CN217352332U - Novel combined island and dike building equipment - Google Patents

Novel combined island and dike building equipment Download PDF

Info

Publication number
CN217352332U
CN217352332U CN202221226702.8U CN202221226702U CN217352332U CN 217352332 U CN217352332 U CN 217352332U CN 202221226702 U CN202221226702 U CN 202221226702U CN 217352332 U CN217352332 U CN 217352332U
Authority
CN
China
Prior art keywords
ship body
island
platform
curtain
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221226702.8U
Other languages
Chinese (zh)
Inventor
殷延伟
李佳彤
殷炜淇
张宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Shangdi Jinxi International Art Exhibition And Auction Co ltd
Original Assignee
Hainan Shangdi Jinxi International Art Exhibition And Auction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Shangdi Jinxi International Art Exhibition And Auction Co ltd filed Critical Hainan Shangdi Jinxi International Art Exhibition And Auction Co ltd
Priority to CN202221226702.8U priority Critical patent/CN217352332U/en
Application granted granted Critical
Publication of CN217352332U publication Critical patent/CN217352332U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a novel combined island and diking device, which comprises an island building operation platform, a first floating platform and a second floating platform; the island building operation platform comprises a first ship body, a clamping plate mold mechanism, a reinforced concrete mixing station and a steel bar platform; fix equipment monolithic through the spud pile subassembly, it is aquatic to roll up curtain billet mould and hydraulic pressure twin columns to put into simultaneously, put into the curtain steel mould to consolidate the reinforcement net, pour into the mould after high grade cement and sand stone material mix into, meet the water and solidify into the cement wall, automatically, withdraw curtain billet mould and hydraulic pressure twin columns, through the operation of above flow, after coupling many sections cement wall, just become the peripheral cement wall in artificial island, carry the building stones silt towards the cement wall the inside again, the island base just can be according to the height that requires, it can on the surface of water to exceed, this device monomer multi-body construction, automatic combination security is high, adapt to different construction environment, equipment accessible MUC intelligent control, realize automatic embanking.

Description

Novel combined island-building diking equipment
Technical Field
The utility model relates to an artifical island technical field that builds specifically indicates a novel island equipment of embanking is built to combination formula.
Background
The artificial island is an artificially constructed but not naturally formed island, is generally constructed on the basis of a small island and a submerged reef, and is one of sea reclamation land. The artificial islands are of different sizes and are built by enlarging the existing islands, buildings or reefs or combining a plurality of natural islands. Sometimes islands of independent sea-fill are used to support the single columns of buildings or structures and thus support the whole. A large amount of soil and stone materials are required to be transported for long distance by a plurality of ships for throwing and filling, a plurality of piling ships are required to be hired for piling operation, dredger ships are required to carry out dredger fill construction and the like, and a large amount of engineering is involved. This will certainly cause a series of problems such as the demand construction equipment is many, construction cycle is long (about more than 1 year), the operational environment is abominable, operation allotment is complicated, current equipment of damming the island adapts to the construction environment poor ability. Therefore, the novel combined island and diking device becomes a problem to be solved urgently.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is a novel combination formula is built island and is built dyke equipment.
In order to solve the technical problem, the utility model provides a technical scheme is a novel combination formula is built island and is built dyke equipment: the device comprises an island construction operation platform, a first floating platform and a second floating platform;
the island building operation platform comprises a first ship body, a clamping plate mould mechanism, a reinforced concrete mixing station and a steel bar platform; the rear part of the first ship body is provided with a strip-shaped groove matched with the clamping plate die mechanism; the clamp plate die mechanism comprises a rolling curtain steel bar die and hydraulic double columns, the rolling curtain steel bar die is arranged in the bar-shaped groove, and the hydraulic double columns are matched with the rolling curtain steel bar die and are arranged on the periphery of the rolling curtain type die in an array manner; the reinforced concrete mixing station is arranged on the front side of the strip-shaped groove, and the steel bar platform is arranged on the front side of the reinforced concrete mixing station;
the first floating platform comprises a second ship body, a material taking mechanism and a first fixed pile assembly; the second ship body is arranged on one side of the first ship body and is clamped and fixed through connection, the material taking mechanism comprises a hoisting crane and a large-clamp grab bucket, the hoisting crane array is arranged on the periphery of a deck of the second ship body, and the large-clamp grab bucket is arranged at the tail end of a steel cable of the hoisting crane; the automatic fixing piles in the first fixing pile assembly are distributed on the outer side wall of the second ship body in an array manner;
the second floating platform comprises a third ship body and a second fixed pile assembly; the third ship body is arranged on the other side of the first ship body and is fixed through a connecting lock; and automatic fixing piles in the second fixing pile assembly are distributed on the outer side wall of the third ship body in an array mode.
As an improvement, both sides of the strip-shaped groove are provided with power cabins.
As an improvement, the rear ends of the first ship body, the second ship body and the third ship body are respectively provided with a water jet propeller.
As an improvement, the hydraulic double columns comprise fixed columns and movable columns, the telescopic direction of a hydraulic rod of each fixed column is consistent with the extending direction of the roller shutter steel bar die, and the telescopic direction of a hydraulic rod of each movable column is perpendicular to the extending direction of the roller shutter steel bar die.
Compared with the prior art, the utility model the advantage lie in: fix equipment monolithic through the spud pile subassembly, roll up curtain billet mould and hydraulic pressure twin columns and put into the aquatic simultaneously, put into the curtain steel mould to consolidate the reinforcing grid, pour into the mould after high-grade cement and sand stone material mix, meet the water and solidify into the cement wall, automatically withdraw curtain billet mould and hydraulic pressure twin columns, through the operation of above flow, couple the back to many sections cement walls, just become the peripheral cement wall on artificial island, carry the building stones silt toward the cement wall the inside again, the island base just can be according to the height that requires, it can on the surface of water to exceed, this device monomer multiform construction, automatic combination security is high, adapt to different construction environment, equipment accessible MUC intelligent control, realize automatic embankment of damming.
Drawings
Fig. 1 is a schematic structural diagram of the novel combined island-building diking equipment of the utility model I.
Fig. 2 is a schematic structural diagram of the novel combined island-building and diking equipment of the utility model II.
Fig. 3 is the structural schematic diagram of the clamping plate mold mechanism of the novel combined type island-building diking equipment.
As shown in the figure: 1. island building operation platform, 2, first floating platform, 3, second floating platform, 4, first hull, 5, splint mould mechanism, 6, steel-concrete mixing plant, 7, reinforcing bar platform, 8, bar groove, 9, roll up curtain billet mould, 10, hydraulic pressure twin columns, 11, second hull, 12, extracting mechanism, 13, first spud pile subassembly, 14, crane, 15, big clamp grab bucket, 16, third hull, 17, second spud pile subassembly, 18, power compartment, 19, water jet propulsor, 20, stationary mast, 21, activity stand.
Detailed Description
The following will make a further detailed description of the novel combined type island-building and diking equipment of the present invention with reference to the accompanying drawings.
With the attached figures 1-3, a novel combined island-building and diking device: the device comprises an island building operation platform, a first floating platform and a second floating platform;
the island building operation platform comprises a first ship body, a clamping plate mold mechanism, a reinforced concrete mixing station and a steel bar platform; the rear part of the first ship body is provided with a strip-shaped groove matched with the clamping plate die mechanism; the clamp plate die mechanism comprises a rolling curtain steel bar die and hydraulic double columns, the rolling curtain steel bar die is arranged in the bar-shaped groove, and the hydraulic double columns are matched with the rolling curtain steel bar die and are arranged on the periphery of the rolling curtain type die in an array manner; the reinforced concrete mixing station is arranged on the front side of the strip-shaped groove, and the steel bar platform is arranged on the front side of the reinforced concrete mixing station;
the first floating platform comprises a second ship body, a material taking mechanism and a first fixed pile assembly; the second ship body is arranged on one side of the first ship body and is fixed through a connecting clamp lock, the material taking mechanism comprises a crane and a large-clamp grab bucket, the crane array is arranged around a deck of the second ship body, and the large-clamp grab bucket is arranged at the tail end of a steel cable of the crane; the automatic fixing piles in the first fixing pile assembly are distributed on the outer side wall of the second ship body in an array manner;
the second floating platform comprises a third ship body and a second fixed pile assembly; the third ship body is arranged on the other side of the first ship body and is fixed through a connecting lock; and automatic fixing piles in the second fixing pile assembly are distributed on the outer side wall of the third ship body in an array mode.
As an improvement, both sides of the strip-shaped groove are provided with power cabins.
As an improvement, the rear ends of the first ship body, the second ship body and the third ship body are respectively provided with a water jet propeller.
As the improvement, the hydraulic pressure twin columns include fixed stand and activity stand, the flexible direction of fixed stand hydraulic stem is unanimous with a roll curtain billet mould extending direction, the flexible direction of activity stand hydraulic stem is perpendicular with a roll curtain billet mould extending direction.
The utility model relates to a novel combination formula is built island and is built dyke equipment's concrete implementation process as follows:
1) the automatic pile fixing steel columns of the first fixing pile assembly and the second fixing pile assembly fix the device integrally;
2) after the device is integrally fixed, the rolling curtain steel bar die and the hydraulic double columns of the fixed die are simultaneously put into water;
3) during construction, the reinforced grid is put into a rolling shutter steel mould; (Note that the reinforcing grid formed by the steel bars is woven and formed according to the construction requirements)
4) And mixing the high-grade cement and the sand and stone materials, injecting the mixture into a mold, and solidifying the mixture into a cement wall when meeting water, wherein the construction is finished at the section.
5) And automatically withdrawing the roller shutter steel bar die and the hydraulic double columns, and finishing the construction process.
6) And the next construction is carried out according to the above procedure.
Through the operation of the process, after a plurality of sections of cement walls are connected, the peripheral cement wall of the artificial island is formed, stone silt is conveyed into the cement wall, and the island foundation can be higher than the water surface according to the required height.
The power cabin comprises at least one of a nuclear power cabin and a diesel power cabin, hydraulic transmission is provided integrally through nuclear power or diesel power, electric transmission is provided, and gear transmission is provided to drive the transmission belt and hydraulic lifting is provided.
The material taking mechanism takes out sand and stones from the seabed and conveys the sand and stones through the conveyor belt connecting platform.
Furthermore, the first ship body, the second ship body or the third ship body can be provided with ship technologies such as a satellite communication radar and a command platform, the functions of automatic navigation and direction control on the sea are completed, and meanwhile, the automatic engineering of island building and diking can be completed through MUC end intelligence.
It should be noted that, the ship is in a shape of a wide-plane shallow-flat-bottom ship, and a strip-shaped groove which can be expanded and narrowed is reserved at the rear part of the middle ship, so that a mould made of a rolling curtain steel bar is convenient for protecting the smooth pouring of concrete.
The present invention and the embodiments thereof have been described above, but the description is not limited thereto, and the embodiment shown in the drawings is only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (4)

1. The utility model provides a novel island equipment of making a dyke is built to combination formula which characterized in that: the device comprises an island building operation platform, a first floating platform and a second floating platform;
the island building operation platform comprises a first ship body, a clamping plate mold mechanism, a reinforced concrete mixing station and a steel bar platform; the rear part of the first ship body is provided with a strip-shaped groove matched with the clamping plate die mechanism; the clamp plate die mechanism comprises a rolling curtain steel bar die and hydraulic double columns, the rolling curtain steel bar die is arranged in the bar-shaped groove, and the hydraulic double columns are matched with the rolling curtain steel bar die and are arranged on the periphery of the rolling curtain type die in an array manner; the reinforced concrete mixing station is arranged on the front side of the strip-shaped groove, and the steel bar platform is arranged on the front side of the reinforced concrete mixing station;
the first floating platform comprises a second ship body, a material taking mechanism and a first fixed pile assembly; the second ship body is arranged on one side of the first ship body and is fixed through a connecting clamp lock, the material taking mechanism comprises a crane and a large-clamp grab bucket, the crane array is arranged around a deck of the second ship body, and the large-clamp grab bucket is arranged at the tail end of a steel cable of the crane; the automatic fixing piles in the first fixing pile assembly are distributed on the outer side wall of the second ship body in an array manner;
the second floating platform comprises a third ship body and a second fixed pile assembly; the third ship body is arranged on the other side of the first ship body and is fixed through a connecting lock; and automatic fixing piles in the second fixing pile assembly are distributed on the outer side wall of the third ship body in an array mode.
2. The novel combined type island building and diking device according to claim 1, wherein: and power cabins are arranged on two sides of the strip-shaped groove.
3. The novel combined type island building and diking device according to claim 1, wherein: and the rear ends of the first ship body, the second ship body and the third ship body are provided with water jet propellers.
4. The novel combined island and diking device according to claim 1, wherein: the hydraulic pressure twin columns is including fixed stand and activity stand, the flexible direction of fixed stand hydraulic stem is unanimous with roll up curtain billet mould extending direction, the flexible direction of activity stand hydraulic stem is perpendicular with roll up curtain billet mould extending direction.
CN202221226702.8U 2022-05-20 2022-05-20 Novel combined island and dike building equipment Active CN217352332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221226702.8U CN217352332U (en) 2022-05-20 2022-05-20 Novel combined island and dike building equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221226702.8U CN217352332U (en) 2022-05-20 2022-05-20 Novel combined island and dike building equipment

Publications (1)

Publication Number Publication Date
CN217352332U true CN217352332U (en) 2022-09-02

Family

ID=83015622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221226702.8U Active CN217352332U (en) 2022-05-20 2022-05-20 Novel combined island and dike building equipment

Country Status (1)

Country Link
CN (1) CN217352332U (en)

Similar Documents

Publication Publication Date Title
WO2023020356A1 (en) Caisson quay and construction method therefor
CN217352332U (en) Novel combined island and dike building equipment
CN101603315B (en) Method for constructing seepage prevention system of secondary cofferdam for immersed tube tunnel
US2050727A (en) Caisson belt apparatus and method
CN114855706A (en) Novel combined island-building diking equipment
CN102031766A (en) Hydroelectric barrage building machine
US3951088A (en) Building equipment for ships' hulls
KR102601005B1 (en) Interlocking block And Port structure using interlocking blocks And Construction method of port structure using interlocking block
CN1233903C (en) Construction method for structure of reinforced concrete underwater
JP3624461B2 (en) Quay restoration method and quay structure
CN87103253A (en) The scene suspention job practices of open caisson and coffer work
CN115897640B (en) Construction method of permeable breakwater
EP3936295A1 (en) Floating caissons, methods and apparatus for constructing floating caissons
JPH0213684B2 (en)
DE102014213760B4 (en) Muringsteinschalungsform
CN218813475U (en) Deep water gravity pier trestle type breakwater
CN212001109U (en) Structural system for flat ground prefabricated modular transportation of large immersed tube tunnel pipe section
CN216809744U (en) Modular breakwater based on lightweight concrete
CN217621305U (en) Structure foundation for prefabricating immersed tube by factory method
Michael et al. Fast-Constructed Marine and Port Structures
CN1022850C (en) Construction method for coast walls
JPS61142255A (en) Bank body in offshore, rapid construction method and apparatus of shore protection
CN115748590A (en) Deep water mold bag concrete structure for wharf front protection bottom and construction method thereof
JP2546110B2 (en) Levee structure using excavated sludge and its construction method