EP3887222A1 - Système de mesure destiné à la surveillance d'une voie ferrée - Google Patents

Système de mesure destiné à la surveillance d'une voie ferrée

Info

Publication number
EP3887222A1
EP3887222A1 EP19794487.9A EP19794487A EP3887222A1 EP 3887222 A1 EP3887222 A1 EP 3887222A1 EP 19794487 A EP19794487 A EP 19794487A EP 3887222 A1 EP3887222 A1 EP 3887222A1
Authority
EP
European Patent Office
Prior art keywords
rail
optical waveguide
measuring arrangement
arrangement according
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP19794487.9A
Other languages
German (de)
English (en)
Inventor
Krzysztof WILCZEK
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prodes GmbH
Original Assignee
Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Plasser und Theurer Export Von Bahnbaumaschinen GmbH filed Critical Plasser und Theurer Export Von Bahnbaumaschinen GmbH
Publication of EP3887222A1 publication Critical patent/EP3887222A1/fr
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K9/00Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
    • B61K9/08Measuring installations for surveying permanent way
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/04Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
    • B61L23/042Track changes detection
    • B61L23/047Track or rail movements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B9/00Fastening rails on sleepers, or the like
    • E01B9/38Indirect fastening of rails by using tie-plates or chairs; Fastening of rails on the tie-plates or in the chairs
    • E01B9/44Fastening the rail on the tie-plate
    • E01B9/46Fastening the rail on the tie-plate by clamps
    • E01B9/48Fastening the rail on the tie-plate by clamps by resilient steel clips
    • E01B9/483Fastening the rail on the tie-plate by clamps by resilient steel clips the clip being a shaped bar
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/04Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
    • B61L23/042Track changes detection
    • B61L23/044Broken rails

Definitions

  • the invention relates to a measuring arrangement for monitoring a
  • Optical waveguide is connected to a measuring device in order to detect a load acting on a rail.
  • the invention also relates to a method for producing the corresponding measuring arrangement.
  • Optical waveguides are becoming increasingly important in corresponding measuring arrangements. These are used on the one hand for signal transmission and on the other hand as elements of a sensor.
  • DAS distributed acoustic detection
  • Vibrations along the track Specifically, the wheels of trains are monitored in order to detect damage at an early stage.
  • the solution aims to make one already used for other purposes
  • WO 2015/110361 A2 discloses a measuring device with a fiber-optic sensor unit for measuring a mechanical variable that acts on a rail.
  • the fiber-optic sensor unit is arranged obliquely on a rail web and is used with primary light to generate a signal light Illuminated reflection or transmission. The signal light is evaluated to determine changes in the load on the rail.
  • the object of the invention is to improve a measuring arrangement of the type mentioned at the outset in such a way that simple manufacture and maintenance as well as precise measurement results with high replicability can be achieved.
  • Another object of the invention is to specify a method for producing the corresponding measuring arrangement.
  • optical waveguide is releasably clamped in at least one rail fastening. This is how one works
  • Optical fibers can be evaluated using known methods.
  • the measuring device connected to the optical waveguide sends light signals into the optical waveguide, reflections of these light signals correlating with the deformations of the optical waveguide. This also enables the precise location of a deformation. Vibrations or wheel loads are thus detected directly because the optical waveguide is arranged in the force path between the rail and the threshold.
  • the optical waveguide is at least at two successive thresholds in the
  • the optical waveguide advantageously runs over a wide area of the track section to be monitored and is clamped in all rail fastenings of the same rail.
  • the optical waveguide serves as a sensor element with a longitudinal extension over a plurality of thresholds.
  • a routed next to the track in a cable trough In contrast to a routed next to the track in a cable trough
  • the optical fiber arranged according to the invention is excited in discrete sections (respective contact point with a threshold). This means that each threshold can be assigned its own virtual sensor. Each individual threshold is monitored with a local assignment of the measurement results. For example, hollow layers or loose ones
  • Axle counters can also be implemented in this way, with interoperability with existing systems.
  • optical waveguide has a loop for longitudinal compensation between two clamping points. This allows changes to be made to the measuring arrangement if necessary.
  • the optical waveguide is placed at a sufficient distance from the welding point using the longitudinal compensation.
  • Optical fiber between two successive sleepers is releasably attached to the rail by means of a fastening means.
  • a fastening means For example, a clip clipped onto the rail foot prevents the
  • Optical fiber sags between the sleepers. Especially for the trouble-free execution of maintenance processes such as
  • the at least one rail fastening comprises an intermediate layer as a base for the rail foot and that the clamped-in optical waveguide lies against the intermediate layer. Vertical loads on the rail are transmitted directly to the optical fiber. In addition, with this arrangement the optical waveguide is protected from external influences by the rail.
  • Rail fastening comprises a tension clamp and that the clamped optical fiber lies against the tension clamp.
  • the lateral guide is an angle guide plate.
  • an angle guide plate is arranged on each side of the rail foot in order to fix the lateral position of the rail.
  • the respective angle guide plate usually also serves as a support for a tension clamp.
  • the at least one rail fastening can be a
  • ribbed plate ribs running parallel to the rail being arranged as lateral guides.
  • Such a ribbed plate is usually used in conjunction with a wooden sleeper to also ensure a predetermined inclination of the rail towards the middle of the track.
  • screw connections serve as fastening elements.
  • the method according to the invention for producing one of the measuring arrangements described provides that in the case of new track construction or track renewal by means of a track construction machine, a rail is placed on sleepers that before, after or during this time the optical waveguide is unwound from a coil arranged on the track construction machine and on respective ones
  • Clamping points is positioned and that the rail by means of
  • Rail fastenings with simultaneous clamping of the fiber optic cable is attached to the sleepers.
  • the measuring arrangement is erected in the course of track construction work, whereby the effort required for this is negligible.
  • common track construction machines which are designed for laying or exchanging rails, can be easily equipped with a coil for unwinding the optical waveguide.
  • Fig. 1 cross section through a rail and a rail fastening with a ribbed plate
  • FIG. 2 Detail A from Fig. 1 with optical fiber in the released state
  • FIG. 3 Detail A from Fig. 1 with optical fiber in the clamped state
  • Fig. 4 cross section through a rail and a rail fastening with
  • FIG. 5 top view of a rail and two sleepers description of the embodiments
  • a rail 1 shown in Fig. 1 is slightly inclined by means of a
  • Rail attachment 2 attached to a threshold 3.
  • the rail fastening 2 comprises one
  • Ribbed plate 4 which is screwed onto the threshold 3 with screws 5. Between the rail base 6 and the ribbed plate 4, an intermediate layer 7, which is usually made of plastic, is arranged.
  • the ribbed slat 4 comprises ribs 8 running on both sides of the rail 1 in the longitudinal direction of the rail. These ribs 8 point downwards
  • At least one optical waveguide 12 is arranged, which is releasably clamped in the rail fastening 2.
  • the mechanical properties of the optical waveguide 12 and the rail fastening 2 are matched to one another.
  • the optical waveguide 12 has a sheathing made from abrasion-resistant plastic or a composite material. This avoids premature mechanical wear of the optical waveguide 12. If necessary, the optical waveguide 12 is also exchanged in the course of a rail exchange, the resultant given thereby
  • a longitudinal groove 13 is provided in the intermediate layer 7 for receiving the optical waveguide 12.
  • the ribbed plate 4 has a corresponding longitudinal groove 13.
  • the longitudinal groove 13 can also be provided in the threshold 3, so that a conventional rail fastening 2 can be used without further adjustments. The same applies to a longitudinal groove 13 on the underside of the rail foot 6.
  • the respective longitudinal groove 13 has a depth which is less than the diameter of the optical waveguide 12 in the released state.
  • the optical waveguide 12 is pressed against surfaces of the rail fastening 2 and optionally the rail 1 or the threshold 3.
  • loads and vibrations acting on rail 1 or threshold 3 are transmitted directly to the
  • the optical waveguide 12 is arranged in a longitudinal groove 13 of a rib 8. In the assembled state, the optical waveguide 12 is clamped between the rib 8 and a lateral web of the rail foot 6. In an advantageous development, this is
  • Optical waveguide 12 with an optical waveguide 12 under the rail base 6 combined. In this way, separate detection and evaluation of the horizontal and vertical forces and vibrations is possible.
  • the threshold 3 for receiving the rail fastening 2 on the top has relief
  • the intermediate layer 7 here forms a damping element between the rail base 6 and the threshold 3.
  • the angle guide plates ⁇ 4 serve as lateral guides which fix the rail base 7 in the horizontal transverse direction of the rail.
  • Each angle guide plate ⁇ 4 also has a groove ⁇ 5 in which one
  • Round material bent clamp ⁇ is engaged.
  • the respective tension clamp ⁇ is tensioned by means of a rail fastening screw ⁇ 6, the ends of the tension clamp ⁇ being pressed against the rail foot 6 from above.
  • a longitudinal groove ⁇ 3 is provided in the intermediate layer 7 or in the threshold 3 below the intermediate layer 7. Also the
  • Angle guide plate ⁇ 4 or below the respective clamp kl is an advantage. Forces and vibrations in a horizontal
  • Rail transverse direction are advantageously detected with an optical waveguide ⁇ 2 between the angle guide plate ⁇ 4 and the associated lateral web of the rail foot 6. For this, the corresponding points
  • Angular guide plate ⁇ 4 has a lateral longitudinal groove ⁇ 3.
  • the arrangement of several optical fibers run2 can be useful.
  • the top view in FIG. 5 shows two rail fastenings 2 with a respective rib plate 4 as an example.
  • the optical fiber ⁇ 2 is clamped in the respective rail attachment 2 below the rail ⁇ .
  • the respective rib plate 4 has a corresponding longitudinal groove ⁇ 3.
  • the optical fiber ⁇ 2 is excited discretely at these clamping points ⁇ 7, so that correspondingly discrete measurement results are available during a measurement process.
  • the optical waveguide Licht2 is arranged in a loop Loop8 between the thresholds. This loop ⁇ 8 serves as length compensation if the
  • Optical fiber ⁇ 2 must be repaired or positioned differently. To use the length compensation of several loops ⁇ 8, the
  • Optical fiber ⁇ 2 can slide through the rail fastenings 2.
  • the optical fiber ⁇ 2 is welded on the rail ⁇ using the length compensation at a sufficient distance from the
  • a fastening means ⁇ 9 is advantageously provided in the respective sleeper compartment between two sleepers 3, with which the optical waveguide ⁇ 2 is detachably fastened to the rail ⁇ .
  • this is a clip that is clipped onto the rail base 6 and holds the optical fiber ⁇ 2 in position. In this way, the optical fiber ⁇ 2 is adequately protected during maintenance work such as rail grinding or track plugs.
  • Fasteners ⁇ 9 can also be used to omit the detector function of the optical fiber ⁇ 2 in complicated track systems.
  • the optical waveguide ⁇ 2 is only clipped to a rail ⁇ in the area of a switch without being clamped in the rail fastenings 2.
  • One end of the optical waveguide ⁇ 2 is connected to a measuring device 20
  • Optical fiber ⁇ 2 and evaluates the resulting reflections. These reflections are dependent on the mechanical stress in the relevant fiber of the optical waveguide ⁇ 2. Such mechanical stresses arise when forces act on the optical waveguide oder2 or the optical waveguide ⁇ 2 is vibrated due to vibrations or vibrations. A localization of the force or the force is also possible via evaluable signal patterns, in particular through the discrete expression of the measurement signal
  • Track maintenance with the old rails ⁇ in a continuous Working methods can be exchanged for new rails ⁇ .
  • the new rails ⁇ are placed in front of the track.
  • the rail fastenings 2 are released.
  • Track construction machine uses a so-called conversion train.
  • This has a conversion device in a central part, which is supported like a bridge on a front and a rear rail chassis.
  • the front rail carriage runs on the old rails ⁇ and the rear rail carriage already drives on the new rails ⁇ .
  • the old rails ⁇ from sleepers 3 and guide them to the outside next to the track.
  • the new rails are guided from the outside in and placed on the sleepers 3.
  • individual sleepers 3 with their rail fastenings 2 are exposed. This state is used to position the optical fiber ⁇ 2 at the respective clamping points ⁇ 7.
  • a coil (cable drum) is arranged in the conversion device, from which the optical fiber 12 is unwound during the machine approach.
  • a positioning device guides the optical waveguide 12 into the exposed longitudinal grooves 13 of the rib plates 4. This either happens only for one rail track or a separate optical waveguide 12 is unwound from an associated coil for each rail track.
  • the intermediate layers 7 are placed on the rib plates 4 with a corresponding depositing device.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

L'invention concerne un système de mesure destiné à la surveillance d'une voie ferrée pourvue de rails (1) fixés sur des traverses (3), un guide optique (12) est relié à un dispositif de mesure (20) aux fins de détection d'une charge agissant sur un rail (1). Le guide optique (12) est pincé de manière amovible dans au moins une attache de rail (2) qui assure la fixation du rail à la traverse (2). Ainsi une contrainte, transmise par le rail (1) à la traverse (3) par l'intermédiaire de l'attache de rail (2), agit directement sur le guide optique (12).
EP19794487.9A 2018-11-26 2019-10-23 Système de mesure destiné à la surveillance d'une voie ferrée Pending EP3887222A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT3572018 2018-11-26
PCT/EP2019/078791 WO2020108873A1 (fr) 2018-11-26 2019-10-23 Système de mesure destiné à la surveillance d'une voie ferrée

Publications (1)

Publication Number Publication Date
EP3887222A1 true EP3887222A1 (fr) 2021-10-06

Family

ID=68344826

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19794487.9A Pending EP3887222A1 (fr) 2018-11-26 2019-10-23 Système de mesure destiné à la surveillance d'une voie ferrée

Country Status (6)

Country Link
US (1) US12037030B2 (fr)
EP (1) EP3887222A1 (fr)
JP (1) JP7542534B2 (fr)
CN (1) CN113056407B (fr)
EA (1) EA202100123A1 (fr)
WO (1) WO2020108873A1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT525309A1 (de) 2021-07-15 2023-02-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren zum sicheren Betreiben eines Schienenverkehrssystems und Schienenverkehrssystem

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5514032Y2 (fr) * 1974-10-18 1980-03-29
JPH04116806U (ja) * 1991-03-29 1992-10-20 三菱電線工業株式会社 光フアイバケーブル通線装置
NL9201667A (nl) * 1992-09-25 1994-04-18 Nl Spoorwegen Nv Stelsel voor het detecteren van treinen.
US5330136A (en) 1992-09-25 1994-07-19 Union Switch & Signal Inc. Railway coded track circuit apparatus and method utilizing fiber optic sensing
DE4432329C2 (de) 1994-09-10 1999-09-16 Daimler Chrysler Ag Vorrichtung zur Zuglaufüberwachung und Fahrwegüberwachung
US5529267A (en) * 1995-07-21 1996-06-25 Union Switch & Signal Inc. Railway structure hazard predictor
JP2907334B1 (ja) * 1998-01-09 1999-06-21 株式会社京三製作所 列車検知装置
DE19851931A1 (de) * 1998-11-11 2000-05-25 Alcatel Sa Anordnung zur Erkennung von Schienenbrüchen und Eisenbahnschiene
EP1128171A1 (fr) * 2000-02-22 2001-08-29 Sensor Line Gesellschaft für optoelektronische Sensoren mbH Capteur de charge à fibre optique pour la detection des véhicules ferroviaires
DE10057740A1 (de) 2000-11-16 2002-05-23 Siemens Ag Einrichtung zum Erkennen von Unregelmäßigkeiten an Eisenbahnrädern
DE102010013312A1 (de) 2010-03-29 2011-09-29 Edilon)(Sedra Gmbh Überwachungsvorrichtung zur Erkennung von Störungen an einem Gleiskörper
CN201817752U (zh) * 2010-10-25 2011-05-04 乐昌市安捷铁路轨枕有限公司 一种门式起重机轨道专用轨枕
CN102121213A (zh) * 2010-12-28 2011-07-13 中国科学院半导体研究所 可监测裂纹和变形的钢轨
CN201951493U (zh) * 2011-01-17 2011-08-31 武汉理工大学 光纤光栅传感列车车轮踏面在线监测装置
CN102092406A (zh) * 2011-01-17 2011-06-15 武汉理工大学 光纤光栅传感列车车轮踏面状态在线监测系统
DE102012213499A1 (de) * 2012-07-31 2014-02-06 Siemens Aktiengesellschaft Fahrzeugortung
CO7080240A1 (es) * 2013-04-01 2014-10-10 Univ Eafit Sistema para detectar defectos en la redondez de las ruedas de un vehiculo ferroviario
CN104340239B (zh) 2013-07-30 2017-01-18 同方威视技术股份有限公司 铁路防灾立体监测报警系统
DE102014100653B4 (de) 2014-01-21 2016-01-21 fos4X GmbH Schienenmesssystem
GB201414616D0 (en) 2014-08-18 2014-10-01 Optasense Holdings Ltd Detection of anomalies in rail wheelsets
US10907958B2 (en) * 2017-09-07 2021-02-02 Frank J Smith Railroad track defect detection apparatus and method
RU2674547C1 (ru) * 2018-02-26 2018-12-11 Акционерное общество Научно-исследовательский и проектно-конструкторский институт информатизации, автоматизации и связи на железнодорожном транспорте Волоконно-оптический датчик для мониторинга железнодорожного пути

Also Published As

Publication number Publication date
WO2020108873A1 (fr) 2020-06-04
US12037030B2 (en) 2024-07-16
EA202100123A1 (ru) 2021-09-02
JP7542534B2 (ja) 2024-08-30
US20210347394A1 (en) 2021-11-11
CN113056407B (zh) 2023-07-07
CN113056407A (zh) 2021-06-29
JP2022508220A (ja) 2022-01-19

Similar Documents

Publication Publication Date Title
DE3635053C2 (de) Verfahren zum Überwachen der Verformungen von Bauteilen mittels Lichtwellenleitern sowie Lichtwellenleiter zur Durchführung des Verfahrens und Verfahren zu seiner Herstellung
EP3820758B1 (fr) Procédé et système de surveillance d'une voie ferrée
DE102008018076B4 (de) System zur Messung von Belastungen beim Rad/Schiene-Kontakt von Schienenfahrzeugen
DE112014006396T5 (de) Tragbare Anbringung einer faseroptischen Messschleife
DE4102869A1 (de) Gleisbaumaschine zum verdichten der schotterbettung
AT506813B1 (de) Verfahren zum prüfen von spannbetonteilen
EP2192395B1 (fr) Procédé destiné à vérifier la résistance à la traction d'une ancre se trouvant dans un mur ou un plafond
WO2019233531A1 (fr) Procédé pour la surveillance de la charge et pour la détermination de la durée de vie de masses de terre armées par géotextiles
EP1628900B1 (fr) Levier de controle
EP1839990B1 (fr) Dispositif pour la vérification des roues d'un véhicule ferroviaire
EP3887222A1 (fr) Système de mesure destiné à la surveillance d'une voie ferrée
WO2019201626A1 (fr) Système de surveillance du fonctionnement d'une chaîne porte-câbles
DE3815152C2 (fr)
DE3139636C2 (de) Vorrichtung zur Befestigung und Justierung von Funktionsflächen eines Fahrwegs, insbesondere für eine elektromagnetische Schnellbahn
EP3459811B1 (fr) Procédé de montage pour un dispositif de mesure des allongements, en particulier pour un compteur d'essieux, et utilisation correspondante
EP2088259B1 (fr) Dispositif de pré-tension d'éléments de renforcement sur des constructions
DE10031092A1 (de) Wägevorrichtung für Schienenfahrzeuge
DE202018105484U1 (de) Überwachungsvorrichtung zur Überwachung einer temporären Schienenverbindung von zwei Schienenabschnitten einer Schiene und Schienenverbindungssystem mit einer derartigen Überwachungsvorrichtung
DE19851931A1 (de) Anordnung zur Erkennung von Schienenbrüchen und Eisenbahnschiene
AT516459B1 (de) Vorrichtung zur Erfassung von Schienenverformungen
DE10048842A1 (de) Schwellenjustiereinrichtung
WO2012025172A1 (fr) Dispositif de mesure et procédé pour balayer des traverses
EP1416259B1 (fr) Procédé et dispositif d'essai de stabilité d'un poteau
EP1270818A2 (fr) Procédé et dispositif de vérification de l'état de joints de chaussée du type doigt
EP1147383A1 (fr) Dispositif de pesage pour vehicules sur rails

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210628

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: PRODES GMBH

17Q First examination report despatched

Effective date: 20240306