EP3391355A1 - Infrastrukturausbau - Google Patents
InfrastrukturausbauInfo
- Publication number
- EP3391355A1 EP3391355A1 EP16704405.6A EP16704405A EP3391355A1 EP 3391355 A1 EP3391355 A1 EP 3391355A1 EP 16704405 A EP16704405 A EP 16704405A EP 3391355 A1 EP3391355 A1 EP 3391355A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- investment
- construction
- construction project
- network
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/06—Asset management; Financial planning or analysis
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/10—Payment architectures specially adapted for electronic funds transfer [EFT] systems; specially adapted for home banking systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q20/00—Payment architectures, schemes or protocols
- G06Q20/08—Payment architectures
- G06Q20/16—Payments settled via telecommunication systems
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/01—Detecting movement of traffic to be counted or controlled
- G08G1/0104—Measuring and analyzing of parameters relative to traffic conditions
- G08G1/0108—Measuring and analyzing of parameters relative to traffic conditions based on the source of data
- G08G1/012—Measuring and analyzing of parameters relative to traffic conditions based on the source of data from other sources than vehicle or roadside beacons, e.g. mobile networks
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/01—Detecting movement of traffic to be counted or controlled
- G08G1/0104—Measuring and analyzing of parameters relative to traffic conditions
- G08G1/0137—Measuring and analyzing of parameters relative to traffic conditions for specific applications
- G08G1/0141—Measuring and analyzing of parameters relative to traffic conditions for specific applications for traffic information dissemination
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/09—Arrangements for giving variable traffic instructions
- G08G1/0962—Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
- G08G1/0967—Systems involving transmission of highway information, e.g. weather, speed limits
- G08G1/096708—Systems involving transmission of highway information, e.g. weather, speed limits where the received information might be used to generate an automatic action on the vehicle control
- G08G1/096716—Systems involving transmission of highway information, e.g. weather, speed limits where the received information might be used to generate an automatic action on the vehicle control where the received information does not generate an automatic action on the vehicle control
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/09—Arrangements for giving variable traffic instructions
- G08G1/0962—Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
- G08G1/0967—Systems involving transmission of highway information, e.g. weather, speed limits
- G08G1/096733—Systems involving transmission of highway information, e.g. weather, speed limits where a selection of the information might take place
- G08G1/096741—Systems involving transmission of highway information, e.g. weather, speed limits where a selection of the information might take place where the source of the transmitted information selects which information to transmit to each vehicle
-
- G—PHYSICS
- G08—SIGNALLING
- G08G—TRAFFIC CONTROL SYSTEMS
- G08G1/00—Traffic control systems for road vehicles
- G08G1/09—Arrangements for giving variable traffic instructions
- G08G1/0962—Arrangements for giving variable traffic instructions having an indicator mounted inside the vehicle, e.g. giving voice messages
- G08G1/0967—Systems involving transmission of highway information, e.g. weather, speed limits
- G08G1/096766—Systems involving transmission of highway information, e.g. weather, speed limits where the system is characterised by the origin of the information transmission
- G08G1/096775—Systems involving transmission of highway information, e.g. weather, speed limits where the system is characterised by the origin of the information transmission where the origin of the information is a central station
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/02—Services making use of location information
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/02—Services making use of location information
- H04W4/029—Location-based management or tracking services
Definitions
- the invention relates to the expansion of an infrastructure.
- the invention relates to the organization and prioritization of a construction project in an infrastructure network.
- a road network is set up for the public use of persons who, for example, use the road network
- a motor vehicle may be equipped with an electronic assistant or an information system to improve the driving of the motor vehicle on the road network.
- the motor vehicle may include a wireless interface for receiving and outputting information relating to a local traffic situation.
- a stationary component is often required, which can be attributed to the road network.
- a communication between the motor vehicle and a stationary infrastructure is to be carried out (car-to-infrastructure, C2I)
- C2I car-to-infrastructure
- an infrastructure must be present and operated in the area of a section of the road network in order to enable the data exchange.
- a transmitting device which is connected to a control system for traffic lights, and a rec ⁇ catch device on board a motor vehicle in this Be ⁇ rich
- the transport network is usually by public
- Hand operated which usually provides only small funds for the development of a technical infrastructure of the road network. This allows advanced technologies that may be helpful to all users of the transport network and be slowed down.
- the invention has for its object to provide a technology for the development of an infrastructure that supports in particular the dissemination of a technical system that includes fixed and mobile system components.
- the invention solves this problem by means of the objects of the independent claims. Subclaims give preferred embodiments again.
- An apparatus comprises a database containing information about construction projects for an infrastructure network, each construction project being assigned a geographical area to which the construction project relates. Furthermore, the device comprises an interface for communication with a mobile terminal of a user and a processing device. The processing device is configured to determine the position of the mobile terminal, to transmit information about a construction project whose associated geographical area comprises the position to the mobile terminal, and to receive an investment instruction of a user of the mobile device for carrying out the construction project.
- a road user can immediately make a personal investment for a construction project that relates to a geographical area where he is located. This allows the user to actively intervene in the prioritization of construction projects. If enough users make an investment for a construction project, this construction project can be carried out immediately.
- a developer for the construction project such as an administration or a government, may have to cope with a reduced planning or organizational effort.
- An operator of the device may claim for their use a remuneration, optionally from a user, an implementer of the construction project or can be collected from both.
- a large number of construction projects can be organized in one central location.
- the construction projects can be managed by different organizations that share a common database.
- a user may also effect a purposeful investment in ignorance of the responsibility of an organization. This allows a direct and transparent allocation between the investment and a noticeable effect on the user when using the infrastructure network after completion of the construction project.
- the device can be used in particular by means of a mobile end ⁇ device that a user performs with it at ⁇ game as a smartphone.
- a mobile terminal can be mounted on board a motor vehicle, via which the device can be contacted.
- a road user can make an investment decision at his current location in the infrastructure network, for example on the basis of a currently available usage situation (eg traffic jam).
- the investment instruction preferably relates to a mo ⁇ netdens amount and the processing means is adapted to carry out a transfer of the amount from an account of the user.
- the device may be configured to directly effect a money transfer or the transfer of a monetary unit from the user to a dedicated account.
- the user's account and the account earmarked each may include allowing the displacement of a monetary unit, for example a bank account, a virtual wallet (Bitcoin) or a He ⁇ sentence or comparison currency.
- the aim of the transfers it is in any case to provide for the implementation of the construction project he ⁇ ford variable sum immediately available, so-that the construction project can be started without further raising the money.
- means for extending a building project may be GESAM ⁇ melt in the manner described, this is not yet completed. This can be useful for ⁇ play, in large construction projects, which are divided into several phases or sections, or in the case ei ⁇ ner subsequent increase in costs.
- a method includes steps of determining a position of a mobile device, detecting a construction project for an infrastructure network, the construction project a geographical area concerned of the infrastructure network is assigned, which includes the position of transmitting of Informa ⁇ functions on the building project to the mobile device , and receiving an investment instruction of a user of the mobile device to carry out the construction project.
- the method may in particular be used, in ⁇ investments such as funds to support a construction project on the infrastructure network to collect.
- ⁇ investments such as funds to support a construction project on the infrastructure network to collect.
- the information about the construction project can include virtually any type of information. However, it is preferred that in particular such information is included that can facilitate an investment decision. To a required for the implementation of the project investment, an investment already Chryslerge ⁇ exempt investment instructions to carry out an investment of investment instructions are still necessary or a number of unanswered investment instructions may include, in particular.
- the infrastructure network preferably comprises a transport network ⁇ and more preferably a road network. The method can be used by anyone who has access to a mobile terminal whose position in the area of the infrastructure network can be determined. In another
- Embodiment may also be the retrieval of information about a construction project and the transmission of an investment decision from a terminal that is not located in the affected area ⁇ be supported. This approach is similar to that of a standard crowdfunding portal.
- the information includes an indication of an intended impact of the construction project on traffic in the affected area of the infrastructure network. For example, in connection with a construction project, it can be stated that a reduction of an average waiting time of a
- a computer program product comprises program code means for carrying out the described method when it runs on a processor or is stored on a computer-readable medium.
- FIG. 3 shows a flowchart of a method.
- 1 shows a system 100.
- An infrastructure network 105 is shown as a traffic network, in particular as a road network.
- the infrastructure network 105 is usually set up for use by persons 110 who can use the infrastructure network 105 in different ways.
- egg ⁇ ne first person 110 may be on foot, a second egg in ⁇ nem motor vehicle 115, and a third means of another means of transport such as a bicycle, Mo torrads or a bus.
- a mobile terminal 120 during use of the infrastructure network 105, which may be embodied, for example, as a smartphone or as a fixed or removable device installed on board the motor vehicle 115.
- the mobile terminal 120 includes a wireless interface that is particularly adapted for communication with a device 125, which will be described in more detail below.
- the communication with the device 125 may, for example onstik over a wireless communication such as WLAN, carried a portion of the Internet or a Mo ⁇ bilfunknetz.
- the person 110 may, while using the infrastructure network 105, inform himself about a construction project 130 relating to the place where the person 110 is currently staying.
- the position 155 of the person 110 or of the mobile terminal 120 is preferably determined and, for example, sent to the device 125 together with an information request.
- the device 125 comprises a wireless interface 135, a processing device 140 and a database 145, in which information about construction projects 130 is stored on the infrastructure network 105. If the mobile terminal 120 is not configured to determine its location 155, the location 155 may be entered by the individual 110 in one embodiment. In another embodiment, the position 155 may also be estimated based on connection parameters incurred in wireless communication with the device 125, for example.
- the radio cell used can be identified by the device 125. The position 155 of the person 110 or of the mobile terminal 120 is then located in the detected radio cell, for example in its geometric center.
- Each construction project 130 relates to a predetermined geographical area 150 of the infrastructure network 105.
- the region 150 can, for example, the intersection shown umfas ⁇ sen.
- the area 150 along ei ⁇ nes traffic route of the infrastructure network 105.
- the extending portion 150 in other cases, however, such as circular, elliptical or rectangular in shape.
- the region 150 includes all traffic routes which are affected by the construction plan ⁇ 130th This can include more areas can be defined 150 that do not necessarily have to hang together ⁇ .
- An assumed position 155 of the person 110 or of the mobile device 120 is shown by way of example.
- the device 125 determines one or more construction 130 whose assigned geographical areas 150, respectively, the position 155 of the user 110 or the mobile device 120 umfas ⁇ sen.
- a comparison is made whether the position 155 of the user 110 and the mobile Einrich- tung 120 is located or in the field 150 of a construction 130 is not, on the basis of a unique identifier, wherein ⁇ play a multiple-digit number or string.
- a position 155 one or more identifiers are determined, which refer respectively to a region 150 of the infrastructure network 105 in this case ⁇ game as a road segment, an intersection, a Un ⁇ ter adjustment or particular by a polygon region.
- Each building project 130 may have one or more such Identifiers are assigned, so that the determination of building projects 130 based on identifiers can be performed easily and efficiently.
- the determination of a game, in ⁇ Euclidean distance between a position of 155 and a region 150 can thus be saved as part of the look-up of the construction project 130th
- Each building project 130 is associated with further information, which is preferably stored in the database 145. This information can then be transmitted by the device 125 to the mobile device 120 of the person 110. This allows the individual 110 to get an idea of which building projects 130 can improve the use of the infrastructure network 105 at the location 155 it is currently located in, and ideally also in what way. If the person 110, for example, the impression that a traffic light in the area 150 (in the example shown, the intersection) that allows crossing a road very slowly, it may un ⁇ be ter modifier in the described manner of building projects 130, the traffic situation in the area 150 and may be able to remedy the malady perceived by the person 110.
- Such a construction project 130 may comprise, for example, the transmission of a traffic light phase of a traffic light installation at the illustrated intersection to mobile terminals 120 in the area 150.
- the construction projects 130 are usually coupled to the provision of predetermined resources.
- a construction 130 can only start or only turnedge- leads, if financing of the project is 130 si ⁇ cheromb. It can be expected that more construction projects 130 exist than can be covered or financed by an operator of the infrastructure network 105.
- the person 110 may decide to make an investment for a particular construction project 130. Part of the resources required for the realization of the construction project 130, in particular a financial can be covered. If there are sufficient persons 110 who would like to make such an investment, the investment required to carry out the construction project 130 can be achieved, so that the construction project 130 can be realized.
- the user is transmitted 110 by the mobile Endge ⁇ Raets 120 an investment instruction to the device 125 that an indication of an excessively active investment - includes and an indication of the associated building project 130 - a resource, usually in the form of cash.
- the device 125 may forward the investment instruction by an optional interface 160 to an executing Institute, beispielswei ⁇ se a bank of the user 110 or a financial institution for execution.
- the device can also perform the investment even 125 by 110 ei ⁇ ne resource, usually money is transferred to an account or retracted in particular from a user's account that is available for the realization of the construction 130 is available.
- the infrastructure network 105 again comprises a traffic network, in particular a road network of a fictitious and exemplary small town.
- the infrastructure network 105 includes a stadium 205, a traffic light 210 on a street near the stadium 205 and an intersection 215, also close to the stadium 205.
- An exemplary assumed position 155 of the user 110 or of his mobile terminal 120 is shown.
- Traffic light 210 depending on traffic situation and major events
- the above-mentioned roadside unit can in particular comprise a stationary ⁇ fixed communication device which is addressed one for communication with vehicles 115 or mobile terminals 120th One thereby enabling communication Zvi ⁇ European transport operators and infrastructure is also called C2I communications.
- Capital and operating costs of such a roadside unit must usually attributed to advertising where ei ⁇ nes section of the infrastructure network 105 to.
- for a desired technique that can act for example traffic relief that Ausstat ⁇ system of motor vehicles 115 with communication and processing infrastructure systems and the equipment of the infrastructure network 105 with one or more roadside units.
- Areas 150 associated with the construction projects 220 and 225 overlap each other and comprise the position 155. If, for example, the user 110 now finds himself in an unsatisfactory traffic situation at the position 155, he is able to negotiate the two construction projects 220 and 225 and decide for themselves whether they would like to make an investment for the realization of either or both of them. In doing so, he can make his decision dependent on information that is given as an example in the tables above. In other embodiments, other or further information may be available for the construction projects 220, 225, such as a site map, an information graphic, a simulation, statistical data, and so forth. Advantageously, it may be irrelevant for the user 110, which person or institution for the
- a position 155 of the terminal 120 or the user 110 is determined.
- This item 155 will be Preferably, together with a request in a step 310 to the device 125 transmitted.
- the position 155 of the user 110 and the mobile terminal 120 in different ways can be loaded true that can be alternatively used for the method 300th
- one or more building projects 130 are determined, whose respectively assigned areas 150 include the specific position 155.
- the construction projects 130 are preferably stored in a database 145, so that the determination of the construction projects 130 may comprise a query of the database 145.
- information about building projects 130 was preferably entered into the database 145 before the process 400 expired.
- the definition of building project 130 usually precedes the incorporation of the information into the database 145.
- information is preferably obtained in a subsequent step 320. This information can be found in particular from the database 145. After being acquired, the information is transmitted to the mobile terminal 120 of the user 110 in a step 325.
- the user 110 may then take on the basis of the received information an investment decision for one or more construction 130 and emit a corresponding Investiti ⁇ ON INSTRUCTIONS.
- the investment instruction preferably comprises a legally binding decision, a predetermined resource, usually a selectable amount through the Benut ⁇ zer 110 money to provide for the realization of the construction project 130 are available.
- the investment instruction is preferably acquired in a step 330 and further preferably transmitted to the device 125 in a step 335.
- the device 125 may update information about the construction project 130 that is affected by the investment instruction.
- information stored in the database 145 can provide a financing status of the construction project 130 to update information that is affected by the investment instruction.
- the investment instruction may be forwarded or effected in a step 345. In both cases, it is ensured that the released resource is provided to the person 110 for the realization of the construction project 130.
- the device 125 can also check whether the already arrived investment sum, ie the sum of all funds already provided for the construction project 130, is already sufficient for the realization of the construction project 130.
- the construction project 130 may be released for execution in a step 355, and the possibility of making another investment for the construction project 130 may be suspended.
- the information about the building project 130 is deleted from the database 145.
Landscapes
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Atmospheric Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Computer Networks & Wireless Communication (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Signal Processing (AREA)
- Primary Health Care (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- General Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Technology Law (AREA)
- Traffic Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Telephonic Communication Services (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/EP2016/051948 WO2017129258A1 (de) | 2016-01-29 | 2016-01-29 | Infrastrukturausbau |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP3391355A1 true EP3391355A1 (de) | 2018-10-24 |
Family
ID=55357961
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP16704405.6A Withdrawn EP3391355A1 (de) | 2016-01-29 | 2016-01-29 | Infrastrukturausbau |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20190043131A1 (de) |
| EP (1) | EP3391355A1 (de) |
| CN (1) | CN108604406A (de) |
| WO (1) | WO2017129258A1 (de) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114117170B (zh) * | 2021-10-26 | 2025-02-11 | 深圳市华阳国际工程设计股份有限公司 | 一种区域建筑特征的确定方法、装置、终端及存储介质 |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001067594A (ja) * | 1999-08-31 | 2001-03-16 | Hitachi Ltd | 放送方法、及び、装置、ならびに、交通情報編集装置、及び、交通情報提示システム |
| US6353398B1 (en) * | 1999-10-22 | 2002-03-05 | Himanshu S. Amin | System for dynamically pushing information to a user utilizing global positioning system |
| US6414602B2 (en) * | 2000-03-28 | 2002-07-02 | Lenny Polyakov | System of advertising |
| US20060241987A1 (en) * | 2004-12-22 | 2006-10-26 | Hntb Corporation | Communication of project information |
| US8233919B2 (en) * | 2009-08-09 | 2012-07-31 | Hntb Holdings Ltd. | Intelligently providing user-specific transportation-related information |
| US20130297387A1 (en) * | 2012-05-01 | 2013-11-07 | Joseph Michael | Systems and methods for monitoring, managing, and facilitating communications and/or transactions relating to transportation infrastructure utilization |
-
2016
- 2016-01-29 CN CN201680080199.0A patent/CN108604406A/zh active Pending
- 2016-01-29 US US16/073,858 patent/US20190043131A1/en not_active Abandoned
- 2016-01-29 WO PCT/EP2016/051948 patent/WO2017129258A1/de not_active Ceased
- 2016-01-29 EP EP16704405.6A patent/EP3391355A1/de not_active Withdrawn
Also Published As
| Publication number | Publication date |
|---|---|
| CN108604406A (zh) | 2018-09-28 |
| US20190043131A1 (en) | 2019-02-07 |
| WO2017129258A1 (de) | 2017-08-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE102011120965B4 (de) | Informationserfassungssystem unter Verwendung von Mehrfachfunk-Telematikvorrichtungen | |
| DE102011116972B4 (de) | Intelligente Telematik-Informationsverbreitung unter Verwendung von Delegations-, Abruf- und Weitergabealgorithmen | |
| DE60219473T2 (de) | Verbessertes verfahren und system zum abbilden von verkehrsvoraussagen in bezug auf telematik- und routenleitanwendungen | |
| EP2953111B1 (de) | Verfahren und vorrichtung zur ermittlung freier abstellplätze auf lkw-parkplätzen und mitteilung an lkw-fahrer | |
| DE102020100024A1 (de) | Verwendung von geofences zur einschränkung des fahrzeugbetriebs | |
| DE112016003722T5 (de) | Systeme und verfahren zum einstellen von fahrplänen und strecken für mitfahrgelegenheiten | |
| DE102012210800A1 (de) | Kontextbasierte Verkehrsflusssteuerung | |
| DE102018111070B4 (de) | Verfahren zum Betreiben eines Kraftfahrzeugs zur Verbesserung von Arbeitsbedingungen von Auswerteeinheiten des Kraftfahrzeugs, Steuersystem zum Durchführen eines derartigen Verfahrens sowie Kraftfahrzeug mit einem derartigen Steuersystem | |
| DE102021126050A1 (de) | Dynamische auswahl von haltepunkten eines autonomen fahrzeugs | |
| EP3178079A1 (de) | Parkplatzmanagement | |
| DE102022102098A1 (de) | Systeme und verfahren zur fahrerassistenzoptimierung unter verwendung von künstlicher intelligenz | |
| EP3789983A1 (de) | Zentralisierte regulierung eines verkehrsflusses | |
| DE102021203732B4 (de) | Verfahren zur Verbesserung der funktionalen Sicherheit kooperativer Fahrmanöver und elektronische Kontrollvorrichtung | |
| DE102019130494A1 (de) | Verfahren und vorrichtung zum adaptiven einsatz von temporären verkehrsregelungsmassnahmen und navigationsreaktion | |
| DE112021003100T5 (de) | Verfahren zum Verwalten der Verteilung eines zum Ankunftspunkt fahrenden Fahrzeug, dazu verwendeter Verwaltungsserver, und Aufzeichnungsmedium, auf dem Programm zum Ausführen des Verfahrens aufgezeichnet ist | |
| DE112016001079T5 (de) | Vorrichtung und Verfahren zur Klassifizierung von Straßenabschnitten basierend auf ihrer Eignung für Platooning | |
| DE102015211051A1 (de) | Verfahren zum Bereitstellen von Informationen betreffend Parkplätze | |
| EP3391355A1 (de) | Infrastrukturausbau | |
| DE102014203226A1 (de) | Verfahren und System zum Bereitstellen von Eingangsdaten für ein Verkehrsmodell eines Verkehrsnetzes | |
| DE102021105580A1 (de) | Verfahren zum Bereitstellen eines freien Parkplatzes | |
| DE112011105919T5 (de) | Karteninformations-Verarbeitungsvorrichtung | |
| DE10131526B4 (de) | Verfahren und Vorrichtung zur Ansteuerung eines Assistenzsystems für ein Fahrzeug | |
| DE102018217610A1 (de) | Verfahren zur Luftqualitätsoptimierung, Steuerung, Fahrzeug und System zur Durchführung des Verfahrens | |
| DE112022002882T5 (de) | Fahrzeugsteuersystem und elektronische steuervorrichtung | |
| DE60105079T2 (de) | Informationsempfänger und -bereitstellungsgerät mit Standortübermittlung des Empfängers |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20180717 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS MOBILITY GMBH |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: G08G 1/0967 20060101ALI20190328BHEP Ipc: G06Q 20/10 20120101ALI20190328BHEP Ipc: G06Q 50/08 20120101ALI20190328BHEP Ipc: G06Q 40/06 20120101ALI20190328BHEP Ipc: G08G 1/01 20060101ALI20190328BHEP Ipc: H04W 4/02 20180101ALI20190328BHEP Ipc: G06Q 20/16 20120101ALI20190328BHEP Ipc: H04W 4/029 20180101AFI20190328BHEP |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| 17Q | First examination report despatched |
Effective date: 20190415 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20190827 |