FR2586742A1 - Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method - Google Patents

Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method Download PDF

Info

Publication number
FR2586742A1
FR2586742A1 FR8311144A FR8311144A FR2586742A1 FR 2586742 A1 FR2586742 A1 FR 2586742A1 FR 8311144 A FR8311144 A FR 8311144A FR 8311144 A FR8311144 A FR 8311144A FR 2586742 A1 FR2586742 A1 FR 2586742A1
Authority
FR
France
Prior art keywords
protection
electromagnetic
volumes
mechanical protection
mechanical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
FR8311144A
Other languages
French (fr)
Inventor
Jean-Pierre Heitzmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SIDETEL
Original Assignee
SIDETEL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIDETEL filed Critical SIDETEL
Priority to FR8311144A priority Critical patent/FR2586742A1/en
Publication of FR2586742A1 publication Critical patent/FR2586742A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/04Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against air-raid or other war-like actions
    • E04H9/10Independent shelters; Arrangement of independent splinter-proof walls
    • E04H9/12Independent shelters; Arrangement of independent splinter-proof walls entirely underneath the level of the ground, e.g. air-raid galleries
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21FPROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR
    • G21F7/00Shielded cells or rooms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

Method for building installations protected from nuclear electromagnetic pulses comprising the digging of the excavation 2, the construction of the foundation slab 3, of three of the four sides 5 of the building, providing mechanical protection, and of the ceiling 6, the installation of the volumes A, E, T for electromagnetic protection in the mechanical protection, the finishing of the fourth side of the mechanical protection and the filling-in of the excavation. The volumes for electromagnetic protection are modular elements A, E, T providing nuclear, bacteriological and chemical protection, which are joined to each other by connection elements.

Description

L'invention concerne un procédé de réalisation d'installations enterres protégées contre les impulsions dlectromagnétiques provenant d'explosions nucléaires, le procéda consistant à réaliser la protection mdcanique, puis la protection électromagnétique, puis à traiter l'étancheité contre les agressions nuoléaires, bactriologiques et chimiques. The invention relates to a method for producing buried installations protected against electromagnetic pulses originating from nuclear explosions, the method consisting in carrying out mechanical protection, then electromagnetic protection, then in treating the seal against nuolar, bacterriological and chemicals.

La protection des installations terrestres de télécommunication contre les champs électromagnétiques intenses engendrés par une explosion nucléaire consiste à utiliser des blindages électromagnétiques contre l'impulsion directe due au rayonnement mais également à prévoir la protection contre l'impulsion indirecte due à la conduction par les cables, les canalisations diverses et le réseau de terre. The protection of terrestrial telecommunications installations against the intense electromagnetic fields generated by a nuclear explosion consists in using electromagnetic shields against the direct impulse due to radiation but also in providing protection against the indirect impulse due to conduction by cables, the various pipelines and the earth network.

Les installations actuelles traitent la protection contre les impulsions électromagnétiques d'une manière globale et mettent en oeuvre une protection multi-fonction vis à Vis des différents effets d'une explosion nucléaire ainsi que des armes baetério- logiques et chimiques pouvant être utilisées. The current installations treat protection against electromagnetic pulses in a global manner and implement multi-function protection against the various effects of a nuclear explosion as well as baeriological and chemical weapons that can be used.

Ces différentes protections sont difficiles ou impossibles à appliquer aux niveaux des matériels eux-mêmes aussi on a retenu la réalisation des protections sous une forme globale. These different protections are difficult or impossible to apply to the levels of the materials themselves, so the protection has been produced in a global form.

C'est ainsi que ltentemble des protections mécaniques (anti-souffle) et radioélectri- ques a été réalisé en construisant une carapace d'acier soudé à l'intérieur du bâtiment et en spécialisant les fonctions de protection au niveau des ouvertures. This is how all of the mechanical (anti-blast) and radio protection was achieved by constructing a welded steel shell inside the building and by specializing the protection functions at the openings.

Cette technique de réalisation présente de nombreux inconvénients. La qualité du blindage radioélectrique constituant la cage de Faraday globale de protection est telle que sa réalisation à l'intérieur de l'ouvrage terminé est impossible 3 en effet, cette intimité du bâtiment et du blindage interdit les oontrales nécessaires en cours de réalisation, au niveau des soudures du blindage en particulier. Il est donc obligatoire de réaliser le blindage, afin de pouvoir le vérifier, avant de faire le bttiment abritant les installations.Ce procédé entratne de nombreuses contraintes ; il faut, en eifet, que le bindage soit oomplètement achevé et que les ouvertures, portes traversées diverses, soient équipées à ce stade pour permettre en particulier la vérification de l'atténuation et de la parfaite intégrité de la cage de Faraday avant d'autoriser l'achèvement de la constraction,
Cela conduit à équiper les ouver tarer deux fois successives t
-mise en place des portes avant la premibre vérification,
-ddpose après vérification,
-repose après achèvement de l'installation.
This production technique has many drawbacks. The quality of the radioelectric shielding constituting the overall Faraday cage of protection is such that its realization inside the finished work is impossible 3 indeed, this intimacy of the building and the shielding prohibits the necessary contrasts during the realization, level of the armor welds in particular. It is therefore compulsory to carry out the shielding, in order to be able to verify it, before making the building housing the installations. This process entails many constraints; it is necessary, in fact, that the binding is completely completed and that the openings, various crossed doors, are equipped at this stage to allow in particular the verification of the attenuation and the perfect integrity of the Faraday cage before authorizing completion of the constraction,
This leads to equip the open taring twice successive t
- installation of the doors before the first verification,
-deposit after verification,
-repose after completion of installation.

Par ailleurs, pendant la réalisa- tion des travaux de gros oeuvre, le blindage est soumis à rude épreuve, les travaux de maçonnerie sont inévitablement préudiciables à la qualité des traitements de surface de l'acier du blindage et il est indispensable d'exercer une surveillance très suivie du chantier pour éviter des dégradations irréversibles. Par exemple, la qualité des reprises de continuité électrique des pièces assemblées mécaniquement sur le bindage, c'est le cas des battis de portes, dépend de la qualitd du traitement de surface des pièces en contact et il a été constaté très souvent qu'en fin de chantier, ces traitements de surface doivent être repris lors d'opérations très coateuses.  In addition, during the carrying out of structural works, the shielding is subjected to severe test, the masonry work is inevitably prejudicial to the quality of the surface treatments of the steel of the shielding and it is essential to exert a very close monitoring of the site to avoid irreversible damage. For example, the quality of the electrical continuity pick-ups of parts assembled mechanically on the binding, this is the case with door casings, depends on the quality of the surface treatment of the parts in contact and it has been found very often that in at the end of the work, these surface treatments must be resumed during very coating operations.

De plus, la protection extérieure du blindage est réalisée par divers revêtements de surface se terminant par une finition de peinture. Cette couche de peinture extérieure n'est pas toujours facile à appliquer, spécialement sous le blindage de sol. La qualité finale de la protection est donc douteuse d'autant qu'il n'est toujours très aisé de nettoyer correctement les soudures avant application de ces diverses protections de surface,
Enfin, le blindage sert souvent de forme de coffrage intérieure pour le coulage du béton du bâtiment. Cela oblige à réaliser un étayage très sérieux afin d'éviter des déformations du blindage lors de la coulée du béton.
In addition, the external protection of the shielding is achieved by various surface coatings ending in a paint finish. This exterior paint layer is not always easy to apply, especially under the floor shielding. The final quality of the protection is therefore doubtful, especially since it is always very easy to clean the welds correctly before applying these various surface protections,
Finally, the shielding often serves as a form of interior formwork for pouring concrete from the building. This requires very serious shoring to avoid deformation of the shielding during the pouring of concrete.

Par conséquent, le contact entre le béton du bâtiment et le blindage n'est pas intime et si des infiltrations se produisent à traverse le bâtiment la corrosion du blindage est inévitable. En effet le ciment n'est pas un agent réducteur que dans la mesure où il n'y a pas de circulation d'air sur le métal en oentact avec le ciment ; s'il y a de l'air donc de loxygène, le métal s'oxyde. C'est le cas du fer à béton affleurant le coffrage qui finit par s'oxyder progressive- ment jusqu'à provoquer la fissuration du béton par la formation de rouille qui fait changer son volume et provoque ainsi des contraintes importantes. Consequently, contact between the building concrete and the shielding is not intimate and if seepage occurs through the building corrosion of the shielding is inevitable. In fact, cement is not a reducing agent only insofar as there is no air circulation on the metal in contact with the cement; if there is air and therefore oxygen, the metal oxidizes. This is the case of the concrete iron flush with the formwork which eventually oxidizes gradually until cracking of the concrete by the formation of rust which changes its volume and thus causes significant stresses.

La garantie de bonne tenue dans le temps du blindage est donc aléatoire paree que les protections de surface sont délicates à mettre en oeuvre et que la proximité du bâtiment rend la surveillance et l'entretien extérieur du blindage impossible. The guarantee of good resistance over time of the shielding is therefore random since the surface protections are difficult to implement and the proximity of the building makes monitoring and external maintenance of the shielding impossible.

Ce procédé de réalisation, en allongeant la durée du chantier et en multipliant les contrtles intermédiaires sur site, conduit finalement à des prix de revient très élevés. This production process, by lengthening the duration of the site and by multiplying the intermediate controls on site, ultimately leads to very high cost prices.

L'invention vise à un procédé de de réalisation d'installations séparant les fonctions de protection et faisant appel à une organisation standardisée des bâtisents et de leur construction sous forme d'élément modulaire.  The invention relates to a method for producing installations separating the protection functions and using a standardized organization of buildings and their construction in the form of a modular element.

Le procédé est remarquable en ce que l'on procède aux epérations suivantes t
a) creusement de la fouille,
b) construction de la semelle, de trois des quatre côtés de la protection mécanique et du plafond,
c) mise en place des volumes de protection électromagnétique dans la protection mécani- que
d) finition du quatrième c8té de la protection mécanique,
e) remblayage de la fouille.
The process is remarkable in that we carry out the following operations t
a) digging the excavation,
b) construction of the sole, of three of the four sides of the mechanical protection and of the ceiling,
c) installation of electromagnetic protection volumes in mechanical protection
d) finishing of the fourth part of the mechanical protection,
e) backfilling the excavation.

Les explications et figures données oi-aprbs à titre d'exemple permettront de comprendre moment l'intentien peut être réslisée. The explanations and figures given here and there by way of example will make it possible to understand when the intentian can be resolved.

La figure 1 représente la mise ea place des éléments modulaires de protection éleotro- magnétique.  FIG. 1 shows the installation of modular electro-magnetic protection elements.

Sa figure 2 est une me oit perspec tive et partiellement arrachée d'une installation souterraine protégée. Figure 2 is a perspective view, partially broken away from a protected underground installation.

La figure 3 est une vue de dessus en coupe de l'installation de la figure 2.  FIG. 3 is a top view in section of the installation of FIG. 2.

La figure 4 est une vue en coupe latérale de l'élément modulaire A de la figure 3.  FIG. 4 is a side sectional view of the modular element A in FIG. 3.

les installations enterrées proté géies contre les impulsions électromagnétiques provenant d'explosions nucléaires, selon l'invention, comportent une protection mécanique 1 constituée par une construc- tion enterrée en béton, susceptible éventuellement de résister aux effets sismiques et au souffle et formant éventuellement un blindage contre les radiations nucléaires par adjonction de charge d'un matériau à section de capture importante, et une protection électromagnétique constituée par des volumes Â,E,T...  buried installations protected against electromagnetic pulses originating from nuclear explosions, according to the invention, comprise mechanical protection 1 constituted by a buried concrete construction, possibly capable of withstanding seismic and blast effects and possibly forming shielding against nuclear radiation by adding charge of a material with a large capture section, and an electromagnetic protection constituted by volumes Â, E, T ...

logés dans la construction en béton 1. housed in concrete construction 1.

Le procédé de réalisation d'une telle installation est le suivant t
On réalise une fouille 2 de profondeur voulue et dont les dimensions correspondent aux dimensions de la construction envisagée, la fouille étant prolongée sur un des côtés d'une longueur suffisante pour permettre le passage d'un volume de protection électromagnétique.
The process for producing such an installation is as follows t
An excavation 2 of desired depth is carried out, the dimensions of which correspond to the dimensions of the envisaged construction, the excavation being extended on one of the sides of a length sufficient to allow the passage of a volume of electromagnetic protection.

On procède ensuite à la construc- tion de la semelle 3, des renforts 4 de trois des quatre cotés 5 et du plafond 6. Sur la semelle terminée, on place des moyens de ripage se prolongeant à l'extérieur de la construction dans la partie prolongée de fouille à ciel ouvert et susceptible de recevoir les volumes A,T,*.. de protection électromagnétique. We then proceed to build the sole 3, reinforcements 4 from three of the four sides 5 and the ceiling 6. On the finished sole, we place shifting means extending outside the construction in the part prolonged surface excavation and likely to receive volumes A, T, * .. of electromagnetic protection.

On met es place les volumes dans la construction 1 puis on procède à la construction du quatrième mur. We put the volumes in construction 1 then we proceed to the construction of the fourth wall.

Le raccordement des volumes les uns aux autres s'effectuent sans entraver la finition des travaux, c'est à dire la construction du mur et le remblayage de la fouille. The volumes are connected to each other without hindering the completion of the work, that is to say the construction of the wall and the backfilling of the excavation.

Pour des raisons de commodités de chantier, la face par laquelle on fera pénétrer les modules sera celle opposée aux portes d'accès à l'int6- rieur du bâtiment.  For reasons of site convenience, the face through which the modules will be penetrated will be the one opposite the access doors to the interior of the building.

Selon une forme preférée de l'invention, la construction recevant les modules sera suffisamment vaste pour ménager des couloirs de circula- tion 7 tout autour des modules afin d'assurer une ventilation correcte et de permettre les travaux d'entretien.  According to a preferred form of the invention, the construction receiving the modules will be large enough to provide circulation corridors 7 all around the modules in order to ensure correct ventilation and to allow maintenance work.

Les dispositifs permettant la réalisation d'installations selon le procédé décrit sont formés de volumes creux approximativement parallélé pipédiques constitués d'une tCle d'acier d'une épaisseur suffisante pour présenter une bonne rigidité mécanique. The devices allowing the realization of installations according to the described method are formed of approximately parallel piped hollow volumes made of a steel sheet of sufficient thickness to have good mechanical rigidity.

Ces volumes sont réalisés sous forme d'éléments modulaires standards susceptibles dtdtre assemblés pour offrir un. volume requis protégé contre les impulsions électromagnétiques (IEM).These volumes are produced in the form of standard modular elements which can be assembled to provide one. required volume protected against electromagnetic pulses (EMI).

La construction de ces éléments répond aux principes généraux de réalisation des blindages ISN c'est b dire absence de soudure dans les angles, ardues arrondies pour éviter les concentrations de courant, décapage général des tales après assemblage par grenaillage et sablage, protection contre la corro- sion des six faces intérieures et extérieures. The construction of these elements meets the general principles of production of ISN shields, that is to say absence of welding in the corners, arduous rounding to avoid concentrations of current, general stripping of the plates after assembly by shot blasting and sandblasting, protection against corrosion. - six interior and exterior faces.

L'isolation thermique intérieure est réalisée en usine ainsi que tout l'équipement de base c'est à dire l'électricité générale, les faut planchers, les faux plafonds, les ancrages muraux standardisés pour les baies d'équipements opérationnels à installer sur le site. The interior thermal insulation is carried out in the factory as well as all the basic equipment, that is to say general electricity, the required floors, false ceilings, standardized wall anchors for the racks of operational equipment to be installed on the site.

Les éléments modulaires A,E,T comportent à l'extrémité d'au moins une face latérale des moyens de fixation pour un élément de communication 8 préfabriqué assurant le passage d'un élément à l'autre. The modular elements A, E, T comprise at the end of at least one lateral face fixing means for a prefabricated communication element 8 ensuring the passage from one element to the other.

Les éléments de communication sont fixés par boulonnage et soudure sur site après assemblage.The communication elements are fixed by bolting and welding on site after assembly.

La continuité du blindage éleetro- magnétique est éventuellement assuré par joints dès le boulonnage. Toutefois du fait de la disposition espacée des éléments modulaires, la vérification de la continuité peut être faite par les moyens classiques et la protection contre la corrosion parfaitement assurée grtce à l'accessibilité de toutes les faces du module.  The continuity of the electromagnetic shielding is possibly ensured by joints from the bolting. However due to the spaced arrangement of the modular elements, the verification of continuity can be done by conventional means and corrosion protection perfectly ensured thanks to the accessibility of all the faces of the module.

La spécialisation des modules peut être poussée aussi loin qu'on le désire lors de leur réalisation en usine. Les figures 2,3 et 4 illustrent cette spécialisation.  The specialization of the modules can be pushed as far as desired during their production in the factory. Figures 2,3 and 4 illustrate this specialization.

L'élément modulaire A "accès et vie" comprend le sas d'accès persennel IEM 9, le sas de protection nucléaire bactériologique et chimique 10, la salle à manger 11, la cuisine 12, le bloc sanitaire 13, le couchage pour 6 personnes 14. Modular element A "access and life" includes the IEM permanent access airlock 9, the bacteriological and chemical nuclear protection airlock 10, the dining room 11, the kitchen 12, the toilet block 13, sleeping for 6 people 14.

L'élément modulaire E "énergie" comprend le local groupe électrogène 15, le local déflashage 17 dans lequel se font les arrivées d'énergie et les liaisons extérieures et où se trouvent les premiers étages de protection contre les surtensions, le local climatisation et onduleur 18, les armoires d'énergie électriqu. 19, une entrée de matériel 20 servant d'issue de secours.  The modular element E "energy" includes the generator set room 15, the deflashing room 17 in which the energy arrivals and external connections are made and where the first overvoltage protection stages are located, the air conditioning and inverter room 18, the electrical energy cabinets. 19, a material entrance 20 serving as an emergency exit.

entre les éléments  et E prennent place autant d'éléments techniques T que nécessaire pour offrir le volume global faredisé. Dans l'exemple représenté deux éléments techniques T ont été prévus. Il est évident que l'on choisira le nombre d'éléments modulaires spécifiques en fonction de l'importance de l'installation et du personnel nécessaire à son fonctionnement. between the elements  and E take place as many technical elements T as necessary to provide the overall volume fared. In the example shown two technical elements T have been provided. It is obvious that the number of specific modular elements will be chosen according to the size of the installation and the personnel necessary for its operation.

Grade à la configuration modulaire, il est possible d'agrandir une installation existante sans perturber son fonctionnement. I1 suffit d'ouvrir une fouille adjacente dans laquelle on construira, selon les mêmes principes, le bâtiment d'extension. La communi- cation entre les deux bâtiments sera facilement réalisée par percement d'un côté et raccordement de l'élément modulaire de l'installation existante avec l'élément voisin de l'extension par un élément de communication, de longueur adaptée, qui sera comme les autres, boulonné et soudé aux éléments modulaires voisins.  Grade modular configuration, it is possible to expand an existing installation without disturbing its operation. It is sufficient to open an adjacent excavation in which the extension building will be constructed, according to the same principles. The communication between the two buildings will be easily achieved by drilling on one side and connecting the modular element of the existing installation with the neighboring element of the extension by a communication element, of suitable length, which will be like the others, bolted and welded to neighboring modular elements.

Suivant une antre forme de réalisation des éléments modulaires, ils portent à une de leurs extrémités un panneau démontable fendant une ouverture 20 permettant les mouvements de matériel et/ou le montage d'un SU d'accès ou/d'un élément de communication. According to another embodiment of the modular elements, they carry at one of their ends a removable panel slitting an opening 20 allowing the movements of material and / or the mounting of an access SU or / of a communication element.

Selon un exemple de réalisation des éléments modulaires, leurs dimensions ont été choisies de manière i être compatible aveo le gabarit rentier et ont 12 mètres de longueur, 2,50 mètres de largeur et 3220 mètres de hauteur. Pour une épaisseur de blindage de 4 n d'acier, le poids d'un tel élément est compris entre 12 et 14 tonnes suivant son équipement.  According to an exemplary embodiment of the modular elements, their dimensions have been chosen so as to be compatible with the rentier template and are 12 meters in length, 2.50 meters in width and 3220 meters in height. For an armor thickness of 4 n of steel, the weight of such an element is between 12 and 14 tonnes depending on its equipment.

Claims (9)

REVENDICATIONS 1. Procédé de réalisation d'installations enterrées, protégées contre les impulsions électromagnétiques., consistant à réaliser la protection mécanique, puis la protection électromagnétique, puis à traiter ltétancheité contre les agressions nucléaires, bactériologiques et chimiques, caractérisé en ce que l'on procède aux opérations suivantes  1. Method for producing buried installations, protected against electromagnetic pulses, consisting of carrying out mechanical protection, then electromagnetic protection, then treating the seal against nuclear, bacteriological and chemical attack, characterized in that one proceeds to the following operations a) creusement de la fouille, a) digging the excavation, b) construction de la semelle, de trois des quatre entés de la protection mécanique et du plafond, b) construction of the base, of three of the four entries of the mechanical protection and of the ceiling, c) mise en place des volumes de protection électromagnétique dans la protection mécanique, c) installation of electromagnetic protection volumes in mechanical protection, d) finition du quatrième caté de la protection mécanique, d) finishing of the fourth category of mechanical protection, e) remblayage de la fouille. e) backfilling the excavation. 2. Procédé selon la revendication 1, caractérisé en ce que dans l'opération a) on creuse une fouille correspondant aux dimensions de la protection mécanique prolongée sur un des Optés d'une longueur suffisante pour permettre le passage d'un volume de protection électromagnétique. 2. Method according to claim 1, characterized in that in operation a) a dig is excavated corresponding to the dimensions of the extended mechanical protection on one of the optics of sufficient length to allow the passage of a volume of electromagnetic protection . 3. Procédé selon la revendication 2 caractérisé en ce que dans l'opération c) on monte sur la semelle des moyens de ripage se prolongeant à ltextérieur de la protection mécanique dans la partie prolongée de fouille à ciel ouvert permettant la mise en place des volumes dans la protection mécanique. 3. Method according to claim 2 characterized in that in operation c) mounting on the sole of the shifting means extending inside the mechanical protection in the extended part of open excavation allowing the establishment of volumes in mechanical protection. 4. Procédé selon la revendication 1, caractérisé en ce que pendant l'opération d) on procède au raccordement mécanique et électrique des volumes entre eux. 4. Method according to claim 1, characterized in that during operation d) one proceeds to the mechanical and electrical connection of the volumes therebetween. 5. Procédé selon l'une des revendications précédentes, caractérisé en ce que l'on ménage entre la protection mécanique et les parois des volumes de protection électromagnétique des couloirs de circulation (7) permettant l'entretien et/ou la circulation autour de chacun des volumes. 5. Method according to one of the preceding claims, characterized in that between the mechanical protection and the walls of the electromagnetic protection volumes of the circulation corridors (7) allowing maintenance and / or circulation around each volumes. 6. Dispositif pour la mise en oeuvre du procédé selon l'une des revendications précédentes, caractérisé en ce que les volumes de protection électromagnétique sont constitués d'-éléments modulaires parallélépipédiques (AET), standaridisés comportant à au moins une de leurs extrémités au moins une ouverture susceptible d'!trs fermée par un panneau (20) assurant la continuité du blindage électromagnétique et la protection nucléaire bactériologique et chimique. 6. Device for implementing the method according to one of the preceding claims, characterized in that the electromagnetic protection volumes consist of parallelepipedal modular elements (AET), standardized with at least one of their ends at least an opening capable of being very closed by a panel (20) ensuring the continuity of the electromagnetic shielding and the bacteriological and chemical nuclear protection. 7. Dispositif selon la revendication 6, caractérisé en ce que les élément modulaires (AET) comportent à l'extrêmité d'ou moins une face latérale des moyens de fixation d'un élément de communication 48) avec l'élément modulaire voisin. 7. Device according to claim 6, characterized in that the modular elements (AET) comprise at the end of at least one lateral face of the means for fixing a communication element 48) with the neighboring modular element. 8. Dispositif selon la revendication 6, caractérisé en ce que les éléments modulaires comportent une isolation thermique intérieure. 8. Device according to claim 6, characterized in that the modular elements comprise an internal thermal insulation. 9. Dispositif selon l'une des revendications 6 à 8, caractérisé en ce qu'au moins un élément modulaire comporte un sas de protection nucléaire, bactériologique et chimique.  9. Device according to one of claims 6 to 8, characterized in that at least one modular element comprises an airlock for nuclear, bacteriological and chemical protection.
FR8311144A 1983-07-05 1983-07-05 Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method Withdrawn FR2586742A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR8311144A FR2586742A1 (en) 1983-07-05 1983-07-05 Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8311144A FR2586742A1 (en) 1983-07-05 1983-07-05 Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method

Publications (1)

Publication Number Publication Date
FR2586742A1 true FR2586742A1 (en) 1987-03-06

Family

ID=9290514

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8311144A Withdrawn FR2586742A1 (en) 1983-07-05 1983-07-05 Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method

Country Status (1)

Country Link
FR (1) FR2586742A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003080966A1 (en) * 2002-03-07 2003-10-02 Composhield A/S Barrier-protected container

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2003080966A1 (en) * 2002-03-07 2003-10-02 Composhield A/S Barrier-protected container

Similar Documents

Publication Publication Date Title
KR101277967B1 (en) Underground shelter
FR2586742A1 (en) Method for building buried installations protected from electromagnetic pulses and devices for the implementation of the said method
EP0994017A1 (en) Prefabricated cabin for a vessel and installation method for such cabin in a vessel
RU2705674C2 (en) Method of erecting tongue-and-groove enclosure during main pipeline operations and sheet collapsible enclosure for construction of pit
EP0042024B1 (en) Method of producing at the site and without formwork masonry partition walls in reinforced concrete
FI3149821T3 (en) Service connection room placed outside for forming a service connection
EP0161133B1 (en) Modulary evolvable structure for a partition
JPS6244636B2 (en)
CN112696032A (en) Construction process flow of vertical face gabion curtain wall
CN111852079B (en) Method for building large integral shielding room
JPH0694863A (en) Construction method of radiation shielding wall
BE902661A (en) Method of forming building walls - using lost shuttering panels with internal ribs attached to framework plates
FR2638182A1 (en) MODULAR PREFABRICATED CONSTRUCTION FOR HOUSEHOLD USE
CN219241540U (en) Multifunctional on-site enclosing structure
EP0233808A1 (en) Modular shelter and method of manufacturing same
KR100213803B1 (en) Fabricated concrete basement and process for constructing the same
JP2001324052A (en) Piping box unit for building and its construction method
RU186417U1 (en) Wall panel
JP2009074268A (en) Aseismatic reinforcing structure of building
JP2022066683A (en) Seal structure of cable tray penetration part
FR2566448A1 (en) Multi-purpose precast modular elements for cellars, shelters, and strongrooms
JPS5847828A (en) Construction of duct to be buried in atomic power plant
BE497400A (en)
EP3978697A1 (en) Prefabricated three-dimensional construction module
FR2624192A1 (en) Device which allows the combined functions of lintel and casing to be ensured for a roller shutter with or without a metal sub-frame

Legal Events

Date Code Title Description
ST Notification of lapse