EP3883705B1 - Contrôle de la vitesse de coulée en coulée continue - Google Patents

Contrôle de la vitesse de coulée en coulée continue Download PDF

Info

Publication number
EP3883705B1
EP3883705B1 EP20702285.6A EP20702285A EP3883705B1 EP 3883705 B1 EP3883705 B1 EP 3883705B1 EP 20702285 A EP20702285 A EP 20702285A EP 3883705 B1 EP3883705 B1 EP 3883705B1
Authority
EP
European Patent Office
Prior art keywords
mold
arrangement
magnetic
magnetic coils
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP20702285.6A
Other languages
German (de)
English (en)
Other versions
EP3883705A1 (fr
EP3883705C0 (fr
Inventor
Hongliang Yang
Martin SEDÉN
Nils Peter JACOBSON
Anders Lehman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABB Schweiz AG
Original Assignee
ABB Schweiz AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB Schweiz AG filed Critical ABB Schweiz AG
Publication of EP3883705A1 publication Critical patent/EP3883705A1/fr
Application granted granted Critical
Publication of EP3883705B1 publication Critical patent/EP3883705B1/fr
Publication of EP3883705C0 publication Critical patent/EP3883705C0/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations
    • B22D11/18Controlling or regulating processes or operations for pouring
    • B22D11/181Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level
    • B22D11/186Controlling or regulating processes or operations for pouring responsive to molten metal level or slag level by using electric, magnetic, sonic or ultrasonic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/04Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds
    • B22D11/041Continuous casting of metals, i.e. casting in indefinite lengths into open-ended moulds for vertical casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal
    • B22D11/114Treating the molten metal by using agitating or vibrating means
    • B22D11/115Treating the molten metal by using agitating or vibrating means by using magnetic fields
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/122Accessories for subsequent treating or working cast stock in situ using magnetic fields
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/16Controlling or regulating processes or operations

Definitions

  • the present disclosure relates to the field of continuous casting of metals and in particular proposes an arrangement for controlling flow speed in a thin slab caster.
  • Stability control is essential in the process of high-speed continuous thin slab casting.
  • Modern, high-productivity thin slab casters can have throughputs of 8 tons per minute and above.
  • the inlet flow speeds of the molten steel when leaving the submerged entry nozzle (SEN) into the mold are high, leading to strong turbulent effects with the risk of unstable, fluctuating, time-varying flow patterns in the upper part of the strand. Reducing these effects is crucial in order to obtain homogeneous and constant thermal and flow conditions for the fluid steel to solidify evenly in the mold.
  • An electromagnetic brake offers a great alternative to counteract these potential quality-reducing phenomena in a dynamic manner for thin slab casters, as it does not only brake the molten steel flow in the mold, but is also able to adjust this braking force by control of the electric current to the brake, to a suitable level according to the incoming flow speed of the steel.
  • EP2633928B1 is an attempted refinement of EMBR control, namely, by arranging a plurality of independently controllable magnetic brakes in different zones of the casting mold. This allows the operator a certain freedom to counteract left/right asymmetries or depth gradients in the flow of molten metal.
  • the magnetic brakes can only apply magnetic fields of which the direction of at least one local magnetic field in the mold is opposite to the direction of other local magnetic field in the mold.
  • a braking arrangement according to EP2633928B1 with one left and one right braking zone can be operated in modes such as a (+, -) mode, a (-, +) mode, but is unable to function in, for example, a (+,+) or (+,o) mode.
  • Patent documents US 2005/039876 A1 , US 4 867 786 A further disclose casting control arrangements comprising independently controllable magnetic brakes.
  • One objective of the present disclosure is to propose a flow speed control arrangement allowing more versatile, flexible and/or more adaptable flow speed control in a mold for continuous casting of metal.
  • the objective is achieved by the invention as defined by the independent claims.
  • the flow speed control arrangement is able to provide a one-directional magnetic flux with different intensity in different areas of the mold.
  • a one-directional magnetic flux is one which is everywhere directed from the mold side proximate to the first front cores to the mold side proximate to the second front cores, unless it is locally zero, or a magnetic flux which is everywhere directed from the mold side proximate to the second front cores to the mold side proximate to the first front cores.
  • the presence of the external magnetic loop allows the generation of a one-directional magnetic flux, it is also possible to apply a flux of the (+, -) or (-, +) type, wherein the net flux may be zero (e.g., if the left/right magnitudes are equal) or non-zero (e.g., if the left/right magnitudes are different).
  • the presence of the external magnetic loop lifts the restriction as stated in EP2633928B1 that the direction of at least one local magnetic field in the mold is opposite to the direction of other local magnetic field in the mold.
  • control interface enables independent control of two or more subsets of the second magnetic coils. This is in addition to the independent control, which the control interface allows, of two or more subsets of the first magnetic coils.
  • independent control which the control interface allows, of two or more subsets of the first magnetic coils.
  • An effect of the controllability of the second magnetic coils is that the geometry and/or local strength of the magnetic flux may be controlled more precisely.
  • the subsets of the first magnetic coils and/or the subsets of the second magnetic coils may be differently positioned with respect to a lateral direction of the mold.
  • the flow speed control arrangement comprises one left and one right first front core and one left and one right second front core
  • the associated two left magnetic coils may be controllable independently from the associated two right magnetic coils. This may allow more precise tuning of the applied magnetic flux with respect to the lateral direction, and thereby more precise control of the flow speed, including the flow geometry.
  • the flow speed control arrangement may comprise two left and two right first front cores and two left and two right second front cores, wherein the two left first front cores may be arranged at different heights, to provide good coverage of the vertical direction of the mold. Similarly, each of the right first, left second and right second front cores may be arranged at different heights.
  • the magnetic coils associated with the two left first front cores are controllable independently from the magnetic coils associated with the two right first front cores.
  • the independent control may be achieved by the fact that the control interface comprises electric terminals for energizing the magnetic coils of each subset. In other words, an electrically separate terminal (or terminal pair) is provided for each subset.
  • the control interface comprises a processor and is at least partially implemented in software, the control independence may be achieved by software instructions to this effect.
  • control interface is adapted for coordinated control of magnetic coils associated with pairs of aligned front cores.
  • the magnetic coil associated with an (upper) left first front core and the magnetic coil associated with an (upper) left second front core are controlled in a coordinated manner.
  • These cores may be aligned in the sense that their symmetry axes, which are generally parallel with the transversal direction of the mold, substantially coincide.
  • Coordinated control is to be understood in the sense that substantially equal or proportional control signals or energizing currents are applied to both magnetic coils, so that the resulting magnetic fluxes through both coils are comparable or substantially equal.
  • control interface may be provided with a common electric terminal (or pair of terminals) for energizing the magnetic coils of those magnetic coils that are to be controlled in a coordinated manner.
  • the coordinated control may be achieved by providing corresponding software instructions.
  • the magnetic coils are controlled on the basis of sensor data relating to the temperature distribution or temperature gradient in the mold or relating to characteristics of the meniscus.
  • the sensor data may have a spatial resolution with respect to a lateral direction of the mold. This is to say, the sensor data may comprise at least one left-side and one right-side value. In embodiments where the spatial resolution is even finer, there may be three or more different sensor data values corresponding to an equal number of points or areas distributed along the lateral direction of the mold.
  • the first and/or second front cores are provided with flux-shaping elements. This causes a spatially non-uniform magnetic flux to pass through the mold.
  • the flux-shaping elements are reconfigurable.
  • the external magnetic loop comprises a first and a second level core, which may be retractable away from the mold to allow mold exchange or maintenance, and an external yoke.
  • This provides a magnetic circuit susceptible of channeling the magnetic field in a substantially closed loop, that is, from the second front cores, through the second level core, the external yoke and the first level core, up to the first front cores, from where the magnetic flux passes transversally through the mold and reaches the second front cores.
  • the flow speed control arrangement is supported in such manner that it can move independently of the mold.
  • the mold is mounted on an oscillation table.
  • the flow speed control arrangement which does not benefit from being subjected to oscillations, should be mounted on a different support structure than the oscillation table. Since the oscillation table thereby has to support less weight, it may have a simpler design, be more economical to operate, and suffer less wear and fatigue.
  • a system for continuous casting of metal which comprises a mold, a supply of molten metal and the flow speed control arrangement with the above characteristics.
  • the system is a thin slab caster.
  • Figures 1 and 2 which are cutaway views differing by the amount of opaque objects that have been removed, show a thin slab caster system with an electromagnetic braking arrangement of a generic type.
  • a SEN 13 releases molten metal, such as steel or a ferrous or non-ferrous alloy, into a mold 2.
  • the metal moves vertically to reach cooler regions of the mold 2, where it solidifies (crystallizes) gradually, eventually to leave the mold 2 as a continuous slab.
  • the mold 2 may for example be made of copper, optionally with a lubricated or coated inner surface to regulate friction, may have a cross section measuring about 100 mm by 1400 mm and be adapted for a casting speed of 5.5 m/min.
  • the electromagnetic braking arrangement shown in figures 1 and 2 comprises a first front core 3 (visible in figure 2 only) on the near side of the mold 2 and a second front core 5 (visible in figure 2 only) on the far side of the mold 2.
  • One magnetic coil 4, 6 surrounds each front core 3, 5 and is thereby associated with said front core 3, 5.
  • Electric terminals 10 for energizing at least the magnetic coil 4 on the near side are shown.
  • Subdivided proximate portions 3.1, 5.1 of the first and second front cores 3, 5 extend up to the surface of the mold 2 through corresponding passages of cooling medium channels 11.1, 12.1, which are adapted to remove excess heat.
  • the electromagnetic braking arrangement further comprises a first and a second level core 8, 9, which interface with the front cores 3, 5 and further interface with a double-sided magnetic yoke 7 serving to close the magnetic circuit.
  • the interfaces in the magnetic circuit may be solid or include air gaps.
  • the magnetic yoke 7 and level cores 8, 9 may be of a ferromagnetic material, such as iron.
  • the hollow arrows illustrate the direction of the local magnetic flux while the magnetic coils 4, 6 are energized.
  • the metal flow in the mold 2 underneath the SEN 13 is exposed to a static magnetic field B , substantially perpendicular to the flow velocity v .
  • the electromagnetic braking arrangement shown in figures 1 and 2 may not allow independent control of the flow at different lateral positions of the mold 2.
  • FIG 3 is a schematic top view of a thin slab caster with an electromagnetic braking arrangement that comprises an external yoke 7.
  • the present thin slab caster has similar characteristics as the one which was described with reference to figures 1 and 2 .
  • the electromagnetic braking arrangement with which the thin slab caster is equipped, comprises a single magnetic coil 4, 6 on each side of the mold 2.
  • the magnetic coils are energized in accordance with signals generated by a connected control interface 14, to provide a magnetic flux similar to the one suggested by the solid arrows. While the control interface 14 may allow independent control over the two magnetic cores 4, 6, it is not possible to give the transversal magnetic field different intensities in a left and right side of the mold 2.
  • Figure 4 is a top view of a still further prior art casting system having an electromagnetic braking arrangement with a left and right first front core 3a, 3b, which are associated with a left and right first magnetic coil 4a, 4b, as well as a left and right second front core 5a, 5b, which are associated with a left and right second magnetic coil 6a, 6b.
  • the magnetic flux is allowed to circulate by virtue of a first internal magnetic yoke 15 interfacing with the left and right first front cores 3a, 3b and a second internal magnetic yoke 16 interfacing with the left and right second front cores 5a, 5b.
  • the depicted electromagnetic braking arrangement can only generate such magnetic fields that the directions of the magnetic field in the left and right side are opposite to each other. This applies regardless of the controllability of the magnetic coils 4a, 4b, 6a, 6b.
  • FIG. 5 is a schematic top view of a thin slab caster with a flow speed control arrangement 1 comprising independently controllable left and right magnetic coils 4, 6 on each side of the mold as well as an external yoke 7, according to an embodiment of the invention.
  • a left-side control interface 14a controls the energization of the magnetic coils 4a, 6a corresponding to the left first and second front cores 3a, 5a.
  • the two coils are controlled in a coordinated manner, in the sense described above.
  • a right-side control interface 14b is arranged to energize the corresponding coils at the right side of the mold 2.
  • This flow speed control arrangement 1 allows independent control of the magnetic field passing through different lateral positions of the mold 2.
  • the magnetic flux may circulate through the external loop including the external yoke 7, rather than through the mold 2.
  • first and second level cores 8, 9 may be divided into a left first, a right first, a left second and a right second level core. Then, the first left level core will interface with the first left front core and so forth.
  • the support structure for the flow speed control arrangement 1 is preferably supported in such manner as to be able to move independently of the mold 2. While the mold 2 may be mounted on an oscillation table, the flow speed control arrangement 1 is preferably mounted on a different support structure than the oscillation table. Since in this manner the oscillation table may carry a lighter load, its design may be simplified.
  • Figure 6 is a schematic view of an arrangement of flux-shaping elements arranged on a proximate portion 5.1, 6.1 of a front core 5, 6 of the flow speed control arrangement 1 in the thin slab caster.
  • the filled squares correspond to portions extending relatively closer to the mold 2, while the empty squares end relatively further from the mold 2. Since the front cores 5, 6, which may be of mild steel, iron or another ferromagnetic material, have much higher magnetic permeability than air, the magnetic flux will prefer the shorter air gap and concentrate there. Therefore, the local magnetic field will be relatively stronger at the shorter air gap than at the longer air gap, so that the magnetic flux passing through the mold 2 will be distributed with higher flexibility. This magnetic flux distribution effect may be even more pronounced if the front core on the opposite side of the mold 2 has symmetric flux-shaping elements.
  • the configuration of the flux-shaping elements can be adapted to the expected flow pattern, in view of the inner geometry of the mold 2, the properties of the SEN 13, the casting speed etc., so that a suitable braking action is achieved.
  • the flux-shaping elements may be reconfigured after deployment, so as to become useful in a different casting process or to incorporate later insights about a given casting process.
  • the reconfigurability is ensured by the flux-shaping elements being provided as a plurality of freely positionable magnetic protrusions 17, of the type shown in figure 7a .
  • the protrusions 17 may be bars of iron or another ferromagnetic material which are releasably fitted into recesses of each front core.
  • a reconfiguration of the flux-shaping elements is preferably carried out between successive continuous casting batches.
  • the flux-shaping elements will cause the magnetic flux to be relatively stronger in the lower portion, except for the central portion.
  • the flux-shaping elements are arranged in an approximately bowl-like shape corresponding to the positions on the mold 2 where more intense braking is expected to be necessary.
  • the width of each of figures 6 and 7b corresponds approximately to the full width of the mold 2.
  • the height may correspond to an upper portion of the mold 2, as suggested by the perspective drawings in figures 1 and 2 .
  • the left and right sides of each configuration shown preferably belong to a respective left and right first (or second) front core with an associated magnetic coil.
  • This achieves a dynamic left/right controllability in addition to the option of reconfiguring the flux-shaping elements between casting batches.
  • the lateral resolution of the controllability may be even finer.
  • the patterns shown in figures 6 and 7b are mirror symmetric with respect to the left/right direction, it is also possible to use asymmetric patterns. Asymmetric braking force distribution resulting from such patterns may be beneficial to stabilize an asymmetric casting jet from the SEN 13.
  • Figure 8 is a schematic top view of a thin slab caster comprising independently controllable left and right magnetic coils 4a, 4b, 6a, 6b on each side of the mold 2 and an external yoke 7, according to an embodiment of the invention.
  • the flow parameters may include a temperature distribution or temperature gradient in the mold 2, a meniscus height profile, meniscus speed, meniscus height fluctuations and/or another meniscus characteristic.
  • the control interfaces 14a, 14b may be connected to - or may be implemented as - thyristor power converters, such as the converters in the applicant's DCS family.
  • figure 9 is a perspective view of a casting mold 2 and an upper portion of a SEN 13.
  • a sensor array comprising a plurality of optical fibers (dashed lines) extending horizontally up to lateral apertures, which fibers allow sensing of a temperature distribution or temperature gradient with high spatial resolution.
  • the resulting sensor data can unveil solidification anomalies and can also in detail capture the meniscus shape and predict the meniscus flow velocity.
  • vertically arranged optical fibers may be used.
  • a fully distributed measurement system readily captures flow speeds and fluctuations on both left and right sides of the SEN 13 and can easily be connected to a left/right independent flow speed control arrangement 1 of the kind described above, to manage flow asymmetries.
  • the high-resolution measurement of temperatures in domains close to the meniscus provides sufficient information to control left and right flow speeds independently.
  • a possible alternative control method is based on a split set of mold level sensors with separate information on levels and fluctuations from the left and right sides.
  • Figure 10 shows a SEN 13 and a resulting inlet speed distribution v ( x ).
  • the lower portion of the figure is a lateral section of the SEN 13, which is embodied as a two-channel fishtail-shaped nozzle.
  • In the upper portion of figure 10 is a transversal section along B - B, where it can be seen that the SEN 13 has a flat cross section which is substantially aligned with the lateral direction of the mold 2.
  • Mold-level sensors may allow the velocity distribution v ( x ) and the meniscus height h to be tracked, so that the flow speed control arrangement 1 may be controlled to apply a suitable braking magnetic field for stabilizing the flow.
  • the magnetic field may be adapted to have a shape suitable to stabilize the flow of molten metal and to help guide momentum toward the meniscus in a double-roll flow pattern, while at the same time minimizing meniscus fluctuations and regulating meniscus local flow speeds.
  • the left and right magnitudes of the applied magnetic field must differ by approximately 23% in order for the flow speeds at ⁇ 440 mm from the lateral center of the mold 2 to be equalized. With this magnetic field applied, the meniscus flow asymmetry is substantially leveled out and the flow speed peaks dampened.
  • an automatic meniscus flow speed and asymmetry control can be set up using a left/right independent flow speed control arrangement 1 in combination with an online flow measurement sensor such as the mold-level sensors discussed above.
  • a closed control loop may be implemented in the processor 18 provided as an industrially suitable computer environment for robust, continuous operation.
  • the control loop may for example execute a PID algorithm.
  • processor 18 one may select an ABB Ability TM Optimold Monitor marketed by the applicant.
  • the closed-loop control system controls the control interfaces 14a, 14b of the flow speed control arrangement 1 to apply varying braking magnetic or electromagnetic fields to counter-act meniscus speeds that are too low or high. It is understood that the left-side control interface 14a controls the energization of both the left first magnetic coil 4a and the left second magnetic coil 6a; and that the right-side control interface 14b controls the energization of both the right first magnetic coil 4b and the right second magnetic coil 6b. In the same way, the control loop cooperates with the flow speed control arrangement 1 to mitigate flow pattern asymmetries.
  • a greater flow speed in one lateral half of the mold 2 may be suppressed by a locally strengthened DC (i.e., non-oscillating) magnetic field.
  • Control can also be carried out with respect to data from an electromagnetic level sensor, where high frequency feedback can be utilized to obtain detailed level and fluctuation information in the probing locations. This enables meniscus speed control and stability control of the meniscus level and in the upper part of the mold 2.
  • the control loop includes two parts, a first one being the decision of the EMBR current based on the process inputs, such as casting speed, SEN geometry, SEN depth, steel grade, mold dimension and similar process characteristics.
  • the decision may rely, in part, on magnetohydrodynamic simulations and/or recorded empirical data.
  • the second part is the dynamic control of the EMBR.
  • the meniscus level sensor 19 which is located on the left and right side of the mold 2 measures the meniscus level and meniscus fluctuations, wherein the transient values may be taken as input to realize the dynamic control of EMBR left/right currents.
  • the dynamic control may include recurring positive and negative adjustments of the EMBR current value which was obtained initially based on the process inputs.
  • the processor 18 connected to the control interface 14 is configured to control the magnetic coils on the basis of numerical simulations of the transient flow dynamics in the mold.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Claims (16)

  1. Agencement (1) de contrôle de la vitesse de coulée dans un moule (2) pour une coulée continue de métal, comprenant :
    au moins deux premiers noyaux avant (3) ayant des premières bobines magnétiques associées (4) disposés sur un côté du moule ;
    au moins deux seconds noyaux avant (5) ayant des secondes bobines magnétiques associées (6) disposés sur un côté opposé du moule sensiblement alignés avec les premiers noyaux avant ;
    une boucle magnétique externe (7, 8, 9) reliant les seconds noyaux avant aux premiers noyaux avant, pour permettre à un flux magnétique unidirectionnel de passer à travers le moule des premiers noyaux avant aux seconds noyaux avant ou vice-versa ; et
    une interface de commande (14) permettant une commande indépendante de deux sous-ensembles des premières bobines magnétiques,
    caractérisé en ce que les noyaux avant sont dotés d'éléments de formation de flux reconfigurables pour permettre à un flux magnétique non uniforme spatialement de passer à travers le moule, dans lequel les éléments de formation de flux reconfigurables comprennent une pluralité de protubérances magnétiques pouvant être positionnées librement (17).
  2. Agencement selon la revendication 1, dans lequel l'interface de commande permet une commande indépendante de deux sous-ensembles des secondes bobines magnétiques.
  3. Agencement selon la revendication 1 ou 2, dans lequel lesdits sous-ensembles des premières ou secondes bobines magnétiques sont positionnés différemment par rapport à une direction latérale du moule.
  4. Agencement selon l'une quelconque des revendications précédentes, dans lequel chacun desdits sous-ensembles des premières ou secondes bobines magnétiques comprend une ou plusieurs bobines magnétiques.
  5. Agencement selon l'une quelconque des revendications précédentes, dans lequel l'interface de commande est conçue pour une commande coordonnée des bobines magnétiques associées à des paires de noyaux avant alignés.
  6. Agencement selon l'une quelconque des revendications précédentes, dans lequel l'interface de commande comprend des bornes électriques (10) pour mettre sous tension les bobines magnétiques de chaque sous-ensemble.
  7. Agencement selon l'une quelconque des revendications précédentes, dans lequel l'interface de commande comprend un processeur (18).
  8. Agencement selon la revendication 7, comprenant en outre un ou plusieurs capteurs (19), dans lequel le processeur de l'interface de commande est configuré pour commander les bobines magnétiques sur la base de données de capteurs provenant desdits capteurs représentant :
    une distribution de température dans le moule, et/ou un profil de hauteur de ménisque, une vitesse de ménisque,
    des fluctuations de hauteur de ménisque ou une autre caractéristique de ménisque.
  9. Agencement selon la revendication 7 ou 8, dans lequel le processeur de l'interface de commande est configuré pour traiter des données de capteur avec une résolution spatiale par rapport à une direction latérale du moule.
  10. Agencement selon l'une quelconque des revendications 7 à 9, dans lequel le processeur de l'interface de commande est configuré pour commander les bobines magnétiques sur la base de simulations numériques de la dynamique de coulée transitoire dans le moule.
  11. Agencement selon l'une quelconque des revendications précédentes, dans lequel la boucle magnétique externe comprend :
    un premier et un second noyau de niveau (8, 9) disposé pour constituer l'interface avec les premiers et seconds noyaux avant, respectivement ; et
    une mâchoire externe (7).
  12. Agencement selon la revendication 11, dans lequel les noyaux de niveau peuvent être rétractés du moule.
  13. Agencement selon l'une quelconque des revendications précédentes, comprenant en outre une structure de support permettant à l'agencement de se déplacer indépendamment du moule.
  14. Agencement selon la revendication 13, dans lequel aucune partie de l'agencement n'est supporté par une table d'oscillation.
  15. Système de coulée continue de métal comprenant :
    un moule (2) ;
    une source d'alimentation en métal (13) ; et
    l'agencement selon l'une quelconque des revendications précédentes.
  16. Système selon la revendication 15, qui est une coulée continue de brames minces.
EP20702285.6A 2019-01-30 2020-01-27 Contrôle de la vitesse de coulée en coulée continue Active EP3883705B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201962798702P 2019-01-30 2019-01-30
PCT/EP2020/051958 WO2020157020A1 (fr) 2019-01-30 2020-01-27 Commande de vitesse d'écoulement en coulée continue

Publications (3)

Publication Number Publication Date
EP3883705A1 EP3883705A1 (fr) 2021-09-29
EP3883705B1 true EP3883705B1 (fr) 2023-07-05
EP3883705C0 EP3883705C0 (fr) 2023-07-05

Family

ID=69326537

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20702285.6A Active EP3883705B1 (fr) 2019-01-30 2020-01-27 Contrôle de la vitesse de coulée en coulée continue

Country Status (6)

Country Link
US (1) US20220040755A1 (fr)
EP (1) EP3883705B1 (fr)
JP (1) JP7069424B2 (fr)
KR (1) KR102319760B1 (fr)
CN (1) CN113365758B (fr)
WO (1) WO2020157020A1 (fr)

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62254954A (ja) * 1986-04-30 1987-11-06 Kawasaki Steel Corp 連続鋳造における鋳型内溶鋼流動の抑制方法
JPS63286257A (ja) * 1987-05-19 1988-11-22 Sumitomo Metal Ind Ltd 電磁撹拌方法
AU608445B2 (en) * 1988-05-16 1991-03-28 Nippon Steel Corporation Injector for high speed thin continuous casting machine and pouring control method
JP2961447B2 (ja) * 1991-03-27 1999-10-12 新日本製鐵株式会社 多条ストランドを有する連続鋳造設備の電磁攪拌方法
JPH05123841A (ja) * 1991-10-30 1993-05-21 Nippon Steel Corp 連続鋳造鋳型の電磁ブレーキ装置
JP2779344B2 (ja) * 1995-06-07 1998-07-23 ジェイ. マルカヒー エンタープライズイズ, ア ディヴィジョン オブ インバーパワー コントロールズ リミテッド 金属の連続鋳造における撹拌制御の方法および装置
WO1998053936A1 (fr) * 1997-05-29 1998-12-03 Kawasaki Steel Corporation Dispositif de freinage electromagnetique pour moule de coulee continue et procede de coulee continue utilisant ce dispositif
SE523157C2 (sv) * 1997-09-03 2004-03-30 Abb Ab Förfarande och anordning för att styra metallflödet vid stränggjutning medelst elektromagnetiska fält
FR2801523B1 (fr) * 1999-11-25 2001-12-28 Usinor Procede de coulee continue des metaux du type utilisant des champs electromagnetiques, et lingotiere et installation de coulee pour sa mise en oeuvre
US6796362B2 (en) * 2000-06-01 2004-09-28 Brunswick Corporation Apparatus for producing a metallic slurry material for use in semi-solid forming of shaped parts
SE0101018L (sv) * 2001-03-21 2002-09-22 Abb Ab Anordning vid kontinuerlig gjutning av metall
SE523881C2 (sv) * 2001-09-27 2004-05-25 Abb Ab Anordning samt förfarande för kontinuerlig gjutning
FR2845626B1 (fr) * 2002-10-14 2005-12-16 Rotelec Sa Procede pour la maitrise des mouvements du metal, dans une lingotiere de coulee continue de brames
JP2006507950A (ja) * 2002-11-29 2006-03-09 アーベーベー・アーベー コントロールシステム、コンピュータプログラム製品、装置及び方法
US7984749B2 (en) * 2003-12-18 2011-07-26 Sms Siemag Ag Magnetic device for continuous casting mold
FR2893868B1 (fr) * 2005-11-28 2008-01-04 Rotelec Sa Reglage du mode de brassage electromagnetique sur la hauteur d'une lingotiere de coulee continue
JP5023990B2 (ja) * 2007-11-16 2012-09-12 住友金属工業株式会社 電磁攪拌・電磁ブレーキ兼用電磁コイル装置
JP5769993B2 (ja) * 2011-03-23 2015-08-26 ジヤトコ株式会社 鋳造装置、鋳造方法及びマグネシウム合金ビレットの製造方法
KR101456453B1 (ko) * 2012-07-24 2014-10-31 주식회사 포스코 주편 품질 예측 장치 및 그 방법
GB201305822D0 (en) * 2013-03-28 2013-05-15 Pavlov Evgeny Improvements in and relating to apparatus and methods
DE102015204123A1 (de) * 2014-07-04 2016-01-07 Sms Group Gmbh Vorrichtung zum Beeinflussen einer Strömung eines Flüssigmetalls innerhalb einer Stranggießkokille
WO2017032392A1 (fr) * 2015-08-21 2017-03-02 Abb Schweiz Ag Moule de coulée et procédé de mesure de la température d'un moule de coulée
KR101839254B1 (ko) * 2016-12-23 2018-03-15 주식회사 포스코 연속주조공정의 유동 제어 장치

Also Published As

Publication number Publication date
KR102319760B1 (ko) 2021-11-02
CN113365758A (zh) 2021-09-07
JP2022508566A (ja) 2022-01-19
US20220040755A1 (en) 2022-02-10
KR20210110881A (ko) 2021-09-09
WO2020157020A1 (fr) 2020-08-06
EP3883705A1 (fr) 2021-09-29
EP3883705C0 (fr) 2023-07-05
CN113365758B (zh) 2023-04-21
JP7069424B2 (ja) 2022-05-17

Similar Documents

Publication Publication Date Title
KR100946612B1 (ko) 연속 주조 장치 및 방법
US7975753B2 (en) Method and apparatus for controlling the flow of molten steel in a mould
US6164365A (en) Apparatus for electromagnetically braking a molten metal in a continuous casting mold
JP4865944B2 (ja) 電磁界を利用した連続鋳造において金属の流動を制御する方法と装置
EP3883705B1 (fr) Contrôle de la vitesse de coulée en coulée continue
KR20000029610A (ko) 연속주조용주형의전자브레이크장치및그것을이용한연속주조방법
KR100751021B1 (ko) 연속적인 주조 주괴 주형에 용융 금속을 공급하는 장치 및그것을 사용하는 방법
JP2006281218A (ja) 鋼の連続鋳造方法
WO2015110984A1 (fr) Procédé et appareil pour maintenir une fusion homogénéisée et des champs contrôlés d'un métal fondu
EP0489202A1 (fr) Procédé pour le contrôle du courant d'acier liquide dans un moule
JP5375242B2 (ja) 連続鋳造装置及び連続鋳造方法
CA2375661C (fr) Procede et installation de mesure et de regulation de la vitesse d'ecoulement d'un metal liquide dans une lingotiere de coulee continue
JP5369808B2 (ja) 連続鋳造装置及び連続鋳造方法
WO1999011404A1 (fr) Procede et dispositif pour la coulee continue ou semi-continue de metal
JP2005238276A (ja) 電磁攪拌鋳造装置
JP7119684B2 (ja) 連続鋳造機
Yokota et al. Electromagnetic Coil Designed by Magneto-Hydro-Dynamic Simulation
Kollberg et al. Improving productivity and quality in thick slab casting by direct control of FC mould
JP7180383B2 (ja) 連続鋳造機
RU2763994C1 (ru) Устройство и способ управления непрерывной разливкой
JPH10328790A (ja) 連続鋳造用鋳型の電磁ブレーキ装置及びそれを用いた連続鋳造方法
JP4539251B2 (ja) 鋼の連続鋳造方法
JPH04344858A (ja) 静磁場を利用する鋼の連続鋳造方法
JPH09150243A (ja) 連続鋳造方法
Banerjee et al. An overview of automatic mould level control as applied to SAIL steel plants

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210623

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20220111

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220524

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

INTC Intention to grant announced (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230208

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1584363

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230715

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602020013294

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

U01 Request for unitary effect filed

Effective date: 20230714

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20230724

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231006

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231105

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231005

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231105

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231006

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

U20 Renewal fee paid [unitary effect]

Year of fee payment: 5

Effective date: 20240124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602020013294

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230705

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240123

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT