EP3936295A1 - Floating caissons, methods and apparatus for constructing floating caissons - Google Patents
Floating caissons, methods and apparatus for constructing floating caissons Download PDFInfo
- Publication number
- EP3936295A1 EP3936295A1 EP20382605.2A EP20382605A EP3936295A1 EP 3936295 A1 EP3936295 A1 EP 3936295A1 EP 20382605 A EP20382605 A EP 20382605A EP 3936295 A1 EP3936295 A1 EP 3936295A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- floating
- caisson
- platform
- concrete
- supports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000007667 floating Methods 0.000 title claims abstract description 76
- 238000000034 method Methods 0.000 title claims abstract description 34
- 239000004567 concrete Substances 0.000 claims abstract description 49
- 238000005507 spraying Methods 0.000 claims abstract description 14
- 239000011378 shotcrete Substances 0.000 claims description 17
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 17
- 238000009826 distribution Methods 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 10
- 229920006327 polystyrene foam Polymers 0.000 claims description 7
- 239000011150 reinforced concrete Substances 0.000 claims description 6
- 239000003562 lightweight material Substances 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 13
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000011065 in-situ storage Methods 0.000 description 5
- 238000009415 formwork Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 3
- 238000004873 anchoring Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000000835 fiber Substances 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 229920000049 Carbon (fiber) Polymers 0.000 description 1
- 229920000271 Kevlar® Polymers 0.000 description 1
- 241001492414 Marina Species 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 239000004917 carbon fiber Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 239000003733 fiber-reinforced composite Substances 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 239000008187 granular material Substances 0.000 description 1
- 239000004761 kevlar Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B15/00—General arrangement or layout of plant ; Industrial outlines or plant installations
- B28B15/002—Mobile plants, e.g. on vehicles or on boats
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B19/00—Machines or methods for applying the material to surfaces to form a permanent layer thereon
- B28B19/003—Machines or methods for applying the material to surfaces to form a permanent layer thereon to insulating material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/22—Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/02—Caissons able to be floated on water and to be lowered into water in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/08—Lowering or sinking caissons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/06—Constructions, or methods of constructing, in water
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C1/00—Dry-docking of vessels or flying-boats
- B63C1/02—Floating docks
Definitions
- the present disclosure relates to floating caissons, and to methods and apparatuses of constructing floating caissons.
- the present disclosure further relates to structures including caissons.
- caissons In structures in port and harbour areas, caissons may be used.
- the use of floating caissons is relatively popular because it allows rapid construction in marine environments.
- Caissons may be used in the construction of e.g. breakwaters, ports, wharves, dry docks, fishing ports, berths, marinas and other.
- Floating caissons are box-like elements, made of (reinforced) concrete, and which typically have a square or rectangular cross-section and have a number of empty cylindrical cells. Inner walls extending between opposite side walls form a grid and a number of empty cylindrical cells (with a square or rectangular cross-section) is formed in the grid.
- Caissons provide stability and rigidity, and may for this reason be used in different port infrastructures as mentioned before.
- the caissons may towed with suitable towboats or other towing systems to their destination.
- the caisson may be ballasted, i.e. the cells may be filled with concrete or granular material. This operation may be performed by auxiliary floating platforms that carry both the material and a special crane to transfer the material. Tractors, dozers, loaders and trucks may help finish the filling operation on top of the caisson.
- a known technique for forming floating caissons is as follows: a slab of concrete may be formed and the parts of the inner walls are formed by pouring concrete in formworks. Once the concrete has formed, the formworks are lifted to form additional portions of walls on top of the already formed walls. Steel meshes may be used to reinforce the walls.
- the walls may be formed in increments of e.g. 1 meter. Due to this technique, the shapes that can be used for the caissons are limited: in principle, only straight walls can be used. Also, this technique requires for the caisson building floating dock to be at least as high as the height of the structure to be built. This makes the caisson building docks very expensive, which means that only a very limited number of them may be use in a country. Infrastructural works may suffer important delays, because caisson building docks are unavailable.
- the present disclosure in various examples provides methods, systems, and devices for manufacturing floating caissons and floating caissons that at least partially resolve some of the aforementioned disadvantages.
- a method of forming a wall of a floating caisson comprises providing a slab on a submersible platform, providing one or more base supports on top of the slab, the base supports having a first outer face and a second outer face.
- the method further comprises forming a first wall portion by spraying concrete on the first and the second outer faces.
- the method then furthermore comprises lowering the platform and forming one or more subsequent wall portions on the first wall portion.
- a method of forming walls, portions of walls, and caissons are provided which allow more versatility in the shape of the caisson. Since no formwork is used, and concrete is sprayed on a support, the resulting wall may have any shape that can be given to the support. Also methods in accordance herewith require less complicated apparatus. Since the wall portion that has been formed is lowered, the surrounding apparatus does not need to be raised to construct subsequent wall portions.
- the forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports.
- subsequent supports and additional supports are used interchangeably throughout the present disclosure.
- lowering the platform may comprise reducing the buoyancy of the platform after the forming of each subsequent wall portion.
- the platform with already formed structure on top may be lowered by varying the buoyancy of the caisson and/or the platform.
- the caisson to the extent that it has been constructed, may be filled with water as desired.
- the top of the formed structure may thus be lowered to be substantially level with the working decks, so that subsequent wall portions may be easily formed.
- reducing the buoyancy of the platform may include filling the platform with water. Particularly when the caisson has been constructed, the platform may be lowered and separated from the caisson to liberate the caisson from the apparatus used in making it. The caisson may then be towed and transported to its destination.
- the base supports and/or subsequent supports are made from a material that is relatively lightweight compared to concrete.
- the base supports and/or subsequent supports may be made from polystyrene foam.
- Polystyrene foam is lightweight, is cheap and can be formed (by cutting, stacking etc.) in almost any desired shape.
- through-holes may be made or provided in the (base) support or additional supports.
- Connectors for connecting the wall portions on the first and second faces of the supports may be provided.
- the connectors may be prefabricated, or may be made in situ.
- armatures may be placed in the through-holes and concrete may be shot or sprayed in the through holes.
- the end portions of the armatures may be folded to be substantially parallel the wall portions on the first and second faces.
- an apparatus for constructing a floating caisson comprises a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon.
- the overhead structure comprises one or more working decks and a shotcrete distribution system for supply shotcrete to workers on the working decks.
- an apparatus which may be more cost effective than prior art solutions.
- the apparatus may be lower than known floating caisson building docks.
- the overhead structure may comprise a plurality of vertical supports supporting transverse beams.
- the working decks may be suspended from the transverse beams.
- the shotcrete distribution system may be guided along the transverse beams.
- one or more of the working decks may be movable with respect to a fixed part of the overhead structure, and particularly one or more of the working decks may be movable horizontally along transverse beams.
- the transverse beams may include guides or rails along which vertical supports connected to the working platforms may be displaced.
- Working decks that can be displaced can be helpful to allow for curved walls of caissons.
- a floating caisson comprising a bottom slab and a plurality of vertical walls.
- the vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core.
- a caisson in accordance with this aspect may be relatively lightweight, i.e. for the same strength and stiffness, the caisson may be lighter than in the prior art.
- the core in particular may be lightweight.
- the core may be formed by the supports, as defined in the other aspects, upon which concrete is sprayed to form the walls. Concrete is provided on its outer faces. Particularly bending strength and stiffness of the resulting structure may be improved by providing the material further away from the neutral axis and avoiding a massive solid structure.
- the geometrical distribution of the mass of the structures has a higher second moment of area and thereby greater stiffness and strength for a given mass can be achieved.
- An aspect of the double-wall reinforced concrete surfaces is to remove the concrete which has the smallest or no load bearing effect, i.e. the effect is to remove the material that is not carrying much load and concentrating it where the load is highest".
- one or more of the vertical walls, and specifically external vertical walls of the floating caisson may include a convex or concave shape. In some examples, one or more of the vertical walls may be doubly curved.
- Figures 1A - 1D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example.
- Figure 1A provides a cross-sectional view
- figures 1B - 1D provide top views of the same apparatus of figure 1A , each of the figures highlighting a different subsystem.
- Figure 1A shows an apparatus 70 for constructing a floating caisson 100.
- the apparatus may be floating in a body of water, e.g. in a part of a sea close to a shore, port or harbor where a structure is to be built.
- the apparatus 70 comprises a floating pontoon 10, and a submersible platform 20, which is connected to the floating pontoon 10.
- the connection is such that a vertical position (inside the water) of the platform 20 can be varied with respect to the floating pontoon 10.
- the connection between the floating pontoon 10 and the platform 20 may include one or more cables or chains or mooring lines, which may be connected at anchoring points 12 and 14.
- the connection may include pulleys or winches as needed.
- the apparatus 70 further comprises an overhead structure 30 supported by the floating pontoon 10, wherein the overhead structure 30 comprises one or more working decks 40A, 40B and a shotcrete distribution system 50 for supplying shotcrete to workers on the working decks.
- Shotcrete (sometimes called “gunite” or “sprayed concrete”) is concrete or mortar conveyed through a hose and pneumatically projected at high velocity onto a surface, as a construction technique.
- the wall formed in this manner may be reinforced by conventional steel rods, steel mesh, or fibers.
- Shotcrete as used throughout the present disclosure may refer to both wet-mix and dry-mix versions.
- the submersible platform may have variable buoyancy to vary a position of the submersible platform 20 with respect to the pontoon and / or with respect the floating caisson 100.
- the platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used.
- the floating pontoon 10 may have an open cross-section, and may be substantially U-shaped or C-shaped.
- FIG 1C it may be seen that several rows of inner working decks 40A may be arranged between the legs of the U-shape. In this particular example, four rows of inner working decks may be arranged. Each of the rows includes three inner working decks 40A. Additionally, an annular outer working deck 40B may be provided. The annular working deck may substantially surround all the inner working decks 40A.
- the overhead structure 30 may include a plurality of vertical side supports 32 and a plurality of transverse beams 34.
- Each of the transverse beams 34 may extend between vertical side supports 32.
- the vertical side supports 32 may be directly positioned on top of floating pontoon 10 and carry the transverse beams 34.
- the overhead structure may be formed or may comprise truss structures.
- the vertical supports 36 may extend between working decks 40A and 40B and a transverse beam 34.
- the vertical supports 36 may be suspended from the transverse beams 34.
- each of the inner working decks 40A may comprise an intermediate vertical support 36.
- one transverse beam 34 may be arranged with each row of working decks 40 A.
- a shotcrete distribution system 50 may include a central supply 54. From the central supply 54, several transverse distribution lines 56 may extend sideways. Each of the transverse distribution lines 56 may include one or more delivery hoses 58 (illustrated in figure 1A ). The distribution lines may be supported by transverse beams 34. If the transverse beams 34 are formed as truss structures, the distribution lines may advantageously be arranged inside the truss structures.
- the hoses 58 may be held by workers on the working decks 40A, 40B and may be used for spraying or "shooting" concrete.
- the hoses may be arranged with the vertical supports 36.
- a hose may be arranged with each of the vertical supports 36.
- Shotcrete machines are available which can control the concrete spraying process and make it very fast and easy. Manual and mechanical methods may be used for the wet spraying process but wet sprayed concrete is traditionally applied by machine.
- An apparatus according to the present disclosure may be relatively easily transported. I.e. it may be dismounted and transported by road (truck) or by sea to a construction site.
- the vertical supports 36, side supports 32 and transverse beams may be relatively easily disassembled from each other.
- a method of forming a wall 120 of a floating caisson 100 may comprise providing a slab 110 on a submersible platform 20.
- One or more supports 130 may be provided on top on top of the slab 20, the supports 130 having a first outer surface 132 and a second outer face 134.
- a wall portion may be formed by spraying or shooting concrete on the first and second outer faces 132, 134 of the supports 130.
- the platform 20 may be lowered. Subsequent wall portions may then be formed on top as needed.
- the walls may thus be formed by spraying or shooting concrete on the supports.
- the supports 130 may be chosen to be lightweight. This shall be understood in the present disclosure as a support with a density that is lower than the density of the concrete sprayed on its face.
- the supports 130 in examples may extend substantially perpendicular to the slab 110.
- a support is polystyrene foam.
- Polystyrene foam is lightweight, and may be cut, sized and shaped and arranged in a wide variety of ways.
- any suitable support shape may be provided upon which concrete can be sprayed.
- the thickness of the concrete on either face of the support may be varied as needed.
- a wide variety of shapes and forms may be provided for the walls of the caisson.
- a wall of the caisson may be curved, e.g. be concave or convex.
- a wall of the caisson may have a double curvature, i.e. may be curved both in a vertical and a horizontal direction. Even though any of the walls of the caisson may be curved in this manner.
- the curvature of the outer walls of the caisson may be particularly suitable, e.g. when they have to function as breakwater structure.
- the curvature of the outer walls of the caisson may be chosen such as to absorb impact of incoming waves and/or to divert incoming waves suitably.
- the supports may be partially hollow in some examples.
- a process of constructing a wall or a plurality of walls of a floating caisson may start with the arrangement of base supports on slab 110 to form the bottom section of the walls. Once the bottom portion of the wall(s) has been formed, the platform 20 may be lowered. Then, subsequent wall portions may be formed until the desired height for the walls is reached.
- the forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports.
- Wall 121 may be formed by a worker from the annular outer working deck 40B for one face of the wall and from an inner working deck 40A for the other face of the wall. The situation is similar for wall 124. For wall 122, spraying may be performed from two neighboring inner working decks 40A. The same applies to wall 123. It is noted that only a cross-section is shown in figure 1A .
- the floating caisson may have a plurality of walls that extend perpendicular to the walls 121, 122, 123 and 124.
- armatures may be positioned along the faces of the supports 130 prior to shooting concrete.
- the armatures may be steel meshes, or fiber reinforced composites (e.g. glass fibers, carbon fibers or Kevlar ® fibers).
- the supports 130 may have through-holes extending from the first face 132 to the second face 134.
- the through-holes may be made in situ (e.g. they may be driller or bored, or carved out or otherwise).
- connectors may be provided through such through holes.
- the connectors may be prefabricated or may be made in situ. As the wall portions, concrete may be used for the connectors. In a particular example, a reinforcement, such as a steel mesh or steel bars may be positioned in the through-hole substantially extending from the first face 132 to the second face 134. When concrete is shot on the faces 132, 134, the spaces of the connectors may be filled with concrete at the same time.
- a reinforcement such as a steel mesh or steel bars may be positioned in the through-hole substantially extending from the first face 132 to the second face 134.
- the steel meshes or steel bars of the connectors may be folded at both ends to be substantially parallel to the walls.
- the overhead structure including working decks may stay substantially at the same height throughout the entire construction process of a caisson.
- the floating caisson to the extent that it has been constructed, is lowered. Subsequent wall portions may thus be formed from the same height. The operators (and working decks) thus stay in substantially the same position.
- the caisson building floating docks need to be at least as high as the heights of the structure to be built, since formworks are used.
- the buoyancy of the platform may be reduced after the forming of each subsequent wall portion.
- the platform may be filled with water as needed to vary its buoyancy. Once wall portions of the caissons have dried up, the caisson may be filled with water to a desired level WL in . This water level does not need to be the same as the overall water level WL at sea, and in general will be different.
- FIGs 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example.
- the first step of spraying concrete is about to take place.
- a slab has been arranged on platform 20.
- the slab may be made of (steel) reinforced concrete. Steel bars may stick out upwards from the slab.
- the slab may contain stub(s) forming the beginning of the walls to be created.
- base supports 130 may be positioned. Reinforcement (steel) meshes may be arranged on either side of the supports 130.
- the base supports 130 may be entirely covered in such a step.
- the base supports 130 that are positioned may not be entirely covered.
- the base supports 130 may have a height of 1,5 or 2 meters, whereas in a single step 1 meter of concrete is sprayed and then left to dry. It should be clear that these dimensions are only examples, and that in practice they may be varied.
- the platform 20 with the caisson may be lowered.
- the caisson may be filled with water as need to lower the caisson structure to the level needed.
- a next portion of wall may be made by repeating the same process. Additional supports may be positioned, reinforcements may be arranged along the first and second faces, and concrete may be shot. In some or all of these steps, connectors between the faces may be provided as explained in other parts of the present disclosure.
- the caisson 100 In the situation of figure 2B , the total height of the walls has been constructed. As such, the floating caisson 100 is finished. It may be seen in figure 2B , how the top of the walls is substantially level with the working decks. In order to remove the caisson 100 from the apparatus, the caisson may be flooded with water to a desired level WL IN . The submersible platform 20 may also be flooded with water as needed to separate it from the floating caisson, see figure 2C . The caisson may then be pulled out and transported to the site of construction.
- a floating caisson may be constructed that comprises a bottom slab and a plurality of vertical walls.
- the vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core.
- the resulting floating caisson may be lighter than similar caissons in the prior art. The strength and stiffness however may still be the same as in the prior art. Less concrete is needed to reach the same level of bending strength.
- the core may be made from a lightweight material, optionally polystyrene foam.
- the first and second concrete layers may be made of reinforced concrete.
- the bottom slab may be made from concrete as well, optionally reinforced concrete.
- one or more of the vertical walls, particularly the outer walls of the caisson may include a convex or concave shape.
- the core may be formed by the base support and additional supports mentioned before.
- FIGs 3A - 3B schematically illustrate an example of a caisson that may be used in structures along the shore.
- Figure 3A shows a side view of a caisson 200 that may be used in a structure such as a pier, seawall or jetty. Jetties may be used e.g. to delimit harbors.
- Sea side is indicated with reference sign 260
- lee side is indicated with reference sign 250.
- the sea side wall 230 may be substantially concave and may function as breakwater.
- the lee side wall 235 may also be curved, but have a different curvature than the sea side wall.
- Reference sign 280 indicates a top surface of the caisson 200.
- the top surface 280 of caisson 200 may be used by pedestrians and other traffic once the caisson has been constructed and is operational.
- the upper portion 270 on the sea side wall 230 forming a barrier or wall may be formed integrally with the caisson and the sea side wall. In prior art solutions, such a wall would normally be added in situ after placement of the caisson.
- Figure 3B illustrates how a caisson 200 may have been transported to the construction site to be placed.
- the caisson 200 may be ballasted and positioned on bedding 210.
- FIGs 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson.
- the apparatus 70 comprises a floating pontoon 10.
- a superstructure of the apparatus 70 comprises vertical side supports 32 and transverse beams 34.
- the working decks 40C and 40D are coupled to vertical beams 36 suspended from the transverse beams 34.
- a shotcrete distribution system 50 for supplying shotcrete to workers 60 on the working decks.
- a submersible platform 20 may be connected to the floating pontoon to vary the vertical position of the submersible platform.
- a connection between the pontoon 10 and platform 20 may include a plurality of chains, wire ropes, cables or similar.
- Anchoring points 12 and 14 may be provided as commented before.
- the floating caisson 300 to be constructed in this example is slightly different from the example of figure 1 .
- a middle wall of floating caisson 300 is a substantially vertical straight wall, whereas the front and rear walls are curved.
- Figure 4A illustrates how the supports 130, 131 upon which the shotcrete is shot may be different for the different walls.
- vertical guides 92 extend between the sea bed SB and the submersible platform 20.
- the guides 92 facilitate the platform 20 to move vertically and not drift.
- one or more of the working decks may be movable, and in particular one or more the vertical supports 36 carrying working decks 40C may be displaced along transverse beams 34.
- the transverse beam may comprise rails or guides, along which the vertical supports 36 may be slid.
- the outer working deck 40D may be displaced in a similar manner.
- the floating pontoon 10 may have a closed perimeter as may be seen in the top view of figure 4B .
- the floating pontoon 10 may have a square ring-shaped form, or gates are provided to close the C-shape or U-shape of the pontoon.
- the platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used. Water lines 21 may be used to selectively fill the platform 20. One or more water lines 21 in some examples may lead from pontoon 21 to submersible platform 20.
- Figures 5A - 5D schematically illustrates a further example a construction method of a caisson.
- Figure 5A illustrates a first step (or one of the first steps) for constructing wall portions with base supports 130, 131.
- a slab of concrete has been provided, with relatively small stubs where the walls are to be formed.
- the outer walls of the floating caisson in this example are curved.
- the working decks 40C and 40D may be horizontally moveable to allow workers to shoot concrete on the supports, even as the walls are curved. Between the steps of figure 5B and 5C , the working decks are horizontally moved. The last construction step may be seen in figure 5C .
- a curved support 131 is placed to form the last portion of a sea side wall of the floating caisson.
- the submersible platform 20 may be filled with water to sink the platform 20.
- the floating caisson may then be towed away.
- Figure 6 schematically illustrates a method for transporting a floating caisson once constructed. It was noted before that the pontoon 10 of the apparatus 70 may form a closed cross-section. In order to tow a floating caisson 300 to a construction site where it may be filled to sink it, a towing vessel 160 using cables 165 or similar may tow the floating caisson 300 away. One side 13 of the floating pontoon may be closed off with gates 13A and 13B which may be opened after construction is finished.
- FIGS 7A and 7B illustrate examples of working decks 40C and 40D.
- the working decks 40C may include a female receiving portion to mate with a bottom portion of the vertical supports 36, such that the vertical support 36 can fit inside and the working deck may thereby be attached to the vertical support.
- the working surface 45 of the working deck may be substantially flat so that workers may move around comfortably and safely.
- Several ribs 43 may be seen that reinforce the working decks 40C, 40D.
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Revetment (AREA)
Abstract
A method of forming a wall of a floating caisson is provided, which comprises: providing a slab (110) on a submersible platform (20); providing one or more base supports (130) on top of the slab (110), the base supports (130) having a first outer surface and a second outer face; forming a first wall portion (121-124) by spraying concrete on the first and the second outer faces; lowering the platform (20); and forming one or more subsequent wall portions (121-124) on the first wall portion (121-124). Also disclosed are apparatuses (70) for constructing a floating caisson and floating caissons.
Description
- The present disclosure relates to floating caissons, and to methods and apparatuses of constructing floating caissons. The present disclosure further relates to structures including caissons.
- Infrastructure in ports and harbours make marine traffic possible, and may facilitate facilitating loading and unloading of vessels. Furthermore they have to offer protection from tides and waves action.
- In structures in port and harbour areas, caissons may be used. The use of floating caissons is relatively popular because it allows rapid construction in marine environments. Caissons may be used in the construction of e.g. breakwaters, ports, wharves, dry docks, fishing ports, berths, marinas and other.
- Floating caissons are box-like elements, made of (reinforced) concrete, and which typically have a square or rectangular cross-section and have a number of empty cylindrical cells. Inner walls extending between opposite side walls form a grid and a number of empty cylindrical cells (with a square or rectangular cross-section) is formed in the grid.
- Caissons provide stability and rigidity, and may for this reason be used in different port infrastructures as mentioned before. After construction, the caissons may towed with suitable towboats or other towing systems to their destination. Once in place, the caisson may be ballasted, i.e. the cells may be filled with concrete or granular material. This operation may be performed by auxiliary floating platforms that carry both the material and a special crane to transfer the material. Tractors, dozers, loaders and trucks may help finish the filling operation on top of the caisson.
- A known technique for forming floating caissons is as follows: a slab of concrete may be formed and the parts of the inner walls are formed by pouring concrete in formworks. Once the concrete has formed, the formworks are lifted to form additional portions of walls on top of the already formed walls. Steel meshes may be used to reinforce the walls.
- The walls may be formed in increments of e.g. 1 meter. Due to this technique, the shapes that can be used for the caissons are limited: in principle, only straight walls can be used. Also, this technique requires for the caisson building floating dock to be at least as high as the height of the structure to be built. This makes the caisson building docks very expensive, which means that only a very limited number of them may be use in a country. Infrastructural works may suffer important delays, because caisson building docks are unavailable.
- The present disclosure in various examples provides methods, systems, and devices for manufacturing floating caissons and floating caissons that at least partially resolve some of the aforementioned disadvantages.
- In a first aspect, a method of forming a wall of a floating caisson is provided. The method comprises providing a slab on a submersible platform, providing one or more base supports on top of the slab, the base supports having a first outer face and a second outer face. The method further comprises forming a first wall portion by spraying concrete on the first and the second outer faces. The method then furthermore comprises lowering the platform and forming one or more subsequent wall portions on the first wall portion.
- In accordance with this aspect, a method of forming walls, portions of walls, and caissons are provided which allow more versatility in the shape of the caisson. Since no formwork is used, and concrete is sprayed on a support, the resulting wall may have any shape that can be given to the support. Also methods in accordance herewith require less complicated apparatus. Since the wall portion that has been formed is lowered, the surrounding apparatus does not need to be raised to construct subsequent wall portions.
- The terms "spraying" or "shooting" concrete are used interchangeably throughout the present disclosure.
- In some examples, the forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports. The terms subsequent supports and additional supports are used interchangeably throughout the present disclosure.
- In some examples, lowering the platform may comprise reducing the buoyancy of the platform after the forming of each subsequent wall portion. The platform with already formed structure on top may be lowered by varying the buoyancy of the caisson and/or the platform. The caisson, to the extent that it has been constructed, may be filled with water as desired. The top of the formed structure may thus be lowered to be substantially level with the working decks, so that subsequent wall portions may be easily formed.
- In some examples, reducing the buoyancy of the platform may include filling the platform with water. Particularly when the caisson has been constructed, the platform may be lowered and separated from the caisson to liberate the caisson from the apparatus used in making it. The caisson may then be towed and transported to its destination.
- In some examples, the base supports and/or subsequent supports are made from a material that is relatively lightweight compared to concrete. Specifically, the base supports and/or subsequent supports may be made from polystyrene foam. Polystyrene foam is lightweight, is cheap and can be formed (by cutting, stacking etc.) in almost any desired shape.
- In some examples, through-holes may be made or provided in the (base) support or additional supports. Connectors for connecting the wall portions on the first and second faces of the supports may be provided. The connectors may be prefabricated, or may be made in situ. In order to make connectors in situ, armatures may be placed in the through-holes and concrete may be shot or sprayed in the through holes.
- In some examples, the end portions of the armatures may be folded to be substantially parallel the wall portions on the first and second faces.
- In a further aspect, an apparatus for constructing a floating caisson is provided. The apparatus comprises a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon. The overhead structure comprises one or more working decks and a shotcrete distribution system for supply shotcrete to workers on the working decks.
- In accordance with this aspect, an apparatus is provided which may be more cost effective than prior art solutions. Particularly, the apparatus may be lower than known floating caisson building docks.
- The overhead structure may comprise a plurality of vertical supports supporting transverse beams. The working decks may be suspended from the transverse beams. Also the shotcrete distribution system may be guided along the transverse beams.
- In some examples, one or more of the working decks may be movable with respect to a fixed part of the overhead structure, and particularly one or more of the working decks may be movable horizontally along transverse beams. The transverse beams may include guides or rails along which vertical supports connected to the working platforms may be displaced. Working decks that can be displaced can be helpful to allow for curved walls of caissons.
- In yet a further aspect, a floating caisson comprising a bottom slab and a plurality of vertical walls is provided. The vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core.
- A caisson in accordance with this aspect may be relatively lightweight, i.e. for the same strength and stiffness, the caisson may be lighter than in the prior art. The core in particular may be lightweight. The core may be formed by the supports, as defined in the other aspects, upon which concrete is sprayed to form the walls. Concrete is provided on its outer faces. Particularly bending strength and stiffness of the resulting structure may be improved by providing the material further away from the neutral axis and avoiding a massive solid structure. The geometrical distribution of the mass of the structures has a higher second moment of area and thereby greater stiffness and strength for a given mass can be achieved. An aspect of the double-wall reinforced concrete surfaces is to remove the concrete which has the smallest or no load bearing effect, i.e. the effect is to remove the material that is not carrying much load and concentrating it where the load is highest".
- In some examples, one or more of the vertical walls, and specifically external vertical walls of the floating caisson, may include a convex or concave shape. In some examples, one or more of the vertical walls may be doubly curved.
- Non-limiting examples of the present disclosure will be described in the following, with reference to the appended drawings, in which:
-
Figures 1A - 1D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example; -
Figures 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example; -
Figures 3A - 3B schematically illustrate an example of a caisson that may be used in structures along the shore; -
Figures 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson; -
Figures 5A - 5D schematically illustrates a further example a construction method of a caisson; -
Figure 6 schematically illustrates a method for transporting a floating caisson once constructed; and -
Figures 7A and7B illustrate examples of working decks. -
Figures 1A - 1D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example.Figure 1A provides a cross-sectional view, whereasfigures 1B - 1D provide top views of the same apparatus offigure 1A , each of the figures highlighting a different subsystem. -
Figure 1A shows anapparatus 70 for constructing a floatingcaisson 100. The apparatus may be floating in a body of water, e.g. in a part of a sea close to a shore, port or harbor where a structure is to be built. - The
apparatus 70 comprises a floatingpontoon 10, and asubmersible platform 20, which is connected to the floatingpontoon 10. The connection is such that a vertical position (inside the water) of theplatform 20 can be varied with respect to the floatingpontoon 10. In this particular example, the connection between the floatingpontoon 10 and theplatform 20 may include one or more cables or chains or mooring lines, which may be connected at anchoringpoints - The
apparatus 70 further comprises anoverhead structure 30 supported by the floatingpontoon 10, wherein theoverhead structure 30 comprises one ormore working decks shotcrete distribution system 50 for supplying shotcrete to workers on the working decks. - Shotcrete, (sometimes called "gunite" or "sprayed concrete") is concrete or mortar conveyed through a hose and pneumatically projected at high velocity onto a surface, as a construction technique. The wall formed in this manner may be reinforced by conventional steel rods, steel mesh, or fibers. Shotcrete as used throughout the present disclosure may refer to both wet-mix and dry-mix versions.
- In some examples, the submersible platform may have variable buoyancy to vary a position of the
submersible platform 20 with respect to the pontoon and / or with respect the floatingcaisson 100. Theplatform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used. - In the top views of
figures 1B - 1D , it may be seen that the floatingpontoon 10 may have an open cross-section, and may be substantially U-shaped or C-shaped. With reference tofigure 1C , it may be seen that several rows of inner workingdecks 40A may be arranged between the legs of the U-shape. In this particular example, four rows of inner working decks may be arranged. Each of the rows includes three inner workingdecks 40A. Additionally, an annularouter working deck 40B may be provided. The annular working deck may substantially surround all theinner working decks 40A. - With reference to
figures 1A and1B , it may be seen that theoverhead structure 30 may include a plurality of vertical side supports 32 and a plurality oftransverse beams 34. Each of thetransverse beams 34 may extend between vertical side supports 32. The vertical side supports 32 may be directly positioned on top of floatingpontoon 10 and carry the transverse beams 34. - As illustrated in
figure 1A , the overhead structure may be formed or may comprise truss structures. The vertical supports 36 may extend between workingdecks transverse beam 34. The vertical supports 36 may be suspended from the transverse beams 34. - In some examples, each of the
inner working decks 40A may comprise an intermediatevertical support 36. In some examples, onetransverse beam 34 may be arranged with each row of workingdecks 40 A. - With reference to
figure 1D , it may be seen how ashotcrete distribution system 50 may include acentral supply 54. From thecentral supply 54, severaltransverse distribution lines 56 may extend sideways. Each of thetransverse distribution lines 56 may include one or more delivery hoses 58 (illustrated infigure 1A ). The distribution lines may be supported bytransverse beams 34. If thetransverse beams 34 are formed as truss structures, the distribution lines may advantageously be arranged inside the truss structures. - The
hoses 58 may be held by workers on the workingdecks - Shotcrete machines are available which can control the concrete spraying process and make it very fast and easy. Manual and mechanical methods may be used for the wet spraying process but wet sprayed concrete is traditionally applied by machine.
- An apparatus according to the present disclosure may be relatively easily transported. I.e. it may be dismounted and transported by road (truck) or by sea to a construction site. The vertical supports 36, side supports 32 and transverse beams may be relatively easily disassembled from each other.
- It may also be appreciated that the build-up of the apparatus illustrated herein is modular and may be easily scaled up as needed.
- Using an apparatus such as the one shown in
figure 1 , a method of forming a wall 120 of a floatingcaisson 100 may comprise providing aslab 110 on asubmersible platform 20. One ormore supports 130 may be provided on top on top of theslab 20, thesupports 130 having a firstouter surface 132 and a secondouter face 134. A wall portion may be formed by spraying or shooting concrete on the first and second outer faces 132, 134 of thesupports 130. - Then, the
platform 20 may be lowered. Subsequent wall portions may then be formed on top as needed. - The walls may thus be formed by spraying or shooting concrete on the supports. The
supports 130 may be chosen to be lightweight. This shall be understood in the present disclosure as a support with a density that is lower than the density of the concrete sprayed on its face. - The
supports 130 in examples may extend substantially perpendicular to theslab 110. - One example of a support is polystyrene foam. Polystyrene foam is lightweight, and may be cut, sized and shaped and arranged in a wide variety of ways. Thus any suitable support shape may be provided upon which concrete can be sprayed. The thickness of the concrete on either face of the support may be varied as needed. As a result, a wide variety of shapes and forms may be provided for the walls of the caisson. E.g. a wall of the caisson may be curved, e.g. be concave or convex. A wall of the caisson may have a double curvature, i.e. may be curved both in a vertical and a horizontal direction. Even though any of the walls of the caisson may be curved in this manner. The curvature of the outer walls of the caisson may be particularly suitable, e.g. when they have to function as breakwater structure. The curvature of the outer walls of the caisson may be chosen such as to absorb impact of incoming waves and/or to divert incoming waves suitably.
- Other materials may also be used for the support, e.g. wood or polymer structures. The supports may be partially hollow in some examples.
- A process of constructing a wall or a plurality of walls of a floating caisson may start with the arrangement of base supports on
slab 110 to form the bottom section of the walls. Once the bottom portion of the wall(s) has been formed, theplatform 20 may be lowered. Then, subsequent wall portions may be formed until the desired height for the walls is reached. The forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports. -
Wall 121 may be formed by a worker from the annularouter working deck 40B for one face of the wall and from aninner working deck 40A for the other face of the wall. The situation is similar forwall 124. Forwall 122, spraying may be performed from two neighboring inner workingdecks 40A. The same applies to wall 123. It is noted that only a cross-section is shown infigure 1A . The floating caisson may have a plurality of walls that extend perpendicular to thewalls - In some examples, armatures may be positioned along the faces of the
supports 130 prior to shooting concrete. The armatures may be steel meshes, or fiber reinforced composites (e.g. glass fibers, carbon fibers or Kevlar® fibers). - In some examples, the
supports 130 may have through-holes extending from thefirst face 132 to thesecond face 134. In other examples, the through-holes may be made in situ (e.g. they may be driller or bored, or carved out or otherwise). In order to reinforce the resulting wall structure, connectors may be provided through such through holes. - The connectors may be prefabricated or may be made in situ. As the wall portions, concrete may be used for the connectors. In a particular example, a reinforcement, such as a steel mesh or steel bars may be positioned in the through-hole substantially extending from the
first face 132 to thesecond face 134. When concrete is shot on thefaces - In some examples, the steel meshes or steel bars of the connectors may be folded at both ends to be substantially parallel to the walls.
- An aspect of examples of the methods disclosed herein is that the overhead structure including working decks may stay substantially at the same height throughout the entire construction process of a caisson. The floating caisson, to the extent that it has been constructed, is lowered. Subsequent wall portions may thus be formed from the same height. The operators (and working decks) thus stay in substantially the same position. In prior art solutions, the caisson building floating docks, need to be at least as high as the heights of the structure to be built, since formworks are used.
- In some examples, the buoyancy of the platform may be reduced after the forming of each subsequent wall portion. In some examples, the platform may be filled with water as needed to vary its buoyancy. Once wall portions of the caissons have dried up, the caisson may be filled with water to a desired level WLin. This water level does not need to be the same as the overall water level WL at sea, and in general will be different.
-
Figures 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example. Infigure 2A , the first step of spraying concrete is about to take place. It may be seen infigure 2A that a slab has been arranged onplatform 20. Such a slab may be made as known in the art. The slab may be made of (steel) reinforced concrete. Steel bars may stick out upwards from the slab. Also the slab may contain stub(s) forming the beginning of the walls to be created. Then base supports 130 may be positioned. Reinforcement (steel) meshes may be arranged on either side of thesupports 130. - Then, concrete may be sprayed on the base supports 130. In some examples, the base supports 130 may be entirely covered in such a step. In other examples, the base supports 130 that are positioned may not be entirely covered. E.g. the base supports 130 may have a height of 1,5 or 2 meters, whereas in a single step 1 meter of concrete is sprayed and then left to dry. It should be clear that these dimensions are only examples, and that in practice they may be varied.
- After the concrete has dried, the
platform 20 with the caisson may be lowered. As mentioned before, the caisson may be filled with water as need to lower the caisson structure to the level needed. Then, a next portion of wall may be made by repeating the same process. Additional supports may be positioned, reinforcements may be arranged along the first and second faces, and concrete may be shot. In some or all of these steps, connectors between the faces may be provided as explained in other parts of the present disclosure. - In the situation of
figure 2B , the total height of the walls has been constructed. As such, the floatingcaisson 100 is finished. It may be seen infigure 2B , how the top of the walls is substantially level with the working decks. In order to remove thecaisson 100 from the apparatus, the caisson may be flooded with water to a desired level WLIN. Thesubmersible platform 20 may also be flooded with water as needed to separate it from the floating caisson, seefigure 2C . The caisson may then be pulled out and transported to the site of construction. - In accordance with examples disclosed herein, a floating caisson may be constructed that comprises a bottom slab and a plurality of vertical walls. The vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core. The resulting floating caisson may be lighter than similar caissons in the prior art. The strength and stiffness however may still be the same as in the prior art. Less concrete is needed to reach the same level of bending strength.
- The core may be made from a lightweight material, optionally polystyrene foam. The first and second concrete layers may be made of reinforced concrete. The bottom slab may be made from concrete as well, optionally reinforced concrete. In some examples, one or more of the vertical walls, particularly the outer walls of the caisson may include a convex or concave shape. The core may be formed by the base support and additional supports mentioned before.
-
Figures 3A - 3B schematically illustrate an example of a caisson that may be used in structures along the shore.Figure 3A shows a side view of acaisson 200 that may be used in a structure such as a pier, seawall or jetty. Jetties may be used e.g. to delimit harbors. Sea side is indicated withreference sign 260, and lee side is indicated withreference sign 250. Thesea side wall 230 may be substantially concave and may function as breakwater. Thelee side wall 235 may also be curved, but have a different curvature than the sea side wall.Reference sign 280 indicates a top surface of thecaisson 200. Thetop surface 280 ofcaisson 200 may be used by pedestrians and other traffic once the caisson has been constructed and is operational. - With examples of the methods disclosed herein, the
upper portion 270 on thesea side wall 230 forming a barrier or wall may be formed integrally with the caisson and the sea side wall. In prior art solutions, such a wall would normally be added in situ after placement of the caisson. -
Figure 3B illustrates how acaisson 200 may have been transported to the construction site to be placed. Thecaisson 200 may be ballasted and positioned onbedding 210. -
Figures 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson. In the example offigure 4A , theapparatus 70 comprises a floatingpontoon 10. Like the previous example, a superstructure of theapparatus 70 comprises vertical side supports 32 andtransverse beams 34. The workingdecks vertical beams 36 suspended from the transverse beams 34. Similarly to the previous example, ashotcrete distribution system 50 for supplying shotcrete toworkers 60 on the working decks. - Further, as in the previous example, a
submersible platform 20 may be connected to the floating pontoon to vary the vertical position of the submersible platform. A connection between thepontoon 10 andplatform 20 may include a plurality of chains, wire ropes, cables or similar. Anchoring points 12 and 14 may be provided as commented before. - The floating
caisson 300 to be constructed in this example is slightly different from the example offigure 1 . A middle wall of floatingcaisson 300 is a substantially vertical straight wall, whereas the front and rear walls are curved.Figure 4A illustrates how thesupports - One difference between the example of
figure 4 and the example offigure 1 , is thatvertical guides 92 extend between the sea bed SB and thesubmersible platform 20. Theguides 92 facilitate theplatform 20 to move vertically and not drift. - A further difference between the example of
figure 4 and the example offigure 1 is that one or more of the working decks may be movable, and in particular one or more thevertical supports 36 carrying workingdecks 40C may be displaced alongtransverse beams 34. The transverse beam may comprise rails or guides, along which thevertical supports 36 may be slid. Also the outer workingdeck 40D may be displaced in a similar manner. - The floating
pontoon 10 may have a closed perimeter as may be seen in the top view offigure 4B . In a horizontal cross-section, the floatingpontoon 10 may have a square ring-shaped form, or gates are provided to close the C-shape or U-shape of the pontoon. - The
platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used.Water lines 21 may be used to selectively fill theplatform 20. One ormore water lines 21 in some examples may lead frompontoon 21 tosubmersible platform 20. -
Figures 5A - 5D schematically illustrates a further example a construction method of a caisson.Figure 5A illustrates a first step (or one of the first steps) for constructing wall portions with base supports 130, 131. At the stage offigure 5 , a slab of concrete has been provided, with relatively small stubs where the walls are to be formed. - The outer walls of the floating caisson in this example are curved. The working
decks figure 5B and5C , the working decks are horizontally moved. The last construction step may be seen infigure 5C . Acurved support 131 is placed to form the last portion of a sea side wall of the floating caisson. - When the floating caisson has been finished,
figure 5D , thesubmersible platform 20 may be filled with water to sink theplatform 20. The floating caisson may then be towed away. -
Figure 6 schematically illustrates a method for transporting a floating caisson once constructed. It was noted before that thepontoon 10 of theapparatus 70 may form a closed cross-section. In order to tow a floatingcaisson 300 to a construction site where it may be filled to sink it, a towingvessel 160 usingcables 165 or similar may tow the floatingcaisson 300 away. Oneside 13 of the floating pontoon may be closed off withgates -
Figures 7A and7B illustrate examples of workingdecks decks 40C may include a female receiving portion to mate with a bottom portion of thevertical supports 36, such that thevertical support 36 can fit inside and the working deck may thereby be attached to the vertical support. The workingsurface 45 of the working deck may be substantially flat so that workers may move around comfortably and safely.Several ribs 43 may be seen that reinforce the workingdecks - Although only a number of examples have been disclosed herein, other alternatives, modifications, uses and/or equivalents thereof are possible. Furthermore, all possible combinations of the described examples are also covered. Thus, the scope of the present disclosure should not be limited by particular examples, but should be determined only by a fair reading of the claims that follow.
Claims (15)
- A method of forming a wall of a floating caisson comprising:providing a slab on a submersible platform;providing one or more base supports on top of the slab, the base supports having a first outer face and a second outer face;forming a first wall portion by spraying concrete on the first and the second outer faces;lowering the platform; andforming one or more subsequent wall portions on the first wall portion.
- The method of claim 1, wherein the forming one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports.
- The method of claim 1 or 2, further comprising lowering the platform by reducing the buoyancy of the platform after the forming of each subsequent wall portion.
- The method of any of claims 1- 3, wherein reducing the buoyancy of the platform includes filling the platform with water.
- The method of any of claims 1 - 4, wherein the base supports and/or subsequent supports are made from a material that is relatively lightweight compared to concrete.
- The method of any of claims 1 - 5, wherein the base supports and/or subsequent supports are made from polystyrene foam.
- An apparatus for constructing a floating caisson, the apparatus comprising:a floating pontoon,a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, andan overhead structure supported by the floating pontoon, whereinthe overhead structure comprises one or more working decks and a shotcrete distribution system for supplying shotcrete to workers on the working decks.
- The apparatus according to claim 7, wherein one or more of the working decks are movable substantially horizontally.
- The apparatus according to claim 7 or 8, wherein the submersible platform is connected to the floating pontoon with one or more cables, optionally guided by pulleys.
- A floating caisson comprising a bottom slab and a plurality of vertical walls, wherein
the vertical walls comprise a core of a first material, and
a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core. - The floating caisson according to claim 10, wherein the core is made from a lightweight material, optionally polystyrene foam.
- The floating caisson according to claim 9 or 10, wherein the first and second concrete layer are made of reinforced concrete.
- The floating caisson according to any of claims 10 - 12, wherein the bottom slab is made from concrete, optionally reinforced concrete.
- The floating caisson according to any of claims 10 - 13, wherein one or more of the vertical walls includes a convex or concave shape.
- A breakwater structure including one or more floating caissons according to any of claims 10 - 14.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP20382605.2A EP3936295A1 (en) | 2020-07-07 | 2020-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
EP21742365.6A EP4178775A1 (en) | 2020-07-07 | 2021-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
PCT/EP2021/068742 WO2022008555A1 (en) | 2020-07-07 | 2021-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP20382605.2A EP3936295A1 (en) | 2020-07-07 | 2020-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
Publications (1)
Publication Number | Publication Date |
---|---|
EP3936295A1 true EP3936295A1 (en) | 2022-01-12 |
Family
ID=71607882
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20382605.2A Withdrawn EP3936295A1 (en) | 2020-07-07 | 2020-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
EP21742365.6A Pending EP4178775A1 (en) | 2020-07-07 | 2021-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21742365.6A Pending EP4178775A1 (en) | 2020-07-07 | 2021-07-07 | Floating caissons, methods and apparatus for constructing floating caissons |
Country Status (2)
Country | Link |
---|---|
EP (2) | EP3936295A1 (en) |
WO (1) | WO2022008555A1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4054034A (en) * | 1976-07-01 | 1977-10-18 | Robert Warren Hyre | Method for casting concrete tanks in water |
US4263862A (en) * | 1978-12-11 | 1981-04-28 | Shepherd Ned A | Lightweight marine structural concrete system |
KR20090055226A (en) * | 2007-11-28 | 2009-06-02 | 삼성중공업 주식회사 | Falling down method of floating concrete block manufactured on the sea |
CN102505702A (en) * | 2011-10-13 | 2012-06-20 | 中国化学工程第十三建设有限公司 | Double-wall concrete open caisson and construction method thereof |
WO2018222553A1 (en) * | 2017-05-27 | 2018-12-06 | Place Daniel William | Additively manufactured object fabrication vessel |
-
2020
- 2020-07-07 EP EP20382605.2A patent/EP3936295A1/en not_active Withdrawn
-
2021
- 2021-07-07 WO PCT/EP2021/068742 patent/WO2022008555A1/en unknown
- 2021-07-07 EP EP21742365.6A patent/EP4178775A1/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4054034A (en) * | 1976-07-01 | 1977-10-18 | Robert Warren Hyre | Method for casting concrete tanks in water |
US4263862A (en) * | 1978-12-11 | 1981-04-28 | Shepherd Ned A | Lightweight marine structural concrete system |
KR20090055226A (en) * | 2007-11-28 | 2009-06-02 | 삼성중공업 주식회사 | Falling down method of floating concrete block manufactured on the sea |
CN102505702A (en) * | 2011-10-13 | 2012-06-20 | 中国化学工程第十三建设有限公司 | Double-wall concrete open caisson and construction method thereof |
WO2018222553A1 (en) * | 2017-05-27 | 2018-12-06 | Place Daniel William | Additively manufactured object fabrication vessel |
Also Published As
Publication number | Publication date |
---|---|
EP4178775A1 (en) | 2023-05-17 |
WO2022008555A1 (en) | 2022-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6491473B2 (en) | Precast modular concrete shapes and methods of installation to form shoreline stabilization, marine and terrestrial structures | |
EP3924159B1 (en) | Method of manufacturing a suction anchor | |
CN109736260B (en) | U-shaped wharf and construction and installation method | |
WO2023020356A1 (en) | Caisson quay and construction method therefor | |
CN103669284A (en) | Box-barrel-type foundation breakwater structure assembled over water and assembling method thereof | |
US3393520A (en) | Container and method of building a breakwater | |
CN113653000A (en) | Caisson and caisson combination | |
EP3936295A1 (en) | Floating caissons, methods and apparatus for constructing floating caissons | |
KR102601005B1 (en) | Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block | |
CN215367481U (en) | Backfill system for pile foundation erosion pit of ocean platform | |
JPH11140893A (en) | Manufacture and launching method for sinking box | |
US11787514B2 (en) | Marine construction and a method for constructing the same | |
CN102348853A (en) | A deep-water port | |
KR20200123977A (en) | Lathe type quay structure reinforced sheet pile and method for reinforcement quay structure using sheet pile | |
CN115897479B (en) | Novel assembled wharf revetment structure based on barrel type foundation and construction method | |
RU2119004C1 (en) | Berthing structure | |
KR102383736B1 (en) | Crane rail foundation integrated caisson and construction method | |
CN217352332U (en) | Novel combined island and dike building equipment | |
CN112779967B (en) | Construction method for sea-land connecting section of sewage sea area discharge pipe | |
JPH10167176A (en) | Repair spud pontoon for pile or column-like structure and method for using the same | |
KR101326773B1 (en) | Harbor Structures Easily respond to Differential Settlement | |
JP3140401B2 (en) | Floating member, underwater / overwater construction method and underwater / overwater construction method for formwork support | |
SU1721169A1 (en) | Built-up hydraulic structure | |
JP2824037B2 (en) | How to build a caisson | |
CN117227921A (en) | Offshore bridge type airport |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
B565 | Issuance of search results under rule 164(2) epc |
Effective date: 20210118 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20220713 |