Publication No. 1992-2117 discloses a method for constructing a precast reinforced concrete structure. In this patent, columns, beams, and floors are precast, and they are combined by lifting equipment, and the reinforcing bars are joined. Disclosed is a method for constructing a structure through joints and site concrete pouring.
또한, 국내 공개특허공보 97-59420호에서는 프리캐스트 공법과 콘크리트 타설 공법을 혼용하여 공기 단축, 공사비 절감, 프리캐스트 공법의 층수 제한극복을 위한 프리캐스트 콘크리트 복합 공법이 개시되어 있다. 이 97-59420호의 특허에서는 기준층 슬라브, 발코니 슬라브, 계단 슬라브 등의 수평재는 공장에서 생산한 프리캐스트 부재로 하고, 수직벽과 같이 실질적으로 하중을 지탱해야 될 수직재는 현장에서 콘크리트를 타설하여 구축하며, 수직재의 상면에 프리캐스트 부재의 가장자리를 걸터앉히고, 프리캐스트 부재간 및 프리캐스트 부재와 수직재간에 형성되는 공간에 현장에서 배근 및 콘크리트를 타설하는 공법이 개시되어 있다.In addition, Korean Unexamined Patent Publication No. 97-59420 discloses a precast concrete composite method for reducing the air, reducing construction costs, and overcoming the limit of the number of layers of the precast method by using a precast method and a concrete placing method. In the patent of 97-59420, horizontal materials such as reference floor slabs, balcony slabs, and stair slabs are precast members produced at the factory, and vertical materials, such as vertical walls, which are to be substantially loaded, are constructed by pouring concrete on site. The method of laying the edge of a precast member on the upper surface of a vertical member, and placing reinforcement and concrete in the field in the space formed between a precast member and between a precast member and a vertical member is disclosed.
하지만, 이와 같은 공법들은 전술한 바와 같이 고성능의 양중 장비가 필요하고, 접합부간 처리가 용이하지 않은 문제점을 안고 있었다.However, these methods had a problem that the high-performance lifting equipment as described above, and the process between the joints is not easy.
따라서, 본 발명은 상기와 같은 종래 기술의 문제점을 해결하기 위한 것으로, 본 발명의 목적은 프리캐스트 공법의 장점과 현장 조립 거푸집 공법의 장점을 결합하여, 벽체와 벽체가 만나는 모서리를 갖는 부분은 프리캐스트 부재를 사용하고, 일직선상의 벽체에 대해서만 현장 타설 공법을 사용하여 철근 콘크리트 구조물을 구축하는 프리캐스트 벽체 부재를 이용한 철근 콘크리트 구조물의 시공방법을 제공하는데 있다.Accordingly, the present invention is to solve the problems of the prior art as described above, the object of the present invention combines the advantages of the precast method and the advantages of the field assembly formwork, the part having the edge where the wall and wall meet free The present invention provides a method of constructing a reinforced concrete structure using a precast wall member that uses a cast member and constructs a reinforced concrete structure using only a straight wall using an in-site casting method.
도1은 본 발명을 적용하여 구축한 아파트 벽체 구조의 평면도.1 is a plan view of an apartment wall structure constructed by applying the present invention.
도2a 내지 도2c는 본 발명에 따른 프리캐스트 벽체 부재의 외관도.2A-2C are external views of a precast wall member according to the present invention.
도3은 본 발명에 따른 프리캐스트 벽체 부재의 내부 구조를 나타낸 도면.Figure 3 shows the internal structure of the precast wall member according to the present invention.
도4a 내지 도4f는 본 발명의 일 실시 예에 따른 시공 순서를 나타낸 도면.4a to 4f are views showing the construction sequence according to an embodiment of the present invention.
도5a 및 도5b는 본 발명의 다른 실시 예에 따른 시공 순서를 나타낸 도면.5a and 5b is a view showing the construction sequence according to another embodiment of the present invention.
상기 목적을 달성하기 위한 본 발명에 따른 일 실시 예는, 아파트와 같은 콘크리트 벽식 구조의 철근 콘크리트 구조물의 시공방법에 있어서, 슬라브 위에 먹선으로 벽체 시공 위치를 표시하는 제1 단계; 벽과 벽이 만나 모서리를 만드는 부분에 대해서는 그 위치에 따라 "┓"형, "┳"형, "╋"형과 같은 프리캐스트 벽체 부재를 미리 제작하고, 상기 프리캐스트 벽체 부재를 현장에서 그 필요 위치에 따라 설치하며, 아래층의 상기 프리캐스트 벽체 부재로부터 올라온 대구경 철근과 현재 설치하는 상기 프리캐스트 벽체 부재의 대구경 철근을 기계적 이음하는 제2 단계; 상기 프리캐스트 벽체 부재들 사이의 직선 벽체에 대해서는 현장에서 타설하기 위해, 선조립된 철근을 상기 프리캐스트 벽체 부재들 사이에 배근하고, 상기 선조립 철근망과 상기 프리캐스트 벽체 부재를 일체화하기 위해 스터드 볼트를 상기 프리캐스트 벽체 부재의 단부에 매립된 철물에 설치하는 제3 단계; 상기 제3단계 수행 후, 상기 직선 벽체를 구축하기 위한 거푸집을 설치하는 제4 단계; 상기 제4단계 수행 후, 슬라브 거푸집을 설치하고, 슬라브 상하부 철근을 배근하는 제5단계; 및 상기 벽체 거푸집과 슬라브 거푸집에 콘크리트를 타설하여, 양생하는 제6단계를 포함하는 것을 특징으로 한다.According to an embodiment of the present invention for achieving the above object, a method for constructing a reinforced concrete structure of a concrete wall structure, such as an apartment, comprising: a first step of displaying a wall construction position with a black line on a slab; For the part where the wall meets the edges, precast wall members such as “┓” type, “┳” type, and “╋” type are pre-fabricated according to their position, and the precast wall member is required in the field. A second step of installing according to a position and mechanically joining the large diameter reinforcing bar raised from the precast wall member below and the large diameter reinforcing bar of the precast wall member currently installed; To cast in situ for straight walls between the precast wall members, prefabricated reinforcing bars are placed between the precast wall members, and studs for integrating the prefabricated rebar network and the precast wall member. A third step of installing a bolt on a hardware embedded in an end of the precast wall member; A fourth step of installing a formwork for building the straight wall after performing the third step; A fifth step of installing the slab formwork and reinforcing the upper and lower slabs of the slab after performing the fourth step; And pouring a concrete into the wall formwork and the slab formwork, characterized in that it comprises a sixth step of curing.
또한, 상기 목적을 달성하기 위한 본 발명에 따른 다른 실시 예는, 아파트와 같은 콘크리트 벽식 구조의 철근 콘크리트 구조물의 시공방법에 있어서, 슬라브 위에 먹선으로 벽체 시공 위치를 표시하는 제1 단계; 벽과 벽이 만나 모서리를 만드는 부분에 대해서는 그 위치에 따라 "┓"형, "┳"형, "╋"형과 같은 프리캐스트 벽체 부재를 미리 제작하고, 상기 프리캐스트 벽체 부재를 현장에서 그 필요 위치에 따라 설치하며, 아래층의 상기 프리캐스트 벽체 부재로부터 올라온 대구경 철근과 현재 설치하는 상기 프리캐스트 벽체 부재의 대구경 철근을 기계적 이음하는 제2 단계; 상기 프리캐스트 벽체 부재들 사이의 직선 벽체에 대해서는 현장에서 타설하기 위해, 선조립된 철근을 상기 프리캐스트 벽체 부재들 사이에 배근하고, 상기 선조립 철근망과 상기 프리캐스트 벽체 부재를 일체화하기 위해 스터드 볼트를 상기 프리캐스트 벽체 부재의 단부에 매립된 철물에 설치하는 제3 단계; 상기 제3단계수행 후, 상기 직선 벽체를 구축하기 위한 거푸집을 설치하는 제4 단계; 상기 제4단계 수행 후, 상기 기설치된 프리캐스트 벽체 부재와 상기 직선 벽체 거푸집 상에 하프 프리캐스트 슬라브를 설치하고, 슬라브 상부 철근을 배근하는 제5단계; 및 상기 벽체 거푸집과 상기 하프 프리캐스트 슬라브 위에 콘크리트를 동시 타설하여, 양생하는 제6단계를 포함하는 것을 특징으로 한다.In addition, another embodiment according to the present invention for achieving the above object, in a method of constructing a reinforced concrete structure of a concrete wall structure, such as an apartment, comprising: a first step of displaying the wall construction position with a black line on the slab; For the part where the wall meets the edges, precast wall members such as “┓” type, “┳” type, and “╋” type are pre-fabricated according to their position, and the precast wall member is required in the field. A second step of installing according to a position and mechanically joining the large diameter reinforcing bar raised from the precast wall member below and the large diameter reinforcing bar of the precast wall member currently installed; To cast in situ for straight walls between the precast wall members, prefabricated reinforcing bars are placed between the precast wall members, and studs for integrating the prefabricated rebar network and the precast wall member. A third step of installing a bolt on a hardware embedded in an end of the precast wall member; A fourth step of installing a formwork for building the straight wall after performing the third step; A fifth step of installing a half precast slab on the precast wall member and the linear wall formwork after performing the fourth step, and reinforcing the upper slab; And simultaneously pouring concrete on the wall formwork and the half precast slab, thereby curing the concrete.
이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시 예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도1은 본 발명을 적용하여 구축한 아파트 벽체 구조의 평면도이고, 도2a 내지 도2c는 본 발명에 따른 프리캐스트 벽체 부재의 외관도이며, 도3은 본 발명에 따른 프리캐스트 벽체 부재의 내부 구조를 나타낸 도면이다.1 is a plan view of an apartment wall structure constructed by applying the present invention, Figures 2a to 2c is an external view of a precast wall member according to the present invention, Figure 3 is an internal structure of a precast wall member according to the present invention The figure which shows.
본 발명의 특징을 개략적으로 살펴보면 다음과 같다.Looking at the features of the present invention as follows.
1) 벽체간의 "┓"형, "┳"형, "╋"형과 같이 벽체와 벽체가 만나 모서리를 형성하는 모든 부분은 프리캐스트 부재를 사용한다.1) Precast members are used for all parts where the wall meets the wall, such as "┓", "┳" and "╋" between walls.
2) 프리캐스트 벽체 부재는 건물 전체의 횡력에 대해서는 부담하지 않고, 수직하중 및 작업하중만 분담할 수 있도록 한다.2) The precast wall members are to bear the vertical load and the working load without burdening the lateral force of the whole building.
3) 현장 거푸집 조립 및 콘크리트 타설은 직선구간만 시행할 수 있도록 한다.3) The site form assembly and concrete placing should be carried out in straight section only.
4) 현장 타설 구간의 벽체 철근은 선조립 철근을 사용하여 작업시간을 단축한다.4) Reinforcement of wall reinforcement in site casting section shortens working time by using prefabricated rebar.
5) 현장 타설 콘크리트는 건물 전체의 횡력을 부담할 수 있는 구조로 한다.5) The site-casting concrete is to be structure that can bear the lateral force of the whole building.
6) 프리캐스트 벽체 부재와 현장 타설 콘크리트는, 프리캐스트 벽체 부재의 단부에 기계적으로 정착하는 스터드 볼트에 의해 접합되도록 한다.6) The precast wall member and the in-situ concrete are to be joined by stud bolts that mechanically anchor to the ends of the precast wall member.
7) 슬라브 콘크리트 공사는 기존 방식대로 거푸집 위에 타설할 수도 있고, 하프(Half) 프리캐스트 슬라브를 사용할 수도 있다. 프리캐스트 벽체가 하프(Half) 프리캐스트 슬라브의 하중을 충분히 견딜 수 있으므로, 동시 타설이 가능하다.7) Slab concrete construction can be cast on formwork in the conventional manner, or use half precast slabs. Since the precast wall can withstand the load of the half precast slab sufficiently, simultaneous casting is possible.
이러한 본 발명의 특징을 도면을 참조하여 살펴본다.This feature of the present invention will be described with reference to the drawings.
도1에 도시된 바와 같이, 본 발명에서는 일직선 벽들이 만나는 모서리 부분을 "┓"형, "┳"형, "╋"형으로 프리캐스트 부재를 제작한 다음, 현장에서는 일직선 벽체만을 콘크리트 타설하여 벽체를 구축하여, 철근 콘크리트 구조물을 구축하도록 하였다.As shown in Fig. 1, in the present invention, a precast member is manufactured in a “┓” type, “┳” type, and “╋” type at the corner portions where the straight walls meet, and then in the field, only the straight wall is concrete poured to make the wall. To build a reinforced concrete structure.
도2a 내지 도2c에 이와 같은 형상의 프리캐스트 부재를 나타낸 것이고, 도3은 프리캐스트 부재의 내부 구조를 나타낸 도면이다.2A to 2C show a precast member having such a shape, and FIG. 3 shows an internal structure of the precast member.
도2a는 "╋"형 프리캐스트 부재의 외관도이고, 도2b는 "┳"형 프리캐스트 부재의 외관도이며, 도2c는 "┓"형 프리캐스트 부재의 외관도이다.FIG. 2A is an external view of the "V" type precast member, FIG. 2B is an external view of the "V" type precast member, and FIG. 2C is an external view of the "V" type precast member.
본 발명에 따른 프리캐스트 부재는 그 내부에 용접철망(16)을 넣어, 자체 강성을 확보하고, 상/하부 이음을 위해 대구경 철근(11)을 프리캐스트 단부에 수직으로 매입한다. 이때, 대구경 철근(11)의 상부는 프리캐스트 부재의 상면으로부터 돌출되도록 하고, 하부에는 아래단의 대구경 철근과 기계적 이음을 하기 위한 장치(14)를 설치한다. 대구경 철근의 기계적 이음이란 슬리브 충진, 슬리브 압착,나사이음, Cad Welding 등 기존에 널리 쓰이는 공법을 의미하며, 본 발명에서는 이러한 기존 방법들을 이용하여, 상/하 대구경 철근을 이음한다.The precast member according to the present invention puts the welded wire mesh 16 therein to secure its own rigidity, and embeds the large diameter reinforcing bar 11 perpendicularly to the precast end to secure the upper and lower joints. At this time, the upper part of the large-diameter rebar 11 is to protrude from the upper surface of the precast member, and the lower portion is provided with a device 14 for mechanical joint with the large-diameter rebar of the lower end. Mechanical joint of large diameter reinforcing bar means a conventional method widely used, such as sleeve filling, sleeve compression, screw joint, Cad Welding, in the present invention, using the existing methods, the upper and lower large diameter reinforcing bars.
그리고, 용접 철망(16)의 수직 길이는 프리캐스트 벽체의 높이보다 약간 작게 하여 프리캐스트 벽체 외부로 나타나지 않게 한다. 프리캐스트 벽체 부재가 현장 타설 벽체와 접합되는 단부에는 전단력에 저항하기 위한 스터드 볼트(13)를 매입할 수 있는 철물(12)을 삽입한다. 스터드 볼트(13)는 프리캐스트 벽체 부재를 조립한 후, 현장 타설 구간에 선조립 철근을 배근하고, 그 배근한 철근망 사이의 공간을 이용하여 스터드 볼트(13)를 스터드 볼트 정착용 철물(12)에 조립한다.And, the vertical length of the welded wire mesh 16 is slightly smaller than the height of the precast wall so that it does not appear outside the precast wall. At the end where the precast wall member is joined with the site-pouring wall, a hardware 12 into which a stud bolt 13 for embedding the shear force is inserted is inserted. After assembling the precast wall member, the stud bolt 13 reinforces the pre-assembled reinforcing bars in the site casting section, and uses the space between the reinforcing bar networks to replace the stud bolts 13 with the stud bolt fixing hardware (12). ) To assemble.
또한, 본 발명에서는 현장 타설 직선 벽체와 접합되는 부재 단부에 현장 타설을 위한 거푸집을 설치하기 위한 폼타이 삽입용 구멍(15)이 수직선상에 다수개 형성되어 있다. 이 폼타이 삽입용 구멍(15)은 거푸집이 제거된 후, 슬리브 처리하여 구멍을 메운다.In addition, in the present invention, a plurality of form tie inserting holes 15 for installing the formwork for spot casting are formed on the vertical line at the end of the member joined to the spot casting straight wall. The form tie inserting hole 15 is sleeved to close the hole after the formwork is removed.
이와 같은 본 발명에 따른 프리캐스트 벽체 부재를 이용하여 철근 콘크리트 구조물을 시공하는 과정을 도4a 내지 도4f를 참조하여 설명한다.A process of constructing a reinforced concrete structure using the precast wall member according to the present invention will be described with reference to FIGS. 4A to 4F.
도4a는 다음 층을 시공하기 전의 아래층이 양생된 후의 상태를 나타낸 도면이다.4A is a view showing a state after the lower layer is cured before the next layer is constructed.
도면에 도시된 바와 같이, 아래층의 "╋"형 프리캐스트 벽체 부재와, "┳"형 프리캐스트 벽체 부재로부터 돌출된 대구경 철근(11)과, 아래층의 현장 타설 벽체로부터 올라온 용접철망(16)이 슬라브 위로 돌출되어 있다. 이러한 상태에서 슬라브 위에 먹선(17)으로 벽체 시공 위치를 표시한다.As shown in the figure, the "╋" type precast wall member in the lower layer, the large diameter reinforcing bar 11 protruding from the "┳" type precast wall member, and the welded wire mesh 16 raised from the site-pouring wall in the lower layer are provided. It protrudes above the slab. In this state, the wall construction position is indicated by a black line 17 on the slab.
그런 다음, 도4b에 도시된 바와 같이, 각 벽체의 모서리에 해당하는 부분에 미리 공장에서 제작된 프리캐스트 벽체 부재를 필요한 부분에 설치한다. 그리고, 아래층의 프리캐스트 벽체 부재로부터 돌출된 대구경 철근과 지금 설치한 프리캐스트 벽체 부재의 대구경 철근을 기계적 이음하는데, 도면에서는 슬리브 충진을 통해 기계적 이음을 하고 있는 모양을 보여주고 있다.Then, as shown in Fig. 4B, a precast wall member manufactured in advance in the factory is installed in the required portion at the portion corresponding to the edge of each wall. In addition, the large diameter reinforcing bar projecting from the precast wall member of the lower layer and the large diameter reinforcing bar of the precast wall member, which are just installed, are mechanically joined, and the figure shows the shape of the mechanical joint through the sleeve filling.
이와 같은 과정을 통해 프리캐스트 벽체 부재를 필요한 부분에 모두 설치하면, 도4c에 도시된 바와 같이 현장 타설 벽체를 구축할 부분에 선조립된 철근을 배근한다. 여기서, 선조립 철근망은 수직 겹침 이음을 통해 배근되고, 이와 같은 선조립 철근망 배근을 완료한 다음에는, 프리캐스트 벽체 부재의 단부에 형성된 스터드 볼트 정착용 매입 철물에 스터드 볼트(13)를 설치한다. 이와 같은 과정을 통해 선조립 철근과 프리캐스트 벽체 부재와는 일체적으로 결합된다. 그런 다음, 규격화된 벽체 거푸집을 도4d에 도시된 바와 같이 설치하는데, 이때 프리캐스트 벽체 부재에 형성된 거푸집 고정용 구멍(15)을 통해 폼타이를 삽입하여 거푸집을 조립한다. 이후, 도4e에 도시된 바와 같이, 슬라브 거푸집을 조립하고 슬라브 상/하부 철근을 배근한다. 이는 종래의 방법과 동일하다.If all of the precast wall members are installed in the necessary parts through this process, as shown in FIG. Here, the prefabricated reinforcing bar is reinforced by vertical overlapping, and after completing the prefabricated reinforcing bar reinforcement, the stud bolt 13 is installed in the embedded hardware for fixing the stud bolt formed at the end of the precast wall member. do. Through this process, the prefabricated rebar and the precast wall member are integrally combined. Then, a standardized wall formwork is installed as shown in FIG. 4D, in which form dies are assembled by inserting a form tie through the formwork fixing holes 15 formed in the precast wall member. Thereafter, as shown in FIG. 4E, the slab formwork is assembled and the slab upper and lower reinforcing bars are reinforced. This is the same as the conventional method.
그런 다음, 도4f에 도시된 바와 같이, 직선 벽체와 슬라브 거푸집 위에 콘크리트를 타설하고, 콘크리트가 양생되도록 대기한다. 콘크리트가 양생되면 거푸집을 탈형하고, 폼타이가 삽입되었던 거푸집 고정용 구멍은 슬리브 충진 등을 통해 메운다. 이와 같은 과정을 통해 하나의 층의 시공이 완료된다.Then, as shown in Fig. 4f, the concrete is poured over the straight wall and the slab formwork, and the concrete is allowed to cure. When the concrete is cured, the mold is demolded, and the form fixing hole where the form tie is inserted is filled by sleeve filling. Through this process, the construction of one floor is completed.
도5a 및 도5b는 본 발명의 다른 실시 예에 따른 시공 순서를 나타낸 도면으로서, 도4a로부터 도4d의 과정이 전술한 바와 같은 과정을 통해 완료된 다음에, 도5a에서는 슬라브를 구축함에 있어, 하프 프리캐스트 슬라브를 이용하여 시공한다. 즉, 도면에 도시된 바와 같이 하프 프리캐스트 슬라브를 기 설치된 프리캐스트 벽체 부재 상부에 설치하고, 슬라브 상부 철근을 배근한다. 여기서, 벽체 콘크리트가 타설되지 않고, 벽체 거푸집만 조립된 상태에서도 프리캐스트 벽체 부재가 부분적으로 지지되기 때문에 하프 프리캐스트 슬라브의 하중을 충분히 지지할 수 있다.Figures 5a and 5b is a view showing the construction sequence according to another embodiment of the present invention, after the process of Figures 4a to 4d is completed through the process as described above, in Fig. 5a to build a slab, Construct using precast slabs. That is, as shown in the drawing, the half precast slab is installed on the precast wall member, and the slab upper reinforcing bar is placed. Here, since the precast wall member is partially supported even when the wall concrete is not poured and only the wall formwork is assembled, the load of the half precast slab can be sufficiently supported.
그런 다음, 도5b에 도시된 바와 같이, 벽체 거푸집과 하프 프리캐스트 슬라브 위에 토핑 콘크리트를 타설하여, 콘크리트를 양생한다. 콘크리트 양생이 완료되면, 전술한 바와 같이 벽체 거푸집을 탈형하고, 벽체 거푸집 고정용 구멍은 슬리브 충진을 통해 메운다.Then, as shown in Fig. 5B, topping concrete is poured on the wall formwork and the half precast slab to cure the concrete. When the concrete curing is completed, the wall formwork is demoulded as described above, and the hole for fixing the wall formwork is filled through the sleeve filling.
이와 같은 과정을 통해 하나의 층이 완성되고, 반복적인 과정을 통해 철근 콘크리트 구조물을 시공할 수 있다.Through this process, one layer is completed, and the reinforced concrete structure can be constructed through an iterative process.
상기와 같이 이루어진 본 발명에 의하면, 콘크리트 벽식 구조에서 벽체 거푸집 및 철근 시공을 간편화하고, 하프 프리캐스트 공법의 적용시 벽체 콘크리트 타설전에 하프 프리캐스트 슬라브를 설치할 수 있으므로, 벽체와 슬라브를 동시에 콘크리트 타설할 수 있을 뿐만 아니라 종래 프리캐스트 공법과 현장 타설 공법의 장점을 잘 살려, 공기를 단축하고, 시공비용을 절감할 수 있는 효과가 있다.According to the present invention made as described above, since the wall formwork and reinforcement construction can be simplified in the concrete wall structure, when the half precast method is applied, half precast slabs can be installed before the wall concrete is poured, so that the wall and the slab can be cast at the same time. Not only can it take advantage of the advantages of the conventional precast method and on-site pouring method, there is an effect that can shorten the air, reducing the construction cost.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2001-0002983A KR100396583B1 (en) | 2001-01-18 | 2001-01-18 | The construction method of rc structure using improved precast wall members |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR10-2001-0002983A KR100396583B1 (en) | 2001-01-18 | 2001-01-18 | The construction method of rc structure using improved precast wall members |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| KR20020061899A true KR20020061899A (en) | 2002-07-25 |
| KR100396583B1 KR100396583B1 (en) | 2003-09-03 |
Family
ID=27692137
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| KR10-2001-0002983A Expired - Fee Related KR100396583B1 (en) | 2001-01-18 | 2001-01-18 | The construction method of rc structure using improved precast wall members |
Country Status (1)
| Country | Link |
|---|---|
| KR (1) | KR100396583B1 (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006073319A3 (en) * | 2005-01-06 | 2006-10-19 | Ferdinand D Crisologo | Precast concrete wall form block |
| CN109184026A (en) * | 2018-10-30 | 2019-01-11 | 江苏华实装配式建筑技术有限公司 | A kind of prefabricated assembled concrete can breathe the big sleeve-board part of exterior wall |
| CN110424574A (en) * | 2019-08-14 | 2019-11-08 | 湖南远大工程设计有限公司 | A kind of dry wall, dry wall and site concrete horizontal connecting node and construction method |
| CN111851469A (en) * | 2020-08-10 | 2020-10-30 | 北京市市政工程设计研究总院有限公司 | Shear wall structural member and construction method of an underground continuous wall |
| CN113802726A (en) * | 2021-10-25 | 2021-12-17 | 湖北宇辉新型建筑材料有限公司 | Edge member of superimposed integral prefabricated shear wall and installation method |
| KR20220077699A (en) * | 2020-12-02 | 2022-06-09 | 경기대학교 산학협력단 | Connection structure and construction method between precast shear wall and foundation |
| CN115059210A (en) * | 2022-07-29 | 2022-09-16 | 四川零零昊科技有限公司 | A prefabricated wall connection device |
| CN118110284A (en) * | 2024-03-29 | 2024-05-31 | 华侨大学 | A reinforcement-free UHPC-connected assembled shear wall structure and its construction method |
| CN120119716A (en) * | 2025-05-13 | 2025-06-10 | 浙江中南建设集团有限公司 | A prefabricated building and construction method based on BIM technology |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100856021B1 (en) | 2007-05-30 | 2008-09-03 | 정상택 | Method for forming pattern on a wall |
| KR101290766B1 (en) | 2011-10-21 | 2013-07-29 | 윤은중 | Molding for constructing vertical hall and construction method for perpendicular hall using it |
| KR101335578B1 (en) | 2011-12-08 | 2013-12-02 | 윤은중 | Molding for constructing perpendicular hall and construction method for perpendicular hall using it |
| KR101745295B1 (en) | 2017-01-17 | 2017-06-08 | 주정욱 | Construction method for reducing noise between floors of building and building construction |
| KR102194554B1 (en) * | 2017-08-11 | 2020-12-23 | (주)연우피씨엔지니어링 | Precast concrete composite wall structure with enhanced seismic performance and construction method for the same |
| KR20200097129A (en) | 2019-02-07 | 2020-08-18 | 우석대학교 산학협력단 | Refrigerator having transparent function for easy recognition of contents |
| KR102397000B1 (en) * | 2022-02-03 | 2022-05-16 | 김건우 | Reinforced pc shear wall |
-
2001
- 2001-01-18 KR KR10-2001-0002983A patent/KR100396583B1/en not_active Expired - Fee Related
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2006073319A3 (en) * | 2005-01-06 | 2006-10-19 | Ferdinand D Crisologo | Precast concrete wall form block |
| CN109184026A (en) * | 2018-10-30 | 2019-01-11 | 江苏华实装配式建筑技术有限公司 | A kind of prefabricated assembled concrete can breathe the big sleeve-board part of exterior wall |
| CN110424574A (en) * | 2019-08-14 | 2019-11-08 | 湖南远大工程设计有限公司 | A kind of dry wall, dry wall and site concrete horizontal connecting node and construction method |
| CN111851469A (en) * | 2020-08-10 | 2020-10-30 | 北京市市政工程设计研究总院有限公司 | Shear wall structural member and construction method of an underground continuous wall |
| KR20220077699A (en) * | 2020-12-02 | 2022-06-09 | 경기대학교 산학협력단 | Connection structure and construction method between precast shear wall and foundation |
| CN113802726A (en) * | 2021-10-25 | 2021-12-17 | 湖北宇辉新型建筑材料有限公司 | Edge member of superimposed integral prefabricated shear wall and installation method |
| CN115059210A (en) * | 2022-07-29 | 2022-09-16 | 四川零零昊科技有限公司 | A prefabricated wall connection device |
| CN118110284A (en) * | 2024-03-29 | 2024-05-31 | 华侨大学 | A reinforcement-free UHPC-connected assembled shear wall structure and its construction method |
| CN120119716A (en) * | 2025-05-13 | 2025-06-10 | 浙江中南建设集团有限公司 | A prefabricated building and construction method based on BIM technology |
Also Published As
| Publication number | Publication date |
|---|---|
| KR100396583B1 (en) | 2003-09-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100396583B1 (en) | The construction method of rc structure using improved precast wall members | |
| CN107795010B (en) | Prefabricated beam-column joint and construction method thereof | |
| KR101460559B1 (en) | Structure and Method for Connecting between Precast Column and In-situ Concrete Slab | |
| CN1821501B (en) | Column-beam connection structure of building and connection method thereof | |
| KR20020011706A (en) | Fabricated pier and Fabricated pier construction method | |
| KR102484159B1 (en) | Rapid Construction Structure of Core Part Using Multi-Story Precast Wall | |
| JP7411749B2 (en) | How to construct a concrete building | |
| KR100304861B1 (en) | Insulation Precast Concrete Panel | |
| KR100226168B1 (en) | Architecture and method for making a stair using a precast concrete | |
| KR101370163B1 (en) | Construction method of concrete structure house | |
| KR101036177B1 (en) | Construction method of building structure using PPC composite method | |
| KR101324884B1 (en) | Hybrid building construction method combining dry type and wet type | |
| KR200320805Y1 (en) | Precast concrete member for column being connected in floor space and structure for connecting column by using of it | |
| KR100712354B1 (en) | PC compound construction method of underground parking lot and PC column-beam connection structure of Janspan PC beam | |
| KR20010090294A (en) | Precast concrete structure for variable plan of apartment house | |
| KR102149662B1 (en) | Method for constructing transfer layer of building using precast concrete slab | |
| KR101542717B1 (en) | construction method of concrete structure house | |
| JPH10317503A (en) | Construction method of wall type reinforced concrete structure | |
| JPH0480444A (en) | Connection unit of reinforced concrete pole and steel framed beam | |
| KR100203012B1 (en) | Executing method of building works used a pc slab | |
| JPH0314483Y2 (en) | ||
| JP2005002585A (en) | Capital member and RCFT pillar construction method using the same | |
| KR102679042B1 (en) | PC half-slab construction method for quick construction of precast concrete apartment house | |
| KR101866559B1 (en) | Construction technique of concrete structures through the Precast Concrete | |
| KR102853813B1 (en) | Insulation Integrated Rooftop Precast Large Equipment Basic Module Construction Method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A201 | Request for examination | ||
| PA0109 | Patent application |
St.27 status event code: A-0-1-A10-A12-nap-PA0109 |
|
| PA0201 | Request for examination |
St.27 status event code: A-1-2-D10-D11-exm-PA0201 |
|
| PG1501 | Laying open of application |
St.27 status event code: A-1-1-Q10-Q12-nap-PG1501 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-3-3-R10-R18-oth-X000 |
|
| E701 | Decision to grant or registration of patent right | ||
| PE0701 | Decision of registration |
St.27 status event code: A-1-2-D10-D22-exm-PE0701 |
|
| GRNT | Written decision to grant | ||
| PR0701 | Registration of establishment |
St.27 status event code: A-2-4-F10-F11-exm-PR0701 |
|
| PR1002 | Payment of registration fee |
St.27 status event code: A-2-2-U10-U11-oth-PR1002 Fee payment year number: 1 |
|
| PG1601 | Publication of registration |
St.27 status event code: A-4-4-Q10-Q13-nap-PG1601 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 4 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 7 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 8 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| FPAY | Annual fee payment |
Payment date: 20110801 Year of fee payment: 9 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 9 |
|
| FPAY | Annual fee payment |
Payment date: 20120719 Year of fee payment: 10 |
|
| PR1001 | Payment of annual fee |
St.27 status event code: A-4-4-U10-U11-oth-PR1001 Fee payment year number: 10 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| LAPS | Lapse due to unpaid annual fee | ||
| PC1903 | Unpaid annual fee |
St.27 status event code: A-4-4-U10-U13-oth-PC1903 Not in force date: 20130822 Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PC1903 | Unpaid annual fee |
St.27 status event code: N-4-6-H10-H13-oth-PC1903 Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE Not in force date: 20130822 |
|
| P22-X000 | Classification modified |
St.27 status event code: A-4-4-P10-P22-nap-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| PN2301 | Change of applicant |
St.27 status event code: A-5-5-R10-R13-asn-PN2301 St.27 status event code: A-5-5-R10-R11-asn-PN2301 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |
|
| R18 | Changes to party contact information recorded |
Free format text: ST27 STATUS EVENT CODE: A-5-5-R10-R18-OTH-X000 (AS PROVIDED BY THE NATIONAL OFFICE) |
|
| R18-X000 | Changes to party contact information recorded |
St.27 status event code: A-5-5-R10-R18-oth-X000 |