EP2193973B1 - Method and device for testing units that influence trains with status data of track signals in relay interlocking systems - Google Patents
Method and device for testing units that influence trains with status data of track signals in relay interlocking systems Download PDFInfo
- Publication number
- EP2193973B1 EP2193973B1 EP09173669A EP09173669A EP2193973B1 EP 2193973 B1 EP2193973 B1 EP 2193973B1 EP 09173669 A EP09173669 A EP 09173669A EP 09173669 A EP09173669 A EP 09173669A EP 2193973 B1 EP2193973 B1 EP 2193973B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- signal
- relay
- test
- test set
- track signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000012360 testing method Methods 0.000 title claims description 44
- 238000000034 method Methods 0.000 title claims description 15
- 230000006870 function Effects 0.000 claims description 7
- 230000009131 signaling function Effects 0.000 claims description 3
- 239000004020 conductor Substances 0.000 claims 2
- 238000013475 authorization Methods 0.000 description 2
- 230000011664 signaling Effects 0.000 description 2
- 241001295925 Gegenes Species 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000015607 signal release Effects 0.000 description 1
- 210000002023 somite Anatomy 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/60—Testing or simulation
Definitions
- the present invention relates to a method and a device for the complete testing of train control units with status data of track signals at relay interlockings.
- the task of the test is particularly difficult in relay interlockings, since these are designed as state machines and thus have no data interfaces, via which individual functional elements outside the route planning process can be influenced by means of a diagnostic computer.
- the entire spectrum of signal types to be tested includes the main signals, pre-signals, block and coverage signals. In the following, however, only the signal is spoken by way of example, preferably a main signal.
- relay interlockings usually do not allow intervention for a functional influence, but they do not generally prohibit.
- all safety relays involved in the function are brought by hand to the required position and locked mechanically by means of a wedge in the attracting position. With the forcibly assumed position of the signal to be tested associated safety relay of the desired signal concept is enforced.
- a second approach is to set the highest driving concept and, as a result, all lower-level driving concepts are formed by pushing away or by pressing on energized relays.
- a check set optimized for the signal type is used in a more uniform manner instead of the signal relay set.
- This test set has the properties for controlling the signals in the outdoor system. However, it does not have functions for setting a route, but for setting the main signal under test (destination). As a result, the advance of a train in the range of the respective signal to be tested from signaltechnischer- as well as from the demand for scholarer-personal protection - not possible. Dangers from an approaching train no longer exist.
- the driving terms to be tested are simulated by means of the test record.
- the input in the test record can be carried out manually or an interface to a test computer is possible via which the test procedure can be systemized.
- the test set connects the loop of the central lock in the interlocking, so that the function of the interlocking is not impaired overall.
- a route with a destination test object can therefore only be set again when the test set has been exchanged for the corresponding relay set of the signal.
- the inventive step is that a new method and a device is set, which eliminates the disadvantages of the wedging method in terms of personal safety and regression, and in particular error-prone by manual manual handling sophisticated.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Description
Die vorliegende Erfindung betrifft ein Verfahren und eine Vorrichtung zum vollständigen Prüfung von Zugbeeinflussungseinheiten mit Zustandsdaten von Streckensignalen bei Relaisstellwerken.The present invention relates to a method and a device for the complete testing of train control units with status data of track signals at relay interlockings.
Mit der Einführung einer neuen Zugbeeinflussungstechnologie, wie z.B. ETCS, ist es je nach zugehörigem Level des Verfahrens erforderlich, an den Lichtsignalen der Sicherungsanlage zur Anzeige der Fahrberechtigung für den voraus liegenden Abschnitt des im Streckennetzes den jeweils angezeigten Begriff abzugreifen und der Telegrammaufbereitung der neuen beizustellenden Zugbeeinflussungstechnologie zuzuführen.With the introduction of a new train control technology, such as ETCS, depending on the associated level of the procedure, it is necessary to tap the light signals of the security system for displaying the driving authorization for the preceding section of the network in the route network and to supply the message processing to the new train control technology to be provided.
Diese Fahrberechtigungssignale, es sind meist Rot / Orange / Grün - Signalsysteme mit 3 Aspekten, verfügen teilweise zusätzlich über eine Anzeige für von der Streckengeschwindigkeit nach unten abweichende einzuhaltende Geschwindigkeitslimiten für den nächsten Abschnitt.These drive authorization signals, which are mostly red / orange / green - signaling systems with 3 aspects, sometimes additionally have an indication of speed limits for the next section which deviate from the line speed.
Da heute die Netze der Bahnen sehr stark genutzt und bis an die Grenzen ausgelastet werden, ist die vollständige Prüfung der Sicherungsanlagen zu Abnahmezwecken im Streckennetz nach der Installation einer neuen Zugbeeinflussungstechnologie vor deren Nutzung ein schwieriges Unterfangen. Die auf den Sicherheitslevel der neu eingebrachten Funktion abgestimmte Prüfung muss nach Kriterien durchgeführt werden, welche den Richtlinien der Zulassungsbehörden entsprechen.As rail networks are now very heavily used and pushed to their limits, the full testing of backup systems for roadside acceptance after installing a new train control technology prior to their use is a difficult undertaking. The test adapted to the safety level of the newly introduced function must be carried out according to criteria which comply with the guidelines of the approval authorities.
Das verlangt, dass alle Zustände an den für den Fahrzeugführer zu beachtenden funktionalen Elementen des Stellwerkes in der Aussenanlage einzustellen sind, in der Regel sind das Signale, deren korrekte und vollständige Übereinstimmung auf die neu installierte Zugbeeinflussungstechnologie zu prüfen und zu protokollieren ist.This requires that all states are set to be observed by the driver functional elements of the interlocking in the outdoor area, as a rule, the signals are their correct and complete To check and log compliance to the newly installed train control technology.
Konkret heisst dies in der Regel, dass alle Signalbegriffe eines Signals einzustellen sind und die Richtigkeit der Ausgabe an der ETCS Balise mittels Telegrammempfang und Verifikation des gesendeten Inhalts zu prüfen ist.Specifically, this usually means that all the signal terms of a signal must be set and the correctness of the output on the ETCS Balise must be checked by means of telegram reception and verification of the transmitted content.
Die Aufgabe der Prüfung ist bei Relaisstellwerken besonders schwierig, da diese als Zustandsautomaten ausgebildet sind und dadurch über keine Datenschnittstellen verfügen, über welche mittels Diagnoserechner einzelne funktionale Elemente ausserhalb des Fahrstrassen-Stellprozesses beeinflusst werden können.The task of the test is particularly difficult in relay interlockings, since these are designed as state machines and thus have no data interfaces, via which individual functional elements outside the route planning process can be influenced by means of a diagnostic computer.
Eine der generellen Schwierigkeiten besteht darin, dass mittels der Einstellung von Fahrstrassen teilweise nur mit grossem Aufwand oder gar nicht eine Einstellung von bestimmten Fahrbegriffen an einem spezifischen Signal möglich ist. Diese Situation besteht unter anderem bei der Rückfallebene der Signalisierung im Störungsfall, hier ist das Herbeiführen der jeweiligen Störungen erforderlich um die Auswirkungen anzustossen.One of the general difficulties is that by means of the setting of routes it is sometimes possible only with great effort or not at all a setting of certain driving terms on a specific signal. This situation exists, among other things, in the fallback of the signaling in the event of a malfunction, here the induction of the respective disturbances is required to initiate the effects.
Weiter kommt hinzu, dass das gesamte zu prüfende Spektrum der Signaltypen die Hauptsignale, Vorsignale, Block- und Deckungssignale beinhaltet. Nachfolgend wird jedoch exemplarisch nur vom Signal gesprochen, bevorzugt ein Hauptsignal.In addition, the entire spectrum of signal types to be tested includes the main signals, pre-signals, block and coverage signals. In the following, however, only the signal is spoken by way of example, preferably a main signal.
Um diese Fahrbegriffe prüfen zu können, müssen somit verschiedene Fahrwege eingestellt werden (zum Teil quer über die gesamte Gleisanlage eines Bahnhofs), was mit der heutigen Dichte des Zugverkehrs meist nicht mehr vertretbar durchführbar ist. Dieses Problem ist zum Beispiel auch mit der Offenbarung der
Die bisherige exemplarische Lösung wird anhand von Spurplan-Relaisstellwerken, wie der Typ DOMINO 67 der Anmelderin, welcher verbreitet in der Schweiz im Einsatz steht, beschrieben.The previous exemplary solution is described on the basis of track-plan relay interlockings, such as the DOMINO 67 of the applicant, which is widely used in Switzerland in use.
Die Betreiber von Relaisstellwerken lassen in der Regel Eingriffe für eine Funktionsbeeinflussung nicht zu, verbieten sie jedoch auch nicht generell. In der Folge werden nach einem bekannten Vorgehen zur Durchführung von Prüfungen im Relaisstellwerk in einer Systemeinheit, das heisst dem einem Signal zugehörigen Relaissatz, alle in die Funktion involvierten Sicherheitsrelais von Hand in die erforderliche Lage gebracht und mechanisch mittels eines Keils in der Anzugslage arretiert. Mit der zwangsweise eingenommenen Stellung der dem zu prüfenden Signals zugehörigen Sicherheitsrelais wird der gewünschte Signalbegriff erzwungen.The operators of relay interlockings usually do not allow intervention for a functional influence, but they do not generally prohibit. As a result, according to a known procedure for carrying out tests in the relay interlocking in a system unit, that is, the relay set associated with a signal, all safety relays involved in the function are brought by hand to the required position and locked mechanically by means of a wedge in the attracting position. With the forcibly assumed position of the signal to be tested associated safety relay of the desired signal concept is enforced.
Verkeilungen sind mechanische Eingriffe an Sicherheitsrelais und dadurch kann unbeabsichtigt und unerkannt eine Beschädigung am Relais verursacht werden. Das kann gravierende sicherheitsrelevante Auswirkungen haben.Keystrokes are mechanical interventions on safety relays, which can cause damage to the relay unintentionally and unrecognized. This can have serious security implications.
Ein zweites Vorgehen besteht im Stellen des höchsten Fahrbegriffs und in der Folge werden mittels Wegdrücken oder Abdrücken von angezogenen Relais alle tieferwertigen Fahrbegriffe gebildet.A second approach is to set the highest driving concept and, as a result, all lower-level driving concepts are formed by pushing away or by pressing on energized relays.
Verkeilen und Abdücken sind Vorgehen ohne einheitliche technische Basis und bergen deshalb Gefahren. Solche Vorgehensweisen erfordern hohes Fachwissen sowie eine genaue Anleitung und eine strenge Protokollierung. Es besteht jedoch infolge der an sich unübersichtlichen Vorgehensweise die Schwierigkeit, die Regressionsfähigkeit der Tests zu gewährleisten.Wedging and pulling down are procedures without a uniform technical basis and therefore harbor dangers. Such procedures require a high level of expertise as well as accurate guidance and strict logging. However, due to the intricate nature of the procedure, there is the difficulty of ensuring the regression capability of the tests.
Generell ist festzuhalten, durch die manuellen Eingriffe im Relaissatz können folgende Gefahren oder Behinderungen entstehen:
- Manipulation am "falschen" Relais. Dieser Erstfehler kann mit einem zweiten unabhängigen Fehler zu einer Gefährdung führen (Mehrfehlerfall)
- Mechanische Beschädigung durch das Verkeilen oder Abdrücken der Relais
- Nach dem Beenden der Prüfung verkeiltes Relais nicht befreien
- Bei Ausfahrsignal wird Block angeschaltet, was zu betriebshemmenden Zuständen kann und indirekt Risiken bewirken kann.
- Manipulation on the "wrong" relay. This first error can lead to a danger with a second independent error (multi-error case)
- Mechanical damage due to wedging or forcing the relays
- After completing the test, do not release the wedged relay
- When the exit signal block is turned on, which can to operating conditions and can cause indirect risks.
Es wird ein Verfahren gemäss Anspruch 1 und eine Vorrichtung gemäss Anspruch 2 vorgeschlagen, welches keine Eingriffe an den Sicherheitsrelais der Systemeinheiten, der Relaissätze erfordert.It is proposed a method according to claim 1 and a device according to claim 2, which does not require any intervention in the safety relay of the system units, the relay sets.
Es sind zwei Funktionsbereiche im Spurplan-Relaisstellwerk von Bedeutung, welche auf eine neue Lösung für die Tests entscheidenden Einfluss haben.
- 1. Der Zentralverschluss mit seiner Relaissatzüberwachung, welcher das gesamte Stellwerk sicherheitstechnisch kontrolliert (sozusagen die Achillesferse der Sicherheit).
- 2. Die Spurplantechnik mit der Fähigkeit, dass die spezifischen Relais(steuer)sätze der Aussenanlageelemente diejenigen Eigenschaften besitzen, welche sie befähigen, bei der Fahrstrasseneinstellung die Gleisbelegung (Stellen und Auflösung) zu verwalten. Die Relais(steuer)sätze sind selbst Zustandsautomaten und somit deterministisch.
- 1. The central lock with its relay set monitoring, which controls the entire interlocking safety-related (so to speak, the Achilles heel of safety).
- 2. The track planning technique with the ability that the specific relay (control) sets of outdoor equipment elements have the characteristics that enable them to manage the track occupancy (locations and resolution) in the course setting. The relay (control) sets are themselves state machines and thus deterministic.
Es wird in der Grundsatzfunktion einheitlicher jedoch ein auf den Signaltyp optimierter Prüfsatz verwendet anstelle des Signal-Relaissatzes.
Dieser Prüfsatz verfügt über die Eigenschaften zum Ansteuern der Signale in der Aussenanlage.
Er verfügt jedoch nicht über Funktionen zum Einstellen einer Fahrstrasse, aber zum Einstellen des in Prüfung stehenden Hauptsignals (Ziel). Dadurch ist das Vordringen eines Zuges in den Bereich des jeweils zu prüfenden Signals aus signaltechnischer- wie auch aus der Forderung nach Prüfer-Personenschutz - nicht möglich. Gefahren durch einen herannahenden Zuges bestehen somit nicht mehr.In the basic function, however, a check set optimized for the signal type is used in a more uniform manner instead of the signal relay set.
This test set has the properties for controlling the signals in the outdoor system.
However, it does not have functions for setting a route, but for setting the main signal under test (destination). As a result, the advance of a train in the range of the respective signal to be tested from signaltechnischer- as well as from the demand for Prüfer-personal protection - not possible. Dangers from an approaching train no longer exist.
Die zu prüfenden Fahrbegriffe werden mittels des Prüfsatzes simuliert.Die Eingabe im Prüfsatz kann manuell erfolgen oder es ist ein Interface zu einem Prüfrechner möglich, über welchen die Prüfprozedur systematisiert werden kann.
Der Prüfsatz beschaltet jedoch die Ringleitung des Zentralverschlusses im Stellwerk, so dass die Funktion des Stellwerkes gesamthaft nicht beeinträchtigt ist.The driving terms to be tested are simulated by means of the test record. The input in the test record can be carried out manually or an interface to a test computer is possible via which the test procedure can be systemized.
However, the test set connects the loop of the central lock in the interlocking, so that the function of the interlocking is not impaired overall.
Eine Fahrstrasse mit einem Ziel-Prüfling kann daher erst wieder eingestellt werden, wenn der Prüfsatz gegen den entsprechenden Relaissatz des Signals wieder zurück getauscht worden ist.A route with a destination test object can therefore only be set again when the test set has been exchanged for the corresponding relay set of the signal.
Das Vorgehen in Einzelschritten bei der Prüfung eines Signals mit deren zusätzlich installierten ETCS-Zugsicherungseinrichtungen ist vorzugsweise dargestellt.The procedure in individual steps when testing a signal with its additionally installed ETCS train protection devices is preferably shown.
Zugslagen in der Gleisanlage mit Fahrdienst feststellen und Prozedur Startzeitpunkt festlegen
- 1. (Relais)-Prüfsatz entsprechend der Aufgabe einstellen (Grundstellung)
- 2. Betreffenden Relaissatz des betreffenden Signals entfernen
- 3. Prüfsatz einsetzen
- 4. Gemäss Prüfprotokoll den erstmöglichen Fahrbegriff am Prüfsatz simulieren
- 5. Prüfung der Übereinstimmung in der Aussenanlage bezüglich Telegramminhalt
- 6. Die weiteren Fahrbegriffe der Signalfunktion des Standortes gemäss Punkt 3 und 4 prüfen
- 7. Nach Beenden der Prüfung den Prüfsatz gegen entsprechenden Relaissatz zurücktauschen
- 8. Prüfen, ob HALT-Rückmelder aktiv ist, das heisst, der Satz ist in Grundstellung
- 9. Signalfreigabe an Fahrdienstleiter für die Nutzung im Betriebsablauf
- 1. Set (relay) test set according to the task (basic position)
- 2. Remove the relevant relay set of the relevant signal
- 3. Insert test set
- 4. According to the test report, simulate the first possible driving concept on the test set
- 5. Checking the conformity in the outdoor installation regarding telegram content
- 6. Check the further driving terms of the signal function of the location according to points 3 and 4
- 7. After completing the test, swap the test set for the corresponding relay set
- 8. Check if HALT-feedback is active, ie the set is in basic position
- 9. Signal release to dispatcher for use in operation
Der erfinderische Schritt liegt darin, dass ein neues Verfahren und eine Einrichtung festgelegt wird, welche die Nachteile der Verkeilmethode bezüglich Personensicherheit sowie Regression und insbesondere Fehleranfälligkeit durch manuelle handwerklich anspruchsvolle Handhabungen eliminiert.The inventive step is that a new method and a device is set, which eliminates the disadvantages of the wedging method in terms of personal safety and regression, and in particular error-prone by manual manual handling sophisticated.
Claims (2)
- Method for testing a train influencing unit with status data from a track signal in a relay interlocking system, comprising the steps:a) Configuring a test set adapted to the track signal in accordance with the test task, with the test set having available to it the property of connecting the track signal but not the function for setting a line and wherein the test set connects a ring conductor of the central lock in the relay interlocking system;b) Physically removing the associated relay set of the track signal involved and inserting the test set in place of the removed relay set;c) Simulating a first possible signal aspect on the test set in accordance with a test protocol;d) Checking the match at the train influencing unit in the external system of the telegram content reflecting the signal aspect;e) Checking the further signal aspects of the signal function of the location in accordance with c) and d) until all safety-relevant signal aspects have been tested;f) Replacing the test set with the corresponding relay set again after ending the testing;g) Checking whether HALT responder is active, i.e. whether the reinstalled relay set is in the basic position, andh) Enabling the track signal for resumption of its use in the normal operating sequence.
- Facility for testing a train influencing unit with status data of a track signal in a relay interlocking unit, comprising:a) Configuring a test set adapted to the track signal in accordance with a test task, with the test set having available to it the property of connecting the track signal but not the function for setting a line and wherein the test set connects a ring conductor of the central lock in the relay interlocking system;b) Physically removing the associated relay set of the track signal involved and inserting the test set in place of the removed relay set;c) Simulating a first possible signal aspect on the test set in accordance with a test protocol;d) Checking the match at the train influencing unit in the external system of the telegram content reflecting the signal aspect;e) Checking the further signal aspects of the signal function of the location in accordance with c) and d) until all safety-relevant signal aspects have been tested;f) Replacing the test set with the corresponding relay set again after ending the testing;g) Checking whether HALT responder is active, i.e. whether the reinstalled relay set is in the basic position, andh) Enabling the track signal for resumption of its use in the normal operating sequence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP09173669A EP2193973B1 (en) | 2008-12-04 | 2009-10-21 | Method and device for testing units that influence trains with status data of track signals in relay interlocking systems |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08021018 | 2008-12-04 | ||
EP09173669A EP2193973B1 (en) | 2008-12-04 | 2009-10-21 | Method and device for testing units that influence trains with status data of track signals in relay interlocking systems |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2193973A2 EP2193973A2 (en) | 2010-06-09 |
EP2193973A3 EP2193973A3 (en) | 2011-01-12 |
EP2193973B1 true EP2193973B1 (en) | 2013-01-30 |
Family
ID=41800427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP09173669A Not-in-force EP2193973B1 (en) | 2008-12-04 | 2009-10-21 | Method and device for testing units that influence trains with status data of track signals in relay interlocking systems |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP2193973B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109774744A (en) * | 2018-12-18 | 2019-05-21 | 浙江众合科技股份有限公司 | Interlocking code bit test tool |
CN112198815A (en) * | 2020-12-04 | 2021-01-08 | 卡斯柯信号(北京)有限公司 | Interlocking function simulation automatic test method and system |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011081477A1 (en) * | 2011-08-24 | 2013-02-28 | Siemens Ag | interlocking computers |
CN102495628B (en) * | 2011-12-27 | 2013-06-19 | 中铁十局集团电务工程有限公司 | Mimic board for signal equipment of station |
CN105549576A (en) * | 2016-01-08 | 2016-05-04 | 董冬 | Maintenance method of intelligent transformer station protective relaying device |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7363187B2 (en) * | 2004-07-08 | 2008-04-22 | Ultra-Tech Enterprises, Inc. | Method and apparatus for automatically testing a railroad interlocking |
KR100620059B1 (en) * | 2004-07-09 | 2006-09-08 | 한국철도기술연구원 | Automatic test device of electronic interlocking device and control method |
-
2009
- 2009-10-21 EP EP09173669A patent/EP2193973B1/en not_active Not-in-force
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109774744A (en) * | 2018-12-18 | 2019-05-21 | 浙江众合科技股份有限公司 | Interlocking code bit test tool |
CN109774744B (en) * | 2018-12-18 | 2021-04-09 | 浙江众合科技股份有限公司 | Interlocking code bit testing tool |
CN112198815A (en) * | 2020-12-04 | 2021-01-08 | 卡斯柯信号(北京)有限公司 | Interlocking function simulation automatic test method and system |
Also Published As
Publication number | Publication date |
---|---|
EP2193973A2 (en) | 2010-06-09 |
EP2193973A3 (en) | 2011-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2193973B1 (en) | Method and device for testing units that influence trains with status data of track signals in relay interlocking systems | |
WO2015039878A1 (en) | Software updating of non-critical components in dual safety-critical distributed systems | |
DE102008045050A1 (en) | Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control | |
DE2701925C3 (en) | Vehicle control with two on-board computers | |
DE102005023296B4 (en) | Train Control System | |
DE102020206630A1 (en) | Simulation device and method for simulating a crossing of at least one trackside position marker | |
EP3782869A1 (en) | Train control system and method for controlling a train within a train control system | |
EP2088051B1 (en) | Method and device for secure setting of a route for a rail vehicle | |
EP3448735B1 (en) | Server device operating a piece of software for controlling a function of a rail transport safety system | |
DE10053023C1 (en) | Method for controlling a safety-critical railway operating process and device for carrying out this method | |
EP2978654B1 (en) | Method for replacing a first signal box with a second signal box | |
EP0920391B1 (en) | Process of controlling and monitoring a traffic control system | |
EP3798090A1 (en) | Method for monitoring a spoken communication in transport and associated traction system | |
WO2020007532A1 (en) | Method for securely exchanging and for securely displaying status data of safety-related components | |
EP4101726B1 (en) | System for testing the correct sequence and transmission of beacon and / or loop telegrams provided for an on-board unit of a vehicle | |
DE102008027488A1 (en) | Transponder simulating device for use in rail-mounted vehicle, has computer unit connected with simulation unit to control simulation unit to generate information signals and to simulate transponder using information signals | |
EP4087766B1 (en) | Arrangement for testing etcs level 2 functionalities in rail transport | |
EP3580114B1 (en) | Method and apparatus for setting at least one route for a railway installation | |
EP1396413B1 (en) | Method for operating assistance of track elements | |
WO2003047937A1 (en) | Method for controlling a safety-critical railway operating process and device for carrying out said method | |
WO2016016003A2 (en) | Method and device for operating a railway safety system | |
WO2014114485A2 (en) | Method and apparatus for etcs l1 and/or l2 - train control | |
EP0683082B1 (en) | Automatic monitoring device of a route control system for rail vehicle | |
DE102005049217A1 (en) | Relay signal tower remote control method for railway transportation, involves controlling tower from control operating place by secure remote control system such that core of tower is maintained without modifications | |
WO2017045863A1 (en) | Communication device and method for automatically exchanging messages in a railway system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA RS |
|
17P | Request for examination filed |
Effective date: 20110620 |
|
17Q | First examination report despatched |
Effective date: 20111123 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 19/06 20060101AFI20120716BHEP Ipc: B61L 27/00 20060101ALN20120716BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG, CH Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 595655 Country of ref document: AT Kind code of ref document: T Effective date: 20130215 Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG, CH Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502009006147 Country of ref document: DE Effective date: 20130328 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20130130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130430 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130530 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130511 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130530 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130501 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
26N | No opposition filed |
Effective date: 20131031 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502009006147 Country of ref document: DE Effective date: 20131031 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A |
|
BERE | Be: lapsed |
Owner name: SIEMENS SCHWEIZ A.G. Effective date: 20131031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20131021 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131021 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140630 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131021 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131021 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130130 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PUE Owner name: SIEMENS MOBILITY AG, CH Free format text: FORMER OWNER: SIEMENS SCHWEIZ AG, CH |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 502009006147 Country of ref document: DE Representative=s name: FISCHER, MICHAEL, DR., DE Ref country code: DE Ref legal event code: R081 Ref document number: 502009006147 Country of ref document: DE Owner name: SIEMENS MOBILITY AG, CH Free format text: FORMER OWNER: SIEMENS SCHWEIZ AG, ZUERICH, CH |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: PC Ref document number: 595655 Country of ref document: AT Kind code of ref document: T Owner name: SIEMENS MOBILITY AG, CH Effective date: 20190612 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: FH1C Free format text: FORMER REPRESENTATIVE(S): MAK ANDRAS, SBGK SZABADALMI UEGYVIVOEI IRODA, HU Representative=s name: SBGK SZABADALMI UEGYVIVOEI IRODA, HU Ref country code: HU Ref legal event code: GB9C Owner name: SIEMENS MOBILITY AG, CH Free format text: FORMER OWNER(S): SIEMENS SCHWEIZ AG, CH |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HU Payment date: 20211218 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20211220 Year of fee payment: 13 Ref country code: CH Payment date: 20220117 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20220912 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502009006147 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221031 Ref country code: HU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221022 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230503 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221031 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 595655 Country of ref document: AT Kind code of ref document: T Effective date: 20231021 |