JP2001177036A - Method of cutting resin dam bar - Google Patents
Method of cutting resin dam barInfo
- Publication number
- JP2001177036A JP2001177036A JP35681099A JP35681099A JP2001177036A JP 2001177036 A JP2001177036 A JP 2001177036A JP 35681099 A JP35681099 A JP 35681099A JP 35681099 A JP35681099 A JP 35681099A JP 2001177036 A JP2001177036 A JP 2001177036A
- Authority
- JP
- Japan
- Prior art keywords
- dam bar
- resin
- punch
- cutting
- leads
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、樹脂封止後のリー
ドフレームからダムバーをカットし、リード間にはみ出
した余分なレジンを除去する方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of cutting a dam bar from a lead frame after resin sealing, and removing excess resin protruding between leads.
【0002】[0002]
【従来の技術】従来より、樹脂封止後のリードフレーム
からダムバーをパンチを用いてカットする工程とリード
間にはみ出した余分なレジンをパンチを用いてカットす
る工程が必要であった。2. Description of the Related Art Heretofore, it has been necessary to perform a step of using a punch to cut a dam bar from a lead frame after resin sealing and a step of using a punch to cut excess resin protruding between leads.
【0003】また、パンチを用いて樹脂封止後のリード
フレームからダムバーをカットしリード間にはみ出した
余分なレジンを同時に突き落とす方法もあった。There has also been a method in which a dam bar is cut from a lead frame after resin sealing using a punch, and excess resin protruding between leads is simultaneously pushed down.
【0004】[0004]
【発明が解決しようとする課題】上記従来技術におい
て、ダムバーカット工程とレジンカット工程の二つの工
程が必要でありリードタイムが長くなるという問題点が
ある。In the above-mentioned prior art, there is a problem that two steps of a dam bar cutting step and a resin cutting step are required, and the lead time becomes long.
【0005】また、パンチを用いて樹脂封止後のリード
フレームからダムバーをカットしリード間にはみ出した
余分なレジンを同時に突き落とす方法もあったが、レジ
ンを完全に除去することは難しくレジン残りが発生す
る。There has also been a method in which a dam bar is cut from a lead frame after resin sealing using a punch, and excess resin protruding between the leads is simultaneously pushed down. However, it is difficult to completely remove the resin, and it is difficult to remove the resin residue. appear.
【0006】[0006]
【課題を解決するための手段】上記問題を解決するた
め、リード間のダムバー位置に合わせたくし刃を形成し
たダムバーカットパンチを用いて、樹脂封止後のリード
フレームからダムバーとリード間にはみ出した余分なレ
ジンを同時にカット除去する。.In order to solve the above problem, a dam bar cut punch formed with a comb blade adapted to the position of the dam bar between the leads is used to protrude from the lead frame after resin sealing between the dam bar and the lead. Excess resin is cut and removed at the same time. .
【0007】ダムバーカットパンチの上部にはダムバー
カットパンチをガイドするパンチガイドが設けられてお
り、その中にスプリングを設けてダムバーカットパンチ
に一定の与圧をかけている。A punch guide for guiding the dam bar cut punch is provided above the dam bar cut punch, and a spring is provided therein to apply a predetermined pressure to the dam bar cut punch.
【0008】その状態のダムバーカットパンチが下降す
ると、ダムバーカットパンチの先端は封止樹脂に常に接
しリードフレームからダムバーとリード間にはみ出した
余分なレジンをカットしつつ、ダムバーをもカットす
る。.When the dam bar cut punch descends in this state, the tip of the dam bar cut punch is always in contact with the sealing resin, and cuts the excess resin protruding from the lead frame between the dam bar and the lead, while also cutting the dam bar. . .
【0009】[0009]
【発明の実施の形態】まず、リード間のダムバー位置に
合わせたくし刃を形成したダムバーカットパンチを用意
する。DESCRIPTION OF THE PREFERRED EMBODIMENTS First, a dam bar cut punch having a comb blade formed in accordance with the position of a dam bar between leads is prepared.
【0010】ダムバーカットパンチの上部にはダムバー
カットパンチをガイドするパンチガイドが設けられてお
り、その中にスプリングを設けてダムバーカットパンチ
に一定の与圧をかけている。A punch guide for guiding the dam bar cut punch is provided above the dam bar cut punch, and a spring is provided therein to apply a constant pressure to the dam bar cut punch.
【0011】次にダムバーカットパンチが下降すると、
ダムバーカットパンチの先端は封止樹脂に常に接しリー
ドフレームからダムバーとリード間にはみ出した余分な
レジンをカットしつつ、ダムバーをもカットする。Next, when the dam bar cut punch descends,
The tip of the dam bar cut punch is always in contact with the sealing resin, and cuts the excess resin protruding from the lead frame between the dam bar and the lead while also cutting the dam bar.
【0012】[0012]
【実施例】以下、図面を参照し本発明の実施例について
詳細に説明する。Embodiments of the present invention will be described below in detail with reference to the drawings.
【0013】まず、図1においてリード間のダムバー位
置に合わせたくし刃を形成したダムバーカットパンチ1
を用意する。該ダムバーカットパンチ1の下部にはくし
刃に応じた抜き穴を設けたダムバーカットダイ2を設け
ている。First, in FIG. 1, a dam bar cut punch 1 having a comb blade formed at the position of a dam bar between leads is formed.
Prepare A dam bar cut die 2 provided with a hole corresponding to a comb blade is provided below the dam bar cut punch 1.
【0014】図2は、ダムバーカットパンチ1とダムバ
ー3とダムバーカットダイ2の位置関係を示す断面図で
ある。ダムバーカットパンチ1が下降するとダムバー3
に接しその後ダムバーカットダイ2によりダムバー3が
切断される。FIG. 2 is a sectional view showing a positional relationship among the dam bar cut punch 1, the dam bar 3, and the dam bar cut die 2. As shown in FIG. When dam bar cut punch 1 descends, dam bar 3
Then, the dam bar 3 is cut by the dam bar cut die 2.
【0015】図3は、樹脂封止後のリードフレーム5の
状態を示す斜視図である。リードフレーム5は封止樹脂
6と接合されており、リードフレーム5と封止樹脂6の
間にはリード間にはみ出した余分なレジン4と該レジン
4の流れ止めをするダムバー3が存在する。FIG. 3 is a perspective view showing a state of the lead frame 5 after resin sealing. The lead frame 5 is joined to the sealing resin 6. Between the lead frame 5 and the sealing resin 6, there is an extra resin 4 protruding between the leads and a dam bar 3 for stopping the flow of the resin 4.
【0016】次に図4を用いてリード間にはみ出した余
分なレジン4と該レジン4の流れ止めをするダムバー3
を同時にカット除去する方法を説明する。ダムバーカッ
トパンチ1の上部にはダムバーカットパンチ1をガイド
するパンチガイド8が設けられており、その中にスプリ
ング7を設けてダムバーカットパンチ1に一定の与圧を
かけている。Next, referring to FIG. 4, an extra resin 4 protruding between the leads and a dam bar 3 for stopping the flow of the resin 4 will be described.
Will be described at the same time. A punch guide 8 for guiding the dam bar cut punch 1 is provided above the dam bar cut punch 1, and a spring 7 is provided therein to apply a constant pressurization to the dam bar cut punch 1.
【0017】ダムバーカットパンチ1が下降すると、ダ
ムバーカットパンチ1の先端は封止樹脂6に常に接しリ
ードフレーム5からダムバー3とリード間にはみ出した
余分なレジン4をカットしつつ、ダムバーをもカットす
る。.When the dam bar cut punch 1 descends, the tip of the dam bar cut punch 1 is always in contact with the sealing resin 6 and cuts off the excess resin 4 protruding from the lead frame 5 between the dam bar 3 and the lead, while cutting the dam bar. Also cut. .
【0018】以上の作用により、一つのダムバーカット
パンチ1のみでダムバー3とリード間にはみ出した余分
なレジン4を同時にカット除去が可能となる。With the above operation, the excess resin 4 which has protruded between the dam bar 3 and the lead can be simultaneously cut and removed with only one dam bar cut punch 1.
【0019】[0019]
【発明の効果】ダムバーカット工程のみでダムバーとリ
ード間にはみ出した余分なレジンを同時にカット除去が
可能となる為リードタイムを短くすることが出来る。According to the present invention, it is possible to simultaneously cut and remove excess resin protruding between the dam bar and the lead only by the dam bar cutting step, so that the lead time can be shortened.
【0020】また、リード間にはみ出した余分なレジン
を突き落とす方法ではなく、レジンをカット除去する方
法の為、レジンを完全に除去することが出来る。In addition, the resin can be completely removed because the resin is cut and removed instead of the method of dropping the excess resin protruding between the leads.
【図1】 ダムバーカットパンチとダムバーカットダイ
の斜視図である。FIG. 1 is a perspective view of a dam bar cut punch and a dam bar cut die.
【図2】 ダムバーカットパンチとダムバーとダムバー
カットダイの位置関係を示す断面図である。FIG. 2 is a sectional view showing a positional relationship between a dam bar cut punch, a dam bar, and a dam bar cut die.
【図3】 樹脂封止後のリードフレームの状態を示す斜
視図である。FIG. 3 is a perspective view showing a state of the lead frame after resin sealing.
【図4】 本発明の実施例に係る、レジン・ダムバーカ
ット方法の詳細図である。FIG. 4 is a detailed view of a resin / dam bar cutting method according to an embodiment of the present invention.
1 ダムバーカットパンチ 2 ダムバーカットダイ 3 ダムバー 4 レジン 5 リードフレーム 6 封止樹脂 7 スプリング 8 パンチガイド DESCRIPTION OF SYMBOLS 1 Dam bar cut punch 2 Dam bar cut die 3 Dam bar 4 Resin 5 Lead frame 6 Sealing resin 7 Spring 8 Punch guide
Claims (1)
を形成したダムバーカットパンチを用いて、樹脂封止後
のリードフレームからダムバーとリード間にはみ出した
余分なレジンを同時に除去することを特徴とするレジン
・ダムバーカット方法。The present invention is characterized in that, using a dam bar cut punch formed with a comb blade corresponding to the position of a dam bar between leads, excess resin protruding between the dam bar and the lead is simultaneously removed from the lead frame after resin sealing. Resin / dam bar cutting method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35681099A JP2001177036A (en) | 1999-12-16 | 1999-12-16 | Method of cutting resin dam bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35681099A JP2001177036A (en) | 1999-12-16 | 1999-12-16 | Method of cutting resin dam bar |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2001177036A true JP2001177036A (en) | 2001-06-29 |
Family
ID=18450894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP35681099A Withdrawn JP2001177036A (en) | 1999-12-16 | 1999-12-16 | Method of cutting resin dam bar |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2001177036A (en) |
-
1999
- 1999-12-16 JP JP35681099A patent/JP2001177036A/en not_active Withdrawn
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR19980070182A (en) | Bump Formation Method | |
JP3741995B2 (en) | Device and method for removing tie bar after resin sealing of semiconductor device, and method for manufacturing semiconductor device | |
WO2006126438A1 (en) | Method and apparatus for producing insert molding | |
KR100244966B1 (en) | Apparatus having trim punch with air flow route for trimming gate scrap | |
JP2001177036A (en) | Method of cutting resin dam bar | |
JP3655081B2 (en) | Method and apparatus for squeezing metal plate | |
KR100452261B1 (en) | Press mold | |
JP2944592B2 (en) | Lead cutting equipment | |
JPH08172153A (en) | Method of lead forming for semiconductor device and metal mold therefor | |
JPH02148745A (en) | Positioning device for lead frame | |
JPH055220U (en) | Cutting die for semiconductor device | |
JP2007109719A (en) | Process for manufacturing semiconductor device | |
JPH0936291A (en) | Method and apparatus for cutting tie bar | |
JP2576645B2 (en) | Manufacturing method of IC lead frame | |
JP2826508B2 (en) | Semiconductor device manufacturing equipment | |
JPH04364803A (en) | Manufacturing space portion of slide fastener chain | |
JPH06154905A (en) | Ic lead cutting dies | |
KR200141174Y1 (en) | Trim forming die of semiconductor manufacture | |
JP2552097B2 (en) | Metal member cutting die | |
JPH07137180A (en) | Method and device for fixing fold forming matrix | |
KR920001243Y1 (en) | Dies | |
KR100220867B1 (en) | Method triming of semiconductor package and structure apparatus of triming | |
JPH01296650A (en) | Manufacture of semiconductor device | |
JPS6331128A (en) | Removal of resin tailing | |
JPH05275590A (en) | Pinch cutting device for lead frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A300 | Withdrawal of application because of no request for examination |
Free format text: JAPANESE INTERMEDIATE CODE: A300 Effective date: 20070306 |