EP3925917A1 - Plateforme de support mobile intégrée et procédé de balayage d'un arbre - Google Patents

Plateforme de support mobile intégrée et procédé de balayage d'un arbre Download PDF

Info

Publication number
EP3925917A1
EP3925917A1 EP20386031.7A EP20386031A EP3925917A1 EP 3925917 A1 EP3925917 A1 EP 3925917A1 EP 20386031 A EP20386031 A EP 20386031A EP 3925917 A1 EP3925917 A1 EP 3925917A1
Authority
EP
European Patent Office
Prior art keywords
invention according
shaft
cmm
platform
moving carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP20386031.7A
Other languages
German (de)
English (en)
Inventor
Georgios GEORGIADIS
Emmanouil Zotos
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kleemann Hellas SA
Original Assignee
Kleemann Hellas SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kleemann Hellas SA filed Critical Kleemann Hellas SA
Priority to EP20386031.7A priority Critical patent/EP3925917A1/fr
Publication of EP3925917A1 publication Critical patent/EP3925917A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • B66B19/007Mining-hoist operation method for modernisation of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/0043Devices enhancing safety during maintenance
    • B66B5/005Safety of maintenance personnel
    • B66B5/0081Safety of maintenance personnel by preventing falling by means of safety fences or handrails, being operable or not, mounted on top of the elevator car

Definitions

  • Present invention refers to an integrated system and method of installing an elevator or any other similar lifting mechanism. It consists of a built-in platform, a method of recording the dimensions and all required details from a shaft, using a coordinate measuring machine (CMM) and the manipulation of the collected data (feeding robotic installation, augmented reality (AR), conventional man installation etc). Following are described further details about the invention.
  • CMM coordinate measuring machine
  • AR augmented reality
  • Elevators are placed in buildings and are a type of vertical transportation that moves people or/and goods between floors of a building. Millions of elevators are installed everyday around the world. Installing an elevator takes several days of work, depending the dimensions of the shaft and the specific features of each construction.
  • the elevator is installed into the shaft by using a scaffold which is previously installed in the shaft.
  • temporary platforms are arranged in order to assist the installers to place the several components, such as brackets on the walls or even the elevator machine on the top of the shaft.
  • the main drawback of this method is the demanded time for installing and uninstalling the scaffold.
  • each shaft is described by different specifications. It is crucial knowing not only the dimensions of the shaft, but also specific features such as abnormalities on the walls. It is common the walls of the shaft not being perfect vertical levels through the whole height.
  • the presented invention combines a built-in carrier platform, that can be used regardless the height of the building, a hoist mechanism that enables the vertical movement of the platform and a method of recording the shaft.
  • the first part of the invention concerns the built-in platform and aims on eliminating the difficulties that the installers face.
  • the scope of the second part, of using the CMM on the platform is presenting an easy way of recording precisely the shaft, so the afterwards installation demands less effort.
  • the built-in platform consists of the support frame (1), which can be placed in any level of the building, the overhead bridge (2), where could be also adjusted the pulley system (7), the carrosserie static support frame (3) and the carrosserie moving carrier (4). Underneath the moving carrier (4) is placed the hoist mechanism (6), which enables the platform of moving up and down. On the platform can be attached the CMM and while the platform descents the CMM is able to scan the shaft.
  • the platform can be placed in any level of the building, but it is useful the fact that it can be placed on the upper floor level, so the moving carrier (4) goes through the whole shaft.
  • the telescopic bars (9) ensure the stability of the construction regardless the height of the storey, since they are regulated to several heights. The stability is ensured since they use the floor and the roof of the corresponding storey.
  • the support frame (1) consists of adjustable parts in order to fit in any opening width.
  • the carrosserie moving carrier (4) slides in the support frame (1) and then is docked and locked.
  • the moving carrier (4) is made of a durable material and its design ensures that it withstands the applied loads, and for ensuring the safety of the worker, balustrades (11) are placed at least at three sides.
  • the side frames (10) of the moving carrier can be foldable, as the balustrades (11), in order to fir better in a variety of shafts.
  • the hoist mechanism (6) and the pulley (7) enables the vertical movement of the platform. Descending can be gravitational, assisted (speed control) either by oil speed valve or small motor. After the appropriate configuration the elevator's motor could be also used for ascending and descending the platform. Any unintentional sideway movements can be eliminated by the alignment casters (5), which are expanded below the moving carrier.
  • the CMM (8) is placed on the carrosserie and is secured, so it remains still concerning the carrosserie as the corresponding reference point.
  • the moving carrier starts going down with CMM machine on it and the shaft is recorded.
  • An additional sensor coupled with the CMM can be placed in any fixed position in the shaft. The purpose of this additional sensor is to provide corrections in data regarding the position of CMM, since the CMM may be subjected to disturbances (sudden lateral movements, obstacles) beyond the range that CMM software can handle.
  • the collected data from the CMM are available to be manipulated by different ways.
  • the collected data can be used by the installers or feed information to a robotic system that executes the installation or even be transferred to an augmented reality (AR) system, this system is further used during the installation and points out the right way of installing each component in the construction.
  • AR augmented reality

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
EP20386031.7A 2020-06-15 2020-06-15 Plateforme de support mobile intégrée et procédé de balayage d'un arbre Withdrawn EP3925917A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP20386031.7A EP3925917A1 (fr) 2020-06-15 2020-06-15 Plateforme de support mobile intégrée et procédé de balayage d'un arbre

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP20386031.7A EP3925917A1 (fr) 2020-06-15 2020-06-15 Plateforme de support mobile intégrée et procédé de balayage d'un arbre

Publications (1)

Publication Number Publication Date
EP3925917A1 true EP3925917A1 (fr) 2021-12-22

Family

ID=71728699

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20386031.7A Withdrawn EP3925917A1 (fr) 2020-06-15 2020-06-15 Plateforme de support mobile intégrée et procédé de balayage d'un arbre

Country Status (1)

Country Link
EP (1) EP3925917A1 (fr)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4411371B1 (ja) * 2009-03-30 2010-02-10 エヌ・ティ・ティジーピー・エコ株式会社 エレベータ昇降路内の位置情報取得装置とそのガイド装置
US20100309452A1 (en) * 2007-12-07 2010-12-09 Otis Elevator Company Methods and devices for surveying elevator hoistways
US20190177120A1 (en) * 2016-08-30 2019-06-13 Inventio Ag Method for analysis and measurement system for measuring an elevator shaft of an elevator system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100309452A1 (en) * 2007-12-07 2010-12-09 Otis Elevator Company Methods and devices for surveying elevator hoistways
JP4411371B1 (ja) * 2009-03-30 2010-02-10 エヌ・ティ・ティジーピー・エコ株式会社 エレベータ昇降路内の位置情報取得装置とそのガイド装置
US20190177120A1 (en) * 2016-08-30 2019-06-13 Inventio Ag Method for analysis and measurement system for measuring an elevator shaft of an elevator system

Similar Documents

Publication Publication Date Title
CA2544881C (fr) Methode et dispositif d'installation de guide-rails dans une cage d'ascenseur
CN101535165B (zh) 在建筑物建造期间装设无机房电梯的方法和装置及曳引机的应用
US7559409B2 (en) Procedure and apparatus for the installation of an elevator
US10036170B2 (en) Climbing equipment and climbing method for the construction of a building
CN103402901A (zh) 方法和电梯配置
SG186043A1 (en) Mobile cantilever platforms and methods of installation thereof
US20030136611A1 (en) Installing frame for installation of shaft equipment, installing elevator with installing frame and method of installation of shaft equipment
EP3786095A1 (fr) Mesure compensatoire de plafond bas
EP3925917A1 (fr) Plateforme de support mobile intégrée et procédé de balayage d'un arbre
JP2009057198A (ja) エレベータかご、エレベータかごの組立方法、および揚重治具
JP2015101440A (ja) 重量物の階段揚重装置及び階段揚重方法
EP3964471A1 (fr) Méthode d'installation assistée
EP2774887A1 (fr) Unité de seuil de porte et procédé pour une unité de porte de palier d'ascenseur
EP1647512B1 (fr) Systeme d'echafaudage de travail pour ascenseur
CN208648493U (zh) 一种无脚手架安装电梯用作业平台装置
JPH05340085A (ja) 昇降路作業用足場装置
WO2004087552A1 (fr) Appareil permettant de piloter un ascenseur a cabines superposees jusqu'a un niveau d'atterrissage
JP2005089148A (ja) エレベーターの据付作業床装置
JPH0484731A (ja) 昇降機用案内レールの実効的曲げ剛性測定装置
JP7583224B2 (ja) 巻上機据付ガイド装置及び巻上機の据付方法
KR102621157B1 (ko) 곤도라 확장용 발판
JP2708145B2 (ja) 荷物昇降用搬器とその使用方法
JP2612258B2 (ja) エレベータ据付工事工法
JP4849748B2 (ja) ダブルデッキエレベータおよびその保守・点検方法
JP2001163546A (ja) マシンルームレスエレベータの据え付け工法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

B565 Issuance of search results under rule 164(2) epc

Effective date: 20201216

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20220614

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20231103

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20240813