EP4087766B1 - Arrangement for testing etcs level 2 functionalities in rail transport - Google Patents
Arrangement for testing etcs level 2 functionalities in rail transport Download PDFInfo
- Publication number
- EP4087766B1 EP4087766B1 EP20824102.6A EP20824102A EP4087766B1 EP 4087766 B1 EP4087766 B1 EP 4087766B1 EP 20824102 A EP20824102 A EP 20824102A EP 4087766 B1 EP4087766 B1 EP 4087766B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rail vehicle
- assembly
- radio
- rbc
- etcs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims description 33
- 230000005540 biological transmission Effects 0.000 claims description 9
- 230000018109 developmental process Effects 0.000 description 7
- 238000011161 development Methods 0.000 description 6
- 238000004088 simulation Methods 0.000 description 5
- 238000012544 monitoring process Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 231100000279 safety data Toxicity 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L15/00—Indicators provided on the vehicle or train for signalling purposes
- B61L15/0081—On-board diagnosis or maintenance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/60—Testing or simulation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
- B61L2027/202—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation using European Train Control System [ETCS]
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L2205/00—Communication or navigation systems for railway traffic
- B61L2205/02—Global system for mobile communication - railways [GSM-R]
Definitions
- the invention relates to an arrangement for testing ETCS Level 2 functionalities in rail traffic.
- ETCS European Train Control System
- OBU On-Board Unit
- This OBU assembly is used to monitor the movement of the rail vehicle.
- the OBU also initiates or initiates emergency braking.
- it relies on train data, which is previously known via inputs from the driver of the rail vehicle, as well as on data from the route, which it transmits through balises and, in the case of "ETCS Level 2", additionally via radio from a "radio block center "RBC" receives. It constantly sends position data to the radio block center so that it can track the train's progress.
- the "Radio Block Center, RBC” is arranged or provided here in the signal box in order to implement the above-mentioned "ETCS Level 2 operation”.
- the Radio Block Center RBC receives safety data for a route from the signal box, for example data on the set route, occupied track sections, etc.
- the Radio Block Center RBC determines the applicable safety information for each rail vehicle that is in the control area of the signal box.
- the safety information determined for a predetermined rail vehicle is transmitted by the radio block center RBC to the on-board unit OBU of the associated rail vehicle.
- This transmission is carried out using a radio connection, preferably via the well-known GSM-R system.
- ETCS Level 2 there is constant communication between the rail vehicle and an ETCS center or signal box via Euroradio.
- Radio block center RBC is required, but this is only intended for regular operation on a specific route.
- the arrangement according to the invention is used to test ETCS Level 2 functionalities in rail transport.
- An on-board unit OBU is intended as the first assembly. As described at the beginning, this first assembly monitors the movement of the rail vehicle as an OBU assembly. In an emergency, the OBU assembly also initiates or initiates emergency braking. For monitoring, it relies on train data that is previously known via inputs from the driver of the rail vehicle, as well as on data from the route, which it transmits through balises and, in the case of "ETCS Level 2", additionally via radio from a "radio block center "RBC" receives. It constantly sends position data to the radio block center so that it can track the train's progress.
- the first assembly has a connection for a GSM-R radio connection in accordance with ETCS Level 2 functionality.
- An adapter is provided as a second assembly in the rail vehicle.
- the adapter is connected to the connection of the first module via a data transmission line, so that a GSM-R radio connection is simulated for the first module.
- the adapter is connected to a computer as a third module via a data transmission line.
- the computer is located in the rail vehicle and contains software with which a radio block center RBC of a signal box is simulated for test purposes in accordance with the ETCS level 2 functionality.
- This arrangement recreates the ETCS Level 2 functionality between the on-board unit OBU and the radio block center RBC, but without requiring radio transmission.
- simulated data is generated via the computer for test purposes and transmitted via cable to the on-board unit OBU.
- data for test purposes is transmitted back to the computer by cable from the on-board unit OBU.
- the adapter or the computer contains driver software for simulating the GSM-R radio connection.
- the rail vehicle is designed for test purposes to travel on a route that has at least two ETCS balise groups.
- the first assembly is designed as an OBU assembly with which the movement of the rail vehicle is monitored.
- the OBU also initiates or initiates emergency braking.
- train data which is previously known via inputs from the driver of the rail vehicle, as well as on data from the route, which it transmits through balises and, in the case of "ETCS Level 2", additionally via radio from a "radio block center "RBC" receives. It constantly sends position data to the radio block center so that it can track the train's progress.
- the computer software that simulates the radio block center is designed to generate data that contains safety-related information about a route or information about the occupancy of track sections.
- the arrangement according to the invention enables test drives on normal routes without much additional effort.
- the arrangement according to the invention also enables test drives on (often very short) sidings. These sidings can be booked or documented for test purposes quickly and often with little administrative effort from the rail network operator.
- the arrangement according to the invention takes place entirely without cooperation with a dispatcher, so that regular operation during the test drives is virtually not affected.
- the arrangement according to the invention triggers special functions at any point via the RBC simulation. This means that these functions can also be tested on a siding.
- RBC simulation is also available in the field, so that testing can also be carried out in the field with the flexibility of a laboratory.
- the arrangement according to the invention increases the product quality because critical test cases are carried out in the field, if necessary repeated there.
- the arrangement according to the invention significantly reduces the dependence on the operator or manufacturer of the RBC.
- FIG 1 This shows FIG 1 the arrangement according to the invention.
- an on-board unit OBU is provided as the first module BG1.
- the first assembly BG1 is designed as an OBU assembly with which, as described above, the movement of the rail vehicle is monitored.
- the first module BG1 has a connection AS for a GSM-R radio connection.
- An adapter ADP is provided as a second assembly BG2 in the rail vehicle.
- the adapter ADP is connected to the connection AS of the first module BG1 via a cable-based data transmission line DL1.
- the ADP adapter simulates a GSM-R radio connection for the first module BG1.
- the adapter ADP is connected via a cable-based data transmission line DL2 to a computer RE as a third module BG3.
- the computer RE is located in the SFZ rail vehicle and contains software with which a radio block center RBC of a signal box is simulated for test purposes in accordance with the ETCS level 2 functionality.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Description
Die Erfindung betrifft eine Anordnung zum Testen von ETCS-Level-2-Funktionalitäten im Schienenverkehr.The invention relates to an arrangement for testing ETCS Level 2 functionalities in rail traffic.
Im europäischen Schienenverkehr wird das bekannte Zugsicherungssystem "European Train Control System, ETCS" verwendet, das als Zugbeeinflussungssystem ein grundlegender Bestandteil des zukünftigen einheitlichen europäischen Eisenbahnverkehrsleitsystems ERTMS ist. Das ETCS soll langfristig die verschiedenen Zugbeeinflussungssysteme in Europa ablösen. Diese Standardisierung ermöglicht eine starke Vereinfachung der signaltechnischen Ausrüstung der Züge in den transeuropäischen Schienennetzen sowie einen einheitlichen hohen Sicherheitsstandard der Infrastruktur. Dabei bleibt die Streckenausrüstung weiterhin unter nationaler Aufsicht.In European rail transport, the well-known train control system "European Train Control System, ETCS" is used, which, as a train control system, is a fundamental part of the future uniform European railway traffic control system ERTMS. In the long term, the ETCS is intended to replace the various train control systems in Europe. This standardization enables the signaling equipment of trains in the trans-European rail networks to be greatly simplified as well as a uniform, high safety standard for the infrastructure. The route equipment remains under national supervision.
Beim ETCS ist eine so genannte "On-Board Unit, OBU" als Baugruppe auf jedem Schienenfahrzeug vorgesehen.With ETCS, a so-called “On-Board Unit, OBU” is provided as a module on every rail vehicle.
Mit dieser OBU-Baugruppe wird die Bewegung des Schienenfahrzeugs überwacht. Im Notfall veranlasst bzw. leitet die OBU auch eine Zwangsbremsung ein. Für die Überwachung stützt sie sich auf Zugdaten, die über Eingaben des Fahrers des Schienenfahrzeugs vorbekannt sind, sowie auf Daten von der Strecke, die sie durch Balisen und im Fall von "ETCS Level 2" zusätzlich per Funk von einem "Radio-Block-Center, RBC" erhält. Sie sendet permanent Positionsdaten an das Radio-Block-Center, so dass dieses den Zuglauf verfolgen kann.This OBU assembly is used to monitor the movement of the rail vehicle. In an emergency, the OBU also initiates or initiates emergency braking. For monitoring, it relies on train data, which is previously known via inputs from the driver of the rail vehicle, as well as on data from the route, which it transmits through balises and, in the case of "ETCS Level 2", additionally via radio from a "radio block center "RBC" receives. It constantly sends position data to the radio block center so that it can track the train's progress.
Das "Radio-Block-Center, RBC" ist hier im Stellwerk angeordnet bzw. vorgesehen, um den oben genannten "ETCS-Level 2-Betrieb" zu realisieren.The "Radio Block Center, RBC" is arranged or provided here in the signal box in order to implement the above-mentioned "ETCS Level 2 operation".
Das Radio-Block-Center RBC erhält vom Stellwerk sicherungstechnische Daten einer Fahrstrecke, beispielweise Daten zur eingestellten Fahrstrecke, zu belegten Gleisabschnitten, etc.The Radio Block Center RBC receives safety data for a route from the signal box, for example data on the set route, occupied track sections, etc.
Das Radio-Block-Center RBC bestimmt daraus für jedes Schienenfahrzeug, das sich im Kontrollbereich des Stellwerks befindet, jeweils geltende Sicherheitsinformationen.From this, the Radio Block Center RBC determines the applicable safety information for each rail vehicle that is in the control area of the signal box.
Die für ein vorbestimmtes Schienenfahrzeug ermittelten Sicherheitsinformationen werden vom Radio-Block-Center RBC an die On-Board Unit OBU des zugehörigen Schienenfahrzeugs übermittelt.The safety information determined for a predetermined rail vehicle is transmitted by the radio block center RBC to the on-board unit OBU of the associated rail vehicle.
Diese Übermittlung wird unter Verwendung einer Funkverbindung, bevorzugt über das bekannte System GSM-R, durchgeführt.This transmission is carried out using a radio connection, preferably via the well-known GSM-R system.
Beim "ETCS Level 2" ist eine ständige Kommunikation zwischen Schienenfahrzeug und einer ETCS-Zentrale bzw. Stellwerk via Euroradio vorgesehen.With "ETCS Level 2" there is constant communication between the rail vehicle and an ETCS center or signal box via Euroradio.
Für einen Test von ETCS-Level-2-Funktionalitäten im Feldbetrieb wird ein Radio-Block-Center RBC benötigt, das jedoch nur für einen Regelbetrieb auf einer bestimmten Strecke vorgesehen ist.To test ETCS Level 2 functionalities in field operation, a radio block center RBC is required, but this is only intended for regular operation on a specific route.
Für Testfahrten ergeben sich damit folgende Nachteile:
- Testfahrten sind nur auf bestimmten Strecken und zu bestimmten Zeiten möglich. In der Regel sind Voranmeldungen nötig und es werden Gebühren fällig. In manchen Projekten sind auch aufwendige Überführungen notwendig.
- Die Kooperation mit einem Fahrdienstleiter im Stellwerk wird benötigt, die ggf. in Konkurrenz zum normalen Betrieb auf der Teststrecke steht.
- Spezielle Funktionen (z.B. für Tunnel, neutrale Abschnitte, u.a) können nur unter realen Bedingungen getestet werden, so dass auf der Teststrecke die Anwendung dieser Funktionalitäten möglich sein muss. Dies bedingt einen erhöhten Zeitaufwand.
- Sind die Möglichkeiten zum Testen der genannten speziellen Funktionen auf der Teststrecke nicht gegeben, ist ein Feldtest nicht durchführbar.
- Fehler des Personals bzw. zugehörige Stresssituationen können im Feld nicht getestet werden, da das RBC nur für den regulären Betrieb vorgesehen ist und Fehlersituationen nicht zulässt.
- Test drives are only possible on certain routes and at certain times. As a rule, advance registration is required and fees apply. In some projects, complex transfers are also necessary.
- Cooperation with a dispatcher in the signal box is required, which may be in competition with normal operations on the test route.
- Special functions (e.g. for tunnels, neutral sections, etc.) can only be tested under real conditions, so it must be possible to use these functionalities on the test route. This requires an increased amount of time.
- If there are no opportunities to test the special functions mentioned on the test track, a field test cannot be carried out.
- Personnel errors or associated stressful situations cannot be tested in the field because the RBC is only intended for regular operation and does not allow error situations.
Diese Probleme wurden bisher ausschließlich organisatorisch gelöst, indem entsprechend Zeit für Testfahrten auf offiziellen Teststrecken eingeplant wurde. Darüber hinaus wurden diejenigen Funktionen, die auf der Teststrecke nicht prüfbar waren, lediglich im Labor getestet.So far, these problems have only been solved organizationally by scheduling appropriate time for test drives on official test routes. In addition, those functions that could not be tested on the test track were only tested in the laboratory.
Aus Dokument
Aus Dokument
Es ist daher die Aufgabe der vorliegenden Erfindung, einen verbesserten Test von ETCS-Level-2-Funktionalitäten im Schienenverkehr anzugeben, der sicher und mit geringen Kosten die oben genannten Nachteile reduziert bzw. gänzlich vermeidet.It is therefore the object of the present invention to provide an improved test of ETCS Level 2 functionalities in rail transport, which safely and at low cost reduces or completely avoids the disadvantages mentioned above.
Diese Aufgabe wird durch die Merkmale des Anspruchs 1 gelöst. Vorteilhafte Weiterbildungen sind in den jeweiligen abhängigen Ansprüchen angegeben.This task is solved by the features of claim 1. Advantageous further developments are specified in the respective dependent claims.
Die erfindungsgemäße Anordnung dient zum Testen von ETCS-Level-2-Funktionalitäten im Schienenverkehr. In einem Schienenfahrzeug ist eine On-Board Unit OBU als erste Baugruppe vorgesehen. Wie eingangs beschrieben überwacht diese erste Baugruppe als OBU-Baugruppe die Bewegung des Schienenfahrzeugs. Im Notfall veranlasst bzw. leitet die OBU-Baugruppe auch eine Zwangsbremsung ein. Für die Überwachung stützt sie sich auf Zugdaten, die über Eingaben des Fahrers des Schienenfahrzeugs vorbekannt sind, sowie auf Daten von der Strecke, die sie durch Balisen und im Fall von "ETCS Level 2" zusätzlich per Funk von einem "Radio-Block-Center, RBC" erhält. Sie sendet permanent Positionsdaten an das Radio-Block-Center, so dass dieses den Zuglauf verfolgen kann.The arrangement according to the invention is used to test ETCS Level 2 functionalities in rail transport. In a rail vehicle An on-board unit OBU is intended as the first assembly. As described at the beginning, this first assembly monitors the movement of the rail vehicle as an OBU assembly. In an emergency, the OBU assembly also initiates or initiates emergency braking. For monitoring, it relies on train data that is previously known via inputs from the driver of the rail vehicle, as well as on data from the route, which it transmits through balises and, in the case of "ETCS Level 2", additionally via radio from a "radio block center "RBC" receives. It constantly sends position data to the radio block center so that it can track the train's progress.
Die erste Baugruppe weist gemäß der ETCS-Level-2-Funktionalität einen Anschluss für eine GSM-R-Funkverbindung auf.The first assembly has a connection for a GSM-R radio connection in accordance with ETCS Level 2 functionality.
Im Schienenfahrzeug ist ein Adapter als zweite Baugruppe vorgesehen. Der Adapter ist mit dem Anschluss der ersten Baugruppe über eine Datenübertragungsleitung verbunden, so dass für die erste Baugruppe eine GSM-R-Funkverbindung simuliert wird. Der Adapter ist über eine Datenübertragungsleitung mit einem Rechner als dritte Baugruppe verbunden. Der Rechner ist im Schienenfahrzeug angeordnet und beinhaltet eine Software, mit der gemäß der ETCS-Level-2-Funktionalität ein Radio-Block-Center RBC eines Stellwerks zu Testzwecken simuliert wird.An adapter is provided as a second assembly in the rail vehicle. The adapter is connected to the connection of the first module via a data transmission line, so that a GSM-R radio connection is simulated for the first module. The adapter is connected to a computer as a third module via a data transmission line. The computer is located in the rail vehicle and contains software with which a radio block center RBC of a signal box is simulated for test purposes in accordance with the ETCS level 2 functionality.
Durch diese Anordnung wird die ETCS-Level-2-Funktionalität zwischen der On-Board Unit OBU und dem Radio-Block-Center RBC nachgestellt, jedoch ohne eine Funkübertragung benötigen zu müssen.This arrangement recreates the ETCS Level 2 functionality between the on-board unit OBU and the radio block center RBC, but without requiring radio transmission.
Zugleich werden über den Rechner für Testzwecke simulierte Daten gebildet und an die On-Board Unit OBU kabelgebunden übertragen.At the same time, simulated data is generated via the computer for test purposes and transmitted via cable to the on-board unit OBU.
Entsprechend werden Daten für Testzwecke von der On-Board Unit OBU kabelgebunden an den Rechner zurückübertragen.Accordingly, data for test purposes is transmitted back to the computer by cable from the on-board unit OBU.
In einer vorteilhaften Weiterbildung beinhaltet der Adapter oder der Rechner eine Treibersoftware zur Simulation der GSM-R-Funkverbindung.In an advantageous development, the adapter or the computer contains driver software for simulating the GSM-R radio connection.
In einer vorteilhaften Weiterbildung ist das Schienenfahrzeug für Testzwecke zum Befahren einer Strecke ausgebildet, die zumindest zwei ETCS-Balisengruppen aufweist.In an advantageous development, the rail vehicle is designed for test purposes to travel on a route that has at least two ETCS balise groups.
In einer vorteilhaften Weiterbildung ist die erste Baugruppe als OBU-Baugruppe ausgebildet, mit der die Bewegung des Schienenfahrzeugs überwacht wird. Im Notfall veranlasst bzw. leitet die OBU auch eine Zwangsbremsung ein. Für die Überwachung stützt sie sich auf Zugdaten, die über Eingaben des Fahrers des Schienenfahrzeugs vorbekannt sind, sowie auf Daten von der Strecke, die sie durch Balisen und im Fall von "ETCS Level 2" zusätzlich per Funk von einem "Radio-Block-Center, RBC" erhält. Sie sendet permanent Positionsdaten an das Radio-Block-Center, so dass dieses den Zuglauf verfolgen kann.In an advantageous development, the first assembly is designed as an OBU assembly with which the movement of the rail vehicle is monitored. In an emergency, the OBU also initiates or initiates emergency braking. For monitoring, it relies on train data, which is previously known via inputs from the driver of the rail vehicle, as well as on data from the route, which it transmits through balises and, in the case of "ETCS Level 2", additionally via radio from a "radio block center "RBC" receives. It constantly sends position data to the radio block center so that it can track the train's progress.
In einer vorteilhaften Weiterbildung ist die Rechner-Software, die das Radio-Block-Center simuliert, zur Generierung von Daten ausgebildet, die sicherungstechnische Angaben zu einer Fahrstrecke bzw. Angaben zur Belegung von Gleisabschnitten beinhalten.In an advantageous development, the computer software that simulates the radio block center is designed to generate data that contains safety-related information about a route or information about the occupancy of track sections.
Durch die erfindungsgemäße Anordnung werden Testfahrten ohne großen Zusatzaufwand auf normalen Strecken ermöglicht.The arrangement according to the invention enables test drives on normal routes without much additional effort.
Durch die erfindungsgemäße Anordnung werden Testfahrten auch auf (oft sehr kurzen) Nebengleisen ermöglicht. Diese Nebengleise sind für Testzwecke schnell und oft mit nur geringem Verwaltungsaufwand beim Schienennetzbetreiber buchbar bzw. belegbar.The arrangement according to the invention also enables test drives on (often very short) sidings. These sidings can be booked or documented for test purposes quickly and often with little administrative effort from the rail network operator.
Die erfindungsgemäße Anordnung erfolgt gänzlich ohne Kooperation mit einem Fahrdienstleiter, so dass der Regelbetrieb über die Testfahrten quasi nicht beeinträchtigt wird.The arrangement according to the invention takes place entirely without cooperation with a dispatcher, so that regular operation during the test drives is virtually not affected.
Durch die erfindungsgemäße Anordnung werden spezielle Funktionen über die RBC-Simulation an beliebiger Stelle ausgelöst. damit sind diese Funktionen auch auf einem Nebengleis testbar.The arrangement according to the invention triggers special functions at any point via the RBC simulation. This means that these functions can also be tested on a siding.
Durch die erfindungsgemäße Anordnung sind über die RBC-Simulation sowohl Fehler- als auch Stresssituationen nachbildbar, die somit überhaupt erstmals im Feldversuch zum Test kommen.Due to the arrangement according to the invention, both error and stress situations can be simulated via the RBC simulation, which are therefore tested in field tests for the first time.
Bei der erfindungsgemäßen Anordnung ist weder eine Entwicklung von Hardware noch von Software nötig, es können an sich bekannte Hard- und Software-Elemente miteinander kombiniert werden. Dadurch werden Zeit und Kosten in der Entwicklung gespart.In the arrangement according to the invention, neither hardware nor software development is necessary; hardware and software elements that are known per se can be combined with one another. This saves time and costs in development.
Durch den Einsatz von Laborkomponenten bei Feldtests ist auch die RBC-Simulation im Feld verfügbar, so dass auch im Feld mit der Flexibilität eines Labors getestet werden kann.By using laboratory components in field tests, RBC simulation is also available in the field, so that testing can also be carried out in the field with the flexibility of a laboratory.
Durch die erfindungsgemäße Anordnung erhöht sich die Produktqualität, weil kritische Testfälle im Feld durchgeführt werden, ggf. dort wiederholt durchgeführt werden.The arrangement according to the invention increases the product quality because critical test cases are carried out in the field, if necessary repeated there.
Durch die erfindungsgemäße Anordnung wird die Abhängigkeit vom Betreiber oder Hersteller des RBC deutlich verringert.The arrangement according to the invention significantly reduces the dependence on the operator or manufacturer of the RBC.
Nachfolgend wird die Erfindung beispielhaft anhand einer Zeichnung näher erläutert.The invention is explained in more detail below using a drawing as an example.
Dabei zeigt
In einem Schienenfahrzeug SZF ist eine On-Board Unit OBU als erste Baugruppe BG1 vorgesehen.In an SZF rail vehicle, an on-board unit OBU is provided as the first module BG1.
Die erste Baugruppe BG1 ist als OBU-Baugruppe ausgebildet, mit der, wie eingangs beschrieben, die Bewegung des Schienenfahrzeugs überwacht wird.The first assembly BG1 is designed as an OBU assembly with which, as described above, the movement of the rail vehicle is monitored.
Die erste Baugruppe BG1 weist gemäß der ETCS-Level-2-Funktionalität einen Anschluss AS für eine GSM-R-Funkverbindung auf.According to the ETCS level 2 functionality, the first module BG1 has a connection AS for a GSM-R radio connection.
Im Schienenfahrzeug ist ein Adapter ADP als zweite Baugruppe BG2 vorgesehen. Der Adapter ADP ist mit dem Anschluss AS der ersten Baugruppe BG1 über eine Datenübertragungsleitung DL1 kabelbasiert verbunden.An adapter ADP is provided as a second assembly BG2 in the rail vehicle. The adapter ADP is connected to the connection AS of the first module BG1 via a cable-based data transmission line DL1.
Durch den Adapter ADP wird für die erste Baugruppe BG1 eine GSM-R-Funkverbindung simuliert.The ADP adapter simulates a GSM-R radio connection for the first module BG1.
Der Adapter ADP ist über eine Datenübertragungsleitung DL2 kabelbasiert mit einem Rechner RE als dritte Baugruppe BG3 verbunden.The adapter ADP is connected via a cable-based data transmission line DL2 to a computer RE as a third module BG3.
Der Rechner RE ist im Schienenfahrzeug SFZ angeordnet und beinhaltet eine Software, mit der gemäß der ETCS-Level-2-Funktionalität ein Radio-Block-Center RBC eines Stellwerks zu Testzwecken simuliert wird.The computer RE is located in the SFZ rail vehicle and contains software with which a radio block center RBC of a signal box is simulated for test purposes in accordance with the ETCS level 2 functionality.
Claims (4)
- Arrangement for testing ETCS level-2 functionalities in rail traffic,- having a rail vehicle which is allowed to carry out a test run on a normal section or on a siding without cooperating with a dispatcher,- in which an on-board unit (OBU) is provided in the rail vehicle (SZF) as a first assembly (BG1) that is used to monitor the movement of the rail vehicle,- in which the first assembly (BG1), according to the ETCS level-2 functionality, has a connection (AS) for a GSM-R radio connection,- in which an adapter (ADP) is provided in the rail vehicle as a second assembly (BG2),- in which the adapter (ADP) is connected to the connection (AS) of the first assembly (BG1) via a data transmission line (DL1), with the result that a GSM-R radio connection is simulated for the first assembly (BG1),- in which the adapter (ADP) is connected to a computer (RE) as a third assembly (BG3) via a data transmission line (DL2),- in which the computer (RE) is arranged in the rail vehicle (SFZ) and comprises software which is used, according to the ETCS level-2 functionality, to simulate a radio block centre (RBC) of a signal box for test purposes,- with the result that the ETCS level-2 functionality between the on-board unit (OBU) and the radio block centre (RBC) can be adjusted without the need for a radio transmission.
- Arrangement according to Claim 1, in which the adapter (ADP) or the computer (RE) comprises driver software for simulating the GSM-R radio connection.
- Arrangement according to Claim 1, in which the rail vehicle (SFZ) is designed, for test purposes, to use a section which has at least two groups of ETCS balises.
- Arrangement according to one of the preceding claims, in which the computer software that simulates the radio block centre (RBC) is designed to generate data comprising safety information for a route or information relating to the allocation of track sections.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102020200259 | 2020-01-10 | ||
PCT/EP2020/083413 WO2021139921A1 (en) | 2020-01-10 | 2020-11-25 | Method for testing etcs level 2 functionalities in rail traffic |
Publications (3)
Publication Number | Publication Date |
---|---|
EP4087766A1 EP4087766A1 (en) | 2022-11-16 |
EP4087766C0 EP4087766C0 (en) | 2023-12-27 |
EP4087766B1 true EP4087766B1 (en) | 2023-12-27 |
Family
ID=73834450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20824102.6A Active EP4087766B1 (en) | 2020-01-10 | 2020-11-25 | Arrangement for testing etcs level 2 functionalities in rail transport |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP4087766B1 (en) |
ES (1) | ES2973818T3 (en) |
PL (1) | PL4087766T3 (en) |
WO (1) | WO2021139921A1 (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102008027488B4 (en) * | 2008-06-10 | 2013-03-28 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Device for simulating balises |
CN106993307A (en) * | 2017-06-09 | 2017-07-28 | 湖南中车时代通信信号有限公司 | Train-ground communication analogue system and method |
DE102018116919B3 (en) * | 2018-07-12 | 2019-10-24 | IGT - Inbetriebnahmegesellschaft Transporttechnik mbH | Method and device for simulating a route drive of a traction vehicle |
-
2020
- 2020-11-25 WO PCT/EP2020/083413 patent/WO2021139921A1/en unknown
- 2020-11-25 PL PL20824102.6T patent/PL4087766T3/en unknown
- 2020-11-25 EP EP20824102.6A patent/EP4087766B1/en active Active
- 2020-11-25 ES ES20824102T patent/ES2973818T3/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP4087766C0 (en) | 2023-12-27 |
PL4087766T3 (en) | 2024-05-20 |
WO2021139921A1 (en) | 2021-07-15 |
EP4087766A1 (en) | 2022-11-16 |
ES2973818T3 (en) | 2024-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3445635B1 (en) | Method for operating a positioning device, and positioning device | |
EP2879934B1 (en) | Control of a rail vehicle | |
DE102014210190A1 (en) | Driving license for a rail vehicle | |
DE102007016395B3 (en) | Vehicle-specific quantification function determining method for track, involves determining regression coefficients for vehicle reaction by satisfying preset vehicle-specific quantification equation | |
EP2658764A1 (en) | Key management system and method for a train protection system | |
EP2870047B1 (en) | Operation of a rail vehicle | |
DE102008045050A1 (en) | Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control | |
DE102016217902A1 (en) | Monitoring a rail vehicle | |
EP2193973B1 (en) | Method and device for testing units that influence trains with status data of track signals in relay interlocking systems | |
EP3592625B1 (en) | Train with a system for monitoring the integrity of the train and a corresponding method | |
EP3782869A1 (en) | Train control system and method for controlling a train within a train control system | |
WO2008138761A1 (en) | Apparatus and method for automatic train control at a level crossing | |
EP4087766B1 (en) | Arrangement for testing etcs level 2 functionalities in rail transport | |
EP1462333A1 (en) | Method and device for wheel position recognition in a train | |
DE102008027488B4 (en) | Device for simulating balises | |
WO2014048721A2 (en) | Speed restriction for a railway line | |
EP3013666B1 (en) | Method for operating a train control system and train control system | |
EP2489570B1 (en) | Method and system for data exchange between a central unit and components for influencing trains for test purposes | |
EP0920391B1 (en) | Process of controlling and monitoring a traffic control system | |
EP4101726B1 (en) | System for testing the correct sequence and transmission of beacon and / or loop telegrams provided for an on-board unit of a vehicle | |
EP2978654A2 (en) | Method for replacing a first signal box with a second signal box | |
EP3312073A1 (en) | Method for testing a rail system and rail system | |
DE10240376B4 (en) | Safe train log book | |
DE102004042979A1 (en) | System for the safe operation of track-bound trains on tracks | |
DE102017221555A1 (en) | Method and control device for communication-based vehicle control |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20220610 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 502020006561 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: B61L0015000000 Ipc: B61L0027200000 Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: B61L0015000000 Ipc: B61L0027200000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 15/00 20060101ALI20230630BHEP Ipc: B61L 27/60 20220101ALI20230630BHEP Ipc: B61L 27/20 20220101AFI20230630BHEP |
|
INTG | Intention to grant announced |
Effective date: 20230808 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502020006561 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
U01 | Request for unitary effect filed |
Effective date: 20231227 |
|
U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI Effective date: 20240108 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240327 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2973818 Country of ref document: ES Kind code of ref document: T3 Effective date: 20240624 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240427 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20231227 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240427 |