EP3147410B1 - Construction method and structure of pressure dispersing expansion head anchor rod - Google Patents

Construction method and structure of pressure dispersing expansion head anchor rod Download PDF

Info

Publication number
EP3147410B1
EP3147410B1 EP15795723.4A EP15795723A EP3147410B1 EP 3147410 B1 EP3147410 B1 EP 3147410B1 EP 15795723 A EP15795723 A EP 15795723A EP 3147410 B1 EP3147410 B1 EP 3147410B1
Authority
EP
European Patent Office
Prior art keywords
cement
cut
paste
anchor
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP15795723.4A
Other languages
German (de)
French (fr)
Other versions
EP3147410A4 (en
EP3147410A1 (en
Inventor
Jianming Zhou
Liangkui CHENG
Huiju FAN
Mingxiang DU
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Ng Foundation Engineering Co Ltd
Original Assignee
Suzhou Ng Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Ng Foundation Engineering Co Ltd filed Critical Suzhou Ng Foundation Engineering Co Ltd
Publication of EP3147410A1 publication Critical patent/EP3147410A1/en
Publication of EP3147410A4 publication Critical patent/EP3147410A4/en
Application granted granted Critical
Publication of EP3147410B1 publication Critical patent/EP3147410B1/en
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Definitions

  • the present invention relates to a construction method of a jet spouting anchor and a structure of the spouting anchor, belonging to the technical field of soil drilling of fixed buildings.
  • Jet spouting anchoring is an effective soil body supporting, protecting and reinforcing technology, has been widely applied at home and abroad, and has advantages of low cost, quick effect, etc.
  • a traditional jet spouting anchor is provided with a 5-10 long anchoring segment.
  • the cement in the anchoring segment accounts for 12%-18%, and the strength of cement soil is relatively low in the 7-30 days. Due to the low strength, the anchor cannot be made into a pressure-type anchor, and can only be made as a tension-type anchor.
  • the anti-pulling force of the anchor is provided by the lateral friction force between the anchoring segment and soil body.
  • the anti-pulling force of the anchor is usually low, obviously low in the soft soil, which fails to meet the engineering requirements of the tension standard for the short maintenance period of the anchor. Meanwhile, the tension-type anchor cables cannot be recycled through dismantling the core. Therefore, the traditional jet spouting anchor cannot be recycled through dismantling the core.
  • the traditional jet spouting anchor always suffers from the problems of low anti-pulling force and failure to recycling through dismantling the core, which seriously affect the application of the traditional jet spouting anchor.
  • the construction method of the traditional jet spouting anchor is as follows: 1) A three-blade bit is used to perform water jet spouting, wherein the aperture is 150-200mm; the jet spouting is deep to the anchor bottom, without water pressure; 2) the drill rod and the bit exist, and a drill rod with a high-pressure nozzle is used to push the anchor body into an anchor hole; 3) after the anchor body is pushed in place, high-pressure cement paste jet spouting is carried out at a pressure of 15-25MPa; the drill rod exists along with the jet spouting; the jet spouted part is the traditional anchoring segment; the anchoring segment is 8-12m long; jet spouting is carried out one more time at a segment about 0.5-1m away from the end of the anchoring segment; the anchoring segment has a cement content of 110kg per meter; and 4) after the jet spouting of the anchoring segment ends, the drill rod exists.
  • the structure of a foundation pit support formed by a traditional jet spouting anchor and concrete pile walls includes a water-pressure jet spouting cut-drilling segment 1 and a cement-paste jet spouting cut-drilling segment 2.
  • the cement paste in the cement-paste jet spouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and one end of each of anchor cables 3, and the other end of each of the anchor cables 3 passes through the water-pressure jet spouting cut-drilling segment 1 and is fixed at an anchor head.
  • the maintenance period of the anchor is merely about 7-21 days.
  • the early strength of the anchor refers to the strength of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 in the 7-12 days.
  • the drilling speed of the drill rod of the traditional jet spouting anchor in the cement paste in the cement-paste jet spouting cut-drilling segment 2 is 25-50cm/min. Due to the quick jet spouting speed of the drill rod, the maximum inner diameter of the cross section of the formed cement paste in the cement-paste jet spouting cut-drilling segment 2 is similar to the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1.
  • the cement in the cement paste in the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 of the traditional jet spouting anchor accounts for 12%-18%, and the anti-pulling force of the traditional jet spouting anchor is generated by the friction force between piles and the soil body, so the traditional jet spouting anchor belongs to a tension-type anchor.
  • the cement paste in the cement-paste jet spouting cut-drilling segment 2 is formed to be relatively long, thereby resulting in slow hardening of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 and low early strength of the traditional jet spouting anchor, and failing to provide sufficient anti-pulling bearing capability. Therefore, the traditional jet spouting anchor has a low anti-pulling force.
  • GB 1304916A relates to a device for making holes to accommodate pile anchors or other anchoring devices, comprising a tube replaceably containing a ram tool consisting of a shaft, a cylindrical portion which is a sliding fit in the tube, and a ramming point.
  • the bottom of the tube may have a cutting edge or as shown a wedge piece. Impacts are applied to a block on top of the tube and tool.
  • the ram tool On reaching different strata the ram tool may be replaced by a flushing lance or a drill or auger.
  • the anchoring device comprises a drill or auger inserted in the hole and surrounded by a hardening mass with optionally tube being removed.
  • the first technical problem to be solved by the present invention is to, aiming at defects in the prior art, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor which has high early cement coil hardening strength and a high anti-pulling bearing capacity.
  • the second technical problem to be solved by the present invention is to, on the basis of the first technical problem, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor with anchor cables which can be recycled by dismantling cores.
  • the first technical solution provided by the present invention to solve the first technical problem is a construction method of a pressure-dispersion type bit expanded anchor, wherein a drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside, and the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment.
  • the cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4 ⁇ 8crnlmin, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
  • the amount of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%.
  • the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
  • the cement soil in the cement-paste jet grouting cut-drilling segment gets hardened and fixes an anchor cable carrier and anchor cables; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
  • the content of the cement mixed in the cement soil in the cement-paste-pressure jet grouting cut-drilling segment is determined according to the mass percentage of the soil body in the cement-paste-pressure jet grouting cut-drilling segment as required in the design.
  • the mass of the soil body per stere is generally 1,600-2,000kg.
  • the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%; and when the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  • the drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn;
  • the cement-paste-pressure jet grouting type cut-drilling is the one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
  • the present invention provides a pressure type anchor, while the traditional jet spouting anchor is a tension type anchor, different in the stressing mechanism.
  • the anti-pulling resistance of the anchor provided by the present invention depends on the lateral friction force of the hardened cement soil in the cement-paste-pressure jet spouting cut-drilling segment and the end bearing capability generated by the cross section of the hardened cement soil, greatly improving the anti-pulling capability.
  • the technology can be utilized in a stable soil layer as an anchoring segment, thereby giving a full play to the end bearing capability of the pressure-type anchor and ensuing small discreteness of the anti-pulling force.
  • the drilling speed of the drill rod in the present invention is controlled to be 4-8cm/min, far smaller than the jet spouting cut-drilling speed of the traditional jet spouting anchor, so the maximum inner diameter of the cross section of the cement-paste-pressure jet spouting cut-drilling segment is 600-800mm.
  • the bearing capability of a single anchor cable is enhanced, increasing safety rating and improving the initial pre-stress of the anchor at the same time. Therefore, the deformation of supporting and protecting structures can be better controlled.
  • the cement-paste-pressure jet spouting cut-drilling of the present invention is one-time drilling, and the cement-paste-pressure jet spouting cut-drilling of the traditional jet spouting anchor is two-level drilling.
  • the present invention reduces the drilling times.
  • the present invention directly gets the point, so the cement-paste-pressure jet grouting cut-drilling segment has advantages of a small length, a large diameter and a high cement ratio, directly enhancing the cement soil strength and early strength of the anchoring segment of the anchor of the present invention.
  • the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced, and the long-existing problems of low cement soil strength and low early strength of the traditional jet spouting anchor, and problem of failure to manufacture the pressure are completely solved.
  • the second technical solution provided by the present invention to solve the first technical problem is a structure of a pressure-dispersion type bit expanded anchor, wherein the construction method of a pressure-dispersion type bit expanded anchor according to claim 1 is adopted to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment gets hardened and encloses an anchor cable carrier and an anchor cable; the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4
  • the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%.
  • the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  • the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment;
  • the anchor cables are anchor cables provided with membranes;
  • the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; and the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cable.
  • the stress is dispersed when at least two anchor cable carrier is adopted, so the anchor belongs to a load-dispersing type anchor.
  • anchor cables are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape, and after the engineering construction is ended, one end of each of the anchor cables can be released through the hinge type carrier to recover the anchor cables;
  • each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable, and after the engineering construction is ended, one end of each of the anchor cables can be released through the fused anchor fixture, which means that the present invention can recover the anchor cables by dismantling the core, and the traditional jet spouting anchor cannot recover the anchor cables by dismantling the core.
  • the anchor is provided with membranes, and the anchor cables are non-adhesive anchor cables, so all the front ends of all the anchor cable carriers are free ends, capable improving the requirements for the initial pre-stress on the anchor of the present invention (1.1 times the designed value, 1.0 time higher than the standard value), thereby realizing testing of every cable, reducing the pit displacement and achieving the effect safer than supports.
  • the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • the second change of the first technical solution is as follows: The drill rod brings the anchor cable carrier and the anchor cable in when drilling.
  • the third change of the first technical solution is as follows: After the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
  • the fourth change of the first technical solution is as follows: The tensioning and locking strength of the pressure-type anchor is greater than 2Mpa.
  • the fifth change of the first technical solution is as follows:
  • the inner diameter of the cross section of the water-pressure jet-spouting cut-drilling segment is 150-200mm.
  • the sixth change of the first technical solution is as follows:
  • the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
  • the seventh change of the first technical solution is as follows: When the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
  • the eighth change of the first technical solution is as follows:
  • the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
  • the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment;
  • the anchor cables are anchor cables provided with membranes;
  • the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • the second change of the second technical solution is as follows:
  • the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment;
  • the anchor cables are anchor cables provided with membranes;
  • the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • the third change of the second technical solution is as follows:
  • the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
  • the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.
  • a construction method of a pressure-dispersion type bit expanded anchor of this embodiment adopts a drill rod to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside, the drill rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment 2.
  • the cement-paste-pressure jet grouting type cut-drilling segment 2 is one-time cut-drilling segment; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4.
  • the content of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 30%-40%.
  • the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 15%-30%.
  • the cement soil in the cement-paste jet grouting cut-drilling segment 2 gets hardened and fixes an anchor cable carrier and anchor cables 3; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
  • the pressure-type anchor of the present invention refers to the pressure-type anchor defined in the Technical Specification for Ground Anchors (Cables) issued by the Standardization Institute of Chinese Construction enacted Technical specification.
  • the anchor cables 3 of the present invention can be steel strands, etc.
  • the anchor cables 3 are provided with membranes.
  • the anchor cables 3 provided with the membranes can be steel strands sheathed with plastic.
  • the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of a traditional jet spouting anchor is 20-40cm/min, and the length of the cement-paste jet grouting cut-drilling segment 2 is 8-12m; sometimes, jet spouting is executed one more time at a segment which is 0.5-1m away from the end of the cement-paste jet grouting cut-drilling segment 2; the inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 200-300mm, and the content of the cement mixed in the cement soil reserved in the cement-paste jet grouting cut-drilling segment 2 is 12%-18%.
  • the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of the pressure-dispersion type bit expanded anchor is 4-8cm/min; the maximum inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 600-800mm; when the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, and the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
  • the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2;
  • the anchor cables 3 are anchor cables provided with membranes;
  • the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
  • the anchor cable carriers may be two, three or more.
  • the drill rod brings the anchor cable carrier and the anchor cables 3 in when drilling.
  • the tensioning and locking strength of the pressure type anchor is greater than 2Mpa.
  • the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1 is 150-200mm.
  • the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
  • the cement-paste-pressure jet grouting cut-drilling segment 2 is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
  • the length ratio of the cement-paste jet grouting cut-drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
  • a structure of a pressure-dispersion type bit expanded anchor is provided in this embodiment, wherein the construction method of a pressure-dispersion type bit expanded anchor is adopted to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and an anchor cable 3; the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4.
  • the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 is 30%-40%.
  • the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  • the anchor cable carriers in this embodiment are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
  • the anchor cable carriers may be two, three or more.
  • the length ratio of the cement-paste jet grouting cut-drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
  • the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.spa or above.
  • the construction method and the structure of the pressure-dispersion type bit expanded anchor rod in this embodiment are compared with those of the traditional jet spouting anchor, as shown in table 1: Table 1 Characteristics Pressure-dispersion type bit expanded anchor rod in this embodiment Traditional jet spouting anchor Steel strand Not adhesive Adhesive Stressing mechanism Pressure type Tension type Early cement strength High Low Recyclable through core dismantling Recyclable Not recyclable Length of the water-pressure jet grouting cut-drilling segment Long Short Displacement control performance High Low
  • the cement-paste jet grouting cut-drilling segment 2 has a small length, a large diameter and a high cement content and is quick in cement hardening, directly improving the structure strength of the pressure-dispersion type bit expanded anchor and the early strength of the structure of the pressure-dispersion type bit expanded anchor, in particular improving the early anti-pulling capability of the cement-paste jet grouting cut-drilling segment 2.
  • the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced.
  • the cement soil strength age of the silty clay increases.
  • the strength of the cement soil can reach design requirements after 7-15 days, equivalent to the strength of the traditional jet spouting anchor after 28-50 days.
  • the strength of the cement soil of the pressure-dispersion type bit expanded anchor of the present invention is far higher than the strength of the cement soil of the traditional jet spouting anchor.
  • the anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2;
  • the anchor cables 3 are anchor cables provided with membranes;
  • the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
  • the anchor cable carrier and the anchor cables 3 are brought into the cement-paste jet grouting cut-drilling segment 2 in the non-jet-spouting state; a casing technology can be employed to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, or the drill rod can be used to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, etc.
  • the anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

    BACKGROUND OF THE INVENTION TECHNICAL FIELD
  • The present invention relates to a construction method of a jet spouting anchor and a structure of the spouting anchor, belonging to the technical field of soil drilling of fixed buildings.
  • DESCRIPTION OF THE RELATED ART
  • Jet spouting anchoring is an effective soil body supporting, protecting and reinforcing technology, has been widely applied at home and abroad, and has advantages of low cost, quick effect, etc. A traditional jet spouting anchor is provided with a 5-10 long anchoring segment. The cement in the anchoring segment accounts for 12%-18%, and the strength of cement soil is relatively low in the 7-30 days. Due to the low strength, the anchor cannot be made into a pressure-type anchor, and can only be made as a tension-type anchor. The anti-pulling force of the anchor is provided by the lateral friction force between the anchoring segment and soil body. Limited by the low strength of the cement soil of the anchoring segment, the anti-pulling force of the anchor is usually low, obviously low in the soft soil, which fails to meet the engineering requirements of the tension standard for the short maintenance period of the anchor. Meanwhile, the tension-type anchor cables cannot be recycled through dismantling the core. Therefore, the traditional jet spouting anchor cannot be recycled through dismantling the core. The traditional jet spouting anchor always suffers from the problems of low anti-pulling force and failure to recycling through dismantling the core, which seriously affect the application of the traditional jet spouting anchor.
  • The construction method of the traditional jet spouting anchor is as follows: 1) A three-blade bit is used to perform water jet spouting, wherein the aperture is 150-200mm; the jet spouting is deep to the anchor bottom, without water pressure; 2) the drill rod and the bit exist, and a drill rod with a high-pressure nozzle is used to push the anchor body into an anchor hole; 3) after the anchor body is pushed in place, high-pressure cement paste jet spouting is carried out at a pressure of 15-25MPa; the drill rod exists along with the jet spouting; the jet spouted part is the traditional anchoring segment; the anchoring segment is 8-12m long; jet spouting is carried out one more time at a segment about 0.5-1m away from the end of the anchoring segment; the anchoring segment has a cement content of 110kg per meter; and 4) after the jet spouting of the anchoring segment ends, the drill rod exists.
  • See FIG. 1 and FIG. 2. The structure of a foundation pit support formed by a traditional jet spouting anchor and concrete pile walls includes a water-pressure jet spouting cut-drilling segment 1 and a cement-paste jet spouting cut-drilling segment 2. The cement paste in the cement-paste jet spouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and one end of each of anchor cables 3, and the other end of each of the anchor cables 3 passes through the water-pressure jet spouting cut-drilling segment 1 and is fixed at an anchor head.
  • During construction, due to the needs of the construction period, the maintenance period of the anchor is merely about 7-21 days. In this way, the early strength of the anchor refers to the strength of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 in the 7-12 days. After making tests repeatedly, the applicant found that the traditional jet spouting anchor has the following problems:
  • The drilling speed of the drill rod of the traditional jet spouting anchor in the cement paste in the cement-paste jet spouting cut-drilling segment 2 is 25-50cm/min. Due to the quick jet spouting speed of the drill rod, the maximum inner diameter of the cross section of the formed cement paste in the cement-paste jet spouting cut-drilling segment 2 is similar to the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1. Besides, the cement in the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 of the traditional jet spouting anchor accounts for 12%-18%, and the anti-pulling force of the traditional jet spouting anchor is generated by the friction force between piles and the soil body, so the traditional jet spouting anchor belongs to a tension-type anchor. For this reasons, in order to provide sufficient pulling bearing capability, the cement paste in the cement-paste jet spouting cut-drilling segment 2 is formed to be relatively long, thereby resulting in slow hardening of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 and low early strength of the traditional jet spouting anchor, and failing to provide sufficient anti-pulling bearing capability. Therefore, the traditional jet spouting anchor has a low anti-pulling force.
  • GB 1304916A relates to a device for making holes to accommodate pile anchors or other anchoring devices, comprising a tube replaceably containing a ram tool consisting of a shaft, a cylindrical portion which is a sliding fit in the tube, and a ramming point. The bottom of the tube may have a cutting edge or as shown a wedge piece. Impacts are applied to a block on top of the tube and tool. On reaching different strata the ram tool may be replaced by a flushing lance or a drill or auger. The anchoring device comprises a drill or auger inserted in the hole and surrounded by a hardening mass with optionally tube being removed.
  • BRIEF SUMMARY OF THE INVENTION
  • The first technical problem to be solved by the present invention is to, aiming at defects in the prior art, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor which has high early cement coil hardening strength and a high anti-pulling bearing capacity.
  • The second technical problem to be solved by the present invention is to, on the basis of the first technical problem, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor with anchor cables which can be recycled by dismantling cores.
  • The first technical solution provided by the present invention to solve the first technical problem is a construction method of a pressure-dispersion type bit expanded anchor, wherein a drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside, and the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment.
  • The cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4∼8crnlmin, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
  • When the soil is clay, silty clay or floury soil, the amount of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%.
  • when the soil is sandy soil, the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
  • The cement soil in the cement-paste jet grouting cut-drilling segment gets hardened and fixes an anchor cable carrier and anchor cables; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
  • In the present invention, the content of the cement mixed in the cement soil in the cement-paste-pressure jet grouting cut-drilling segment is determined according to the mass percentage of the soil body in the cement-paste-pressure jet grouting cut-drilling segment as required in the design. The mass of the soil body per stere is generally 1,600-2,000kg. When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%; and when the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  • According to the present invention, the drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn; the cement-paste-pressure jet grouting type cut-drilling is the one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
  • 1) The present invention provides a pressure type anchor, while the traditional jet spouting anchor is a tension type anchor, different in the stressing mechanism. The anti-pulling resistance of the anchor provided by the present invention depends on the lateral friction force of the hardened cement soil in the cement-paste-pressure jet spouting cut-drilling segment and the end bearing capability generated by the cross section of the hardened cement soil, greatly improving the anti-pulling capability. The technology can be utilized in a stable soil layer as an anchoring segment, thereby giving a full play to the end bearing capability of the pressure-type anchor and ensuing small discreteness of the anti-pulling force.
  • 2) The drilling speed of the drill rod in the present invention is controlled to be 4-8cm/min, far smaller than the jet spouting cut-drilling speed of the traditional jet spouting anchor, so the maximum inner diameter of the cross section of the cement-paste-pressure jet spouting cut-drilling segment is 600-800mm. In this way, the bearing capability of a single anchor cable is enhanced, increasing safety rating and improving the initial pre-stress of the anchor at the same time. Therefore, the deformation of supporting and protecting structures can be better controlled.
  • 3) The cement-paste-pressure jet spouting cut-drilling of the present invention is one-time drilling, and the cement-paste-pressure jet spouting cut-drilling of the traditional jet spouting anchor is two-level drilling. The present invention reduces the drilling times.
  • 4) When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, AND the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%, far higher than the content of the mixed cement mixed in the cement paste in the traditional jet spouting anchor structure, equivalent to that, without increase in the cement amount, the cement is completely used in a 2-4m cement-paste-pressure jet grouting cut-drilling segment to perform high-cement-ratio jet spouting replacement in the present invention. The present invention directly gets the point, so the cement-paste-pressure jet grouting cut-drilling segment has advantages of a small length, a large diameter and a high cement ratio, directly enhancing the cement soil strength and early strength of the anchoring segment of the anchor of the present invention. During actual engineering construction, the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced, and the long-existing problems of low cement soil strength and low early strength of the traditional jet spouting anchor, and problem of failure to manufacture the pressure are completely solved.
  • 5) The cement paste in the cement-paste-pressure jet grouting cut-drilling segment overflows to fill in a part of the water-pressure jet spouting cut-drilling segment, and the content of the mixed cement of the part in the water-pressure jet spouting cut-drilling segment is (5%-10%), so the strength is higher than the original soil.
  • The second technical solution provided by the present invention to solve the first technical problem is a structure of a pressure-dispersion type bit expanded anchor, wherein the construction method of a pressure-dispersion type bit expanded anchor according to claim 1 is adopted to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment gets hardened and encloses an anchor cable carrier and an anchor cable; the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4:
  • When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%.
  • When the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  • In order to solve the second technical problem, the present invention makes the following improvement on the above technical solution: the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • 1) The anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; and the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cable. Compared with the prior art where a single anchor cable carrier fixes a plurality of anchor cables, the stress is dispersed when at least two anchor cable carrier is adopted, so the anchor belongs to a load-dispersing type anchor. 2) When the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape, and after the engineering construction is ended, one end of each of the anchor cables can be released through the hinge type carrier to recover the anchor cables; when the when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable, and after the engineering construction is ended, one end of each of the anchor cables can be released through the fused anchor fixture, which means that the present invention can recover the anchor cables by dismantling the core, and the traditional jet spouting anchor cannot recover the anchor cables by dismantling the core. 3) The anchor is provided with membranes, and the anchor cables are non-adhesive anchor cables, so all the front ends of all the anchor cable carriers are free ends, capable improving the requirements for the initial pre-stress on the anchor of the present invention (1.1 times the designed value, 1.0 time higher than the standard value), thereby realizing testing of every cable, reducing the pit displacement and achieving the effect safer than supports.
  • The first change of the first technical solution is as follows: The anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • The second change of the first technical solution is as follows: The drill rod brings the anchor cable carrier and the anchor cable in when drilling.
  • The third change of the first technical solution is as follows: After the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
  • The fourth change of the first technical solution is as follows: The tensioning and locking strength of the pressure-type anchor is greater than 2Mpa.
  • The fifth change of the first technical solution is as follows: The inner diameter of the cross section of the water-pressure jet-spouting cut-drilling segment is 150-200mm.
  • The sixth change of the first technical solution is as follows: The water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
  • The seventh change of the first technical solution is as follows: When the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
  • The eighth change of the first technical solution is as follows: The length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
  • The first change of the second technical solution is as follows: The anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • The second change of the second technical solution is as follows: The anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  • The third change of the second technical solution is as follows: The length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
  • As a change of the above technical solution: The cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.
  • The applicant found that, compared with cements with a common strength rating, for example, the cement with a rating of P.o.42.5, the high-mark cement with a strength rating 52.5Mpa or above can obviously improve the early bearing capability of the anchor and improve the early strength of the anchor.
  • BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
  • The present invention is described in further detail with reference to the attached drawings.
    • FIG. 1 is a structural view of a traditional jet-spouting anchor.
    • FIG. 2 is a structural view of a foundation pit support formed by the traditional jet-spouting anchor and concrete pile walls.
    • FIG. 3 is structural view of a pressure-dispersion type bit expanded anchor according to an embodiment of the present invention.
    • FIG. 4 is a structural view of a foundation pit support formed by the pressure-dispersion type bit expanded anchor and concrete pile walls.
    • FIG. 5 is a schematic view of structures of a water-pressure jet spouting cut-drilling segment and a cement-paste-pressure jet spouting cut-drilling segment of the traditional jet spouting anchor.
    • FIG. 6 is a schematic view of structures of a water-pressure jet spouting cut-drilling segment and a cement-paste-pressure jet spouting cut-drilling segment of the pressure-dispersion type bit expanded anchor of the present invention.
    • FIG. 7 is a comparison diagram of the strength-age increase of the structure of the pressure-dispersion type bit expanded anchor of the present invention and the structure of the traditional jet spouting anchor.
    DETAILED DESCRIPTION OF THE INVENTION EMBODIMENT
  • A construction method of a pressure-dispersion type bit expanded anchor of this embodiment, as shown in FIG. 3 and FIG. 4, adopts a drill rod to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside, the drill rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment 2.
  • The cement-paste-pressure jet grouting type cut-drilling segment 2 is one-time cut-drilling segment; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4.
  • When the soil is clay, silty clay or floury soil, the content of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 30%-40%.
  • When the soil is sandy soil, the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 15%-30%.
  • The cement soil in the cement-paste jet grouting cut-drilling segment 2 gets hardened and fixes an anchor cable carrier and anchor cables 3; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
  • The pressure-type anchor of the present invention refers to the pressure-type anchor defined in the Technical Specification for Ground Anchors (Cables) issued by the Standardization Institute of Chinese Construction enacted Technical specification.
  • The anchor cables 3 of the present invention can be steel strands, etc. The anchor cables 3 are provided with membranes. The anchor cables 3 provided with the membranes can be steel strands sheathed with plastic.
  • As shown in FIG. 5 and FIG. 6, the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of a traditional jet spouting anchor is 20-40cm/min, and the length of the cement-paste jet grouting cut-drilling segment 2 is 8-12m; sometimes, jet spouting is executed one more time at a segment which is 0.5-1m away from the end of the cement-paste jet grouting cut-drilling segment 2; the inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 200-300mm, and the content of the cement mixed in the cement soil reserved in the cement-paste jet grouting cut-drilling segment 2 is 12%-18%. According to the present invention, the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of the pressure-dispersion type bit expanded anchor is 4-8cm/min; the maximum inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 600-800mm; when the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, and the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3. The anchor cable carriers may be two, three or more.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the drill rod brings the anchor cable carrier and the anchor cables 3 in when drilling.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the tensioning and locking strength of the pressure type anchor is greater than 2Mpa.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1 is 150-200mm.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, when the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment 2, the cement-paste-pressure jet grouting cut-drilling segment 2 is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
  • According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the length ratio of the cement-paste jet grouting cut-drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
  • A structure of a pressure-dispersion type bit expanded anchor is provided in this embodiment, wherein the construction method of a pressure-dispersion type bit expanded anchor is adopted to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and an anchor cable 3; the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4.
  • When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 is 30%-40%.
  • When the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  • The anchor cable carriers in this embodiment are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3. The anchor cable carriers may be two, three or more.
  • In this embodiment, the length ratio of the cement-paste jet grouting cut-drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
  • In this embodiment, the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.spa or above.
  • The construction method and the structure of the pressure-dispersion type bit expanded anchor rod in this embodiment are compared with those of the traditional jet spouting anchor, as shown in table 1: Table 1
    Characteristics Pressure-dispersion type bit expanded anchor rod in this embodiment Traditional jet spouting anchor
    Steel strand Not adhesive Adhesive
    Stressing mechanism Pressure type Tension type
    Early cement strength High Low
    Recyclable through core dismantling Recyclable Not recyclable
    Length of the water-pressure jet grouting cut-drilling segment Long Short
    Displacement control performance High Low
  • It can be seen that, by the construction method and structure of the pressure-dispersion type bit expanded anchor in this embodiment, the cement-paste jet grouting cut-drilling segment 2 has a small length, a large diameter and a high cement content and is quick in cement hardening, directly improving the structure strength of the pressure-dispersion type bit expanded anchor and the early strength of the structure of the pressure-dispersion type bit expanded anchor, in particular improving the early anti-pulling capability of the cement-paste jet grouting cut-drilling segment 2. During actual engineering construction, the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced.
  • When the construction method and structure of the pressure-dispersion type bit expanded anchor in this embodiment are applied to the silty clay soil, the cement soil strength age of the silty clay increases. As shown in FIG. 7, by the structure of the pressure-dispersion type bit expanded anchor of the present invention, the strength of the cement soil can reach design requirements after 7-15 days, equivalent to the strength of the traditional jet spouting anchor after 28-50 days. Moreover, in the same maintenance age, the strength of the cement soil of the pressure-dispersion type bit expanded anchor of the present invention is far higher than the strength of the cement soil of the traditional jet spouting anchor.
  • The present invention is not limited to the above embodiment. For example: 1) Of course, when the construction method of the pressure-dispersion type bit expanded anchor in this embodiment adopts one anchor cable carrier, the anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3. 2) According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, after the drill rod ends the cut-drilling through cement paste jet spouting and exits, the anchor cable carrier and the anchor cables 3 are brought into the cement-paste jet grouting cut-drilling segment 2 in the non-jet-spouting state; a casing technology can be employed to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, or the drill rod can be used to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, etc. 3) The anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.

Claims (14)

  1. A construction method of a pressure-dispersion type bit expanded anchor, a drill rod performing cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment (1) and a cement-paste-pressure jet grouting cut-drilling segment (2) which communicate with each other from the inside to the outside, the drill rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, wherein
    cement soil in the cement-paste jet grouting cut-drilling segment gets hardened and fixes an anchor cable carrier and anchor cables (3); and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days;
    characterized in that the cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4;
    when the soil is clay, silty clay or floury soil, the amount of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%;
    when the soil is sandy soil, the amount of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%;.
  2. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, wherein the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  3. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, wherein the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  4. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the drill rod brings the anchor cable carrier and the anchor cable in when drilling.
  5. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein after the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
  6. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
  7. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein when the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
  8. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
  9. The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.
  10. A structure of a pressure-dispersion type bit expanded anchor according to claim 1, the construction method of a pressure-dispersion type bit expanded anchor being adopted to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside, the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment getting hardened and enclosing an anchor cable carrier and an anchor cable, characterized in that, the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4;
    when the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%;
    when the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
  11. The structure of a pressure-dispersion type bit expanded anchor according to claim 10, wherein the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  12. The structure a pressure-dispersion type bit expanded anchor according to claim 10, wherein the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
  13. The structure a pressure-dispersion type bit expanded anchor according to claim 10, 11 or 12, wherein the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
  14. The structure a pressure-dispersion type bit expanded anchor according to claim 10, 11 or 12, wherein the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 525Mpa or above.
EP15795723.4A 2014-05-21 2015-05-11 Construction method and structure of pressure dispersing expansion head anchor rod Not-in-force EP3147410B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410216623.2A CN104032737B (en) 2014-05-21 2014-05-21 Construction method and the structure of pressure dispersing type enlarged footing anchor pole
PCT/CN2015/078695 WO2015176614A1 (en) 2014-05-21 2015-05-11 Construction method and structure of pressure dispersing expansion head anchor rod

Publications (3)

Publication Number Publication Date
EP3147410A1 EP3147410A1 (en) 2017-03-29
EP3147410A4 EP3147410A4 (en) 2017-04-12
EP3147410B1 true EP3147410B1 (en) 2017-12-27

Family

ID=51463714

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15795723.4A Not-in-force EP3147410B1 (en) 2014-05-21 2015-05-11 Construction method and structure of pressure dispersing expansion head anchor rod

Country Status (4)

Country Link
EP (1) EP3147410B1 (en)
JP (1) JP6285078B2 (en)
CN (1) CN104032737B (en)
WO (1) WO2015176614A1 (en)

Families Citing this family (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8112871B2 (en) 2009-09-28 2012-02-14 Tyco Healthcare Group Lp Method for manufacturing electrosurgical seal plates
US8512371B2 (en) 2009-10-06 2013-08-20 Covidien Lp Jaw, blade and gap manufacturing for surgical instruments with small jaws
US8597295B2 (en) 2010-04-12 2013-12-03 Covidien Lp Surgical instrument with non-contact electrical coupling
US8469991B2 (en) 2010-06-02 2013-06-25 Covidien Lp Apparatus for performing an electrosurgical procedure
US8430877B2 (en) 2010-06-02 2013-04-30 Covidien Lp Apparatus for performing an electrosurgical procedure
US8814864B2 (en) 2010-08-23 2014-08-26 Covidien Lp Method of manufacturing tissue sealing electrodes
US8685009B2 (en) 2011-05-16 2014-04-01 Covidien Lp Thread-like knife for tissue cutting
US8968283B2 (en) 2011-05-19 2015-03-03 Covidien Lp Ultrasound device for precise tissue sealing and blade-less cutting
US8852185B2 (en) 2011-05-19 2014-10-07 Covidien Lp Apparatus for performing an electrosurgical procedure
US9039732B2 (en) 2011-07-11 2015-05-26 Covidien Lp Surgical forceps
US8864795B2 (en) 2011-10-03 2014-10-21 Covidien Lp Surgical forceps
US9492221B2 (en) 2011-10-20 2016-11-15 Covidien Lp Dissection scissors on surgical device
US8968310B2 (en) 2011-11-30 2015-03-03 Covidien Lp Electrosurgical instrument with a knife blade lockout mechanism
US9113897B2 (en) 2012-01-23 2015-08-25 Covidien Lp Partitioned surgical instrument
US8968360B2 (en) 2012-01-25 2015-03-03 Covidien Lp Surgical instrument with resilient driving member and related methods of use
US9375282B2 (en) 2012-03-26 2016-06-28 Covidien Lp Light energy sealing, cutting and sensing surgical device
US9820765B2 (en) 2012-05-01 2017-11-21 Covidien Lp Surgical instrument with stamped double-flange jaws
US9113901B2 (en) 2012-05-14 2015-08-25 Covidien Lp Modular surgical instrument with contained electrical or mechanical systems
US9526564B2 (en) 2012-10-08 2016-12-27 Covidien Lp Electric stapler device
US9681908B2 (en) 2012-10-08 2017-06-20 Covidien Lp Jaw assemblies for electrosurgical instruments and methods of manufacturing jaw assemblies
US9375259B2 (en) 2012-10-24 2016-06-28 Covidien Lp Electrosurgical instrument including an adhesive applicator assembly
US9572529B2 (en) 2012-10-31 2017-02-21 Covidien Lp Surgical devices and methods utilizing optical coherence tomography (OCT) to monitor and control tissue sealing
US9498281B2 (en) 2012-11-27 2016-11-22 Covidien Lp Surgical apparatus
US9713491B2 (en) 2013-02-19 2017-07-25 Covidien Lp Method for manufacturing an electrode assembly configured for use with an electrosurigcal instrument
US9655673B2 (en) 2013-03-11 2017-05-23 Covidien Lp Surgical instrument
US9456863B2 (en) 2013-03-11 2016-10-04 Covidien Lp Surgical instrument with switch activation control
US10070916B2 (en) 2013-03-11 2018-09-11 Covidien Lp Surgical instrument with system and method for springing open jaw members
US9649151B2 (en) 2013-05-31 2017-05-16 Covidien Lp End effector assemblies and methods of manufacturing end effector assemblies for treating and/or cutting tissue
WO2015017991A1 (en) 2013-08-07 2015-02-12 Covidien Lp Bipolar surgical instrument
US9445865B2 (en) 2013-09-16 2016-09-20 Covidien Lp Electrosurgical instrument with end-effector assembly including electrically-conductive, tissue-engaging surfaces and switchable bipolar electrodes
US9943357B2 (en) 2013-09-16 2018-04-17 Covidien Lp Split electrode for use in a bipolar electrosurgical instrument
US9687295B2 (en) 2014-04-17 2017-06-27 Covidien Lp Methods of manufacturing a pair of jaw members of an end-effector assembly for a surgical instrument
CN104032737B (en) * 2014-05-21 2016-05-04 苏州市能工基础工程有限责任公司 Construction method and the structure of pressure dispersing type enlarged footing anchor pole
US10080606B2 (en) 2014-09-17 2018-09-25 Covidien Lp Method of forming a member of an end effector
CN106498943B (en) * 2015-09-08 2019-03-05 宏润建设集团股份有限公司 Disposable high-pressure rotary-spray type enlarged footing Prestressed Soil anchor pole construction method
US10631887B2 (en) 2016-08-15 2020-04-28 Covidien Lp Electrosurgical forceps for video assisted thoracoscopic surgery and other surgical procedures
US11172980B2 (en) 2017-05-12 2021-11-16 Covidien Lp Electrosurgical forceps for grasping, treating, and/or dividing tissue
CN107143358B (en) * 2017-06-28 2024-04-09 山东省地质矿产勘查开发局八0一水文地质工程地质大队(山东省地矿工程勘察院) Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof
CN107513996A (en) * 2017-10-20 2017-12-26 上海智平基础工程有限公司 A kind of anchorage and its construction method of recoverable prestressed anchor cable
US11109930B2 (en) 2018-06-08 2021-09-07 Covidien Lp Enhanced haptic feedback system
CN109322623A (en) * 2018-10-19 2019-02-12 广州市第二建筑工程有限公司 A kind of pile machine equipment and construction method of major diameter rotary churning pile
CN110055974A (en) * 2019-04-24 2019-07-26 兰州理工大学 A kind of recyclable miniature steel pipe pile soil nailing combined support structure and its recovery method
CN111560952A (en) * 2019-12-31 2020-08-21 刘晓理 Fusion structure of umbrella-shaped expansion device and free-cutting anchor rod or recyclable anchor rod cable
US11622804B2 (en) 2020-03-16 2023-04-11 Covidien Lp Forceps with linear trigger mechanism
CN113323031A (en) * 2021-05-17 2021-08-31 宇旺建工集团有限公司 Construction method of high-pressure rotary spraying and cloth bag expanding anti-floating anchor rod
CN113529709A (en) * 2021-08-13 2021-10-22 深圳百勤建设工程有限公司 Pressure type anchor rod construction method and pressure type anchor rod
CN113585289A (en) * 2021-09-18 2021-11-02 中冶建工集团有限公司 Support method for collapse soil deep foundation pit
CN113914313A (en) * 2021-10-27 2022-01-11 贵州建工集团第一建筑工程有限责任公司 Finite depth anchor cable construction method under complex geological condition
CN113931179A (en) * 2021-10-27 2022-01-14 贵州建工集团第一建筑工程有限责任公司 Anchor cable pore-forming and grouting construction method
CN114435538B (en) * 2022-01-26 2023-05-05 南京林业大学 Device and method for reversely pulling shelling growth type fish mine anchors
CN114547806B (en) * 2022-03-03 2024-05-03 中国地质科学院探矿工艺研究所 Self-bearing anchor cable design method considering anchor-rock interaction

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2403643A (en) * 1944-02-25 1946-07-09 George L Dresser Method of and apparatus for introducing grout into subsoil
DE1922744A1 (en) * 1969-05-03 1970-11-05 Mueller Ludwig Device for creating a cavity in a building site with very different soil layers for pile foundation or anchoring purposes
DE3824955A1 (en) * 1988-07-22 1990-01-25 Gkn Keller Gmbh Method of producing ground anchors
US5203127A (en) * 1991-06-28 1993-04-20 Olthoff John R Earth anchor
US5348424A (en) * 1992-02-07 1994-09-20 Railway Technical Research Institute Reinforcing block for excavation work and method of construction thereof
JP2804236B2 (en) * 1994-12-14 1998-09-24 東興建設株式会社 Anchor construction method and device
JP3103038B2 (en) * 1996-11-29 2000-10-23 構造工事株式会社 Expanded bottom anchor method
JP2000345560A (en) * 1999-06-07 2000-12-12 Hiromitsu Utsunomiya Building structure of ground anchor its building method
JP3904779B2 (en) * 1999-11-15 2007-04-11 鉱研工業株式会社 Ground improvement type anchor method and ground improvement combined drilling machine
NL1015346C2 (en) * 2000-05-31 2001-12-03 Visser & Smit Bouw Bv Removal method for free anchor length of grouted anchor sunk into the ground, involves heating free anchor length to form point of weakness
JP4591878B2 (en) * 2004-02-10 2010-12-01 株式会社複合技術研究所 Reinforcement structure of existing retaining wall and reinforcement method for existing retaining wall
CN100371533C (en) * 2005-07-19 2008-02-27 曾庆义 Construction method of high pressure jet expansion head anchor rod and its device
CN101575854B (en) * 2009-06-10 2010-10-20 陕西中机岩土工程有限责任公司 High-pressure jet grouting enlarged footing anchor rod and construction method thereof
CN203530988U (en) * 2013-08-12 2014-04-09 中国建筑第四工程局有限公司 One-time forming major-diameter anchor rod foundation pit supporting structure
CN103526754A (en) * 2013-09-30 2014-01-22 中国建筑第八工程局有限公司 Method for constructing head-expanded anchoring rod in sand-rich decomposed rock
CN104032737B (en) * 2014-05-21 2016-05-04 苏州市能工基础工程有限责任公司 Construction method and the structure of pressure dispersing type enlarged footing anchor pole
CN203866824U (en) * 2014-05-21 2014-10-08 苏州市能工基础工程有限责任公司 Pressure-dispersing type expansion anchor rod structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
JP6285078B2 (en) 2018-02-28
EP3147410A4 (en) 2017-04-12
WO2015176614A1 (en) 2015-11-26
CN104032737A (en) 2014-09-10
EP3147410A1 (en) 2017-03-29
CN104032737B (en) 2016-05-04
JP2017516936A (en) 2017-06-22

Similar Documents

Publication Publication Date Title
EP3147410B1 (en) Construction method and structure of pressure dispersing expansion head anchor rod
CN103088819B (en) Construction prestressed cable method
CN201704689U (en) Four-corner-reinforced pre-stressed anchor rope head for reinforcing rock slope
CN103147440B (en) Construction prestressed cable method
CN105064356B (en) Prestressed composite rod cable anchoring device for supporting soft loose soil body
CN104775428A (en) Compound-type prestressed anchor cable structure and construction method thereof
CN104895072B (en) A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method
EP3135821B1 (en) Structure of permanent anchor
CN104790394A (en) Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure
WO2020151347A1 (en) Prefabricated prestressed anchor structure
CN102080377B (en) Composite anchor rod and guide construction method thereof
RU83517U1 (en) SOIL ANCHOR
CN111379581B (en) Deep roadway prestress full-anchor support construction equipment and construction method thereof
EP2893139B1 (en) Arrangement for the high-strength anchorage of a tendon having a tie rod in a structural element and method for producing an anchorage of this type
CN104372793A (en) Anti-floating method used for existing basement by adopting pre-stressed anchor cables in jet grouting pile method
CN218813685U (en) Self-advancing anchor rod prestress applying device
CN205529907U (en) P -type anchorage device at fixed end
CN204327134U (en) A kind of prestressing force balance anchor cable
CN109853730A (en) A kind of novel precast reinforced concrete frame joint and its method of construction
KR101853185B1 (en) Pile grouting device for enhanced friction of skin
CN203866824U (en) Pressure-dispersing type expansion anchor rod structure
CN205062813U (en) But ground tackle of recovery type anchor rope
CN201661305U (en) Friction type anchor rod capable of being recovered
EP3336258B1 (en) End anchorage for a soil and/or rock anchor
CN208816155U (en) The prestressing force grouting cable anchor of breaking surrounding rock roadway support

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20161221

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20170310

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 5/74 20060101AFI20170306BHEP

Ipc: E02D 5/80 20060101ALI20170306BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
INTG Intention to grant announced

Effective date: 20170804

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 958412

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015007055

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180327

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20171227

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 958412

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180327

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180427

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015007055

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

26N No opposition filed

Effective date: 20180928

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171227

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20150511

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180511

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20211124

Year of fee payment: 7

Ref country code: DE

Payment date: 20211124

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20211126

Year of fee payment: 7

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602015007055

Country of ref document: DE

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220511

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220511