EP3499169A1 - Collecteur stratifié, échangeur thermique et dispositif à cycle de réfrigération - Google Patents

Collecteur stratifié, échangeur thermique et dispositif à cycle de réfrigération Download PDF

Info

Publication number
EP3499169A1
EP3499169A1 EP17902575.4A EP17902575A EP3499169A1 EP 3499169 A1 EP3499169 A1 EP 3499169A1 EP 17902575 A EP17902575 A EP 17902575A EP 3499169 A1 EP3499169 A1 EP 3499169A1
Authority
EP
European Patent Office
Prior art keywords
flow passages
flow passage
refrigerant
branching
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP17902575.4A
Other languages
German (de)
English (en)
Other versions
EP3499169B1 (fr
EP3499169A4 (fr
Inventor
Yosuke Fujimori
Norihiro Yoneda
Yohei Kato
Shinya Higashiiue
Ryota AKAIWA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of EP3499169A1 publication Critical patent/EP3499169A1/fr
Publication of EP3499169A4 publication Critical patent/EP3499169A4/fr
Application granted granted Critical
Publication of EP3499169B1 publication Critical patent/EP3499169B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02Header boxes; End plates
    • F28F9/0219Arrangements for sealing end plates into casing or header box; Header box sub-elements
    • F28F9/0221Header boxes or end plates formed by stacked elements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B39/00Evaporators; Condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B39/00Evaporators; Condensers
    • F25B39/02Evaporators
    • F25B39/028Evaporators having distributing means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B39/00Evaporators; Condensers
    • F25B39/04Condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02Header boxes; End plates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02Header boxes; End plates
    • F28F9/026Header boxes; End plates with static flow control means, e.g. with means for uniformly distributing heat exchange media into conduits
    • F28F9/0278Header boxes; End plates with static flow control means, e.g. with means for uniformly distributing heat exchange media into conduits in the form of stacked distribution plates or perforated plates arranged over end plates

Definitions

  • the present invention relates to a laminated header that distributes and supplies refrigerant, a heat exchanger provided with this laminated header, and a refrigeration cycle apparatus provided with this heat exchanger.
  • a typical heat exchanger For reducing a pressure loss of refrigerant flowing in a heat transfer tube, a typical heat exchanger includes flow passages formed by arranging a plurality of heat transfer tubes in parallel. A header that distributes and supplies the refrigerant to each heat transfer tube is disposed at a refrigerant inlet of each heat transfer tube.
  • a laminated header As the header, a laminated header has been known. This laminated header is formed by laminating a plurality of plates in which a distribution flow passage is formed, the distribution flow passage branching into a plurality of outlet flow passages for one inlet flow passage, to distribute and supply refrigerant to each heat transfer tube of a heat exchanger (e.g., see Patent Literature 1).
  • Patent Literature 1 WO 2016/071946
  • a distribution ratio of the refrigerant for each heat transfer tube of the heat exchanger is desirably kept uniform to uniformly supply the refrigerant to each heat transfer.
  • the heat exchanger is to act as an evaporator, for ensuring the performance of the heat exchanger that acts as the evaporator, it is important to keep uniform a ratio of a flow rate of liquid refrigerant that flows out of each of the plurality of outlet flow passages, that is, the distribution ratio of the refrigerant.
  • the liquid refrigerant may come into an uneven state in the distribution flow passage as the refrigerant repeatedly branches in the branching flow passage, and the liquid refrigerant may nonuniformly flows out of each of the plurality of refrigerant outlets. Then, the refrigerant is nonuniformly supplied to each heat transfer tube of the heat exchanger, leading to deterioration in heat exchange performance.
  • the present invention has been made in view of the problem as described above, and it is an object of the present invention to provide a laminated header, a heat exchanger, and a refrigeration cycle apparatus, the laminated header being configured to uniformly distribute refrigerant to each heat transfer tube of the heat exchanger.
  • a laminated header includes one first opening, a plurality of second openings, and a distribution flow passage communicating between the first opening and each of the plurality of second openings, the laminated header including a plurality of plates that are laminated, the distribution flow passage includes a first flow passage communicating with the first opening and having a linear shape extending in a direction in which the plurality of plates are laminated, a first branching flow passage communicating with the first flow passage and branching the first flow passage into a plurality of flow passages, a plurality of second flow passages communicating with the first branching flow passage and each having a linear shape extending in the direction in which the plurality of plates are laminated, a first return flow passage communicating with each of the plurality of second flow passages and extending in a longitudinal direction of a same plate of the plurality of plates, a plurality of third flow passages each communicating with a corresponding one of the first return flow passages and each having a linear shape extending in the direction in which the plurality of plates are laminate
  • each of the first flow passage, the second flow passages, the third flow passages, the fourth flow passages, the fifth flow passages, and the sixth flow passages that are linear portions is formed to have a certain length, so that it is possible to prevent the uneven state of the refrigerant and make a distribution ratio uniform.
  • the laminated header according to the present invention distributes refrigerant flowing into a heat exchanger
  • the laminated header is not limited to such a case and may be a laminated header that distributes refrigerant flowing into other device.
  • the heat exchanger according to the present invention is applied to an air-conditioning apparatus, which is an example of the refrigeration cycle apparatus, but the heat exchanger is not limited to such a case and may be applied to another refrigeration cycle apparatus having a refrigerant cycle circuit, for example.
  • the refrigeration cycle apparatus switches between a heating operation (heating-up operation) and a cooling operation (cooling-down operation), but the refrigeration cycle apparatus is not limited to such a case and may be a refrigeration cycle apparatus that performs only the heating operation or the cooling operation.
  • a laminated header 2 and a heat exchanger 1 according to Embodiment 1 of the present invention will be described.
  • Fig. 1 is a front view schematically illustrating a configuration of the heat exchanger 1 according to Embodiment 1.
  • a flow direction of refrigerant is indicated by an arrow.
  • the heat exchanger 1 includes the laminated header 2, a cylindrical header 3, a plurality of heat transfer tubes 4, a retainer 5, and a plurality of fins 6.
  • a header of the same type as the laminated header 2 may be used.
  • the laminated header 2 includes one refrigerant inflow port 2A and a plurality of refrigerant outflow ports 2B. Inside the laminated header 2, at least one distribution flow passage communicating between the one refrigerant inflow port 2A and the plurality of refrigerant outflow ports 2B is formed.
  • a refrigerant pipe 20A of a refrigeration cycle apparatus is connected to the refrigerant inflow port 2A.
  • One end portion 4A of a heat transfer tube 4 is connected to each refrigerant outflow port 2B.
  • refrigerant inflow port 2A corresponds to the "first opening” of the present invention.
  • refrigerant outflow port 2B corresponds to the "second opening” of the present invention.
  • the cylindrical header 3 includes a plurality of refrigerant inflow ports 3A and one refrigerant outflow port 3B. Inside the cylindrical header 3, a merging flow passage communicating between the plurality of refrigerant inflow ports 3A and the one refrigerant outflow port 3B is formed. The other end portion 4B of the heat transfer tube 4 is connected to each refrigerant inflow port 3A. A refrigerant pipe 20B of the refrigeration cycle apparatus is connected to the refrigerant outflow port 3B.
  • the one end portion 4A of the heat transfer tubes 4 is connected to each refrigerant outflow port 2B of the laminated header 2, and the other end portion 4B of the heat transfer tube 4 is connected to each refrigerant inflow port 3A of the cylindrical header 3. That is, the plurality of heat transfer tubes 4 are connected between the laminated header 2 and the cylindrical header 3 to connect between the laminated header 2 and the cylindrical header 3.
  • the one end portion 4A, which is the end portion of the heat transfer tube 4 close to the laminated header 2 is connected to the refrigerant outflow port 2B of the laminated header 2 in such a manner that the heat transfer tube 4 is retained by the retainer 5.
  • the heat transfer tube 4 is a flat tube having a plurality of flow passages formed in the heat transfer tube 4, or a circular tube.
  • the heat transfer tube 4 is made of copper or aluminum, for example.
  • the plurality of fins 6 are joined to the circumference of the heat transfer tube 4.
  • Fig. 1 illustrates a case where eight heat transfer tubes 4 are provided, the number of heat transfer tubes 4 is not limited to the illustrated number and is only required to be two or more.
  • the retainer 5 is made up of a plate and has a hole portion through which the one end portion 4A of each heat transfer tube 4 is inserted. That is, by insertion of the heat transfer tube 4 through the hole portion of the retainer 5, the retainer 5 retains a part of the periphery of the heat transfer tube 4.
  • the retainer 5 is made of aluminum, for example.
  • the fin 6 is made of aluminum, for example.
  • the heat transfer tube 4 and the fin 6 are joined by brazing, for example.
  • the refrigerant flowing through the refrigerant pipe 20A of the refrigeration cycle apparatus flows into the laminated header 2 via the refrigerant inflow port 2A.
  • the refrigerant having flown into the laminated header 2 is distributed in the distribution flow passage formed inside the laminated header 2 and flows into the plurality of heat transfer tubes 4 via the plurality of refrigerant outflow ports 2B.
  • the refrigerant exchanges heat with, for example, air supplied by a fan.
  • the refrigerant flowing through each of the plurality of heat transfer tubes 4 flows into the cylindrical header 3 via each of the plurality of refrigerant inflow ports 3A.
  • the refrigerant having flown into the cylindrical header 3 merges in the merging flow passage formed inside the cylindrical header 3 and flows out toward the refrigerant pipe 20B via the refrigerant outflow port 3B.
  • the refrigerant can flow reversely, namely, flow from the cylindrical header 3 toward the laminated header 2. That is, when the heat exchanger 1 acts as a condenser, the refrigerant flows from the cylindrical header 3 toward the laminated header 2.
  • Fig. 2 is an explanatory view for describing first plates constituting the laminated header 2.
  • Fig. 3 is an explanatory view for describing second plates constituting the laminated header 2.
  • Fig. 4 is an exploded perspective view for schematically illustrating a state in which the laminated header 2 has been disassembled. Note that Fig. 2 schematically illustrates a state in which each first plate is seen from the flow direction of the refrigerant. Similarly, Fig. 3 schematically illustrates a state in which each second plate is seen from the flow direction of the refrigerant. In Fig. 4 , the flow of the refrigerant is indicated by a broken line arrow. The state of being seen from the flow direction of the refrigerant refers to the state of being seen from the refrigerant inflow port 2A of the laminated header 2.
  • the laminated header 2 includes a first plate 111, a first plate 112, a first plate 113, a first plate 114, and a first plate 115.
  • the first plate 111, the first plate 112, the first plate 113, the first plate 114, and the first plate 115 are each made up of a plate-like material in a rectangular shape having a thickness of about 1 to 10 mm, for example.
  • the first plate 111, the first plate 112, the first plate 113, the first plate 114, and the first plate 115 are each made of aluminum, for example.
  • the first plate 111, the first plate 112, the first plate 113, the first plate 114, and the first plate 115 are collectively called a first plate.
  • the laminated header 2 includes a second plate 121, a second plate 122, a second plate 123, and a second plate 124.
  • the second plate 121, the second plate 122, the second plate 123, and the second plate 124 are each made up of a plate-like material in a rectangular shape having a thickness of about 1 to 10 mm, for example.
  • the second plate 121, the second plate 122, the second plate 123, and the second plate 124 are each made of aluminum, for example.
  • the second plate 121, the second plate 122, the second plate 123, and the second plate 124 are collectively called a second plate.
  • the first plate 111 has one circular through hole 10a-1 opened in the first plate 111 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 10a-1 serves as the refrigerant inflow port 2A.
  • the through hole 10a-1 is opened at a center portion of the first plate 111.
  • the first plate 112 has one circular through hole 10a-3 opened in the first plate 112 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 10a-3 is opened at a center portion of the first plate 112.
  • the first plate 112 has four linear through holes 12b opened in the first plate 112 in the state of being seen from the flow direction of the refrigerant.
  • the four through holes 12b are opened to be linearly arrayed in a vertical direction on the drawing.
  • the first plate 112 has two curved through holes 11b opened in the first plate 112 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 11b on the upper portion of the drawing is opened to bypass the through hole 12b that is second from the top of the drawing.
  • the through hole 11b on the lower portion of the drawing is opened to bypass the through hole 12b that is second from the bottom of the drawing.
  • the two through holes 11b are opened to be point symmetric to each other about the through hole 10a-3. Note that the shape of the through hole 11b is not limited to the illustrated shape and may be any shape as long as the through hole 11b bypasses the through hole 12b.
  • the first plate 113 has one circular through hole 10a-5 opened in the first plate 113 in the state of being seen from the flow direction of the refrigerant.
  • the first plate 113 has two circular through holes 11a-2 opened in the first plate 113 in the state of being seen from the flow direction of the refrigerant.
  • the through holes 11a-2 are opened adjacently to the through hole 10a-5, to be located symmetrically about the through hole 10a-5.
  • the first plate 113 has four substantially S-shaped through holes 12d opened in the first plate 113 in the state of being seen from the flow direction of the refrigerant.
  • the four through holes 12d are opened to be arrayed in the vertical direction on the drawing.
  • the first plate 113 has two circular through holes 11c-2 opened in the first plate 113 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 11 c-2 on the upper portion of the drawing is opened at a center portion between the two through holes 12d on the upper portion of the drawing.
  • the through hole 11c-2 on the lower portion of the drawing is opened at a center portion between the two through holes 12d on the lower portion of the drawing.
  • the first plate 113 has four circular through holes 12a-2 opened in the first plate 113 in the state of being seen from the flow direction of the refrigerant.
  • the two through holes 12a-2 on the upper portion of the drawing are opened adjacently to the through hole 11c-2 on the upper portion of the drawing, to be arrayed in the vertical direction on the drawing.
  • the two through holes 12a-2 on the lower portion of the drawing are opened adjacently to the through hole 11 c-2 on the lower portion of the drawing, to be arrayed in the vertical direction on the drawing.
  • the first plate 114 has eight circular through holes 13a-2 opened in the first plate 114 in the state of being seen from the flow direction of the refrigerant.
  • the eight through holes 13a-2 are opened to be arrayed in the vertical direction on the drawing. Further, the eight through holes 13a-2 are arranged in such a manner that two vertically arrayed through holes 13a-2 are defined as one group. That is, the eight through holes 13a-2 are arranged to be vertically arrayed, with two through holes 13a-2 that communicate with the same one third branching flow passage 12D defined as one group.
  • the through hole 13a-2 that is first from the top of the drawing and the through hole 13a-2 that is second from the top of the drawing are defined as one group.
  • the through hole 13a-2 that is third from the top of the drawing and the through hole 13a-2 that is fourth from the top of the drawing are defined as one group.
  • the through hole 13a-2 that is fifth from the top of the drawing and the through hole 13a-2 that is sixth from the top of the drawing are defined as one group.
  • the through hole 13a-2 that is seventh from the top of the drawing and the through hole 13a-2 that is eighth from the top of the drawing are defined as one group.
  • the first plate 114 has two substantially S-shaped through holes 11d and one substantially S-shaped through hole 10b opened in the first plate 114 in the state of being seen from the flow direction of the refrigerant.
  • the one through hole 10b and the two through holes 11d are opened to be arrayed in the vertical direction on the drawing.
  • the through hole 11d on the upper portion of the drawing is opened between the through holes 13a-2 that are second and third from the top of the drawing.
  • the through hole 11b between the through holes 11d is opened between the through holes 13a-2 that are fourth and fifth from the top of the drawing.
  • the through hole 11d on the lower portion of the drawing is opened between the through holes 13a-2 that are sixth and seventh from the top of the drawing.
  • the first plate 115 has eight circular through holes 13a-4 opened in the first plate 115 in the state of being seen from the flow direction of the refrigerant.
  • the eight through holes 13a-4 are opened to be arrayed in the vertical direction on the drawing.
  • the eight through holes 13a-4 are arranged in such a manner that two vertically arrayed through holes 13a-4 are defined as one group. That is, the eight through holes 13a-4 are arranged to be vertically arrayed, with two through holes 13a-4 that communicate with the same one third branching flow passage 12D defined as one group.
  • the through hole 13a-4 serves as the refrigerant outflow port 2B.
  • the second plate 121 has one circular through hole 10a-2 opened in the second plate 121 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 10a-2 is opened at a center portion of the second plate 121.
  • the second plate 122 has one circular through hole 10a-4 opened in the second plate 122 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 10a-4 is opened at a center portion of the second plate 122.
  • the second plate 122 has two circular through holes 11a-3 opened in the second plate 122 in the state of being seen from the flow direction of the refrigerant.
  • the through holes 11a-3 are opened adjacently to the through hole 10a-4, to be located symmetrically about the through hole 10a-4.
  • the second plate 122 has four circular through holes 12c opened in the second plate 122 in the state of being seen from the flow direction of the refrigerant.
  • the four through holes 12c are opened to be arrayed in the vertical direction on the drawing.
  • the second plate 122 has two circular through holes 11 c-1 opened in the second plate 122 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 11 c-1 on the upper portion of the drawing is opened at a center portion between the through holes 12c that are first and second from the top of the drawing.
  • the through hole 11 c-1 on the lower portion of the drawing is opened at a center portion between the through holes 12c that are first and second from the bottom of the drawing.
  • the second plate 122 has four circular through holes 12a-3 opened in the second plate 122 in the state of being seen from the flow direction of the refrigerant.
  • the through holes 12a-3 that are first and second from the top of the drawing are opened adjacently to the through hole 11c-1 on the upper portion of the drawing, to be located symmetrically about the through hole 11c-1 on the upper portion of the drawing.
  • the through holes 12a-3 that are first and second from the bottom of the drawing are opened adjacently to the through hole 11c-1 on the lower portion of the drawing, to be located symmetrically about the through hole 11c-1 on the lower portion of the drawing.
  • the second plate 123 has one circular through hole 10a-6 opened in the second plate 123 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 10a-6 is opened at a center portion of the second plate 123.
  • the second plate 123 has two circular through holes 11 a-1 opened in the second plate 123 in the state of being seen from the flow direction of the refrigerant.
  • the through holes 11 a-1 are opened adjacently to the through hole 10a-5, to be located symmetrically about the through hole 10a-6.
  • the second plate 123 has eight circular through holes 13a-1 opened in the second plate 123 in the state of being seen from the flow direction of the refrigerant.
  • the eight through holes 13a-1 are opened to be arrayed in the vertical direction on the drawing.
  • the eight through holes 13a-1 are arranged in such a manner that two vertically arrayed through holes 13a-1 are defined as one group. That is, the eight through holes 13a-1 are arranged to be vertically arrayed, with two through holes 13a-1 that communicate with the same one third branching flow passage 12D defined as one group.
  • the second plate 123 has two circular through holes 11 c-3 opened in the second plate 123 in the state of being seen from the flow direction of the refrigerant.
  • the through hole 11c-3 on the upper portion of the drawing is opened at a center portion between the through holes 13a-1 that are second and third from the top of the drawing.
  • the through hole 11c-3 on the lower portion of the drawing is opened at a center portion between the through holes 13a-1 that are second and third from the bottom of the drawing.
  • the second plate 123 has four circular through holes 12a-1 opened in the second plate 123 in the state of being seen from the flow direction of the refrigerant.
  • the through holes 12a-1 that are first and second from the top of the drawing are opened adjacently to the through hole 11c-3 on the upper portion of the drawing, to be located symmetrically about the through hole 11c-3 on the upper portion of the drawing.
  • the through holes 12a-1 that are first and second from the bottom of the drawing are opened adjacently to the through hole 11c-3 on the lower portion of the drawing, to be located symmetrically about the through hole 11c-3 on the lower portion of the drawing.
  • the second plate 124 has eight circular through holes 13a-3 opened in the second plate 124 in the state of being seen from the flow direction of the refrigerant.
  • the eight through holes 13a-3 are opened to be arrayed in the vertical direction on the drawing.
  • the eight through holes 13a-3 are arranged in such a manner that two vertically arrayed through holes 13a-3 are defined as one group. That is, the eight through holes 13a-3 are arranged to be vertically arrayed, with two through holes 13a-3 that communicate with the same one third branching flow passage 12D defined as one group.
  • the laminated header 2 is constituted by alternately laminating the first plates and the second plates made up as above. That is, the laminated header 2 is constituted by placing each of the second plates between corresponding two of the first plates.
  • a brazing material is applied to both surfaces or one surface of the second plate.
  • the first plates are laminated with the second plate interposed between the first plates and integrally joined together by brazing.
  • the second plate 121 is placed between the first plate 111 and the first plate 112.
  • the second plate 122 is placed between the first plate 112 and the first plate 113.
  • the second plate 123 is placed between the first plate 113 and the first plate 114.
  • the second plate 124 is placed between the first plate 114 and the first plate 115.
  • a distribution flow passage that communicates between the refrigerant inflow port 2A and the plurality of refrigerant outflow ports 2B is formed.
  • the distribution flow passage is made up of a first flow passage 10A, a first branching flow passage 10B, second flow passages 11A, first return flow passages 11B, third flow passages 11C, second branching flow passages 11D, fourth flow passages 12A, second return flow passages 12B, fifth flow passages 12C, third branching flow passages 12D, and sixth flow passages 13A.
  • a case where the refrigerant is branched into eight flows is shown as an example. Specifically, as illustrated in Fig.
  • one first flow passage 10A and one branching flow passage 10B are formed.
  • Two second flow passages 11A, two first return flow passages 11B, two third flow passages 11C, and two second branching flow passages 11D are formed.
  • Four fourth flow passages 12A, four second return flow passages 12B, four fifth flow passages 12C, and four third branching flow passages 12D are formed.
  • eight sixth flow passages 13A are formed.
  • the first flow passage 10A is formed in a linear shape extending in the direction in which the first plates and the second plates are laminated. That is, in a state where the first plates and the second plates are laminated, the through hole 10a-1, the through hole 10a-2, the through hole 10a-3, the through hole 10a-4, the through hole 10a-5, and the through hole 10a-6 are opened at positions facing each other to communicate with each other.
  • the through hole 10b serving as the first branching flow passage 10B is opened at a position across the through hole 10a-6 from the through hole 10a-5.
  • the first flow passage 10A is communicated with the center of the first branching flow passage 10B.
  • the first branching flow passage 10B is constituted of the through hole 10b. That is, the first branching flow passage 10B communicates with the first flow passage 10A and branches the first flow passage 10A into a plurality of flow passages. Consequently, the refrigerant having flown through the first flow passage 10A is branched in the first branching flow passage 10B into two flows in the vertical direction on the drawing. The first branching flow passage 10B causes the refrigerant to flow in the reverse direction.
  • the second flow passage 11A is communicated with each of both end portions of the first branching flow passage 10B.
  • the second flow passage 11A is formed in the linear shape extending in the direction in which the first plates and the second plates are laminated. That is, in the state where the first plates and the second plates are laminated, the through hole 11a-1, the through hole 11a-2, and the through hole 11a-3 are opened at positions facing each other to communicate with each other.
  • the refrigerant flows in the direction opposite to the direction in which the refrigerant flows through the first flow passage 10A.
  • the through hole 11b serving as the first return flow passage 11 B is opened at a position across the through hole 11a-3 from the through hole 11a-2. Then, the second flow passage 11A is communicated with one end portion of the first return flow passage 11B.
  • the first return flow passage 11 B is constituted of the through hole 11b extending in the longitudinal direction of the first plate 112.
  • the refrigerant having flown through the second flow passage 11A flows into the first return flow passage 11 B through the one end portion of the first return flow passage 11B, flows in the longitudinal direction of the first plate 112, and flows out of the first return flow passage 11 B through the other end portion of the first return flow passage 11B.
  • the second flow passage 11A is communicated with the one end portion and the third flow passage 11C is communicated with the other end portion, to cause the refrigerant to flow in the reverse direction.
  • the longitudinal direction of the first plate 112 is the vertical direction of the first plate 112 on the drawing.
  • the third flow passage 11C is formed in the linear shape extending in the direction in which the first plates and the second plates are laminated. That is, in the state where the first plates and the second plates are laminated, the through hole 11c-1, the through hole 11c-2, and the through hole 11c-3 are opened at positions facing each other to communicate with each other.
  • the refrigerant flows in the direction opposite to the direction in which the refrigerant flows through the second flow passage 11A.
  • the through hole 11d serving as the second branching flow passage 11 D is opened at a position across the through hole 11c-3 from the through hole 11c-2.
  • the third flow passage 11C is communicated with the center of the second branching flow passage 11D.
  • the second branching flow passage 11D is constituted of the through hole 11d. That is, the second branching flow passage 11D communicates with the third flow passage 11C and branches the third flow passage 11C into a plurality of flow passages. Consequently, the refrigerant having flown through the third flow passage 11C is branched in the second branching flow passage 11D into two flows in the vertical direction on the drawing. The second branching flow passage 11D causes the refrigerant to flow in the reverse direction.
  • the fourth flow passage 12A is communicated with each of both end portions of the second branching flow passage 11D.
  • the fourth flow passage 12A is formed in the linear shape extending in the direction in which the first plates and the second plates are laminated. That is, in the state where the first plates and the second plates are laminated, the through hole 12a-1, the through hole 12a-2, and the through hole 12a-3 are opened at positions facing each other to communicate with each other.
  • the refrigerant flows in the direction opposite to the direction in which the refrigerant flows through the third flow passage 11C.
  • the through hole 12b serving as the second return flow passage 12B is opened at a position across the through hole 12a-3 from the through hole 12a-2. Then, the fourth flow passage 12A is communicated with one end portion of the second return flow passage 12B.
  • the second return flow passage 12B is constituted of the through hole 12b extending in the longitudinal direction of the first plate 112.
  • the refrigerant having flown through the fourth flow passage 12A flows into the second return flow passage 12B through the one end portion of the second return flow passage 12B, flows in the flow direction of the refrigerant in the first plate 112, and flows out of the second return flow passage 12B through the other end portion of the second return flow passage 12B.
  • the fourth flow passage 12A is communicated with the one end portion and the fifth flow passage 12C is communicated with the other end portion, to cause the refrigerant to flow in the reverse direction.
  • the longitudinal direction of the first plate 112 is the vertical direction of the first plate 112 on the drawing.
  • the fifth flow passage 12C is formed in the linear shape extending in the direction in which the first plates and the second plates are laminated. That is, in the state where the first plates and the second plates are laminated, the through hole 12c is opened at a position where the other end portion of the second return flow passage 12B and the center of the third branching flow passage 12D face each other to communicate with each other.
  • the refrigerant flows in the direction opposite to the direction in which the refrigerant flows through the fourth flow passage 12A.
  • the third branching flow passage 12D is constituted of the through hole 12d. That is, the third branching flow passage 12D communicates with the fifth flow passage 12C and branches the fifth flow passage 12C into a plurality of flow passages. Consequently, the refrigerant having flown through the fifth flow passage 12C is branched in the third branching flow passage 12D into two flows in the vertical direction on the drawing.
  • the sixth flow passage 13A is communicated with each of both end portions of the third branching flow passage 12D.
  • the sixth flow passage 13A is formed in the linear shape extending in the direction in which the first plates and the second plates are laminated. That is, in the state where the first plates and the second plates are laminated, the through hole 13a-1, the through hole 13a-2, the through hole 13a-3, and the through hole 13a-4 are opened at positions facing each other to communicate with each other.
  • the refrigerant flows in the same direction as the direction in which the refrigerant flows through the fifth flow passage 12C.
  • the through hole 13a-1 is opened at a position opposite to each of both end portions of the through hole 12d.
  • the first plate and the second plate are processed by pressing or cutting.
  • plates each having a thickness equal to or smaller than 5 mm and being processable with the pressing may be used.
  • plates each having a thickness equal to or larger than 5 mm may be used.
  • the refrigerant pipe 20A is connected to the first flow passage 10A of the laminated header 2 via the refrigerant inflow port 2A.
  • the through hole 10a-1 constituting the first flow passage 10A corresponds to the refrigerant inflow port 2A in Fig. 1 .
  • the heat transfer tube 4 is connected to each of the sixth flow passages 13A of the laminated header 2 via a corresponding one of the refrigerant outflow ports 2B.
  • the through holes 13a-4 each constituting the sixth flow passage 13A correspond to the refrigerant outflow ports 2B in Fig. 1 .
  • the first flow passage 10A is communicated with the center of the first branching flow passage 10B formed in the first plate 114.
  • the second flow passage 11A is communicated with each of both end portions of the first branching flow passage 10B.
  • the first plates and the second plates are laminated and brazed to communicate among through holes and form the distribution flow passage.
  • Fig. 5 is a longitudinal sectional view for describing the flow of the refrigerant in the laminated header 2.
  • the flows of the refrigerant are indicated by solid line arrows a to m.
  • the upper half of the drawing of the laminated header 2 is enlarged and schematically illustrated.
  • refrigerant that is in a two-phase gas-liquid state and flows through the refrigerant pipe 20A flows into the laminated header 2 from the through hole 10a-1 of the first plate 111 that serves as the refrigerant inflow port 2A (arrow a).
  • the refrigerant having flown inside the laminated header 2 travels straight in the first flow passage 10A (arrow b) and collides with the surface of the second plate 124 in the first branching flow passage 10B of the first plate 114 to vertically branch in the gravity direction (arrow c).
  • the refrigerant having branched in the first branching flow passage 10B travels to each of both end portions of the first branching flow passage 10B and flows into the pair of second flow passages 11A.
  • the refrigerant having flown into the second flow passages 11A travels straight (arrow d) in the second flow passages 11A in a direction opposite to the direction in which the refrigerant travels in the first flow passage 10A.
  • This refrigerant is caused by the first return flow passage 11 B of the first plate 112 to flow in the reverse direction. That is, the refrigerant collides with the surface of the second plate 121 in the first return flow passages 11 B to change its flow direction (arrow e).
  • the refrigerant having flown into the first return flow passage 11 B travels to the end portion of the first return flow passage 11B and flows into the third flow passage 11C.
  • the refrigerant having flown into the third flow passage 11C travels straight (arrow f) in the same direction as the direction in which the refrigerant travels in the first flow passage 10A.
  • This refrigerant collides with the surface of the second plate 124 in the second branching flow passage 11D of the first plate 114 to vertically branch in the gravity direction (arrow g).
  • the refrigerant having branched in the second branching flow passage 11D travels to each of both end portions of the second branching flow passage 11 D, and flows into the pair of fourth flow passages 12A formed to communicate with the one second branching flow passage 11 D.
  • the refrigerant having flown into the fourth flow passage 12A travels straight (arrow h) in the fourth flow passage 12A in the same direction as the direction in which the refrigerant travels in the second flow passage 11A.
  • This refrigerant collides with the surface of the second plate 121 in the second return flow passage 12B of the first plate 112 to change its flow direction (arrow i).
  • the refrigerant having flown into the second return flow passage 12B travels to the end portion of the second return flow passage 12B and flows into the fifth flow passage 12C.
  • the refrigerant having flown into the fifth flow passage 12C travels straight (arrow j) in the fifth flow passage 12C in the same direction as the direction in which the refrigerant travels in the first flow passage 10A.
  • This refrigerant collides with the surface of the second plate 123 in the third branching flow passage 12D of the first plate 113 to vertically branch in the gravity direction (arrow k).
  • the refrigerant having branched in the third branching flow passage 12D travels to each of both end portions of the third branching flow passage 12D and flows into the pair of sixth flow passages 13A formed to communicate with the one third branching flow passage 12D.
  • the refrigerant having flown into the sixth flow passage 13A travels straight (arrow I) in the sixth flow passage 13A in a direction opposite to the direction in which the refrigerant travels in the fourth flow passage 12A. Then, the refrigerant flowing through the sixth flow passage 13A flows out of the sixth flow passage 13A (arrow m) and is uniformly distributed to each of the plurality of heat transfer tubes 4 via the flow passages of the retainer 5.
  • Embodiment 1 the description has been given, as an example, to the case where the refrigerant passes in a branching flow passage three times and is branched into eight flows, but the number of times the refrigerant branches is not particularly limited.
  • the distribution flow passage of the laminated header 2 repeatedly bends at a right angle and branches at a plurality of positions to reach the plurality of refrigerant outflow ports 2B.
  • a large amount of liquid film of the refrigerant unevenly exists at portions in the inner circumference of the flow passages in the bending portions and the branching portions of the flow passages due to the centrifugal force.
  • the refrigerant flows into the next branching flow passage in this state, a large amount of the liquid refrigerant unevenly flows into portions of the branching flow passages, and the two-phase gas-liquid refrigerant cannot be uniformly distributed to the plurality of heat transfer tubes 4.
  • a linear portion ensured to have a certain length is formed between the bending portion or the branching portion of the flow passage and a position at which the refrigerant flows into the next branching flow passage.
  • the first flow passage 10A, the second flow passages 11A, the third flow passages 11C, the fourth flow passages 12A, and the fifth flow passages 12C are each configured to have a length larger than the thickness of one plate. This configuration can ensure the straight-traveling portion for the refrigerant and during the passage in this portion, the liquid film in the uneven state is made uniform.
  • the refrigerant can be prevented from unevenly flowing in the next branching flow passage, and the two-phase gas-liquid refrigerant is uniformly distributed in all of the branching flow passages. Additionally, as the laminated header 2 includes the first return flow passages 11 B and the second return flow passages 12B, it is possible to equally distribute the two-phase gas-liquid refrigerant while achieving the size reduction.
  • the laminated header 2 has no other branching flow passage formed in the second flow passages 11A, the first return flow passages 11B, and the third flow passages 11C through which the first branching flow passage 10B communicates with the second branching flow passages 11D. That is, in the laminated header 2, the refrigerant branched in the first branching flow passage 10B is caused by the first return flow passage 11 B to flow in the reverse direction and reach the second branching flow passage 11D.
  • the laminated header 2 has no other branching flow passage formed in the fourth flow passages 12A, the second return flow passages 12B, and the fifth flow passages 12C through which the second branching flow passages 11 D communicate with the third branching flow passages 12D. That is, in the laminated header 2, the refrigerant branched in the second branching flow passages 11D is caused by the second return flow passages 12B to flow in the reverse direction and reach the third branching flow passages 12D.
  • an entrance distance from a branching point toward another branching point can be ensured to be long and each amount of the refrigerant after the branching can be made equal. That is, in the laminated header 2, the flow passage from the first branching flow passage 10B serving as the first branching point to the second branching flow passage 11D serving as the next branching point can be made longer than twice the thickness of the four plates, so that the straight-traveling portion for the refrigerant can be ensured and, in the straight-traveling portion, the liquid film in the uneven state can be made uniform.
  • the first branching flow passage 10B and the second branching flow passages 11D are formed in the first plate 114 having the eight through holes 13a-2 opened in the first plate 114.
  • the distance of the flow passage from the first branching flow passage 10B serving as the first branching point to the second branching flow passage 11 D serving as the next branching point can be made the same as a reciprocating distance. That is, in the laminated header 2, the distance of the flow passage between the branching points can be ensured to be long and each amount of the refrigerant after the branching can be made equal.
  • the opening positions of the eight through holes 13a-2 opened in the first plate 114 are not equally spaced but arranged in such a manner that two through holes are defined as one group.
  • a space between the groups is made wider than a space between two through holes 13a-2 defined as one group.
  • at least one of the through hole 10b serving as the first branching flow passage 10B and the through hole 11d serving as the second branching flow passage 11D is opened in the wider space between the through holes 13a-2, namely the space between the groups.
  • each of the first branching flow passage 10B and the second branching flow passages 11D can be disposed between corresponding two of the sixth flow passages 13A and other corresponding two of the sixth flow passages 13A, and the linear distance of the flow passage from the first branching flow passage 10B serving as the first branching point to the second branching flow passages 11D each serving as the next branching point can be made long. That is, in the laminated header 2, the entrance distance from a branching point toward another branching point can be ensured to be long and the rectifying effect of the liquid film can be further improved.
  • both the through hole 10b and the through holes 11d are opened in the first plate 114
  • either through hole may be opened in another plate.
  • the second branching flow passages 11D are each formed at a position that is closer to corresponding ones of the through holes 13a-2 than is the position of a corresponding one of the third branching flow passages 12D.
  • the entrance distance from each of the second branching flow passages 11D to a corresponding one of the third branching flow passages 12D can be ensured to be long and the rectifying effect of the liquid film can be further improved.
  • Embodiment 2 an example of a usage mode of the heat exchanger 1 according to Embodiment 1 will be described as Embodiment 2 of the present invention.
  • an air-conditioning apparatus 100 provided with the heat exchanger 1 according to Embodiment 1 will be described as an example of the refrigeration cycle apparatus.
  • the present invention is not limited to the case where the heat exchanger 1 is provided in the air-conditioning apparatus 100, and for example, the heat exchanger 1 may be provided in another refrigeration cycle apparatus including a refrigerant cycle circuit.
  • the air-conditioning apparatus 100 switches between a cooling operation and a heating operation, but the air-conditioning apparatus 100 is not limited to such a case and may perform only the cooling operation or the heating operation. In this case, it is not necessary to provide a four-way valve 22.
  • Fig. 6 is a circuit configuration diagram schematically illustrating an example of the refrigerant circuit configuration of the air-conditioning apparatus 100, which is an example of the refrigeration cycle apparatus according to Embodiment 2 of the present invention.
  • Embodiment 2 a difference from Embodiment 1 will be mainly described, and the same portion as in Embodiment 1 is provided with the same reference sign and the description of the same portion will be omitted.
  • the flow of the refrigerant during the cooling operation is indicated by a broken line arrow, and the flow of the refrigerant during the heating operation is indicated by a solid line arrow.
  • the air-conditioning apparatus 100 includes a compressor 21, the four-way valve 22, an outdoor heat exchanger 23, an expansion device 24, an indoor heat exchanger 25, an outdoor fan 26, an indoor fan 27, and a controller 28.
  • the compressor 21, the four-way valve 22, the outdoor heat exchanger 23, the expansion device 24, the outdoor fan 26, and the controller 28 are mounted in a heat-source-side unit.
  • the indoor heat exchanger 25 and the indoor fan 27 are mounted in a load-side unit.
  • expansion device 24 may be mounted in the load-side unit.
  • the controller may be mounted in the load-side unit. Further, the controller may be provided in each of both the heat-source-side unit and the load-side unit and may be communicable.
  • the compressor 21, the outdoor heat exchanger 23, the expansion device 24, and the indoor heat exchanger 25 are connected by a refrigerant pipe 20, to form a refrigerant cycle circuit.
  • the refrigerant pipe 20 includes the refrigerant pipe 20A and the refrigerant pipe 20B described in Embodiment 1.
  • the compressor 21 compresses refrigerant.
  • the refrigerant compressed by the compressor 21 is discharged and sent to the outdoor heat exchanger 23 or the indoor heat exchanger 25.
  • the compressor 21 is, for example, a rotary compressor, a scroll compressor, a screw compressor, or a reciprocating compressor.
  • the four-way valve 22 switches the flows of the refrigerant between the heating operation and the cooling operation. That is, the four-way valve 22 is switched to connect between the compressor 21 and the indoor heat exchanger 25 during the heating operation, and switched to connect between the compressor 21 and the outdoor heat exchanger 23 during the cooling operation. Note that a combination of two-way valves or three-way valves may be adopted in place of the four-way valve 22.
  • the outdoor heat exchanger 23 is used as a heat-source-side heat exchanger, acts as the evaporator during the heating operation, and acts as the condenser during the cooling operation. That is, when the outdoor heat exchanger 23 acts as the evaporator, in the outdoor heat exchanger 23, low-temperature low-pressure refrigerant having flown out of the expansion device 24 exchanges heat with air supplied by the outdoor fan 26, and low-temperature low-pressure liquid refrigerant or two-phase refrigerant is evaporated.
  • the outdoor fan 26 is used as a heat-source-side fan and supplies air to the outdoor heat exchanger 23.
  • the expansion device 24 expands and depressurizes the refrigerant having flown out of the outdoor heat exchanger 23 or the indoor heat exchanger 25.
  • the expansion device 24 may be, for example, an electric expansion valve capable of adjusting the flow rate of refrigerant.
  • the indoor heat exchanger 25 is used as a load-side heat exchanger, acts as the condenser during the heating operation, and acts as the evaporator during the cooling operation. That is, when the indoor heat exchanger 25 acts as the condenser, in the indoor heat exchanger 25, high-temperature high-pressure refrigerant having discharged from the compressor 21 exchanges heat with air supplied by the indoor fan 27, and high-temperature high-pressure gas refrigerant is condensed.
  • the indoor heat exchanger 25 acts as the evaporator
  • low-temperature low-pressure refrigerant having flown out of the expansion device 24 exchanges heat with air supplied by the indoor fan 27, and low-temperature low-pressure liquid refrigerant or two-phase refrigerant is evaporated.
  • the indoor fan 27 is used as a load-side fan and supplies air to the indoor heat exchanger 25.
  • the controller 28 integrally controls the entire operation of the air-conditioning apparatus 100. Specifically, in accordance with the content of the user's operation, the controller 28 controls the operation of each unit of the air-conditioning apparatus 100, namely, the compressor 21, the four-way valve 22, the expansion device 24, the outdoor fan 26, and the indoor fan 27, each of which is an actuator. Specifically, the actuators, a variety of unillustrated sensors, and other devices are connected to the controller 28, and the controller 28 controls the operation of the actuators while acquiring temperature information and pressure information, to perform an operation in accordance with the content of the user's operation. For example, the flow passages of the four-way valve 22 are switched by the controller 28, to switch between the cooling operation and the heating operation.
  • the controller 28 can be hardware such as a circuit device that achieves its function or can be an arithmetic unit such as a microcomputer and software executed on the arithmetic unit.
  • the refrigerant in the high-temperature high-pressure gas state is discharged from the compressor 21.
  • the refrigerant flows to follow the broken line arrow.
  • the high-temperature high-pressure gas refrigerant discharged from the compressor 21 flows into the outdoor heat exchanger 23 that acts as the condenser via the four-way valve 22.
  • the outdoor heat exchanger 23 the high-temperature high-pressure gas refrigerant having flown in exchanges heat with air supplied by the outdoor fan 26, and the high-temperature high-pressure gas refrigerant is condensed to become high-pressure liquid refrigerant.
  • the high-pressure liquid refrigerant having flown out of the outdoor heat exchanger 23 is brought into low-pressure two-phase gas-liquid refrigerant by the expansion device 24.
  • the low-pressure two-phase gas-liquid refrigerant flows into the indoor heat exchanger 25 that acts as the evaporator.
  • the indoor heat exchanger 25 the two-phase gas-liquid refrigerant having flown in exchanges heat with air supplied by the indoor fan 27, and the liquid refrigerant out of the refrigerant in the two-phase state is evaporated to become low-pressure gas refrigerant.
  • the air with its heat exchanged is supplied to an air-conditioned space by the indoor fan 27 to cool the air-conditioned space.
  • the low-pressure gas refrigerant having flown out of the indoor heat exchanger 25 flows into the compressor 21 via the four-way valve 22 and is compressed to become high-temperature high-pressure gas refrigerant, which is discharged again from the compressor 21. Hereinafter, this cycle is repeated.
  • the refrigerant in the high-temperature high-pressure gas state is discharged from the compressor 21.
  • the refrigerant flows to follow the solid line arrow.
  • the high-temperature high-pressure gas refrigerant discharged from the compressor 21 flows into the indoor heat exchanger 25 that acts as the condenser via the four-way valve 22.
  • the indoor heat exchanger 25 the high-temperature high-pressure gas refrigerant having flown in exchanges heat with air supplied by the indoor fan 27, and the high-temperature high-pressure gas refrigerant is condensed to become high-pressure liquid refrigerant.
  • the air with its heat exchanged is supplied to an air-conditioned space by the indoor fan 27 to heat the air-conditioned space.
  • the high-pressure liquid refrigerant sent out from the indoor heat exchanger 25 is brought into low-pressure two-phase gas-liquid refrigerant by the expansion device 24.
  • the low-pressure two-phase gas-liquid refrigerant flows into the outdoor heat exchanger 23 that acts as the evaporator.
  • the two-phase gas-liquid refrigerant having flown in exchanges heat with air supplied by the outdoor fan 26, and the liquid refrigerant out of the refrigerant in the two-phase state is evaporated to become low-pressure gas refrigerant.
  • the low-pressure gas refrigerant having flown out of the outdoor heat exchanger 23 flows into the compressor 21 via the four-way valve 22 and is compressed to become high-temperature high-pressure gas refrigerant, which is discharged again from the compressor 21. Hereinafter, this cycle is repeated.
  • the heat exchanger 1 according to Embodiment 1 is only required to be used for at least one of the outdoor heat exchanger 23 and the indoor heat exchanger 25, but as illustrated in Fig. 6 , the heat exchanger 1 according to Embodiment 1 may be used for both the outdoor heat exchanger 23 and the indoor heat exchanger 25.
  • the heat exchanger 1 When the heat exchanger 1 according to Embodiment 1 acts as the evaporator, the heat exchanger 1 is connected in such a manner that the refrigerant flows in from the laminated header 2 and flows out to the cylindrical header 3. That is, when the heat exchanger 1 acts as the evaporator, the refrigerant in the two-phase gas-liquid state flows into the laminated header 2 from the refrigerant pipe 20, branches, and flows into each heat transfer tube 4 of the heat exchanger 1. When the heat exchanger 1 acts as the condenser, the liquid refrigerant flows from each heat transfer tube 4, merges in the laminated header 2, and flows out to the refrigerant pipe 20.
  • the two-phase gas-liquid refrigerant is distributed to the laminated header 2 more uniformly to improve the heat exchange efficiency.
  • refrigerant used for the air-conditioning apparatus 100 is not particularly limited, and the effect can be exerted even when refrigerant such as R410A, R32, and HFO1234yf is used.
  • the working fluid As a working fluid, the examples of the air and the refrigerant have been shown, but the working fluid is not limited to the examples, and the same effect can be exerted even when other gases, liquids, or gas-liquid mixed fluids are used. That is, the working fluid varies and the effect can be exerted in any case.
  • the other examples of the refrigeration cycle apparatus include a water heater, a refrigerator, and an air-conditioning water-heater compound machine, and the heat exchange efficiency improves in any case.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
EP17902575.4A 2017-10-13 2017-10-13 Collecteur stratifié, échangeur thermique et dispositif à cycle de réfrigération Active EP3499169B1 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/037256 WO2019073610A1 (fr) 2017-10-13 2017-10-13 Collecteur stratifié, échangeur thermique et dispositif à cycle de réfrigération

Publications (3)

Publication Number Publication Date
EP3499169A1 true EP3499169A1 (fr) 2019-06-19
EP3499169A4 EP3499169A4 (fr) 2019-06-26
EP3499169B1 EP3499169B1 (fr) 2020-05-27

Family

ID=66100667

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17902575.4A Active EP3499169B1 (fr) 2017-10-13 2017-10-13 Collecteur stratifié, échangeur thermique et dispositif à cycle de réfrigération

Country Status (4)

Country Link
EP (1) EP3499169B1 (fr)
JP (1) JP6840262B2 (fr)
CN (1) CN111201415B (fr)
WO (1) WO2019073610A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11740026B2 (en) 2019-06-28 2023-08-29 Daikin Industries, Ltd. Heat exchanger and heat pump apparatus
EP4235059A4 (fr) * 2020-10-21 2023-11-29 Mitsubishi Electric Corporation Distributeur, échangeur de chaleur et dispositif de climatisation
US11913689B2 (en) 2019-06-28 2024-02-27 Daikin Industries, Ltd. Heat exchanger and heat pump device

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020262699A1 (fr) * 2019-06-28 2020-12-30 ダイキン工業株式会社 Échangeur de chaleur et appareil de pompe à chaleur
EP4095476B1 (fr) * 2020-01-23 2024-02-14 Mitsubishi Electric Corporation Échangeur de chaleur et appareil à cycle frigorifique
WO2023275936A1 (fr) * 2021-06-28 2023-01-05 三菱電機株式会社 Distributeur de réfrigérant, échangeur de chaleur, et dispositif à cycle de réfrigération
WO2023238233A1 (fr) * 2022-06-07 2023-12-14 三菱電機株式会社 Échangeur de chaleur à calandre, et dispositif à cycle frigorifique
EP4317898A1 (fr) * 2022-08-04 2024-02-07 Valeo Systemes Thermiques Collecteur
JP7426456B1 (ja) 2022-09-30 2024-02-01 ダイキン工業株式会社 室内熱交換器及び空気調和機

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5241839A (en) * 1991-04-24 1993-09-07 Modine Manufacturing Company Evaporator for a refrigerant
US5242016A (en) * 1992-04-02 1993-09-07 Nartron Corporation Laminated plate header for a refrigeration system and method for making the same
DE29517100U1 (de) * 1995-10-17 1997-02-13 Zimmer, Johannes, Klagenfurt Strömungsteilungs- und -umformungskörper
JPH09189463A (ja) * 1996-02-29 1997-07-22 Mitsubishi Electric Corp 熱交換器の分配装置及びその製造方法
CN105164489B (zh) * 2013-05-15 2018-03-20 三菱电机株式会社 层叠型集管、热交换器以及空调装置
CN105229404B (zh) * 2013-05-15 2018-07-17 三菱电机株式会社 层叠型联管箱、热交换器和空气调节装置
WO2014184912A1 (fr) * 2013-05-15 2014-11-20 三菱電機株式会社 Collecteur stratifié, échangeur thermique, et climatiseur
WO2014184913A1 (fr) * 2013-05-15 2014-11-20 三菱電機株式会社 Collecteur empilé, échangeur de chaleur et dispositif de climatisation
WO2014184915A1 (fr) * 2013-05-15 2014-11-20 三菱電機株式会社 Collecteur laminé, échangeur de chaleur, et climatiseur
US10222141B2 (en) * 2013-10-01 2019-03-05 Mitsubishi Electric Corporation Stacking type header, heat exchanger and air-conditioning apparatus
KR102031021B1 (ko) * 2014-11-04 2019-10-11 미쓰비시덴키 가부시키가이샤 적층형 헤더, 열교환기, 및, 공기 조화 장치

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11740026B2 (en) 2019-06-28 2023-08-29 Daikin Industries, Ltd. Heat exchanger and heat pump apparatus
US11913689B2 (en) 2019-06-28 2024-02-27 Daikin Industries, Ltd. Heat exchanger and heat pump device
EP4235059A4 (fr) * 2020-10-21 2023-11-29 Mitsubishi Electric Corporation Distributeur, échangeur de chaleur et dispositif de climatisation

Also Published As

Publication number Publication date
CN111201415B (zh) 2021-05-14
WO2019073610A1 (fr) 2019-04-18
CN111201415A (zh) 2020-05-26
JPWO2019073610A1 (ja) 2020-04-02
EP3499169B1 (fr) 2020-05-27
JP6840262B2 (ja) 2021-03-10
EP3499169A4 (fr) 2019-06-26

Similar Documents

Publication Publication Date Title
EP3499169B1 (fr) Collecteur stratifié, échangeur thermique et dispositif à cycle de réfrigération
US11629897B2 (en) Distributor, heat exchanger, and refrigeration cycle apparatus
CN110073154B (zh) 分配器、热交换器以及制冷循环装置
EP3205967B1 (fr) Échangeur thermique et dispositif de climatisation
EP3088830B1 (fr) Dispositif extérieur de type à pompe à chaleur avec échangeur de chaleur à plaques
EP2865982A1 (fr) Echangeur de chaleur et dispositif à cycle réfrigérant équipé de l'échangeur de chaleur
EP3217135B1 (fr) Collecteur stratifié, échangeur de chaleur et appareil de climatisation
EP2998678A1 (fr) Colonne stratifiée, échangeur de chaleur et climatiseur
CN109564070B (zh) 热交换器和使用它的制冷系统
CN109844439B (zh) 热交换器和使用该热交换器的制冷系统
EP3088831B1 (fr) Échangeur de chaleur et climatiseur
EP2998680A1 (fr) Colonne stratifiée, échangeur de chaleur, et climatiseur
EP3715732A1 (fr) Appareil de climatisation
JP2014020696A (ja) 空気調和機
CN110382978B (zh) 热交换器以及空调机
JP7112164B2 (ja) 冷媒分配器、熱交換器および空気調和装置
CN110285603B (zh) 热交换器和使用其的制冷系统
EP3112791B1 (fr) Collecteur stratifié, échangeur thermique et dispositif de climatisation
EP4163572A1 (fr) Distributeur de fluide frigorigène, échangeur de chaleur, et dispositif de climatisation

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20181001

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20190528

RIC1 Information provided on ipc code assigned before grant

Ipc: F25B 39/00 20060101ALI20190522BHEP

Ipc: F28F 9/02 20060101AFI20190522BHEP

Ipc: F25B 41/00 20060101ALI20190522BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20191216

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1274982

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200615

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017017489

Country of ref document: DE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200828

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200827

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200927

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200928

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20200527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200827

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1274982

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017017489

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20210302

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201013

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20201031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201031

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201031

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201031

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20201013

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230512

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230831

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230830

Year of fee payment: 7