GB281342A - Improvements in and relating to steam turbines - Google Patents
Improvements in and relating to steam turbinesInfo
- Publication number
- GB281342A GB281342A GB32139/27A GB3213927A GB281342A GB 281342 A GB281342 A GB 281342A GB 32139/27 A GB32139/27 A GB 32139/27A GB 3213927 A GB3213927 A GB 3213927A GB 281342 A GB281342 A GB 281342A
- Authority
- GB
- United Kingdom
- Prior art keywords
- steam
- tapped
- relating
- steam turbines
- turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000012530 fluid Substances 0.000 abstract 1
- 238000010438 heat treatment Methods 0.000 abstract 1
- 230000001105 regulatory effect Effects 0.000 abstract 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D25/00—Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
- F01D25/32—Collecting of condensation water; Drainage ; Removing solid particles
Abstract
281,342. Akt.-Ges. Brown, Boveri, et Cie. Nov. 29, 1926, [Convention date]. Working - fluid supply; regulating.-Wet steam from the outermost region of flow of a low pressure turbine a is tapped off at b, dried, and returned at d, missing one or more stages. The tapped steam may pass wholly through the drier c and back to the turbine, or part may be led off via the pipe e for heating or distilling. The blades B missed by the tappedoff steam are made shorter than the remainder.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE281342X | 1926-11-29 |
Publications (1)
Publication Number | Publication Date |
---|---|
GB281342A true GB281342A (en) | 1927-12-29 |
Family
ID=6035618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB32139/27A Expired GB281342A (en) | 1926-11-29 | 1927-11-29 | Improvements in and relating to steam turbines |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB281342A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2122690A (en) * | 1982-07-01 | 1984-01-18 | Skoda Kp | Steam turbine bleeding slot |
-
1927
- 1927-11-29 GB GB32139/27A patent/GB281342A/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2122690A (en) * | 1982-07-01 | 1984-01-18 | Skoda Kp | Steam turbine bleeding slot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB281342A (en) | Improvements in and relating to steam turbines | |
GB189131A (en) | Improvements in or relating to turbine blades | |
GB377048A (en) | Improved radial flow steam turbine | |
GB206211A (en) | Improvements in or relating to feed water heating in condensing steam turbine plant | |
GB326239A (en) | Improvements relating to elastic fluid turbines | |
GB285811A (en) | Improvements in exhaust turbines | |
GB218839A (en) | Improvements relating to steam turbines | |
GB529148A (en) | Improvements in and relating to elastic fluid turbine plants | |
GB197654A (en) | Improvements in steam power installations | |
GB234148A (en) | Improvements relating to steam turbine installations | |
GB267137A (en) | Improvements in and relating to back pressure turbines | |
GB518380A (en) | Improvements in and relating to gas turbine installations | |
GB266320A (en) | Improvements in or relating to steam power plant with intermediate superheating | |
GB645671A (en) | Improvements in or relating to power plants | |
GB176817A (en) | Improvements in condensing and feed water heating systems in steam power plants | |
GB478810A (en) | Improvements in and relating to the guide apparatus for steam or gas turbines | |
GB288545A (en) | A combined boiler feed and condensation plant | |
GB613590A (en) | Improvements in or relating to the utilisation of the exhaust gases from gas turbines | |
GB823267A (en) | Steam turbine set with bleeder steam feed water preheater | |
GB311586A (en) | Improvements in steam turbines | |
GB500007A (en) | Improvements in and relating to the external heating of superheated steam turbines and like machines | |
GB305039A (en) | ||
GB218162A (en) | Improvements in and relating to high pressure steam turbines | |
GB267850A (en) | Improvements in back pressure turbines | |
GB283504A (en) | An arrangement for draining the low pressure blading in steam turbines |