EP3029159B1 - Procédé de réparation de haut fourneau - Google Patents

Procédé de réparation de haut fourneau Download PDF

Info

Publication number
EP3029159B1
EP3029159B1 EP14832291.0A EP14832291A EP3029159B1 EP 3029159 B1 EP3029159 B1 EP 3029159B1 EP 14832291 A EP14832291 A EP 14832291A EP 3029159 B1 EP3029159 B1 EP 3029159B1
Authority
EP
European Patent Office
Prior art keywords
foundation
pull
furnace
new
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP14832291.0A
Other languages
German (de)
English (en)
Other versions
EP3029159A1 (fr
EP3029159A4 (fr
Inventor
Hiroshi Takasaki
Yuji Sudo
Hiroki Tago
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Engineering Co Ltd
Original Assignee
Nippon Steel and Sumikin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumikin Engineering Co Ltd filed Critical Nippon Steel and Sumikin Engineering Co Ltd
Publication of EP3029159A1 publication Critical patent/EP3029159A1/fr
Publication of EP3029159A4 publication Critical patent/EP3029159A4/fr
Application granted granted Critical
Publication of EP3029159B1 publication Critical patent/EP3029159B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces

Definitions

  • the present invention relates to a method for revamping a blast furnace, and more particularly, to a method for revamping a blast furnace capable of performing removal of an old furnace proper and an old furnace tower structure and construction of a new furnace proper and a new furnace tower structure in a short period of time.
  • the renewal of the furnace body is performed by removing the old furnace proper constructed on a foundation of a blast furnace installation site and by constructing a new furnace proper on the foundation.
  • a so-called ring block construction method for revamping a blast furnace in which the furnace body is sliced into a cross section of a ring and is removed from the foundation as a ring block and the ring block is assembled in a different site to be carried into the foundation.
  • Patent Literature 1 a large block construction method of increasing the size of the ring block and segmenting the blast furnace into four huge ring blocks or so has been developed.
  • the weight of the furnace bottom residue cooled and solidified after the blowing out the blast furnace is great, and in some cases, the total weight is, for example, 8,000 tons. Thus, it is difficult to suspend them.
  • Patent Literature 2 A method for dismantling the blast furnace bottom portion that removes the heavy furnace bottom portion without suspension has been suggested (see Patent Literature 2).
  • a foundation is divided into a plurality of elongate compartments extending in a carry-out direction, a work of horizontally cutting the foundation and repacking a sliding plate and a filler is successively performed on each compartment, and after the repacking of all the compartments is performed, the compartments are moved to slide using the sliding plate and are carried out only in a horizontal direction.
  • this method it is also possible to remove and carry in a huge furnace bottom portion having a weight exceeding 8,000 tons as the ring block. With the above techniques, the revamping construction period of the blast furnace is shortened.
  • Patent Literature 4 As a construction method for tall structures of plant equipment, a technique of collectively carrying in an apparatus body and its peripheral framework onto the foundation is suggested (see Patent Literature 4).
  • Patent Literature 4 since the bottom of the apparatus is provided as a separate body, the dimension of the apparatus body and the framework is shortened by the size of the separate lower apparatus so as to be conveyed. After installing the foundation, the shortened apparatus body and the framework are suspended and extended, and the separately conveyed lower apparatus is installed to complete the apparatus main body.
  • the technique of Patent Literature 4 is similar to a large block construction method in the blast furnace. However, as is also described in Patent Literature 4, the technique assumes the conveyance using ships and vehicles, but does not assume a huge structure such as a blast furnace. Furthermore, in Patent Literature 4, although there is a description of installation using a special foldable framework, there is no description of removal of the old structure.
  • Patent Literature 5 discloses a ring block transporter that transports a plurality of ring blocks between an installation site for a blast furnace and a work site that is separate from the installation site.
  • Patent Literature 6 provides a structure for furnace bottom part in a blast furnace, wherein a horizontally extending gap part is arranged, so that the heat-transfer is restrained, and the separation of the foundation from the furnace body can be easily performed.
  • furnace volume expansion of the new furnace proper is limited in order to avoid interference with the old furnace tower structure.
  • Patent Literature 3 by collectively replacing the furnace body, it is possible to eliminate the suspending work to the furnace body tower in the ring block construction method including the large block construction method.
  • the furnace body tower is not renewed, and the technique cannot be applied to the renewal of a blast furnace involving the expansion of the furnace body volume.
  • Patent Literature 4 since the assumed apparatus is small enough to be conveyed by ships and vehicles, the method disclosed therein cannot be directly applied to the renewal of the blast furnace, there is a need for a work in expansion and contraction of the framework and attachment and detachment of the lower apparatus, and this technique is not suitable for shortening construction period.
  • Patent Literature 1 or 2 it is difficult to further shorten the construction period. Even with reference to Patent Literatures 3 and 4 disclosing techniques before Patent Literatures 1 and 2, it is difficult to perform the removal of an old furnace proper and an old furnace tower structure, and the construction of a new furnace proper and a new furnace tower structure at the time of revamping of the blast furnace in a short period of time.
  • An object of the invention is to provide a method for revamping a blast furnace capable of performing the removal of the old furnace proper and the old furnace tower structure and the construction of the new furnace proper and the new furnace tower structure in a short period of time.
  • Our invention provides a method for revamping a blast furnace as described in our claim 1.
  • the new furnace proper and the new furnace tower structure are constructed on the top of a new foundation in a new furnace construction site different from the blast furnace installation site. Further, after the old blast furnace is blown out, by performing the old furnace pull-out step and the new furnace pull-in step, it is possible to remove the old furnace proper and the old furnace tower structure from the site foundation, and to collectively replace the new furnace proper and the new furnace tower structure constructed in advance.
  • the removed old furnace proper and the old furnace tower structure can be suitably dismantled in a state of re-operating the new blast furnace in still another old furnace dismantling site.
  • the revamping construction period of the blast furnace can be shortened to about 50 to 70 days.
  • equipment such as various facilities and piping and wiring
  • equipment installed between the old furnace proper and the old furnace tower structure can be carried out to the outside of the foundation in a mounted state.
  • the equipment installed between the new furnace proper and the new furnace tower structure is outfitted in advance in the new furnace construction step to be collectively carried in onto the foundation.
  • the revamping construction period can also be shortened in this regard.
  • a remarkable feature of the invention is that, since the old furnace tower structure is replaced with a new furnace tower structure simultaneously with the replacement of the old furnace proper with the new furnace proper, even when the furnace volume of the new furnace proper is significantly enlarged, the size of the new furnace proper is not restricted by the size of the old furnace tower structure. That is, even when a large new furnace proper which is not able to be housed in the old furnace tower structure, the large new furnace proper can be housed by constructing a new furnace tower structure matching thereto, and it is also possible to drastically enhance a freedom degree of expanding the furnace volume.
  • the upper surface of the foundation bottom is rough with large irregularities and the like, the upper surface can be covered with a restoration foundation, and the upper surface of the restoration foundation can be reconstructed with high smoothness. Therefore, when installing a sliding structure of the pull-in transfer device on the upper surface of the restoration foundation, it is possible for the new furnace proper to be stably carried in with high accuracy.
  • the new foundation, the new furnace proper and the new furnace tower structure are conveyed to the site foundation in the new furnace pull-in step.
  • the pull-in transfer device by linearly providing the pull-in transfer device, it is possible to perform the conveyance by minimum driving with no direction change or the like, thereby reducing a possibility of causing deformation and the like on the new furnace proper and the new furnace tower structure on the new foundation, and safely performing the conveyance.
  • the old furnace body carry-out device can partially share, for example, a portion from the site foundation to the direction change position with the aforementioned pull-in transfer device, and it is possible to efficiently use a ground leveled and reinforced as the pull-in transfer device.
  • the pull-out transfer device in order to receive the load of the huge new furnace proper and new furnace tower structure, sufficient reinforcement is performed on the ground on which the pull-in transfer device is installed.
  • the pull-out transfer device as well, there is a need for reinforcement of the ground to receive a heavy load of the old furnace proper and the old furnace tower structure, and by partially sharing the pull-out transfer device with the pull-in transfer device, it is possible to reduce the work and cost of the ground reinforcement as a whole.
  • the invention is not limited to the configuration of partially sharing the mutual conveying path in the pull-out transfer device and the pull-in transfer device.
  • the invention may be configured so that the pull-out transfer device and the pull-in transfer device are independent of each other.
  • the pull-out transfer device changes in direction at a halfway of the pull-in transfer device and extends in the intersection direction, it is possible to set the old furnace dismantling site at a site different from the new furnace construction site, and it is possible to avoid an interference of the working site.
  • the invention is not limited to the configuration in which the pull-in transfer device is linearly set and the pull-out transfer device experiences the direction change in the intersection direction in the middle (i.e. at a halfway).
  • the invention may be configured so that the pull-out transfer device is linearly set, and the pull-in transfer device experiences the direction change in the intersection direction in the middle.
  • each of the pull-out transfer device and the pull-in transfer device may experience the direction change.
  • the pull-in transfer device may experience the direction change in the intersection direction at a halfway of the conveying path and the pull-out transfer device may experience the direction change in the intersection direction from a halfway of the pull-in transfer device may be provided.
  • a shared portion of the conveying path may extend from the blast furnace installation site, the pull-in transfer device may extend from its end portion toward the new furnace construction site in the intersection direction, and the pull-out transfer device may extend toward the old furnace dismantling site from the end portion to the opposite side.
  • each of the pull-out transfer device and the pull-in transfer device may be linearly configured.
  • the pull-out transfer device and the pull-in transfer device need to be independent from each other, and for example, it is possible to use a configuration in which the pull-out transfer device linearly extends to one side of the site foundation and the pull-in transfer device extends in the other direction.
  • an angle formed between the pull-out transfer device and the pull-in transfer device is not limited to the configuration that forms 180 degrees (the devices are arranged on the same line) or 90 degrees, but a configuration that forms an angle such as 45 degrees or 60 degrees may be adopted. The reason is that, since the furnace body tower is also integrally conveyed in the invention, there is no restriction such as an angle that allows the passage of the furnace body tower.
  • the solid lubricated low-friction lining it is preferable to use a lining on which a solid lubricant, for example, fine powdery solid lubricant such as polytetrafluoroethylene resin (PTFE), molybdenum disulfide and graphite are rigidly attached on the surface of a substrate.
  • a solid lubricant for example, fine powdery solid lubricant such as polytetrafluoroethylene resin (PTFE), molybdenum disulfide and graphite are rigidly attached on the surface of a substrate.
  • the sliding structure may be utilized not only in the pull-in transfer device utilized in the new furnace pull-in step, but also in a pull-out transfer device that is used in the old furnace pull-out step.
  • the aforementioned pull-in transfer device and pull-out transfer device specifically preferably are installed with a platform(s) as described below and a sliding structure(s) along the conveying path in order to perform the conveying operation using the platform(s) and the sliding structure(s).
  • the pull-out transfer device includes a first movement path extending from the site foundation toward the site where the new furnace construction step is performed, a second movement path extending in the intersection direction from a halfway of the first movement path, an pull-out transfer base that is movable on the first movement path, a branch transfer base that is movable in the second movement path, and a recess that is formed in the ground along the second movement path and houses the branch transfer base
  • the first movement path includes a sliding structure that is continued from an upper surface of the pull-out transfer base to the upper surface of the foundation bottom and includes a sliding surface having a height set at a level L1, a sliding structure that is formed between a lower surface of the pull-out transfer base and the ground and includes a sliding surface having a height set at a level L2
  • the second movement path includes a sliding structure that is
  • the smooth and stable conveyance can be performed, and it is possible to share the reinforcement or the like of the ground. Furthermore, by using a sliding structure of a level L4 higher than the level L1 in carrying in a new blast furnace and a new foundation from the pull-in transfer base, it is possible to carry in the new blast furnace and the new foundation onto the upper surface of the restoration foundation.
  • the pull-out transfer device includes a first movement path extending from the site foundation toward a site where the new furnace construction step is performed, a second movement path extending in the intersection direction from a halfway of the first movement path, and an pull-out transfer base that is movable from the first movement path to the second movement path
  • the first movement path includes a sliding structure that is continued from an upper surface of the pull-out transfer base to the upper surface of the foundation bottom and includes a sliding surface having a height set at a level L1
  • the second movement path includes a sliding structure that is formed between the lower surface of the pull-out transfer base and the ground, is continued with the sliding structure of the level 2 of the first movement path in the intersection direction, and includes a sliding surface having a height set at the level L2
  • the pull-in transfer device includes a third movement path extending from
  • the pull-out transfer device includes a first movement path extending from the site foundation toward a site where the new furnace construction step is performed, a second movement path extending in the intersection direction from a halfway of the first movement path, a branch base installed on the ground along the second movement path, a branch transfer base that is movable along the branch base, and an intermediate base that is connected to the site foundation and the branch base along the first movement path
  • the first movement path includes a sliding structure that is continued from an upper surface of the branch transfer base to the upper surface of the foundation bottom via the upper surface of the intermediate base and includes a sliding surface having a height set at a level L1
  • the second movement path includes a sliding structure that is formed between a lower surface of the branch transfer base and an upper surface of the branch base and includes a sliding surface having a height set at a level L3'
  • the pull-in transfer device includes a third movement path extending from the new foundation toward the site foundation, a construction base that supports the new foundation, and an
  • the new furnace proper or the new foundation is controllably slid by the sliding structure of the level L4 and can be directly carried in onto the site foundation.
  • the new blast furnace and the new foundation can be carried in onto the upper surface of the restoration foundation.
  • the new blast furnace and the new foundation can be carried in onto the upper surface of the restoration foundation.
  • the pull-in transfer device includes: a guide groove which is continued in a conveying direction on a fixed side of the sliding structure; and a guide block engaged with the guide groove on a movement side, the guide block being installed at two front and rear positions in a traveling direction of the movement side.
  • the guide block by the engagement of the guide groove with the guide block, even when the movement side of the pull-in transfer device somehow tends to move in a direction other than a predetermined conveying direction, since the vertical load applied to the movement side is heavy enough (i.e. the weight of the entire blast furnace), the guide block cannot go out beyond the step of the guide groove. Therefore, since the guide block is maintained in the guide groove and the guide is continued, the movement side is movable only in a predetermined conveying direction, thus ensuring stability and high accuracy of the conveyance.
  • the pull-in transfer device includes an accuracy of a horizontal error of 3 mm or less per 1 m of movement.
  • the conveyance of a new foundation, a new furnace proper and a new furnace tower structure in the new furnace pull-in step as described above has high accuracy and stability, it is possible to sufficiently suppress the deformation or the like that occurs in the new furnace proper and the new furnace tower structure on the new foundation, and it is possible to perform the safe conveyance with high accuracy.
  • the invention by limiting the work on the foundation to the old furnace pull-out step and the new furnace pull-in step, it is possible to limit the revamping construction period of the blast furnace mainly to the construction periods of the old furnace pull-out step and the new furnace pull-in step. Thus, it is possible to significantly shorten the revamping construction period.
  • the invention can provides a method for revamping a blast furnace capable of performing the removal of the old furnace proper and the old furnace tower structure, and the construction of the new furnace proper and the new furnace tower structure in a short period of time.
  • FIG. 1 Each drawing of Figs. 1 to 4 illustrates an outline of a blast furnace revamping process performed in this exemplary embodiment ( Fig. 1 ), a plane arrangement of a working site used in the revamp ( Fig. 2 ), an old furnace pull-out step ( Fig. 3 ), and a new furnace pull-in step ( Fig. 4 ).
  • a blast furnace revamped in this exemplary embodiment (an old blast furnace 10) is installed on a blast furnace installation site P1.
  • an old furnace proper 11 and an old furnace tower structure 12 are constructed on a site foundation 13.
  • the site foundation 13 is rectangular in a plan view, and a new furnace construction site P2 is set on an axis A1 perpendicular to a middle point of its one side.
  • a new blast furnace 20 including a new furnace proper 21 and a new furnace tower structure 22 is constructed on an upper surface of a new foundation 23.
  • An old furnace dismantling site P3 is set on an axis A2 extending in an orthogonal direction from an intermediate position of the axis A1 that connects the new furnace construction site P2 and the blast furnace installation site P1.
  • a new furnace construction step S2 starts in the new furnace construction site P2, and the new furnace proper 21 and the new furnace tower structure 22 to be the new blast furnace 20 are constructed on the new foundation 23.
  • a furnace volume of the new furnace proper 21 is enlarged to be larger than a furnace volume of the old furnace proper 11. Therefore, a span of the new furnace tower structure 22 is wider than the span of the old furnace tower structure 12.
  • auxiliary facilities such as control equipment and wiring and piping are outfitted in the new blast furnace 20 on the new foundation 23.
  • a foundation segmentation step S3 of segmenting the site foundation 13 of the old blast furnace 10 in operation into a foundation top 14 and a foundation bottom 15 is performed.
  • a blow-out S4 is performed in the old blast furnace 10, thereafter, an old furnace pull-out step S5 is performed, and the foundation top 14, on which the old blast furnace 10 including the old furnace proper 11 and the old furnace tower structure 12 is carried, is conveyed to the old furnace dismantling site P3.
  • the foundation top 14 carrying the old blast furnace 10 is carried out in a direction of the axis A1 (sometimes referred to as axis A1 (A2, A3...) direction hereinafter), is moved along the axis A2 by changing the direction, and is conveyed to the old furnace dismantling site P3.
  • the new furnace construction step S2 is continued.
  • a new furnace pull-in step S6 is performed subsequent to the old furnace pull-out step S5.
  • a new foundation 23 carrying the new blast furnace 20 in the new furnace construction step S2 is moved in an axis A1 direction and is carried in on the foundation bottom 15 after removal of the foundation top 14 and the old blast furnace 10.
  • the new blast furnace 20 When the new blast furnace 20 is carried in onto the foundation bottom 15, the connection of piping and wiring to the new furnace proper 21 and the new furnace tower structure 22 is performed to complete the new blast furnace 20. Further, the blast furnace is blown in to start a new blast furnace operation S7 using the new blast furnace 20.
  • the foundation top 14 and the old blast furnace 10 carried out in the old furnace pull-out step S5 are sequentially dismantled by performing the old furnace dismantling step S8 in the old furnace dismantling site P3.
  • the new blast furnace operation S7 is separately initiated in the blast furnace installation site P1, and the old furnace dismantling step S8 can be performed independently of the operation of the blast furnace and can be gradually progressed depending on a desired schedule.
  • Figs. 5 to 8 illustrate details of the foundation segmentation step S3 in this exemplary embodiment.
  • the site foundation 13 installed on the blast furnace installation site P1 is horizontally cut at a level L1 and is segmented into a foundation top 14 and a foundation bottom 15.
  • the old blast furnace 10 (having the old furnace proper 11 and the old furnace tower structure 12) is constructed on the site foundation 13.
  • the segmented foundation top 14 is horizontally movable integrally with the old blast furnace 10 constructed on the upper surface.
  • the foundation bottom 15 is left while being fixed on the blast furnace installation site P1.
  • a plurality of strip-shaped cut compartments (in a plan view) along the axis A1 described above may be initially set on the site foundation 13 and the horizontal cutting using a wire saw is sequentially performed for each cut compartment. It is possible to use the procedure described in Patent Literature 2 described above.
  • each cut compartment (T1, T2, T3,%) of a side surface (a side surface facing the new furnace construction site P2 or an opposite side surface) of the site foundation 13 is bored with a drill at positions of each boundary (B1, B2,...) to form a through-hole 91 which passes through the site foundation 13 in the axis A1 direction.
  • a guide member 92 such as an H-beam is installed in the through-hole 91, and wire saws 93 are held at heights of an upper flange and a lower flange of the guide member.
  • the wire saws 93 can horizontally cut a material (a brick forming the site foundation 13) of the cut compartment T2 interposed between the boundaries B1 and B2, for example, by being mounted to move through and around the two through-holes 91 of the positions of the boundaries B1 and B2.
  • the site foundation 13 is segmented into the foundation top 14 and the foundation bottom 15 in the cut compartment T2. Further, between the foundation top 14 and the foundation bottom 15, a cavity 94 is formed after removal of the cut material having a predetermined thickness.
  • a fixed side sliding plate 81, a movement side sliding plate 82 and a high pack anchor 95 are installed in the cavity 94.
  • the fixed side sliding plate 81 is laid on the bottom surface of the cavity 94, that is, the upper surface of the foundation bottom 15.
  • a stainless alloy or the like having a low friction coefficient is used as the fixed side sliding plate 81.
  • the movement side sliding plate 82 is installed on the upper surface of the fixed side sliding plate 81.
  • a low-friction lining 83 containing a solid lubricant is provided on a surface, which faces the fixed side sliding plate 81, of the movement side sliding plate 82.
  • the low-friction lining 83 it is possible to use a lining in which a solid lubricant, for example, fine powders if polytetrafluoroethylene resin (PTFE), molybdenum disulfide, graphite and the like are rigidly adhered on the surface of the substrate.
  • a solid lubricant for example, fine powders if polytetrafluoroethylene resin (PTFE), molybdenum disulfide, graphite and the like are rigidly adhered on the surface of the substrate.
  • a lining commercially available as a "PILLAR FLUOROGOLD PILLAR No. 4801 produced by NIPPON PILLAR PACKING Co., Ltd.” is usable.
  • the high pack anchor 95 is an elongated tough flexible bag having a length corresponding to the movement side sliding plates 82 and obtained by weaving aramid resin fibers or the like.
  • the high pack anchor 95 is disposed on the upper surface of the movement side sliding plate 82. Further, by filling a grout such as cement slurry therein, an upper surface of the high pack anchor 95 is pressed against a ceiling surface of the cavity 94, i.e., the lower surface of the foundation top 14.
  • the foundation top 14 is supported by the high pack anchor 95.
  • the load of the foundation top 14 can be transferred to the foundation bottom 15 via the high pack anchor 95, the movement side sliding plate 82 and the fixed side sliding plate 81.
  • the movement side sliding plates 82 and the fixed side sliding plates 81 installed between the foundation top 14 and the foundation bottom 15 constitute a part of a conveying device that is used in an old furnace pull-out step S5, which will be described later.
  • the pull-out transfer device 30 is provided with an pull-out transfer base 31 that is movable along the axis A1 from the vicinity of the site foundation 13 (see Fig. 3 ), and a branch transfer base 32 that is movable along the axis A2 from a halfway of a movement path of the pull-out transfer base 31 (see Fig. 3 ).
  • the pull-out transfer base 31 is a flat platform formed by a steel frame shaft assembly or the like, and a sliding structure 42 is provided between its lower surface and the ground.
  • the upper surface of the pull-out transfer base 31 is set at the same height as the upper surface of the foundation bottom 15, and a sliding structure 41 which is continued from the upper surface of the pull-out transfer base 31 to the upper surface of the foundation bottom 15 is provided.
  • a sliding surface height of the sliding structure 41 is set at a level L1
  • a sliding surface height of the sliding structure 42 is set at a level L2.
  • the branch transfer base 32 is a flat platform formed by a steel frame shaft assembly or the like, and is installed in a recess 33 in the axis A2 direction formed in the ground.
  • One end of the recess 33 is disposed in a path that connects the blast furnace installation site P1 and the new furnace construction site P2, and the other end thereof is disposed in the old furnace dismantling site P3.
  • a sliding structure 43 is installed between the bottom surface of the recess 33 and the lower surface of the branch transfer base 32.
  • the sliding surface height of the sliding structure 43 is set at a level L3.
  • the upper surface of the branch transfer base 32 is set at the same height as the ground. Although the majority of above-mentioned sliding structure 42 is installed on the ground, a part thereof is installed on the upper surface of the branch transfer base 32.
  • the sliding structure 41 provided on the upper surface of the pull-out transfer base 31 is configured by utilizing the fixed side sliding plate 81 described in Fig. 7 and the movement side sliding plate 82 with the low-friction lining 83 provided thereon.
  • the fixed side sliding plate 81 of the sliding structure 41 is continuously installed from the upper surface of the foundation bottom 15 to the upper surface of the pull-out transfer base 31.
  • the movement side sliding plate 82 of the sliding structure 41 is installed on the lower surface of the foundation top 14 to slide with respect to the fixed side sliding plate 81 of the sliding structure 41.
  • the foundation top 14 can be horizontally carried out along the sliding surface of the level L1 and can be placed on the upper surface of the pull-out transfer base 31.
  • the sliding structure 42 on which the pull-out transfer base 31 (see Fig. 8 ) slides includes the fixed side sliding plate 81 described in Fig. 7 , and a movement side sliding plate 82 with the low-friction lining 83 provided thereon.
  • the fixed side sliding plate 81 of the sliding structure 42 is continuously installed from the vicinity of the foundation bottom 15 to the upper surface of the branch transfer base 32.
  • the movement side sliding plate 82 of the sliding structure 42 is installed on the lower surface of the pull-out transfer base 31 to slide with respect to the fixed side sliding plate 81 of the sliding structure 42.
  • the pull-out transfer base 31 with the foundation top 14 placed thereon can be horizontally carried out along the sliding surface of the level L2 and can be placed on the upper surface of the branch transfer base 32.
  • the sliding structure 43 on which the branch transfer base 32 slides includes the fixed side sliding plate 81 described in Fig. 7 , and the movement side sliding plate 82 with the low-friction lining 83 provided thereon.
  • the fixed side sliding plate 81 of the sliding structure 43 is continuously disposed from one end to the other end of the recess 33.
  • the movement side sliding plate 82 of the sliding structure 43 is installed on the lower surface of the branch transfer base 32 to slide with respect to the fixed side sliding plate 81 of the sliding structure 43.
  • the branch transfer base 32 on which the foundation top 14 and the pull-out transfer base 31 are mounted can be horizontally carried out along the sliding surface of the level L2 and can be conveyed to the old furnace dismantling site P3.
  • the sliding structure 42 is placed on the ground, and the sliding structure 43 is installed on the bottom surface of the recess 33.
  • the ground and the bottom surface, on which the sliding structures 42 and 43 are installed, are subjected to ground improvement or the like so that sufficient rigidity is obtained to withstand the heavy load such as a furnace body of a blast furnace.
  • the reinforcing steel material 34 (see Fig. 12 ) that receives the sliding structures 42 and 43 is provided on the ground and the bottom surface.
  • a reinforcing steel material 34 such as an H-shaped steel having a flat upper surface is embedded on the ground on which the sliding structure 42 is installed.
  • a level adjustment rail 96 using a long steel plate is installed on the upper surface of the reinforcing steel material 34.
  • the fixed side sliding plate 81 of the sliding structure 42 is supported on the upper surface of the rail 96 at the level L2.
  • the similar reinforcing steel material 34 and the rail 96 are also installed on the bottom surface of the recess 33, on which the sliding structure 43 is installed, and the fixed side sliding plate 81 of the sliding structure 43 is supported at the level L3 by the reinforcing steel material 34 and the rails 96.
  • the sliding structure 42 is continuously disposed from the ground being in contact with the side surface of the foundation bottom 15 to the upper surface of the branch transfer base 32. However, when moving the branch transfer base 32 using the sliding structure 43, the fixed side sliding plate 81 of the sliding structure 42 is cut at an edge portion of the branch transfer base 32 (a dotted line portion in Fig. 12 ), and is separated from the sliding structure 42 outside the recess 33 remaining in the ground.
  • a guide structure 50 is installed in each of the sliding structures 42 and 43.
  • the above-described reinforcing steel material 34 is embedded in the ground, and the pull-out transfer base 31 is supported thereon.
  • the sliding structure 42 is provided between the upper surface of the reinforcing steel material 34 and the lower surface of the pull-out transfer base 31.
  • a guide groove 51 which is linearly continued along the longitudinal direction (the axis A1 direction of Fig. 2 ) of the sliding structure 42 is formed in the central one of the sliding structures 42 described above.
  • the guide groove 51 is deep enough to reach the reinforcing steel material 34 from the sliding structure 42.
  • a guide block 52 made of a steel capable of being housed in the guide groove 51 is provided on the lower surface of the pull-out transfer base 31.
  • the cross-sectional shapes of the guide block 52 and the guide grooves 51 are such that the respective tops have a rectangular shape and bottoms have a semi-circular shape, and a predetermined gap required for sliding is ensured between the respective contour shapes.
  • the cross-sectional shapes may be other shapes.
  • the guide block 52 is fixed to the two positions of the front side and the rear side in the movement direction, on the lower surface of the pull-out transfer base 31.
  • the guide structure 50 accurately maintains the orientation of the pull-out transfer base 31 in the continuous direction of the guide groove 51 (i.e. the axis A1 that is a conveying direction of the sliding structure 42). Further, since the engagement between the guide block 52 and the guide groove 51 is maintained even during movement when driving the pull-out transfer base 31 is driven in the conveying direction, the pull-out transfer base 31 can be accurately conveyed to an expected target position while the conveying direction is correctly regulated.
  • the pull-out transfer base 31 attempts to move in a direction other than the predetermined conveying direction for some reasons, since the vertical load applied to the pull-out transfer base 31 is a heavy weight of the entire blast furnace, the guide block 52 cannot go out beyond the step of the guide groove 51. Therefore, the guide block 52 is maintained in the guide groove 51 and the continuous guidance is provided, and the pull-out transfer base 31 is only movable in a predetermined conveying direction without meandering.
  • the old furnace pull-out step S5 by sequentially performing a first conveying operation, a second conveying operation and a third conveying operation described below using the pull-out transfer device 30 described above, the old blast furnace 10 located in the blast furnace installation site P1 is conveyed to the old furnace dismantling site P3.
  • the foundation top 14 and the old blast furnace 10 constructed on the top of the foundation top 14 are integrally carried out from the upper surface of the foundation bottom 15 and are moved to the upper surface of the pull-out transfer base 31.
  • any of traction from the front side in the traveling direction or propulsion from the rear side may be adopted, but it is preferred to perform, for example, the following traction.
  • a wire may be connected to the foundation top 14 and the foundation top may be pulled by a winch from the side of the new furnace construction site P2 side. It is possible to use a hydraulic jack such as a center hole jack or other driving sources in the traction.
  • the traction wire is inserted into a gap of the framework of the new foundation 23 or is pulled out of both sides of the new furnace construction site P2 so as to circumvent the new foundation 23.
  • Figs. 18 and 19 illustrate an example of a specific traction device.
  • a traction device 70 has four center hole jacks 71 installed in parallel on the ground near the new furnace construction site P2, and the respective pulled wires 72 extend to the site foundation 13 along the axis A1 which is in the carry-out conveying direction.
  • Such a traction device 70 is also used in the second and third conveying operations.
  • the center hole jack(s) 71 similar to the traction device 70 in the first conveying operation is installed on the ground near the new furnace construction site P2, the wires 72 extending in the axis A1 direction are connected to the pull-out transfer base 31 via the reaction force receiving member 73 and the pull-out transfer base is pulled.
  • the center hole jack(s) 71 similar to the traction device 70 in the first conveying operation is installed on the old furnace dismantling site P3, the wires 72 extending in the axis A2 direction are connected to the branch transfer base 32 via the reaction force receiving member 73 and the branch transfer base is pulled.
  • the old blast furnace 10 is conveyed from the blast furnace installation site P1 to the old furnace dismantling site P3 by the old furnace pull-out step S5 described above.
  • the new furnace pull-in step S6 the new blast furnace 20 constructed in the new furnace construction site P2 is transferred to the top of the foundation bottom 15 of the site foundation 13 after removal of the old blast furnace 10.
  • a part (a fixed side sliding plate 81 of Fig. 7 ) of the sliding structure 41 is left on the upper surface of the foundation bottom 15, and a part (the fixed side sliding plate 81 in Fig. 7 ) of the sliding structure 42 is left on the ground between the foundation bottom 15 and the recess 33. Further, a part (the fixed side sliding plate 81 in Fig. 12 ) of the sliding structure 43 is left in the recess 33 of the trace in which the branch transfer base 32 moves.
  • the pull-in transfer device 39 has an pull-in transfer base 38 that supports the new foundation 23, a sliding structure 44 that is continued from the bottom of the pull-in transfer base 38 to the front of the foundation bottom 15, a sliding structure 45 that is installed between the upper surface of the pull-in transfer base 38 and the lower surface of the new foundation 23, and a sliding structure 46 that is installed on the upper surface of the foundation bottom 15.
  • each of the sliding structures 44, 45 and 46 includes the same components (i.e. the fixed side sliding plate 81, the movement side sliding plates 82 and the low-friction lining 83 illustrated in Fig. 7 ) as the sliding structures 41 to 43 mentioned above, and the sliding structures 44, 45 and 46 continuously extend in the axis A1 direction (see Fig. 4 ).
  • the sliding structure 44 is formed between the lower surface of the pull-in transfer base 38 and the ground, and the fixed side formed on the ground is installed in succession to the front of the foundation bottom 15.
  • the recess 33 as described above is left at a halfway of the sliding structure 44.
  • the support member 35 is installed on the recess 33 to support the sliding structure 45 across the recess 33 over the entire surface.
  • the sliding structure 44 may use a part of the sliding structure 42 that is left on the ground between the foundation bottom 15 and the recess 33.
  • the sliding structure 44 below the pull-in transfer base 38 is constructed in advance when installing the pull-in transfer base 38.
  • the pull-in transfer base 38 is horizontally movable with the new foundation 23 and the new blast furnace 20 placed on the upper surface thereof from the new furnace construction site P2 to the front of the blast furnace installation site P1.
  • the height of the sliding surface of the sliding structure 44 is at the same level L2 as the sliding structure 42. However, when not using a part of the sliding structure 42, the height of the sliding surface may be at a different level.
  • the ground reinforcement using the reinforcing steel material 34 is performed.
  • the ground reinforcement using the reinforcing steel material 34 can be directly used.
  • the sliding structure 45 is installed between the lower surface of the new foundation 23 and the upper surface of the pull-in transfer base 38 in advance when installing the new foundation 23 on the pull-in transfer base 38.
  • the new foundation 23 is horizontally movable with respect to the pull-in transfer base 38.
  • the height of the sliding surface of the sliding structure 45 is at a level L4.
  • the level L4 is set higher than the level L1 of the sliding structure 41 described above.
  • the sliding structure 46 includes a fixed side installed on the upper surface of the foundation bottom 15, and a movement side (new foundation 23 side) of the sliding structure 45 described above.
  • the new foundation 23 is horizontally moved with respect to the pull-in transfer base 38 using the sliding structures 45 and 46, and is transferred to the upper surface of the foundation bottom 15.
  • the height of the sliding surface of the sliding structure 46 is at the same level L4 as the sliding structure 45.
  • a restoration foundation 26 that supports the sliding structure 46 is installed on the upper surface of the foundation bottom 15.
  • the fixed side sliding plate 81 (see Fig. 7 ) of the sliding structure 41 installed in the foundation segmentation step S3 is left on the upper surface of the foundation bottom 15 of the site foundation 13old furnace pull-out step.
  • the fixed side sliding plate 81 of the sliding structure 41 is removed.
  • the upper surface of the foundation bottom 15 exposed after removing the fixed side sliding plate 81 of the sliding structure 41 is a surface formed by a horizontal cutting with a wire saw in the foundation segmentation step S3, and the residual irregularities are inevitable. Therefore, the upper surface of the foundation bottom 15 is cut and removed over a predetermined thickness to smoothen and the upper surface of the foundation bottom 15.
  • the restoration foundation 26 is installed on the upper surface of the smoothened foundation bottom 15.
  • the restoration foundation 26 has a pad 84 installed on the upper surface of the foundation bottom 15, a pad liner 85 placed on the pad 84, and a base grout 86 that is filled around the pad 84 and is solidified.
  • the same level adjustment rail 96 as the rail installed on the upper surface of the reinforcing steel material 34 for ground reinforcement as described above is installed, and the sliding structure 46 is installed on an upper surface of the rail 96.
  • the pad 84 is intended to support the fixed side sliding plate 81 of the sliding structure 46 via the pad liner 85 and the rail 96, and is arranged on the upper surface the foundation bottom 15 at a predetermined interval along the continuous direction of the fixed side sliding plate 81.
  • the pad 84 is capable of supporting the weight of the fixed side sliding plate 81, by applying the deformation to the pad 84 by an operator, the sliding surface of the fixed side sliding plate 81 is adjusted to be a level L4.
  • a pad 84 anything can be used as long as a pad can support the weight of the fixed side sliding plate 81, is deformable in the installation stage and is cured by the passage of time from the installation or a predetermined process.
  • a grout with high viscosity or a thermosetting synthetic resin material it is possible to use.
  • the pad liner 85 is a shim (i.e. a back plate made of steel), the upper surface height of the rail 96 is aligned to a predetermined level by adding or subtracting a plurality of liners, and thus, the upper surface, i.e. the sliding surface of the fixed side sliding plate 81, is adjusted to the level L4.
  • the base grout 86 is made of a concrete or the like, and is filled around the pad 84 after the adjustment of the height of the fixed side sliding plate 81.
  • the base grout 86 is filled from the upper surface of the foundation bottom 15 to the height to cover the side surface of the rail 96, and the upper surface side of the rail 96 and the fixed side sliding plate 81 are kept exposed.
  • the restoration foundation 26 When the base grout 86 is solidified, the restoration foundation 26 is completed.
  • the restoration foundation 26 keeps the height of the fixed side sliding plate 81 at the adjusted height (i.e. in a state in which the sliding surface is at the level L4).
  • the fixed side sliding plate 81 of the sliding structure 46 is supported so that the sliding structure 46 is the level L4 of the sliding surface by the restoration foundation 26.
  • the movement side sliding plate 82 of the lower surface of the new foundation 23 installed as the sliding structure 45 comes into sliding contact with the fixed side sliding plate 81 of the upper surface of the foundation bottom 15 via the low-friction lining 83 provided on the surface of the movement side sliding plates, and thus, the function as the sliding structure 46 is obtained.
  • the new foundation 23 and the new blast furnace 20 can be conveyed to the top of the foundation bottom 15.
  • the sliding structures 44, 45 and 46 define the pull-in transfer device 39.
  • each of the sliding structures 44, 45 and 46 is adjusted with high accuracy so as to exhibit a horizontal error of 3 mm or less per 1 m of movement.
  • the guide structure 50 similar to that in the pull-out transfer device 30 is installed between the fixed side of the sliding structures 44, 45 and 46, and the new foundation 23 and the pull-in transfer base 38.
  • the posture during conveyance is stabilized, and it is possible to convey the new blast furnace 20 into the correct position on the foundation bottom 15.
  • the new blast furnace 20 located at the new furnace construction site P2 is conveyed to the blast furnace installation site P1.
  • the pull-in transfer base 38 located at the new furnace construction site P2 is driven in the axis A1 direction (see Fig. 3 ) to cause a slide movement of the sliding structure 44 located at the level L2, thereby integrally and horizontally moving the new blast furnace 20, the new foundation 23 and the pull-in transfer base 38 and conveying the new blast furnace 20, the new foundation 23 and the introduction platform 38 from the new furnace construction site P2 to a position adjacent to the foundation bottom 15.
  • the new foundation 23 located above the pull-in transfer base 38 and being adjacent to the foundation bottom 15 is driven in the axis A1 direction (see Fig. 3 ) to cause the slide movement of the sliding structure 45 at the level L4 to slide, the new blast furnace 20 and the new foundation 23 are integrally and horizontally moved, are gradually transferred to the sliding structure 46 located at the same level L4, and are conveyed to the upper surface of the restoration foundation 26 formed on the foundation bottom 15 from the upper surface of the pull-in transfer base 38.
  • the new foundation 23 and the new blast furnace 20 are installed on the foundation bottom 15, and the new blast furnace 20 is completely carried in onto the blast furnace installation site P1.
  • the driving of the pull-in transfer base 38 and the new foundation 23 may be effected by the traction or propulsion, and it is possible to use the same structure as the traction device 70 (see Figs. 18 and 19 ) that is used in the above-described old furnace pull-out step S5.
  • the carried-in new foundation 23 and restoration foundation 26 are securely fixed until the new blast furnace operation S7.
  • fixation can be performed in a short period of time in parallel with the connection and the like of peripheral facilities of the new blast furnace 20.
  • the first exemplary embodiment provides the following effects.
  • the new furnace body 21 and the new furnace tower structure 22 as the new blast furnace 20 can be constructed on the new foundation 23 in a new furnace construction site P2 different from the blast furnace installation site P1 in an operating state (the old blast furnace operation S1) of the old blast furnace 10. Further, after performing the blow-out S4 of the old blast furnace 10, by performing the old furnace pull-out step S5 and the new furnace pull-in step S6, the foundation top 14 and the old blast furnace 10 (the old furnace proper 11 and the old furnace tower structure 12) can be removed from the top of the site foundation 13, and can be collectively replaced with the new foundation 23 and the new blast furnace 20 that are constructed in advance. The removed old blast furnace 10 can be appropriately disassembled in another old furnace dismantling site P3 while the new blast furnace 20 is re-operated (the new blast furnace operation S7).
  • the revamping construction period of the blast furnace can be shortened to about 50 to 70 days.
  • the furnace volume is not restricted to the dimensions of the old furnace tower structure 12 even when the furnace volume of the new furnace proper is greatly enlarged.
  • a large new furnace proper 21 which is not adapted to be housed in the old furnace tower structure 12, can be provided by constructing a new furnace tower structure 22 matching thereto in advance. Accordingly, it is possible to significantly increase the degree of freedom in enlarging the furnace volume.
  • the conveyed new furnace proper 21 can be integrally conveyed in a stable state by being supported on the new furnace tower structure 22, the process can be safely performed.
  • the conveyance of the new furnace pull-in step S6 can be performed.
  • the new foundation 23 and the new blast furnace 20 located in the new furnace construction site P2 can be conveyed to the top of the foundation bottom 15 of the blast furnace installation site P1.
  • the sliding structures 44, 45 and 46 are configured so that a fixed side sliding plate 81 over a long distance is used as a fixed side (lower side), a short movement side sliding plate 82 is used as a movement side, the plates are formed of a stainless steel alloy or the like having a low coefficient of friction, and a low-friction lining 83 including a solid lubricant is provided on the movement side sliding plate 82
  • a heavy weight e.g. exceeding 8,000 tons
  • each of the sliding structures 44, 45 and 46 is adjusted with high accuracy so that a horizontal error is 3 mm or less per 1 m of movement. Therefore, it is possible to sufficiently suppress the deformation or the like that occurs in the new furnace proper 21 and the new furnace tower structure 22 on the new foundation 23, and it is possible to perform the safe conveyance with high accuracy.
  • the guide grooves 51 are formed on the fixed sides of the sliding structures 44, 45 and 46 and the guide blocks 52 are formed and on and engaged with the lower surfaces of the new foundation 23 and the pull-in transfer base 38 as the movement side.
  • the guide is not disengaged by the large weight of new blast furnace 20, resulting in a stable attitude during conveyance, and it is possible to carry in the new blast furnace 20 to a precise position on the foundation bottom 15.
  • the conveyance of the new blast furnace 20 and the new foundation 23 is effected by the horizontal movement of the pull-in transfer base 38 at the level L2 using the sliding structure 44 and the horizontal movement at the level L4 using the sliding structures 45 and 46 reaching the upper surface of the foundation bottom 15 from the upper surface of the pull-in transfer base 38.
  • the new blast furnace 20 and the new foundation 23 are not raised and lowered at all, it is possible to shorten the revamping construction period accordingly.
  • the conveyance in the old furnace pull-out step S5 can be performed, that is, the foundation top 14 and the old blast furnace 10 located in the blast furnace installation site P1 can be conveyed to the old furnace dismantling site P3.
  • the pull-out transfer device 30 is conveyed along an L-shaped path in which the direction changes in the middle, and especially, a part of the path (i.e. a portion from the vicinity of the site foundation 13 to the recess 33) is superimposed with the pull-in transfer device 39.
  • a part of the path i.e. a portion from the vicinity of the site foundation 13 to the recess 33.
  • the new furnace proper 21 and the new furnace tower structure 22 a sufficient reinforcement is performed on the ground on which the carry-in conveying path is provided.
  • the carry-out conveying path there is a need for reinforcement of the ground to receive a heavy load of the foundation top 14, the old furnace proper 11 and the old furnace tower structure 12, and by partially sharing the carry-in conveying path with the carry-out conveying path, it is possible to reduce the work of the ground reinforcement as a whole.
  • the pull-out transfer device 30 extends from its middle to an intersection direction (the axis A2 direction), while partially sharing the path with the pull-in transfer device 39 (the axis A1 direction), it is possible to set the old furnace dismantling site P3 in a site different from the new furnace construction site P2, thereby avoiding interference of the working site.
  • the direction change from the axis A1 direction to the axis A2 direction in the pull-out transfer device 30 is achieved by placing the pull-out transfer base 31, which moves in the axis A1 direction, on the branch transfer base 32 which moves in the axis A2 direction.
  • a special mechanism for direction change or the like is unnecessary, it is possible to smoothly and reliably perform the work.
  • the recess 33 is formed in the axis A1 direction in which the branch transfer base 32 is to be moved, so that the branch transfer base 32 can be moved at the level L3 lower by one level than the level L2 at which the pull-out transfer base 31 moves.
  • the conveyance of the old blast furnace 10 and the foundation top 14 is effected by the horizontal movement at the level L1 of the sliding structure 41 from the upper surface of the foundation bottom 15 to the upper surface of the pull-out transfer base 31, the horizontal movement at the level L2 along the sliding structure 42 of the pull-out transfer base 31, and the horizontal movement at the level L3 along the sliding structure 43 of the branch transfer base 32.
  • each of the sliding structures 41, 42 and 43 is configured so that a fixed side sliding plate 81 over a long distance is used as a fixed side (a lower side), a short movement side sliding plate 82 is used as a movement side, the plates are formed of a stainless steel alloy or the like having a low coefficient of friction, and a low-friction lining 83 containing a solid lubricant is provided on the movement side sliding plate 82.
  • a heavy weight e.g. exceeding 8,000 tons
  • the cutting is sequentially performed in a plurality of cut compartments such that the high pack anchor is filled in the cut portion.
  • Figs. 25 and 26 illustrate a second exemplary embodiment of the invention.
  • this exemplary embodiment revamps a blast furnace by a general progression illustrated in Figs. 1 to 4 .
  • this exemplary embodiment is different from the above-described first exemplary embodiment in a configuration of a pull-out transfer device 30A that is used in the old furnace pull-out step S5. Therefore, in the following description, the repeated description of the common features is not provided, and the different portions will be described.
  • the pull-out transfer device 30 uses the recess 33 formed in the ground, the sliding structure 43 laid on the bottom surface thereof and the branch transfer base 32 moving within the recess 33 in order to perform the third conveying operation (conveyance in the axis A2 direction reaching the old furnace dismantling site P3).
  • the recess 33 and the branch transfer base 32 are omitted, and the third conveying operation is performed at the same level L2 as the second conveying operation.
  • the pull-out transfer device 30A is provided with the same pull-out transfer base 31 and sliding structures 41 and 42 as the above-described first exemplary embodiment.
  • the sliding structure 41 is set at the level L1
  • the sliding structure 42 is set at the level L2.
  • the sliding structure 42 is supported on the ground over the entire length and is reinforced with a reinforcing steel material 34 illustrated in Fig. 12 .
  • the sliding structure 43 is installed on the ground at the level L2 similarly to the sliding structure 42.
  • the pull-out transfer base 31 is conveyed in the axis A1 direction using the sliding structure 42 and reaches the intersection of the sliding structure 42 and the sliding structure 43. Further, in the third conveying operation, the pull-out transfer base 31 is conveyed from the intersection in the axis A2 direction using the sliding structure 43 and is sent to the old furnace dismantling site P3.
  • the upper surface serving as the sliding surface needs to be smoothly polished after individually welding each of the fixed side sliding plates 81. Therefore, it is desirable to suitably select which one of the first exemplary embodiment or the present exemplary embodiment to be employed in consideration of the work load or the like depending on the site conditions and the like.
  • this exemplary embodiment revamps the blast furnace by the general progression illustrated in Figs. 1 to 4 .
  • this exemplary embodiment is different from the above-described first exemplary embodiment in the configurations of an pull-out transfer device 30B used in the old furnace pull-out step S5 and an pull-in transfer device 39B used in the new furnace pull-in step S6.
  • the repeated description of the common features is omitted, and the different portions will be described.
  • the pull-out transfer device 30 (see Fig. 8 ) is equipped with the sliding structure 41 in the axis A1 direction (level L1), the sliding structure 42 in the same axis A1 direction (level L2) and the sliding structure 43 in the axis A2 direction (level L3) corresponding to each of the first to third conveying operations. Further, by setting the upper and lower surfaces of the pull-out transfer base 31 at the level L1 and the level L2, respectively, and by setting the level L3 below a predetermined height of the level L2 (i.e. by forming the recess 33 and laying the sliding structure 43 on its lower surface), the pull-out transfer base 31 is placed on the branch transfer base 32 to achieve the direction change in the axis A2 direction.
  • the pull-out transfer base 31 and the second conveying operation are omitted, as the first conveying operation, the foundation top 14 and the old blast furnace 10 are horizontally moved to the top of the branch transfer base 32 from the foundation bottom 15 in the axis A1 direction at the level L1, and as the third conveying operation, the branch transfer base 32 on which the foundation top 14 and the old blast furnace 10 are mounted is conveyed in the axis A2 direction at the level L3' lower than the level L1.
  • the pull-out transfer device 30B of this exemplary embodiment has the following features different from the above-described first exemplary embodiment.
  • an intermediate base 61 is installed on the ground toward the new furnace construction site P2 from the vicinity of the foundation bottom 15.
  • a front end of the intermediate base 61 facing the new furnace construction site P2 extends up to the front of the position at which the direction changes.
  • a branch base 62 is installed on the ground from the position of direction change toward the old furnace dismantling site P3 (see Fig. 3 ).
  • the branch transfer base 32 is placed on the top of the branch base 62.
  • the sliding structure 41 is installed between the upper surface of the foundation bottom 15 and the lower surface of the foundation top 14 as in the first exemplary embodiment, and its fixed side (the fixed side sliding plate 81 illustrated in Fig. 7 ) extends to the upper surface of the branch transfer base 32 from the upper surface of the foundation bottom 15 via the upper surface of the intermediate base 61.
  • the height of the sliding surface of the sliding structure 41 is set at the same level L1 as the first exemplary embodiment.
  • the same sliding structure 43 as the first exemplary embodiment is installed between the upper surface of the branch base 62 and the lower surface of the branch transfer base 32.
  • the height of the sliding surface of the sliding structure 43 is set at a level L3' lower by the height of the branch transfer base 32 than the level L1 of the sliding structure 41.
  • the sliding structure 43 is disposed on the lower surface of the recess 33 (see Fig. 8 ), and its sliding surface is at the level L3 lower than the ground surface in the first exemplary embodiment.
  • the level L3' of this exemplary embodiment is set at the upper surface of the branch base 62 installed on the ground, the level L3'is higher than the ground.
  • this exemplary embodiment is the same as the first exemplary embodiment in that the level L3' is lower than the height until then (the level L2 in the first exemplary embodiment, and the level L1 in this exemplary embodiment) by the height of the branch transfer base 32 used in the direction change.
  • the pull-in transfer device 39 (see Fig. 21 ) is equipped with a sliding structure 44 that allows slide movement of the bottom surface side of the pull-in transfer base 38 in order to perform the first conveying operation, and sliding structures 45 and 46 that allows the slide movement of the new foundation 23 with respect to upper surface of the pull-in transfer base 38 and the upper surface of the restoration foundation 26 in order to perform the second conveyance.
  • the first conveying operation that horizontally moves the pull-in transfer base 38 is omitted, and the second conveying operation is performed, in which the new foundation 23 and the new blast furnace 20 are horizontally moved directly from the top of the stand installed on the new furnace construction site P2 and are conveyed to the upper surface of the restoration foundation 26 in a single operation.
  • the pull-in transfer device 39B of this exemplary embodiment includes the following configurations different from the above-described first exemplary embodiment.
  • a construction base 63 is installed on the ground, and the new foundation 23 for constructing the new blast furnace 20 is supported on the upper surface of the construction base 63.
  • a sliding structure 45 having a height of a sliding surface at a level L4 is installed between the lower surface of the new foundation 23 and the upper surface of the construction base 63.
  • the intermediate base 61 and the branch base 62 of the pull-out transfer device 30B (see Fig. 27 ) used in the old furnace pull-out step S5, and the sliding structures 41 and 43 of each upper surface remain between the new furnace construction site P2 and the foundation bottom 15.
  • auxiliary bases 64 and 65 are placed on the intermediate base 61 and the branch base 62, respectively, so that the upper surface heights of the stands are the same as that of the construction base 63.
  • the restoration foundation 26 is also formed on the upper surface of the foundation bottom 15, and the height of the upper surface of the restoration foundation 26 is the same as that of the construction base 63.
  • the fixed side of the sliding structure 46 is laid from the upper surface of the restoration foundation 26 over the upper surfaces of the auxiliary bases 65 and 64.
  • the sliding structure 46 shares the movement side of the sliding structure 45 formed on the lower surface of the new foundation 23 (see Fig. 23 ).
  • the sliding surface of the sliding structure 46 is set at the level L4 and is connected to the end portion of the fixed side of the sliding structure 45 of the upper surface of the construction base 63 after installation, and it's the upper surface of the sliding structure 46 is smoothly finished.
  • the foundation top 14 and the old blast furnace 10 are conveyed from the top of the foundation bottom 15 to the top of the branch transfer base 32 using the sliding structure 41.
  • the branch transfer base 32 is conveyed to the old furnace dismantling site P3 (see Fig. 3 ) by using the sliding structure 43.
  • the new furnace pull-in step S6 after installation of the restoration foundation 26, the auxiliary bases 64 and 65 and the sliding structure 46, the new foundation 23 and the new blast furnace 20 are conveyed to the blast furnace installation site P1 at once.
  • branch base 62 and the branch transfer base 32 are used in the conveyance in the axis A2 direction, there is no need to perform the connection and polishing of a plurality of intersections between the sliding structure 42 and the sliding structure 43 as in the second exemplary embodiment.
  • Figs. 32 and 33 illustrate a fourth exemplary embodiment of the invention.
  • this exemplary embodiment revamps the blast furnace by each process described in Fig. 1 .
  • this exemplary embodiment is different from the above-described first to third exemplary embodiments in a planar arrangement of the blast furnace installation site P1, the new furnace construction site P2 and the old furnace dismantling site P3, and is also different in the arrangements of the carry-out conveying path used in the old furnace pull-out step S5 and the carry-in conveying path used in the new furnace pull-in step S6.
  • the new furnace construction site P2 is placed in the axis A1 direction with respect to the blast furnace installation site P1, and the old furnace dismantling site P3 is installed on the axis A2 extending in the intersection direction from the middle between the blast furnace installation site P1 and the new furnace construction site P2.
  • the new furnace construction site P2 and the old furnace dismantling site P3 are disposed opposite to each other with respect to the arrangement of Fig. 2 described above. Therefore, in this exemplary embodiment, the carry-out conveying path 30' from the blast furnace installation site P1 to the old furnace dismantling site P3 is linearly configured, and the carry-in conveying path 39' ranging from the new furnace construction site P2 to the blast furnace installation site P1 is configured in an L-shape that branches from a halfway of the carry-out conveying path 30' in the intersection direction.
  • the conveyance is performed as follows.
  • the site foundation 13 is segmented in the blast furnace installation site P1, and is linearly moved to the old furnace dismantling site P3 along the carry-out conveying path 30' integrally with the foundation top 14 and the old blast furnace 10 (the old furnace proper 11 and the old furnace tower structure 12) disposed thereon.
  • the new blast furnace 20 (the new furnace proper 21 and the new furnace tower structure 22) constructed in the new furnace construction site P2 is moved integrally with the new foundation 23 to the blast furnace installation site P1 along the carry-in conveying path 39'.
  • the new blast furnace 20 is moved along the axis A2 and along the axis A1 after the direction change.
  • the specific mechanism of the conveying device in the carry-out conveying path 30' and the carry-in conveying path 39' may be the same as the pull-out transfer devices 30, 30A and 30B and the pull-in transfer devices 39, 39A and 39B of each of the above-described exemplary embodiments, and the specific mechanism may be suitably designed in accordance with the configuration of the above-described first exemplary embodiment (using the levels L1 to L4), second exemplary embodiment (using the levels L1, L2 and L4) or third exemplary embodiment (using the levels L1, L3' and L4).
  • the fourth exemplary embodiment it is also possible to obtain the same effects as the first to third exemplary embodiments described above. However, the effect by the linear carry-in conveying path in the respective exemplary embodiments cannot be obtained.
  • Figs. 34 and 35 illustrate a fifth exemplary embodiment of the invention.
  • this exemplary embodiment revamps the blast furnace by each process described in Fig. 1 .
  • this exemplary embodiment is different from the above-described first to third exemplary embodiments in the planar arrangements of the blast furnace installation site P1, the new furnace construction site P2 and the old furnace dismantling site P3, and is also different in the arrangements of the carry-out conveying path used in the old furnace pull-out step S5 and the carry-in conveying path used in the new furnace pull-in step S6.
  • This exemplary embodiment is configured so that each of the carry-out conveying path 30' and the carry-in conveying path 39' performs the direction change in the middle.
  • the carry-out conveying path 30' extends from the blast furnace installation site P1 along the axis A1, is subjected to direction change in the middle, and extends upward in the drawings along the axis A2
  • the old furnace dismantling site P3 is located at an end portion.
  • the carry-in conveying path 39' extends from the blast furnace installation site P1 along the axis A1, is subjected to direction change in the middle, and extends downward in the drawings along the axis A2, and the new furnace construction site P2 is located at an end portion.
  • this exemplary embodiment is configured so that each of the carry-out conveying path 30' and the carry-in conveying path 39' is subjected to the direction change in the middle, and the path extending from the blast furnace installation site P1 along the axis A1 is shared by the carry-out conveying path 30' and the carry-in conveying path 39'.
  • the conveyance is performed as follows.
  • the site foundation 13 is segmented in the blast furnace installation site PI, and is moved to the blast furnace installation site P1 along the carry-out conveying path 30' integrally with the foundation top 14 and the old blast furnace 10 (the old furnace proper 11 and the old furnace tower structure 12) provided thereon.
  • the carry-out conveying path 30' the movement is initially performed along the axis A1, and the movement is performed along the axis A2 after the direction change toward the old furnace dismantling site P3.
  • the new blast furnace 20 (the new furnace proper 21 and the new furnace tower structure 22) constructed in the new furnace construction site P2 is moved integrally with the new foundation 23 to the blast furnace installation site P1 along the carry-in conveying path 39'.
  • the movement is initially performed along the axis A2 (toward the old furnace dismantling site P3), and the movement is performed along the axis A1 after the direction change toward the blast furnace installation site P1.
  • the specific mechanism of the conveying device in the carry-out conveying path 30' and the carry-in conveying path 39' may be configured in the same manner as the pull-out transfer devices 30, 30A and 30B and the pull-in transfer devices 39, 39A and 39B of each of the above-described exemplary embodiments, and the specific mechanism may be suitably designed in accordance with the configuration of the above-described first exemplary embodiment (using the levels L1 to L4), second exemplary embodiment (using the levels L1, L2 and L4) or third exemplary embodiment (using the levels L1, L3' and L4).
  • the angle of the direction change when changing the conveying direction in the middle, may be 45 degrees, 60 degrees or any other angle without being limited to 90 degrees.
  • the number of parts that perform the direction change in each conveying path such as the carry-out conveying path 30' and the carry-in conveying path 39' (i.e. the number of times of performing the direction change in one conveying path) may be two or more without being limited to one.
  • Figs. 36 and 37 illustrate a sixth exemplary embodiment of the invention.
  • this exemplary embodiment revamps the blast furnace by each process described in Fig. 1 .
  • this exemplary embodiment is different from the above-described first to third exemplary embodiments in the planar arrangements of the blast furnace installation site PI, the new furnace construction site P2 and the old furnace dismantling site P3 and is also different in the carry-out conveying path used in the old furnace pull-out step S5 and the carry-in conveying path used in the new furnace pull-in step S6.
  • the blast furnace installation site PI, the new furnace construction site P2 and the old furnace dismantling site P3 are arranged on a straight line along the axis A1.
  • the new furnace construction site P2 and the old furnace dismantling site P3 are located on the opposite side with respect to the blast furnace installation site P1.
  • each of the carry-out conveying path 30' and the carry-in conveying path 39' is linearly configured.
  • the carry-out conveying path 30' and the carry-in conveying path 39' are installed on the opposite sides with the blast furnace installation site P1 interposed therebetween, and have configurations independent of each other with no shared portion.
  • the conveyance is performed as follows.
  • the site foundation 13 is segmented in the blast furnace installation site PI, and is linearly moved to the old furnace dismantling site P3 along the carry-out conveying path 30' integrally with the foundation top 14 and the old blast furnace 10 (the old furnace proper 11 and the old furnace tower structure 12) disposed thereon.
  • the new blast furnace 20 (the new furnace proper 21 and the new furnace tower structure 22) constructed in the new furnace construction site P2 is linearly moved integrally with the new foundation 23 to the blast furnace installation site P1 along the carry-in conveying path 39'.
  • the specific mechanism of the conveying device in the carry-out conveying path 30' and the carry-in conveying path 39' may be the same as the pull-out transfer devices 30, 30A and 30B and the pull-in transfer devices 39, 39A and 39B of each of the above-described exemplary embodiments, and the specific mechanism may be suitably designed in accordance with the configuration of the above-described first exemplary embodiment (using the levels L1 to L4), second exemplary embodiment (using the levels L1, L2 and L4) or third exemplary embodiment (using the levels L1, L3' and L4).
  • the carry-out conveying path 30' and the carry-in conveying path 39' are linearly situated and independent of each other. Therefore, in this exemplary embodiment, the features (levels L3 and L3') for direction change as in the above-described exemplary embodiments can be omitted.
  • Figs. 38 and 39 illustrate a seventh exemplary embodiment of the invention.
  • this exemplary embodiment revamps the blast furnace by each process described in Fig. 1 .
  • this exemplary embodiment is different from the above-described first to third exemplary embodiments in the planar arrangements of the blast furnace installation site PI, the new furnace construction site P2 and the old furnace dismantling site P3, and is also different in the arrangements of the carry-out conveying path used in the old furnace pull-out step S5 and the carry-in conveying path used in the new furnace pull-in step S6.
  • each of the carry-out conveying path 30' and the carry-in conveying path 39' is linearly configured.
  • the carry-out conveying path 30' extends along the axis A1 direction
  • the carry-in conveying path 39' extends along an axis A3 (a diagonal direction of the rectangular site foundation 13) that forms an angle of 45 degrees with respect to the axis A1.
  • the new furnace construction site P2 can be set at a position different from the above-described sixth exemplary embodiment.
  • the sites can be arranged by changing the position of the new furnace construction site P2.
  • the carry-in conveying path 39' can be diagonally (the axis A3 is 30 degrees, 60 degrees, 120 degrees, 135 degrees or the like with respect to the axis A1) installed toward the site in which the new furnace construction site P2 can be defined.
  • An existing blast furnace foundation structure such as a reinforced concrete structure constructed on the ground of the blast furnace installation site P1 corresponds to the site foundation 13.
  • Such a site foundation 13 is segmented into the foundation top 14 and the foundation bottom 15 in the foundation segmentation step S3, it is desirable to select its segmented position in consideration of the internal reinforced concrete structure of the site foundation 13 or the like.
  • a slab-like foundation structure that extends in a planar manner may be used as the new foundation 23, and a steel frame shaft assembly structure or a structure partially filled with refractory filler such as castable refractory may be used.
  • the new foundation 23 is carried in onto the blast furnace installation site P1 to form the foundation of the new blast furnace 20, and the facility equipment and the piping and wiring such as cooling pipes required as the blast furnace function may be installed in advance.
  • the equipment to the new foundation 23 may be installed prior to the construction of the new furnace proper 21 and the new furnace tower structure 22 to the upper surface of the new foundation 23 or may be simultaneously installed.
  • the pull-out transfer base 31, the branch transfer base 32, the pull-in transfer base 38, the intermediate base 61, the branch base 62 and the construction base 63 in each exemplary embodiment is only necessary for the pull-out transfer base 31, the branch transfer base 32, the pull-in transfer base 38, the intermediate base 61, the branch base 62 and the construction base 63 in each exemplary embodiment to be capable of supporting the load of the foundation top 14 and the old blast furnace 10 supported on the upper surface or the new foundation 23 and the new blast furnace 20, and it is possible to use a steel frame shaft assembly structure.
  • the new furnace pull-in step S6 when conveying the new blast furnace 20 and the new foundation 23, it is required to minimize the deformation of the new furnace proper 21 and the new furnace tower structure 22 after the completion of outfitting. Therefore, in the pull-in transfer devices 39 and 39B relating to the conveyance of the new furnace proper 21 or the like, it is desirable to ensure the sufficient rigidity.
  • the pull-out transfer devices 30, 30A and 30B do not require such a high accuracy as that of the pull-in transfer devices 39 and 39B.
  • the fixed side sliding plate 81 and the movement side sliding plate 82 of Fig. 7 described above that the fixed side sliding plate 81 is a plate-shaped member continuous in the conveying direction, but the movement side sliding plate 82 may be intermittently arranged without being limited to be continuous in the conveying direction. Further, details thereof may be suitably changed as long as an expected sliding performance can be obtained by, for example, arranging a plurality of disk-shaped pads.
  • the movement side sliding plate 82 is provided with the low-friction lining 83.
  • the low-friction lining 83 may be provided on the fixed side sliding plate 81. Otherwise, the low-friction lining 83 may be omitted, the fixed side sliding plate 81 and the movement side sliding plate 82 are brought into direct sliding contact with each other, and lubricant having high lubricity under a high load may be supplied between each of the plates.
  • the low-friction lining 83 a lining in which the solid lubricant itself has a sheet shape or a film shape may be adopted without being limited to a lining obtained by rigidly adhering a solid lubricant, for example (e.g., fine powders such as polytetrafluoroethylene resin (PTFE), molybdenum disulfide and graphite) onto the surface of the substrate.
  • a solid lubricant for example (e.g., fine powders such as polytetrafluoroethylene resin (PTFE), molybdenum disulfide and graphite) onto the surface of the substrate.
  • the low-friction lining 83 may be omitted, and the solid lubricant may be dispersed in a viscous medium and may be supplied between the fixed side sliding plate 81 and the movement side sliding plate 82 in a form of grease.
  • the guide structure 50 is provided in each of the pull-out transfer devices 30, 30A and 30B and the pull-in transfer devices 39 and 39B to improve the accuracy of the conveyance axis.
  • a high accuracy is essential in the pull-in transfer devices 39 and 39B, the high accuracy is not required in the pull-out transfer devices 30, 30A and 30B.
  • each of the pull-out transfer devices 30, 30A and 30B and the pull-in transfer devices 39, 39A and 39B is provided, and the height levels L1 to L4 are set in each device.
  • the first exemplary embodiment using the levels L1 to L4
  • the second exemplary embodiment using the levels L1, L2 and L4
  • the third exemplary embodiment using the levels L1, L3' and L4 are defined, and the same height levels L1 to L4 are also used in the carry-out conveying path 30' and the carry-in conveying path 39' of the fourth to seventh exemplary embodiments.
  • the specific values of the height levels L1 to L4 may be appropriately set at the time of implementation. Further, it is also possible to add other levels depending on the intersection of the conveying paths or the like.
  • the level L4 (a level in which the restoration foundation 26 is installed on the upper surface of the smooth foundation bottom 15) at all times with respect to the basic level L1 (a level in which the site foundation 13 is horizontally cut and is segmented into the foundation top 14 and the foundation bottom 15), i.e. the formation of the new restoration foundation 26 by leveling the upper surface of the foundation bottom 15.
  • the branch transfer base 32 is supported via the sliding structure 43.
  • the ground that supports the sliding structure 43 is reinforced with the reinforcing steel material 34.
  • the pull-in transfer base 38 is supported on the upper surface of the branch transfer base 32 via the sliding structure 42.
  • the new foundation 23 is formed on the upper surface of the pull-in transfer base 38 via the sliding structure 45, and the new blast furnace 20 including the new furnace proper 21 and the new furnace tower structure 22 is formed on the new foundation 23.
  • the sliding surface (the sliding structure 43) of the branch transfer base 32 can be set at the level L3
  • the sliding surface (the sliding structure 42) of the pull-in transfer base 38 can be set at the level L2
  • the sliding surface (the sliding structure 45) of the new foundation 23 can be set at the level L4.
  • the invention is applicable as a method for revamping a blast furnace that performs the removal of an old furnace proper and an old furnace tower structure and the construction of a new furnace proper and a new furnace tower structure in a short period of time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Furnace Charging Or Discharging (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)

Claims (6)

  1. Procédé de réparation d'un haut fourneau qui comprend un corps de fourneau et une tour de corps de fourneau installés sur une fondation de site, le procédé comprenant :
    une étape de construction de nouveau fourneau (S2) dans laquelle est construite une nouvelle fondation (23) et sont construites une nouvelle structure de tour de fourneau (22) et un nouveau fourneau proprement dit (21) sur la nouvelle fondation (23) dans un nouveau site de construction de fourneau (P2) différent de la fondation de site (P1) ;
    une étape de segmentation de fondation (S3) dans laquelle la fondation de site est découpée horizontalement pour segmenter la fondation de site en une partie supérieure de fondation (14) sur laquelle sont montés l'ancien fourneau proprement dit (11) et l'ancienne structure de tour de fourneau (12), et en une partie inférieure de fondation (15), l'étape de construction de nouveau fourneau (S2) et l'étape de segmentation de fondation (S3) étant effectuées pendant que le haut fourneau fonctionne ;
    une étape de soufflage (S4) de haut fourneau ;
    une étape d'extraction d'ancien fourneau (S5) dans laquelle la partie supérieure de fondation (14) est extraite du haut de la partie inférieure de fondation (15) conjointement avec l'ancien fourneau proprement dit (11) et l'ancienne structure de tour de fourneau (12) ; et
    une étape d'installation de nouveau fourneau (S6) dans laquelle la nouvelle fondation (23) est installée sur la partie inférieure de fondation (15) conjointement avec la nouvelle structure de tour de fourneau (22)et le nouveau fourneau proprement dit (21).
    dans lequel, dans l'étape d'installation de nouveau fourneau (S6), une fondation de restauration (26) est formée sur une surface supérieure de la partie inférieure de fondation (15), et la nouvelle fondation (23) est installée sur une surface supérieure de la fondation de restauration (26) conjointement avec la nouvelle structure de tour de fourneau (22)et le nouveau fourneau proprement dit (21) ;
    dans lequel, dans l'étape de construction de nouveau fourneau (S2), un dispositif de transfert d'installation (39, 39B) s'étendant linéairement depuis le nouveau site de construction de fourneau (P2) jusqu'à la fondation de site (P1), est utilisé,
    dans l'étape d'extraction d'ancien fourneau (S5), un dispositif de transfert d'extraction (30, 30A, 30B) est utilisé en s'étendant depuis la fondation de site (P1) vers un site (P2) où l'l'étape de construction de nouveau fourneau (S2) est réalisée, et s'étend depuis une position de changement de direction dans une direction d'intersection, et
    chacun du dispositif de transfert d'installation (39, 39B) et du dispositif de transfert d'extraction (30, 30A, 30B) comprend une structure coulissante (41, 42, 43, 44, 45, 46) utilisant un revêtement lubrifié solide à faible friction (83) entre une paire de plaques coulissantes (81, 82).
  2. Procédé de réparation d'un haut fourneau selon la revendication 1,
    dans lequel le dispositif de transfert d'extraction (30) comprend un premier trajet de déplacement s'étendant depuis la fondation de site (P1) vers le site (P2) où l'étape de construction de nouveau fourneau est réalisée, un deuxième trajet de déplacement s'étendant dans la direction d'intersection à mi-chemin du premier trajet de déplacement, une base de transfert d'extraction (31) déplaçable sur le premier trajet de déplacement, une base de transfert de branche (32) déplaçable dans le deuxième trajet de déplacement, et un évidement (33) qui est formé dans le sol le long du deuxième trajet de déplacement et logeant la base de transfert de branche (32),
    le premier trajet de déplacement comprend une structure coulissante (41) qui se prolonge d'une surface supérieure de la base de transfert d'extraction (31) vers la surface supérieure de la partie inférieure de fondation (15) et comprend une surface coulissante ayant une hauteur réglée à un niveau L1, une structure coulissante (42) qui est formée entre une surface inférieure de la base de transfert d'extraction (31) et le sol et comprend une surface coulissante ayant une hauteur réglée à un niveau L2, et une structure coulissante (42) qui est formée sur une surface supérieure de la base de transfert de branche (32) et comprend une surface coulissante ayant une hauteur réglée au niveau L2,
    le deuxième trajet de déplacement comprend une structure coulissante (43) qui est formée entre une surface inférieure de la base de transfert de branche (32) et une surface de fond de l'évidement (33) et comprend une surface coulissante ayant une hauteur réglée à un niveau L3,
    le dispositif de transfert d'installation (39) comprend un troisième trajet de déplacement s'étendant depuis la nouvelle fondation (23) vers la fondation de site (P1), une base de transfert d'installation (38) déplaçable sur le troisième trajet de déplacement et qui supporte la nouvelle fondation, et un élément de support (35) disposé dans l'évidement à mi-chemin du troisième trajet de déplacement,
    le troisième trajet de déplacement comprend une structure coulissante (44) qui est formée entre une surface inférieure de la base de transfert d'installation (38) et le sol, se prolonge au voisinage de la partie inférieure de fondation par l'intermédiaire d'une surface supérieure de l'élément de support et comprend une surface coulissante ayant une hauteur réglée au niveau L2, une structure coulissante (45) qui est formée entre une surface supérieure de la base de transfert d'installation (38) et une surface inférieure de la nouvelle fondation (23) et comprend une surface coulissante ayant une hauteur réglée à un niveau L4, et une structure coulissante (46) qui est formée entre la surface supérieure de la fondation de restauration (26) et la surface inférieure de la nouvelle fondation (23) et comprend une surface coulissante ayant une hauteur réglée au niveau L4, et
    les hauteurs des surfaces coulissantes des structures coulissantes ont une relation : niveau L4 > niveau L1 > niveau L2 > niveau L3.
  3. Procédé de réparation d'un haut fourneau selon la revendication 1,
    dans lequel le dispositif de transfert d'extraction (30A) comprend un premier trajet de déplacement s'étendant depuis la fondation de site (P1) vers un site (P2) où l'étape de construction de nouveau fourneau est réalisée, un deuxième trajet de déplacement s'étendant dans la direction d'intersection à mi-chemin du premier trajet de déplacement, et une base de transfert d'extraction (31) déplaçable depuis le premier trajet de déplacement vers le deuxième trajet de déplacement,
    le premier trajet de déplacement comprend une structure coulissante (41) qui se prolonge depuis une surface supérieure de la base de transfert d'extraction (31) vers la surface supérieure de la partie inférieure de fondation(15) et comprend une surface coulissante ayant une hauteur réglée à un niveau L1, et une structure coulissante (42) qui est formée entre une surface inférieure de la base de transfert d'extraction (31) et le sol et comprend une surface coulissante ayant une hauteur réglée à un niveau L2,
    le deuxième trajet de déplacement comprend une structure coulissante (42) qui est formée entre la surface inférieure de la base de transfert d'extraction (31) et le sol, se prolonge avec la structure coulissante du niveau 2 du premier trajet de déplacement dans la direction d'intersection, et comprend une surface coulissante ayant une hauteur réglée au niveau L2,
    le dispositif de transfert d'installation (39) comprend un troisième trajet de déplacement s'étendant depuis la nouvelle fondation (23) vers la fondation de site (P1), et une base de transfert d'installation (38) déplaçable sur le troisième trajet de déplacement et supporte la nouvelle fondation,
    le troisième trajet de déplacement comprend une structure coulissante (44) qui est formée entre la surface inférieure de la base de transfert d'installation (38) et le sol, se prolonge jusqu'au voisinage de la partie inférieure de fondation, et comprend une surface coulissante ayant une hauteur réglée au niveau L2, une structure coulissante (45) qui est formée entre la surface supérieure de la base de transfert d'installation (38) et la surface inférieure de la nouvelle fondation (23) et comprend une surface coulissante présentant une hauteur réglée à un niveau L4, et une structure coulissante (46) qui est formée entre la surface supérieure de la fondation de restauration (26) et la surface inférieure de la nouvelle fondation (23) et comprend une surface coulissante ayant une hauteur réglée au niveau L4, et
    les hauteurs des surfaces coulissantes des structures coulissantes ont une relation : niveau L4 > niveau L1 > niveau L2.
  4. Procédé de réparation d'un haut fourneau selon la revendication 1,
    dans lequel le dispositif de transfert d'extraction (30B) comprend un premier trajet de déplacement s'étendant depuis la fondation de site (P1) vers un site (P2) où l'étape de construction de nouveau fourneau est réalisée, un deuxième trajet de déplacement s'étendant dans la direction d'intersection à mi-chemin du premier trajet de déplacement, une base de branche (62) installée sur le sol le long du deuxième trajet de déplacement, une base de transfert de branche (32) déplaçable le long de la base de branche, et une base intermédiaire (61) qui est reliée à la fondation de site et à la base de branche le long du premier trajet de déplacement,
    le premier trajet de déplacement comprend une structure coulissante (41) qui se prolonge depuis une surface supérieure de la base de transfert de branche (32) vers la surface supérieure de la partie inférieure de fondation(15) par l'intermédiaire de la surface supérieure de la base intermédiaire (61) et comprend une surface coulissante ayant une hauteur réglée à un niveau L1,
    le deuxième trajet de déplacement comprend une structure coulissante (43) qui est formée entre une surface inférieure de la base de transfert de branche (32) et une surface supérieure de la base de branche (62) et comprend une surface coulissante ayant une hauteur réglée à un niveau L3',
    le dispositif de transfert d'installation (39B) comprend un troisième trajet de déplacement s'étendant depuis la nouvelle fondation vers la fondation de site, une base de construction (63) qui supporte la nouvelle fondation, et une base auxiliaire (64, 65) qui est installée sur le base de branche (62) et la base intermédiaire (61) à mi-chemin du troisième trajet de déplacement,
    le troisième trajet de déplacement comprend une structure coulissante (46) qui est formée entre une surface inférieure de la nouvelle fondation (23) et une surface supérieure de la base de construction (63), se prolonge jusqu'à une surface supérieure de la fondation de restauration (26) par l'intermédiaire d'une surface supérieure de la base auxiliaire (64, 65), et comprend une surface coulissante ayant une hauteur réglée au niveau L4, et
    les hauteurs des surfaces coulissantes des structures coulissantes ont une relation : niveau L4 > niveau L1 > niveau L3'.
  5. Procédé de réparation d'un haut fourneau selon l'une quelconque des revendications 1 à 4,
    dans lequel le dispositif de transfert d'installation (39, 39B) comprend : une rainure de guidage (51) qui se prolonge dans une direction de transport sur un côté fixe de la structure coulissante ; et
    un bloc de guidage (52) s'engageant avec la rainure de guidage sur un côté de déplacement, le bloc de guidage étant installé dans deux positions avant et arrière dans une direction de déplacement du côté de déplacement,
  6. Procédé de réparation d'un haut-fourneau selon l'une quelconque des revendications 1 à 5, dans lequel le dispositif de transfert d'installation (39, 39B) a une précision d'une erreur horizontale de 3 mm ou moins par 1 m de déplacement.
EP14832291.0A 2013-07-30 2014-07-29 Procédé de réparation de haut fourneau Not-in-force EP3029159B1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2013158324 2013-07-30
JP2013272269A JP5577450B1 (ja) 2013-07-30 2013-12-27 高炉の改修方法
PCT/JP2014/069944 WO2015016220A1 (fr) 2013-07-30 2014-07-29 Procédé de réparation de haut fourneau

Publications (3)

Publication Number Publication Date
EP3029159A1 EP3029159A1 (fr) 2016-06-08
EP3029159A4 EP3029159A4 (fr) 2017-04-05
EP3029159B1 true EP3029159B1 (fr) 2018-05-09

Family

ID=51579076

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14832291.0A Not-in-force EP3029159B1 (fr) 2013-07-30 2014-07-29 Procédé de réparation de haut fourneau

Country Status (7)

Country Link
EP (1) EP3029159B1 (fr)
JP (1) JP5577450B1 (fr)
KR (1) KR101665990B1 (fr)
CN (1) CN105408499B (fr)
BR (1) BR112016000677B1 (fr)
RU (1) RU2618978C1 (fr)
WO (1) WO2015016220A1 (fr)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109097516A (zh) * 2018-09-29 2018-12-28 中国冶集团有限公司 高炉大修工程更换高炉炉壳的施工方法
CN110592300A (zh) * 2019-08-29 2019-12-20 上海宝冶冶金工程有限公司 高炉炉壳的运输系统及方法
CN111422643B (zh) * 2020-03-31 2021-08-10 神华天津煤炭码头有限责任公司 装船机齿圈轴承的维护方法
CN114058750B (zh) * 2021-11-30 2022-10-14 中国十九冶集团有限公司 高炉整体水平推移的新旧基础搭接方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5213406A (en) * 1975-07-23 1977-02-01 Kawasaki Steel Corp Method of exchanging old furnace body with new one at relining of blas t furnaces
JPS5243709A (en) * 1975-10-02 1977-04-06 Sankiyuu Kk Building method of blast furnace
SU1028822A1 (ru) * 1981-11-04 1983-07-15 Украинский Государственный Институт По Проектированию Металлургических Заводов "Укргипромез" Способ реконструкции доменной печи и устройство дл его осуществлени
JPS58106036A (ja) * 1981-12-21 1983-06-24 山九株式会社 高層構造物の建設方法
SU1032149A1 (ru) * 1982-03-09 1983-07-30 Ордена Трудового Красного Знамени Центральный Научно-Исследовательский И Проектный Институт Строительных Металлоконструкций "Цниипроектстальконструкция" Способ реконструкции и ремонта доменной печи
SU1262015A1 (ru) * 1985-03-27 1986-10-07 Государственный Проектный Институт "Днепропроектстальконструкция" Способ реконструкции доменной печи
JP2006183105A (ja) * 2004-12-28 2006-07-13 Nippon Steel Corp 高炉炉体の撤去方法
JP2006283183A (ja) 2005-04-05 2006-10-19 Nippon Steel Engineering Co Ltd 高炉炉体の撤去方法
KR101322251B1 (ko) 2006-05-18 2013-10-28 신닛떼쯔 수미킨 엔지니어링 가부시끼가이샤 고로 노 저부의 해체 방법
JP4351288B2 (ja) * 2007-08-09 2009-10-28 新日鉄エンジニアリング株式会社 リングブロックの搬送装置および高炉炉体の改修方法
JP5213406B2 (ja) * 2007-10-05 2013-06-19 キヤノン株式会社 調整方法、露光装置、およびデバイス製造方法
JP4351290B2 (ja) * 2007-10-26 2009-10-28 新日鉄エンジニアリング株式会社 高炉の炉底構造
CN102146488B (zh) * 2010-02-09 2012-07-25 上海宝冶建设有限公司 用于高炉的模块化且一体化的拆卸和安装方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
KR101665990B1 (ko) 2016-10-13
JP5577450B1 (ja) 2014-08-20
JP2015045081A (ja) 2015-03-12
BR112016000677B1 (pt) 2020-03-31
EP3029159A1 (fr) 2016-06-08
CN105408499A (zh) 2016-03-16
CN105408499B (zh) 2017-08-15
RU2618978C1 (ru) 2017-05-11
EP3029159A4 (fr) 2017-04-05
WO2015016220A1 (fr) 2015-02-05
KR20160022941A (ko) 2016-03-02

Similar Documents

Publication Publication Date Title
EP3029159B1 (fr) Procédé de réparation de haut fourneau
EP3404142B1 (fr) Système structural de voie ferrée à dalles préfabriquées pour l'atténuation des vibrations et procédé de construction associé
US6260270B1 (en) Method and apparatus for short-term relining or construction of blast furnace
CN105507154B (zh) 预制梁吊装定位装置及其预制梁吊装施工方法
EP3384088B1 (fr) Système modulaire permettant la pose de lignes souterraines, de chemin de fer et de tramway
CN104908149A (zh) 磁浮直线轨道梁模板系统及使用方法
CN101688256B (zh) 环状构件的搬运装置和高炉炉体的大修方法
CN104895035A (zh) 垂直升船机大型承船厢高效安装方法及安装定位辅助工装装置
CN105201074A (zh) 用于钢结构滑移施工的替换支座及施工方法
CN108691277A (zh) 用于节段预制拼装梁在架设过程中定位的三维调整工装
CN104895336A (zh) 一种劲性混合结构钢梁的安装就位方法
JP2014025337A (ja) 仮設橋の施工方法及び該施工方法に用いるプレキャスト床版
CN102444406A (zh) 针梁式仰拱衬砌滑行模架及其施工方法
JP5854000B2 (ja) 装炭車軌条受台の更新方法
CN102937375A (zh) 一种烧结机尾部移动装置的安装方法
CN205347996U (zh) 预制梁吊装定位装置
JP6183800B2 (ja) コークス炉および装炭車軌条受台の設置方法
CN101683711B (zh) 大型机组成套设备在线改造安装方法
JP5970305B2 (ja) 管渠の布設方法
KR200350110Y1 (ko) 콘크리트 블럭의 지지 장치
CN102874231B (zh) 车辆移动系统及其铺设方法
KR20170001395A (ko) 높이 조절이 가능한 철제 거푸집을 이용한 콘크리트 주행로 시공방법
CN114396062A (zh) 一种边坡锚固机械化施工工法
CN104389624A (zh) 三维空间曲面组合式顶模架装置及方法
CN105648927A (zh) 通用型拱桥吊杆维修系统及施工方法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20160225

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20170302

RIC1 Information provided on ipc code assigned before grant

Ipc: C21B 7/00 20060101AFI20170224BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20171102

RAX Requested extension states of the european patent have changed

Extension state: BA

Extension state: ME

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

DAX Request for extension of the european patent (deleted)
AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 997625

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180515

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014025385

Country of ref document: DE

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20180509

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180809

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180809

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180810

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 997625

Country of ref document: AT

Kind code of ref document: T

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014025385

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180729

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180731

26N No opposition filed

Effective date: 20190212

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180731

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180731

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180731

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180731

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180729

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180809

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180729

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180509

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20140729

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180909

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220608

Year of fee payment: 9

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602014025385

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240201