FR2815050A3 - Loading quay for lorries is made up of concrete boxes with three sides, opposite sides having inwardly-projecting lips at top - Google Patents

Loading quay for lorries is made up of concrete boxes with three sides, opposite sides having inwardly-projecting lips at top Download PDF

Info

Publication number
FR2815050A3
FR2815050A3 FR0112729A FR0112729A FR2815050A3 FR 2815050 A3 FR2815050 A3 FR 2815050A3 FR 0112729 A FR0112729 A FR 0112729A FR 0112729 A FR0112729 A FR 0112729A FR 2815050 A3 FR2815050 A3 FR 2815050A3
Authority
FR
France
Prior art keywords
loading dock
loading
sides
base
horizontal direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR0112729A
Other languages
French (fr)
Other versions
FR2815050B3 (en
Inventor
Johan Gerrit Ouwerkerk
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LANGE BETON DE BV
Original Assignee
LANGE BETON DE BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LANGE BETON DE BV filed Critical LANGE BETON DE BV
Publication of FR2815050A3 publication Critical patent/FR2815050A3/en
Application granted granted Critical
Publication of FR2815050B3 publication Critical patent/FR2815050B3/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G69/00Auxiliary measures taken, or devices used, in connection with loading or unloading
    • B65G69/28Loading ramps; Loading docks
    • B65G69/287Constructional features of deck or surround

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Road Paving Machines (AREA)

Abstract

The loading quay for lorries is made up of concrete boxes (1a - 1c) with three sides (4 - 6). The opposite sides (4, 5) have an inwardly-projecting lip (7, 8) at the top. Paving slabs are fitted on to these. An Independent claim is included for a jack on which the boxes may be levelled.

Description

<Desc/Clms Page number 1> <Desc / Clms Page number 1>

L'invention se rapporte à un quai de chargement pour un camion, comprenant une plaque de base, des parois disposées de trois côtés, de sorte que les parois situées face-à-face sont pourvues de renflements se faisant mutuellement face et écartés de la base.  The invention relates to a loading dock for a truck, comprising a base plate, walls arranged on three sides, so that the walls located face-to-face are provided with bulges facing each other and spaced from the based.

De tels quais de chargement sont bien connus.  Such loading docks are well known.

Ils sont normalement coulés en béton sur place. En raison de la forme, un coulage échelonné est requis, où des coffrages compliqués sont indispensables. They are normally poured in concrete on site. Due to the shape, staggered pouring is required, where complicated formwork is essential.

L'objectif de l'invention consiste à éviter les désavantages susmentionnés.  The object of the invention is to avoid the above-mentioned disadvantages.

Cet objectif est atteint par le fait que le quai de chargement est réalisé comme un élément préfabriqué.  This objective is achieved by the fact that the loading dock is made as a prefabricated element.

Ces désavantages sont évités par l'utilisation d'un élément préfabriqué.  These disadvantages are avoided by the use of a prefabricated element.

Un tel quai de chargement est de préférence réalisé en béton ; il est néanmoins tout à fait possible de réaliser un tel quai de chargement en d'autres matériaux, tels que du métal, du bois ou de la matière synthétique.  Such a loading dock is preferably made of concrete; it is nevertheless quite possible to produce such a loading dock in other materials, such as metal, wood or synthetic material.

Un tel quai de chargement est de préférence réalisé comme un ensemble. Ceci facilite en effet la mise en place et le positionnement.  Such a loading dock is preferably made as a whole. This makes it easier to set up and position.

Il est toutefois imaginable de réaliser le quai en un nombre restreint d'éléments combinés sur place pour constituer un quai de chargement.  It is however conceivable to realize the quay in a limited number of elements combined on site to constitute a loading quay.

Pour faciliter le positionnement, le quai de chargement est pourvu à sa face inférieure d'un élément de positionnement aux quatre coins.  To facilitate positioning, the loading dock is provided on its underside with a positioning element at the four corners.

Les éléments de positionnement sont de préférence-aménagés pour le réglage de la hauteur et de la position horizontale du quai de chargement suivant deux directions perpendiculaires entre elles.  The positioning elements are preferably arranged for adjusting the height and the horizontal position of the loading dock in two directions perpendicular to each other.

<Desc/Clms Page number 2><Desc / Clms Page number 2>

Des possibilités suffisantes de réglage sont ainsi obtenues simplement.  Sufficient adjustment possibilities are thus obtained simply.

Selon une autre forme préférée de réalisation, l'élément de positionnement comprend une base à relier à l'assise, un élément principal à déplacer dans une direction horizontale par rapport à l'élément de base, et un élément vertical de réglage pouvant être réglé par rapport à l'élément principal dans la direction verticale et dans une seconde direction horizontale, s'étendant perpendiculairement à la première direction horizontale.  According to another preferred embodiment, the positioning element comprises a base to be connected to the seat, a main element to be moved in a horizontal direction relative to the base element, and a vertical adjustment element that can be adjusted relative to the main member in the vertical direction and in a second horizontal direction, extending perpendicular to the first horizontal direction.

Ceci conduit à une forme simple de réalisation constructive. This leads to a simple form of constructive realization.

L'invention se rapporte enfin à une méthode de mise en place d'un quai de chargement où le quai de chargement est fabriqué en dehors du site et est ensuite mis en place et positionné.  The invention finally relates to a method of setting up a loading dock where the loading dock is manufactured outside the site and is then set up and positioned.

Les mêmes avantages que ceux signalés ci-dessus concernant l'aménagement selon l'invention sont ici obtenus.  The same advantages as those indicated above concerning the arrangement according to the invention are obtained here.

L'invention fera ensuite l'objet d'une description en se référant aux illustrations, dans lesquelles : la fig. 1 représente une vue schématique en perspective d'une série de quais de chargement selon l'invention ; et la fig. 2 représente une vue schématique détaillée en perspective d'un élément de positionnement utilisé avec un quai de chargement selon l'invention.  The invention will then be described with reference to the illustrations, in which: FIG. 1 shows a schematic perspective view of a series of loading docks according to the invention; and fig. 2 shows a detailed schematic perspective view of a positioning element used with a loading dock according to the invention.

Sur la figure 1 sont représentés 3 quais de chargement identiques la, Ib et lc, dont deux, à savoir lb et lc, sont mis en place sur une fondation sous forme de poutres 2. Le dernier quai de chargement la doit encore être mis en place.  In Figure 1 are shown 3 identical loading docks la, Ib and lc, two of which, namely lb and lc, are placed on a foundation in the form of beams 2. The last loading dock la must still be placed square.

Chacun des quais de chargement 1 comprend une base 3, deux parois latérales 4,5 et une paroi arrière 6. Les parois latérales 4,5 sont pourvues chacune d'un renflement 7,8 en extension vers l'intérieur. Ces renflements servent de support à des dalles non  Each of the loading docks 1 comprises a base 3, two side walls 4,5 and a rear wall 6. The side walls 4,5 are each provided with a bulge 7,8 in extension towards the inside. These bulges are used to support non-slabs

<Desc/Clms Page number 3><Desc / Clms Page number 3>

représentées dans les illustrations et s'étendant sur les quais de chargement.  shown in the illustrations and spanning the loading docks.

Ces renflements rendent difficiles le coulage sur place des quais de chargement. Ils requièrent en effet un processus échelonné de coulage impliquant un important travail de charpente pour lès coffrages, ce qui accroît fortement le coût.  These bulges make it difficult to pour loading docks on site. They indeed require a staggered pouring process involving significant structural work for formwork, which greatly increases the cost.

Lors du coulage hors site de ces quais de chargement, c'est-à-dire dans une fabrique de béton, ces problèmes peuvent être résolus plus aisément par l'emploi de coffrages et formes qui peuvent servir plusieurs fois.  When pouring these loading docks off-site, that is to say in a concrete factory, these problems can be more easily resolved by the use of forms and forms which can be used several times.

Comme des dalles de béton sont normalement apposées par-dessus les quais de chargement, où doivent par exemple pouvoir circuler des chariots élévateurs, il s'avère important que la face supérieure des quais de chargement mutuellement jointifs soit plane. Ce qui signifie que les quais de chargement doivent être positionnés avec précision.  As concrete slabs are normally affixed over the loading docks, where lift trucks must be able to circulate, for example, it is important that the upper face of the mutually adjoining loading docks is flat. This means that the loading docks must be precisely positioned.

Quatre dispositifs de positionnement 10 sont utilisés à cette fin. Ils permettent le réglage du quai de chargement dans deux directions horizontales et dans la direction verticale, et sont chacun mis en place à l'un des quatre coins de la base du quai de chargement.  Four positioning devices 10 are used for this purpose. They allow the loading dock to be adjusted in two horizontal directions and in the vertical direction, and are each positioned at one of the four corners of the base of the loading dock.

Une forme préférée de réalisation d'un tel dispositif de positionnement 10 est représentée à la figure 2. Ce dispositif de positionnement 10 comprend un rail 11 s'étendant en direction horizontale et une plaque 13 qui lui est reliée au moyen de boulons 12. Des boulons à tête rectangulaire pouvant s'ancrer dans le rail Il sont de préférence utilisés. Les boulons 12 et la plaque 13 avec eux peuvent ainsi coulisser dans la direction longitudinale du rail 11.  A preferred embodiment of such a positioning device 10 is shown in FIG. 2. This positioning device 10 comprises a rail 11 extending in the horizontal direction and a plate 13 which is connected to it by means of bolts 12. Des rectangular head bolts that can be anchored in the rail They are preferably used. The bolts 12 and the plate 13 with them can thus slide in the longitudinal direction of the rail 11.

Les boulons se prolongent à travers des trous oblongs 14 pratiqués dans la plaque 13. Un réglage dans une seconde direction horizontale est obtenu grâce à la mobilité des trous oblongs.  The bolts extend through oblong holes 14 made in the plate 13. An adjustment in a second horizontal direction is obtained thanks to the mobility of the oblong holes.

Un trou fileté 15, à travers lequel s'étend un goujon 16, est prévu dans la plaque 13. Au sommet d'un  A threaded hole 15, through which a stud 16 extends, is provided in the plate 13. At the top of a

<Desc/Clms Page number 4><Desc / Clms Page number 4>

goujon 16 est installé un plateau de support 17 sur lequel le quai de chargement peut s'appuyer. La hauteur du plateau peut être réglée en tournant le goujon dans la plaque.  stud 16 is installed a support plate 17 on which the loading dock can be supported. The height of the tray can be adjusted by turning the stud in the plate.

Il est ainsi possible de régler chaque coin des quais de chargement dans trois directions à l'aide du dispositif de positionnement.  It is thus possible to adjust each corner of the loading docks in three directions using the positioning device.

Un caisson 18 est monté sous le rail 12 pour assurer une stabilisation. Ce caisson peut en outre être utilisé pour faciliter le coulage du dispositif de positionnement dans les poutres de support ; le goujon saillant à la face inférieure est ainsi protégé.  A box 18 is mounted under the rail 12 to ensure stabilization. This box can also be used to facilitate the casting of the positioning device in the support beams; the protruding stud on the underside is thus protected.

Trois de tels éléments de positionnement suffiraient en principe. Il est toutefois plus pratique d'en utiliser quatre pièces, une à chaque coin ; le réglage est ainsi facilité.  Three such positioning elements would suffice in principle. However, it is more practical to use four pieces, one at each corner; adjustment is thus facilitated.

Après le réglage de tous les quais de chargement, d'éventuels espaces entre les quais de chargement peuvent être comblés par des éléments de paroi 20, comme cela est représenté à la figure 1.  After the adjustment of all the loading docks, possible spaces between the loading docks can be filled with wall elements 20, as shown in FIG. 1.

Après le réglage effectué au moyen des dispositifs de positionnement et l'apport d'un coffrage inhérent, dans ce cas simplifié, l'espace restant peut être rempli de béton, de sable ou de gravier, de sorte que les dispositifs de réglage soient enfouis.  After the adjustment made by means of the positioning devices and the addition of an inherent formwork, in this simplified case, the remaining space can be filled with concrete, sand or gravel, so that the adjustment devices are buried .

L'ensemble ainsi créé peut enfin être recouvert de dalles de béton par exemple. The assembly thus created can finally be covered with concrete slabs for example.

Claims (8)

REVENDICATIONS 1. Quai de chargement pour un camion, comprenant une plaque de base, des parois disposées de trois côtés, de sorte que les parois situées face-à-face sont pourvues de renflements se faisant mutuellement face et écartés de la base, caractérisé en ce que le quai de chargement est réalisé comme un élément préfabriqué. 1. Loading dock for a truck, comprising a base plate, walls arranged on three sides, so that the walls situated face-to-face are provided with bulges facing each other and separated from the base, characterized in that that the loading dock is made as a prefabricated element. 2. Quai de chargement selon la revendication 1, caractérisé en ce que le quai de chargement est réalisé en béton.  2. Loading dock according to claim 1, characterized in that the loading dock is made of concrete. 3. Quai de chargement selon, la revendication 1 ou 2, caractérisé en ce que le quai de chargement est réalisé comme un ensemble.  3. loading dock according to claim 1 or 2, characterized in that the loading dock is made as a whole. 4. Quai de chargement selon la revendication 1 ou 2, caractérisé en ce que le quai de chargement est composé d'au moins deux parties.  4. Loading dock according to claim 1 or 2, characterized in that the loading dock is composed of at least two parts. 5. Quai de chargement selon l'une des revendications précédentes, caractérisé en ce que le quai de chargement est pourvu, à sa face inférieure, d'un élément de positionnement à ses quatre coins.  5. Loading dock according to one of the preceding claims, characterized in that the loading dock is provided, on its underside, with a positioning element at its four corners. 6. Quai de chargement selon la revendication 5, caractérisé en ce que les éléments de positionnement sont équipés pour le réglage de la hauteur, et de la position horizontale du quai de chargement dans deux directions mutuellement perpendiculaires.  6. loading dock according to claim 5, characterized in that the positioning elements are equipped for adjusting the height and the horizontal position of the loading dock in two mutually perpendicular directions. 7. Elément de positionnement à appliquer auprès d'un quai de chargement selon la revendication 5 ou 6, caractérisé en ce que l'élément de positionnement comprend une base à relier à l'assise, un élément principal à déplacer dans une direction horizontale par rapport à l'élément de base, et un élément vertical de réglage pouvant être réglé par rapport à l'élément principal dans la direction verticale et dans une seconde direction horizontale, s'étendant perpendiculairement à la première direction horizontale.  7. Positioning element to be applied to a loading dock according to claim 5 or 6, characterized in that the positioning element comprises a base to be connected to the seat, a main element to be moved in a horizontal direction by relative to the base member, and a vertical adjusting member adjustable in relation to the main member in the vertical direction and in a second horizontal direction, extending perpendicular to the first horizontal direction. <Desc/Clms Page number 6> <Desc / Clms Page number 6> 8. Méthode pour la mise en place d'un quai de chargement, caractérisé en ce que le quai de chargement est fabriqué en dehors du site et est ensuite mis en place et positionné. 8. Method for setting up a loading dock, characterized in that the loading dock is manufactured outside the site and is then set up and positioned.
FR0112729A 2000-10-05 2001-10-03 LOADING DOCK Expired - Lifetime FR2815050B3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL1016336A NL1016336C1 (en) 2000-10-05 2000-10-05 Loading bay.

Publications (2)

Publication Number Publication Date
FR2815050A3 true FR2815050A3 (en) 2002-04-12
FR2815050B3 FR2815050B3 (en) 2002-09-13

Family

ID=19772195

Family Applications (1)

Application Number Title Priority Date Filing Date
FR0112729A Expired - Lifetime FR2815050B3 (en) 2000-10-05 2001-10-03 LOADING DOCK

Country Status (3)

Country Link
BE (1) BE1014414A6 (en)
FR (1) FR2815050B3 (en)
NL (1) NL1016336C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2238191A1 (en) * 2004-02-13 2005-08-16 Tornymark, S.A. Method for the construction of loading docks for the assembly of levelling platforms comprising a transportable pre-fabricated pit, and device for implementing same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2238191A1 (en) * 2004-02-13 2005-08-16 Tornymark, S.A. Method for the construction of loading docks for the assembly of levelling platforms comprising a transportable pre-fabricated pit, and device for implementing same
WO2005077794A1 (en) * 2004-02-13 2005-08-25 Tornymark, S.A. Method for the construction of loading docks for the assembly of levelling platforms comprising a transportable pre-fabricated pit, and device for implementing same

Also Published As

Publication number Publication date
FR2815050B3 (en) 2002-09-13
BE1014414A6 (en) 2003-10-07
NL1016336C1 (en) 2002-04-08

Similar Documents

Publication Publication Date Title
EP1579075A1 (en) System for transferring loads between cast-in-place slabs
FR2520027A1 (en) BUFFER ASSEMBLIES AND CHASSIS OF VIEWS HAVING MEANS FOR AVOIDING OSCILLATION MOVEMENTS
EP0031773A2 (en) Modular vertical construction element especially intended for use in retaining structures, and process for making such structures
EP0844335A1 (en) Movable barrier and assembly formed by a set of such barriers
FR2815050A3 (en) Loading quay for lorries is made up of concrete boxes with three sides, opposite sides having inwardly-projecting lips at top
EP1035273A1 (en) Shuttering assembly, especially for the construction of pools
EP1219764A1 (en) Method for making a civil engineering construction, especially swimming pools or water basins and means for carrying out this method
FR2944821A1 (en) Formwork for realization of concrete slab in building site, has secondary beams separated by space partially filled using removable temporary protection floor received at primary beams before laying formwork plates
FR2668029A3 (en) Device for covering over ditches in which trees are planted in thoroughfares
EP2381034B1 (en) Device intended for being installed in an expansion joint between concrete slabs
FR2824851A1 (en) PREFABRICATED BRIDGE SUPPORT
FR2693751A1 (en) Ground covering plate - comprises flexible support layer with spaced supports on lower side and drainage channels between upper and lower sides discharging into cavities between supports
FR2619401A1 (en) PREFABRICATED ELEMENTS FOR THE CONSTRUCTION OF WALLS AND WALLS
FR2958307A1 (en) Prefabricated modular construction element for rising modular separating partition of flat storage bin, has parallelepiped block with complementary stacking areas having shapes and dimensions complementary to monolith of element
FR2516114A1 (en) SUPPORTING FRAME ELEMENTS FOR PLATES OR COVER GRIDS
FR2531119A1 (en) Well cover of adjustable height.
FR2688810A1 (en) Expendable shuttering device for making the walls of swimming pools
FR2495996A1 (en) Concrete slab forming mould - comprises stack of moulds each with rigid plate and ribs at two edges to retain adjacent mould
FR2676077A1 (en) MODULAR PREFABRICATED ELEMENT FOR THE DRY ERECTION OF SUPPORTING ARTICLES, CONSTRUCTION WORK OBTAINED FROM THE SAME, AND METHOD OF DRY ERECTING THE SAME.
FR3074508A1 (en) SYSTEM FOR AIDING THE INSTALLATION OF A FLOOR ELEMENT SUCH AS A SLAB AND METHODS OF INSTALLING A FLOOR ELEMENT USING THE SAME
BE666433A (en)
FR2493386A1 (en) Prefabricated sectional funeral cask - has prefabricated panels which allow casks to be stacked vertically
FR2812323A1 (en) Prefabricated concrete swimming pool is composed of two longitudinal elements forming vertical wall and bottom wall portion having longitudinal rabbet fitting rabbet in bottom slab forming pool bottom and two end elements
FR2581102A1 (en) Prefabricated wall with internal buttresses
FR2935412A1 (en) Permanent formwork for realization of poured concrete staircase in swimming pool, has primary walls secured to secondary walls to brace and maintain primary walls in vertical position for forming compartments filled with poured concrete