EP3704050A1 - Fastening and tensioning device for guide cables of a conveying system - Google Patents

Fastening and tensioning device for guide cables of a conveying system

Info

Publication number
EP3704050A1
EP3704050A1 EP18807254.0A EP18807254A EP3704050A1 EP 3704050 A1 EP3704050 A1 EP 3704050A1 EP 18807254 A EP18807254 A EP 18807254A EP 3704050 A1 EP3704050 A1 EP 3704050A1
Authority
EP
European Patent Office
Prior art keywords
arrangement according
guide
cable
clamp
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP18807254.0A
Other languages
German (de)
French (fr)
Inventor
Stephan Sonneborn
Carsten Frank
Arno Becker
Christian Kirchhoff
Kai Lotzvie
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemag Tecberg GmbH
Original Assignee
Siemag Tecberg GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemag Tecberg GmbH filed Critical Siemag Tecberg GmbH
Publication of EP3704050A1 publication Critical patent/EP3704050A1/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/06Arrangements of ropes or cables
    • B66B7/08Arrangements of ropes or cables for connection to the cars or cages, e.g. couplings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/025End supports, i.e. at top or bottom

Definitions

  • the present invention relates to a fastening and Spannvorrich device for guide cables of a conveyor system in vertical or inclined shafts, as described by the preamble of independent claim 1.
  • safety functions such as e.g. ensure that the conveyors are safely guided in the shaft.
  • the bias can on the one hand by hanging on the guide rope Ge weights (underground) can be achieved and the other by the tensioning of the guide cables (surface).
  • Both functions, clamping and holding, can also be achieved by a clamp with integrated clamping option.
  • Used measuring devices between the guide wire clamp and its displacement can be determined the actual rope pre-tensioning force and rempliwer tet to be able to initiate timely countermeasures in case of irregularities.
  • the deflection pulley and the guide rope fastening or tensioning system can be in each other's way, so that an additional level in the hoisting tower or scaffold or additional height is required which is detrimental to construction costs, maintenance and servicing.
  • the guide cable is fastened for this purpose in the region of the shaft sump and vertically guided by the shaft upwards.
  • the rope is deflected once with the help of a deflection and guided to the inventive arrangement.
  • the arrangement is provided with a cable deflection, for deflecting the at least one guide cable from the shank level in the clamping plane.
  • the cable deflection can be performed rotating about a fixed axis or be firmly connected to a rotating axis to minimize frictional force losses between the rope and the disc.
  • the arrangement is provided with a guide cable or interception clamp arranged in the clamping plane, which securely clamps the cable and holds it in its position.
  • An equally preferably provided horizontally adjoining cable tensioning device ensures during the preloading process for the required biasing force in the rope.
  • the cable deflection and the interception clamp are mounted on a common abutment, wherein the position of the intercepting clamp is preferably before bar relative to the abutment in the clamped and in the open state.
  • the change in the position of the intercepting clamp can be done hydraulically, pneuma table or electrically.
  • the device is provided in accordance with the invention with a guide in which the intercepting clamp is arranged relative movable bearing with respect to the rest in the clamping direction of the guide cable.
  • the clamping device may be formed separately from the fastening device in a particularly preferred embodiment of this detachable, preferably designed to be mobile, for use on different guide cables of one or more sets of guide cables.
  • the removable clamping device can be formed centered on the abutment.
  • That is the end of the at least one guide cable, which is to be stretched, passed through a rope thimble or by a Vergusskopf, the Seilkausche or the Vergusskopf can be connected to a cross yoke.
  • the position of the transverse yoke can be made variable in its position in the longitudinal direction with respect to the guide cable, wherein the change in the position of the transverse yoke hydraulically, pneumatically, electrically or otherwise he can be introduced and wherein the position of the transverse yoke in Longitudinal direction relative to the guide cable preferably by means of spacers can be locked.
  • the arrangement may be designed such that a load measuring device between the catch terminal from and their displacement is integrated, for measuring the rope loads of the guide cable and to determine the currently set biasing force.
  • the entire arrangement may be wholly or partially embedded in the ground to further reduce the height and to optimize the accessibility of the provided in the arrangement stage.
  • Fig. 1 shows an embodiment of the fastening and tensioning device according to the invention of guide cables in shaft conveyor systems by way of example in a three-dimensional representation.
  • FIG. 2 shows the side view of the embodiment according to FIG. 1
  • FIG. 3 shows the top view of the embodiment according to FIG. 1
  • Fig. 4 shows an alternative embodiment with hiding device and Seilkau cal
  • the guide cable 1 via a Seilumlenk tone 2, which is designed here as a rotatable sheave of a vertical alignment in the shaft by approx. 90 ° from the shaft level to the fastening and tensioning device.
  • a cable holder 3 guides the rope centrally in the horizontally (centered hori zontal hori zontal) arranged ceremoniessseil- or intercepting clamp 4, in which the Füh tion rope 1 securely clamped by wedges 4a and thus held in position.
  • Visible is also a measuring device 5, which allows the monitoring of existing rope pretensioning force and in the illustrated embodiment between an abutment rule 6 and guide wire clamp or interception clamp 4 is arranged.
  • the jaws 9a of the tension clamp 9 are guided in guides 10 and comprise the loose end of the guide cable 1.
  • the tension clamp 9 is moved in the illustrated embodiment against the abutment by means of hydraulic cylinders 9b and thus clamps the clamped loose end of the guide rope first ,
  • the tensioning device 7 can be removed by means of a transport device 11.
  • Figure 4 shows an alternative embodiment of a fastening and Spannvor direction for guide cables of a conveyor system in vertical or oblique manholes.
  • a displacement 16 arranged in the base 14 can be seen, which, in addition to the deflection roller 18, also receives a support frame 22 for the deflection of the guide cable 20.
  • the guide cable 20 is fixed in this embodiment in a Seilkausche 24 which is connected to a hiding device 26, which are held by detents 28 and 30 in the support frame 22.
  • the fixed in the Seilkausche 24 guide rope 20 is clamped by means of a GE on the locking 30 supporting hydraulic cylinder 32 ge and fixed, which moves the hiding device 26.
  • a load cell 36 is provided between the lock 28 and the hiding device 26 or spacers 34 arranged therebetween in the illustrated embodiment, with the aid of which the load of the guide cable 20 can be measured.

Abstract

In order to fasten guide cables in preferably vertical shafts, the guide cable (1) is deflected from the vertical direction by means of a deflecting device (2) and is retained by means of catching clamps (4). A preferably mobile tensioning device (7) having a further cable clamp produces the required pretensioning force.

Description

Beschreibung  description
Titel: Befestigungs- und Spannvorrichtung für Führungsseile einer Förderanlage  Title: Fastening and tensioning device for guide cables of a conveyor system
[0001] Die vorliegende Erfindung bezieht sich auf eine Befestigungs- und Spannvorrich tung für Führungsseile einer Förderanlage in vertikalen oder schrägen Schächten, wie durch den Oberbegriff des unabhängigen Anspruches 1 beschrieben. The present invention relates to a fastening and Spannvorrich device for guide cables of a conveyor system in vertical or inclined shafts, as described by the preamble of independent claim 1.
[0002] Bedingt durch die angestrebte Reduzierung der Kosten, die beim Bau von Fördereinrichtungen entstehen, wird weltweit versucht, unterschiedliche Funktionen einer Schachtförderanlage auf dieselben räumlichen Ebenen zusammenzulegen. Due to the desired reduction in costs incurred in the construction of conveyors is trying worldwide to combine different functions of a hoistway on the same spatial levels.
[0003] Insbesondere dem Seilhandling kommt in diesem Zusammenhang eine bedeu- tende Rolle zu, da durch ausgefeilte Techniken der Ausfall von Förderzeiten bis auf ein Minimum reduziert werden kann. [0003] Cable handling in particular plays an important role in this context, since through sophisticated techniques the failure of delivery times can be reduced to a minimum.
[0004] Gleichzeitig sind jedoch auch Sicherheitsfunktionen, wie z.B. das sichere Füh ren der Fördermittel im Schacht zu beachten. At the same time, however, safety functions, such as e.g. ensure that the conveyors are safely guided in the shaft.
[0005] Hierbei wird zwischen fest eingebauten Spurlattensystemen und Führungsseil systemen unterschieden. Here, a distinction is made between permanently installed track systems and guide cable systems.
[0006] Damit ein Führungsseilsystem seine Aufgabe ordnungsgemäß erfüllen kann, muss eine ausreichende Vorspannung der Führungsseile gewährleitstet sein. For a guide cable system to perform its task properly, sufficient bias of the guide cables must be sicherleitstet.
[0007] Die Vorspannung kann zum einen durch am Führungsseil anhängende Ge wichte (Untertage) erzielt werden und zum anderen durch das Spannen der Führungsseile (Übertage). The bias can on the one hand by hanging on the guide rope Ge weights (underground) can be achieved and the other by the tensioning of the guide cables (surface).
[0008] Im Falle des Spannens von Führungsseilen ist es bekannt z.B. Führungs seilspannvorrichtungen mit zugehörigen Führungsseilklemmen einzusetzen, die in der Re gel vertikal bzw. in Seillängsausrichtung ohne Ablenkung des Führungsseiles aus der Schachtlängsrichtung angeordnet sind. [0009] Während die Spannvorrichtung das Führungsseil im Schacht durch Dehnen auf die erforderliche Vorspannung bringt, klemmt die Führungsseilklemme das Seil an schließend, verhindert so das Zusammenziehen des Seils nach dem Lösen der Spannvor richtung und die Vorspannung bleibt erhalten. In the case of tensioning of guide ropes, it is known, for example, to use guide cable tensioning devices with associated guide cable clamps, which are arranged vertically in the longitudinal direction or in rope longitudinal alignment without deflection of the guide cable from the shaft longitudinal direction. While the tensioning device brings the guide cable in the shaft by stretching to the required preload, the guide cable clamp clamps the cable to closing, thus preventing the contraction of the rope after loosening the Spannvor direction and the bias is maintained.
[0010] Beide Funktionen, Spannen und Halten, können auch durch eine Klemme mit integrierter Spannmöglichkeit erzielt werden. Both functions, clamping and holding, can also be achieved by a clamp with integrated clamping option.
[0011] Eingesetzte Messeinrichtungen zwischen der Führungsseilklemme und deren Verlagerung können die tatsächlich vorhandene Seilvorspannkraft ermitteln und ausgewer tet werden, um bei Unregelmäßigkeiten rechtzeitig Gegenmaßnahmen einleiten zu können. Used measuring devices between the guide wire clamp and its displacement can be determined the actual rope pre-tensioning force and ausgewer tet to be able to initiate timely countermeasures in case of irregularities.
[0012] Diese Ausgleichsmaßnahmen sind insbesondere bei neuen Führungsseilen regelmäßig erforderlich, um den Vorspannverlust durch das Setzen der Führungsseile aus zugleichen. Im Laufe der Nutzungsdauer werden die Zeitintervalle zwischen den erforder lichen Ausgleichsmaßnahmen in der Regel zunehmend geringer. These compensatory measures are regularly required especially for new guide ropes to compensate for the Vorspannverlust by setting the guide ropes. In the course of the useful life, the time intervals between the necessary compensatory measures usually become increasingly smaller.
[0013] Aufgrund der räumlichen Nähe der Förderseile (Oberseile) und der Führungs seile der Fördermittel, können sich Ablenkscheibe und Führungsseilbefestigungs- bzw. - spannsystem gegenseitig im Weg sein, so dass eine zusätzliche Ebene im Förderturm bzw.- gerüst bzw. zusätzliche Bauhöhe erforderlich ist, was sich nachteilig auf Baukosten, War tung und Instandhaltung auswirkt. Due to the spatial proximity of the hoisting ropes (upper ropes) and the guide ropes of the conveying means, the deflection pulley and the guide rope fastening or tensioning system can be in each other's way, so that an additional level in the hoisting tower or scaffold or additional height is required which is detrimental to construction costs, maintenance and servicing.
[0014] Ebenso schließen sich der Einsatz von Klemm-und Hubvorrichtungen und vertikal angeordneten Führungsseilbefestigungs- und -spannsystemen auf einer gemein samen Ebene im Förderturm bzw. -gerüst in der Regel gegenseitig aus. Likewise, the use of clamping and lifting devices and vertically arranged Führungsseilbefestigungs- and -spannsystemen on a common seed level in the winding tower or scaffold close usually from each other.
[0015] Es besteht daher ein Bedarf an einer Lösung für eine gattungsgemäße Anord nung, die die genannten Probleme behebt, und die möglichst einfach, flexibel und effizient zu installieren und zur warten ist. There is therefore a need for a solution for a generic Anord tion that fixes the above problems, and is as simple as possible, flexible and efficient to install and maintain.
[0016] Dieses Problem wird durch eine Anordnung nach Maßgabe des unabhängigen Patentanspruches 1 gelöst, wobei zweckmäßige Ausführungsformen durch die Merkmale der Unteransprüche gekennzeichnet sind. [0017] Vorgesehen ist dabei eine Befestigungs- und Spannvorrichtung für Führungs- seile einer Schachtförderanlage in vertikalen oder schrägen Schächten, zur Erzeugung, Beibehaltung und Anpassung von Vorspannkräften in zumindest einem Führungsseil für seilgeführte Fördermittel, wobei sich diese erfindungsgemäß dadurch auszeichnet, dass die Spannebene der Anordnung in einem Winkel zur Erstreckung des Schachtes angeordnet ist. Besonders bevorzugt ist die Spannebene der Anordnung dabei im Wesentlichen hori zontal angeordnet. This problem is solved by an arrangement in accordance with the independent claim 1, wherein expedient embodiments are characterized by the features of the subclaims. Provided here is a fastening and tensioning device for guide ropes of a shaft conveyor system in vertical or oblique manholes, for generating, maintaining and adapting prestressing forces in at least one guide cable for cable-guided conveying means, wherein this invention is characterized in that the clamping plane of the Arrangement is arranged at an angle to the extension of the shaft. Particularly preferably, the clamping plane of the arrangement is arranged substantially hori zontal.
[0018] Durch den Einsatz einer winkelig bzw. horizontal angeordneten Führungseil- befestigungs- und -spannvorrichtung für Führungsseile kann der erforderliche vertikale Platzbedarf des Gesamtsystems minimiert werden. Dies bietet Vorteile insbesondere bei der Turmanordnung von Fördermaschinen mit Ablenkscheiben, da die Förder- und Füh rungssysteme räumlich unabhängig voneinander angeordnet werden können. [0018] The use of an angularly or horizontally arranged guide wire fastening and tensioning device for guide cables can minimize the required vertical space requirement of the overall system. This offers advantages in particular in the tower arrangement of carriers with baffles, since the delivery and Füh insurance systems can be arranged spatially independently.
[0019] Durch den Einsatz von winkelig bzw. horizontal angeordneten Führungsseil- befestigungs- und -spannsystemen kann der notwendige Freiraum sowohl für Ablenk- scheiben, als auch für den Einsatz von Klemm-und Hubvorrichtungen oder sonstigen Vor richtungen geschaffen werden. [0019] The use of angularly or horizontally arranged guide wire fastening and clamping systems makes it possible to create the necessary clearance both for deflection disks and for the use of clamping and lifting devices or other devices.
[0020] Das Führungsseil wird zu diesem Zweck im Bereich des Schachtsumpfs befes tigt und vertikal durch den Schacht nach oben geführt. Auf der Führungsseilspannebene im Förderturm- bzw. -gerüst wird das Seil mit Hilfe einer Umlenkscheibe einmalig umgelenkt und auf die erfindungsgemäße Anordnung geführt. Hierzu ist nach Maßgabe der Erfindung die Anordnung mit einer Seilumlenkung versehen, zur Umlenkung des mindestens einen Führungsseiles aus der Schachtebene in die Spannebene. Die Seilumlenkung kann dabei rotierend um eine feststehende Achse ausgeführt sein oder aber fest mit einer rotierenden Achse verbunden sein, um Reibkraftverluste zwischen Seil und Scheibe zu minimieren. The guide cable is fastened for this purpose in the region of the shaft sump and vertically guided by the shaft upwards. On the Führungsseilspannebene in Förderturm- or scaffolding, the rope is deflected once with the help of a deflection and guided to the inventive arrangement. For this purpose, according to the invention, the arrangement is provided with a cable deflection, for deflecting the at least one guide cable from the shank level in the clamping plane. The cable deflection can be performed rotating about a fixed axis or be firmly connected to a rotating axis to minimize frictional force losses between the rope and the disc.
[0021] In Sonderfällen, in denen die Vorspannung der Führungsseile im Schachts umpf erfolgen soll oder muss und bspw. ein ausreichend tiefes Abteufen des Schachtes zur Anordnung der Spanngewichte oder einer vertikal angeordneten Spanneinrichtung wegen ungünstiger Bergbeschaffenheit nicht möglich ist, kommt der Einsatz eines erfindungsge- mäßen winkelig bzw. horizontal angeordneten Führungsseilbefestigungs- und - spannsystems zur Verlagerung von Führungsseilen auch Untertage bzw. im Schachtsumpf in Betracht. In special cases, in which the bias of the guide cables in the shaft Umpf should or should be and, for example, a sufficiently deep sinking of the shaft for arranging the clamping weights or a vertically arranged clamping device is not possible because of unfavorable mountain conditions, the use of erfindungsge- mäss angled or horizontally arranged Führungsseilbefestigungs- and - tensioning system for the displacement of guide ropes also underground or in the shaft sump into consideration.
[0022] Vorzugsweise ist die Anordnung mit einer in der Spannebene angeordneten Führungsseil- oder Abfangklemme versehen, die das Seil sicher klemmt und in seiner Posi- tion hält. [0022] Preferably, the arrangement is provided with a guide cable or interception clamp arranged in the clamping plane, which securely clamps the cable and holds it in its position.
[0023] Eine ebenso bevorzugt vorgesehene sich horizontal anschließende Seilspann vorrichtung sorgt während des Vorspannvorgangs für die erforderliche Vorspannkraft im Seil. An equally preferably provided horizontally adjoining cable tensioning device ensures during the preloading process for the required biasing force in the rope.
[0024] Ebenso bevorzugt sind dabei die Seilumlenkung und die Abfangklemme auf einem gemeinsamen Widerlager befestigt, wobei die Position der Abfangklemme vor zugsweise bezüglich des Widerlagers im geklemmten sowie im offenen Zustand veränder bar ist. Die Veränderung der Position der Abfangklemme kann dabei hydraulisch, pneuma tisch oder elektrisch erfolgen. Also preferably, the cable deflection and the interception clamp are mounted on a common abutment, wherein the position of the intercepting clamp is preferably before bar relative to the abutment in the clamped and in the open state. The change in the position of the intercepting clamp can be done hydraulically, pneuma table or electrically.
[0025] Weiterhin bevorzugt ist die Vorrichtung nach Maßgabe der Erfindung mit einer Führung versehen, in der die Abfangklemme relativbeweglich bezüglich des Wider lagers in Spannrichtung des Führungsseiles angeordnet ist. Further preferably, the device is provided in accordance with the invention with a guide in which the intercepting clamp is arranged relative movable bearing with respect to the rest in the clamping direction of the guide cable.
[0026] Die Spannvorrichtung kann in einer besonders bevorzugten Ausführungsform separat von der Befestigungsvorrichtung ausgebildet von dieser abnehmbar, vorzugsweise mobil ausgebildet sein, zum Einsatz an verschiedenen Führungsseilen eines oder mehrere Sätze von Führungsseilen. Dabei kann die abnehmbare Spannvorrichtung am Widerlager zentrierbar ausgebildet sein. The clamping device may be formed separately from the fastening device in a particularly preferred embodiment of this detachable, preferably designed to be mobile, for use on different guide cables of one or more sets of guide cables. In this case, the removable clamping device can be formed centered on the abutment.
[0027] Vorzugsweise ist dass das Ende des zumindest einen Führungsseiles, welches gespannt werden soll, durch eine Seilkausche oder durch einen Vergusskopf geführt, wobei die Seilkausche bzw. der Vergusskopf mit einem Querjoch verbunden sein kann. [0028] Die Position des Querjochs kann dabei in seiner Position in Längsrichtung bezüglich des Führungsseils veränderbar ausgebildet sein, wobei die Veränderung der Po- sition des Querjochs hydraulisch, pneumatisch, elektrisch oder auf sonstigem Wege er bracht werden kann und wobei die Position des Querjochs in Längsrichtung bezüglich des Führungsseils vorzugsweise mittels Distanzstücken arretierbar ist. Preferably, that is the end of the at least one guide cable, which is to be stretched, passed through a rope thimble or by a Vergusskopf, the Seilkausche or the Vergusskopf can be connected to a cross yoke. The position of the transverse yoke can be made variable in its position in the longitudinal direction with respect to the guide cable, wherein the change in the position of the transverse yoke hydraulically, pneumatically, electrically or otherwise he can be introduced and wherein the position of the transverse yoke in Longitudinal direction relative to the guide cable preferably by means of spacers can be locked.
[0029] Darüber hinaus kann die Anordnung derart ausgebildet sein, dass eine Last messeinrichtung zwischen der Ab fangklemme und deren Verlagerung integriert ist, zur Messung der Seillasten des Führungsseiles und zur Ermittlung der aktuell eingestellten Vorspannkraft. In addition, the arrangement may be designed such that a load measuring device between the catch terminal from and their displacement is integrated, for measuring the rope loads of the guide cable and to determine the currently set biasing force.
[0030] In einer weiteren Variante kann die gesamte Anordnung ganz oder teilweise in den Boden eingelassen sein, um die Bauhöhe weiter zu reduzieren und die Begehbarkeit der in der Anordnung vorgesehenen Bühne zu optimieren. In a further variant, the entire arrangement may be wholly or partially embedded in the ground to further reduce the height and to optimize the accessibility of the provided in the arrangement stage.
[0031] Weitere Eigenschaften und Vorteile der Erfindung ergeben sich aus der fol genden, rein demonstrativen und in keiner Weise beschränkenden Beschreibung verschie dener Ausführungsformen der Erfindung unter Bezugnahme auf die beigefügten Zeich nungen bzw. Skizzen. Insbesondere können die Merkmale der verschiedenen Ausführungs formen auch untereinander kombiniert werden. Gleiche Bezugszeichen verweisen dabei auf identische Elemente in den Figuren. Dabei zeigt: Other features and advantages of the invention will become apparent from the fol lowing, purely demonstrative and in no way limiting description of various embodiments of the invention with reference to the accompanying drawing calculations or sketches. In particular, the features of the various forms of execution can also be combined with each other. The same reference numbers refer to identical elements in the figures. Showing:
[0032] Fig. 1 eine Ausführungsform der erfindungsgemäßen Befestigungs- und Spannvorrichtung von Führungsseilen in Schachtförderanlagen beispielhaft in einer drei dimensionalen Darstellung. Fig. 1 shows an embodiment of the fastening and tensioning device according to the invention of guide cables in shaft conveyor systems by way of example in a three-dimensional representation.
[0033] Fig. 2 die Seitenansicht der Ausführungsform nach Fig. 1 [0034] Fig. 3 die Draufsicht der Ausführungsform nach Fig. 1 2 shows the side view of the embodiment according to FIG. 1 FIG. 3 shows the top view of the embodiment according to FIG. 1
[0035] Fig. 4 eine alternative Ausführungsform mit Versteckeinrichtung und Seilkau sche [0036] Wie in der Fig. 1 zu erkennen ist, wird in der dargestellten Ausführungsform der Befestigungs- und Spannvorrichtung für Führungsseile einer Förderanlage in vertikalen oder schrägen Schächten das Führungsseil 1 über eine Seilumlenkeinrichtung 2, die hier als drehbare Seilscheibe ausgeführt ist, von einer vertikalen Ausrichtung im Schacht um ca. 90° aus der Schachtebene auf die Befestigungs- und Spannvorrichtung gelenkt. Fig. 4 shows an alternative embodiment with hiding device and Seilkau cal As can be seen in Fig. 1, in the illustrated embodiment of the fastening and tensioning device for guide cables of a conveyor in vertical or oblique manholes, the guide cable 1 via a Seilumlenkeinrichtung 2, which is designed here as a rotatable sheave of a vertical alignment in the shaft by approx. 90 ° from the shaft level to the fastening and tensioning device.
[0037] Ein Seilniederhalter 3 führt das Seil zentrisch in die horizontal (Seilmitte hori zontal ausgerichtet) angeordnete Führungsseil- oder Abfangklemme 4, in der das Füh rungsseil 1 durch Keile 4a sicher geklemmt und damit auf Position gehalten wird. A cable holder 3 guides the rope centrally in the horizontally (centered hori zontal hori zontal) arranged Führungsseil- or intercepting clamp 4, in which the Füh tion rope 1 securely clamped by wedges 4a and thus held in position.
[0038] Erkennbar ist auch eine Messeinrichtung 5, welche die Überwachung der vor handenen Seilvorspannkraft ermöglicht und die in der dargestellten Ausführungsform zwi schen einem Widerlager 6 und Führungsseilklemme bzw. Abfangklemme 4 angeordnet ist. Visible is also a measuring device 5, which allows the monitoring of existing rope pretensioning force and in the illustrated embodiment between an abutment rule 6 and guide wire clamp or interception clamp 4 is arranged.
[0039] Zu erkennen ist auch eine von der Befestigungseinrichtung separate, mobile Spannvorrichtung 7, die mit Hilfe einer Zentriereinrichtung 8 mittig zum Führungsseil 1 an der Befestigungseinrichtung ausgerichtet ist. Evident is also a separate from the fastening device, mobile clamping device 7, which is aligned with the aid of a centering device 8 centrally to the guide cable 1 on the fastening device.
[0040] Die Klemmbacken 9a der Spannklemme 9 sind in Führungen 10 geführt und umfassen das lose Ende des Führungsseils 1. Die Spannklemme 9 wird in der dargestellten Ausführungsform gegen das Widerlager mit Hilfe von Hydraulikzylindern 9b bewegt und spannt so das geklemmte lose Ende des Führungsseils 1. The jaws 9a of the tension clamp 9 are guided in guides 10 and comprise the loose end of the guide cable 1. The tension clamp 9 is moved in the illustrated embodiment against the abutment by means of hydraulic cylinders 9b and thus clamps the clamped loose end of the guide rope first ,
[0041] Die Bewegung der Klemmbacken 9a erfolgt mit Hilfe einer Spannklemmen- führungseinrichtung 10. Durch die Bewegung lösen sich die Keile 4a der Seilabfangklem- me 4 und die Spannklemme 9 übernimmt die Seilkraft. The movement of the clamping jaws 9a takes place with the aid of a tensioning clamp guiding device 10. As a result of the movement, the wedges 4a of the cable clamping clamp 4 are released and the tensioning clamp 9 takes over the cable force.
[0042] Nach Erreichen der erforderlichen Vorspannkraft bzw. des erforderlichen Spannweges übernimmt die Seilabfangklemme 4 wieder die Fast des Führungsseiles 1. After reaching the required biasing force or the required clamping path, the Seilabfangklemme 4 again takes over the almost of the guide rope. 1
[0043] Nach Abschluss der Arbeiten kann die Spannvorrichtung 7 mit Hilfe einer Transporteinrichtung 11 entfernt werden. After completion of the work, the tensioning device 7 can be removed by means of a transport device 11.
[0044] Mit Hilfe von einfachen (nicht dargestellten) Seilbefestigungseinrichtungen kann das lose Seilende sicher befestigt werden. [0045] Die gesamte Vorrichtung kann ganz oder teilweise in den Boden 12 eingelas- sen sein. [0046] Figur 4 zeigt eine alternative Ausführung einer Befestigungs- und Spannvor richtung für Führungsseile einer Förderanlage in vertikalen oder schrägen Schächten. With the help of simple (not shown) cable fastening devices loose end of the rope can be securely attached. The entire device can be wholly or partially let into the ground 12. Figure 4 shows an alternative embodiment of a fastening and Spannvor direction for guide cables of a conveyor system in vertical or oblique manholes.
[0047] Zu erkennen ist dabei eine im Boden 14 angeordnete Verlagerung 16, die ne- ben der Umlenkrolle 18 für die Umlenkung des Führungsseiles 20 auch einen Tragrahmen 22 aufnimmt. Das Führungsseil 20 ist bei dieser Ausführungsform in einer Seilkausche 24 fixiert, die mit einer Versteckvorrichtung 26 verbunden ist, welche über Arretierungen 28 und 30 im Tragrahmen 22 gehalten sind. Das in der Seilkausche 24 fixierte Führungsseil 20 wird mittels eines sich an der Arretierung 30 abstützenden Hydraulikzylinders 32 ge spannt und fixiert, der die Versteckvorrichtung 26 bewegt. Zwischen der Arretierung 28 und der Versteckvorrichtung 26, bzw. dazwischen angeordneten Distanzstücken 34, ist in der dargestellten Ausführungsform darüber hinaus eine Wägezelle 36 vorgesehen, mit de- ren Hilfe die Last des Führungsseiles 20 gemessen werden kann. A displacement 16 arranged in the base 14 can be seen, which, in addition to the deflection roller 18, also receives a support frame 22 for the deflection of the guide cable 20. The guide cable 20 is fixed in this embodiment in a Seilkausche 24 which is connected to a hiding device 26, which are held by detents 28 and 30 in the support frame 22. The fixed in the Seilkausche 24 guide rope 20 is clamped by means of a GE on the locking 30 supporting hydraulic cylinder 32 ge and fixed, which moves the hiding device 26. In addition, a load cell 36 is provided between the lock 28 and the hiding device 26 or spacers 34 arranged therebetween in the illustrated embodiment, with the aid of which the load of the guide cable 20 can be measured.
[0048] Natürlich sind auch Kombinationen von Elementen der in den Fig. 1 bis 3 sowie 4 gezeigten Ausführungsformen denkbar. Of course, combinations of elements of the embodiments shown in Figs. 1 to 3 and 4 are conceivable.

Claims

Ansprüche claims
1. Befestigungs- und Spannvorrichtung für Führungsseile einer Schachtförderanlage in vertikalen oder schrägen Schächten, zur Erzeugung, Beibehaltung und Anpas- sung von Vorspannkräften in zumindest einem Führungsseil (1, 20) für seilgeführte Fördermittel, dadurch gekennzeichnet, dass die Spannebene der Anordnung in ei- nem Winkel zur Erstreckung des Schachtes angeordnet ist. 1. Fixing and tensioning device for guide cables of a shaft conveyor system in vertical or inclined shafts, for generating, maintaining and adapting prestressing forces in at least one guide cable (1, 20) for cable-guided conveying means, characterized in that the clamping plane of the arrangement is nem angle to the extension of the shaft is arranged.
2. Anordnung nach Anspruch 1, dadurch gekennzeichnet, dass die Spannebene der Anordnung im Wesentlichen horizontal angeordnet ist. 2. Arrangement according to claim 1, characterized in that the clamping plane of the arrangement is arranged substantially horizontally.
3. Anordnung nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Anordnung mit einer Seilumlenkung (2, 18) versehen ist, zur Umlenkung des mindestens einen Führungsseiles (1, 20) aus der Schachtebene in die Spannebene. 3. Arrangement according to claim 1 or 2, characterized in that the arrangement with a cable deflection (2, 18) is provided for deflecting the at least one guide cable (1, 20) from the shaft plane in the clamping plane.
4. Anordnung nach Anspruch 3, dadurch gekennzeichnet, dass die Seilumlenkung (2, 18) rotierend um eine feststehende Achse ausgeführt ist. 4. Arrangement according to claim 3, characterized in that the cable guide (2, 18) is designed to rotate about a fixed axis.
5. Anordnung nach Anspruch 2, dadurch gekennzeichnet, dass die Seilumlenkung (2, 18) fest mit einer rotierenden Achse verbunden ist. 5. Arrangement according to claim 2, characterized in that the cable guide (2, 18) is fixedly connected to a rotating axle.
6. Anordnung nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass sie mit einer Abfangklemme (4) versehen ist, durch die das Führungsseil (2) geführt und abgefangen ist. 6. Arrangement according to one of the preceding claims, characterized in that it is provided with a interception clamp (4) through which the guide cable (2) is guided and intercepted.
7. Anordnung nach Anspruch 6, dadurch gekennzeichnet, dass die Seilumlenkung und die Abfangklemme (4) auf einem gemeinsamen Widerlager (6) befestigt sind. 7. Arrangement according to claim 6, characterized in that the cable deflection and the intercepting clamp (4) on a common abutment (6) are attached.
8. Anordnung nach einem der Ansprüche 6 oder 7, dadurch gekennzeichnet, dass die Position der Abfangklemme (4) bezüglich des Widerlagers (6) im geklemmten so- wie im offenen Zustand veränderbar ist. 8. Arrangement according to one of claims 6 or 7, characterized in that the position of the intercepting clamp (4) with respect to the abutment (6) in the clamped as well as in the open state is changeable.
9. Anordnung nach Anspruch 8, dadurch gekennzeichnet, dass die Veränderung der Position der Abfangklemme (4) hydraulisch, pneumatisch oder elektrisch erfolgt. 9. Arrangement according to claim 8, characterized in that the change in the position of the interception clamp (4) is carried out hydraulically, pneumatically or electrically.
10. Anordnung nach einem der Ansprüche 8 oder 9, dadurch gekennzeichnet, dass An ordnung mit einer Führung versehen ist, in der die Abfangklemme (4) relativbe- weglich bezüglich des Widerlagers (6) in Spannrichtung des Führungsseiles (1) an geordnet ist. 10. Arrangement according to one of claims 8 or 9, characterized in that order is provided with a guide in which the interception clamp (4) relative to the abutment (6) in the clamping direction of the guide cable (1) is arranged relative to.
11. Anordnung nach einem der vorangehenden Ansprüche, dadurch gekennzeichnet, dass die Spannvorrichtung (11) separat von der Befestigungsvorrichtung ist und von dieser abnehmbar ausgebildet ist. 11. Arrangement according to one of the preceding claims, characterized in that the clamping device (11) is separate from the fastening device and is designed to be removable from this.
12. Anordnung nach Anspruch 11, dadurch gekennzeichnet, dass die Spannvorrichtung (11) mobil ausgebildet ist zum Einsatz an verschiedenen Führungsseilen (1) eines oder mehrere Sätze von Führungsseilen. 12. Arrangement according to claim 11, characterized in that the clamping device (11) is designed to be mobile for use on different guide cables (1) one or more sets of guide cables.
13. Anordnung nach Anspruch 11 oder 12, dadurch gekennzeichnet, dass die abnehm bare Spannvorrichtung (11) am Widerlager (6) zentrierbar ausgebildet ist. 13. Arrangement according to claim 11 or 12, characterized in that the detachable bare clamping device (11) on the abutment (6) is formed centered.
14. Anordnung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das Ende des zumindest einen Führungsseiles (1, 20) durch eine Seilkausche geführt ist. 14. Arrangement according to one of the preceding claims, characterized in that the end of the at least one guide cable (1, 20) is guided by a Seilkausche.
15. Anordnung nach einem der Ansprüche 1 bis 13, dadurch gekennzeichnet, dass das Ende des zumindest einen Führungsseiles (1, 20) durch einen Vergusskopf geführt wird. 15. Arrangement according to one of claims 1 to 13, characterized in that the end of the at least one guide cable (1, 20) is guided by a Vergusskopf.
16. Anordnung nach Anspruch 14 oder 15, dadurch gekennzeichnet, dass die Seilkau sche bzw. der Vergusskopf mit einem Querjoch verbunden ist. 16. Arrangement according to claim 14 or 15, characterized in that the Seilkau cal or the Vergusskopf is connected to a transverse yoke.
17. Anordnung nach Anspruch 16, dadurch gekennzeichnet, dass die Position des Querjochs in seiner Position in Längsrichtung bezüglich des Führungsseils verän derbar ist. 17. Arrangement according to claim 16, characterized in that the position of the transverse yoke in its position in the longitudinal direction with respect to the guide cable is changed derbar.
18. Anordnung nach Anspruch 17, dadurch gekennzeichnet, dass die Veränderung der18. Arrangement according to claim 17, characterized in that the change of
Position des Querjochs hydraulisch, pneumatisch, elektrisch oder auf sonstigem Wege erbracht wird. Position of the cross yoke is provided hydraulically, pneumatically, electrically or by other means.
19. Anordnung nach Anspruch 18, dadurch gekennzeichnet, dass die Position des Querjochs in Längsrichtung bezüglich des Führungsseils (1, 20) mittels Distanzstü- cken (34) arretierbar ist. 19. Arrangement according to claim 18, characterized in that the position of the transverse yoke in the longitudinal direction with respect to the guide cable (1, 20) by means of Distanzstü- bridges (34) can be locked.
20. Anordnung nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass eine Lastmesseinrichtung (34) zwischen der Abfangklemme und deren Verla gerung integriert ist, zur Messung der Seillasten des Führungsseiles (1, 20). 20. Arrangement according to one of the preceding claims, characterized in that a load measuring device (34) is integrated between the interception clamp and its Verla delay, for measuring the rope loads of the guide cable (1, 20).
EP18807254.0A 2017-12-13 2018-11-16 Fastening and tensioning device for guide cables of a conveying system Pending EP3704050A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102017129772.3A DE102017129772A1 (en) 2017-12-13 2017-12-13 Fixing and tensioning device for guide cables of a conveyor system
PCT/EP2018/081595 WO2019115150A1 (en) 2017-12-13 2018-11-16 Fastening and tensioning device for guide cables of a conveying system

Publications (1)

Publication Number Publication Date
EP3704050A1 true EP3704050A1 (en) 2020-09-09

Family

ID=64426890

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18807254.0A Pending EP3704050A1 (en) 2017-12-13 2018-11-16 Fastening and tensioning device for guide cables of a conveying system

Country Status (5)

Country Link
EP (1) EP3704050A1 (en)
CN (1) CN111465570A (en)
DE (1) DE102017129772A1 (en)
EA (1) EA202091225A1 (en)
WO (1) WO2019115150A1 (en)

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB881823A (en) * 1959-05-14 1961-11-08 Nikex Nehezipari Kulkere Improvements in or relating to shaft-sinking rigs
DE1866876U (en) * 1962-11-29 1963-02-07 Emil Domes MOBILE HANGING FRAMEWORK WITH TENSIONING DEVICES FOR GUIDE ROPES.
DE2804621C2 (en) * 1978-02-03 1983-01-27 M.A.N. Maschinenfabrik Augsburg-Nürnberg AG, 4200 Oberhausen Device for setting, monitoring and readjusting the tensioning forces in guide and friction ropes in shaft hoisting systems in the mining industry
DD203891B1 (en) * 1981-08-07 1986-04-09 Entwicklungs Musterbau Baumech SAFETY SYSTEM FOR ROPE RUNNING ROLL
JP3035102B2 (en) * 1993-02-09 2000-04-17 株式会社日立ビルシステム How to replace the main elevator rope
KR100967174B1 (en) * 2008-03-17 2010-07-27 (주)재경건설 The cage lift
CN201236089Y (en) * 2008-06-07 2009-05-13 徐州市工大三森科技有限公司 On-line automatic detection adjusting device for cage guide rope tension
CN201250036Y (en) * 2008-07-30 2009-06-03 尹士道 Cage guide steel-rope automatic tensioner
CN101759080A (en) * 2009-11-20 2010-06-30 徐州市工大三森科技有限公司 Online automatic detection and adjustment device for tension of cage guide rope
CN102085993B (en) * 2010-12-03 2013-06-26 中国矿业大学 Device and method for automatically adjusting tension of flexible guiding rail of mine lift
CN102275799B (en) * 2011-07-08 2013-01-16 中国矿业大学 Mine elevator
CN103359645B (en) * 2013-07-08 2015-12-09 中国矿业大学 Flexible cable suspension platform guide rope tension force variotrol and method
CN105692390B (en) * 2016-03-25 2017-12-19 中国矿业大学 A kind of safe guidance system of flexible guiding rail of mine lift and its method of work

Also Published As

Publication number Publication date
EA202091225A1 (en) 2020-09-30
CN111465570A (en) 2020-07-28
WO2019115150A1 (en) 2019-06-20
DE102017129772A1 (en) 2019-06-13

Similar Documents

Publication Publication Date Title
DE102018100868B3 (en) Method and device for damping tower vibrations in a wind turbine and tower with such a device
EP2928806A1 (en) Cable clamp, and lift system having a cable clamp
EP0353545A2 (en) Transport and turning device for the core components of a nuclear reactor
DE102011052183B4 (en) hoist
EP2236745A2 (en) Excavation machine, in particular surface miner and method for fitting and detaching a transport device for a excavation machine
EP3406362A1 (en) Endless track train drawing machine and process for drawing
EP3119713A1 (en) Elevator comprising balance rope tensioning device
EP2444553B1 (en) Ramming and traction device
WO2019115150A1 (en) Fastening and tensioning device for guide cables of a conveying system
EP3015414A1 (en) Load bearing device
EP3681836A1 (en) Installation device and method bringing an installation device into an installation position in an elevator shaft
DE2535865C3 (en) Device for driving sheet piles
CH510343A (en) Cable laying roller set
DE202017100749U1 (en) System for unwinding tensioning strands
EP2361213B1 (en) Load bearing medium attachment device
DE3520065C1 (en) Device for connecting two ropes during the rope change on winding apparatus
DE102006019261B4 (en) Drill with movable bezel
DE102019219001B4 (en) Hook block for a crane
DE19962298C2 (en) Press-in device for pipes and drill rods
DE102009032426B3 (en) Device for mounting and/or demounting ballast and/or ballasted stone on crane i.e. tower crane, has lifting device including rolling and hook blocks that are fastened to cantilever, where hoist rope of crane returns back to blocks
DE2804621A1 (en) Mine shaft lift rope clamp monitor - has detector to measure tension which is adjusted by hydraulic actuator
DE202020101054U1 (en) Lift gripper and wakeboard lift
EP2253571A1 (en) Lift tensioner and lift assembly with same
EP0996782B1 (en) Carrier device for components of a weaving machine
AT522864A1 (en) Wire saw

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200602

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20221104