RU83517U1 RU2009104996/22U RU2009104996U RU83517U1 RU 83517 U1 RU83517 U1 RU 83517U1 RU 2009104996/22 U RU2009104996/22 U RU 2009104996/22U RU 2009104996 U RU2009104996 U RU 2009104996U RU 83517 U1 RU83517 U1 RU 83517U1
Authority
RU
Russia
Prior art keywords
rod
tubular
anchor
tubular rod
nut
Prior art date
Application number
RU2009104996/22U
Other languages
Russian (ru)
Inventor
Алексей Генрихович Малинин
Original Assignee
Алексей Генрихович Малинин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Алексей Генрихович Малинин filed Critical Алексей Генрихович Малинин
Priority to RU2009104996/22U priority Critical patent/RU83517U1/en
Application granted granted Critical
Publication of RU83517U1 publication Critical patent/RU83517U1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Грунтовый анкер, включающий трубчатую тягу с защитной оболочкой из пластмассы на ее боковой поверхности, цементный камень, жестко закрепляющий нижнюю часть трубчатой тяги, снабженный натяжным приспособлением в верхней части ее, содержащем на трубчатом элементе упорную пластину, шайбы и гайку соответственно, отличающийся тем, что в качестве трубчатой тяги использован набор насосно-компрессорных труб (НКТ), соединенных между собой муфтой, имеющей коническую резьбу, в торцевых частях трубчатой тяги размещены центраторы, в нижней части закреплен полый режущий инструмент, а в верхней - переходник с резьбой, который соединен муфтой с трубчатой тягой и закреплен конической резьбой, натяжное приспособление имеет в качестве трубчатого элемента шпильку, на которой имеется шарнир, выполненный из набора шайб - конической, размещенной на упорной пластине, и сферической, размещенной на конической шайбе, гайка размещена на сферической шайбе.Soil anchor, including tubular rod with a protective sheath made of plastic on its lateral surface, cement stone, rigidly fixing the lower part of the tubular rod, equipped with a tension device in its upper part, containing on the tubular element a thrust plate, washers and nut, respectively, characterized in that as tubular traction, a set of tubing was used, interconnected by a sleeve having a tapered thread, centralizers were placed in the end parts of the tubular traction, in the lower part the hollow cutting tool is insulated, and in the upper one there is an adapter with a thread, which is connected by a sleeve with a tubular rod and fixed by a tapered thread, the tensioner has a pin as a tubular element, on which there is a hinge made of a set of washers - tapered, placed on the thrust plate, and a spherical placed on a conical washer, a nut placed on a spherical washer.

Description

Полезная модель - относится к области фундаментостроения и касается конструкции грунтового анкера. Она может быть использована для анкеровки конструктивных элементов и фундаментов, крепления стенок котлованов, для предварительного напряжения грунта, когда требуется повышение устойчивости сооружений путем их прижатия к основанию или, когда требуется приложение внешней нагрузки к грунтовой поверхности для предупреждения разупрочнения, обрушения или выпора массивов грунта.Utility model - refers to the field of foundation engineering and relates to the design of soil anchor. It can be used for anchoring structural elements and foundations, fixing the walls of pits, for prestressing the soil, when it is necessary to increase the stability of structures by pressing them to the base, or when an external load is required on the soil surface to prevent softening, collapse or bulging of soil masses.

Известен грунтовый анкер (а.с. №711234, МПК Е02D 5/80, от 31.10.75 г.) [1], содержащий стержень, один конец которого расположен в скважине и жестко закреплен в ней в торцевой части. Другой конец стержня снабжен упорным диском, жестко прикрепленным к стержню. К нижней поверхности диска примыкает пластина, охватывающая стержень и вильчатые клинья, направленные навстречу друг другу с охватом стержня так, что они перекрывают расстояние между пластиной и опорой. Домкратом создают усилия натяжения на заданную величину и фиксируют анкер в этом состоянии с помощью вильчатых клиньев, а при необходимости, и пластиной, размещенной между упором и вильчатыми клиньями.Known soil anchor (AS No. 711234, IPC E02D 5/80, dated 10.31.75,) [1] containing a rod, one end of which is located in the well and rigidly fixed in it in the end part. The other end of the rod is provided with a thrust disc rigidly attached to the rod. A plate is adjacent to the lower surface of the disk, covering the rod and forked wedges directed towards each other with the span of the rod so that they overlap the distance between the plate and the support. The jack creates tension forces by a predetermined amount and fix the anchor in this state with the help of forked wedges, and, if necessary, with a plate placed between the stop and forked wedges.

Устройство использует в качестве тяги сплошной стержень из арматурной стали, что приводит к удорожанию конструкции. Оно многоэлементно. Ненадежно закреплена нижняя часть тяги с помощью механического устройства или цементным раствором. Использование вильчатых клиньев не всегда обеспечивает предварительное и последующее напряжение тяги в грунте, поскольку не гарантирует знание величины и длительность действия предельных нагрузок на анкер в процессе монтажа и их эксплуатации, нагрузок, гарантирующих, что элементы натяжного приспособления сохранят свои упругие свойства, особенно, вильчатые клинья, что приводит к деформации тяги в зазоре в момент натяжения. Величину зазора невозможно определить заранее и The device uses as a rod a solid rod made of reinforcing steel, which leads to a rise in the cost of the structure. It is multi-element. The lower part of the rod is not securely fixed using a mechanical device or cement mortar. The use of forked wedges does not always provide preliminary and subsequent thrust in the ground, since it does not guarantee knowledge of the magnitude and duration of the extreme loads on the anchor during installation and their operation, loads that guarantee that the elements of the tensioner retain their elastic properties, especially forked wedges , which leads to deformation of the traction in the gap at the time of tension. The gap cannot be determined in advance and

появляется проблема наличия достаточного количества прокладок, выбирающих этот зазор от опоры до приваренного к стержню - тяге упорного диска, который, к тому же, трудно закрепить сваркой в полевых условиях на строительном участке.there is a problem of having a sufficient number of gaskets that select this gap from the support to the thrust disc welded to the rod, which, moreover, is difficult to fix by field welding at the construction site.

Известен анкер (а.с. №1281635, МПК Е02D 5/80, от 01.06.84 г.) [2], состоящий из тяги с наконечником. В корневой части тяга с наконечником заделана в цементном конце, окруженном дренирующей обоймой, а по длине свободного удлинения - в цементно-каменную обойму. Тяга прикреплена к конструкции при помощи распределительной плиты и натяжного стопорного устройства. По длине свободно удлиняемого участка тяга выполнена с покрытием из антикоррозионной смазки, заключенной в пластиковую оболочку и находится в обойме из затвердевшего залитого в скважину цементного раствора. В корневой части тяга заделана в цементном камне посредством наконечника. Но, за счет использования цементного раствора, имеющего малое водоцементное отношение с добавлением в него пластификатора и компонентов, замедляющих сроки схватывания, процесс затвердевания и получения цементного камня неконтролируем, так как сухая смесь из песка, извести и цемента должна увлажняться, и в случае сухого грунта и наличия пластификатора с замедляющим схватывание цемента составом в инъекционном цементном растворе, прочность сухой смеси будет недостаточной, чтобы впоследствии удержать тягу в скважине, а способность пластификатора придавать пластичные свойства и уменьшать прочность - известны. Следовательно, пластифицированный цементный камень не сможет помочь реализовать основное свойство тяги - иметь высокую несущую способность.Known anchor (AS No. 1281635, IPC E02D 5/80, dated 01.06.84) [2], consisting of a rod with a tip. In the root part, a rod with a tip is sealed at the cement end surrounded by a drainage holder, and along the length of the free extension, into a cement-stone holder. The rod is attached to the structure using a distribution plate and a tension locking device. The length of the freely extendable section of the rod is made with a coating of anticorrosive grease, enclosed in a plastic shell and is in a cage made of hardened cement mortar poured into the well. In the root part, the rod is embedded in the cement stone by means of a tip. But, due to the use of a cement mortar having a small water-cement ratio with the addition of a plasticizer and components that slow down the setting time, the solidification process and the production of cement stone are uncontrollable, since a dry mixture of sand, lime and cement should be moistened, and in the case of dry soil and the presence of a plasticizer with a retarding cement setting in the injection cement mortar, the strength of the dry mix will be insufficient to subsequently retain traction in the well, and fixators to give plastic properties and reduce strength are known. Therefore, plasticized cement stone will not be able to help realize the main property of traction - to have a high bearing capacity.

В качестве прототипа заявляемой полезной модели выбрано наиболее близкое по технической сущности устройство грунтового анкера (а.с. №1214843, МПК Е02D 5/80, от 01.06.84 г.) [4], включающего стержневую и трубчатую тяги, которые покрыты антикоррозионной смазкой и защищены пластмассовыми оболочками. Стержневая тяга имеет корневую часть. В трубчатой тяге выполнены отверстия, перекрытые манжетами. Тяги погружены в скважину. При повторной инъекции цементного раствора через трубчатую тягу образуется уширение. Для лучшего сцепления с цементным камнем трубчатая тяга имеет по высоте чередующиеся по взаимно перпендикулярным направлениям поперечные вмятины. На голову стержневой тяги навинчивается натяжная гайка, а на трубчатую тягу - натяжная гайка. Натяжные гайки опираются на опорные шайбы. В трубчатую тягу в верхней ее части впрессован для усиления трубчатый элемент.As a prototype of the claimed utility model, the device of the soil anchor closest in technical essence was selected (A.S. No. 1214843, IPC E02D 5/80, dated June 1, 84) [4], including rod and tubular rods that are coated with anticorrosive grease and protected by plastic shells. The rod rod has a root portion. In the tubular draft holes are made, overlapped by cuffs. The rods are immersed in the well. Upon repeated injection of the cement mortar through the tubular draft, broadening is formed. For better adhesion to cement stone, the tubular rod has transverse dents alternating in height in mutually perpendicular directions. A tension nut is screwed onto the rod head, and a tension nut is screwed onto the tubular rod. The tension nuts rest on the support washers. A tubular element is pressed into the tubular rod in its upper part to reinforce.

Устройство грунтового анкера сложно в изготовлении и использовании, так как оно материалоемко, усложнено элементами. Наличие стержня не гарантирует, что тяга анкерная разместится в скважине вертикально. Технологическая схема монтажа анкера многоступенчатая с привлечением дополнительно обсадной трубы и занимает много времени в целом. Устройство дорогостоящее, так как трубчатую тягу в цементируемой части готовят перфорированной с манжетами над отверстиями. Использование сплошного стержня в качестве непрерывной тяги усложняет условия его размещения, особенно, в глубоких скважинах, так как и до, и во время, и после твердения цемента стержень может незапланированно деформироваться, что отрицательно скажется на несущей способности устройства, значительно уменьшая ее. Сам монтаж малопроизводителен, так как требуется предварительное бурение скважины, размещение обсадной трубы, затем тяг, не имеющих центраторов, цемент подается через обсадную трубу, потом через трубчатую тягу и так далее. В случае деформации стержня усложняется закрепление натяжного приспособления из-за использования шайб, не способных выбирать положение в зазоре и помочь гайке фиксировать тяги в напряженном состоянии после натяжения в случае деформации стержня в зоне натяжного приспособления.The device of the soil anchor is difficult to manufacture and use, since it is material-intensive, complicated by elements. The presence of the rod does not guarantee that the anchor rod will be placed vertically in the well. The technological scheme for installing the anchor is multi-stage with the use of an additional casing and takes a lot of time as a whole. The device is expensive, since the tubular rod in the cemented part is prepared perforated with cuffs above the holes. The use of a solid rod as a continuous thrust complicates the conditions for its placement, especially in deep wells, since both before, during, and after hardening of cement, the rod can be unplanned to deform, which will negatively affect the bearing capacity of the device, significantly reducing it. Installation itself is inefficient, since preliminary drilling of the well is required, placement of the casing pipe, then tie rods that do not have centralizers, cement is supplied through the casing pipe, then through the pipe rod and so on. In the case of a rod deformation, it becomes more difficult to fix the tensioner due to the use of washers that are not able to select the position in the gap and help the nut to fix the rods in tension after tension in case of the rod deformation in the zone of the tensioner.

Задача полезной модели - упрощение устройства - грунтового анкера и упрощение монтажных работ, улучшение технологического процесса натяжения анкера.The objective of the utility model is to simplify the device - soil anchor and simplify installation work, improve the technological process of tensioning the anchor.

Технический результат достигается тем, что грунтовый анкер, как и известный, включающий трубчатую тягу с защитной оболочкой из пластмассы на ее боковой поверхности, цементный камень, жестко закрепляющий нижнюю часть трубчатой тяги, снабженный натяжным приспособлением в верхней части ее, содержащем на трубчатом элементе упорную пластину, шайбы и гайку соответственно, согласно изобретению в качестве трубчатой тяги использован набор насосно-компрессорных труб (НКТ), соединенных между собой муфтой, имеющей коническую резьбу, в торцевых частях трубчатой тяги размещены центраторы, в нижней части закреплен полый режущий инструмент, а в верхней - переходник с резьбой, который соединен муфтой с трубчатой тягой и закреплен конической резьбой, натяжное приспособление имеет в качестве трубчатого элемента шпильку, на которой имеется шарнир, выполненный из набора шайб - конической, размещенной на упорной пластине, и сферической, размещенной на конической шайбе, гайка размещена на сферической шайбе.The technical result is achieved by the fact that a ground anchor, like the known one, including a tubular rod with a protective sheath made of plastic on its side surface, cement stone, rigidly fixing the lower part of the tubular rod, equipped with a tension device in its upper part containing a thrust plate on the tubular element , washers and nut, respectively, according to the invention, as a tubular thrust, a set of tubing is used, interconnected by a sleeve having a tapered thread, at the end hours centralizers are placed at the ends of the tubular rod, a hollow cutting tool is fixed at the bottom, and a threaded adapter is attached at the top, which is connected by a sleeve to the pipe rod and fixed with a tapered thread, the tensioner has a pin as a tubular element on which there is a hinge made from a set washers - conical, placed on the thrust plate, and spherical, placed on the conical washer, the nut is placed on the spherical washer.

Сопоставительный анализ заявляемого устройства с прототипом показал, что заявляемое устройство имеет значительно более простую конструкцию без ущерба высокой несущей способности анкера, т.к. тяга анкерная выполнена только из одного элемента - трубчатой тяги. В качестве трубчатой тяги используют готовые и широко распространенные в буровой технике НКТ - трубы насосно-компрессорные. Так как трубчатая тяга состоит из набора готовых труб, соединенных между собой муфтами, имеющими коническую резьбу, она легко монтируется в единое целое, ее можно иметь значительно большей длины, что может позволить анкер стержневой. Таким образом, заявляемая трубчатая тяга может быть использована при глубоком бурении скважин без критических величин изгибающих деформаций как в процессе бурения, так и при монтаже.A comparative analysis of the claimed device with the prototype showed that the claimed device has a much simpler design without compromising the high bearing capacity of the anchor, because anchor rod is made of only one element - tubular rod. As tubular traction, tubing is used that is ready-made and widely used in drilling equipment - tubing. Since the tubular thrust consists of a set of finished pipes interconnected by couplings having a tapered thread, it is easily mounted as a unit, it can have a significantly longer length, which can be achieved by a rod anchor. Thus, the inventive tubular thrust can be used for deep drilling of wells without critical values of bending deformations both during drilling and during installation.

За счет перераспределения напряжений между трубами, муфтами и центраторами, образуется единая анкерная система трубчатой тяги, ответственная за несущую способность всего устройства анкера. В отличие от прототипа, в котором натяжная гайка опирается на шайбу, а та - на упорную пластину, и которые размещены на трубчатой тяге, а внутри нее имеется еще тяга в виде стержня, заявляемое устройство имеет набор из двух шайб, конической и сферической форм, образующих шарнирную систему, позволяющую натяжной гайке самоустанавливаться в процессе натяжения анкера, независимо от угла размещения анкера по отношению к стене котлована, независимо от деформации шпильки в момент натяжения. Упорная пластина имеет такую же возможность, так как между переходником и этой пластиной размещен бугель. Шпилька выполнена съемной. Она от трубчатой тяги отсоединяется через переходник, что увеличивает надежность монтажных работ, т.к. исключает необходимость при неблагоприятных условиях натяжения или эксплуатации восстанавливать полностью весь анкер, вновь бурить скважину и т.д., увеличивает ремонтопригодность элементов анкера. За счет использования высокопрочной трубчатой тяги улучшается и ускоряется и технология монтажных работ, т.к. совмещаются операция по бурению скважин, установке и закреплению в грунте анкера.Due to the redistribution of stresses between pipes, couplings and centralizers, a single tubular traction anchor system is formed, which is responsible for the bearing capacity of the entire anchor device. Unlike the prototype, in which the tension nut rests on the washer, and that - on the thrust plate, and which are placed on the tubular rod, and inside it there is still rod-shaped rod, the claimed device has a set of two washers, conical and spherical, forming a hinge system that allows the tension nut to self-install during the tension of the anchor, regardless of the angle of placement of the anchor relative to the wall of the pit, regardless of the deformation of the stud at the time of tension. The thrust plate has the same possibility, since a yoke is placed between the adapter and this plate. The hairpin is made removable. It is disconnected from the tubular rod through an adapter, which increases the reliability of installation work, because eliminates the need for adverse conditions of tension or operation to completely restore the entire anchor, re-drill the well, etc., increases the maintainability of the elements of the anchor. Through the use of high-strength tubular traction, the installation technology is improved and accelerated, as Operation of drilling wells, installing and fixing anchors in the ground is combined.

Наличие в тяге и режущем инструменте полости исключает необходимость проведения цементирования нижней части тяги, скважины грунта в приграничной зоне размещения анкера специальными инъекционными приспособлениями или дополнительным введением в скважину обсадной трубы, как в прототипе.The presence in the rod and the cutting tool of the cavity eliminates the need for cementing the lower part of the rod, the soil well in the border area of the anchor with special injection devices or the additional introduction of casing into the well, as in the prototype.

Заявляемый грунтовый анкер имеет «новизну», обладает существенными отличиями, являясь техническим решением и промышленно применим. Полезная модель испытана в реальных условиях для крепления стенок котлована и показала, что The inventive soil anchor has a "novelty", has significant differences, as a technical solution and is industrially applicable. The utility model was tested in real conditions for fixing the walls of the pit and showed that

устройство надежно в эксплуатации. Предполагается внедрение в Перми в ЗАО «ИнжПроектСтрой» и на объектах строительства в различных городах России.the device is reliable in operation. It is planned to introduce it in Perm at ZAO InzhProektStroy and at construction sites in various cities of Russia.

Грунтовый анкер содержит набор труб 1′, 1" и т.д., соединенных муфтой 2 с конической резьбой между собой, т.е. готовые насосно-компрессорные трубы - НКТ (фиг.1-2), используемые в качестве трубчатой тяги анкера. На трубы 1′, 1" и т.д. надета с зазором защитная оболочка из полимера 3 перед соединением труб муфтами.The soil anchor contains a set of pipes 1 ′, 1 ", etc., connected by a sleeve 2 with a conical thread to each other, i.e., finished tubing pipes - tubing (Fig.1-2), used as a tubular tie rod . On pipes 1 ′, 1 ", etc. a protective shell of polymer 3 is put on with a gap before connecting the pipes with couplings.

На боковых поверхностях в торцевых частях набора труб размещены центраторы 4 в виде дисков со сквозными вертикальными отверстиями. На нижнем конце трубчатой тяги закреплен полый режущий инструмент 5, а на верхнем торце - переходник 6 с резьбой 7 в нем. Переходник закреплен на трубчатой тяге муфтой 3. В переходнике закреплено натяжное приспособление, состоящее из шпильки 9, на которой имеются пластина 10, шайба коническая 11 и сферическая 12, а так же натяжная гайка 13 (фиг.3).On the lateral surfaces in the end parts of the set of pipes centralizers 4 are placed in the form of disks with through vertical holes. A hollow cutting tool 5 is fixed at the lower end of the tubular rod, and an adapter 6 with a thread 7 in it is fixed at the upper end. The adapter is fixed on the tubular rod by a coupling 3. In the adapter is fixed a tensioner consisting of a stud 9 on which there is a plate 10, a conical washer 11 and a spherical 12, as well as a tension nut 13 (Fig. 3).

На фиг.1 - показано устройство в транспортном положении, в разрезе;Figure 1 - shows the device in a transport position, in section;

На фиг.2 - трубчатая тяга в разрезеFigure 2 - sectional tubular thrust

На фиг.3 - натяжное приспособление, в разрезе,Figure 3 - tensioner, in section,

На фиг.4 - грунтовый анкер в момент монтажа в грунте, в разрезеFigure 4 - soil anchor at the time of installation in the soil, in the context

На фиг.5 - грунтовый анкер в момент цементации скважин, в разрезеFigure 5 - soil anchor at the time of cementing wells, in the context

На фиг.6 - компоновка грунтового анкера в момент натяжения, в разрезе.Figure 6 - arrangement of soil anchor at the time of tension, in a section.

Устройство работает следующим образом.The device operates as follows.

Компонуют трубчатую тягу 1 анкера. Для этого используют трубы, применяемые в буровой технике, так называемые насосно-компрессорные (НКТ). Трубы 1′, 1" и т.д. длина которых 3 метра, соединяют между собой муфтами 2, предварительно разместив на трубах защитные оболочки из пластмассы 3 с зазором между оболочкой и боковой поверхностью трубы. В муфтах закрепляют трубы конической резьбой, образуя трубчатую тягу грунтового анкера. Перед муфтами на торцевых частях трубчатой тяги размещают центраторы 4 в виде дисков со сквозными отверстиями, диаметры которых соответствуют диаметру режущего инструмента 5, который выполнен полым и закреплен в торце нижней части трубчатой тяги. В качестве режущего инструмента используют долото буровое.The tubular rod 1 of the anchor is assembled. To do this, use pipes used in drilling equipment, the so-called tubing (tubing). Pipes 1 ′, 1 ”, etc., 3 meters long, are connected by couplings 2, after placing protective sheaths made of plastic 3 on the pipes with a gap between the sheath and the side surface of the pipe. The pipes are fixed with conical threads in the couplings, forming a tubular rod In front of the couplings, centralizers 4 are placed in the end parts of the tubular rod in the form of disks with through holes, the diameters of which correspond to the diameter of the cutting tool 5, which is hollow and fixed at the end of the lower part of the tubular rod. The cutting tools use a drill bit.

В торце верхней части трубчатой тяги закрепляют переходник 6 муфтой на резьбе. В переходнике выполнена резьба 7. К переходнику подсоединяют опрессовочный блок (не показан) и подсоединяют бурильную установку типа Dwill 830 BB (фиг.4). Приводят во вращение полый режущий инструмент с трубчатой тягой на нем. Происходит бурение At the end of the upper part of the tubular rod, the adapter 6 is fixed with a coupling on the thread. A thread 7 is made in the adapter. A crimping unit (not shown) is connected to the adapter and a Dwill 830 BB type drilling rig is connected (Fig. 4). The hollow cutting tool with the tubular pull on it is brought into rotation. Drilling in progress

скважины с одновременной установкой в грунте анкера. Бурение осуществляют при подаче воздуха или слабого цементного раствора через трубчатую тягу и полый режущий инструмент (фиг.5). Центраторы 4 со сквозным отверстием в них удерживают в равновесии устанавливаемый в грунте анкер и свободно пропускают цементный раствор, снизу вверх. После установке в грунте трубчатой тяги анкера полости тяги и режущего инструмента подают цементный раствор с В/Ц=1, который заполняет скважину, пропитывает грунт в приграничной с ней зоне. И изливается через устье скважины наружу. После этого подают тем же путем в скважину цементный раствор с В/Ц=06-0,4 и выдерживают 0,5 часа, после которого проводят опрессовку, подключая опрессовочный блок (не показан) к переходнику. Опрессовка идет под давлением 10 атмосфер. Оставляют систему на 10-14 дней для затвердевания цемента и образования цементного камня 8 (фиг.5) на нижней части трубчатой тяги и прочной адгезионной связи цемента с грунтом. Через 10-14 дней в переходнике закрепляют предварительно убрав опрессовочный блок натяжное приспособление.wells with simultaneous installation of an anchor in the ground. Drilling is carried out when air or a weak cement mortar is supplied through a tubular rod and a hollow cutting tool (Fig. 5). Centralizers 4 with a through hole in them keep the anchor installed in the soil in equilibrium and freely pass the cement mortar from bottom to top. After installing a tubular draft anchor in the draft cavity anchor and the cutting tool in the soil, a cement mortar with W / C = 1 is supplied, which fills the well, impregnates the soil in the border area with it. And it pours out through the wellhead out. After that, cement mortar with W / C = 06-0.4 is fed into the well in the same way and held for 0.5 hours, after which pressure testing is carried out by connecting a pressure testing unit (not shown) to the adapter. Pressure testing is carried out under a pressure of 10 atmospheres. Leave the system for 10-14 days for the hardening of cement and the formation of cement stone 8 (figure 5) on the bottom of the tubular rod and a strong adhesive bond of cement to the ground. After 10-14 days, the adapter is fixed by first removing the crimping unit, the tensioner.

Для этого в переходнике резьбой закрепляют шпильку 9 через бугель, закрепленный на стенке котлована 14 (фиг.6).To do this, a threaded rod 9 is fixed in the adapter through a yoke mounted on the wall of the pit 14 (Fig.6).

На шпильке 9 свободно размещены пластина 10 шарнир выполненный из конической и сферической шайбы 12, а так же натяжная гайка 13. За счет шарнира напряжение, которое часто приводит к деформации, изгибу шпильки в зазоре между элементами, не создает трудности при фиксации анкера шайбой в натяжном приспособлении. Трубы НКТ изготовлены из стали группы прочности К, Л (ГОСТ 633-80).A plate 10 freely placed on the pin 9 is a hinge made of a conical and spherical washers 12, as well as a tension nut 13. Due to the hinge, stress, which often leads to deformation, bending of the pin in the gap between the elements, does not make it difficult to fix the anchor with the washer in the tension fixture. The tubing pipes are made of steel of strength group K, L (GOST 633-80).

Заявляемая полезная модель - грунтовый анкер имеет преимущества перед прототипом. Устройство за счет использования готовых и широко распространенных в буровой технике насосно-компрессорных труб (НКТ) позволяет значительно упростить сборку, монтаж и эксплуатацию анкера.The inventive utility model - soil anchor has advantages over the prototype. The device through the use of ready-made and widely used in drilling equipment tubing (tubing) can significantly simplify the assembly, installation and operation of the anchor.

Устройство значительно повышает производительность работ за счет совмещения операций по бурению, монтажу анкера в грунте и цементированию.The device significantly improves productivity by combining drilling operations, mounting the anchor in the ground and cementing.

Устройство более надежно в эксплуатации за счет более качественного закрепления анкера в грунте, способности оптимально перераспределения напряжения в трубчатой тяге, а гайке - самоустановиться в натяжном приспособлении, независимо от угла отклонения шпильки в момент натяжения.The device is more reliable in operation due to better fixing of the anchor in the soil, the ability to optimally redistribute stress in the tubular rod, and the nut to self-install in the tensioner, regardless of the angle of deviation of the stud at the time of tension.

Список информации, принятой во внимание.List of information taken into account.

1. а.с. №711234, МПК Е02D 5/80, от 31.10.75 г. (аналог)1. A.S. No. 711234, IPC E02D 5/80, dated 10.31.75, (analog)

2. а.с. №1281635, МПК Е02D 5/80, от 01.06.84 г. (аналог)2. A.S. No. 1281635, IPC E02D 5/80, dated June 1, 84 (analogue)

3. а.с. №1214843, МПК Е02D 5/80, от 01.06.84 г. (прототип)3. A.S. No. 1214843, IPC E02D 5/80, dated 01.06.84, (prototype)

Claims (1)

Грунтовый анкер, включающий трубчатую тягу с защитной оболочкой из пластмассы на ее боковой поверхности, цементный камень, жестко закрепляющий нижнюю часть трубчатой тяги, снабженный натяжным приспособлением в верхней части ее, содержащем на трубчатом элементе упорную пластину, шайбы и гайку соответственно, отличающийся тем, что в качестве трубчатой тяги использован набор насосно-компрессорных труб (НКТ), соединенных между собой муфтой, имеющей коническую резьбу, в торцевых частях трубчатой тяги размещены центраторы, в нижней части закреплен полый режущий инструмент, а в верхней - переходник с резьбой, который соединен муфтой с трубчатой тягой и закреплен конической резьбой, натяжное приспособление имеет в качестве трубчатого элемента шпильку, на которой имеется шарнир, выполненный из набора шайб - конической, размещенной на упорной пластине, и сферической, размещенной на конической шайбе, гайка размещена на сферической шайбе.
Figure 00000001
Soil anchor, including a tubular rod with a protective sheath made of plastic on its lateral surface, cement stone, rigidly fixing the lower part of the tubular rod, provided with a tension device in its upper part, containing a thrust plate, washers and nut, respectively, characterized in that as a tubular rod, a set of tubing was used, interconnected by a sleeve having a tapered thread, centralizers were placed in the end parts of the tubular rod, in the lower part the hollow cutting tool is insulated, and in the upper one there is an adapter with a thread, which is connected by a sleeve with a tubular rod and fixed by a tapered thread, the tensioner has a pin as a tubular element, on which there is a hinge made of a set of washers - tapered, placed on the thrust plate, and a spherical placed on a conical washer, the nut is placed on a spherical washer.
Figure 00000001
RU2009104996/22U 2009-02-12 2009-02-12 SOIL ANCHOR RU83517U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2009104996/22U RU83517U1 (en) 2009-02-12 2009-02-12 SOIL ANCHOR

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2009104996/22U RU83517U1 (en) 2009-02-12 2009-02-12 SOIL ANCHOR

Publications (1)

Publication Number Publication Date
RU83517U1 true RU83517U1 (en) 2009-06-10

Family

ID=41025066

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2009104996/22U RU83517U1 (en) 2009-02-12 2009-02-12 SOIL ANCHOR

Country Status (1)

Country Link
RU (1) RU83517U1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2490470C1 (en) * 2012-02-28 2013-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Spacing anchor
RU2543842C1 (en) * 2013-11-29 2015-03-10 Общество с ограниченной ответственностью "МПО РИТА" Ground anchor or drilling pile and manufacturing method of ground anchor or drilling pile
RU2614131C1 (en) * 2015-12-11 2017-03-22 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ) Method of arrangement of root pile with controlled widening
CN107083980A (en) * 2017-06-15 2017-08-22 湖南科技大学 The country rock disaster alarm method and anchoring prior-warning device of a kind of roadway supported by bolt
RU2654117C2 (en) * 2016-07-13 2018-05-16 Общество с ограниченной ответственностью "ПОЛИТЕКС-ЭКО" (ООО "ПОЛИТЕКС-ЭКО") Composite anchor and method of its production
RU2716072C1 (en) * 2016-11-18 2020-03-05 Сучжоу Нг. Фаундейшн Инжинииринг Ко., Лтд Hot-melt anchor head
RU197033U1 (en) * 2020-01-10 2020-03-26 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" DRILLING SOIL ANCHOR
CN115893175A (en) * 2023-01-09 2023-04-04 中铁城建集团第一工程有限公司 Hyperboloid overhanging steel net rack synchronous integral lifting system and construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2490470C1 (en) * 2012-02-28 2013-08-20 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Spacing anchor
RU2543842C1 (en) * 2013-11-29 2015-03-10 Общество с ограниченной ответственностью "МПО РИТА" Ground anchor or drilling pile and manufacturing method of ground anchor or drilling pile
RU2614131C1 (en) * 2015-12-11 2017-03-22 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тюменский индустриальный университет" (ТИУ) Method of arrangement of root pile with controlled widening
RU2654117C2 (en) * 2016-07-13 2018-05-16 Общество с ограниченной ответственностью "ПОЛИТЕКС-ЭКО" (ООО "ПОЛИТЕКС-ЭКО") Composite anchor and method of its production
RU2716072C1 (en) * 2016-11-18 2020-03-05 Сучжоу Нг. Фаундейшн Инжинииринг Ко., Лтд Hot-melt anchor head
CN107083980A (en) * 2017-06-15 2017-08-22 湖南科技大学 The country rock disaster alarm method and anchoring prior-warning device of a kind of roadway supported by bolt
CN107083980B (en) * 2017-06-15 2023-06-30 湖南科技大学 Surrounding rock disaster early warning method and anchor early warning device for anchor bolt supporting roadway
RU197033U1 (en) * 2020-01-10 2020-03-26 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" DRILLING SOIL ANCHOR
CN115893175A (en) * 2023-01-09 2023-04-04 中铁城建集团第一工程有限公司 Hyperboloid overhanging steel net rack synchronous integral lifting system and construction method
CN115893175B (en) * 2023-01-09 2023-06-16 中铁城建集团第一工程有限公司 Synchronous integral lifting system for hyperboloid overhanging steel net frame and construction method

Similar Documents

Publication Publication Date Title
RU83517U1 (en) SOIL ANCHOR
WO2021248822A1 (en) Construction method for expanded-head prestressed concrete anchor rod
CN101906977B (en) Method for preventing and treating large deformation and collapse of softrock tunnel
CN201704689U (en) Four-corner-reinforced pre-stressed anchor rope head for reinforcing rock slope
CN103088819B (en) Construction prestressed cable method
CN108956285B (en) Drawing test method for single-anchor fiber rib anti-floating anchor rod system
CN109837895A (en) A kind of big pressure dispersing anchorage cable construction of depth
CN204266121U (en) Button anchor system combinations formula pile foundation support table anchorage
CN107817162B (en) Rapid drawing test method for nonmetal anti-floating anchor rod with enlarged head
CN107621412B (en) Quick drawing test device for nonmetal anti-floating anchor rod with enlarged head
CN103572701A (en) Buckling anchor system combined rock anchor
CN106150060A (en) Based on assembled wall-connecting piece exterior wall scaffold system and construction method
CN106759321B (en) Anchor rod for improving bearing capacity of retaining wall and construction process thereof
CN104532860B (en) Recoverable soil nail
CN102797486A (en) Fabricated grilling anti-invert method for treating pucking
CN210562163U (en) Prefabricated prestressed anchor rod piece
CN103590338A (en) Method for constructing composite tunnel concrete anchors of suspension bridge and rock anchor construction structure
CN208379585U (en) A kind of architectural engineering anchor-rod positioner
CN104806031B (en) Timber structure reinforced construction method
CN109113749A (en) Four line large section railway tunnel construction method of weak surrounding rock
CN212153367U (en) Sleeve type variable-diameter steel reinforcement cage and expanded anchor rod pile
KR102079563B1 (en) Compression friction type anchor panel ground reinforcement system
CN204327134U (en) A kind of prestressing force balance anchor cable
CN202194130U (en) Compound pre-stressed anti-pulling pile with enlarged head
CN203846399U (en) Combined type rock anchor with buckling anchor system

Legal Events

Date Code Title Description
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20130213