GB1137851A - Improvements in and relating to tie anchors in the earth - Google Patents
Improvements in and relating to tie anchors in the earthInfo
- Publication number
- GB1137851A GB1137851A GB28166A GB28166A GB1137851A GB 1137851 A GB1137851 A GB 1137851A GB 28166 A GB28166 A GB 28166A GB 28166 A GB28166 A GB 28166A GB 1137851 A GB1137851 A GB 1137851A
- Authority
- GB
- United Kingdom
- Prior art keywords
- tie
- pipe
- coating
- ground
- drill pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/76—Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
1,137,851. Making ground anchors. K. BAUER. 4 Jan., 1966, No. 281/66. Heading E1B. A process for forming a tie anchor in the ground, comprises coating a tie rod 2 with a layer 4 of hardenable synthetic resin before placing it in a body of hardenable load-bearing material 7, to form, on simultaneous hardening of the resin and the material, a tension transmitting bridge therebetween. A hole for the anchor is made by a drill pipe (1), (fig. 1). The coated rod is then placed in the pipe, (fig. 2). The pipe is partially withdrawn, and the material 7 injected through it, (fig. 3). After hardening the pipe is removed and the tie is tensioned, (fig. 4.) The tie may have a first coating 2 of plastics, which may be impregnated with quartz in the region of the coating 4. If the drill pipe has a tip, this can be left in the ground. The drill pipe may be removed before the tie rod is inserted in the material 7. The load-bearing material can be placed in a vertical bore, and the tie rod may be placed in a bore that intersects the material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB28166A GB1137851A (en) | 1966-01-04 | 1966-01-04 | Improvements in and relating to tie anchors in the earth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB28166A GB1137851A (en) | 1966-01-04 | 1966-01-04 | Improvements in and relating to tie anchors in the earth |
Publications (1)
Publication Number | Publication Date |
---|---|
GB1137851A true GB1137851A (en) | 1968-12-27 |
Family
ID=9701609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB28166A Expired GB1137851A (en) | 1966-01-04 | 1966-01-04 | Improvements in and relating to tie anchors in the earth |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB1137851A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0006515A1 (en) * | 1978-06-22 | 1980-01-09 | Bayer Ag | Process for the anchoring of a tie rod |
-
1966
- 1966-01-04 GB GB28166A patent/GB1137851A/en not_active Expired
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0006515A1 (en) * | 1978-06-22 | 1980-01-09 | Bayer Ag | Process for the anchoring of a tie rod |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4139323A (en) | Rock anchor | |
GB1344354A (en) | Corrosion-resistant tie-rod and method for securing the same in soil | |
GB1170894A (en) | Ground Anchor. | |
NL6607584A (en) | ||
GB1166816A (en) | Process for Fixing Consolidating Rods in Drill Holes, especially in Friable Rock | |
GB1084097A (en) | ||
ES472534A1 (en) | Method of anchoring a borehole anchor | |
GB1272524A (en) | Improvements in or relating to hardenable resin cartridges | |
GB1515162A (en) | Stabilization of cavity walls | |
GB1337015A (en) | Consolidation of rock strata | |
GB1137851A (en) | Improvements in and relating to tie anchors in the earth | |
ATE154T1 (en) | METHOD OF ANCHORING TENSION MEMBERS. | |
GB1441796A (en) | Method and a means for stressing and anchoring a stressing member in the wall of a hollow structure | |
ES461393A1 (en) | Rock reinforcement | |
IT1157712B (en) | filling of holes esp. in concrete pavement | |
GB1007393A (en) | A method of reinforcing a rock formation | |
GR3036465T3 (en) | Method for protecting concrete-embedded reinforcing elements against oxidation effects | |
GB1115796A (en) | Improvements in and relating to ground anchors and methods of making such anchors | |
ES396603A1 (en) | A procedure to build anchorages for land. (Machine-translation by Google Translate, not legally binding) | |
GB1030619A (en) | A process for the production of piles | |
GB1458381A (en) | Ground anchoring devices | |
SU1173000A1 (en) | Method of constructing a soil anchor | |
GB968063A (en) | Process of grouting elongated members in drill holes | |
GB1224646A (en) | Consolidation of soil and other water-permeable masses of similar grain size | |
SU97017A1 (en) | Ground fixing method |