WO2022008555A1 - Floating caissons, methods and apparatus for constructing floating caissons - Google Patents

Floating caissons, methods and apparatus for constructing floating caissons Download PDF

Info

Publication number
WO2022008555A1
WO2022008555A1 PCT/EP2021/068742 EP2021068742W WO2022008555A1 WO 2022008555 A1 WO2022008555 A1 WO 2022008555A1 EP 2021068742 W EP2021068742 W EP 2021068742W WO 2022008555 A1 WO2022008555 A1 WO 2022008555A1
Authority
WO
WIPO (PCT)
Prior art keywords
floating
caisson
concrete
platform
supports
Prior art date
Application number
PCT/EP2021/068742
Other languages
French (fr)
Inventor
Manuel Rojas Fernández-Fígares
Original Assignee
Rojas Fernandez Figares Manuel
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rojas Fernandez Figares Manuel filed Critical Rojas Fernandez Figares Manuel
Priority to EP21742365.6A priority Critical patent/EP4178775A1/en
Publication of WO2022008555A1 publication Critical patent/WO2022008555A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • B28B15/002Mobile plants, e.g. on vehicles or on boats
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B19/00Machines or methods for applying the material to surfaces to form a permanent layer thereon
    • B28B19/003Machines or methods for applying the material to surfaces to form a permanent layer thereon to insulating material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/02Caissons able to be floated on water and to be lowered into water in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/06Constructions, or methods of constructing, in water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats
    • B63C1/02Floating docks

Definitions

  • the present disclosure relates to floating caissons, and to methods and apparatuses of constructing floating caissons.
  • the present disclosure further relates to structures including caissons.
  • caissons In structures in port and harbour areas, caissons may be used.
  • the use of floating caissons is relatively popular because it allows rapid construction in marine environments.
  • Caissons may be used in the construction of e.g. breakwaters, ports, wharves, dry docks, fishing ports, berths, marinas and other.
  • Floating caissons are box-like elements, made of (reinforced) concrete, and which typically have a square or rectangular cross-section and have a number of empty cylindrical cells. Inner walls extending between opposite side walls form a grid and a number of empty cylindrical cells (with a square or rectangular cross-section) is formed in the grid.
  • Caissons provide stability and rigidity, and may for this reason be used in different port infrastructures as mentioned before. After construction, the caissons may towed with suitable towboats or other towing systems to their destination. Once in place, the caisson may be ballasted, i.e. the cells may be filled with concrete or granular material. This operation may be performed by auxiliary floating platforms that carry both the material and a special crane to transfer the material. Tractors, dozers, loaders and trucks may help finish the filling operation on top of the caisson. [0007] A known technique for forming floating caissons is as follows: a slab of concrete may be formed and the parts of the inner walls are formed by pouring concrete in formworks. Once the concrete has formed, the formworks are lifted to form additional portions of walls on top of the already formed walls. Steel meshes may be used to reinforce the walls.
  • the walls may be formed in increments of e.g. 1 meter. Due to this technique, the shapes that can be used for the caissons are limited: in principle, only straight walls can be used. Also, this technique requires for the caisson building floating dock to be at least as high as the height of the structure to be built. This makes the caisson building docks very expensive, which means that only a very limited number of them may be use in a country. Infrastructural works may suffer important delays, because caisson building docks are unavailable.
  • the present disclosure in various examples provides methods, systems, and devices for manufacturing floating caissons and floating caissons that at least partially resolve some of the aforementioned disadvantages.
  • a method of forming a wall of a floating caisson comprises providing a slab on a submersible platform, providing one or more base supports on top of the slab, the base supports having a first outer face and a second outer face.
  • the method further comprises forming a first wall portion by spraying concrete on the first and the second outer faces.
  • the method then furthermore comprises lowering the platform and forming one or more subsequent wall portions on the first wall portion.
  • a method of forming walls, portions of walls, and caissons are provided which allow more versatility in the shape of the caisson. Since no formwork is used, and concrete is sprayed on a support, the resulting wall may have any shape that can be given to the support. Also methods in accordance herewith require less complicated apparatus. Since the wall portion that has been formed is lowered, the surrounding apparatus does not need to be raised to construct subsequent wall portions.
  • the forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports.
  • subsequent supports and additional supports are used interchangeably throughout the present disclosure.
  • lowering the platform may comprise reducing the buoyancy of the platform after the forming of each subsequent wall portion.
  • the platform with already formed structure on top may be lowered by varying the buoyancy of the caisson and/or the platform.
  • the caisson to the extent that it has been constructed, may be filled with water as desired.
  • the top of the formed structure may thus be lowered to be substantially level with the working decks, so that subsequent wall portions may be easily formed.
  • reducing the buoyancy of the platform may include filling the platform with water. Particularly when the caisson has been constructed, the platform may be lowered and separated from the caisson to liberate the caisson from the apparatus used in making it. The caisson may then be towed and transported to its destination.
  • the base supports and/or subsequent supports are made from a material that is relatively lightweight compared to concrete.
  • the base supports and/or subsequent supports may be made from polystyrene foam.
  • Polystyrene foam is lightweight, is cheap and can be formed (by cutting, stacking etc.) in almost any desired shape.
  • through-holes may be made or provided in the (base) support or additional supports.
  • Connectors for connecting the wall portions on the first and second faces of the supports may be provided.
  • the connectors may be prefabricated, or may be made in situ.
  • armatures may be placed in the through- holes and concrete may be shot or sprayed in the through holes.
  • an apparatus for constructing a floating caisson comprises a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon.
  • the overhead structure comprises one or more working decks and a shotcrete distribution system for supplying shotcrete to workers on the working decks.
  • an apparatus which may be more cost effective than prior art solutions.
  • the apparatus may be lower than known floating caisson building docks.
  • the position of the platform with respect to the floating pontoon can be varied to allow for the manufacture of subsequent parts of the floating caissons. I.e. instead of constructing continuously at a higher level until the structure is finished, the construction may take place at substantially the same height. The already formed structure is lowered to be able to keep on working at substantially the same height.
  • the overhead structure may comprise a plurality of vertical supports supporting transverse beams.
  • the working decks may be suspended from the transverse beams.
  • the shotcrete distribution system may be guided along the transverse beams.
  • one or more of the working decks may be movable with respect to a fixed part of the overhead structure, and particularly one or more of the working decks may be movable horizontally along transverse beams.
  • the transverse beams may include guides or rails along which vertical supports connected to the working platforms may be displaced.
  • Working decks that can be displaced can be helpful to allow for curved walls of caissons.
  • a floating caisson comprising a bottom slab and a plurality of vertical walls.
  • the vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core.
  • the floating caisson in accordance with this aspect may optionally be obtained by methods according to the hereinbefore mentioned first aspect and/or using apparatus in accordance with the aforementioned further aspect.
  • a caisson in accordance with this aspect may be relatively lightweight, i.e. for the same strength and stiffness, the caisson may be lighter than in the prior art.
  • the core in particular may be lightweight.
  • the core may be formed by the supports, as defined in the other aspects, upon which concrete is sprayed to form the walls. Concrete is provided on its outer faces. Particularly bending strength and stiffness of the resulting structure may be improved by providing the material further away from the neutral axis and avoiding a massive solid structure.
  • the geometrical distribution of the mass of the structures has a higher second moment of area and thereby greater stiffness and strength for a given mass can be achieved.
  • An aspect of the double-wall reinforced concrete surfaces is to remove the concrete which has the smallest or no load bearing effect, i.e.
  • one or more of the vertical walls, and specifically external vertical walls of the floating caisson may include a convex or concave shape. In some examples, one or more of the vertical walls may be doubly curved.
  • an apparatus for constructing a floating caisson comprises a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon.
  • the overhead structure comprises one or more working decks and a concrete distribution system for supplying concrete to workers on the working decks.
  • floating caissons or sidewalls of the caissons may be at least partially formed by pouring concrete in formworks.
  • the formworks may be removed.
  • the already formed walls may be lowered by submerging the submersible platform.
  • Steel meshes may be used to reinforce the walls.
  • Figures 1A - 1 D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example
  • Figures 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example
  • Figures 3A - 3B schematically illustrate an example of a caisson that may be used in structures along the shore;
  • Figures 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson
  • Figures 5A - 5D schematically illustrates a further example a construction method of a caisson
  • Figure 6 schematically illustrates a method for transporting a floating caisson once constructed
  • FIGS 7A and 7B illustrate examples of working decks.
  • Figures 1 A - 1 D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example.
  • Figure 1 A provides a cross-sectional view
  • figures 1 B - 1 D provide top views of the same apparatus of figure 1A, each of the figures highlighting a different subsystem.
  • Figure 1A shows an apparatus 70 for constructing a floating caisson 100.
  • the apparatus may be floating in a body of water, e.g. in a part of a sea close to a shore, port or harbor where a structure is to be built.
  • the apparatus 70 comprises a floating pontoon 10, and a submersible platform 20, which is connected to the floating pontoon 10.
  • the connection is such that a vertical position (inside the water) of the platform 20 can be varied with respect to the floating pontoon 10.
  • the connection between the floating pontoon 10 and the platform 20 may include one or more cables or chains or mooring lines, which may be connected at anchoring points 12 and 14.
  • the connection may include pulleys or winches as needed.
  • the apparatus 70 further comprises an overhead structure 30 supported by the floating pontoon 10, wherein the overhead structure 30 comprises one or more working decks 40A, 40B and a shotcrete distribution system 50 for supplying shotcrete to workers on the working decks.
  • the working decks may be configured to support workers on the working decks. They may allow workers to move around on them.
  • Shotcrete (sometimes called “gunite” or “sprayed concrete”) is concrete or mortar conveyed through a hose and pneumatically projected at high velocity onto a surface, as a construction technique.
  • the wall formed in this manner may be reinforced by conventional steel rods, steel mesh, or fibers.
  • Shotcrete as used throughout the present disclosure may refer to both wet-mix and dry-mix versions.
  • the submersible platform may have variable buoyancy to vary a position of the submersible platform 20 with respect to the pontoon and / or with respect the floating caisson 100.
  • the platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used.
  • the floating pontoon 10 may have an open cross-section, and may be substantially U-shaped or C-shaped.
  • FIG 1 C it may be seen that several rows of inner working decks 40A may be arranged between the legs of the U-shape. In this particular example, four rows of inner working decks may be arranged. Each of the rows includes three inner working decks 40A. Additionally, an annular outer working deck 40B may be provided. The annular working deck may substantially surround all the inner working decks 40A.
  • the overhead structure 30 may include a plurality of vertical side supports 32 and a plurality of transverse beams 34. Each of the transverse beams 34 may extend between vertical side supports 32.
  • the vertical side supports 32 may be directly positioned on top of floating pontoon 10 and carry the transverse beams 34.
  • the overhead structure may be formed or may comprise truss structures.
  • the vertical supports 36 may extend between working decks 40A and 40B and a transverse beam 34.
  • the vertical supports 36 may be suspended from the transverse beams 34.
  • each of the inner working decks 40A may comprise an intermediate vertical support 36.
  • one transverse beam 34 may be arranged with each row of working decks 40 A.
  • a shotcrete distribution system 50 may include a central supply 54. From the central supply 54, several transverse distribution lines 56 may extend sideways. Each of the transverse distribution lines 56 may include one or more delivery hoses 58 (illustrated in figure 1 A). The distribution lines may be supported by transverse beams 34. If the transverse beams 34 are formed as truss structures, the distribution lines may advantageously be arranged inside the truss structures.
  • the hoses 58 may be held by workers on the working decks 40A, 40B and may be used for spraying or “shooting” concrete.
  • the hoses may be arranged with the vertical supports 36.
  • a hose may be arranged with each of the vertical supports 36.
  • Shotcrete machines are available which can control the concrete spraying process and make it very fast and easy. Manual and mechanical methods may be used for the wet spraying process but wet sprayed concrete is traditionally applied by machine.
  • An apparatus according to the present disclosure may be relatively easily transported. I.e. it may be dismounted and transported by road (truck) or by sea to a construction site.
  • the vertical supports 36, side supports 32 and transverse beams may be relatively easily disassembled from each other.
  • a method of forming a wall 120 of a floating caisson 100 may comprise providing a slab 110 on a submersible platform 20.
  • One or more supports 130 may be provided on top on top of the slab 20, the supports 130 having a first outer surface 132 and a second outer face 134.
  • a wall portion may be formed by spraying or shooting concrete on the first and second outer faces 132, 134 of the supports 130.
  • the platform 20 may be lowered. Subsequent wall portions may then be formed on top as needed.
  • the walls may thus be formed by spraying or shooting concrete on the supports.
  • the supports 130 may be chosen to be lightweight. This shall be understood in the present disclosure as a support with a density that is lower than the density of the concrete sprayed on its face.
  • the supports 130 in examples may extend substantially perpendicular to the slab 110.
  • a support is polystyrene foam.
  • Polystyrene foam is lightweight, and may be cut, sized and shaped and arranged in a wide variety of ways.
  • any suitable support shape may be provided upon which concrete can be sprayed.
  • the thickness of the concrete on either face of the support may be varied as needed.
  • a wide variety of shapes and forms may be provided for the walls of the caisson.
  • a wall of the caisson may be curved, e.g. be concave or convex.
  • a wall of the caisson may have a double curvature, i.e. may be curved both in a vertical and a horizontal direction. Even though any of the walls of the caisson may be curved in this manner.
  • the curvature of the outer walls of the caisson may be particularly suitable, e.g. when they have to function as breakwater structure.
  • the curvature of the outer walls of the caisson may be chosen such as to absorb impact of incoming waves and/or to divert incoming waves suitably.
  • the supports may be partially hollow in some examples.
  • a process of constructing a wall or a plurality of walls of a floating caisson may start with the arrangement of base supports on slab 110 to form the bottom section of the walls. Once the bottom portion of the wall(s) has been formed, the platform 20 may be lowered. Then, subsequent wall portions may be formed until the desired height for the walls is reached.
  • the forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports.
  • Wall 121 may be formed by a worker from the annular outer working deck 40B for one face of the wall and from an inner working deck 40A for the other face of the wall.
  • the situation is similar for wall 124.
  • spraying may be performed from two neighboring inner working decks 40A.
  • wall 123 It is noted that only a cross-section is shown in figure 1 A.
  • the floating caisson may have a plurality of walls that extend perpendicular to the walls 121 , 122, 123 and 124.
  • armatures may be positioned along the faces of the supports 130 prior to shooting concrete.
  • the armatures may be steel meshes, or fiber reinforced composites (e.g. glass fibers, carbon fibers or Kevlar® fibers).
  • the supports 130 may have through-holes extending from the first face 132 to the second face 134.
  • the through-holes may be made in situ (e.g. they may be driller or bored, or carved out or otherwise).
  • connectors may be provided through such through holes.
  • the connectors may be prefabricated or may be made in situ. As the wall portions, concrete may be used for the connectors. In a particular example, a reinforcement, such as a steel mesh or steel bars may be positioned in the through-hole substantially extending from the first face 132 to the second face 134. When concrete is shot on the faces 132, 134, the spaces of the connectors may be filled with concrete at the same time.
  • a reinforcement such as a steel mesh or steel bars may be positioned in the through-hole substantially extending from the first face 132 to the second face 134.
  • the steel meshes or steel bars of the connectors may be folded at both ends to be substantially parallel to the walls.
  • An aspect of examples of the methods disclosed herein is that the overhead structure including working decks may stay substantially at the same height throughout the entire construction process of a caisson.
  • the floating caisson to the extent that it has been constructed, is lowered. Subsequent wall portions may thus be formed from the same height. The operators (and working decks) thus stay in substantially the same position.
  • the caisson building floating docks need to be at least as high as the heights of the structure to be built, since formworks are used.
  • the buoyancy of the platform may be reduced after the forming of each subsequent wall portion.
  • the platform may be filled with water as needed to vary its buoyancy. Once wall portions of the caissons have dried up, the caisson may be filled with water to a desired level WL in . This water level does not need to be the same as the overall water level WL at sea, and in general will be different.
  • FIGs 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example.
  • the first step of spraying concrete is about to take place.
  • a slab has been arranged on platform 20.
  • the slab may be made of (steel) reinforced concrete. Steel bars may stick out upwards from the slab.
  • the slab may contain stub(s) forming the beginning of the walls to be created.
  • base supports 130 may be positioned. Reinforcement (steel) meshes may be arranged on either side of the supports 130.
  • the base supports 130 may be entirely covered in such a step. In other examples, the base supports 130 that are positioned may not be entirely covered. E.g. the base supports 130 may have a height of 1 ,5 or 2 meters, whereas in a single step 1 meter of concrete is sprayed and then left to dry. It should be clear that these dimensions are only examples, and that in practice they may be varied.
  • the platform 20 with the caisson may be lowered.
  • the caisson may be filled with water as need to lower the caisson structure to the level needed.
  • a next portion of wall may be made by repeating the same process. Additional supports may be positioned, reinforcements may be arranged along the first and second faces, and concrete may be shot. In some or all of these steps, connectors between the faces may be provided as explained in other parts of the present disclosure.
  • a floating caisson may be constructed that comprises a bottom slab and a plurality of vertical walls.
  • the vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core.
  • the resulting floating caisson may be lighter than similar caissons in the prior art. The strength and stiffness however may still be the same as in the prior art. Less concrete is needed to reach the same level of bending strength.
  • the core may be made from a lightweight material, optionally polystyrene foam.
  • the first and second concrete layers may be made of reinforced concrete.
  • the bottom slab may be made from concrete as well, optionally reinforced concrete.
  • one or more of the vertical walls, particularly the outer walls of the caisson may include a convex or concave shape.
  • the core may be formed by the base support and additional supports mentioned before.
  • FIG. 3A schematically illustrate an example of a caisson that may be used in structures along the shore.
  • Figure 3A shows a side view of a caisson 200 that may be used in a structure such as a pier, seawall or jetty. Jetties may be used e.g. to delimit harbors.
  • Sea side is indicated with reference sign 260
  • lee side is indicated with reference sign 250.
  • the sea side wall 230 may be substantially concave and may function as breakwater.
  • the lee side wall 235 may also be curved, but have a different curvature than the sea side wall.
  • Reference sign 280 indicates a top surface of the caisson 200.
  • the top surface 280 of caisson 200 may be used by pedestrians and other traffic once the caisson has been constructed and is operational.
  • the upper portion 270 on the sea side wall 230 forming a barrier or wall may be formed integrally with the caisson and the sea side wall.
  • such a wall would normally be added in situ after placement of the caisson.
  • Figure 3B illustrates how a caisson 200 may have been transported to the construction site to be placed.
  • the caisson 200 may be ballasted and positioned on bedding 210.
  • FIGs 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson.
  • the apparatus 70 comprises a floating pontoon 10.
  • a superstructure of the apparatus 70 comprises vertical side supports 32 and transverse beams 34.
  • the working decks 40C and 40D are coupled to vertical beams 36 suspended from the transverse beams 34.
  • a shotcrete distribution system 50 for supplying shotcrete to workers 60 on the working decks.
  • a submersible platform 20 may be connected to the floating pontoon to vary the vertical position of the submersible platform.
  • the position of the submersible platform may be changed without changing the vertical position of the floating pontoon.
  • a connection between the pontoon 10 and platform 20 may include a plurality of chains, wire ropes, cables or similar.
  • Anchoring points 12 and 14 may be provided as commented before.
  • the floating caisson 300 to be constructed in this example is slightly different from the example of figure 1.
  • a middle wall of floating caisson 300 is a substantially vertical straight wall, whereas the front and rear walls are curved.
  • Figure 4A illustrates how the supports 130, 131 upon which the shotcrete is shot may be different for the different walls.
  • one or more of the working decks may be movable, and in particular one or more the vertical supports 36 carrying working decks 40C may be displaced along transverse beams 34.
  • the transverse beam may comprise rails or guides, along which the vertical supports 36 may be slid.
  • the outer working deck 40D may be displaced in a similar manner.
  • the floating pontoon 10 may have a closed perimeter as may be seen in the top view of figure 4B. In a horizontal cross-section, the floating pontoon 10 may have a square ring-shaped form, or gates are provided to close the C-shape or U-shape of the pontoon.
  • the platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used. Water lines 21 may be used to selectively fill the platform 20. One or more water lines 21 in some examples may lead from pontoon 21 to submersible platform 20.
  • Figures 5A - 5D schematically illustrates a further example a construction method of a caisson.
  • Figure 5A illustrates a first step (or one of the first steps) for constructing wall portions with base supports 130, 131 . At the stage of figure 5, a slab of concrete has been provided, with relatively small stubs where the walls are to be formed.
  • the outer walls of the floating caisson in this example are curved.
  • the working decks 40C and 40D may be horizontally moveable to allow workers to shoot concrete on the supports, even as the walls are curved. Between the steps of figure 5B and 5C, the working decks are horizontally moved. The last construction step may be seen in figure 5C.
  • a curved support 131 is placed to form the last portion of a sea side wall of the floating caisson.
  • the submersible platform 20 may be filled with water to sink the platform 20.
  • the floating caisson may then be towed away.
  • FIG. 6 schematically illustrates a method for transporting a floating caisson once constructed. It was noted before that the pontoon 10 of the apparatus 70 may form a closed cross-section. In order to tow a floating caisson 300 to a construction site where it may be filled to sink it, a towing vessel 160 using cables 165 or similar may tow the floating caisson 300 away. One side 13 of the floating pontoon may be closed off with gates 13A and 13B which may be opened after construction is finished.
  • FIGs 7A and 7B illustrate examples of working decks 40C and 40D.
  • the working decks 40C may include a female receiving portion to mate with a bottom portion of the vertical supports 36, such that the vertical support 36 can fit inside and the working deck may thereby be attached to the vertical support.
  • the working surface 45 of the working deck may be substantially flat so that workers may move around comfortably and safely.
  • Several ribs 43 may be seen that reinforce the working decks 40C, 40D.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Revetment (AREA)

Abstract

A method of forming a wall (121) of a floating caisson (100) is provided, which comprises: providing a slab (110) on a submersible platform (20); providing one or more base supports (130) on top of the slab (110), the base supports having a first outer face (132) and a second outer face (134); forming a first wall portion (121) by spraying concrete on the first and the second outer faces (132, 134); lowering the platform (20); and forming one or more subsequent wall portions on the first wall portion (121). Also disclosed are apparatuses (70) for constructing a floating caisson (100) and floating caissons (100).

Description

FLOATING CAISSONS. METHODS AND APPARATUS FOR CONSTRUCTING
FLOATING CAISSONS
[0001] The present application claims the benefit of European patent application ne EP 20 382 605.2 filed on July 7th, 2020.
[0002] The present disclosure relates to floating caissons, and to methods and apparatuses of constructing floating caissons. The present disclosure further relates to structures including caissons.
BACKGROUND
[0003] Infrastructure in ports and harbours make marine traffic possible, and may facilitate facilitating loading and unloading of vessels. Furthermore they have to offer protection from tides and waves action.
[0004] In structures in port and harbour areas, caissons may be used. The use of floating caissons is relatively popular because it allows rapid construction in marine environments. Caissons may be used in the construction of e.g. breakwaters, ports, wharves, dry docks, fishing ports, berths, marinas and other.
[0005] Floating caissons are box-like elements, made of (reinforced) concrete, and which typically have a square or rectangular cross-section and have a number of empty cylindrical cells. Inner walls extending between opposite side walls form a grid and a number of empty cylindrical cells (with a square or rectangular cross-section) is formed in the grid.
[0006] Caissons provide stability and rigidity, and may for this reason be used in different port infrastructures as mentioned before. After construction, the caissons may towed with suitable towboats or other towing systems to their destination. Once in place, the caisson may be ballasted, i.e. the cells may be filled with concrete or granular material. This operation may be performed by auxiliary floating platforms that carry both the material and a special crane to transfer the material. Tractors, dozers, loaders and trucks may help finish the filling operation on top of the caisson. [0007] A known technique for forming floating caissons is as follows: a slab of concrete may be formed and the parts of the inner walls are formed by pouring concrete in formworks. Once the concrete has formed, the formworks are lifted to form additional portions of walls on top of the already formed walls. Steel meshes may be used to reinforce the walls.
[0008] The walls may be formed in increments of e.g. 1 meter. Due to this technique, the shapes that can be used for the caissons are limited: in principle, only straight walls can be used. Also, this technique requires for the caisson building floating dock to be at least as high as the height of the structure to be built. This makes the caisson building docks very expensive, which means that only a very limited number of them may be use in a country. Infrastructural works may suffer important delays, because caisson building docks are unavailable.
[0009] The present disclosure in various examples provides methods, systems, and devices for manufacturing floating caissons and floating caissons that at least partially resolve some of the aforementioned disadvantages.
SUMMARY
[0010] In a first aspect, a method of forming a wall of a floating caisson is provided. The method comprises providing a slab on a submersible platform, providing one or more base supports on top of the slab, the base supports having a first outer face and a second outer face. The method further comprises forming a first wall portion by spraying concrete on the first and the second outer faces. The method then furthermore comprises lowering the platform and forming one or more subsequent wall portions on the first wall portion.
[0011] In accordance with this aspect, a method of forming walls, portions of walls, and caissons are provided which allow more versatility in the shape of the caisson. Since no formwork is used, and concrete is sprayed on a support, the resulting wall may have any shape that can be given to the support. Also methods in accordance herewith require less complicated apparatus. Since the wall portion that has been formed is lowered, the surrounding apparatus does not need to be raised to construct subsequent wall portions.
[0012] The terms “spraying” or “shooting” concrete are used interchangeably throughout the present disclosure. [0013] In some examples, the forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports. The terms subsequent supports and additional supports are used interchangeably throughout the present disclosure.
[0014] In some examples, lowering the platform may comprise reducing the buoyancy of the platform after the forming of each subsequent wall portion. The platform with already formed structure on top may be lowered by varying the buoyancy of the caisson and/or the platform. The caisson, to the extent that it has been constructed, may be filled with water as desired. The top of the formed structure may thus be lowered to be substantially level with the working decks, so that subsequent wall portions may be easily formed.
[0015] In some examples, reducing the buoyancy of the platform may include filling the platform with water. Particularly when the caisson has been constructed, the platform may be lowered and separated from the caisson to liberate the caisson from the apparatus used in making it. The caisson may then be towed and transported to its destination.
[0016] In some examples, the base supports and/or subsequent supports are made from a material that is relatively lightweight compared to concrete. Specifically, the base supports and/or subsequent supports may be made from polystyrene foam. Polystyrene foam is lightweight, is cheap and can be formed (by cutting, stacking etc.) in almost any desired shape.
[0017] In some examples, through-holes may be made or provided in the (base) support or additional supports. Connectors for connecting the wall portions on the first and second faces of the supports may be provided. The connectors may be prefabricated, or may be made in situ. In order to make connectors in situ, armatures may be placed in the through- holes and concrete may be shot or sprayed in the through holes.
[0018] In some examples, the end portions of the armatures may be folded to be substantially parallel the wall portions on the first and second faces. [0019] In a further aspect, an apparatus for constructing a floating caisson is provided. The apparatus comprises a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon. The overhead structure comprises one or more working decks and a shotcrete distribution system for supplying shotcrete to workers on the working decks.
[0020] In accordance with this aspect, an apparatus is provided which may be more cost effective than prior art solutions. Particularly, the apparatus may be lower than known floating caisson building docks. In particular, the position of the platform with respect to the floating pontoon can be varied to allow for the manufacture of subsequent parts of the floating caissons. I.e. instead of constructing continuously at a higher level until the structure is finished, the construction may take place at substantially the same height. The already formed structure is lowered to be able to keep on working at substantially the same height.
[0021] The overhead structure may comprise a plurality of vertical supports supporting transverse beams. The working decks may be suspended from the transverse beams. Also the shotcrete distribution system may be guided along the transverse beams.
[0022] In some examples, one or more of the working decks may be movable with respect to a fixed part of the overhead structure, and particularly one or more of the working decks may be movable horizontally along transverse beams. The transverse beams may include guides or rails along which vertical supports connected to the working platforms may be displaced. Working decks that can be displaced can be helpful to allow for curved walls of caissons.
[0023] In yet a further aspect, a floating caisson comprising a bottom slab and a plurality of vertical walls is provided. The vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core. The floating caisson in accordance with this aspect may optionally be obtained by methods according to the hereinbefore mentioned first aspect and/or using apparatus in accordance with the aforementioned further aspect.
[0024] A caisson in accordance with this aspect may be relatively lightweight, i.e. for the same strength and stiffness, the caisson may be lighter than in the prior art. The core in particular may be lightweight. The core may be formed by the supports, as defined in the other aspects, upon which concrete is sprayed to form the walls. Concrete is provided on its outer faces. Particularly bending strength and stiffness of the resulting structure may be improved by providing the material further away from the neutral axis and avoiding a massive solid structure. The geometrical distribution of the mass of the structures has a higher second moment of area and thereby greater stiffness and strength for a given mass can be achieved. An aspect of the double-wall reinforced concrete surfaces is to remove the concrete which has the smallest or no load bearing effect, i.e. the effect is to remove the material that is not carrying much load and concentrating it where the load is highest”. [0025] In some examples, one or more of the vertical walls, and specifically external vertical walls of the floating caisson, may include a convex or concave shape. In some examples, one or more of the vertical walls may be doubly curved.
[0026] In yet a further aspect, an apparatus for constructing a floating caisson is provided. The apparatus comprises a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon. The overhead structure comprises one or more working decks and a concrete distribution system for supplying concrete to workers on the working decks. In this apparatus, floating caissons or sidewalls of the caissons may be at least partially formed by pouring concrete in formworks.
[0027] In this aspect, once the concrete has formed, the formworks may be removed. The already formed walls may be lowered by submerging the submersible platform. Steel meshes may be used to reinforce the walls.
BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Non-limiting examples of the present disclosure will be described in the following, with reference to the appended drawings, in which:
Figures 1A - 1 D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example;
Figures 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example; Figures 3A - 3B schematically illustrate an example of a caisson that may be used in structures along the shore;
Figures 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson;
Figures 5A - 5D schematically illustrates a further example a construction method of a caisson;
Figure 6 schematically illustrates a method for transporting a floating caisson once constructed; and
Figures 7A and 7B illustrate examples of working decks.
DETAILED DESCRIPTION OF EXAMPLES
[0029] Figures 1 A - 1 D schematically illustrate a method, and apparatus for constructing a floating caisson according to a first example. Figure 1 A provides a cross-sectional view, whereas figures 1 B - 1 D provide top views of the same apparatus of figure 1A, each of the figures highlighting a different subsystem.
[0030] Figure 1A shows an apparatus 70 for constructing a floating caisson 100. The apparatus may be floating in a body of water, e.g. in a part of a sea close to a shore, port or harbor where a structure is to be built.
[0031] The apparatus 70 comprises a floating pontoon 10, and a submersible platform 20, which is connected to the floating pontoon 10. The connection is such that a vertical position (inside the water) of the platform 20 can be varied with respect to the floating pontoon 10. In this particular example, the connection between the floating pontoon 10 and the platform 20 may include one or more cables or chains or mooring lines, which may be connected at anchoring points 12 and 14. The connection may include pulleys or winches as needed. [0032] The apparatus 70 further comprises an overhead structure 30 supported by the floating pontoon 10, wherein the overhead structure 30 comprises one or more working decks 40A, 40B and a shotcrete distribution system 50 for supplying shotcrete to workers on the working decks. The working decks may be configured to support workers on the working decks. They may allow workers to move around on them.
[0033] Shotcrete, (sometimes called “gunite” or “sprayed concrete”) is concrete or mortar conveyed through a hose and pneumatically projected at high velocity onto a surface, as a construction technique. The wall formed in this manner may be reinforced by conventional steel rods, steel mesh, or fibers. Shotcrete as used throughout the present disclosure may refer to both wet-mix and dry-mix versions.
[0034] In some examples, the submersible platform may have variable buoyancy to vary a position of the submersible platform 20 with respect to the pontoon and / or with respect the floating caisson 100. The platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used.
[0035] In the top views of figures 1 B - 1 D, it may be seen that the floating pontoon 10 may have an open cross-section, and may be substantially U-shaped or C-shaped. With reference to figure 1 C, it may be seen that several rows of inner working decks 40A may be arranged between the legs of the U-shape. In this particular example, four rows of inner working decks may be arranged. Each of the rows includes three inner working decks 40A. Additionally, an annular outer working deck 40B may be provided. The annular working deck may substantially surround all the inner working decks 40A.
[0036] With reference to figures 1A and 1 B, it may be seen that the overhead structure 30 may include a plurality of vertical side supports 32 and a plurality of transverse beams 34. Each of the transverse beams 34 may extend between vertical side supports 32. The vertical side supports 32 may be directly positioned on top of floating pontoon 10 and carry the transverse beams 34.
[0037] As illustrated in figure 1 A, the overhead structure may be formed or may comprise truss structures. The vertical supports 36 may extend between working decks 40A and 40B and a transverse beam 34. The vertical supports 36 may be suspended from the transverse beams 34. [0038] In some examples, each of the inner working decks 40A may comprise an intermediate vertical support 36. In some examples, one transverse beam 34 may be arranged with each row of working decks 40 A.
[0039] With reference to figure 1 D, it may be seen how a shotcrete distribution system 50 may include a central supply 54. From the central supply 54, several transverse distribution lines 56 may extend sideways. Each of the transverse distribution lines 56 may include one or more delivery hoses 58 (illustrated in figure 1 A). The distribution lines may be supported by transverse beams 34. If the transverse beams 34 are formed as truss structures, the distribution lines may advantageously be arranged inside the truss structures.
[0040] The hoses 58 may be held by workers on the working decks 40A, 40B and may be used for spraying or “shooting” concrete. In some examples, the hoses may be arranged with the vertical supports 36. In some examples, a hose may be arranged with each of the vertical supports 36.
[0041] Shotcrete machines are available which can control the concrete spraying process and make it very fast and easy. Manual and mechanical methods may be used for the wet spraying process but wet sprayed concrete is traditionally applied by machine.
[0042] An apparatus according to the present disclosure may be relatively easily transported. I.e. it may be dismounted and transported by road (truck) or by sea to a construction site. The vertical supports 36, side supports 32 and transverse beams may be relatively easily disassembled from each other.
[0043] It may also be appreciated that the build-up of the apparatus illustrated herein is modular and may be easily scaled up as needed.
[0044] Using an apparatus such as the one shown in figure 1 , a method of forming a wall 120 of a floating caisson 100 may comprise providing a slab 110 on a submersible platform 20. One or more supports 130 may be provided on top on top of the slab 20, the supports 130 having a first outer surface 132 and a second outer face 134. A wall portion may be formed by spraying or shooting concrete on the first and second outer faces 132, 134 of the supports 130. [0045] Then, the platform 20 may be lowered. Subsequent wall portions may then be formed on top as needed.
[0046] The walls may thus be formed by spraying or shooting concrete on the supports. The supports 130 may be chosen to be lightweight. This shall be understood in the present disclosure as a support with a density that is lower than the density of the concrete sprayed on its face.
[0047] The supports 130 in examples may extend substantially perpendicular to the slab 110.
[0048] One example of a support is polystyrene foam. Polystyrene foam is lightweight, and may be cut, sized and shaped and arranged in a wide variety of ways. Thus any suitable support shape may be provided upon which concrete can be sprayed. The thickness of the concrete on either face of the support may be varied as needed. As a result, a wide variety of shapes and forms may be provided for the walls of the caisson. E.g. a wall of the caisson may be curved, e.g. be concave or convex. A wall of the caisson may have a double curvature, i.e. may be curved both in a vertical and a horizontal direction. Even though any of the walls of the caisson may be curved in this manner. The curvature of the outer walls of the caisson may be particularly suitable, e.g. when they have to function as breakwater structure. The curvature of the outer walls of the caisson may be chosen such as to absorb impact of incoming waves and/or to divert incoming waves suitably.
[0049] Other materials may also be used for the support, e.g. wood or polymer structures. The supports may be partially hollow in some examples.
[0050] A process of constructing a wall or a plurality of walls of a floating caisson may start with the arrangement of base supports on slab 110 to form the bottom section of the walls. Once the bottom portion of the wall(s) has been formed, the platform 20 may be lowered. Then, subsequent wall portions may be formed until the desired height for the walls is reached. The forming of one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports. [0051] Wall 121 may be formed by a worker from the annular outer working deck 40B for one face of the wall and from an inner working deck 40A for the other face of the wall. The situation is similar for wall 124. For wall 122, spraying may be performed from two neighboring inner working decks 40A. The same applies to wall 123. It is noted that only a cross-section is shown in figure 1 A. The floating caisson may have a plurality of walls that extend perpendicular to the walls 121 , 122, 123 and 124.
[0052] In some examples, armatures may be positioned along the faces of the supports 130 prior to shooting concrete. The armatures may be steel meshes, or fiber reinforced composites (e.g. glass fibers, carbon fibers or Kevlar® fibers).
[0053] In some examples, the supports 130 may have through-holes extending from the first face 132 to the second face 134. In other examples, the through-holes may be made in situ (e.g. they may be driller or bored, or carved out or otherwise). In order to reinforce the resulting wall structure, connectors may be provided through such through holes.
[0054] The connectors may be prefabricated or may be made in situ. As the wall portions, concrete may be used for the connectors. In a particular example, a reinforcement, such as a steel mesh or steel bars may be positioned in the through-hole substantially extending from the first face 132 to the second face 134. When concrete is shot on the faces 132, 134, the spaces of the connectors may be filled with concrete at the same time.
[0055] In some examples, the steel meshes or steel bars of the connectors may be folded at both ends to be substantially parallel to the walls.
[0056] An aspect of examples of the methods disclosed herein is that the overhead structure including working decks may stay substantially at the same height throughout the entire construction process of a caisson. The floating caisson, to the extent that it has been constructed, is lowered. Subsequent wall portions may thus be formed from the same height. The operators (and working decks) thus stay in substantially the same position. In prior art solutions, the caisson building floating docks, need to be at least as high as the heights of the structure to be built, since formworks are used.
[0057] In some examples, the buoyancy of the platform may be reduced after the forming of each subsequent wall portion. In some examples, the platform may be filled with water as needed to vary its buoyancy. Once wall portions of the caissons have dried up, the caisson may be filled with water to a desired level WLin. This water level does not need to be the same as the overall water level WL at sea, and in general will be different.
[0058] Figures 2A - 2C schematically illustrate different stages in a method for constructing a floating caisson according to an example. In figure 2A, the first step of spraying concrete is about to take place. It may be seen in figure 2A that a slab has been arranged on platform 20. Such a slab may be made as known in the art. The slab may be made of (steel) reinforced concrete. Steel bars may stick out upwards from the slab. Also the slab may contain stub(s) forming the beginning of the walls to be created. Then base supports 130 may be positioned. Reinforcement (steel) meshes may be arranged on either side of the supports 130.
[0059] Then, concrete may be sprayed on the base supports 130. In some examples, the base supports 130 may be entirely covered in such a step. In other examples, the base supports 130 that are positioned may not be entirely covered. E.g. the base supports 130 may have a height of 1 ,5 or 2 meters, whereas in a single step 1 meter of concrete is sprayed and then left to dry. It should be clear that these dimensions are only examples, and that in practice they may be varied.
[0060] After the concrete has dried, the platform 20 with the caisson may be lowered. As mentioned before, the caisson may be filled with water as need to lower the caisson structure to the level needed. Then, a next portion of wall may be made by repeating the same process. Additional supports may be positioned, reinforcements may be arranged along the first and second faces, and concrete may be shot. In some or all of these steps, connectors between the faces may be provided as explained in other parts of the present disclosure.
[0061] In the situation of figure 2B, the total height of the walls has been constructed. As such, the floating caisson 100 is finished. It may be seen in figure 2B, how the top of the walls is substantially level with the working decks. In order to remove the caisson 100 from the apparatus, the caisson may be flooded with water to a desired level WUN. The submersible platform 20 may also be flooded with water as needed to separate it from the floating caisson, see figure 2C. The caisson may then be pulled out and transported to the site of construction. [0062] In accordance with examples disclosed herein, a floating caisson may be constructed that comprises a bottom slab and a plurality of vertical walls. The vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core. The resulting floating caisson may be lighter than similar caissons in the prior art. The strength and stiffness however may still be the same as in the prior art. Less concrete is needed to reach the same level of bending strength.
[0063] The core may be made from a lightweight material, optionally polystyrene foam. The first and second concrete layers may be made of reinforced concrete. The bottom slab may be made from concrete as well, optionally reinforced concrete. In some examples, one or more of the vertical walls, particularly the outer walls of the caisson may include a convex or concave shape. The core may be formed by the base support and additional supports mentioned before.
[0064] Figures 3A - 3B schematically illustrate an example of a caisson that may be used in structures along the shore. Figure 3A shows a side view of a caisson 200 that may be used in a structure such as a pier, seawall or jetty. Jetties may be used e.g. to delimit harbors. Sea side is indicated with reference sign 260, and lee side is indicated with reference sign 250. The sea side wall 230 may be substantially concave and may function as breakwater. The lee side wall 235 may also be curved, but have a different curvature than the sea side wall. Reference sign 280 indicates a top surface of the caisson 200. The top surface 280 of caisson 200 may be used by pedestrians and other traffic once the caisson has been constructed and is operational.
[0065] With examples of the methods disclosed herein, the upper portion 270 on the sea side wall 230 forming a barrier or wall may be formed integrally with the caisson and the sea side wall. In prior art solutions, such a wall would normally be added in situ after placement of the caisson.
[0066] Figure 3B illustrates how a caisson 200 may have been transported to the construction site to be placed. The caisson 200 may be ballasted and positioned on bedding 210.
[0067] Figures 4A - 4B schematically illustrate a further example of an apparatus for constructing a floating caisson. In the example of figure 4A, the apparatus 70 comprises a floating pontoon 10. Like the previous example, a superstructure of the apparatus 70 comprises vertical side supports 32 and transverse beams 34. The working decks 40C and 40D are coupled to vertical beams 36 suspended from the transverse beams 34. Similarly to the previous example, a shotcrete distribution system 50 for supplying shotcrete to workers 60 on the working decks.
[0068] Further, as in the previous example, a submersible platform 20 may be connected to the floating pontoon to vary the vertical position of the submersible platform. The position of the submersible platform may be changed without changing the vertical position of the floating pontoon. A connection between the pontoon 10 and platform 20 may include a plurality of chains, wire ropes, cables or similar. Anchoring points 12 and 14 may be provided as commented before.
[0069] The floating caisson 300 to be constructed in this example is slightly different from the example of figure 1. A middle wall of floating caisson 300 is a substantially vertical straight wall, whereas the front and rear walls are curved. Figure 4A illustrates how the supports 130, 131 upon which the shotcrete is shot may be different for the different walls.
[0070] One difference between the example of figure 4 and the example of figure 1 , is that vertical guides 92 extend between the sea bed SB and the submersible platform 20. The guides 92 facilitate the platform 20 to move vertically and not drift.
[0071] A further difference between the example of figure 4 and the example of figure 1 is that one or more of the working decks may be movable, and in particular one or more the vertical supports 36 carrying working decks 40C may be displaced along transverse beams 34. The transverse beam may comprise rails or guides, along which the vertical supports 36 may be slid. Also the outer working deck 40D may be displaced in a similar manner.
[0072] The floating pontoon 10 may have a closed perimeter as may be seen in the top view of figure 4B. In a horizontal cross-section, the floating pontoon 10 may have a square ring-shaped form, or gates are provided to close the C-shape or U-shape of the pontoon.
[0073] The platform 20 may have a system to control ingress and egress of water. Suitable (bilge) pumps and valve systems may be used. Water lines 21 may be used to selectively fill the platform 20. One or more water lines 21 in some examples may lead from pontoon 21 to submersible platform 20. [0074] Figures 5A - 5D schematically illustrates a further example a construction method of a caisson. Figure 5A illustrates a first step (or one of the first steps) for constructing wall portions with base supports 130, 131 . At the stage of figure 5, a slab of concrete has been provided, with relatively small stubs where the walls are to be formed.
[0075] The outer walls of the floating caisson in this example are curved. The working decks 40C and 40D may be horizontally moveable to allow workers to shoot concrete on the supports, even as the walls are curved. Between the steps of figure 5B and 5C, the working decks are horizontally moved. The last construction step may be seen in figure 5C. A curved support 131 is placed to form the last portion of a sea side wall of the floating caisson.
[0076] When the floating caisson has been finished, figure 5D, the submersible platform 20 may be filled with water to sink the platform 20. The floating caisson may then be towed away.
[0077] Figure 6 schematically illustrates a method for transporting a floating caisson once constructed. It was noted before that the pontoon 10 of the apparatus 70 may form a closed cross-section. In order to tow a floating caisson 300 to a construction site where it may be filled to sink it, a towing vessel 160 using cables 165 or similar may tow the floating caisson 300 away. One side 13 of the floating pontoon may be closed off with gates 13A and 13B which may be opened after construction is finished.
[0078] Figures 7A and 7B illustrate examples of working decks 40C and 40D. The working decks 40C may include a female receiving portion to mate with a bottom portion of the vertical supports 36, such that the vertical support 36 can fit inside and the working deck may thereby be attached to the vertical support. The working surface 45 of the working deck may be substantially flat so that workers may move around comfortably and safely. Several ribs 43 may be seen that reinforce the working decks 40C, 40D.
[0079] While the use of shotcrete has generally been described in the illustrated examples, and walls of floating caissons are formed generally by shooting or projecting concrete on a support, in other examples, classic formworks may be used. Substantially the same apparatus including pontoon, submersible platform and a similar overhead structure including working decks may be used in these cases. Instead of shotcrete, concrete for formworks may be supplied through a suitable distribution system.
[0080] Although only a number of examples have been disclosed herein, other alternatives, modifications, uses and/or equivalents thereof are possible. Furthermore, all possible combinations of the described examples are also covered. Thus, the scope of the present disclosure should not be limited by particular examples, but should be determined only by a fair reading of the claims that follow.

Claims

1 . A method of forming a wall of a floating caisson comprising: providing a slab on a submersible platform; providing one or more base supports on top of the slab, the base supports having a first outer face and a second outer face; forming a first wall portion by spraying concrete on the first and the second outer faces; lowering the platform; and forming one or more subsequent wall portions on the first wall portion.
2. The method of claim 1 , wherein the forming one or more subsequent wall portions comprises providing one or more subsequent supports having first and second outer faces on top of the base supports and forming the subsequent wall portions by spraying or shooting concrete on the first and second outer faces of the subsequent supports.
3. The method of claim 1 or 2, further comprising lowering the platform by reducing the buoyancy of the platform after the forming of each subsequent wall portion.
4. The method of claim 3, wherein reducing the buoyancy of the platform includes filling the platform with water.
5. The method of any of claims 1 - 4, wherein the base supports and/or subsequent supports are made from a material that is relatively lightweight compared to concrete.
6. The method of any of claims 1 - 5, wherein the base supports and/or subsequent supports are made from polystyrene foam.
7. An apparatus for constructing a floating caisson, the apparatus comprising: a floating pontoon, a submersible platform, which is connected to the floating pontoon in such a way that a vertical position of the platform with respect to the floating pontoon can be varied, and an overhead structure supported by the floating pontoon, wherein the overhead structure comprises one or more working decks and a shotcrete distribution system for supplying shotcrete to workers on the working decks.
8. The apparatus according to claim 7, wherein one or more of the working decks are movable substantially horizontally.
9. The apparatus according to claim 7 or 8, wherein the submersible platform is connected to the floating pontoon with one or more cables, optionally guided by pulleys.
10. A floating caisson obtainable by a method according to any of claims 1 - 6 comprising a bottom slab and a plurality of vertical walls, wherein the vertical walls comprise a core of a first material, and a first concrete layer on a first face of the core and a concrete layer on a second opposite face of the core.
11. The floating caisson according to claim 10, wherein the core is made from a lightweight material, optionally polystyrene foam.
12. The floating caisson according to claim 9 or 10, wherein the first and second concrete layer are made of reinforced concrete.
13. The floating caisson according to any of claims 10 - 12, wherein the bottom slab is made from concrete, optionally reinforced concrete.
14. The floating caisson according to any of claims 10 - 13, wherein one or more of the vertical walls includes a convex or concave shape.
15. A breakwater structure including one or more floating caissons according to any of claims 10 - 14.
PCT/EP2021/068742 2020-07-07 2021-07-07 Floating caissons, methods and apparatus for constructing floating caissons WO2022008555A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP21742365.6A EP4178775A1 (en) 2020-07-07 2021-07-07 Floating caissons, methods and apparatus for constructing floating caissons

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP20382605.2A EP3936295A1 (en) 2020-07-07 2020-07-07 Floating caissons, methods and apparatus for constructing floating caissons
EP20382605.2 2020-07-07

Publications (1)

Publication Number Publication Date
WO2022008555A1 true WO2022008555A1 (en) 2022-01-13

Family

ID=71607882

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2021/068742 WO2022008555A1 (en) 2020-07-07 2021-07-07 Floating caissons, methods and apparatus for constructing floating caissons

Country Status (2)

Country Link
EP (2) EP3936295A1 (en)
WO (1) WO2022008555A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4054034A (en) * 1976-07-01 1977-10-18 Robert Warren Hyre Method for casting concrete tanks in water
US4263862A (en) * 1978-12-11 1981-04-28 Shepherd Ned A Lightweight marine structural concrete system
KR20090055226A (en) * 2007-11-28 2009-06-02 삼성중공업 주식회사 Falling down method of floating concrete block manufactured on the sea
CN102505702A (en) * 2011-10-13 2012-06-20 中国化学工程第十三建设有限公司 Double-wall concrete open caisson and construction method thereof
WO2018222553A1 (en) * 2017-05-27 2018-12-06 Place Daniel William Additively manufactured object fabrication vessel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4054034A (en) * 1976-07-01 1977-10-18 Robert Warren Hyre Method for casting concrete tanks in water
US4263862A (en) * 1978-12-11 1981-04-28 Shepherd Ned A Lightweight marine structural concrete system
KR20090055226A (en) * 2007-11-28 2009-06-02 삼성중공업 주식회사 Falling down method of floating concrete block manufactured on the sea
CN102505702A (en) * 2011-10-13 2012-06-20 中国化学工程第十三建设有限公司 Double-wall concrete open caisson and construction method thereof
WO2018222553A1 (en) * 2017-05-27 2018-12-06 Place Daniel William Additively manufactured object fabrication vessel

Also Published As

Publication number Publication date
EP4178775A1 (en) 2023-05-17
EP3936295A1 (en) 2022-01-12

Similar Documents

Publication Publication Date Title
KR20170118709A (en) How to build, assemble and launch a floating wind turbine platform
CN109736260B (en) U-shaped wharf and construction and installation method
WO2020176262A2 (en) Suction anchors and their methods of manufacture
US3640075A (en) Method of installing breakwater caissons
US20220063769A1 (en) Suction Anchors for Securing Structures to an Underwater Floor
CN103669284A (en) Box-barrel-type foundation breakwater structure assembled over water and assembling method thereof
WO2023020356A1 (en) Caisson quay and construction method therefor
US3393520A (en) Container and method of building a breakwater
JP3663693B2 (en) Large structure manufacturing and repair work methods as well as barges used to implement these methods
US7007620B2 (en) Modular ships for transporting and installing precast modular intermodal concrete shapes
CN113653000A (en) Caisson and caisson combination
EP3936295A1 (en) Floating caissons, methods and apparatus for constructing floating caissons
US5216773A (en) Method of formation and installation of a floating bridge
JPH11140893A (en) Manufacture and launching method for sinking box
CN215367481U (en) Backfill system for pile foundation erosion pit of ocean platform
JP2012077578A (en) Work scaffolding and method for constructing the same
CN102348853A (en) A deep-water port
KR20200123977A (en) Lathe type quay structure reinforced sheet pile and method for reinforcement quay structure using sheet pile
CN115897479B (en) Novel assembled wharf revetment structure based on barrel type foundation and construction method
CN218813475U (en) Deep water gravity pier trestle type breakwater
CN203593995U (en) Cylindrical caisson type foundation bulwark structure assembled above water
KR20050051895A (en) Temporary coffering structure using dead load and buoyancy and construction or repairing method for irrigation structure using the same
KR102383736B1 (en) Crane rail foundation integrated caisson and construction method
JPH10167176A (en) Repair spud pontoon for pile or column-like structure and method for using the same
RU2119004C1 (en) Berthing structure

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21742365

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2021742365

Country of ref document: EP

Effective date: 20230207