EP0384360A2 - Transporting system for cans between two drawing frames - Google Patents

Transporting system for cans between two drawing frames Download PDF

Info

Publication number
EP0384360A2
EP0384360A2 EP90103163A EP90103163A EP0384360A2 EP 0384360 A2 EP0384360 A2 EP 0384360A2 EP 90103163 A EP90103163 A EP 90103163A EP 90103163 A EP90103163 A EP 90103163A EP 0384360 A2 EP0384360 A2 EP 0384360A2
Authority
EP
European Patent Office
Prior art keywords
cans
transport
path
gates
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP90103163A
Other languages
German (de)
French (fr)
Other versions
EP0384360A3 (en
Inventor
Siegfried Dipl.-Ing. Günkinger
Markus Dipl.-Ing. Wurster
Manfred Langen
Gregor Gebald
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Truetzschler GmbH and Co KG
Original Assignee
Truetzschler GmbH and Co KG
Zinser Textilmaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Truetzschler GmbH and Co KG, Zinser Textilmaschinen GmbH filed Critical Truetzschler GmbH and Co KG
Publication of EP0384360A2 publication Critical patent/EP0384360A2/en
Publication of EP0384360A3 publication Critical patent/EP0384360A3/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/005Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving
    • D01H9/008Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving for cans

Definitions

  • the invention relates to a can transport system between two successive routes in the work step, the presentation on the downstream route takes place in double rows of gates.
  • Can transport systems between two consecutive lines in the work process are generally known in the textile industry.
  • EU-PS 0 129 746 describes, for example, a system in which the lines connected in series are operated with a single-row template.
  • the feed cans are orthogonal to the tape entry.
  • the filled cans of the first route passage are brought into a standby row, which is arranged parallel to the row of supply cans of the second route passage while maintaining a gap.
  • a disadvantage of this known device is, among other things, the very large overall width and the relatively complex, deflected belt inlet.
  • the aforementioned literature reference does not indicate any automatic can transport between the two routes.
  • a buffer device is switched into the transport track, which enables the empty cans to be replaced by full cans.
  • This system also uses a single-row template on the downstream section, which leads to a considerable overall length of the system.
  • the can transport is still carried out manually.
  • the object of the invention is to create an automatic can transport system which, on the one hand, has a very compact construction and, on the other hand, ensures free access to the storage cans arranged in a double row at all times.
  • a first outer transport path arranged parallel to the gate rows
  • a second inner transport path running parallel to the first transport path
  • an operating aisle arranged between the gate rows and the transport paths
  • the rows of gates with the feeding cans remain freely accessible for the operating personnel during the entire time.
  • the entire supply of rags on this line is stopped.
  • the operating personnel interrupts the remaining fuses and triggers the change process using a hand switch.
  • the empty cans of the inner row of gates are first clocked on a transverse path connected to the outer transport path and the empty cans of the outer row of gates are moved to the inner row of gates.
  • the full cans of the inner transport path are made up across the service aisle onto the outer row of gates and the full cans of the outer transport path onto the inner transport path.
  • the operating aisle remains freely accessible in this case too, so that the operating personnel can put on the fuse of the full cans standing on the outer row of gates from the operating aisle.
  • FIG. 1 shows an upstream route 20 which is connected to a downstream route 21 via a can transport system 22.
  • the routes 20, 21 each have two deliveries.
  • the can transport system 22 essentially consists of an outer transport path 23 and an inner transport path 24.
  • the outer transport path 23 is connected on the one hand to a transverse path 28 and on the other hand to an entry path 29.
  • the inlet track 29 is connected to the route 20 and has a gradient in the direction of this route.
  • the inner transport track 24 is connected to the route 20 via the outlet track 30.
  • the run-out track 30 is designed such that it can be raised on one side in the region of the route. In this way, a gradient can be set in the direction of the inner transport path 24.
  • the can transport system 22 also has a number of longitudinal conveying devices 31-35 and pushing devices 36-39 acting transversely to the transport tracks 23, 24.
  • Figure 2 shows the starting position in the upper half of the drawing.
  • the lower half of the drawing shows the situation that occurs when the jug in slot 2 is full.
  • the machine control checks whether the parking spaces 3 and 4 on the run-out path 30 are free and the parking space 10 on the run-in path 29 is occupied. If the result is positive, the can changing device arranged (known and therefore not shown) within the section 20 pushes the full can from the parking space 2 to the parking space 3. With this movement, the empty can from the parking space 1 to the parking space 2 and the can from the parking space 10 conveyed to parking space 1.
  • the cans remaining on the infeed path 29 automatically roll towards the parking space 10 due to the gradient of the infeed path.
  • the parking space 9 which is freed up in the process is immediately filled up, since the longitudinal conveying devices 33, 34 assigned to the outer transport path 23 push the empty cans arranged there, as shown.
  • the parking space 7 is left blank to ensure free access to the control aisle 25.
  • the full can which has now reached the parking space 4 by lifting the outlet path 30 on one side, is transported further to the parking space 11 via the conveyor device 35.
  • the can changing process described above is repeated until four full cans are deposited on the inner transport path 24 (FIG. 3, upper half of the drawing).
  • the outer transport path 23 is unoccupied in this section.
  • the full cans deposited on the inner transport path 24 are moved outwards onto the transport path 23 by means of a pushing device 36, so that the inner transport path 24 connected to the outlet path 30 becomes free again (FIG. 3, lower half of the drawing).
  • the can changing process described at the beginning starts again and only ends when there are four full cans on the inner transport path again.
  • the template cans arranged in the gate rows 26, 27 also begin to run out (FIG. 4, upper half of the drawing).
  • the full cans standing on the outer row of gates 27 are pushed onto the inner row of gates 27 by the pushing device 37 and the full cans standing on the inner conveyor track 24 are pushed onto the outer row 26 of the gates by the pushing device 38.
  • the pushing device 38 has to bridge the operating aisle 25 and therefore has a deflection which is approximately twice as large as the deflection of the other devices (36-39).
  • the operating personnel then apply the fuses of the full cans standing on the outer row of gates 26. Subsequently, the empty cans on the outer transport path 23 are clocked by the conveying devices 32-34 to the gradient of the infeed path 29.
  • the starting position is reached again; a new cycle of change can begin.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Attitude Control For Articles On Conveyors (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Branching, Merging, And Special Transfer Between Conveyors (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Abstract

The invention relates to a system (22) for transporting cans between two successive drawing frames (20, 21) in the operating cycle, the cans being fed to the following drawing frame (21) in double creel rows (26, 27). An outer transport path (23), an inner transport path (24) and a service passage (25) are provided parallel to the creel rows (26, 27). <??>The transport paths (23, 24) have longitudinal conveying means (32-34) and are connected functionally to one another by means of pushing devices (36-39), and also to the creel rows (26, 27). <IMAGE>

Description

Die Erfindung betrifft ein Kannentransportsystem zwischen zwei im Arbeitsgang aufeinanderfolgenden Strecken, wobei die Vorlage an der nachgeordneten Strecke in doppelten Gatterreihen erfolgt.The invention relates to a can transport system between two successive routes in the work step, the presentation on the downstream route takes place in double rows of gates.

Kannentransportsysteme zwischen zwei im Arbeitsgang aufeinander­folgenden Strecken sind in der Textilindustrie allgemein be­kannt.Can transport systems between two consecutive lines in the work process are generally known in the textile industry.

Die EU-PS 0 129 746 beschreibt beispielsweise ein System, bei dem die in Reihe geschalteten Strecken mit einreihiger Vor­lage betrieben werden. Die Vorlagekannen stehen dabei orthogonal zum Bandeinlauf. Die gefüllten Kannen der ersten Streckenpassage werden in eine Bereitschaftsreihe gebracht, die unter Beibehal­tung einer Lücke parallel zur Reihe der Vorlagekannen der zweiten Streckenpassage angeordnet ist.EU-PS 0 129 746 describes, for example, a system in which the lines connected in series are operated with a single-row template. The feed cans are orthogonal to the tape entry. The filled cans of the first route passage are brought into a standby row, which is arranged parallel to the row of supply cans of the second route passage while maintaining a gap.

Nachteilig bei dieser bekannten Einrichtung ist unter anderem die sehr große Baubreite sowie der relativ aufwendige, umgelenkte Bandeinlauf. Der vorgenannten Literaturstelle sind außerdem kei­ne Hinweise auf einen automatischen Kannentransport zwischen den beiden Strecken entnehmbar.A disadvantage of this known device is, among other things, the very large overall width and the relatively complex, deflected belt inlet. In addition, the aforementioned literature reference does not indicate any automatic can transport between the two routes.

Durch die DE-OS 37 07 080 ist ein Kannentransportsystem zwischen zwei Strecken bekannt, bei dem die Strecken über eine Transport­bahn verbunden sind.From DE-OS 37 07 080 a can transport system between two routes is known, in which the routes are connected via a transport track.

In die Transportbahn ist eine Puffereinrichtung eingeschaltet, die ein Austauschen der Leer- gegen Vollkannen ermöglicht. Auch bei diesem System wird mit einreihiger Vorlage an der nachgeord­neten Strecke gearbeitet, was zu einer erheblichen Baulänge der Anlage führt. Außerdem erfolgt der Kannentransport nach wie vor manuell.A buffer device is switched into the transport track, which enables the empty cans to be replaced by full cans. This system also uses a single-row template on the downstream section, which leads to a considerable overall length of the system. In addition, the can transport is still carried out manually.

Automatische Kannentransportsysteme sind im Prinzip allerdings ebenfalls bekannt. Als Stand der Technik wird in diesem Zusammen­hang zum Beispiel auf die europäische Patentanmeldung 0 069 087 und das britische Patent 1 136 782 verwiesen.In principle, however, automatic can transport systems are also known. In this context, reference is made, for example, to the European patent application 0 069 087 and the British patent 1 136 782 as prior art.

Ausgehend von dem vorgenannten Stand der Technik liegt der Er­findung die Aufgabe zugrunde, ein automatisches Kannentransport­system zu schaffen, das einerseits sehr kompakt gebaut ist und andererseits jederzeit freien Zugang zu den in Doppelreihe ange­ordneten Vorlagekannen gewährleistet.On the basis of the aforementioned prior art, the object of the invention is to create an automatic can transport system which, on the one hand, has a very compact construction and, on the other hand, ensures free access to the storage cans arranged in a double row at all times.

Diese Aufgabe wird erfindungsgemäß durch eine erste, parallel zu den Gatterreihen angeordnete äußere Transportbahn, eine zweite, parallel zur ersten Transportbahn verlaufende innere Transport­bahn, einen zwischen den Gatterreihen und den Transportbahnen an­geordneten Bediengang, Schubeinrichtungen zum Querverschieben von Kannen zwischen den Transportbahnen und den Gatterreihen sowie longitudinale Fördereinrichtungen im Bereich der Transportbahnen gelöst.This object is achieved according to the invention by a first outer transport path arranged parallel to the gate rows, a second inner transport path running parallel to the first transport path, an operating aisle arranged between the gate rows and the transport paths, pushing devices for shifting cans between the transport paths and the gate rows as well as longitudinal Conveyors in the area of the transport tracks solved.

Longitudinale Fördereinrichtungen sowie Schubeinrichtungen zum Querverschieben von Kannen sind in verschiedenen Ausführungsfor­men, beispielsweise durch die europäische Patentanmeldungen 0 069 087 und 0 129 089 oder die britischen Patente 941 219 und 1 139 782, bekannt und daher in den Zeichnungen nur schematisch angedeutet.Longitudinal conveying devices and pushing devices for the transverse displacement of cans are known in various embodiments, for example by European patent applications 0 069 087 and 0 129 089 or British patents 941 219 and 1 139 782, and are therefore only indicated schematically in the drawings.

Bei einem solchen Kannentransportsystem sind neunzehn Kannen im Umlauf. Acht in Doppelreihe stehende Kannen bilden dabei die Vor­lage für die nachgeordnete Strecke. Die in einer vorgeordneten Strecke gefüllten Kannen werden über eine innere Transportbahn abtransportiert und in einer endseitigen Parkzone der inneren Transportbahn gesammelt. Bei Erreichen einer bestimmten Anzahl werden die vollen Kannen mittels einer Schubvorrichtung auf die äußere Transportbahn querverschoben.
Anschließend werden auf der inneren Transportbahn erneut volle Kannen gesammelt. Die auf der äußeren und inneren Transportbahn deponierten vollen Kannen bilden die Reserve für den nächsten Kannenwechselvorgang.
With such a can transport system, nineteen cans are in circulation. Eight cans in double rows form the template for the downstream section. The cans filled in an upstream section are transported away via an inner transport path and collected in an end-side parking zone of the inner transport path. When a certain number is reached, the full cans are pushed onto the outer transport path by means of a pusher.
Then full cans are collected again on the inner transport track. The full cans deposited on the outer and inner transport track form the reserve for the next can changing process.

Die Gatterreihen mit den Vorlagekannen bleiben während der ge­samten Zeit für das Bedienpersonal frei zugängig.The rows of gates with the feeding cans remain freely accessible for the operating personnel during the entire time.

Sobald die Lunte in einer der Vorlagekannen der nachgeordneten Strecke ausgelaufen ist, wird der gesamte Lunteneinzug an dieser Strecke gestoppt. Das Bedienpersonal unterbricht die noch ver­bleibenden Lunten und löst über einen Handschalter den Wechsel­vorgang aus. Beim Wechselvorgang werden zunächst die Leerkannen der inneren Gatterreihe auf eine mit der äußeren Transportbahn verbundene Querbahn getaktet und die Leerkannen der äußeren Gat­terreihe auf die innere Gatterreihe verschoben. Gleichzeitig wer­den die vollen Kannen der inneren Transportbahn über den Bedien­gang hinweg auf die äußere Gatterreihe und die vollen Kannen der äußeren Transportbahn auf die innere Transportbahn nachgeholt. Der Bediengang bleibt auch in diesem Fall frei zugängig, so daß das Bedienpersonal vom Bediengang aus die Lunte der auf der äußeren Gatterreihe stehenden vollen Kannen anlegen kann.As soon as the fuse in one of the supply cans of the downstream line has run out, the entire supply of rags on this line is stopped. The operating personnel interrupts the remaining fuses and triggers the change process using a hand switch. During the changing process, the empty cans of the inner row of gates are first clocked on a transverse path connected to the outer transport path and the empty cans of the outer row of gates are moved to the inner row of gates. At the same time, the full cans of the inner transport path are made up across the service aisle onto the outer row of gates and the full cans of the outer transport path onto the inner transport path. The operating aisle remains freely accessible in this case too, so that the operating personnel can put on the fuse of the full cans standing on the outer row of gates from the operating aisle.

Nachdem die auf der inneren Gatterreihe befindlichen Leerkannen ebenfalls auf die Querbahn ausgetaktet wurden, werden die vollen Kannen in ihre Endposition geschoben. Mit dem Anlegen der rest­lichen vier Lunten und dem Nachholen der auf der äußeren Trans­portbahn befindlichen Leerkannen ist der Wechselvorgang beendet.After the empty cans on the inner row of gates have also been clocked out on the transverse path, the full cans are pushed into their end position. The changeover process ends when the remaining four fuses are put on and the empty cans on the outer conveyor track are made up for.

Weitere Einzelheiten der Erfindung sind einem nachfolgend anhand der Zeichnung dargestellten Ausführungsbeispiel entnehmbar. Es zeigen:

  • Figur 1: Schematisch eine Draufsicht auf das erfindungsgemäße Kannentransportsystem Strek­ke/Strecke
  • Figuren 2 - 6: Einzelne Verfahrensschritte beim Einsatz des er­findungsgemäßen Kannentransportsystems
Further details of the invention can be found in an exemplary embodiment shown below with reference to the drawing. Show it:
  • Figure 1: Schematic a plan view of the can transport system Strekke / line according to the invention
  • Figures 2-6 : Individual process steps when using the can transport system according to the invention

In Figur 1 ist eine vorgeordnete Strecke 20 dargestellt, die mit einer nachgeordneten Strecke 21 über ein Kannentransportsystem 22 verbunden ist. Wie aus der Zeichnung ersichtlich, weisen die Strecken 20, 21 jeweils zwei Ablieferungen auf.FIG. 1 shows an upstream route 20 which is connected to a downstream route 21 via a can transport system 22. As can be seen from the drawing, the routes 20, 21 each have two deliveries.

Das Kannentransportsystem 22 besteht im wesentlichen aus einer äußeren Transportbahn 23 und einer inneren Transportbahn 24. Die äußere Transportbahn 23 ist einerseits mit einer Querbahn 28 und andererseits mit einer Einlaufbahn 29 verbunden. Die Einlaufbahn 29 ist an die Strecke 20 angeschlossen und weist in Richtung dieser Strecke Gefälle auf.The can transport system 22 essentially consists of an outer transport path 23 and an inner transport path 24. The outer transport path 23 is connected on the one hand to a transverse path 28 and on the other hand to an entry path 29. The inlet track 29 is connected to the route 20 and has a gradient in the direction of this route.

Die innere Transportbahn 24 ist über die Auslaufbahn 30 mit der Strecke 20 verbunden. Die Auslaufbahn 30 ist dabei derart gestal­tet, daß sie einseitig im Bereich der Strecke anhebbar ist. Auf diese Weise kann ein Gefälle in Richtung auf die innere Trans­portbahn 24 eingestellt werden.The inner transport track 24 is connected to the route 20 via the outlet track 30. The run-out track 30 is designed such that it can be raised on one side in the region of the route. In this way, a gradient can be set in the direction of the inner transport path 24.

Innerhalb der Transportbahnen 23, 24 sind ein Bediengang 25 sowie Gatterreihen 26, 27 vorgesehen. Das Kannentransportsystem 22 weist außerdem eine Anzahl longitudinaler Fördereinrichtungen 31 - 35 sowie quer zu den Transportbahnen 23, 24 wirkende Schub­einrichtungen 36 - 39 auf.An operating aisle 25 and rows of gates 26, 27 are provided within the transport tracks 23, 24. The can transport system 22 also has a number of longitudinal conveying devices 31-35 and pushing devices 36-39 acting transversely to the transport tracks 23, 24.

Nachfolgend wird die Funktion des erfindungsgemäßen Kannentrans­portsystems anhand der Figuren 2-6 erläutert. Zur Verdeut­lichung sind einzelne Kannenstellplätze im Bereich der Transport­bahnen bzw. der Ein- und Auslaufbahn mit Kennziffern 1-11 versehen.The function of the can transport system according to the invention is explained below with reference to FIGS. 2-6. For clarification, individual pitches in the area of the transport lanes or the inlet and outlet lanes are marked with numbers 1-11.

Figur 2 zeigt in der oberen Zeichnungshälfte die Ausgangsposi­tion.Figure 2 shows the starting position in the upper half of the drawing.

Im Kannentransportsystem 22 sind neunzehn Kannen 40 im Umlauf. Acht volle Kannen stehen auf den Gatterreihen 26, 27, zwei Kannen sind im Bereich der Strecke 20 auf den Stellplätzen 1 und 2, die restlichen neun (leeren) Kannen stehen auf der äußeren Trans­portbahn 23 bzw. auf der Einlaufbahn 29. Die auf dem Stellplatz 2 innerhalb der Strecke 20 befindliche Kanne wird gerade gefüllt.Nineteen cans 40 are in circulation in the can transport system 22. Eight full cans are on the gate rows 26, 27, two cans are in the area of the line 20 on the parking spaces 1 and 2, the remaining nine (empty) cans are on the outer transport path 23 and on the infeed path 29. Those on the parking space 2 can located within the line 20 is being filled.

In der unteren Zeichnungshälfte ist die Situation dargestellt, die eintritt, wenn die Kanne auf dem Stellplatz 2 voll ist. Durch die Maschinensteuerung wird überprüft, ob die Stellplätze 3 und 4 auf der Auslaufbahn 30 frei und der Stellplatz 10 auf der Ein­laufbahn 29 belegt ist. Bei positivem Ergebnis schiebt die inner­halb der Strecke 20, angeordnete (bekannte und deshalb nicht dar­gestellte) Kannenwechselvorrichtung die volle Kanne vom Stell­platz 2 auf den Stellplatz 3. Bei dieser Bewegung wird gleichzei­tig die leere Kanne vom Stellplatz 1 auf den Stellplatz 2 und die Kanne vom Stellplatz 10 auf den Stellplatz 1 weiterbefördert.The lower half of the drawing shows the situation that occurs when the jug in slot 2 is full. The machine control checks whether the parking spaces 3 and 4 on the run-out path 30 are free and the parking space 10 on the run-in path 29 is occupied. If the result is positive, the can changing device arranged (known and therefore not shown) within the section 20 pushes the full can from the parking space 2 to the parking space 3. With this movement, the empty can from the parking space 1 to the parking space 2 and the can from the parking space 10 conveyed to parking space 1.

Die auf der Einlaufbahn 29 verbliebenen Kannen rollen aufgrund des Gefälles der Einlaufbahn selbsttätig auf den Stellplatz 10 zu. Der dabei frei werdende Stellplatz 9 wird sogleich aufge­füllt, da die der äußeren Transportbahn 23 zugeordneten longi­tudinalen Fördereinrichtungen 33, 34 die dort angeordneten leeren Kannen, wie dargestellt, nachschieben.The cans remaining on the infeed path 29 automatically roll towards the parking space 10 due to the gradient of the infeed path. The parking space 9 which is freed up in the process is immediately filled up, since the longitudinal conveying devices 33, 34 assigned to the outer transport path 23 push the empty cans arranged there, as shown.

Der Stellplatz 7 bleibt dabei ausgespart, um den freien Zugang zum Bediengang 25 zu gewährleisten.The parking space 7 is left blank to ensure free access to the control aisle 25.

Gleichzeitig wird die inzwischen durch einseitiges Anheben der Auslaufbahn 30 auf den Stellplatz 4 gelangte volle Kanne über die Fördereinrichtung 35 zum Stellplatz 11 weitertransportiert.At the same time, the full can, which has now reached the parking space 4 by lifting the outlet path 30 on one side, is transported further to the parking space 11 via the conveyor device 35.

Der vorbeschriebene Kannenwechselvorgang wiederholt sich, bis vier volle Kannen auf der inneren Transportbahn 24 deponiert sind (Figur 3, obere Zeichnungshälfte).The can changing process described above is repeated until four full cans are deposited on the inner transport path 24 (FIG. 3, upper half of the drawing).

Zu diesem Zeitpunkt ist, wie ersichtlich, die äußere Transport­bahn 23 in diesem Abschnitt unbesetzt. Die auf der inneren Trans­portbahn 24 deponierten vollen Kannen werden mittels einer Schub­einrichtung 36 nach außen auf die Transportbahn 23 verschoben, so daß die innere, mit der Auslaufbahn 30 verbundene Transportbahn 24 wieder frei wird (Figur 3, untere Zeichnungshälfte).At this time, as can be seen, the outer transport path 23 is unoccupied in this section. The full cans deposited on the inner transport path 24 are moved outwards onto the transport path 23 by means of a pushing device 36, so that the inner transport path 24 connected to the outlet path 30 becomes free again (FIG. 3, lower half of the drawing).

Der eingangs beschriebene Kannenwechselvorgang startet erneut und endet erst, wenn wieder vier volle Kannen auf der inneren Trans­portbahn stehen. Etwa zu diesem Zeitpunkt beginnen auch die in den Gatterreihen 26, 27 angeordneten Vorlagekannen auszulaufen (Figur 4, obere Zeichnungshälfte).The can changing process described at the beginning starts again and only ends when there are four full cans on the inner transport path again. At about this time, the template cans arranged in the gate rows 26, 27 also begin to run out (FIG. 4, upper half of the drawing).

Die auf der inneren Gatterreihe 27 befindlichen leeren Vorlage­kannen werden jetzt über die Transporteinrichtung 31 auf die Querbahn 28 getaktet und dort über die Transporteinrichtung 32, wie in Figur 4, untere Zeichnungshälfte dargestellt, weitertrans­portiert.The empty supply cans located on the inner row of gates 27 are now clocked onto the transverse path 28 via the transport device 31 and are transported there further via the transport device 32, as shown in FIG. 4, lower half of the drawing.

Anschließend werden die leeren Vorlagekannen der äußeren Gatter­reihe 26 durch eine Schubeinrichtung 37 auf die innere Gatter­reihe 27, die vollen Kannen der inneren Transportbahn 24 durch eine Schubeinrichtung 38 auf die äußere Gatterreihe 27 und die vollen Kannen der äußeren Transportbahn 23 durch eine Schubein­richtung 39 auf die innere Transportbahn 24 verschoben. Diese Vorgänge laufen gleichzeitig ab. Das Resultat ist in Figur 5, obere Bildhälfte dargestellt.Subsequently, the empty supply cans of the outer row of gates 26 are pushed onto the inner row of gates 27 by a pusher 37, the full cans of the inner conveyor track 24 are pushed onto the outer row of gates 27 by a pusher 38 and the full cans of the outer conveyor track 23 are pushed onto the inner one by a pusher 39 Transport track 24 shifted. These processes take place simultaneously. The result is shown in Figure 5, upper half of the figure.

Während die auf der Querbahn 28 befindlichen Leerkannen über die longitudinalen Fördereinrichtungen 32, 33 abgefördert werden, werden die leeren Kannen der inneren Gatterreihe 27 durch die Fördereinrichtung 31 ebenfalls auf die Querbahn 28 getaktet (Fi­gur 5, untere Zeichnungshälfte).While the empty cans located on the transverse path 28 are conveyed away via the longitudinal conveyor devices 32, 33, the empty cans of the inner row of gates 27 are also clocked onto the transverse path 28 by the conveyor device 31 (FIG. 5, lower half of the drawing).

Die Bedienperson legt jetzt vom frei zugänglichen Bediengang 25 aus die Lunten der auf der äußeren Gatterreihe 27 stehenden Voll­kannen an und startet das System erneut.The operator now puts on the fuses of the full cans standing on the outer row of gates 27 from the freely accessible operating aisle 25 and starts the system again.

Wie die Figur 6 zeigt, werden die auf der äußeren Gatterreihe 27 stehenden Vollkannen durch die Schubeinrichtung 37 auf die innere Gatterreihe 27 und die auf der inneren Transportbahn 24 stehenden Vollkannen durch die Schubeinrichtung 38 auf die äußere Gatter­reihe 26 geschoben.As FIG. 6 shows, the full cans standing on the outer row of gates 27 are pushed onto the inner row of gates 27 by the pushing device 37 and the full cans standing on the inner conveyor track 24 are pushed onto the outer row 26 of the gates by the pushing device 38.

Die Schubeinrichtung 38 muß dabei den Bediengang 25 überbrücken und weist daher eine Auslenkung auf, die etwa doppelt so groß ist wie die Auslenkung der anderen Einrichtungen (36 - 39).The pushing device 38 has to bridge the operating aisle 25 and therefore has a deflection which is approximately twice as large as the deflection of the other devices (36-39).

Anschließend legt das Bedienpersonal die Lunten der auf der äu­ßeren Gatterreihe 26 stehenden Vollkannen an. Im Anschluß daran werden die Leerkannen auf der äußeren Transportbahn 23 durch die Fördereinrichtungen 32 - 34 zur Gefällstrecke der Einlaufbahn 29 getaktet.The operating personnel then apply the fuses of the full cans standing on the outer row of gates 26. Subsequently, the empty cans on the outer transport path 23 are clocked by the conveying devices 32-34 to the gradient of the infeed path 29.

Die Ausgangsposition ist damit wieder erreicht; ein neuer Wech­selzyklus kann beginnen.The starting position is reached again; a new cycle of change can begin.

Bezugszahlenliste:List of reference numbers:

  • (1) Kannenstellplatz(1) Pitcher space
  • (2) Kannenstellplatz(2) pitches
  • (3) Kannenstellplatz(3) pitches
  • (4) Kannenstellplatz(4) pitches
  • (5) Kannenstellplatz(5) pitches
  • (6) Kannenstellplatz(6) pitches
  • (7) Kannenstellplatz(7) Pitcher space
  • (8) Kannenstellplatz(8) pitches
  • (9) Kannenstellplatz(9) Pitcher space
  • (10) Kannenstellplatz(10) pitches
  • (11) Kannenstellplatz(11) Pitcher space
  • (20) Strecke(20) route
  • (21) Strecke(21) route
  • (22) Kannentransportsystem(22) Can transport system
  • (23) äußere Transportbahn(23) outer conveyor track
  • (24) innere Transportbahn(24) inner conveyor track
  • (25) Bediengang(25) Aisle
  • (26) äußere Gatterreihe(26) outer row of gates
  • (27) innere Gatterreihe(27) inner row of gates
  • (28) Querbahn(28) cross track
  • (29) Einlaufbahn(29) Inlet
  • (30) Auslaufbahn(30) runout
  • (31) Fördereinrichtung(31) Conveyor
  • (32) Fördereinrichtung(32) Conveyor
  • (33) Fördereinrichtung(33) Conveyor
  • (34) Fördereinrichtung(34) Conveyor
  • (35) Fördereinrichtung(35) Conveyor
  • (36) Schubeinrichtung(36) Thruster
  • (37) Schubeinrichtung(37) Thruster
  • (38) Schubeinrichtung(38) Thruster
  • (39) Schubeinrichtung(39) Thrust device
  • (40) Kanne(40) jug

Claims (12)

1. Kannentransportsystem zwischen zwei im Arbeitsgang aufein­anderfolgenden Strecken, wobei die Vorlage an der nachgeord­neten Strecke in doppelten Gatterreihen erfolgt, gekennzeich­net durch eine erste, parallel zu den Gatterreihen (26, 27) angeordnete äußere Transportbahn (23), eine zweite, parallel zur ersten Transportbahn (23) verlaufende innere Transport­bahn (24), einen zwischen den Gatterreihen (26, 27) und den Transportbahnen (23, 24) angeordneten Bediengang (25), Schub­einrichtungen (36 - 39) zum Querverschieben von Kannen (40) zwischen den Transportbahnen (23, 24) und den Gatterreihen (26, 27) sowie longitudinale Fördereinrichtungen (31 - 35) im Bereich der Transportbahnen (23, 24).1. Can transport system between two successive routes in the work process, the presentation on the downstream route takes place in double gate rows, characterized by a first, parallel to the gate rows (26, 27) arranged outer transport path (23), a second, parallel to the first transport path (23) inner transport track (24), an operating aisle (25) arranged between the rows of gates (26, 27) and the transport tracks (23, 24), pushing devices (36 - 39) for transversely moving cans (40) between the transport tracks ( 23, 24) and the rows of gates (26, 27) and longitudinal conveying devices (31 - 35) in the region of the transport tracks (23, 24). 2. Kannentransportsystem nach Anspruch 1, dadurch gekennzeich­net, daß die innere Transportbahn (24) eine Schubeinrichtung (36) aufweist, die das Verschieben einer Vielzahl von auf der inneren Transportbahn (24) angeordneten Kannen (40) zur äußeren Transportbahn (23) hin ermöglicht.2. Can transport system according to claim 1, characterized in that the inner transport path (24) has a pushing device (36) which enables the displacement of a plurality of cans (40) arranged on the inner transport path (24) towards the outer transport path (23) . 3. Kannentransportsystem nach Anspruch 1, dadurch gekennzeich­net, daß die innere Transportbahn (24) eine Schubeinrichtung (38) zum Verschieben der Kannen (40) zur äußeren Gatterreihe (26) hin aufweist, wobei die Auslenkung der Schubeinrichtung (38) so groß ist, daß die Kannen (40) über den Bediengang (25) hinwegverschoben werden.3. Can transport system according to claim 1, characterized in that the inner transport path (24) has a pushing device (38) for moving the cans (40) to the outer row of gates (26), the deflection of the pushing device (38) being so great, that the cans (40) are moved over the service aisle (25). 4. Kannentransportsystem nach Anspruch 1, dadurch gekennzeich­net, daß die Transportbahnen (23, 24) mindestens auf einem Teil ihrer Länge longitudinale Fördereinrichtungen (32 - 34) aufweisen.4. Can transport system according to claim 1, characterized in that the transport tracks (23, 24) have at least part of their length longitudinal conveyors (32-34). 5. Kannentransportsystem nach Anspruch 1, dadurch gekennzeich­net, daß im Bereich der inneren Gatterreihe (27) eine Förder­einrichtung (31) angeordnet ist.5. Can transport system according to claim 1, characterized in that a conveyor (31) is arranged in the region of the inner row of gates (27). 6. Kannentransportsystem nach Anspruch 4, dadurch gekennzeich­net, daß die Fördereinrichtungen (31 - 34) aus Kannenschub- und/oder Kannenzugeinrichtungen bestehen.6. can transport system according to claim 4, characterized in that the conveying means (31 - 34) consist of can pushing and / or can pulling devices. 7. Kannentransportsystem nach Anspruch 4, dadurch gekennzeich­net, daß die Fördereinrichtungen (31 - 34) aus antreibbaren Rollen oder dergleichen bestehen.7. Can transport system according to claim 4, characterized in that the conveyor devices (31 - 34) consist of drivable rollers or the like. 8. Kannentransportsystem nach Anspruch 1, dadurch gekennzeich­net, daß die äußere Transportbahn (23) mit einer orthogonal angeschlossenen Querbahn (28) und einer ebenfalls orthogonal angeordneten Einlaufbahn (29) verbunden ist.8. Can transport system according to claim 1, characterized in that the outer transport path (23) with an orthogonally connected transverse path (28) and a likewise orthogonally arranged inlet path (29) is connected. 9. Kannentransportsystem nach Anspruch 8, dadurch gekennzeich­net, daß die Einlaufbahn (29) zur vorgeschalteten Strecke (20) hin Gefälle aufweist.9. Can transport system according to claim 8, characterized in that the inlet track (29) to the upstream section (20) has a slope. 10. Kannentransportsystem nach Anspruch 1, dadurch gekennzeich­net, daß die innere Transportbahn (24) über eine orthogonal angeordnete Auslaufbahn (30) mit der vorgeschalteten Strecke (20) verbunden ist.10. Can transport system according to claim 1, characterized in that the inner transport path (24) via an orthogonally arranged outlet path (30) is connected to the upstream section (20). 11. Kannentransportsystem nach Anspruch 10, dadurch gekennzeich­net, daß die Auslaufbahn (30) mit einem Mechanismus ausge­stattet ist, der ein einseitiges Anheben der Auslaufbahn (30) im Bereich der Strecke (20) ermöglicht.11. Can transport system according to claim 10, characterized in that the outlet path (30) is equipped with a mechanism which enables unilateral lifting of the outlet path (30) in the region of the route (20). 12. Verfahren zum Auswechseln von Vorlagekannen, die in Doppel­reihe vor einer nachgeordneten Strecke stehen, insbesondere zum Austauschen leerer Kannen gegen volle Kannen, unter Ver­wendung der Vorrichtung nach Anspruch 1, dadurch gekennzeich­net,
daß zunächst auf einer inneren Transportbahn (24) eine Reihe aus vollen Kannen (40) gebildet und mittels einer Schubein­richtung (36) parallel zu sich selbst auf eine äußere Trans­portbahn (23) geschoben wird,
daß dann auf der inneren Transportbahn (24) erneut eine Reihe mit vollen Kannen (40) gebildet und die auf der inneren Gat­terreihe (27) stehenden leeren Kannen mittels einer Förder­einrichtung (31) auf eine Querbahn (28) getaktet werden, daß anschließend mittels der Schubeinrichtungen (37, 38, 39) gleichzeitig die Leerkannen von der äußeren Gatterreihe (26) in die innere Gatterreihe (27), die vollen Kannen von der inneren Transportbahn (24) zur äußeren Gatterreihe (26) und die vollen Kannen der äußeren Transportbahn (23) auf die in­nere Transportbahn (24) geschoben werden,
daß nach dem Anlegen der Lunten der auf der äußeren Gatter­reihe (26) stehenden vollen Kannen die auf der inneren Gat­terreihe (27) befindlichen Leerkannen ebenfalls zur Querbahn (28) ausgetaktet, und die vollen Kannen in die Gatterreihen (26, 27) nachgeholt werden.
12. A method for replacing supply cans which are in a double row in front of a downstream section, in particular for exchanging empty cans for full cans, using the device according to claim 1, characterized in that
that a row of full cans (40) is first formed on an inner transport path (24) and pushed onto an outer transport path (23) parallel to itself by means of a pushing device (36),
that then a row with full cans (40) is again formed on the inner transport path (24) and the empty cans standing on the inner row of gates (27) are cycled to a transverse path (28) by means of a conveyor (31), that subsequently by means of the Push devices (37, 38, 39) simultaneously the empty cans from the outer row of gates (26) into the inner row of gates (27), the full cans from the inner conveyor track (24) to the outer row of gates (26) and the full cans of the outer conveyor track ( 23) are pushed onto the inner transport track (24),
that after the fuses of the full cans standing on the outer row of gates (26), the empty cans located on the inner row of gates (27) are also clocked out to the transverse path (28), and the full cans are made up in the rows of gates (26, 27).
EP19900103163 1989-02-21 1990-02-19 Transporting system for cans between two drawing frames Withdrawn EP0384360A3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE3905279A DE3905279A1 (en) 1989-02-21 1989-02-21 CAN TRANSPORT SYSTEM LINE / LINE
DE3905279 1989-02-21

Publications (2)

Publication Number Publication Date
EP0384360A2 true EP0384360A2 (en) 1990-08-29
EP0384360A3 EP0384360A3 (en) 1991-07-03

Family

ID=6374581

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19900103163 Withdrawn EP0384360A3 (en) 1989-02-21 1990-02-19 Transporting system for cans between two drawing frames

Country Status (4)

Country Link
US (1) US4995140A (en)
EP (1) EP0384360A3 (en)
JP (1) JPH02265869A (en)
DE (1) DE3905279A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5500986A (en) * 1993-05-14 1996-03-26 Tru/ tzscher GmbH & Co. KG Method and apparatus for moving rectangular coiler cans
FR2735150A1 (en) * 1995-06-10 1996-12-13 Truetzschler Gmbh & Co Kg POT CONVEYOR SYSTEM
WO1998040546A1 (en) * 1997-03-13 1998-09-17 Vouk S.P.A. Officine Meccanotessili A drawing frame with two drawing heads in cascade

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5272790A (en) * 1989-07-26 1993-12-28 Maschinenfabrik Rieter Ag Maintaining a predetermined quality of sliver in a card and/or drawframe
US5067202A (en) * 1989-07-26 1991-11-26 Maschinenfabrik Rieter Ag Method of maintaining a predetermined quantity of sliver in a card and/or drawframe
DE3928648A1 (en) * 1989-08-30 1991-03-07 Fritz Stahlecker SYSTEM WITH ONE OR MORE SPINNING MACHINES AND WITH AT LEAST ONE CHANGING CARRIAGE TO CHANGE CAN
DE4015377C2 (en) * 1990-05-14 2002-08-14 Truetzschler Gmbh & Co Kg Device for transporting at least one can between a sliver-delivering spinning machine, e.g. B. teasel and a sliver-fed spinning machine, e.g. B. route
DE4112322A1 (en) * 1991-04-16 1992-10-22 Gregor Gebald METHOD FOR FEEDING TAPES TO A ROUTE
DE19713903A1 (en) * 1996-08-16 1998-02-19 Manfred Langen Circulation conveyor
IT1293613B1 (en) * 1996-08-22 1999-03-08 Truetzschler & Co TRANSPORT SYSTEM OF VESSELS BETWEEN TWO CONSECUTIVE IRONING MACHINES IN THE PROCESSING CYCLE
DE19722536A1 (en) * 1996-08-22 1998-02-26 Truetzschler Gmbh & Co Kg Can conveyor system between two successive sections in the work process
CN111910302A (en) * 2019-05-09 2020-11-10 北自所(北京)科技发展有限公司 Automatic conveying and temporary storage system and method for sliver cans pre-combined to sliver-combined roll

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB941219A (en) * 1961-04-08 1963-11-06 Om Ltd Automatic can replacing apparatus for textile drawing frames
DE1265014B (en) * 1963-01-12 1968-03-28 Schubert & Salzer Maschinen Can changing and transport device for spinning preparation machines
GB1136782A (en) * 1966-05-23 1968-12-18 Inst Textilmaschinen A method of and apparatus for changing sliver cans between sliver delivery and feeding sections
FR2072043A1 (en) * 1969-12-24 1971-09-24 Schubert & Salzer Maschinen
EP0069087A1 (en) * 1981-06-19 1983-01-05 Officine Savio S.p.A. Method and apparatus for loading a creel and linking more than one fibre processing machines
DE3707080A1 (en) * 1987-03-05 1988-09-15 Lippert Masch Stahlbau J Apparatus for the filling and emptying of spinning cans

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE118782C (en) *
DE362773C (en) * 1922-11-01 Albert Erbe Bowl for mixing plaster
DE52999C (en) * G. A. KROLL & CO. in Hannover Schachtthörenverschlufs for elevators
DD52999A (en) *
US3443287A (en) * 1962-02-09 1969-05-13 Schubert & Salzer Maschinen Can changing in strand material handling
JPS5022626B2 (en) * 1972-10-19 1975-08-01
DE2543621C2 (en) * 1975-09-30 1984-11-22 Zinser Textilmaschinen Gmbh, 7333 Ebersbach Can changing device
IN161184B (en) * 1983-06-21 1987-10-17 Rieter Ag Maschf
DE3505494A1 (en) * 1985-02-16 1986-09-04 Langen, Manfred, 4050 Mönchengladbach METHOD AND DEVICE FOR REPLACING EMPTY CAN CAN FOR FILLED
WO1986006358A1 (en) * 1985-04-30 1986-11-06 Büro Patent Ag Installation and method for the automatic feeding of filled cans and the automatic evacuation of empty cans in a spinning machine
DE3626773A1 (en) * 1986-08-07 1988-03-03 Schlafhorst & Co W ROUTE
DE3728929A1 (en) * 1987-08-29 1989-03-09 Gregor Gebald Apparatus for the supply and removal of cans
DE3809282A1 (en) * 1988-03-19 1989-09-28 Klaus Hoffmann Apparatus for the supply and removal of cans
JP2612668B2 (en) * 1993-06-30 1997-05-21 イソライト工業株式会社 Porous ceramic grain compact and manufacturing method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB941219A (en) * 1961-04-08 1963-11-06 Om Ltd Automatic can replacing apparatus for textile drawing frames
DE1265014B (en) * 1963-01-12 1968-03-28 Schubert & Salzer Maschinen Can changing and transport device for spinning preparation machines
GB1136782A (en) * 1966-05-23 1968-12-18 Inst Textilmaschinen A method of and apparatus for changing sliver cans between sliver delivery and feeding sections
FR2072043A1 (en) * 1969-12-24 1971-09-24 Schubert & Salzer Maschinen
EP0069087A1 (en) * 1981-06-19 1983-01-05 Officine Savio S.p.A. Method and apparatus for loading a creel and linking more than one fibre processing machines
DE3707080A1 (en) * 1987-03-05 1988-09-15 Lippert Masch Stahlbau J Apparatus for the filling and emptying of spinning cans

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5500986A (en) * 1993-05-14 1996-03-26 Tru/ tzscher GmbH & Co. KG Method and apparatus for moving rectangular coiler cans
FR2735150A1 (en) * 1995-06-10 1996-12-13 Truetzschler Gmbh & Co Kg POT CONVEYOR SYSTEM
WO1998040546A1 (en) * 1997-03-13 1998-09-17 Vouk S.P.A. Officine Meccanotessili A drawing frame with two drawing heads in cascade

Also Published As

Publication number Publication date
US4995140A (en) 1991-02-26
JPH02265869A (en) 1990-10-30
DE3905279A1 (en) 1990-08-23
EP0384360A3 (en) 1991-07-03

Similar Documents

Publication Publication Date Title
DE19504457A1 (en) Modular flow production plant
DE3906718A1 (en) TRANSPORT AND HANDLING SYSTEM FOR DIVERSE TEXTILE MACHINES, ESPECIALLY TWISTING MACHINES
CH682086A5 (en)
DE60214430T2 (en) Goods conveying and collecting system and method
EP0384360A2 (en) Transporting system for cans between two drawing frames
DE4338552C2 (en) Textile machine producing cross-wound bobbins with a large number of bobbins arranged in series
DE3928648A1 (en) SYSTEM WITH ONE OR MORE SPINNING MACHINES AND WITH AT LEAST ONE CHANGING CARRIAGE TO CHANGE CAN
DE19521185A1 (en) Can conveyor system between two lines
DE3712027A1 (en) Process and apparatus for the transportation of full bobbins and empty bobbin cores in a textile machine
CH673478A5 (en)
EP0329965A2 (en) Method and device for exchanging roving bobbins in a ring spinning machine
CH691485A5 (en) Method and apparatus for filling cans elongated section of a spinning machine.
EP0311958B1 (en) Switching arrangement
EP3670409A1 (en) Textile machine which produces cross-wound bobbins, with a cross-wound bobbin transport device
EP0604607B1 (en) System for handling printed products
EP3556917B1 (en) Transport device for a spinning unit
DE3809282A1 (en) Apparatus for the supply and removal of cans
WO2017001297A1 (en) Device for receiving and transporting away wound coils
EP0855456B1 (en) Method and apparatus for transporting full roving bobbins respectively empty roving cores
DE4303416C2 (en) Method and device for removing thread spools from a textile machine
EP0311069B1 (en) Transport system for roving bobbins between spinning machines
EP0909844B1 (en) Sliver can stand
EP0534184B1 (en) Transporting system for transporting individual carriers
DE4407110A1 (en) Method and device for filling cans with an elongated cross-section (flat cans) on a spinning machine, e.g. B. route
DE102018132459A1 (en) Textile machine producing cross-wound bobbins with a cross-wound bobbin transport device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH DE FR IT LI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): CH DE FR IT LI

17P Request for examination filed

Effective date: 19920220

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TRUETZSCHLER GMBH & CO. KG

17Q First examination report despatched

Effective date: 19930729

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19950413