EP3556917B1 - Transport device for a spinning unit - Google Patents

Transport device for a spinning unit Download PDF

Info

Publication number
EP3556917B1
EP3556917B1 EP19169860.4A EP19169860A EP3556917B1 EP 3556917 B1 EP3556917 B1 EP 3556917B1 EP 19169860 A EP19169860 A EP 19169860A EP 3556917 B1 EP3556917 B1 EP 3556917B1
Authority
EP
European Patent Office
Prior art keywords
tracks
ring spinning
spinning machine
creel
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP19169860.4A
Other languages
German (de)
French (fr)
Other versions
EP3556917A1 (en
Inventor
Karl-Heinz Mack
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Saurer Spinning Solutions GmbH and Co KG
Original Assignee
Saurer Spinning Solutions GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saurer Spinning Solutions GmbH and Co KG filed Critical Saurer Spinning Solutions GmbH and Co KG
Publication of EP3556917A1 publication Critical patent/EP3556917A1/en
Application granted granted Critical
Publication of EP3556917B1 publication Critical patent/EP3556917B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/005Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/14Details
    • D01H1/18Supports for supply packages
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins
    • D01H9/182Overhead conveying devices

Definitions

  • the invention relates to a transport device for a spinning mill for supplying ring spinning machines with feed bobbins and disposing of the empty spun tubes with a hanging rail system which is arranged between at least one roving machine and a ring spinning machine and is equipped with a storage device which enables hanging carriage trains to be temporarily stored which are either full Feed bobbins or are equipped with empty spun tubes.
  • transport devices for roving bobbins have long been known in connection with the operation of ring spinning machines. It is known, for example, to install a network of hanging rails between roving machines and ring spinning machines, on which hanging carriage trains are movably guided, which are equipped either with fresh roving bobbins or with empty-spun tubes.
  • a transport device in which a block of roving machines, preferably so-called roving frames, is connected to a block of ring spinning machines via a suspension rail system.
  • the hanging rail system In the area of the gate of the ring spinning machines, the hanging rail system has several rows of gates, which are connected at the ends of the ring spinning machines via a switch to a ring-shaped rail track of the hanging rail system.
  • a comparable transport device with a hanging rail system switched on between roving machines and ring spinning machines is also in DE 195 08 399 C2 described.
  • the suspension rail system in Each area of the roving machines has a storage facility for hanging carriage trains and in the area of the ring spinning machines up to four rows of creels.
  • creel rows are connected at the ends of the ring spinning machines via points to a ring-shaped rail track of the suspension rail system.
  • transfer devices are known in connection with transport devices for roving bobbins. Such transfer devices are intended to reduce the cost of switches that are required in the hanging rail systems.
  • transport devices for roving bobbins which, as usual, are arranged between at least one roving frame and a plurality of ring spinning machines and have a network of hanging rails on which hanging carriage trains are movably guided.
  • These known transport devices have at least one main overhead rail and several branch overhead rails, with a transfer device being arranged between the main overhead rail and the branch overhead rails.
  • a transfer device is installed in an area between a main overhead rail and one of the branch overhead rails, which can be moved along the main overhead rail and has two slidably mounted carriages with overhead rail sections.
  • the carriages can be moved in the transfer device transversely to their direction of travel in such a way that their suspension rail sections can be aligned with the main suspension rail and with one of several branch suspension rails.
  • Suspension wagon trains can then be transferred in both directions via this suspension rail connection.
  • This means that such transfer devices can be used to move trains of hanging carriages loaded with full roving bobbins from a main hanging rail track into a branch hanging rail track in the creel of a ring spinning machine, and after the roving bobbins have been worked off again from the branch hanging rail tracks to the main Overhead rail are returned, which is connected to a roving machine or a buffer.
  • the invention is based on the object of providing a transport device for a spinning mill, which is used to supply ring spinning machines with feed bobbins and to dispose of empty spun tubes and which has a hanging rail system with a storage device arranged between at least one roving machine and a ring spinning machine , with which hanging wagon trains can be exchanged extremely quickly and therefore very effectively, especially when batches are changed.
  • a creel with a large number of creel rows is installed in the area of the ring spinning machine, which are connected to the hanging rail system via a switch configuration in such a way that, if necessary, a plurality of hanging carriage trains, which have empty spun tubes, can be pulled out of the creel rows at the same time the ring spinning machine can be extended and that the same number of hanging carriage trains, which are equipped with full supply bobbins, can then be moved back into the creel rows of the ring spinning machine at the same time.
  • the switch configuration has a number of straight connecting tracks and a number of crossing tracks crossing the connecting tracks, and that a pre-switch is installed to connect the connecting tracks with the crossing tracks, and a bridge switch is installed in the crossing areas of connecting tracks and crossing tracks.
  • the number of connecting tracks and the number of crossing tracks are the same and correspond to the number of creel rows installed in the creel of the ring spinning machine.
  • the transport device has the particular advantage that the simultaneous extension of a plurality of hanging trolley trains that are equipped with empty spun tubes and the subsequent simultaneous retraction of the same number of hanging trolley trains that have fresh supply bobbins, the time that was previously required by several replacing hanging carriage trains positioned in the creel rows of a ring spinning machine is significantly reduced.
  • the storage device is designed in such a way that all hanging carriage trains discharged from the creel rows of the ring spinning machine can enter the storage device at the same time and then the same number of hanging carriage trains can move out of the storage device again at the same time in the direction of the ring spinning machine.
  • creel rows are arranged in the area of the creel of a ring spinning machine, an arrangement with six creel rows having proved to be particularly advantageous in modern ring spinning machines.
  • creel rows i.e. three creel rows per longitudinal side of the spinning machine, not only ensures that the numerous spinning positions of the ring spinning machine are properly supplied with roving in a simple manner, but also ensures that, if necessary, hanging carriage trains that have empty spun tubes, can be exchanged for hanging trolleys that are equipped with fresh roving bobbins.
  • the storage device preferably has a pre-storage arrangement which has a plurality of first rails corresponding to the number of creel rows of the at least one ring spinning machine and the same number of second rails.
  • a first track is preferably arranged adjacent to a second track and a first switch is arranged and configured at the end of the first and second tracks facing the at least one ring spinning machine in such a way that when the first switch is in a first position, a suspension wagon train can enter the first track can enter and in a second position of the first switch a hanging wagon train can exit the second track.
  • hanging wagon trains temporarily stored in the second tracks can be extended with full roving bobbins in the direction of the ring spinning machines. A batch change on a ring spinning machine can thus be carried out quickly.
  • a second switch is preferably arranged and designed at the other end of the first and second tracks in such a way that in a first position of the second switch a hanging wagon train can exit the first track and in a second position of the second switch a hanging wagon train can move into the second track can drive in.
  • the second tracks can advantageously be filled again with hanging car trains with full roving bobbins and the hanging car trains with empty spun bobbins can be moved out of the first tracks.
  • the hanging carriage trains with the empty spun tubes can be driven to the roving machine or a main store.
  • the storage device between the pre-storage arrangement and the at least one roving machine comprises a further pre-storage arrangement which has the same number of rails as the at least one ring spinning machine has creel rows. In this way, two lot changes can be carried out immediately one after the other.
  • the connecting tracks lead to the storage device and the crossing tracks lead to the creel rows of the ring spinning machine.
  • the pre-switches preferably each have a branch position and a straight-ahead position. In the branching position, the crossing tracks are preferably connected to the connecting tracks, and in the straight position, the connecting tracks are preferably connected to the connecting tracks of a further switch configuration.
  • the bridge points can preferably be arranged in such a way that either the connecting tracks or the crossing tracks are continuous.
  • the bridge points can have a rotatable track element, for example.
  • the pre-switches are each equipped with their own drive, for example with an electric motor drive, while the numerous bridge switches are connected by a lever linkage and can be actuated by means of a common drive, preferably also an electric motor drive.
  • switch configurations designed in this way enable a large number of hanging carriage trains to be guided in a relatively simple manner at the same time, so that, if required, both a large number of hanging carriage trains can be simultaneously and safely discharged from the creel rows of a ring spinning machine, and then the same number of hanging carriage trains can be fed back in at the same time the creel rows of a ring spinning machine can be introduced.
  • the 1 shows a side view of the creel of a ring spinning machine 1.
  • the ring spinning machine 1 arranged in a spinning mill is shown only very schematically, i.e. this ring spinning machine 1 is shown in 1 shown.
  • the gate 2 of the ring spinning machine 1 in the exemplary embodiment has three rows of gates 3 per longitudinal side of the spinning machine, i.e. a total of six rows of gates 3 formed by rails 9 of a suspension rail system identified overall by the reference numeral 10 .
  • Hanging wagon trains 11 run in these rails 9 of the hanging rail system 10, which either, as in 1 indicated, are equipped with full roving bobbins 12, preferably flyer bobbins, or have empty-spun sleeves.
  • the hanging wagon trains 11 can be moved in the hanging rail system 10 and, as is known per se, usually consist of support members that are flexibly connected to one another, so that they can also travel through curves.
  • the support members are guided in a manner known per se by means of rollers in the downwardly open, ⁇ -like rails 9 of the suspension rail system 10 .
  • Such hanging wagon trains 11 are usually driven either by hand, by "locomotives” or by friction roller drives.
  • the 2 shows a plan view of a transport device arranged in a spinning mill and designed according to the invention for supplying ring spinning machines 1 with roving bobbins 12 or for disposing of the empty bobbins spun by the ring spinning machines 1 in the course of the spinning process.
  • the transport device has a hanging rail system 10 on which hanging wagon trains 11 are movably guided.
  • a ring spinning machine block consisting of three ring spinning machines 1 is connected to two roving machines 14 via a suspension rail system 10 .
  • the hanging rail system 10 is also equipped with a storage device 16 .
  • the memory device 16 has a first Pre-storage arrangement, at the ends of which the switches 22 and 23 are arranged.
  • storage device 16 includes a second pre-storage arrangement 17.
  • the storage device 16 is also connected via a siding 4 to at least one roving machine 14, with two roving machines 14 being shown in the exemplary embodiment.
  • the suspension carriage trains 11 are fitted with fresh roving bobbins 12. This means that incoming hanging wagon trains 11 equipped with empty spun tubes are converted as soon as possible on the roving machine 14, i.e. equipped with fresh roving bobbins 12 and then transported via the siding 4 to the storage device 16, where they are initially temporarily stored in the second pre-storage arrangement 17 , which is connected to the first pre-storage arrangement of the storage device 16 in terms of conveying technology.
  • the 3 shows on a larger scale a section of the 2 Hanging rail system 10 shown in its entirety.
  • the gates 2 of the ring spinning machines 1 each have a total of six rows of gates 3, each of which has a switch configuration 15, which is described below with reference to FIG figures 4 and 5 is explained in more detail, are connected to the suspension rail system 10 of the transport device designed according to the invention.
  • the switch configuration 15 and thus the gate rows 3 are coupled to a storage device 16 which has pre-storage arrangements.
  • the first pre-storage device has adjacent tracks 18 and 19 in each case. This means that the two tracks 18 and 19 are right next to each other.
  • the number of track pairs 18 and 19 corresponds to the number of creel rows 3 of a ring spinning machine 1.
  • the first pre-storage device therefore has six track pairs 18 and 19 and thus a total of twelve tracks.
  • the storage device also has a second pre-storage device 17.
  • the pre-storage device 17 has the same number of rails 20 as a ring spinning machine has creel rows. In the present embodiment, there are six tracks 20.
  • the 4 shows the switch configuration 15 in plan view, while the Fig.5 represents a bottom view.
  • such a switch configuration 15 in the exemplary embodiment has six so-called connecting tracks 21, which run through the switch configuration 15 in a straight line, and six so-called crossing tracks 25, which cross the connecting tracks 21 and which each form an extension of one of the creel rows 3 of a ring spinning machine 1.
  • pre-switches 5 are installed on the input side of the switch configurations 15 , each of the total of six pre-switches 5 being arranged in the region of an incoming connecting track 21 and each being controllable in a defined manner by a separate drive 24 .
  • switch configurations 15 are each equipped with bridge switches 6 in the crossing areas of connecting tracks 21/crossing tracks 25.
  • the switch configurations 15 each have a total of fifteen bridge switches 6 .
  • up to six hanging carriage trains 11 can be simultaneously discharged from the creel rows 3 of a ring spinning machine 1 and then up to six hanging carriage trains 11 can be moved back into the creel rows 3 at the same time.
  • hanging wagon trains 11 coming from the storage facility 16 can enter the switch configuration 15 via the connecting tracks 21, through a corresponding switch position of the pre-switches 5 or straight through the switch configuration 15 in the direction of the outgoing connecting tracks 21 and thus to a subsequent switch configuration 15 to be forwarded.
  • the pre-switches 5 each have a separate electric motor drive 24, the drives 24, like the drive 8 for the bridge switches, preferably being controllable in a defined manner via a central control device of the spinning mill.
  • the numerous bridge switches 6 are also connected via a lever linkage 7 and are also connected to their common drive 8 via this lever linkage 7 .
  • the arrangement and design of a switch configuration 15 shown in the exemplary embodiment has the particular advantage that, if necessary, up to six hanging carriage trains 11 can be ejected simultaneously from the creel rows 3 of a ring spinning machine 1 without any problems, and then the same number of hanging carriage trains 11 can be simultaneously fed back into the creel rows of the ring spinning machine without any problems 1 can be fed in, which leads to a significant reduction in machine downtime, especially when changing batches.
  • the switch configuration 15 arranged on the input side of the creel 2 of the middle ring spinning machine 1 is first switched properly.
  • the pre-switches 5 are switched to their branching position by their drives 24 and the bridge switches 6 are controlled in such a way that they are available for passage with respect to the crossing tracks 25 in terms of conveyance.
  • bridge switches 6, which are connected to a common drive 8 via a lever linkage 7, are switched, for example by the central control device of the spinning mill, in such a way that all hanging wagon trains 11 cross the connecting tracks 21 in between and finally via the associated pre-switch 5 into the connected connecting track 21 can enter.
  • All hanging wagon trains 11 then continue to run in the direction of the storage device 16 via the connected connecting tracks 21, with the connecting tracks 21 each being connected to the points 22 of the first pre-storage device, as can be seen.
  • the first pre-storage arrangement which has a total of 12 tracks 18, 19, is equipped with points 22 and 23 in its end regions.
  • a hanging wagon train 11 loaded with fresh roving bobbins 12 is temporarily stored on the tracks 19 of the first pre-storage arrangement.
  • the six hanging wagon trains 11 loaded with fresh roving bobbins then leave the first pre-storage arrangement and reach the switch configuration 15 via the connecting tracks 21, which still shows the switching position that was set to discharge the hanging wagon trains 11 loaded with empty spun bobbins.
  • the piecing process can be started again immediately on the ring spinning machine 1 .
  • the switches 23 are set in such a way that the hanging wagon trains 11 with fresh roving bobbins move from the tracks 20 into the free tracks 19 of the first pre-storage device.
  • the hanging car trains 11, which were previously temporarily stored on the tracks 18 of the first pre-storage arrangements and are equipped with empty spun tubes are transferred to the tracks 20 of the second pre-storage arrangement 17 by appropriate adjustment of the points 23, from where the hanging car trains 11 later, i.e. as soon as this is possible , are sent via the connecting track 4 to the roving machine 14.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Description

Die Erfindung betrifft eine Transportvorrichtung für eine Spinnerei zum Versorgen von Ringspinnmaschinen mit Vorlagespulen und Entsorgen der leergesponnenen Hülsen mit einem Hängeschienensystem, das zwischen mindestens einer Vorspinnmaschine und einer Ringspinnmaschine angeordnet und mit einer Speichereinrichtung ausgestattet ist, die ein Zwischenspeichern von Hängewagenzügen ermöglicht, welche entweder mit vollen Vorlagespulen oder mit leergesponnenen Hülsen bestückt sind.The invention relates to a transport device for a spinning mill for supplying ring spinning machines with feed bobbins and disposing of the empty spun tubes with a hanging rail system which is arranged between at least one roving machine and a ring spinning machine and is equipped with a storage device which enables hanging carriage trains to be temporarily stored which are either full Feed bobbins or are equipped with empty spun tubes.

Im Zusammenhang mit dem Betrieb von Ringspinnmaschinen sind seit längerem verschiedene Ausführungsformen für Transportvorrichtungen für Vorgarnspulen bekannt. Es ist beispielweise bekannt, zwischen Vorspinnmaschinen und Ringspinnmaschinen ein Netz von Hängeschienen zu installieren, an denen Hängewagenzüge verfahrbar geführt sind, die entweder mit frischen Vorgarnspulen oder mit leergesponnenen Hülsen bestückt sind.Various embodiments of transport devices for roving bobbins have long been known in connection with the operation of ring spinning machines. It is known, for example, to install a network of hanging rails between roving machines and ring spinning machines, on which hanging carriage trains are movably guided, which are equipped either with fresh roving bobbins or with empty-spun tubes.

Derartige Transportvorrichtungen für Vorgarnspulen sind auch in der Patentliteratur in zahlreichen Patentanmeldungen zum Teil recht ausführlich beschrieben.Such transport devices for roving bobbins are also described in great detail in the patent literature in numerous patent applications.

Durch die DE 42 13 122 A1 ist beispielsweise eine Transportvorrichtung bekannt, bei der ein Block von Vorspinnmaschinen, vorzugsweise so genannte Flyer, über ein Hängeschienensystem an einen Block von Ringspinnmaschinen angeschlossen ist.through the DE 42 13 122 A1 For example, a transport device is known in which a block of roving machines, preferably so-called roving frames, is connected to a block of ring spinning machines via a suspension rail system.

In das Hängeschienensystem, an dem Hängewagenzüge umlaufen, die entweder von Hand, durch "Lokomotiven" oder durch Reibradantriebe bewegt werden und die entweder mit vollen Flyerspulen oder mit leergesponnenen Hülsen bestückt sind, ist eine Reinigungseinrichtung für die leergesponnenen Flyerspulenhülsen sowie ein Zentralpuffer zum Zwischenspeichern von Hängewagenzügen eingeschaltet.In the hanging rail system, on which hanging wagon trains circulate, which are moved either by hand, by "locomotives" or by friction wheel drives and which are equipped either with full roving bobbins or with empty bobbins, there is a cleaning device for the empty roving bobbin bobbins and a central buffer for temporarily storing hanging wagon trains switched on.

Das Hängeschienensystem weist im Bereich des Gatters der Ringspinnmaschinen jeweils mehrere Gatterreihen auf, die endseitig der Ringspinnmaschinen jeweils über eine Weiche an eine ringförmig angeordnete Schienenbahn des Hängeschienensystems angeschlossen sind.In the area of the gate of the ring spinning machines, the hanging rail system has several rows of gates, which are connected at the ends of the ring spinning machines via a switch to a ring-shaped rail track of the hanging rail system.

Eine vergleichbare Transportvorrichtung mit einem zwischen Vorspinnmaschinen und Ringspinnmaschinen eingeschalteten Hängeschienensystem ist auch in der DE 195 08 399 C2 beschrieben. Bei dieser bekannten Transportvorrichtung weist das Hängeschienensystem im Bereich der Vorspinnmaschinen jeweils einen Speicher für Hängewagenzüge und im Bereich der Ringspinnmaschinen bis zu vier Gatterreihen auf.A comparable transport device with a hanging rail system switched on between roving machines and ring spinning machines is also in DE 195 08 399 C2 described. In this known transport device, the suspension rail system in Each area of the roving machines has a storage facility for hanging carriage trains and in the area of the ring spinning machines up to four rows of creels.

Auch hier sind die Gatterreihen endseitig der Ringspinnmaschinen jeweils über Weichen an eine ringförmig angeordnete Schienenbahn des Hängeschienensystems angeschlossen.Here, too, the creel rows are connected at the ends of the ring spinning machines via points to a ring-shaped rail track of the suspension rail system.

Des Weiteren sind im Zusammenhang mit Transportvorrichtungen für Vorgarnspulen so genannte Überleitvorrichtungen bekannt. Durch solche Überleitvorrichtungen soll der Aufwand an Weichen, die in den Hängeschienensystemen benötigt werden, vermindert werden.Furthermore, so-called transfer devices are known in connection with transport devices for roving bobbins. Such transfer devices are intended to reduce the cost of switches that are required in the hanging rail systems.

In der DE 10 2007 014 596 A1 und der DE 10 2007 029 288 A1 sind beispielsweise Transportvorrichtungen für Vorgarnspulen beschrieben, die, wie üblich, zwischen mindestens einer Vorspinnmaschine und mehreren Ringspinnmaschinen angeordnet sind und ein Netz von Hängeschienen aufweisen, an denen Hängewagenzüge verfahrbar geführt sind.In the DE 10 2007 014 596 A1 and the DE 10 2007 029 288 A1 are described, for example, transport devices for roving bobbins, which, as usual, are arranged between at least one roving frame and a plurality of ring spinning machines and have a network of hanging rails on which hanging carriage trains are movably guided.

Diese bekannten Transportvorrichtungen weisen mindestens eine Haupt-Hängeschienenbahn sowie mehrere Zweig-Hängeschienenbahnen auf, wobei zwischen der Haupt-Hängeschienenbahn und den Zweig-Hängeschienenbahnen eine Überleitvorrichtung angeordnet ist.These known transport devices have at least one main overhead rail and several branch overhead rails, with a transfer device being arranged between the main overhead rail and the branch overhead rails.

Das heißt, in einem Bereich zwischen einer Haupt-Hängeschienenbahn und einer den Zweig-Hängeschienenbahnen ist eine Überleitvorrichtung installiert, die entlang der Haupt-Hängeschienenbahn verfahrbar ist und zwei verschiebbar gelagerte Schlitten mit Hängeschienen-Abschnitten aufweist.This means that a transfer device is installed in an area between a main overhead rail and one of the branch overhead rails, which can be moved along the main overhead rail and has two slidably mounted carriages with overhead rail sections.

Die Schlitten sind in der Überleitvorrichtung quer zu ihrer Fahrtrichtung derart verschiebbar, dass ihre Hängeschienen-Abschnitte mit der Haupt-Hängeschienenbahn sowie mit einer von mehreren Zweig-Hängeschienenbahnen in Flucht gebracht werden können.The carriages can be moved in the transfer device transversely to their direction of travel in such a way that their suspension rail sections can be aligned with the main suspension rail and with one of several branch suspension rails.

Über diese Hängeschienenbahn-Verbindung können dann Hängewagenzüge in beiden Richtungen übergeleitet werden. Das bedeutet, mittels derartiger Überleitvorrichtungen können sowohl Hängewagenzüge, die mit vollen Vorgarnspulen bestückt sind, von einer Haupt-Hängeschienenbahn in eine Zweig-Hängeschienenbahn im Gatter einer Ringspinnmaschine eingefahren, als auch nach dem Abarbeiten der Vorgarnspulen wieder aus den Zweig-Hängeschienenbahnen auf die Haupt-Hängeschienenbahn zurückgeführt werden, die mit einer Vorspinnmaschine oder einem Zwischenspeicher verbunden ist.Suspension wagon trains can then be transferred in both directions via this suspension rail connection. This means that such transfer devices can be used to move trains of hanging carriages loaded with full roving bobbins from a main hanging rail track into a branch hanging rail track in the creel of a ring spinning machine, and after the roving bobbins have been worked off again from the branch hanging rail tracks to the main Overhead rail are returned, which is connected to a roving machine or a buffer.

Nachteilig bei den vorstehend beschriebenen, bekannten Transportvorrichtungen ist allerdings, dass Hängewagenzüge, die in den Gatterreihen einer Ringspinnmaschine positioniert sind, lediglich einzeln und damit nacheinander ausgetauscht werden können.The disadvantage of the known transport devices described above, however, is that hanging carriage trains that are positioned in the creel rows of a ring spinning machine can only be exchanged individually and therefore one after the other.

Das heißt, wenn im Bereich der Gatterreihen einer Ringspinnmaschine mehrere Hängewagenzüge positioniert sind, die alle ausgetauscht werden sollen, gestaltet sich der Wechselvorgang relativ zeitaufwendig, da, bevor ein Hängewagenzug, der mit neuen, vollen Flyerspulen bestückt ist, in eine der Gatterreihen des Gatters einer Ringspinnmaschine einfahren kann, stets zunächst ein Hängewagenzug, der leergesponnene Hülsen aufweist, aus der Gatterreihe herausgefahren werden muss.This means that if several hanging carriage trains are positioned in the area of the creel rows of a ring spinning machine, all of which are to be exchanged, the changing process is relatively time-consuming, since before a hanging carriage train that is equipped with new, full roving bobbins enters one of the creel rows of the creel Ring spinning machine can retract, always first a hanging carriage train, which has empty spun sleeves, must be moved out of the gate row.

Bei modernen Ringspinnmaschinen, die eine Vielzahl von Gatterreihen, zum Beispiel vier bis zehn Gatterreihen, aufweisen, gestaltet sich der Wechselvorgang entsprechend relativ langwierig und führt zu nicht unerheblichen Produktionsverlusten.In modern ring spinning machines, which have a large number of creel rows, for example four to ten creel rows, the changing process is correspondingly relatively lengthy and leads to not inconsiderable production losses.

Insbesondere bei Partiewechseln, bei denen stets alle in den Gatterreihen positionierten Hängewagenzüge getauscht werden müssen, kommt es bislang in der Regel zu erheblichen Produktionseinbußen, da die Ringspinnmaschine während des gesamten Wechselvorganges abgeschaltet ist.In the case of lot changes in particular, where all the hanging carriage trains positioned in the rows of creels have to be changed, there have usually been considerable production losses since the ring spinning machine is switched off during the entire changing process.

Ausgehend vom vorstehend beschriebenen Stand der Technik, liegt der Erfindung die Aufgabe zugrunde, eine Transportvorrichtung für eine Spinnerei, die der Versorgung von Ringspinnmaschinen mit Vorlagespulen und der Entsorgung von leergesponnenen Hülsen dient und ein zwischen mindestens einer Vorspinnmaschine und einer Ringspinnmaschine angeordnetes Hängeschienensystem mit einer Speichereinrichtung aufweist, zu entwickeln, mit dem Hängewagenzüge, insbesondere auch bei Partiewechseln, extrem schnell und damit sehr effektiv ausgetauscht werden können.Proceeding from the prior art described above, the invention is based on the object of providing a transport device for a spinning mill, which is used to supply ring spinning machines with feed bobbins and to dispose of empty spun tubes and which has a hanging rail system with a storage device arranged between at least one roving machine and a ring spinning machine , with which hanging wagon trains can be exchanged extremely quickly and therefore very effectively, especially when batches are changed.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, dass im Bereich der Ringspinnmaschine ein Gatter mit einer Vielzahl von Gatterreihen installiert ist, die über eine Weichenkonfiguration so an das Hängeschienensystem angeschlossen sind, dass im Bedarfsfall eine Mehrzahl von Hängewagenzügen, die leergesponnene Hülsen aufweisen, gleichzeitig aus den Gatterreihen der Ringspinnmaschine ausfahrbar sind und dass anschließend die gleiche Anzahl von Hängewagenzügen, die mit vollen Vorlagespulen bestückt sind, wieder gleichzeitig in die Gatterreihen der Ringspinnmaschine einfahrbar ist.This object is achieved according to the invention in that a creel with a large number of creel rows is installed in the area of the ring spinning machine, which are connected to the hanging rail system via a switch configuration in such a way that, if necessary, a plurality of hanging carriage trains, which have empty spun tubes, can be pulled out of the creel rows at the same time the ring spinning machine can be extended and that the same number of hanging carriage trains, which are equipped with full supply bobbins, can then be moved back into the creel rows of the ring spinning machine at the same time.

Erfindungsgemäß ist vorgesehen, dass die Weichenkonfiguration eine Anzahl von geradlinigen Verbindungsgleisen sowie eine Anzahl die Verbindungsgleise querende Kreuzungsgleise aufweist und dass zur Verbindung der Verbindungsgleise mit den Kreuzungsgleisen jeweils eine Vorweiche und in den Kreuzungsbereichen von Verbindungsgleisen und Kreuzungsgleisen jeweils eine Brückenweiche installiert ist.According to the invention, it is provided that the switch configuration has a number of straight connecting tracks and a number of crossing tracks crossing the connecting tracks, and that a pre-switch is installed to connect the connecting tracks with the crossing tracks, and a bridge switch is installed in the crossing areas of connecting tracks and crossing tracks.

Die Anzahl der Verbindungsgleise und die Anzahl der Kreuzungsgleise sind dabei gleich und entsprechen der Anzahl der im Gatter der Ringspinnmaschine installierten Gatterreihen.The number of connecting tracks and the number of crossing tracks are the same and correspond to the number of creel rows installed in the creel of the ring spinning machine.

Vorteilhafte Ausführungsformen der Erfindung sind Gegenstand der Unteransprüche.Advantageous embodiments of the invention are the subject matter of the dependent claims.

Die erfindungsgemäße Transportvorrichtung hat insbesondere den Vorteil, dass durch das gleichzeitige Ausfahren einer Mehrzahl von Hängewagenzügen, die mit leergesponnenen Hülsen bestückt sind und das anschließend gleichzeitige Einfahren der gleichen Anzahl von Hängewagenzügen, die frische Vorlagespulen aufweisen, die Zeitspanne, die bislang benötigt wurde, um mehrere in den Gatterreihen einer Ringspinnmaschine positionierte Hängewagenzüge auszutauschen, erheblich verkürzt wird.The transport device according to the invention has the particular advantage that the simultaneous extension of a plurality of hanging trolley trains that are equipped with empty spun tubes and the subsequent simultaneous retraction of the same number of hanging trolley trains that have fresh supply bobbins, the time that was previously required by several replacing hanging carriage trains positioned in the creel rows of a ring spinning machine is significantly reduced.

Da somit auch die Zeitspanne, während der die Ringspinnmaschine abgeschaltet ist, verkürzt wird, wird mit der erfindungsgemäßen Transportvorrichtung folglich auch die Produktivität der Ringspinnmaschinen, insbesondere auch, wenn öfters Partiewechsel anstehen, deutlich verbessert.Since the period of time during which the ring spinning machine is switched off is thus also shortened, the productivity of the ring spinning machines is consequently also significantly improved with the transport device according to the invention, in particular when lot changes are often pending.

In vorteilhafter Ausführungsform ist vorgesehen, dass die Speichereinrichtung so gestaltet ist, dass alle aus den Gatterreihen der Ringspinnmaschine ausgeschleusten Hängewagenzüge gleichzeitig in die Speichereinrichtung einfahren und anschließend die gleiche Anzahl von Hängewagenzügen wieder gleichzeitig in Richtung der Ringspinnmaschine aus der Speichereinrichtung ausfahren können.In an advantageous embodiment, it is provided that the storage device is designed in such a way that all hanging carriage trains discharged from the creel rows of the ring spinning machine can enter the storage device at the same time and then the same number of hanging carriage trains can move out of the storage device again at the same time in the direction of the ring spinning machine.

Das bedeutet, bei einem Austausch von Hängewagenzügen werden, obwohl eine Vielzahl von Hängewagenzügen gleichzeitig ausgewechselt werden, sowohl im Bereich der Ringspinnmaschinen, als auch im Bereich der Speichereinrichtung Verzögerungen jedweder Art vermieden.This means that when hanging carriage trains are exchanged, delays of any kind are avoided, even though a large number of hanging carriage trains are exchanged at the same time, both in the area of the ring spinning machines and in the area of the storage device.

Vorzugsweise sind im Bereich des Gatters einer Ringspinnmaschine jeweils zwischen vier und zehn Gatterreihen angeordnet, wobei sich eine Anordnung mit sechs Gatterreihen bei modernen Ringspinnmaschinen als besonders vorteilhaft erwiesen hat.Preferably between four and ten creel rows are arranged in the area of the creel of a ring spinning machine, an arrangement with six creel rows having proved to be particularly advantageous in modern ring spinning machines.

Durch die Anordnung von sechs Gatterreihen, das heißt, von je drei Gatterreihen pro Spinnmaschinenlängsseite, ist nicht nur auf einfache Weise eine ordnungsgemäße Versorgung der zahlreichen Spinnstellen der Ringspinnmaschine mit Vorgarn gewährleistet, sondern es ist auch sichergestellt, dass im Bedarfsfall problemlos und schnell Hängewagenzüge, die leergesponnene Hülsen aufweisen, gegen Hängewagen, die mit frischen Vorgarnspulen bestückt sind, getauscht werden können.The arrangement of six creel rows, i.e. three creel rows per longitudinal side of the spinning machine, not only ensures that the numerous spinning positions of the ring spinning machine are properly supplied with roving in a simple manner, but also ensures that, if necessary, hanging carriage trains that have empty spun tubes, can be exchanged for hanging trolleys that are equipped with fresh roving bobbins.

Die Speichereinrichtung weist vorzugsweise eine Vorspeicheranordnung auf, die eine Mehrzahl von ersten Gleisen entsprechend der Anzahl von Gatterreihen der mindestens einen Ringspinnmaschine und die gleiche Anzahl von zweiten Gleisen aufweist. Vorzugsweise ist jeweils ein erstes Gleis benachbart zu einem zweiten Gleis angeordnet und jeweils eine erste Weiche ist an dem der mindestens einen Ringspinnmaschine zugewandten Ende der ersten und zweiten Gleise so angeordnet und ausgebildet, dass in einer ersten Stellung der ersten Weiche ein Hängewagenzug in das erste Gleis einfahren kann und in einer zweiten Stellung der ersten Weiche ein Hängewagenzug aus dem zweiten Gleis ausfahren kann. So können unmittelbar nach Einfahren von Hängewagenzügen mit leergesponnen Hülsen in die ersten Gleise, in den zweiten Gleisen zwischengespeicherte Hängewagenzüge mit vollen Vorgarnspulen in Richtung der Ringspinnmaschinen ausgefahren werden. So kann ein Partiewechsel an einer Ringspinnmaschine schnell durchgeführt werden.The storage device preferably has a pre-storage arrangement which has a plurality of first rails corresponding to the number of creel rows of the at least one ring spinning machine and the same number of second rails. In each case, a first track is preferably arranged adjacent to a second track and a first switch is arranged and configured at the end of the first and second tracks facing the at least one ring spinning machine in such a way that when the first switch is in a first position, a suspension wagon train can enter the first track can enter and in a second position of the first switch a hanging wagon train can exit the second track. Thus, immediately after the entry of hanging wagon trains with empty spun tubes into the first tracks, hanging wagon trains temporarily stored in the second tracks can be extended with full roving bobbins in the direction of the ring spinning machines. A batch change on a ring spinning machine can thus be carried out quickly.

Vorzugsweise ist an dem anderen Ende der ersten und zweiten Gleise jeweils eine zweite Weiche so angeordnet und ausgebildet, dass in einer ersten Stellung der zweiten Weiche ein Hängewagenzug aus dem ersten Gleis ausfahren kann und in einer zweiten Stellung der zweiten Weiche ein Hängewagenzug in das zweite Gleis einfahren kann. Auf diese Weise können die zweiten Gleise vorteilhaft wieder mit Hängewagenzügen mit vollen Vorgarnspulen aufgefüllt werden und die Hängewagenzüge mit leergesponnenen Hülsen können aus den ersten Gleisen ausgefahren werden. Die Hängewagenzüge mit den leergesponnenen Hülsen können zu der Vorspinnmaschine oder einem Hauptspeicher gefahren werden.A second switch is preferably arranged and designed at the other end of the first and second tracks in such a way that in a first position of the second switch a hanging wagon train can exit the first track and in a second position of the second switch a hanging wagon train can move into the second track can drive in. In this way, the second tracks can advantageously be filled again with hanging car trains with full roving bobbins and the hanging car trains with empty spun bobbins can be moved out of the first tracks. The hanging carriage trains with the empty spun tubes can be driven to the roving machine or a main store.

Es ist jedoch besonders, wenn die die Speichereinrichtung zwischen der Vorspeicheranordnung und der mindestens einen Vorspinnmaschine eine weitere Vorspeicheranordnung umfasst, die über die gleiche Anzahl an Gleisen verfügt wie die mindestens eine Ringspinnmaschine Gatterreihen aufweist. So können zwei Partiewechsel unmittelbar hintereinander durchgeführt werden.However, it is special if the storage device between the pre-storage arrangement and the at least one roving machine comprises a further pre-storage arrangement which has the same number of rails as the at least one ring spinning machine has creel rows. In this way, two lot changes can be carried out immediately one after the other.

Gemäß einer Weiterbildung der Erfindung führen die Verbindungsgleise zu der Speichereinrichtung und die Kreuzungsgleise zu den Gatterreihen der Ringspinnmaschine.According to a development of the invention, the connecting tracks lead to the storage device and the crossing tracks lead to the creel rows of the ring spinning machine.

Vorzugsweise weisen die Vorweichen jeweils eine Abzweigstellung sowie eine Geradeausstellung auf. In der Abzweigstellung sind die Kreuzungsgleise vorzugsweise mit den Verbindungsgleisen verbunden und in der Geradeausstellung sind die Verbindungsgleise vorzugsweise mit den Verbindungsgleisen einer weiteren Weichenkonfiguration verbunden sind.The pre-switches preferably each have a branch position and a straight-ahead position. In the branching position, the crossing tracks are preferably connected to the connecting tracks, and in the straight position, the connecting tracks are preferably connected to the connecting tracks of a further switch configuration.

Die Brückenweichen können vorzugsweise so angeordnet werden, dass entweder die Verbindungsgleise oder die Kreuzungsgleise durchgängig sind. Dazu können die Brückenweichen zum Beispiel ein drehbares Gleiselement aufweisen.The bridge points can preferably be arranged in such a way that either the connecting tracks or the crossing tracks are continuous. For this purpose, the bridge points can have a rotatable track element, for example.

Des Weiteren sind die Vorweichen jeweils mit einem eigenen Antrieb, beispielsweise mit einem elektromotorischen Antrieb, ausgestattet, während die zahlreichen Brückenweichen durch ein Hebelgestänge verbunden und mittels eines gemeinsamen Antriebes, vorzugsweise ebenfalls eines elektromotorischen Antriebes, betätigbar sind.Furthermore, the pre-switches are each equipped with their own drive, for example with an electric motor drive, while the numerous bridge switches are connected by a lever linkage and can be actuated by means of a common drive, preferably also an electric motor drive.

Da sowohl die Antriebe der Vorweichen, als auch der Antrieb der Brückenweichen an eine Zentralsteuereinheit der Spinnerei angeschlossen sind, ist im Bedarfsfall jederzeit eine definierte Ansteuerung der Weichenkonfiguration gewährleistet.Since both the drives of the pre-switches and the drives of the bridge switches are connected to a central control unit in the spinning mill, a defined control of the switch configuration is guaranteed at all times if required.

Das bedeutet, derartig ausgebildete Weichenkonfigurationen ermöglichen auf relativ einfache Weise eine gleichzeitige definierte Führung einer Vielzahl von Hängewagenzügen, so dass bei Bedarf gleichzeitig und sicher sowohl eine Mehrzahl von Hängewagenzügen aus den Gatterreihen einer Ringspinnmaschine ausgeschleust, als auch anschließend gleichzeitig eine gleiche Anzahl von Hängewagenzügen wieder in die Gatterreihen einer Ringspinnmaschine eingeschleust werden können.This means that switch configurations designed in this way enable a large number of hanging carriage trains to be guided in a relatively simple manner at the same time, so that, if required, both a large number of hanging carriage trains can be simultaneously and safely discharged from the creel rows of a ring spinning machine, and then the same number of hanging carriage trains can be fed back in at the same time the creel rows of a ring spinning machine can be introduced.

Die Erfindung wird nachfolgend anhand von in den Zeichnungen dargestellten Ausführungsbeispielen näher erläutert.The invention is explained in more detail below with reference to exemplary embodiments illustrated in the drawings.

Es zeigt:

Fig. 1
in Seitenansicht das Gatter einer Ringspinnmaschine, wobei das Gatter pro Spinnmaschinenlängsseite drei, also insgesamt sechs Gatterreihen aufweist, und bezüglich der Ringspinnmaschine lediglich eine, der die Unterwalzen der Streckwerke tragenden, so genannten Stanzen dargestellt ist,
Fig. 2
in Draufsicht eine in einer Spinnerei angeordnete, erfindungsgemäß ausgebildete Transportvorrichtung, mit drei Ringspinnmaschinen, die jeweils mit einem Gatter ausgerüstet sind, das eine Vielzahl von Gatterreihen aufweist, wobei die Gatterreihen jeweils über eine Weichenkonfiguration an ein Hängeschienensystem angeschlossen sind, das mit einer Speichereinrichtung ausgestattet ist,
Fig. 3
in einem größeren Maßstab einen Ausschnitt, der in Fig. 2 dargestellten Transportvorrichtung,
Fig. 4
eine Draufsicht auf eine eingangsseitig der Gatterreihen einer Ringspinnmaschine installierten Weichenkonfiguration,
Fig. 5
die in Fig. 4 dargestellte Weichenkonfiguration in Unteransicht, wobei die Weichenkonfiguration so gestaltet ist, dass aus den Gatterreihen der Ringspinnmaschinen gleichzeitig bis zu sechs Hängewagenzüge ausfahren und in Richtung der Speichereinrichtung geleitet werden können sowie anschließend gleichzeitig die gleiche Anzahl Hängewagenzüge, die von der Speichereinrichtung kommen, in Richtung der Gatterreihen der Ringspinnmaschinen gefahren werden können.
It shows:
1
a side view of the creel of a ring spinning machine, with the creel having three rows of creels per longitudinal side of the spinning machine, i.e. a total of six rows of creels, and with regard to the ring spinning machine only one row, the so-called punches carrying the lower rollers of the drafting units, is shown,
2
a plan view of a transport device arranged in a spinning mill and designed according to the invention, with three ring spinning machines, each of which is equipped with a creel that has a large number of creel rows, with the creel rows each being connected via a switch configuration to a suspension rail system that is equipped with a storage device ,
3
on a larger scale a detail that in 2 shown transport device,
4
a plan view of a switch configuration installed on the input side of the creel rows of a ring spinning machine,
figure 5
in the 4 the switch configuration shown in a view from below, the switch configuration being designed in such a way that up to six hanging carriage trains can exit the creel rows of the ring spinning machines at the same time and be guided in the direction of the storage device, and then the same number of hanging carriage trains that come from the storage device in the direction of the creel rows of the ring spinning machines can be driven.

Die Fig. 1 zeigt in Seitenansicht, das Gatter einer Ringspinnmaschine 1. Die in einer Spinnerei angeordnete Ringspinnmaschine 1 ist allerdings lediglich stark schematisch dargestellt, das heißt, von dieser Ringspinnmaschine 1 ist in Fig. 1 nur eine der die Unterwalzen der Streckwerke der Ringspinnmaschine 1 tragenden, so genannten Stanzen 13 dargestellt.the 1 shows a side view of the creel of a ring spinning machine 1. However, the ring spinning machine 1 arranged in a spinning mill is shown only very schematically, i.e. this ring spinning machine 1 is shown in 1 shown.

Wie ersichtlich, weist das Gatter 2 der Ringspinnmaschine 1 im Ausführungsbeispiel je Spinnmaschinenlängsseite drei Gatterreihen 3, also insgesamt sechs Gatterreihen 3 auf, die durch Schienen 9 eines insgesamt mit dem Bezugszeichen 10 gekennzeichneten Hängeschienensystems gebildet werden.As can be seen, the gate 2 of the ring spinning machine 1 in the exemplary embodiment has three rows of gates 3 per longitudinal side of the spinning machine, i.e. a total of six rows of gates 3 formed by rails 9 of a suspension rail system identified overall by the reference numeral 10 .

In diesen Schienen 9 des Hängeschienensystems 10 laufen Hängewagenzüge 11, die entweder, wie in Fig. 1 angedeutet, mit vollen Vorgarnspulen 12, vorzugsweise Flyerspulen, bestückt sind, oder die leergesponnenen Hülsen aufweisen.Hanging wagon trains 11 run in these rails 9 of the hanging rail system 10, which either, as in 1 indicated, are equipped with full roving bobbins 12, preferably flyer bobbins, or have empty-spun sleeves.

Die Hängewagenzüge 11 sind im Hängeschienensystem 10 verfahrbar und bestehen in der Regel, wie an sich bekannt, aus flexibel miteinander verbundenen Traggliedern, so dass sie auch Kurven durchfahren können.The hanging wagon trains 11 can be moved in the hanging rail system 10 and, as is known per se, usually consist of support members that are flexibly connected to one another, so that they can also travel through curves.

Die Tragglieder sind dabei in an sich bekannter Weise mittels Rollen in den nach unten offenen, Ω-ähnlichen Schienen 9 des Hängeschienensystems 10 geführt.The support members are guided in a manner known per se by means of rollers in the downwardly open, Ω-like rails 9 of the suspension rail system 10 .

Der Antrieb solcher Hängewagenzüge 11 erfolgt üblicherweise entweder per Hand, durch "Lokomotiven" oder durch Reibrollenantriebe.Such hanging wagon trains 11 are usually driven either by hand, by "locomotives" or by friction roller drives.

Die Fig. 2 zeigt in Draufsicht eine in einer Spinnerei angeordnete, erfindungsgemäß ausgebildete Transportvorrichtung zum Versorgen von Ringspinnmaschinen 1 mit Vorgarnspulen 12 bzw. zum Entsorgen der im Zuge des Spinnvorganges durch die Ringspinnmaschinen 1 leergesponnenen Hülsen.the 2 shows a plan view of a transport device arranged in a spinning mill and designed according to the invention for supplying ring spinning machines 1 with roving bobbins 12 or for disposing of the empty bobbins spun by the ring spinning machines 1 in the course of the spinning process.

Wie vorstehend bereits erläutert, verfügt die Transportvorrichtung über ein Hängeschienensystem 10, an dem Hängewagenzüge 11 verfahrbar geführt sind.As already explained above, the transport device has a hanging rail system 10 on which hanging wagon trains 11 are movably guided.

Wie des Weiteren ersichtlich, ist beim Ausführungsbeispiel ein Ringspinnmaschinenblock, bestehend aus drei Ringspinnmaschinen 1, über ein Hängeschienensystem 10 mit zwei Vorspinnmaschinen 14 verbunden.As can also be seen, in the exemplary embodiment, a ring spinning machine block consisting of three ring spinning machines 1 is connected to two roving machines 14 via a suspension rail system 10 .

Im Bereich der Gatter 2 der drei Ringspinnmaschinen 1 sind jeweils insgesamt sechs Gatterreihen 3 installiert, die jeweils über eine Weichenkonfiguration 15 mit dem Hängeschienensystem 10 verbunden sind.In the area of the gates 2 of the three ring spinning machines 1, a total of six rows of gates 3 are installed, each of which is connected to the suspension rail system 10 via a switch configuration 15.

Wie in Fig. 2 weiter angedeutet, ist das Hängeschienensystem 10 außerdem mit einer Speichereinrichtung 16 ausgestattet. Die Speichereinrichtung 16 weist eine erste Vorspeicheranordnung auf, an deren Enden jeweils die Weichen 22 und 23 angeordnet sind. Außerdem umfasst die Speichereinrichtung 16 eine zweite Vorspeicheranordnung 17.As in 2 further indicated, the hanging rail system 10 is also equipped with a storage device 16 . The memory device 16 has a first Pre-storage arrangement, at the ends of which the switches 22 and 23 are arranged. In addition, storage device 16 includes a second pre-storage arrangement 17.

Die Speichereinrichtung 16 ist außerdem über ein Anschlussgleis 4 mit wenigstens einer Vorspinnmaschine 14 verbunden, wobei im Ausführungsbeispiel zwei Vorspinnmaschinen 14 dargestellt sind.The storage device 16 is also connected via a siding 4 to at least one roving machine 14, with two roving machines 14 being shown in the exemplary embodiment.

In der Vorspinnmaschine 14 werden die Hängewagenzüge 11 mit frischen Vorgarnspulen 12 bestückt. Das heißt, einlaufende, mit leergesponnenen Hülsen bestückte Hängewagenzüge 11 werden an der Vorspinnmaschine 14 sobald wie möglich umgerüstet, das heißt, mit frischen Vorgarnspulen 12 ausgestattet und anschließend über das Anschlussgleis 4 zur Speichereinrichtung 16 transportiert, wo sie zunächst in der zweiten Vorspeicheranordnung 17 zwischengespeichert werden, die fördertechnisch mit der ersten Vorspeicheranordnung der Speichereinrichtung 16 verbunden ist.In the roving machine 14, the suspension carriage trains 11 are fitted with fresh roving bobbins 12. This means that incoming hanging wagon trains 11 equipped with empty spun tubes are converted as soon as possible on the roving machine 14, i.e. equipped with fresh roving bobbins 12 and then transported via the siding 4 to the storage device 16, where they are initially temporarily stored in the second pre-storage arrangement 17 , which is connected to the first pre-storage arrangement of the storage device 16 in terms of conveying technology.

Die Fig. 3 zeigt in einem größeren Maßstab einen Ausschnitt des in der Fig. 2 in seiner Gesamtheit dargestellten Hängeschienensystems 10.the 3 shows on a larger scale a section of the 2 Hanging rail system 10 shown in its entirety.

Wie ersichtlich, weisen die Gatter 2 der Ringspinnmaschinen 1 jeweils insgesamt sechs Gatterreihen 3 auf, die jeweils über eine Weichenkonfiguration 15, die nachfolgend anhand der Figuren 4 und 5 näher erläutert wird, an das Hängeschienensystem 10 der erfindungsgemäß ausgebildeten Transportvorrichtung angeschlossen sind.As can be seen, the gates 2 of the ring spinning machines 1 each have a total of six rows of gates 3, each of which has a switch configuration 15, which is described below with reference to FIG figures 4 and 5 is explained in more detail, are connected to the suspension rail system 10 of the transport device designed according to the invention.

Die Weichenkonfiguration 15 und damit die Gatterreihen 3 sind an eine Speichereinrichtung 16 gekoppelt, die über Vorspeicheranordnungen verfügt.The switch configuration 15 and thus the gate rows 3 are coupled to a storage device 16 which has pre-storage arrangements.

Die erste Vorspeichereinrichtung weist jeweils benachbarte Gleise 18 und 19 auf. Das heißt die beiden Gleise 18 und 19 liegen direkt nebeneinander. Die Anzahl der Gleispaare 18 und 19 entspricht der Anzahl der Gatterreihen 3 einer Ringspinnmaschine 1. Im vorliegenden Ausführungsbeispiel weist die erste Vorspeichereinrichtung also sechs Gleispaare 18 und 19 auf und damit insgesamt zwölf Gleise.The first pre-storage device has adjacent tracks 18 and 19 in each case. This means that the two tracks 18 and 19 are right next to each other. The number of track pairs 18 and 19 corresponds to the number of creel rows 3 of a ring spinning machine 1. In the present exemplary embodiment, the first pre-storage device therefore has six track pairs 18 and 19 and thus a total of twelve tracks.

Die Speichereinrichtung verfügt des Weiteren über eine zweite Vorspeichereinrichtung 17. Die Vorspeichereinrichtung 17 verfügt über die gleiche Anzahl an Gleisen 20 wie eine Ringspinnmaschine Gatterreihen aufweist. Im vorliegenden Ausführungsbeispiel sind also sechs Gleise 20 vorhanden.The storage device also has a second pre-storage device 17. The pre-storage device 17 has the same number of rails 20 as a ring spinning machine has creel rows. In the present embodiment, there are six tracks 20.

Die Figuren 4 und 5 zeigen dabei jeweils unterschiedliche Ansichten einer vorteilhaften Ausführungsform einer Weichenkonfiguration 15.the figures 4 and 5 each show different views of an advantageous embodiment of a switch configuration 15.

Die Fig. 4 zeigt dabei die Weichenkonfiguration 15 in Draufsicht, während die Fig.5 eine Unteransicht darstellt.the 4 shows the switch configuration 15 in plan view, while the Fig.5 represents a bottom view.

Wie insbesondere aus Fig. 5 ersichtlich, verfügt eine solche Weichenkonfiguration 15 im Ausführungsbeispiel über sechs so genannte Verbindungsgleise 21, die die Weichenkonfiguration 15 geradlinig durchlaufen sowie über sechs so genannte Kreuzungsgleise 25, die die Verbindungsgleise 21 queren und die jeweils eine Verlängerung einer der Gatterreihen 3 einer Ringspinnmaschine 1 bilden.Like in particular figure 5 As can be seen, such a switch configuration 15 in the exemplary embodiment has six so-called connecting tracks 21, which run through the switch configuration 15 in a straight line, and six so-called crossing tracks 25, which cross the connecting tracks 21 and which each form an extension of one of the creel rows 3 of a ring spinning machine 1.

In Förderrichtung F sind eingangsseitig der Weichenkonfigurationen 15 jeweils Vorweichen 5 installiert, wobei jede der insgesamt sechs Vorweichen 5 im Bereich eines einlaufenden Verbindungsgleises 21 angeordnet und jeweils durch einen separaten Antriebes 24 definiert ansteuerbar ist.In the conveying direction F, pre-switches 5 are installed on the input side of the switch configurations 15 , each of the total of six pre-switches 5 being arranged in the region of an incoming connecting track 21 and each being controllable in a defined manner by a separate drive 24 .

Des Weiteren sind derartige Weichenkonfigurationen 15 in den Kreuzungsbereichen Verbindungsgleise 21/ Kreuzungsgleise 25 jeweils mit Brückenweichen 6 ausgestattet.Furthermore, such switch configurations 15 are each equipped with bridge switches 6 in the crossing areas of connecting tracks 21/crossing tracks 25.

Beim vorliegenden Ausführungsbeispiel weisen die Weichenkonfigurationen 15 jeweils insgesamt fünfzehn Brückenweichen 6 auf.In the present exemplary embodiment, the switch configurations 15 each have a total of fifteen bridge switches 6 .

Wie dargestellt, können bei Bedarf, entsprechend der Schaltstellung der Vorweichen 5 und der Brückenweichen 6, gleichzeitig bis zu sechs Hängewagenzüge 11 aus den Gatterreihen 3 einer Ringspinnmaschine 1 ausgeschleust und anschließend bis zu sechs Hängewagenzüge 11 wieder gleichzeitig in die Gatterreihen 3 eingefahren werden.As shown, if required, depending on the switching position of the pre-switches 5 and the bridge switches 6, up to six hanging carriage trains 11 can be simultaneously discharged from the creel rows 3 of a ring spinning machine 1 and then up to six hanging carriage trains 11 can be moved back into the creel rows 3 at the same time.

Allerdings können Hängewagenzüge 11, die von der Speichereinrichtung 16 kommend, über die Verbindungsgleise 21 in die Weichenkonfiguration 15 einlaufen, durch eine entsprechend der Schaltstellung der Vorweichen 5 auch oder geradeaus durch die Weichenkonfiguration 15 hindurch in Richtung der auslaufenden Verbindungsgleise 21 und damit zu einer nachfolgenden Weichenkonfiguration 15 weitergeleitet werden.However, hanging wagon trains 11 coming from the storage facility 16 can enter the switch configuration 15 via the connecting tracks 21, through a corresponding switch position of the pre-switches 5 or straight through the switch configuration 15 in the direction of the outgoing connecting tracks 21 and thus to a subsequent switch configuration 15 to be forwarded.

Wie aus Fig. 4 ersichtlich, weisen die Vorweichen 5 jeweils einen separaten, elektromotorischen Antrieb 24 auf, wobei die Antriebe 24, wie der Antrieb 8 für die Brückenweichen, vorzugsweise über eine Zentralsteuereinrichtung der Spinnerei, definiert ansteuerbar sind.How out 4 As can be seen, the pre-switches 5 each have a separate electric motor drive 24, the drives 24, like the drive 8 for the bridge switches, preferably being controllable in a defined manner via a central control device of the spinning mill.

Die zahlreichen Brückenweichen 6 sind außerdem über ein Hebelgestänge 7 verbunden und über dieses Hebelgestänge 7 auch an ihren gemeinsamen Antrieb 8 angeschlossen.The numerous bridge switches 6 are also connected via a lever linkage 7 and are also connected to their common drive 8 via this lever linkage 7 .

Die im Ausführungsbeispiel dargestellte Anordnung und Ausbildung einer Weichenkonfiguration 15 hat insbesondere den großen Vorteil, dass im Bedarfsfall problemlos bis zu sechs Hängewagenzüge 11 gleichzeitig aus den Gatterreihen 3 einer Ringspinnmaschine 1 ausschleusbar und anschließend problemlos die gleiche Anzahl von Hängewagenzüge 11 wieder gleichzeitig in die Gatterreihen der Ringspinnmaschine 1 einschleusbar sind, was speziell bei Partiewechseln zu einer starken Verkürzung der Maschinenausfallzeiten führt.The arrangement and design of a switch configuration 15 shown in the exemplary embodiment has the particular advantage that, if necessary, up to six hanging carriage trains 11 can be ejected simultaneously from the creel rows 3 of a ring spinning machine 1 without any problems, and then the same number of hanging carriage trains 11 can be simultaneously fed back into the creel rows of the ring spinning machine without any problems 1 can be fed in, which leads to a significant reduction in machine downtime, especially when changing batches.

Funktion der erfindungsgemäßen Transportvorrichtung:Function of the transport device according to the invention:

Wenn an einer der Ringspinnmaschinen 1, beispielsweise an der mittleren Ringspinnmaschine, die Vorgarnspulen 12 der in den Gatterreihen 3 des Gatters 2 der Ringspinnmaschine 1 positionierten Hängewagenzüge 11 abgewickelt sind, ist, um den Spinnprozess fortsetzen zu können, ein Wechsel der Hängewagenzüge 11 erforderlich, wobei der Wechselvorgang möglichst wenig Zeit beanspruchen sollte.When the roving bobbins 12 of the hanging carriage trains 11 positioned in the creel rows 3 of the creel 2 of the ring spinning machine 1 are unwound on one of the ring spinning machines 1, for example on the middle ring spinning machine, a change of the hanging carriage trains 11 is necessary in order to be able to continue the spinning process, whereby the changing process should take as little time as possible.

Das bedeutet, die sechs in den Gatterreihen 3 der mittleren Ringspinnmaschine 1 positionierten, jetzt leergesponnene Hülsen aufweisende Hängewagenzüge 11 müssen schnellstmöglich gegen sechs Hängewagenzüge 11 getauscht werden, die mit frischen Vorgarnspulen 12 bestückt sind.This means that the six hanging carriage trains 11 positioned in the creel rows 3 of the middle ring spinning machine 1 and now having empty spun sleeves must be exchanged as quickly as possible for six hanging carriage trains 11 that are equipped with fresh roving bobbins 12 .

Um die sechs mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 gleichzeitig aus den Gatterreihen 3 der Ringspinnmaschine 1 ausschleusen zu können, wird deshalb zunächst die eingangsseitig des Gatters 2 der mittleren Ringspinnmaschine 1 angeordnete Weichenkonfiguration 15 ordnungsgemäß geschaltet.In order to be able to simultaneously eject the six hanging carriage trains 11 equipped with empty spun tubes from the creel rows 3 of the ring spinning machine 1, the switch configuration 15 arranged on the input side of the creel 2 of the middle ring spinning machine 1 is first switched properly.

Das heißt, die Vorweichen 5 und die Brückenweichen 6 der betreffenden Weichenkonfiguration 15 werden so geschaltet, dass jede der Gatterreihen 3 fördertechnisch durchgängig an eines der Verbindungsgleise 21 des Hängeschienensystems 10 angeschlossen ist, die die Weichenkonfiguration 15 geradlinig durchlaufen.This means that the pre-switches 5 and the bridge switches 6 of the relevant switch configuration 15 are switched in such a way that each of the rows of gates 3 is conveyed is continuously connected to one of the connecting tracks 21 of the suspension rail system 10, which run through the switch configuration 15 in a straight line.

Zu diesem Zweck werden die Vorweichen 5 durch ihre Antriebe 24 in ihre Abzweigstellung geschaltet und die Brückenweichen 6 so angesteuert, dass sie bezüglich der Kreuzungsgleise 25 fördertechnisch auf Durchgang stehen.For this purpose, the pre-switches 5 are switched to their branching position by their drives 24 and the bridge switches 6 are controlled in such a way that they are available for passage with respect to the crossing tracks 25 in terms of conveyance.

Das bedeutet, die über ein Hebelgestänge 7 an einen gemeinsamen Antrieb 8 angeschlossenen Brückenweichen 6 werden, zum Beispiel durch die Zentralsteuereinrichtung der Spinnerei, so geschaltet, dass alle Hängewagenzüge 11 die jeweils zwischenliegenden Verbindungsgleise 21 queren und schließlich über die zugehörige Vorweiche 5 in das angeschlossene Verbindungsgleis 21 einlaufen können.This means that the bridge switches 6, which are connected to a common drive 8 via a lever linkage 7, are switched, for example by the central control device of the spinning mill, in such a way that all hanging wagon trains 11 cross the connecting tracks 21 in between and finally via the associated pre-switch 5 into the connected connecting track 21 can enter.

Über die angeschlossenen Verbindungsgleise 21 laufen dann alle Hängewagenzüge 11 in Richtung der Speichereinrichtung 16 weiter, wobei, wie ersichtlich, die Verbindungsgleise 21 jeweils an die Weichen 22 der ersten Vorspeichereinrichtung angeschlossen sind.All hanging wagon trains 11 then continue to run in the direction of the storage device 16 via the connected connecting tracks 21, with the connecting tracks 21 each being connected to the points 22 of the first pre-storage device, as can be seen.

Die erste Vorspeicheranordnung die insgesamt über 12 Gleise 18, 19 verfügt, ist in ihren Endbereichen mit Weichen 22 bzw. 23 ausgestattet.The first pre-storage arrangement, which has a total of 12 tracks 18, 19, is equipped with points 22 and 23 in its end regions.

In der Praxis ist auf den Gleisen 19 der ersten Vorspeicheranordnung jeweils ein Hängewagenzug 11 zwischengespeichert, der mit frischen Vorgarnspulen 12 bestückt ist.In practice, a hanging wagon train 11 loaded with fresh roving bobbins 12 is temporarily stored on the tracks 19 of the first pre-storage arrangement.

Das bedeutet, die einlaufenden, mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 werden durch die Weichen 22 so gesteuert, dass sie auf die leeren Gleise 18 der ersten Vorspeicheranordnung laufen, wo sie zwischengespeichert werden.This means that the incoming hanging wagon trains 11 loaded with empty spun tubes are controlled by the switches 22 in such a way that they run onto the empty tracks 18 of the first pre-storage arrangement, where they are temporarily stored.

Anschließend fahren die sechs mit frischen Vorgarnspulen bestückten Hängewagenzüge 11 aus der ersten Vorspeicheranordnung aus und gelangen über die Verbindungsgleise 21 zur Weichenkonfiguration 15, die nach wie vor die Schaltstellung ausweist, die zum Ausschleusen der mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 eingestellt worden war.The six hanging wagon trains 11 loaded with fresh roving bobbins then leave the first pre-storage arrangement and reach the switch configuration 15 via the connecting tracks 21, which still shows the switching position that was set to discharge the hanging wagon trains 11 loaded with empty spun bobbins.

Das bedeutet, die sechs mit frischen Vorgarnspulen bestückten Hängewagenzüge 11 werden in Richtung der Gatterreihen 3 abgelenkt und können gleichzeitig in die Gatterreihen 3 der Ringspinnmaschine 1 einlaufen.This means that the six hanging carriage trains 11 loaded with fresh roving bobbins are deflected in the direction of the creel rows 3 and can enter the creel rows 3 of the ring spinning machine 1 at the same time.

Nach dem ordnungsgemäßen Positionieren der Hängewagenzüge 11 kann an der Ringspinnmaschine 1 sofort wieder mit dem Anspinnprozess gestartet werden.After the suspension carriage trains 11 have been correctly positioned, the piecing process can be started again immediately on the ring spinning machine 1 .

Im Anschluss werden aus der zweiten Vorspeicheranordnung 17 Hängewagenzüge 11, die an der Vorspinnmaschine 14 mit frischen Vorgarnspulen 12 bestückt worden sind, in die erste Vorspeicheranordnung überführt. Dazu werden die Weichen 23 so eingestellt, dass die Hängewagenzüge 11 mit frischen Vorgarnspulen von den Gleisen 20 in die freien Gleise 19 der ersten Vorspeichereinrichtung fahren. Außerdem werden die bislang auf den Gleisen 18 der ersten Vorspeicheranordnungen zwischengespeicherten, mit leergesponnenen Hülsen bestückten Hängewagenzüge 11 durch entsprechende Verstellung der Weichen 23 auf die Gleise 20 der zweiten Vorspeicheranordnung 17 überführt, von wo aus die Hängewagenzüge 11 später, das heißt, sobald dies möglich ist, über das Verbindungsgleis 4 zur Vorspinnmaschine 14 geschickt werden.Subsequently, from the second pre-storage arrangement 17, trains of hanging carriages 11, which have been loaded with fresh roving bobbins 12 on the roving machine 14, are transferred to the first pre-storage arrangement. For this purpose, the switches 23 are set in such a way that the hanging wagon trains 11 with fresh roving bobbins move from the tracks 20 into the free tracks 19 of the first pre-storage device. In addition, the hanging car trains 11, which were previously temporarily stored on the tracks 18 of the first pre-storage arrangements and are equipped with empty spun tubes, are transferred to the tracks 20 of the second pre-storage arrangement 17 by appropriate adjustment of the points 23, from where the hanging car trains 11 later, i.e. as soon as this is possible , are sent via the connecting track 4 to the roving machine 14.

An der Vorspinnmaschine 14 werden die Hängewagenzüge 11 dann erneut mit frischen Vorgarnspulen 12 bestückt.On the roving machine 14, the suspension carriage trains 11 are then again fitted with fresh roving bobbins 12.

BezugszeichenlisteReference List

11
Ringspinnmaschinering spinning machine
22
Gattergate
33
Gatterreihegate row
44
Anschlussgleissiding
55
Vorweichepre-soak
66
Brückenweichebridge switch
77
Hebelgestängelever linkage
88th
Antriebdrive
99
Schienerail
1010
Hängeschienensystemhanging rail system
1111
Hängewagenzughanging wagon train
1212
Vorgarnspuleroving spool
1313
Stanzepunch
1414
Vorspinnmaschineroving machine
1515
Weichenkonfigurationswitch configuration
1616
Speichereinrichtungstorage facility
1717
Zweite VorspeicheranordnungSecond pre-storage arrangement
1818
Gleis der ersten VorspeicheranordnungTrack of the first pre-storage arrangement
1919
Gleis der ersten VorspeicheranordnungTrack of the first pre-storage arrangement
2020
Gleis der zweiten VorspeicheranordnungTrack of the second pre-storage arrangement
2121
Verbindungsgleisconnecting track
2222
Weichesoft
2323
Weichesoft
2424
Antriebdrive
2525
Kreuzungsgleiscrossing track
Ff
Förderrichtungconveying direction

Claims (8)

  1. Transport device for a spinning mill for supplying ring spinning machines (1) with roving packages (12) and disposing of the tubes that have been spun empty, comprising an overhead rail system (10), which is arranged between at least one pre-spinning machine (14) and one ring spinning machine (1) and is equipped with a storage device (16), which enables the intermediate storing of overhead trolley trains (11), which are loaded either with full roving packages (12) or with tubes that have been spun empty,
    characterised in that
    in the region of the ring spinning machine (1) a creel (2) having a plurality of creel rows (3) is installed, which creel rows (3) are connected to the overhead rail system (10) via a switch configuration (15) in such a way that, if necessary, a plurality of overhead trolley trains (11) that have tubes that have been spun empty can be simultaneously moved out of the creel rows (3) of the ring spinning machine (1),
    subsequently the same number of overhead trolley trains (11) loaded with full roving packages (12) can be simultaneously moved into the creel rows (3) of the ring spinning machine (1) again,
    the switch configuration (15) has a number of straight-line connection tracks (21) and an equal number of crossing tracks (25), which cross the connection tracks (21),
    this number corresponds to the number of creel rows (3) installed in the creel (2) of the ring spinning machine (1), and
    in each case a pre-switch (5) is installed in order to connect the connection tracks (21) to the crossing tracks (25) and a bridge switch (6) is installed in each of the crossing regions of connection tracks (21) and crossing tracks (25).
  2. Transport device according to claim 1, characterised in that the storage device (16) is designed in such a way that all the overhead trolley trains (11) moved out of the creel rows (3) of the ring spinning machine (1) can simultaneously move into the storage device (16) and subsequently the same number of overhead trolley trains (11) can simultaneously move out of the storage device (16) toward the ring spinning machine (1) again, that the storage device (16) has a pre-storage assembly, which has a plurality of first tracks (18) corresponding to the number of creel rows (3) of the at least one ring spinning machine (1) and has the same number of second tracks (19), and that each first track (18) is arranged adjacently to a second track (19) and a first switch (22) is arranged at the end of the first track and of the second track facing the at least one ring spinning machine (1) in such a way and is designed in such a way that in a first position of the first switch (22) an overhead trolley train (11) can move into the first track (18) and in a second position of the first switch (22) an overhead trolley train (11) can move out of the second track (19).
  3. Transport device according to claim 2, characterised in that a second switch (23) is arranged at the other end of each of the first and second tracks in such a way and is designed in such a way that in a first position of the second switch (23) an overhead trolley train (11) can move out of the first track (18) and in a second position of the second switch (23) an overhead trolley train can move into the second track (19).
  4. Transport device according to any one of claims 2 and 3, characterised in that the storage device (16) comprises, between the pre-storage assembly and the at least one pre-spinning machine (14), a further pre-storage assembly (17) having a number of tracks (20) equal to the number of creel rows (3) of the at least one ring spinning machine (1).
  5. Transport device according to any one of the preceding claims, characterised in that the connection tracks (21) lead to the storage device (16) and the crossing tracks (25) lead to the creel rows (3) of the ring spinning machine (1).
  6. Transport device according to any one of the preceding claims, characterised in that the pre-switches (5) each have a branching-off position, in which the crossing tracks (25) are connected to the connection tracks (21), and a straight-ahead position, in which the connection tracks (21) are connected to the connection tracks (21) of a further switch configuration (15).
  7. Transport device according to any one of the preceding claims, characterised in that the bridge switches (6) can be arranged in such a way that either the connection tracks (21) or the crossing tracks (25) are continuous.
  8. Transport device according to any one of the preceding claims, characterised in that the numerous bridge switches (6) are connected by means of a lever linkage (7) to a common drive (8), which can be controlled in a defined manner.
EP19169860.4A 2018-04-18 2019-04-17 Transport device for a spinning unit Active EP3556917B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102018109232.6A DE102018109232A1 (en) 2018-04-18 2018-04-18 Transport device for a spinning mill

Publications (2)

Publication Number Publication Date
EP3556917A1 EP3556917A1 (en) 2019-10-23
EP3556917B1 true EP3556917B1 (en) 2022-09-28

Family

ID=66217951

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19169860.4A Active EP3556917B1 (en) 2018-04-18 2019-04-17 Transport device for a spinning unit

Country Status (4)

Country Link
EP (1) EP3556917B1 (en)
CN (1) CN110387607B (en)
DE (1) DE102018109232A1 (en)
ES (1) ES2929795T3 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112301477B (en) * 2020-11-03 2022-08-23 江苏大生集团有限公司 Sliver barrel arrangement and operation method for automatic conveying of sliver barrels of roving frame

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3734506A1 (en) * 1987-10-12 1989-04-27 Veit Gmbh & Co SWITCH ARRANGEMENT
DE4000227A1 (en) * 1989-04-05 1990-08-23 Rieter Ag Maschf Textile ring spinning frame - has overhead rail system for automatic delivery of roving bobbins with removal of empties
DE8911853U1 (en) * 1989-10-04 1991-02-07 Veit Transpo GmbH, 8910 Landsberg Spinning mill with a hanging conveyor system
DE4213122A1 (en) 1992-04-21 1993-10-28 Zinser Textilmaschinen Gmbh Suspended trolley rail conveyor - has rail sections to form a central buffer to park trolleys
JPH07157200A (en) * 1993-12-06 1995-06-20 Howa Mach Ltd Coarse thread bobbin transporting device
DE19508399C2 (en) 1995-03-09 2000-05-11 Zinser Textilmaschinen Gmbh Spinning system consisting of a number of pre-spinning machines and ring spinning machines
DE19601286C1 (en) * 1996-01-16 1996-11-14 Zinser Textilmaschinen Gmbh An easily re-configured conveyor system. for textile spools and tubes
DE10251631B4 (en) * 2002-11-06 2005-09-29 Saurer Gmbh & Co. Kg Transport system for roving bobbins
DE102007029288A1 (en) 2007-03-23 2008-12-24 Oerlikon Textile Gmbh & Co. Kg Transport device in a spin line
DE102007014596A1 (en) 2007-03-23 2008-09-25 Oerlikon Textile Gmbh & Co. Kg Overhead transport system especially for reels in a spinning system has a transfer module to move sets of reels between a main track and side tracks
CN103074709B (en) * 2013-02-06 2015-08-26 晋中经纬泓鑫机械有限公司 Thickness coupling device in fine spining machine
JP2015158029A (en) * 2014-02-25 2015-09-03 株式会社豊田自動織機 Weighing device of roving package

Also Published As

Publication number Publication date
DE102018109232A1 (en) 2019-10-24
CN110387607B (en) 2022-05-31
CN110387607A (en) 2019-10-29
EP3556917A1 (en) 2019-10-23
ES2929795T3 (en) 2022-12-01

Similar Documents

Publication Publication Date Title
EP0709501B1 (en) Method for exchanging cans between a transport carriage for flat cans and an open-end spinning machine; and a transport carriage for carrying out this method
DE3928648A1 (en) SYSTEM WITH ONE OR MORE SPINNING MACHINES AND WITH AT LEAST ONE CHANGING CARRIAGE TO CHANGE CAN
EP3556917B1 (en) Transport device for a spinning unit
DE10251631B4 (en) Transport system for roving bobbins
EP0311958B1 (en) Switching arrangement
EP0384360A2 (en) Transporting system for cans between two drawing frames
DE4015938A1 (en) Rotor spinning assembly sliver supply - has station to transfer contents of round cans to flat cans for increased density along row of spinning stations
DE10130467B4 (en) Arrangement of service positions for maintenance equipment on a textile machine
EP3670409A1 (en) Textile machine which produces cross-wound bobbins, with a cross-wound bobbin transport device
EP0869206B1 (en) Transport and storage system for spinning cans
EP3428115A1 (en) Lifting device and method for moving a lifting carriage
EP0855456B1 (en) Method and apparatus for transporting full roving bobbins respectively empty roving cores
CH691490A5 (en) Transport and Umsetzanlage between at least one roving frame and a downstream storage or processing area.
DE10224909A1 (en) Mechanised assembly transfers pre-wound bobbins from on creels and a hanging power-driven guide to tufting machine or beamer
EP0311069B1 (en) Transport system for roving bobbins between spinning machines
DE19508399C2 (en) Spinning system consisting of a number of pre-spinning machines and ring spinning machines
WO2017001297A1 (en) Device for receiving and transporting away wound coils
EP0909844B1 (en) Sliver can stand
EP0534184B1 (en) Transporting system for transporting individual carriers
WO2007036335A1 (en) Supplying spool feeding method and device
DE102013018985A1 (en) Method for carrying out a cross-bobbin change at a workstation of a textile machine producing cross-wound bobbins as well as textile machines producing cross-wound bobbins.
EP4021835B1 (en) Tube supply device for a textile machine that produces cross-wound packages
DE69114807T2 (en) Process for the automatic operation of winding devices in textile machines.
EP0339295A1 (en) Transport system to overcome level differences
EP1146153B1 (en) Transport and storage system for rectangular spinning cans

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200423

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B65H 67/06 20060101ALI20220520BHEP

Ipc: D01H 9/18 20060101ALI20220520BHEP

Ipc: D01H 1/18 20060101ALI20220520BHEP

Ipc: D01H 9/00 20060101AFI20220520BHEP

INTG Intention to grant announced

Effective date: 20220615

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1521291

Country of ref document: AT

Kind code of ref document: T

Effective date: 20221015

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502019005741

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2929795

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20221201

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221228

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230130

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230128

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502019005741

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20230428

Year of fee payment: 5

Ref country code: ES

Payment date: 20230503

Year of fee payment: 5

Ref country code: DE

Payment date: 20230426

Year of fee payment: 5

Ref country code: CH

Payment date: 20230502

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230629

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220928

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230417