WO2020151347A1 - Prefabricated prestressed anchor structure - Google Patents

Prefabricated prestressed anchor structure Download PDF

Info

Publication number
WO2020151347A1
WO2020151347A1 PCT/CN2019/119338 CN2019119338W WO2020151347A1 WO 2020151347 A1 WO2020151347 A1 WO 2020151347A1 CN 2019119338 W CN2019119338 W CN 2019119338W WO 2020151347 A1 WO2020151347 A1 WO 2020151347A1
Authority
WO
WIPO (PCT)
Prior art keywords
anchor
slurry
grouting pipe
grout
rod structure
Prior art date
Application number
PCT/CN2019/119338
Other languages
French (fr)
Chinese (zh)
Inventor
付文光
孙军兰
李新元
何志勇
程磊
戴锦鸿
高升坚
Original Assignee
深圳市地质环境研究院有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳市地质环境研究院有限公司 filed Critical 深圳市地质环境研究院有限公司
Priority to JP2021600124U priority Critical patent/JP3235428U/en
Publication of WO2020151347A1 publication Critical patent/WO2020151347A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/12Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Definitions

  • the utility model relates to the technical field of prestressed anchor rod construction, in particular to a prefabricated prestressed anchor rod structure.
  • prestressed anchor rods can be divided into two categories: tension type and pressure type.
  • the tensile anchor rod is formed by drilling, installing anchor bars, and grouting in the stratum. It is difficult to remove impurities such as water, soil, rock cuttings and mud in the borehole, and it is easy to partially adhere to the surface of the anchor bar. Defects such as slag or mud skin, no partial grout coating, and mud inclusions in the slurry; and the slurry is diluted to varying degrees by the water in the hole and cannot be vibrated after grouting, resulting in lower actual strength of the slurry. The strength of the slurry is unstable, which leads to low and unstable bond strength between the slurry and the anchor bar, and ultimately leads to low tensile strength of the anchor bar, unstable and large dispersion, and the anchor bar is susceptible to corrosion.
  • the end of the grouting pipe exceeds the inner anchor head, and the grout flows around under the inner anchor head during grouting, and is blocked by the inner anchor head.
  • Impurities such as water, soil, rock debris and mud under the inner anchor head It is difficult to rule out clean and inclusion in the slurry, resulting in low and unstable strength of the slurry under the inner anchor head, which can easily lead to local compression damage, resulting in low and unstable anchor bearing capacity; at the same time, under the inner anchor head
  • the anchor bar is connected to the inner anchor head by the anchor clamp.
  • the full length of the anchor bar is wrapped by the isolation sleeve to form anti-corrosion protection, it is difficult to form effective anti-corrosion protection for the anchor clamp due to the poor slurry quality under the anchor head. As a result, the load-bearing capacity of the pressure-type anchor is very discrete and the corrosion resistance is not good.
  • the purpose of the utility model is to provide a prefabricated prestressed anchor rod structure, which aims to solve the problem of poor anti-corrosion performance of the prestressed anchor rod in the prior art.
  • the prefabricated prestressed anchor rod structure includes a drilled hole and a core placed inside the drilled hole.
  • the core includes a plurality of anchor bars, a grout and a grouting pipe.
  • One end of the grouting pipe is embedded in the slurry, the other end of the anchor bar extends in a direction away from the slurry, and one end of the grouting pipe is embedded in the slurry, and the slurry has a hole close to the bore
  • the grouting pipe penetrates the bottom of the slurry, the other end of the grouting pipe extends in a direction away from the slurry, and one end of the anchor bar and one end of the grouting pipe are respectively It is fixedly arranged with the slurry.
  • a plurality of the anchor ribs are arranged at a circumferential interval along the grouting pipe.
  • the distance between adjacent anchor bars is 10-60 mm, and the diameter of the anchor bars is 12-80 mm.
  • the anchor bar includes an anchor section and a free section, the anchor section is in the slurry, the free section is provided with an isolation sleeve, the isolation sleeve surrounds the free section, and the isolation sleeve The inner end of the tube is embedded in the slurry.
  • the range of the inner end of the isolation sleeve embedded in the slurry is 200-300 mm.
  • each of the anchor bars is arranged at a circumferential interval along the circumference of the grouting pipe.
  • the prefabricated prestressed anchor rod structure includes a template member, each of the anchor bars and the grouting pipe is relatively fixed by lashing, and one end of each of the anchor bars and one end of the grouting pipe are respectively placed
  • the core is formed by grouting and vibrating in the template; the diameter of the core is in the range of 60-150mm.
  • the outer surface of the slurry is provided with transverse ribs, and the transverse ribs are spirally arranged on the outer surface of the slurry.
  • transverse ribs are arranged in an inclined shape.
  • the core includes a steel mesh, the steel mesh is in the grout, the steel mesh is enclosed to form an enclosed space, and a plurality of the anchor bars and the grouting pipe are all located State the enclosed space.
  • the core is prefabricated in the factory or construction site, the fabricated core is placed in the borehole, and the grouting pipe is used for grouting.
  • the grouting pipe is used for grouting.
  • the slurry and the soil bond Due to the prefabrication of the core, the quality of the slurry is effectively guaranteed, and the dispersion of the bearing capacity of the anchor is prevented from being too large, resulting in poor stability of the bearing capacity of the anchor; in addition, the slurry and the reinforcement are effectively guaranteed
  • the body has sufficient bonding strength, and, under the action of the slurry, it protects the reinforcement and improves the corrosion resistance of the reinforcement.
  • Figure 1 is a schematic plan view of a prefabricated prestressed anchor rod structure provided by an embodiment of the present invention
  • FIG. 2 is a schematic diagram of a section A of the prefabricated prestressed anchor rod structure provided by the embodiment of the present invention
  • FIG. 3 is a schematic diagram of the construction plan of the prefabricated prestressed anchor rod structure provided by the embodiment of the present invention.
  • FIG. 4 is a schematic plan view of a prefabricated prestressed anchor rod structure provided by an embodiment of the present invention.
  • Fig. 5 is a schematic sectional view of part B of the prefabricated prestressed anchor rod structure provided by the embodiment of the present invention.
  • the prefabricated prestressed anchor rod structure provided by the utility model is used to solve the problems of low bearing capacity, instability and poor anti-corrosion performance of the prestressed anchor rod.
  • the prefabricated prestressed anchor rod structure includes a drilled hole and a core body 10, the core body 10 is placed inside the drilled hole, the core body 10 includes a plurality of anchor bars 11, a slurry 12 and a grouting pipe 13, and one end of the anchor bar 11 is embedded
  • the other end of the anchor bar 11 extends away from the slurry 12
  • one end of the grouting pipe 13 is embedded in the slurry 12
  • the slurry 12 has a bottom close to the bottom of the borehole
  • the grouting pipe 13 penetrates the slurry.
  • the other end of the grouting pipe 13 is arranged to extend away from the slurry 12
  • one end of the anchor rib 11 and one end of the grouting pipe 13 are fixedly arranged with the slurry 12, respectively.
  • the core body 10 is prefabricated in the factory or the construction site.
  • the prepared core body 10 is placed in the borehole, and the grouting pipe 13 is used for grouting to make the slurry 12 and the soil layer 30 bonding; due to the prefabrication of the core body 10, the quality of the slurry 12 is effectively ensured, and the dispersion of the bearing capacity of the bolt is prevented from being too large, resulting in poor stability of the bearing capacity of the bolt, and the overall bearing capacity is improved; in addition, the slurry is effectively guaranteed 12 has sufficient bonding strength with the bar to make it more stable, and under the action of the slurry 12, it protects the bar and improves the corrosion resistance of the bar.
  • only one anchor bar 11 may also be used, and one or more anchor bars 11 are provided according to the design bearing capacity of the anchor bar 11 to ensure the overall stability of the core body 10 and at the same time. Reduce manufacturing costs.
  • the diameter of the borehole is greater than the diameter of the slurry 12 by more than 40 mm, which is convenient for the slurry 12 to be placed in the borehole and facilitates the installation of the anchor rod.
  • the material of the anchor bar 11 can be steel bars or steel strands, and the material of the slurry 12 can be fine stone concrete, cement mortar or cement paste; the price is low and the production speed is fast.
  • the multiple anchor bars 11 are arranged circumferentially and spaced along the grouting pipe 13; the use of multiple anchor bars 11 makes the overall anchoring effect stronger. At the same time, the multiple anchor bars 11 are arranged at intervals to make the overall anchoring force of the core 10 more uniform. In addition, the force of the slurry 12 is uniform, and the bearing capacity of the slurry 12 is provided.
  • the range of the distance between adjacent anchor bars 11 is 10-60 mm. With this arrangement, the matching effect of each anchor bar 11 is better and sufficient anchoring effect is ensured.
  • the diameter range of the anchor bar 11 is 12-80mm; the value range of the diameter of the anchor bar 11 is determined according to the design bearing capacity of each anchor bar 11, and the distance between each anchor bar 11 is 10-60mm; sufficient anchoring force is ensured.
  • the anchor bar 11 includes an anchor section and a free section.
  • the anchor section is in the slurry 12.
  • the free section is provided with an isolation sleeve 20 that surrounds the free section, and the inner end of the isolation sleeve 20 is embedded in the slurry 12; thereby enhancing isolation
  • the isolation grouting is performed to ensure the tension of the free section.
  • the inner end of the isolation sleeve 20 is embedded in the slurry 12 in a range of 200-300 mm; waste of the isolation sleeve 20 is avoided, and at the same time, the installation stability of the isolation sleeve 20 is ensured.
  • One end of the grouting pipe 13 is embedded in the middle of the slurry 12, and the anchor bars 11 are arranged at a circumferential interval along the circumference of the grouting pipe 13; this makes the structure more compact, and when grouting is carried out through the grouting pipe 13, it is convenient for the cement slurry to be uniform Surround the core 10 to ensure the bonding effect between the core 10 and the soil layer 30.
  • the prefabricated prestressed anchor rod structure includes a template member.
  • Each anchor bar 11 and the grouting pipe 13 are relatively fixed by lashing.
  • One end of each anchor bar 11 and one end of the grouting pipe 13 are respectively placed in the template member for grouting and vibrating.
  • the core body 10 is formed; the manufacture of the core body 10 is facilitated, and the prefabrication of the core body 10 is realized.
  • the diameter of the core body 10 is in the range of 60-150 mm; the arrangement of each anchor bar 11 and the grouting tube 13 is ensured, and the core body 10 and the anchor rod have sufficient anti-deformation effect to improve the anchoring effect.
  • the outer surface of the slurry 12 is provided with stripes; the contact area between the slurry 12 and the soil layer 30 is enhanced, the bonding effect of the slurry 12 and the soil layer 30 is enhanced, and the anchoring effect of the core body 10 is improved.
  • the length of the core 10 is in the range of 2 to 3 m, and the strength of the slurry 12 is in the range of 20 to 50 MPa; it is ensured that the slurry 12 has sufficient anchoring stability.
  • a connecting channel is formed at the bottom of the slurry 12, the connecting channel is connected to the soil layer 30, and one end of the grouting pipe 13 is connected to the connecting channel; the grouting pipe 13 is realized for grouting.
  • the outer surface of the slurry 12 is provided with transverse ribs 14, which are arranged spirally on the outer surface of the slurry 12; under the action of the transverse ribs 14, the bonding strength of the slurry 12 is enhanced, and the Anchoring effect.
  • transverse ribs 14 are arranged in an oblique shape to increase the transverse area of the transverse ribs 14 and improve the bonding strength of the slurry 12.
  • the core 10 includes a steel mesh 15 in the slurry 12, the steel mesh 15 encloses to form an enclosed space, and multiple anchor bars 11 and grouting pipes 13 are in the enclosed space; Under the action of 15, it helps to reduce the cracks of the slurry 12, thereby enhancing the anti-corrosion performance of the slurry 12 and protecting the slurry 12 from cracking.
  • the outer surface of the steel mesh 15 is provided with multiple horizontal strip groups, the two horizontal strip groups are arranged symmetrically along the center of the slurry; the horizontal strip group includes horizontally arranged rods, one end of the rod is connected to the steel mesh 15 On the outer surface of the rod, the other end of the rod body is in contact with the slurry 12; under the action of the rod body, it is convenient for the steel mesh 15 to be centered, which facilitates the installation of the steel mesh 15 and ensures the anti-cracking protection effect of the steel mesh 15.
  • One end of the rod is arranged in a movable connection with the outer surface of the steel mesh 15. After the steel mesh 15 is placed on the slurry 12, the rod is swung so that the other end of the rod conflicts with the slurry 12. At this time, the rod is arranged horizontally so that The steel mesh 15 and the slurry 12 are relatively fixed, so as to avoid the deviation of the steel mesh 15 during grouting, which affects the anti-cracking protection effect of the steel mesh 15.
  • the template can be used as a protective cover for the core 10 without being removed, thereby enhancing the anti-corrosion performance of the core 10.
  • the material of the slurry 12 can be fine stone concrete or mortar, thereby enhancing the bonding strength of the anchor bar and the slurry and enhancing the anti-corrosion performance.

Abstract

The present utility model relates to the technical field of prestressed anchors and disclosed is a prefabricated prestressed anchor structure, comprising a drilled hole and a core placed inside the drilled hole. The core comprises multiple anchor bars, a grout, and a grouting tube; one end of the anchor bar is embedded into the grout, and the other end of the anchor bar extends away from the grout; one end of the grouting tube is embedded into the grout; the grout has a bottom close to the bottom of the drilled hole; the grouting tube penetrates through the bottom of the grout; the other end of the grouting tube extends away from the grout; one end of the anchor bar and one end of the grouting tube are separately fixed into the grout. Because the core is prefabricated, the quality of the grout is effectively ensured, and the poor stability of the bearing capacity of the anchor caused by large discreteness of the bearing capacity of the anchor is avoided; in addition, an adequate bonding strength between the grout and the bar is effectively ensured, and under the action of the grout, the bar is protected and the corrosion resistance of the bar is improved.

Description

预制式预应力锚杆结构Prefabricated prestressed anchor rod structure 技术领域Technical field
本实用新型涉及预应力锚杆施工的技术领域,特别涉及预制式预应力锚杆结构。The utility model relates to the technical field of prestressed anchor rod construction, in particular to a prefabricated prestressed anchor rod structure.
背景技术Background technique
在国内外土木建设工程领域,以预应力锚杆为核心的岩土锚固技术应用十分广泛,大量应用于边坡治理、基坑支护、地下结构抗浮、隧道及地下洞室加固、地灾治理等工程;按结构原理,预应力锚杆可分为拉力型以及压力型两大类。In the field of civil construction engineering at home and abroad, the geotechnical anchoring technology with prestressed anchors as the core is widely used, and it is widely used in slope treatment, foundation pit support, underground structure anti-floating, tunnel and underground cavern reinforcement, and disaster Treatment and other projects; according to structural principles, prestressed anchor rods can be divided into two categories: tension type and pressure type.
技术问题technical problem
目前,在地层中钻孔、安装锚筋、注浆而形成拉力型锚杆,由于钻孔内积水、泥土、岩屑及泥浆等杂质很难排除干净,很容易在锚筋表面局部附着泥渣或泥皮、局部无浆液包裹,以及浆体中夹杂泥块等缺陷;并且,浆体被孔内积水在不同程度上稀释、注浆后无法振捣,导致浆体实际强度较低、浆体强度不稳定,从而导致浆体与锚筋的粘结强度较低且不稳定,最终导致锚筋抗拉脱承载力较低且不稳定、离散性较大,锚筋易受腐蚀。At present, the tensile anchor rod is formed by drilling, installing anchor bars, and grouting in the stratum. It is difficult to remove impurities such as water, soil, rock cuttings and mud in the borehole, and it is easy to partially adhere to the surface of the anchor bar. Defects such as slag or mud skin, no partial grout coating, and mud inclusions in the slurry; and the slurry is diluted to varying degrees by the water in the hole and cannot be vibrated after grouting, resulting in lower actual strength of the slurry. The strength of the slurry is unstable, which leads to low and unstable bond strength between the slurry and the anchor bar, and ultimately leads to low tensile strength of the anchor bar, unstable and large dispersion, and the anchor bar is susceptible to corrosion.
压力型锚杆,注浆管端头超过内锚头,注浆时浆液绕流至内锚头下,受内锚头阻隔作用,内锚头下的积水、泥土、岩屑及泥浆等杂质很难排除干净而夹杂在浆液中,造成内锚头下浆体强度偏低且不稳定,容易导致局部受压破坏,从而导致锚杆承载力偏低且不稳定;同时,在内锚头下,锚筋通过锚夹具连接在内锚头上,尽管锚筋全长被隔离套管包裹形成了防腐保护,但由于锚头下浆体质量较差,很难对锚夹具形成有效的防腐保护,导致压力型锚杆的承载力离散性很大且防腐性能不好。Pressure-type anchor rod, the end of the grouting pipe exceeds the inner anchor head, and the grout flows around under the inner anchor head during grouting, and is blocked by the inner anchor head. Impurities such as water, soil, rock debris and mud under the inner anchor head It is difficult to rule out clean and inclusion in the slurry, resulting in low and unstable strength of the slurry under the inner anchor head, which can easily lead to local compression damage, resulting in low and unstable anchor bearing capacity; at the same time, under the inner anchor head The anchor bar is connected to the inner anchor head by the anchor clamp. Although the full length of the anchor bar is wrapped by the isolation sleeve to form anti-corrosion protection, it is difficult to form effective anti-corrosion protection for the anchor clamp due to the poor slurry quality under the anchor head. As a result, the load-bearing capacity of the pressure-type anchor is very discrete and the corrosion resistance is not good.
技术解决方案Technical solutions
本实用新型的目的在于提供预制式预应力锚杆结构,旨在解决现有技术中预应力锚杆的防腐性能不佳的问题。The purpose of the utility model is to provide a prefabricated prestressed anchor rod structure, which aims to solve the problem of poor anti-corrosion performance of the prestressed anchor rod in the prior art.
本实用新型是这样实现的,预制式预应力锚杆结构,包括钻孔以及置于钻孔内部的芯体,所述芯体包括多条锚筋、浆体及注浆管,所述锚筋的一端嵌入所述浆体,所述锚筋的另一端朝背离所述浆体方向延伸布置,所述注浆管的一端嵌入所述浆体,所述浆体具有靠近所述钻孔的孔底的底部,所述注浆管贯穿所述浆体的底部,所述注浆管的另一端朝背离所述浆体方向延伸布置,所述锚筋的一端和所述注浆管的一端分别与所述浆体呈固定布置。The utility model is realized in this way. The prefabricated prestressed anchor rod structure includes a drilled hole and a core placed inside the drilled hole. The core includes a plurality of anchor bars, a grout and a grouting pipe. One end of the grouting pipe is embedded in the slurry, the other end of the anchor bar extends in a direction away from the slurry, and one end of the grouting pipe is embedded in the slurry, and the slurry has a hole close to the bore At the bottom of the bottom, the grouting pipe penetrates the bottom of the slurry, the other end of the grouting pipe extends in a direction away from the slurry, and one end of the anchor bar and one end of the grouting pipe are respectively It is fixedly arranged with the slurry.
进一步的,多条所述锚筋沿所述注浆管呈圆周环绕间隔布置。Further, a plurality of the anchor ribs are arranged at a circumferential interval along the grouting pipe.
进一步的,相邻所述锚筋的间距范围为10-60mm,所述锚筋的直径范围为12-80mm。Further, the distance between adjacent anchor bars is 10-60 mm, and the diameter of the anchor bars is 12-80 mm.
进一步的,所述锚筋包括锚固段及自由段,所述锚固段处于所述浆体,所述自由段设有隔离套管,所述隔离套管环绕包围所述自由段,所述隔离套管的内端嵌入所述浆体。 Further, the anchor bar includes an anchor section and a free section, the anchor section is in the slurry, the free section is provided with an isolation sleeve, the isolation sleeve surrounds the free section, and the isolation sleeve The inner end of the tube is embedded in the slurry.
进一步的,所述隔离套管的内端嵌入所述浆体的范围为200-300mm。Further, the range of the inner end of the isolation sleeve embedded in the slurry is 200-300 mm.
进一步的,所述注浆管的一端嵌入所述浆体的中部,各个所述锚筋沿所述注浆管的圆周呈环绕间隔布置。Further, one end of the grouting pipe is embedded in the middle of the slurry, and each of the anchor bars is arranged at a circumferential interval along the circumference of the grouting pipe.
进一步的,所述预制式预应力锚杆结构包括模板件,各个所述锚筋和所述注浆管呈绑扎相对固定,各个所述锚筋的一端和所述注浆管的一端分别置于所述模板件内,灌浆,振捣,形成所述芯体; 所述芯体的直径范围为60-150mm。Further, the prefabricated prestressed anchor rod structure includes a template member, each of the anchor bars and the grouting pipe is relatively fixed by lashing, and one end of each of the anchor bars and one end of the grouting pipe are respectively placed The core is formed by grouting and vibrating in the template; the diameter of the core is in the range of 60-150mm.
进一步的,所述浆体的外表面设有横肋,所述横肋呈螺旋状环绕布置在所述浆体的外表面。Further, the outer surface of the slurry is provided with transverse ribs, and the transverse ribs are spirally arranged on the outer surface of the slurry.
进一步的,所述横肋呈倾斜状布置。Further, the transverse ribs are arranged in an inclined shape.
进一步的,所述芯体包括钢筋网片,所述钢筋网片处于所述浆体内,所述钢筋网片围合形成围合空间,多条所述锚筋以及所述注浆管均处于所述围合空间。Further, the core includes a steel mesh, the steel mesh is in the grout, the steel mesh is enclosed to form an enclosed space, and a plurality of the anchor bars and the grouting pipe are all located State the enclosed space.
有益效果Beneficial effect
与现有技术相比,本实用新型提供的预制式预应力锚杆结构,芯体在工厂或工地现场进行预制,将制作好的芯体置于钻孔内,利用注浆管进行注浆,使浆体与土层粘结;由于芯体预制形成,有效保证浆体的质量,避免锚杆承载力的离散性过大,导致锚杆承载力的稳定性差;另外,有效保证浆体与筋体具有足够的粘结强度,并且,在浆体的作用下,对筋体起到保护作用,提高筋体的耐腐蚀性。Compared with the prior art, in the prefabricated prestressed anchor rod structure provided by the present invention, the core is prefabricated in the factory or construction site, the fabricated core is placed in the borehole, and the grouting pipe is used for grouting. Make the slurry and the soil bond; due to the prefabrication of the core, the quality of the slurry is effectively guaranteed, and the dispersion of the bearing capacity of the anchor is prevented from being too large, resulting in poor stability of the bearing capacity of the anchor; in addition, the slurry and the reinforcement are effectively guaranteed The body has sufficient bonding strength, and, under the action of the slurry, it protects the reinforcement and improves the corrosion resistance of the reinforcement.
附图说明Description of the drawings
图1是本实用新型实施例提供的预制式预应力锚杆结构的平面示意图;Figure 1 is a schematic plan view of a prefabricated prestressed anchor rod structure provided by an embodiment of the present invention;
图2是本实用新型实施例提供的预制式预应力锚杆结构的A部剖面示意图;2 is a schematic diagram of a section A of the prefabricated prestressed anchor rod structure provided by the embodiment of the present invention;
图3是本实用新型实施例提供的预制式预应力锚杆结构的施工平面示意图;3 is a schematic diagram of the construction plan of the prefabricated prestressed anchor rod structure provided by the embodiment of the present invention;
图4是本实用新型实施例提供的预制式预应力锚杆结构的平面示意图;4 is a schematic plan view of a prefabricated prestressed anchor rod structure provided by an embodiment of the present invention;
图5是本实用新型实施例提供的预制式预应力锚杆结构的B部剖面示意图。Fig. 5 is a schematic sectional view of part B of the prefabricated prestressed anchor rod structure provided by the embodiment of the present invention.
本发明的最佳实施方式The best mode of the invention
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solutions and advantages of the present utility model clearer, the following further describes the present utility model in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present utility model, and are not used to limit the present utility model.
本实施例的附图中相同或相似的标号对应相同或相似的部件;在本实用新型的描述中,需要理解的是,若有术语“上”、“下”、“左”、“右”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此附图中描述位置关系的用语仅用于示例性说明,不能理解为对本专利的限制,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语的具体含义。The same or similar reference numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if there are the terms "upper", "lower", "left", "right" The orientation or positional relationship of other indications is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation and Therefore, the terms describing the positional relationship in the drawings are only used for exemplary description and cannot be understood as a limitation of the patent. For those of ordinary skill in the art, the specific meaning of the above terms can be understood according to the specific circumstances. .
以下结合具体实施例对本实用新型的实现进行详细的描述。The implementation of the present utility model will be described in detail below in conjunction with specific embodiments.
参照图1-5所示,为本实用新型提供较佳实施例。Referring to Figures 1-5, a preferred embodiment is provided for the utility model.
本实用新型提供的预制式预应力锚杆结构,用于解决预应力锚杆的承载力低、不稳定以及防腐性能不佳的问题。The prefabricated prestressed anchor rod structure provided by the utility model is used to solve the problems of low bearing capacity, instability and poor anti-corrosion performance of the prestressed anchor rod.
预制式预应力锚杆结构,包括钻孔以及芯体10,芯体10置于钻孔内部,芯体10包括多条锚筋11、浆体12及注浆管13,锚筋11的一端嵌入浆体12,锚筋11的另一端朝背离浆体12方向延伸布置,注浆管13的一端嵌入浆体12,浆体12具有靠近钻孔的孔底的底部,注浆管13贯穿浆体12的底部,注浆管13的另一端朝背离浆体12方向延伸布置,锚筋11的一端和注浆管13的一端分别与浆体12呈固定布置。The prefabricated prestressed anchor rod structure includes a drilled hole and a core body 10, the core body 10 is placed inside the drilled hole, the core body 10 includes a plurality of anchor bars 11, a slurry 12 and a grouting pipe 13, and one end of the anchor bar 11 is embedded For the slurry 12, the other end of the anchor bar 11 extends away from the slurry 12, one end of the grouting pipe 13 is embedded in the slurry 12, and the slurry 12 has a bottom close to the bottom of the borehole, and the grouting pipe 13 penetrates the slurry. At the bottom of 12, the other end of the grouting pipe 13 is arranged to extend away from the slurry 12, and one end of the anchor rib 11 and one end of the grouting pipe 13 are fixedly arranged with the slurry 12, respectively.
上述的预制式预应力锚杆结构,芯体10在工厂或工地现场进行预制,将制作好的芯体10置于钻孔内,利用注浆管13进行注浆,使浆体12与土层30粘结;由于芯体10预制形成,有效保证浆体12的质量,避免锚杆承载力的离散性过大,导致锚杆承载力的稳定性差,提高整体承载力;另外,有效保证浆体12与筋体具有足够的粘结强度,使其更加稳定,并且,在浆体12的作用下,对筋体起到保护作用,提高筋体的耐腐蚀性。In the above-mentioned prefabricated prestressed anchor rod structure, the core body 10 is prefabricated in the factory or the construction site. The prepared core body 10 is placed in the borehole, and the grouting pipe 13 is used for grouting to make the slurry 12 and the soil layer 30 bonding; due to the prefabrication of the core body 10, the quality of the slurry 12 is effectively ensured, and the dispersion of the bearing capacity of the bolt is prevented from being too large, resulting in poor stability of the bearing capacity of the bolt, and the overall bearing capacity is improved; in addition, the slurry is effectively guaranteed 12 has sufficient bonding strength with the bar to make it more stable, and under the action of the slurry 12, it protects the bar and improves the corrosion resistance of the bar.
本实施例中,也可仅采用一条锚筋11,根据锚筋11的设计承载力,设置一条或多条锚筋11,保证芯体10整体稳固性,同时。降低制造成本。In this embodiment, only one anchor bar 11 may also be used, and one or more anchor bars 11 are provided according to the design bearing capacity of the anchor bar 11 to ensure the overall stability of the core body 10 and at the same time. Reduce manufacturing costs.
钻孔的直径大于浆体12的直径40mm以上,便于浆体12置于钻孔,便于锚杆的安设。The diameter of the borehole is greater than the diameter of the slurry 12 by more than 40 mm, which is convenient for the slurry 12 to be placed in the borehole and facilitates the installation of the anchor rod.
锚筋11材料可为钢筋或钢绞线,浆体12材料可为细石混凝土、水泥砂浆或水泥净浆;价格低廉,且制作速度快。The material of the anchor bar 11 can be steel bars or steel strands, and the material of the slurry 12 can be fine stone concrete, cement mortar or cement paste; the price is low and the production speed is fast.
多条锚筋11沿注浆管13呈圆周环绕间隔布置;采用多条锚筋11使整体的锚固效果更强,同时,多条锚筋11间隔布置使芯体10的整体锚固力更加均匀,且浆体12的受力均匀,提供浆体12的承受力。The multiple anchor bars 11 are arranged circumferentially and spaced along the grouting pipe 13; the use of multiple anchor bars 11 makes the overall anchoring effect stronger. At the same time, the multiple anchor bars 11 are arranged at intervals to make the overall anchoring force of the core 10 more uniform. In addition, the force of the slurry 12 is uniform, and the bearing capacity of the slurry 12 is provided.
相邻锚筋11的间距范围为10-60mm,这样设置,各个锚筋11的配合效果更佳,保证足够的锚固效果。The range of the distance between adjacent anchor bars 11 is 10-60 mm. With this arrangement, the matching effect of each anchor bar 11 is better and sufficient anchoring effect is ensured.
锚筋11的直径范围为12-80mm;锚筋11的直径的取值范围根据各个锚筋11的设计承载力而确定,各个锚筋11的距离为10~60mm;保证具有足够的锚固力。The diameter range of the anchor bar 11 is 12-80mm; the value range of the diameter of the anchor bar 11 is determined according to the design bearing capacity of each anchor bar 11, and the distance between each anchor bar 11 is 10-60mm; sufficient anchoring force is ensured.
锚筋11包括锚固段及自由段,锚固段处于浆体12,自由段设有隔离套管20,隔离套管20环绕包围自由段,隔离套管20的内端嵌入浆体12;从而增强隔离套管20的安设稳固性,并且,保证隔离套管20全面保护自由段,增强自由段的防腐性能,提高锚筋11的使用寿命。The anchor bar 11 includes an anchor section and a free section. The anchor section is in the slurry 12. The free section is provided with an isolation sleeve 20 that surrounds the free section, and the inner end of the isolation sleeve 20 is embedded in the slurry 12; thereby enhancing isolation The installation stability of the casing 20, and ensures that the isolation casing 20 fully protects the free section, enhances the anti-corrosion performance of the free section, and improves the service life of the anchor bar 11.
另外,当注浆延伸至自由段时,在隔离套管20的作用下,起到隔离注浆,保证自由段的张拉。 In addition, when the grouting extends to the free section, under the action of the isolation sleeve 20, the isolation grouting is performed to ensure the tension of the free section.
隔离套管20的内端嵌入浆体12的范围为200-300mm;避免隔离套管20的浪费,同时,保证隔离套管20的安设稳固性。The inner end of the isolation sleeve 20 is embedded in the slurry 12 in a range of 200-300 mm; waste of the isolation sleeve 20 is avoided, and at the same time, the installation stability of the isolation sleeve 20 is ensured.
注浆管13的一端嵌入浆体12的中部,各个锚筋11沿注浆管13的圆周呈环绕间隔布置;使结构更紧凑,并且,通过注浆管13进行注浆时,便于水泥浆均匀包围芯体10,保证芯体10与土层30的粘结效果。One end of the grouting pipe 13 is embedded in the middle of the slurry 12, and the anchor bars 11 are arranged at a circumferential interval along the circumference of the grouting pipe 13; this makes the structure more compact, and when grouting is carried out through the grouting pipe 13, it is convenient for the cement slurry to be uniform Surround the core 10 to ensure the bonding effect between the core 10 and the soil layer 30.
预制式预应力锚杆结构包括模板件,各个锚筋11和注浆管13呈绑扎相对固定,各个锚筋11的一端和注浆管13的一端分别置于模板件内,进行灌浆,振捣,形成芯体10;便于芯体10的制成,实现芯体10预制。The prefabricated prestressed anchor rod structure includes a template member. Each anchor bar 11 and the grouting pipe 13 are relatively fixed by lashing. One end of each anchor bar 11 and one end of the grouting pipe 13 are respectively placed in the template member for grouting and vibrating. , The core body 10 is formed; the manufacture of the core body 10 is facilitated, and the prefabrication of the core body 10 is realized.
芯体10的直径范围为60-150mm;保证各个锚筋11和注浆管13的设置,且保证芯体10与锚杆配合具有足够的抗变形效果,提高锚固效果。The diameter of the core body 10 is in the range of 60-150 mm; the arrangement of each anchor bar 11 and the grouting tube 13 is ensured, and the core body 10 and the anchor rod have sufficient anti-deformation effect to improve the anchoring effect.
再者,浆体12的外表面设有条纹;增强浆体12与土层30的接触面积,增强浆体12与土层30粘结效果,提高芯体10的锚固效果。Furthermore, the outer surface of the slurry 12 is provided with stripes; the contact area between the slurry 12 and the soil layer 30 is enhanced, the bonding effect of the slurry 12 and the soil layer 30 is enhanced, and the anchoring effect of the core body 10 is improved.
芯体10的长度范围为2~3m,浆体12的强度范围为20~50MPa;保证浆体12具有足够的锚固稳固性。The length of the core 10 is in the range of 2 to 3 m, and the strength of the slurry 12 is in the range of 20 to 50 MPa; it is ensured that the slurry 12 has sufficient anchoring stability.
浆体12的底部形成有连接通道,连接通道连通土层30,注浆管13的一端与连接通道连通;实现注浆管13进行注浆。A connecting channel is formed at the bottom of the slurry 12, the connecting channel is connected to the soil layer 30, and one end of the grouting pipe 13 is connected to the connecting channel; the grouting pipe 13 is realized for grouting.
浆体12的外表面设有横肋14,横肋14呈螺旋状环绕布置在浆体12的外表面;在横肋14的作用下,增强浆体12的粘结强度,增强浆体12的锚固效果。The outer surface of the slurry 12 is provided with transverse ribs 14, which are arranged spirally on the outer surface of the slurry 12; under the action of the transverse ribs 14, the bonding strength of the slurry 12 is enhanced, and the Anchoring effect.
再者,横肋14呈倾斜状布置,增大横肋14的横向面积,提高浆体12的粘结强度。Furthermore, the transverse ribs 14 are arranged in an oblique shape to increase the transverse area of the transverse ribs 14 and improve the bonding strength of the slurry 12.
芯体10包括钢筋网片15,钢筋网片15处于浆体12内,钢筋网片15围合形成围合空间,多条锚筋11以及注浆管13均处于围合空间;在钢筋网片15的作用下,有助于减小浆体12产生裂缝,从而增强浆体12的防腐性能,对浆体12起到抗裂保护。The core 10 includes a steel mesh 15 in the slurry 12, the steel mesh 15 encloses to form an enclosed space, and multiple anchor bars 11 and grouting pipes 13 are in the enclosed space; Under the action of 15, it helps to reduce the cracks of the slurry 12, thereby enhancing the anti-corrosion performance of the slurry 12 and protecting the slurry 12 from cracking.
再者,钢筋网片15的外表面设有多组水平条组,两组水平条组沿浆体的中心呈对称布置;水平条组包括呈水平布置的杆体,杆体的一端连接钢筋网片15的外表面,杆体的另一端抵触浆体12;在杆体的作用下,便于钢筋网片15对中,便于钢筋网片15的安设,并且保证钢筋网片15的抗裂保护效果。Furthermore, the outer surface of the steel mesh 15 is provided with multiple horizontal strip groups, the two horizontal strip groups are arranged symmetrically along the center of the slurry; the horizontal strip group includes horizontally arranged rods, one end of the rod is connected to the steel mesh 15 On the outer surface of the rod, the other end of the rod body is in contact with the slurry 12; under the action of the rod body, it is convenient for the steel mesh 15 to be centered, which facilitates the installation of the steel mesh 15 and ensures the anti-cracking protection effect of the steel mesh 15.
杆体的一端与钢筋网片15的外表面呈活动连接布置,钢筋网片15置于浆体12后,摆动杆体,使杆体的另一端与浆体12抵触,此时,杆体呈水平布置,使钢筋网片15与浆体12呈相对固定,避免注浆时,钢筋网片15造成偏移,影响钢筋网片15的抗裂保护效果。One end of the rod is arranged in a movable connection with the outer surface of the steel mesh 15. After the steel mesh 15 is placed on the slurry 12, the rod is swung so that the other end of the rod conflicts with the slurry 12. At this time, the rod is arranged horizontally so that The steel mesh 15 and the slurry 12 are relatively fixed, so as to avoid the deviation of the steel mesh 15 during grouting, which affects the anti-cracking protection effect of the steel mesh 15.
另外,模板可不拆除,作为芯体10的防护套,从而增强芯体10的防腐性能。In addition, the template can be used as a protective cover for the core 10 without being removed, thereby enhancing the anti-corrosion performance of the core 10.
浆体12的材料可采用细石混凝土或砂浆,从而增强锚筋与浆体的粘结强度及增强防腐性能。The material of the slurry 12 can be fine stone concrete or mortar, thereby enhancing the bonding strength of the anchor bar and the slurry and enhancing the anti-corrosion performance.
以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above are only the preferred embodiments of the present utility model and are not intended to limit the present utility model. Any modification, equivalent replacement and improvement made within the spirit and principle of the utility model shall be included in the present utility model. Within the scope of protection.

Claims (10)

  1. 预制式预应力锚杆结构,其特征在于,包括钻孔以及置于钻孔内部的芯体,所述芯体包括多条锚筋、浆体及注浆管,所述锚筋的一端嵌入所述浆体,所述锚筋的另一端朝背离所述浆体方向延伸布置,所述注浆管的一端嵌入所述浆体,所述浆体具有靠近所述钻孔的孔底的底部,所述注浆管贯穿所述浆体的底部,所述注浆管的另一端朝背离所述浆体方向延伸布置,所述锚筋的一端和所述注浆管的一端分别与所述浆体呈固定布置。The prefabricated prestressed anchor rod structure is characterized in that it includes a drilled hole and a core placed inside the drilled hole. The core includes a plurality of anchor bars, a grout, and a grouting pipe. One end of the anchor bar is embedded in the hole In the slurry, the other end of the anchor bar extends in a direction away from the slurry, and one end of the grouting pipe is embedded in the slurry, and the slurry has a bottom close to the bottom of the drilled hole, The grouting pipe penetrates the bottom of the slurry, the other end of the grouting pipe extends in a direction away from the slurry, and one end of the anchor bar and one end of the grouting pipe are respectively connected to the grouting The body is in a fixed arrangement.
  2. 如权利要求1所述的预制式预应力锚杆结构,其特征在于,多条所述锚筋沿所述注浆管呈圆周环绕间隔布置。The prefabricated prestressed anchor rod structure according to claim 1, wherein a plurality of the anchor ribs are arranged at a circumferential interval along the grouting pipe.
  3. 如权利要求2所述的预制式预应力锚杆结构,其特征在于,相邻所述锚筋的间距范围为10-60mm,所述锚筋的直径范围为12-80mm。The prefabricated prestressed anchor rod structure according to claim 2, wherein the distance between adjacent anchor bars is 10-60 mm, and the diameter of the anchor bars is 12-80 mm.
  4. 如权利要求1-3任意一项所述的预制式预应力锚杆结构,其特征在于,所述锚筋包括锚固段及自由段,所述锚固段处于所述浆体,所述自由段设有隔离套管,所述隔离套管环绕包围所述自由段,所述隔离套管的内端嵌入所述浆体。The prefabricated prestressed anchor rod structure according to any one of claims 1 to 3, wherein the anchor bar includes an anchor section and a free section, the anchor section is in the slurry, and the free section is provided There is an isolation sleeve, the isolation sleeve surrounds the free section, and the inner end of the isolation sleeve is embedded in the slurry.
  5. 如权利要求4所述的预制式预应力锚杆结构,其特征在于,所述隔离套管的内端嵌入所述浆体的范围为200-300mm。The prefabricated prestressed anchor rod structure according to claim 4, wherein the inner end of the isolation sleeve is embedded in the slurry in a range of 200-300 mm.
  6. 如权利要求1-3任意一项所述的预制式预应力锚杆结构,其特征在于,所述注浆管的一端嵌入所述浆体的中部,各个所述锚筋沿所述注浆管的圆周呈环绕间隔布置。The prefabricated prestressed anchor rod structure according to any one of claims 1 to 3, wherein one end of the grouting pipe is embedded in the middle of the slurry, and each of the anchor bars is along the grouting pipe. The circumference is arranged around intervals.
  7. 如权利要求1-3任意一项所述的预制式预应力锚杆结构,其特征在于,所述预制式预应力锚杆结构包括模板件,各个所述锚筋和所述注浆管呈绑扎相对固定,各个所述锚筋的一端和所述注浆管的一端分别置于所述模板件内,灌浆,振捣,形成所述芯体;所述芯体的直径范围为60-150mm。The prefabricated prestressed anchor rod structure according to any one of claims 1 to 3, wherein the prefabricated prestressed anchor rod structure includes a template member, and each of the anchor bars and the grouting pipe is lashed Relatively fixed, one end of each anchor bar and one end of the grouting pipe are respectively placed in the template member, grouted and vibrated to form the core; the diameter of the core is in the range of 60-150 mm.
  8. 如权利要求1-3任意一项所述的预制式预应力锚杆结构,其特征在于,所述浆体的外表面设有横肋,所述横肋呈螺旋状环绕布置在所述浆体的外表面。The prefabricated prestressed anchor rod structure according to any one of claims 1-3, wherein the outer surface of the slurry is provided with transverse ribs, and the transverse ribs are arranged spirally around the slurry. The outer surface.
  9. 如权利要求8所述的预制式预应力锚杆结构,其特征在于,所述横肋呈倾斜状布置。9. The prefabricated prestressed anchor structure of claim 8, wherein the transverse ribs are arranged in an inclined shape.
  10. 如权利要求1-3任意一项所述的预制式预应力锚杆结构,其特征在于,所述芯体包括钢筋网片,所述钢筋网片处于所述浆体内,所述钢筋网片围合形成围合空间,多条所述锚筋以及所述注浆管均处于所述围合空间。The prefabricated prestressed anchor rod structure according to any one of claims 1-3, wherein the core includes a steel mesh, the steel mesh is in the slurry, and the steel mesh surrounds They are combined to form an enclosed space, and a plurality of the anchor bars and the grouting pipe are all located in the enclosed space.
PCT/CN2019/119338 2019-01-24 2019-11-19 Prefabricated prestressed anchor structure WO2020151347A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021600124U JP3235428U (en) 2019-01-24 2019-11-19 Prefabricated prestress anchor structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201920128725.7 2019-01-24
CN201920128725.7U CN209837018U (en) 2019-01-24 2019-01-24 Prefabricated prestressed anchor rod construction structure

Publications (1)

Publication Number Publication Date
WO2020151347A1 true WO2020151347A1 (en) 2020-07-30

Family

ID=68902710

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/119338 WO2020151347A1 (en) 2019-01-24 2019-11-19 Prefabricated prestressed anchor structure

Country Status (3)

Country Link
JP (1) JP3235428U (en)
CN (1) CN209837018U (en)
WO (1) WO2020151347A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945720A (en) * 2020-08-31 2020-11-17 华侨大学 Self-reducing guide cap and tension-compression composite anchor rod adopting same
CN114046821A (en) * 2021-11-10 2022-02-15 山东高速股份有限公司 Prestressed beam grouting monitoring device and monitoring process
CN114087000A (en) * 2021-11-18 2022-02-25 甘肃省公路交通建设集团有限公司 Recoverable positioning grouting anchor pipe and positioning grouting anchoring method
CN114293567A (en) * 2021-12-27 2022-04-08 北京建工四建工程建设有限公司 Construction method for improving bearing capacity of natural foundation by embedding basic raft plates into slope protection piles
CN115369870A (en) * 2022-09-22 2022-11-22 中国五冶集团有限公司 Post-cast anti-floating anchor rod

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165647A (en) * 1994-12-15 1996-06-25 Kurosawa Kensetsu Kk Ground anchor construction method and its fixation member
JP2005023662A (en) * 2003-07-03 2005-01-27 Kowa Sangyo Kk Anchor, anchoring method and method of removing tendon for anchor
CN102605780A (en) * 2012-04-17 2012-07-25 周治国 Recyclable anchor rod for foundation pit support and construction method thereof
CN206928285U (en) * 2017-06-14 2018-01-26 张智猷 Prefabricated high-strength core body and pressure type anchor rod
CN109778850A (en) * 2019-01-24 2019-05-21 深圳市工勘岩土技术有限公司 Prefabricated prestressed anchor construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08165647A (en) * 1994-12-15 1996-06-25 Kurosawa Kensetsu Kk Ground anchor construction method and its fixation member
JP2005023662A (en) * 2003-07-03 2005-01-27 Kowa Sangyo Kk Anchor, anchoring method and method of removing tendon for anchor
CN102605780A (en) * 2012-04-17 2012-07-25 周治国 Recyclable anchor rod for foundation pit support and construction method thereof
CN206928285U (en) * 2017-06-14 2018-01-26 张智猷 Prefabricated high-strength core body and pressure type anchor rod
CN109778850A (en) * 2019-01-24 2019-05-21 深圳市工勘岩土技术有限公司 Prefabricated prestressed anchor construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945720A (en) * 2020-08-31 2020-11-17 华侨大学 Self-reducing guide cap and tension-compression composite anchor rod adopting same
CN114046821A (en) * 2021-11-10 2022-02-15 山东高速股份有限公司 Prestressed beam grouting monitoring device and monitoring process
CN114046821B (en) * 2021-11-10 2023-06-02 山东高速股份有限公司 Prestressed beam grouting monitoring device and monitoring technology
CN114087000A (en) * 2021-11-18 2022-02-25 甘肃省公路交通建设集团有限公司 Recoverable positioning grouting anchor pipe and positioning grouting anchoring method
CN114087000B (en) * 2021-11-18 2023-08-04 甘肃公航旅永积高速公路项目管理有限公司 Recoverable positioning grouting anchor pipe and positioning grouting anchoring method
CN114293567A (en) * 2021-12-27 2022-04-08 北京建工四建工程建设有限公司 Construction method for improving bearing capacity of natural foundation by embedding basic raft plates into slope protection piles
CN115369870A (en) * 2022-09-22 2022-11-22 中国五冶集团有限公司 Post-cast anti-floating anchor rod
CN115369870B (en) * 2022-09-22 2023-08-01 中国五冶集团有限公司 Post-cast anti-floating anchor rod

Also Published As

Publication number Publication date
CN209837018U (en) 2019-12-24
JP3235428U (en) 2021-12-23

Similar Documents

Publication Publication Date Title
WO2020151347A1 (en) Prefabricated prestressed anchor structure
CN204982864U (en) Insert steel reinforcement cage behind long spiral pore -forming guncreting
CN204703160U (en) Two anchoring section prestressed anchor Cable Structure
CN103510540B (en) Mortar flag stone retaining wall reinforcement construction method and structure thereof
CN108104121B (en) Structure and method for improving compressive strength of pressure type anchor cable cement grouting body
WO2020151348A1 (en) Prefabricated prestressed anchor rod construction method
CN102808414B (en) Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure
CN204703159U (en) Prefabricated anchor head pressure anchor wire structure
CN101487258B (en) Bearing rope anchor of cable crane and its construction method
CN102808422A (en) Bonded post-tensioned prestressed construction method for cast-in-place reinforced concrete structure
CN111894045A (en) Anti-floating anchoring structure and anti-floating anchoring construction method for basement bottom plate
CN105714819A (en) Novel prestressed anchor cable outer anchor head multiple protection device and fixing method thereof
CN113123373A (en) Pressure-bearing uplift pile with rear-inserted unbonded steel strand U-shaped pipe and construction method thereof
CN203533005U (en) Prestressed steel-concrete composite pressure jacking pipe
CN101793027B (en) Core-grouted static pressure anchor rod pile
CN106120817B (en) A kind of slope surface building concrete layer landslide-proofing construction technology
CN112647497B (en) In-hole prestress supporting member, prestress anchor rod and construction method
CN212582757U (en) Anti-floating anchoring structure for basement bottom plate
CN212612665U (en) Anti-floating anchor rod rigid anchor backing plate capable of applying ultrahigh prestress
CN211773818U (en) Prestressed concrete annular foundation and external prestressed reinforcement structure thereof
CN210827460U (en) Drainage anchor nail for slope drainage reinforcement and drainage system
CN208363089U (en) The steel strand reinforced structure of Pulling-Resistant Anchor Rod in a kind of stake
CN112982395A (en) Stiff composite pile body anchor rod device and construction process
CN105442594A (en) Hole reaming mud-jacking construction technology for prestress hollow square pile with built-in mud-jacking pipe
CN113322982A (en) Method for managing landslide of accumulation layer

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19911401

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021600124

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19911401

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 19911401

Country of ref document: EP

Kind code of ref document: A1