EP3907117B1 - String transport system - Google Patents

String transport system Download PDF

Info

Publication number
EP3907117B1
EP3907117B1 EP19907520.1A EP19907520A EP3907117B1 EP 3907117 B1 EP3907117 B1 EP 3907117B1 EP 19907520 A EP19907520 A EP 19907520A EP 3907117 B1 EP3907117 B1 EP 3907117B1
Authority
EP
European Patent Office
Prior art keywords
load
supports
transport system
bearing elements
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP19907520.1A
Other languages
German (de)
French (fr)
Other versions
EP3907117A4 (en
EP3907117C0 (en
EP3907117A1 (en
Inventor
Anatoli Eduardovich Unitsky
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Unitsky Anatoli Eduardovich
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP3907117A1 publication Critical patent/EP3907117A1/en
Publication of EP3907117A4 publication Critical patent/EP3907117A4/en
Application granted granted Critical
Publication of EP3907117B1 publication Critical patent/EP3907117B1/en
Publication of EP3907117C0 publication Critical patent/EP3907117C0/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B5/00Elevated railway systems without suspended vehicles
    • B61B5/02Elevated railway systems without suspended vehicles with two or more rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B3/00Elevated railway systems with suspended vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B5/00Elevated railway systems without suspended vehicles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/08Tracks for mono-rails with centre of gravity of vehicle above the load-bearing rail
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/22Tracks for railways with the vehicle suspended from rigid supporting rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/22Tracks for railways with the vehicle suspended from rigid supporting rails
    • E01B25/24Supporting rails; Auxiliary balancing rails; Supports or connections for rails

Definitions

  • the invention relates to the area of transport communications, in particular, to the integrated aboveground transport systems of a string type, with transport infrastructure providing speed cargo and passenger traffic.
  • Overpass-type transport systems by Yunitski based on string track structure are well-known, for instance, track structure of transport system by Yunitski [1] is known, comprising at least one fastened on supports rail cord in the form of prestressed load-bearing member (string), encased in body with conjugated working surface for moving of vehicles.
  • string rail cord in span between adjacent supports, forms span sections of single-rail or multi-rail track structure.
  • the track structure of this type uses inserts (gaskets) of variable height increasing towards the middle of span, which, however, complicates the technology of manufacturing and installation of rail cords in field conditions and does not allow to achieve the straightness of track structure and "velvet-smooth track” effect.
  • String transport system by Yunitski [2] comprising fastened on foundation on different levels in spans between adjacent supports and interconnected at least one main cord in the form of prestressed load-bearing member, encased in body with rolling surface for vehicles conjugated therewith, and at least one auxiliary cord with prestressed load-bearing member.
  • Main cord is connected with auxiliary cord by the system of supporting elements of various height, embodied in the form of suspensions and/or pillars, spaced along the span between adjacent supports at certain intervals therebetween.
  • the rolling surface conjugated with body of main cord is located with excess, increasing towards the middle of the span, over straight line passing through the points of this surface in the points of connecting main cord with adjacent supporting elements.
  • rolling surface conjugated with body of main cord may be disposed on liners of variable thickness installed inside or outside body of the cord, between the rolling surface and load-bearing member, at intervals between adjacent supporting elements or/and in span between adjacent supports, wherein body of main cord may be integrally formed with variable thickness liners.
  • the known transport system provides sufficient bearing capacity and rigidity of string track structure, however, is not high-tech and complicates the process of manufacturing rail cords in field conditions and at height of up to tens and hundreds of meters, and, moreover, does not allow to achieve the straightness of track structure and "velvet-smooth track" effect.
  • transport system by Yunitski [3] which includes, at least, one tensioned above foundation, in spans between supports, track structure in the form of extended body, forming rail track with rolling surface and vehicle mounted thereupon.
  • the body of such track structure is made hollow and equipped with prestressed extended load-bearing elements positioned therein, concreted with hardening material distributed in volume of cavity free of load-bearing elements.
  • prestressed extended load-bearing elements are positioned in body in such way that the height of their position level can vary within limits of height of internal volume of body along the span between supports, decreasing towards the middle of span and increasing in directions towards supports forming it.
  • the hardening material used represents materials based on polymer binders, composites and/or cement mixtures, whereas extended load-bearing elements of the structure are made of wire, and/or rods, and/or twisted or non-twisted ropes, and/or cords, strips, strands, tapes, pipes, and/or from different combinations of the above-mentioned variants of high-strength materials.
  • the rail cord in the known transport systems is formed by string-type rails tensioned between anchor supports, the common feature of which is the presence of extended body with rolling surface conjugated therewith, and with prestressed longitudinal load-bearing member enclosed therein.
  • the basis of work of the known transport system is that the rolling surfaces conjugating with bodies of rail cords form a track for supporting wheels of vehicles, the movement of which can be organized by any of the known types of drive.
  • end anchor supports enduring maximum loads from load-bearing elements of rail cords, possess increased materials intensity and cost.
  • transport systems do not provide the required rigidity and straightness of the track, which does not allow, during operation thereof with non-stop traffic, to achieve smoothness and softness of the vehicle motion throughout the track structure.
  • Yunitski which comprises end and intermediate supports mounted on foundation, and at least one rail cord stretched in the spans between them, which includes a plurality of prestressed load-bearing elements tensioned between the supports, combined, at least, in one load-bearing member coupled to the rolling surface for motion of vehicle, whereby up to half of plurality of load-bearing elements are rigidly fixed in longitudinal direction in fastening units located on intermediate supports, and the remaining part of plurality of load-bearing elements is connected to intermediate supports without restriction of their longitudinal movement.
  • the technical aim is also achieved provided that up to a tenth of plurality of load-bearing elements are rigidly fixed in longitudinal direction in fastening units located on the intermediate supports.
  • load-bearing member possesses body and load-bearing elements positioned therein.
  • load-bearing member is implemented in a bodyless embodiment.
  • fastening unit represents an anchor
  • the claimed string transport system by Yunitski (see Fig.1 ) comprises end 2 supports and intermediate 3 supports mounted on foundation 1.
  • end 2 supports and intermediate 3 supports may have various designs, for example - in the form of towers, columns with caps (not shown on figures), steel and reinforced concrete columnar and frame buildings and structures equipped, for example, with passenger stations and/or cargo terminals (not shown on figures), other functional structures.
  • At least one rail cord 4 is tensioned, comprising plurality of prestressed load-bearing elements 5 tensioned between supports, and combined at least in one load-bearing member 6 (see Figs.2 and 3 ).
  • End 2 supports are anchor supports with ends of prestressed load-bearing elements 5 of rail cords 4 fastened thereon by means of anchoring.
  • Intermediate 3 supports represent anchor supports, with ends of prestressed load-bearing elements 5 of rail cords 4 fastened thereon by means of anchoring.
  • the claimed string transport system may include intermediate 3 supports which are not anchor ones.
  • some of plurality of load-bearing elements are rigidly fixed (e.g. by anchoring) in fastening units on intermediate 3 anchor supports.
  • the remaining load-bearing elements 5 of rail cord 4 remain unfixed on intermediate 3 support and are connected to these supports without restrictions on their longitudinal movement.
  • Such intermediate 3 supports partially act as intermediate anchor supports and participate in redistribution of force loads on end 2 (anchor) supports. Hereby, stability of end 2 supports in relation to longitudinal tension forces is increased.
  • load-bearing elements 5 may be used, made of, as a rule, in the form of twisted and/or untwisted ropes, cables, bands, strips, cords, strands, reinforcement bars, high-strength steel wire, tubes or other extended load-bearing elements from any high-strength materials, assembled in one bunch and/or several bunches.
  • Load-bearing member 6 is connected via body 8 with rolling surface A for motion of vehicle 7.
  • Wheeled vehicle 7 (passenger and/or cargo, and/or cargo-passenger), as part of string transport system by Yunitski, can be either mounted on wheels on rolling surface A of load-bearing member 6 of rail cord 4, a view of cross-sectional embodiment of which is schematically shown on Fig. 2 , or suspended from below on rolling surface A of load-bearing member 6 of rail cord 4, a view of cross-sectional embodiment of which is schematically shown on Fig. 3 .
  • the motion of vehicle 7 can be realized by any of the known types of drive.
  • Rail cord 4 may be monorail, or may be, for example, an element of a multi-rail track structure, or one of chords (or chord fragment) of trussed construct of track structure of string transport system, or cable/cord assembly (not shown on figures).
  • load-bearing member 6 may comprise body 8, in which load-bearing elements 5 are placed.
  • An embodiment of load-bearing member 6 of rail cord 4 in a body variant of practical implementation is shown schematically on Figs.2 - 5 .
  • the space inside body 8 of load-bearing member 6 can be filled with hardening mixture 9.
  • hardening mixture 9 polymer binder composite compositions, cement mixtures (see Figs.2, 3 and 4 ) and/or similar hardening materials are used.
  • load-bearing member 6 of rail cord 4 is grouted (concreted), thereby transferring and redistributing external loads and forces to all prestressed load-bearing elements 5 of string transport system, which significantly increases flexural rigidity and reliability of body 8 of load-bearing member 6 of rail cord 4 (see Figs.2, 3 and 4 ).
  • load-bearing member 6 of rail cord 4 does not work as a flexible element, but as a rigid continuous beam.
  • An alternative embodiment is a bodyless variant of load-bearing member 6 of rail cord 4, whereby vehicle 7 interacts and travels on the rolling surface A located directly on the surface of load-bearing member 6, made, for example, in the form of a rope.
  • Fastening units 10 of load-bearing elements 5 of load-bearing member 6 (and rail cord 4 as a whole) on end 2 and intermediate 3 anchor supports represent any known devices similar to those used in suspension and cable-stayed bridges, ropes and prestressed reinforced concrete structures for fastening (anchoring) of tensioned load-bearing members (reinforcement, ropes, high-strength wires, etc.).
  • fastening unit 10 of load-bearing elements 5 of load-bearing member 6 on intermediate 3 anchor supports comprises anchor 11 positioned on load-bearing bulkhead 12 (see Fig.5 ) rigidly fixed on intermediate 3 anchor support.
  • any intermediate 3 anchor support has a certain margin of stability, in order to save material resources, it is advisable to redistribute between end 2 and intermediate 3 anchor supports of transport system, through the anchors 11 positioned on transverse bulkhead 12 of intermediate 3 anchor support, the effect of axial forces which create prestressing of load-bearing elements 5 of rail cord 4.
  • Partial anchoring of load-bearing elements 5 on intermediate 3 anchor supports allows to evenly distribute combined tension force of load-bearing member 6, transferred to intermediate 3 anchor supports, and thereby ensure their load relief, and increase stability of end 2 supports and reliability of rail-string transport overpass, with decreased material capacity, costs of supports and load-bearing member 6, alongside with load-bearing elements 5 and rail cord 4 as a whole.
  • the mentioned embodiment of track structure, and in particular of rail cord 4 ensures the preservation of reliability and safety, even in extreme situation, when the integrity of one or more load-bearing elements 5 is damaged.
  • Increase of number of load-bearing elements 5 rigidly fixed in longitudinal direction in fastening units 10, located on intermediate 3 anchor supports, more than half of all load-bearing elements 5 of load-bearing member 6, makes it possible to carry out more substantial load relief of supports, but at the same time there is a significant increase in material consumption and cost of intermediate 3 anchor supports, as well as - unjustifiable reduction in technological effectiveness of construction of the transport system as a whole.
  • anchor 11 on intermediate 3 anchor support is configured to join prestressed load-bearing elements 5.
  • durability of both load-bearing elements 5 of load-bearing member 6 and rail cord 4 as a whole is improved.
  • the joints of load-bearing elements 5 are arranged on intermediate 3 anchor supports in fastening units 10. This will allow to reduce cost and simplify assembly process of transport system in field conditions.
  • intermediate 3 anchor support comprising fastening unit 10 is provided with elements reinforcing its stability, for example, stays 13, and/or braces 14 (see Figs.1 and 6 ).
  • elements reinforcing its stability for example, stays 13, and/or braces 14 (see Figs.1 and 6 ).
  • material capacity and cost of supports are significantly reduced, and reliability and bearing capacity of Yunitski string transport system are significantly increased.
  • Construction of the presented string transport system by Yunitski includes installation on foundation 1 of end 2 and intermediate 3 supports, in spans Z between which at least one rail cord 4 is fastened and at least one wheeled vehicle 7 is guided along it.
  • the load-bearing elements 5 of load-bearing member 6 of rail cord 4 are tensioned and anchored, in accordance with design option, both on end 2 and intermediate 3 anchor supports.
  • end 2 anchor supports in span between end 2 anchor supports, equaling to, for example, 10,000 meters, it can be established, at the same distance from each other, depending on the design option, from two to ten intermediate 3 anchor supports.
  • the intermediate 3 anchor supports during construction and installation of rail cord 4, will experience 2 to 10 times less forces from load-bearing elements 5, since load-bearing elements 5, for example, reinforcement ropes, have a limited length not exceeding 1,000 - 5,000 m.
  • Rail cord 4 is arranged between supports in spans L. Its prestressing is carried out by tensioning in longitudinal direction of load-bearing elements 5 of load-bearing member 6 and their anchoring on corresponding supports.
  • load-bearing elements 5 of load-bearing member 6 and their anchoring on corresponding supports.
  • each intermediate 3 anchor support there occurs balancing of tension forces, formed on both sides of the support, of load-bearing elements 5 anchored on this support.
  • each intermediate 3 support has a certain margin of stability. Thus, with end 2 supports distancing, the stability of intermediate 3 support 3 and its resistance to overturning moment from load-bearing elements 5 anchored thereon is increased.
  • intermediate 3 anchor support with anchor 11 is made reinforced and/or it is supplied with stays 13 and/or braces 14, which allows to increase its stability without significant increase in material capacity.
  • String transport system by Yunitski of the described structure allows to create a transport system, having high load capacity and improved operational characteristics and ensure load relief, reduction of material capacity and stresses in end 2 supports, increase of rigidity and reliability of rail cord 4 with stabilization throughout its longitudinal evenness and straightness of rolling surfaces A and achievement of "velvet-smooth track" effect with increase of spans Z between supports.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Railway Tracks (AREA)
  • Bridges Or Land Bridges (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)

Description

    Technical field
  • The invention relates to the area of transport communications, in particular, to the integrated aboveground transport systems of a string type, with transport infrastructure providing speed cargo and passenger traffic.
  • Background Art
  • Overpass-type transport systems by Yunitski based on string track structure are well-known, for instance, track structure of transport system by Yunitski [1] is known, comprising at least one fastened on supports rail cord in the form of prestressed load-bearing member (string), encased in body with conjugated working surface for moving of vehicles. In such transport system, string rail cord, in span between adjacent supports, forms span sections of single-rail or multi-rail track structure. In order to equalize the natural sagging of load-bearing member of rail cord in span between adjacent supports, the track structure of this type uses inserts (gaskets) of variable height increasing towards the middle of span, which, however, complicates the technology of manufacturing and installation of rail cords in field conditions and does not allow to achieve the straightness of track structure and "velvet-smooth track" effect.
  • String transport system by Yunitski [2] is also known, comprising fastened on foundation on different levels in spans between adjacent supports and interconnected at least one main cord in the form of prestressed load-bearing member, encased in body with rolling surface for vehicles conjugated therewith, and at least one auxiliary cord with prestressed load-bearing member. Main cord is connected with auxiliary cord by the system of supporting elements of various height, embodied in the form of suspensions and/or pillars, spaced along the span between adjacent supports at certain intervals therebetween. In the interval between two adjacent supports, the rolling surface conjugated with body of main cord is located with excess, increasing towards the middle of the span, over straight line passing through the points of this surface in the points of connecting main cord with adjacent supporting elements.
  • Additionally, rolling surface conjugated with body of main cord may be disposed on liners of variable thickness installed inside or outside body of the cord, between the rolling surface and load-bearing member, at intervals between adjacent supporting elements or/and in span between adjacent supports, wherein body of main cord may be integrally formed with variable thickness liners.
  • Selection of ratio of interval between supporting elements ensures such interaction of vehicle with track structure, during which in each specified interval, strain-stress state of main cord will remain optimum.
  • The known transport system provides sufficient bearing capacity and rigidity of string track structure, however, is not high-tech and complicates the process of manufacturing rail cords in field conditions and at height of up to tens and hundreds of meters, and, moreover, does not allow to achieve the straightness of track structure and "velvet-smooth track" effect.
  • Accepted as prototype, transport system by Yunitski [3] is known, which includes, at least, one tensioned above foundation, in spans between supports, track structure in the form of extended body, forming rail track with rolling surface and vehicle mounted thereupon. The body of such track structure is made hollow and equipped with prestressed extended load-bearing elements positioned therein, concreted with hardening material distributed in volume of cavity free of load-bearing elements. Those prestressed extended load-bearing elements are positioned in body in such way that the height of their position level can vary within limits of height of internal volume of body along the span between supports, decreasing towards the middle of span and increasing in directions towards supports forming it. The hardening material used represents materials based on polymer binders, composites and/or cement mixtures, whereas extended load-bearing elements of the structure are made of wire, and/or rods, and/or twisted or non-twisted ropes, and/or cords, strips, strands, tapes, pipes, and/or from different combinations of the above-mentioned variants of high-strength materials.
  • The rail cord in the known transport systems is formed by string-type rails tensioned between anchor supports, the common feature of which is the presence of extended body with rolling surface conjugated therewith, and with prestressed longitudinal load-bearing member enclosed therein. The basis of work of the known transport system is that the rolling surfaces conjugating with bodies of rail cords form a track for supporting wheels of vehicles, the movement of which can be organized by any of the known types of drive.
  • Moreover, in the structures of rail cords and the track structure on the whole, of the known transport systems, end anchor supports, enduring maximum loads from load-bearing elements of rail cords, possess increased materials intensity and cost. In addition, such transport systems do not provide the required rigidity and straightness of the track, which does not allow, during operation thereof with non-stop traffic, to achieve smoothness and softness of the vehicle motion throughout the track structure.
  • The next-coming prior art document is WO 2017/219112 A1 .
  • The task of achieving the following engineering purposes lies at the heart of the invention:
    • load relieving thanks to redistribution of stresses in anchor supports of the string transport system;
    • enhancing reliability of the transport system;
    • stabilizing longitudinal flatness, ensuring presence of vertical operating flatness of rolling surfaces of rail cord throughout its entire length, with "velvet-smooth track" effect.
    Summary of invention
  • This task is solved by the subject matter of claim 1. Further aspects are defined in the subclaims.
    More specifically, the required technical tasks and desired aims of the present invention are achieved by using string transport system by Yunitski, which comprises end and intermediate supports mounted on foundation, and at least one rail cord stretched in the spans between them, which includes a plurality of prestressed load-bearing elements tensioned between the supports, combined, at least, in one load-bearing member coupled to the rolling surface for motion of vehicle, whereby up to half of plurality of load-bearing elements are rigidly fixed in longitudinal direction in fastening units located on intermediate supports, and the remaining part of plurality of load-bearing elements is connected to intermediate supports without restriction of their longitudinal movement.
  • The solution of the given problem is also ensured provided that up to one-third of plurality of load-bearing elements are rigidly fixed in longitudinal direction in fastening units located on intermediate supports.
  • The technical aim is also achieved provided that up to a tenth of plurality of load-bearing elements are rigidly fixed in longitudinal direction in fastening units located on the intermediate supports.
  • The technical objective is achieved also due to the fact that load-bearing member possesses body and load-bearing elements positioned therein.
  • The above result is also achieved because the space within body of load-bearing member is filled up with hardening mixture.
  • The solution of the given task is also possible provided that load-bearing member is implemented in a bodyless embodiment.
  • Achievement of this result is also ensured by the fact that fastening unit represents an anchor.
  • The solution of the set task is also possible on the condition that anchor is configured to joint prestressed load-bearing elements.
  • This result is also achieved by the fact that joints of load-bearing elements are located on intermediate supports in fastening units.
  • Achievement of the above result is also ensured by the fact that intermediate support containing fastening unit is equipped with elements reinforcing its stability.
  • Brief description of drawings
  • The essence of this invention is clarified through the drawings in Fig.1-Fig.6, which illustrate the following:
    • Fig. 1 - schematic view of string transport system by Yunitski - general view (embodiment);
    • Fig.2 - schematic view of cross section of body of rail cord for mounted vehicle (embodiment);
    • Fig.3 - schematic view of cross section of body of rail cord for suspended vehicle (embodiment);
    • Fig.4 - schematic view of longitudinal section of rail body on intermediate supports (embodiment);
    • Fig. 5 - schematic view of anchors in fastening unit of load-bearing elements on intermediate support (embodiment);
    • Fig.6 - schematic view of fastening units of load-bearing elements on various supports of string transport system by Yunitski - general view (embodiment).
    Embodiments of invention
  • The essence of the claimed invention is further presented in a closer detail.
  • The claimed string transport system by Yunitski (see Fig.1) comprises end 2 supports and intermediate 3 supports mounted on foundation 1.
  • Depending on the properties of the foundation 1, installation site and set of functions, end 2 supports and intermediate 3 supports may have various designs, for example - in the form of towers, columns with caps (not shown on figures), steel and reinforced concrete columnar and frame buildings and structures equipped, for example, with passenger stations and/or cargo terminals (not shown on figures), other functional structures.
  • In spans Z between supports, at least one rail cord 4 is tensioned, comprising plurality of prestressed load-bearing elements 5 tensioned between supports, and combined at least in one load-bearing member 6 (see Figs.2 and 3).
  • End 2 supports are anchor supports with ends of prestressed load-bearing elements 5 of rail cords 4 fastened thereon by means of anchoring.
  • Intermediate 3 supports represent anchor supports, with ends of prestressed load-bearing elements 5 of rail cords 4 fastened thereon by means of anchoring. At the same time, the claimed string transport system may include intermediate 3 supports which are not anchor ones.
  • In some cases, in places with limited capacity to erect full end 2 supports, for example, in urban conditions, as well as on weak soils, it is advisable to partially redistribute the tension force of load-bearing elements 5 to intermediate 3 anchor supports.
  • In such cases, some of plurality of load-bearing elements are rigidly fixed (e.g. by anchoring) in fastening units on intermediate 3 anchor supports. At the same time, the remaining load-bearing elements 5 of rail cord 4 remain unfixed on intermediate 3 support and are connected to these supports without restrictions on their longitudinal movement. Such intermediate 3 supports partially act as intermediate anchor supports and participate in redistribution of force loads on end 2 (anchor) supports. Hereby, stability of end 2 supports in relation to longitudinal tension forces is increased.
  • As load-bearing member 6, schematic view of cross section in body embodiment of which is presented on Figs.2 and 3, load-bearing elements 5 may be used, made of, as a rule, in the form of twisted and/or untwisted ropes, cables, bands, strips, cords, strands, reinforcement bars, high-strength steel wire, tubes or other extended load-bearing elements from any high-strength materials, assembled in one bunch and/or several bunches.
  • Load-bearing member 6 is connected via body 8 with rolling surface A for motion of vehicle 7.
  • Wheeled vehicle 7 (passenger and/or cargo, and/or cargo-passenger), as part of string transport system by Yunitski, can be either mounted on wheels on rolling surface A of load-bearing member 6 of rail cord 4, a view of cross-sectional embodiment of which is schematically shown on Fig. 2, or suspended from below on rolling surface A of load-bearing member 6 of rail cord 4, a view of cross-sectional embodiment of which is schematically shown on Fig. 3. At the same time, the motion of vehicle 7 can be realized by any of the known types of drive.
  • It is obvious to a person skilled in the art, that the presented inventive concept, depending on design option and required technical parameters, allows application of multiple combinations of embodiment of both load-bearing member 6 and rail cord 4 as a whole. Rail cord 4 may be monorail, or may be, for example, an element of a multi-rail track structure, or one of chords (or chord fragment) of trussed construct of track structure of string transport system, or cable/cord assembly (not shown on figures).
  • In some cases of practical implementation of the proposed transport system, load-bearing member 6 may comprise body 8, in which load-bearing elements 5 are placed. An embodiment of load-bearing member 6 of rail cord 4 in a body variant of practical implementation is shown schematically on Figs.2 - 5.
  • The space inside body 8 of load-bearing member 6 can be filled with hardening mixture 9.
  • According to any of the unlimited variants of use of hardening mixture 9, as such, depending on the design option, polymer binder composite compositions, cement mixtures (see Figs.2, 3 and 4) and/or similar hardening materials are used.
  • As a result, load-bearing member 6 of rail cord 4 is grouted (concreted), thereby transferring and redistributing external loads and forces to all prestressed load-bearing elements 5 of string transport system, which significantly increases flexural rigidity and reliability of body 8 of load-bearing member 6 of rail cord 4 (see Figs.2, 3 and 4).
  • At the same time, load-bearing member 6 of rail cord 4 does not work as a flexible element, but as a rigid continuous beam.
  • An alternative embodiment is a bodyless variant of load-bearing member 6 of rail cord 4, whereby vehicle 7 interacts and travels on the rolling surface A located directly on the surface of load-bearing member 6, made, for example, in the form of a rope.
  • Common to all practical embodiments of the proposed transport system is that up to half of plurality of load-bearing elements 5 are rigidly fixed in longitudinal direction in fastening units 10 located on intermediate 3 supports, while the remaining part of plurality of load-bearing elements 5 is connected to intermediate 3 supports without limiting their longitudinal movement.
  • Fastening units 10 of load-bearing elements 5 of load-bearing member 6 (and rail cord 4 as a whole) on end 2 and intermediate 3 anchor supports represent any known devices similar to those used in suspension and cable-stayed bridges, ropes and prestressed reinforced concrete structures for fastening (anchoring) of tensioned load-bearing members (reinforcement, ropes, high-strength wires, etc.).
  • On Figs.4 and 6, an embodiment of fastening unit 10 of load-bearing elements 5 of load-bearing member 6 on intermediate 3 anchor supports is shown. In this embodiment, fastening unit 10 comprises anchor 11 positioned on load-bearing bulkhead 12 (see Fig.5) rigidly fixed on intermediate 3 anchor support.
  • Due to the fact that any intermediate 3 anchor support has a certain margin of stability, in order to save material resources, it is advisable to redistribute between end 2 and intermediate 3 anchor supports of transport system, through the anchors 11 positioned on transverse bulkhead 12 of intermediate 3 anchor support, the effect of axial forces which create prestressing of load-bearing elements 5 of rail cord 4.
  • Partial anchoring of load-bearing elements 5 on intermediate 3 anchor supports (on load-bearing bulkheads 12, rigidly fixed on these supports) allows to evenly distribute combined tension force of load-bearing member 6, transferred to intermediate 3 anchor supports, and thereby ensure their load relief, and increase stability of end 2 supports and reliability of rail-string transport overpass, with decreased material capacity, costs of supports and load-bearing member 6, alongside with load-bearing elements 5 and rail cord 4 as a whole.
  • As proven by practical experience of elaborating and operating of the claimed string transport system, a significant reduction in material capacity and stresses in intermediate 3 anchor supports is achieved when up to half of plurality of load-bearing elements 5 are rigidly fixed in longitudinal direction in fastening units 10, located on intermediate 3 anchor supports, provided that the remaining part of plurality of load-bearing elements 5 is connected to intermediate 3 supports without restrictions of their longitudinal movement (see Fig.4).
  • From the viewpoint of labor intensity and profitability, optimal is the embodying of up to a third of plurality of load-bearing elements 5 fixed rigidly in longitudinal direction in fastening units 10 positioned on intermediate 3 supports.
  • It is advisable from the viewpoint of saving materials, to ensure durability of rail cord 4 and safety of the transport system, to embody up to a tenth of a plurality of load-bearing elements 5 rigidly fixed in longitudinal direction in fastening units 10 located on intermediate 3 anchor supports.
  • Thus, the mentioned embodiment of track structure, and in particular of rail cord 4, ensures the preservation of reliability and safety, even in extreme situation, when the integrity of one or more load-bearing elements 5 is damaged. Increase of number of load-bearing elements 5 rigidly fixed in longitudinal direction in fastening units 10, located on intermediate 3 anchor supports, more than half of all load-bearing elements 5 of load-bearing member 6, makes it possible to carry out more substantial load relief of supports, but at the same time there is a significant increase in material consumption and cost of intermediate 3 anchor supports, as well as - unjustifiable reduction in technological effectiveness of construction of the transport system as a whole.
  • Preferably, anchor 11 on intermediate 3 anchor support is configured to join prestressed load-bearing elements 5. In this case, durability of both load-bearing elements 5 of load-bearing member 6 and rail cord 4 as a whole is improved.
  • Advantageously, the joints of load-bearing elements 5 are arranged on intermediate 3 anchor supports in fastening units 10. This will allow to reduce cost and simplify assembly process of transport system in field conditions.
  • Advantageously, intermediate 3 anchor support comprising fastening unit 10 is provided with elements reinforcing its stability, for example, stays 13, and/or braces 14 (see Figs.1 and 6). In this case, material capacity and cost of supports are significantly reduced, and reliability and bearing capacity of Yunitski string transport system are significantly increased.
  • Industrial applicability
  • Construction of the presented string transport system by Yunitski includes installation on foundation 1 of end 2 and intermediate 3 supports, in spans Z between which at least one rail cord 4 is fastened and at least one wheeled vehicle 7 is guided along it. In this case, the load-bearing elements 5 of load-bearing member 6 of rail cord 4 are tensioned and anchored, in accordance with design option, both on end 2 and intermediate 3 anchor supports.
  • Hence, in span between end 2 anchor supports, equaling to, for example, 10,000 meters, it can be established, at the same distance from each other, depending on the design option, from two to ten intermediate 3 anchor supports. Thus, the intermediate 3 anchor supports, during construction and installation of rail cord 4, will experience 2 to 10 times less forces from load-bearing elements 5, since load-bearing elements 5, for example, reinforcement ropes, have a limited length not exceeding 1,000 - 5,000 m.
  • String transport system by Yunitski works in the following way.
  • Rail cord 4 is arranged between supports in spans L. Its prestressing is carried out by tensioning in longitudinal direction of load-bearing elements 5 of load-bearing member 6 and their anchoring on corresponding supports. Hereby, on each intermediate 3 anchor support, there occurs balancing of tension forces, formed on both sides of the support, of load-bearing elements 5 anchored on this support. As a result, there is no overturning moment on intermediate 3 support. In addition, each intermediate 3 support has a certain margin of stability. Thus, with end 2 supports distancing, the stability of intermediate 3 support 3 and its resistance to overturning moment from load-bearing elements 5 anchored thereon is increased. This makes it possible to redistribute the effect of longitudinal forces, which create prestressing of load-bearing elements 5 of load-bearing member 6 of rail cord 4, between end 2 and intermediate 3 supports of transport system, especially during construction and installation, when each intermediate 3 support becomes end, since it closes with a part of load-bearing elements 5 and tension from them.
  • To increase reliability and bearing capacity of string transport system, intermediate 3 anchor support with anchor 11 is made reinforced and/or it is supplied with stays 13 and/or braces 14, which allows to increase its stability without significant increase in material capacity.
  • This makes it possible to significantly reduce material capacity and, accordingly, the cost of the transport system, without deteriorating its speed characteristics, due to load relief of supports, as well as reducing and redistributing combined tension force of load-bearing member 6 between all supports along rail cord 4. As a result, it is possible to increase spans Z between adjacent supports.
  • String transport system by Yunitski of the described structure allows to create a transport system, having high load capacity and improved operational characteristics and ensure load relief, reduction of material capacity and stresses in end 2 supports, increase of rigidity and reliability of rail cord 4 with stabilization throughout its longitudinal evenness and straightness of rolling surfaces A and achievement of "velvet-smooth track" effect with increase of spans Z between supports.
  • Information sources
    1. 1. Patent RU 2080268, IPC B61B 5/02, 13/00; E01B 25/00, publ.1997.
    2. 2. Patent EA 006111, IPC B61B 3/00, 5/00; E01B 25/00, publ.25.08.2005.
    3. 3. Patent EA 005017, IPC B61B 5/00, E01B 25/24, publ.28.10.2004.

Claims (10)

  1. String transport system, which comprises end (2) and intermediate (3) anchor supports mounted on foundation (1), and at least one rail cord (4) stretched in spans (L) between them, which includes a plurality of prestressed load-bearing elements (5) tensioned between the anchor supports, combined, at least, in one load-bearing member (6) intended for coupling with a rolling surface for motion of vehicle,
    characterized by that
    up to half of plurality of load-bearing elements (5) are rigidly fixed in longitudinal direction in fastening units located on the intermediate anchor supports, and the remaining part of plurality of load-bearing elements (5) is connected to the intermediate anchor supports without restriction of their longitudinal movement.
  2. String transport system according to claim 1, characterized by that up to one-third of plurality of load-bearing elements (5) are rigidly fixed in longitudinal direction in fastening units located on intermediate anchor supports.
  3. String transport system according to claim 1, characterized by that up to a tenth of plurality of load-bearing elements (5) are rigidly fixed in longitudinal direction in fastening units located on intermediate anchor supports.
  4. String transport system according to claim 1, characterized by that load-bearing member (6) possesses body and load-bearing elements positioned therein.
  5. String transport system according to claim 4, characterized by that the space within body (8) of load-bearing member (6) is filled up with hardening mixture (9).
  6. String transport system according to claim 1, characterized by that load-bearing member (6) is realized in bodyless embodiment.
  7. String transport system according to claim 1, characterized by that fastening unit represents an anchor.
  8. String transport system according to claims 1 and 7, characterized by that anchor is configured to joint prestressed load-bearing elements (5).
  9. String transport system according to claim 8, characterized by that joints of load-bearing elements (5) are located on intermediate (3) anchor supports in fastening units.
  10. String transport system according to claim 1, characterized by that intermediate (3) anchor support, containing fastening unit, is equipped with elements reinforcing its stability.
EP19907520.1A 2019-01-04 2019-12-30 String transport system Active EP3907117B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EA201900138A EA037218B1 (en) 2019-01-04 2019-01-04 Yunitsky string transportation system
PCT/BY2019/000018 WO2020140143A1 (en) 2019-01-04 2019-12-30 String transport system

Publications (4)

Publication Number Publication Date
EP3907117A1 EP3907117A1 (en) 2021-11-10
EP3907117A4 EP3907117A4 (en) 2022-10-05
EP3907117B1 true EP3907117B1 (en) 2024-03-06
EP3907117C0 EP3907117C0 (en) 2024-03-06

Family

ID=71406512

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19907520.1A Active EP3907117B1 (en) 2019-01-04 2019-12-30 String transport system

Country Status (4)

Country Link
EP (1) EP3907117B1 (en)
CN (1) CN114728662B (en)
EA (1) EA037218B1 (en)
WO (1) WO2020140143A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117604830B (en) * 2023-10-13 2024-08-13 广东京兰空铁发展有限公司 Rail system, erection method and air-railway traffic system

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB737265A (en) * 1952-04-09 1955-09-21 Fisher & Ludlow Ltd Improvements in or relating to conveyors for goods
US3604361A (en) * 1969-01-21 1971-09-14 Aerial Transit Systems Inc Aerial guideway system
CH624624A5 (en) * 1977-11-14 1981-08-14 Rudolf Baltensperger
EP0207887A1 (en) * 1985-06-27 1987-01-07 Ateliers de Constructions Mecaniques de Vevey S.A. Public transport installation moving on a suspended track
AU6289594A (en) * 1994-04-08 1995-10-30 Anatoly Eduardovich Junitsky Line transport system
CN2263134Y (en) * 1995-08-09 1997-09-24 铁道部大桥工程局 Short platform compound hauling-rope type hanging basket
EP1227200B1 (en) * 2001-01-29 2008-06-04 VSL International AG Device and method for Anchoring one end of a stay to a base
RU2223357C1 (en) * 2002-05-30 2004-02-10 Юницкий Анатолий Эдуардович Transportation system (versions) and method of its building
EA200301256A1 (en) * 2003-07-23 2004-10-28 Анатолий Эдуардович Юницкий STRING TRANSPORT SYSTEM (VARIANTS), METHOD OF MANUFACTURING AND INSTALLATION OF THE FLIGHT CUT TO STRING RAILS THREAD
EA200400906A1 (en) * 2004-07-09 2005-08-25 Анатолий Эдуардович Юницкий UNITSKY TRANSPORTATION SYSTEM (OPTIONS) AND METHOD OF CONSTRUCTION OF THE TRANSPORT SYSTEM
RU2325293C2 (en) * 2006-07-27 2008-05-27 Анатолий Эдуардович Юницкий Stringed transportation system of yunitsky and methods of stringed transportation system build-up
RU2324612C1 (en) * 2006-07-27 2008-05-20 Анатолий Эдуардович Юницкий Yunitsky stringed transport system
US7624684B2 (en) * 2007-08-09 2009-12-01 Richard David Morris Cable suspended, self leveling tram with self-propelled tractor bogie
RU2475387C1 (en) * 2011-08-18 2013-02-20 Анатолий Эдуардович Юницкий Yunitsky's conveying system and method of configuring string-type conveying system
US10370204B2 (en) * 2015-02-08 2019-08-06 Hyperloop Technologies, Inc. Transportation system
EA031884B1 (en) * 2016-06-20 2019-03-29 Анатолий Эдуардович Юницкий Yunitsky's communication system
EA034463B1 (en) * 2016-06-20 2020-02-11 Анатолий Эдуардович Юницкий Yunitskiy's communication system and its application for transportation of liquids and/or gases and/or in power supply and/or communication networks
EA031917B1 (en) * 2016-12-23 2019-03-29 Анатолий Эдуардович Юницкий Unitsky's transport system
EA038766B1 (en) * 2019-09-25 2021-10-15 Анатолий Эдуардович Юницкий Yunitsky string-type transport system

Also Published As

Publication number Publication date
EP3907117A4 (en) 2022-10-05
EP3907117C0 (en) 2024-03-06
CN114728662B (en) 2023-10-31
EA201900138A1 (en) 2020-07-31
CN114728662A (en) 2022-07-08
WO2020140143A1 (en) 2020-07-09
EP3907117A1 (en) 2021-11-10
EA037218B1 (en) 2021-02-20

Similar Documents

Publication Publication Date Title
RU2325293C2 (en) Stringed transportation system of yunitsky and methods of stringed transportation system build-up
KR101256130B1 (en) ease precast girder and bridge using the same
CN107386091B (en) The suspension bridge and construction method of saddle paraboloid spatial mixing cable system
RU2520983C2 (en) Transportation system of yunitsky
RU2475387C1 (en) Yunitsky's conveying system and method of configuring string-type conveying system
CN211171558U (en) Modular ultrahigh-performance concrete prefabricated assembled beam suitable for different spans
EP3907117B1 (en) String transport system
CN115427283B (en) You Nici base chord cable transportation system
RU2475386C1 (en) Yunitsky's conveying system and method of configuring string-type conveying system
EP3560786B1 (en) Transport system
CN109890681B (en) Delivery system
RU2224064C1 (en) Transportation system and method of its building
CN111094100B (en) Truss type track structure and guide rail
CN112770955B (en) You Nici-based transportation system and method of manufacturing and assembling same
EP4074570A1 (en) Transport system
CN111424524A (en) Modular ultrahigh-performance concrete prefabricated assembled beam suitable for different spans
WO2018223208A1 (en) Rail for a transport system
EA037758B1 (en) Yunitsky's transport system (embodiments)
EA034463B1 (en) Yunitskiy's communication system and its application for transportation of liquids and/or gases and/or in power supply and/or communication networks
RU167381U1 (en) BEAM BRIDGE REINFORCED CONCRETE PRE-STRESSED
WO2017219113A1 (en) Transportation system
EA044147B1 (en) UNITSKY TRANSPORT SYSTEM
EA004391B1 (en) Railway structure of transport system of yunitsky (variants)
KR20130106518A (en) Truss type prestressed concrete girder
EA036973B1 (en) Yunitsky's transport system

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210802

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20220901

RIC1 Information provided on ipc code assigned before grant

Ipc: E01B 25/22 20060101ALI20220826BHEP

Ipc: E01B 25/08 20060101ALI20220826BHEP

Ipc: B61B 13/04 20060101ALI20220826BHEP

Ipc: B61B 5/00 20060101ALI20220826BHEP

Ipc: B61B 3/02 20060101AFI20220826BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230919

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: UNITSKY, ANATOLI EDUARDOVICH

RIN1 Information on inventor provided before grant (corrected)

Inventor name: UNITSKY, ANATOLI EDUARDOVICH

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602019048026

Country of ref document: DE

U01 Request for unitary effect filed

Effective date: 20240326

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20240408

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240606

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240606

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240606

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240607

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240706

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240306